SlideShare a Scribd company logo
Unit 3- Signaling & Control Systems
Lecture 3.1
Department of Civil Engineering, PCCOE, Pune – 411 044 1
Objectives; Principles of signaling; Classification and types of
signals; Control of movement of trains and monitoring; Track
circuiting; Interlocking of signals & points: necessity and
functions, methods of interlocking, devices for interlocking
(names & figures)
Signaling
Department of Civil Engineering, PCCOE, Pune – 411 044 2
Signalling consists of the systems, devices and means by
which trains are operated efficiently and tracks are used to
maximum extent, maintaining the safety of the passengers,
the staff and the rolling stock.
Department of Civil Engineering, PCCOE, Pune – 411 044 3
Need/Objectives of Signalling
The purpose of signalling and interlocking is primarily to control
and regulate the movement of trains safely and efficiently.
(a) To regulate the movement of trains so that they run safely at
maximum permissible speeds.
(b) To maintain a safe distance between trains that are running
on the same line in the same direction.
(c) To ensure the safety of two or more trains that have to cross
or approach each other.
(d) To provide facilities for safe and efficient shunting.
Department of Civil Engineering, PCCOE, Pune – 411 044 4
Objectives of Signalling
(e) To regulate the arrival and departure of trains from the
station yard.
(f) To guide the trains to run at restricted speeds during the
maintenance and repair of tracks.
(g) To ensure the safety of the train when it comes in contact
with road traffic at level crossings.
Department of Civil Engineering, PCCOE, Pune – 411 044 5
Classification of Signals
Railway signals can be classified based on different characteristics as below
Audible-Detonators
Visual-Hand signal, fixed signal
Department of Civil Engineering, PCCOE, Pune – 411 044 6
Classification of Signals
Characteristics
of operational
Signals-
audible and
visible signals.
Department of Civil Engineering, PCCOE, Pune – 411 044 7
Classification of Signals
Audible Signals- (Also called detonating signals) are such as
detonators and fog signals placed on the rails in cloudy and foggy weather
when hand or fixed signals are not visible.
-sound of detonator draws attention of the
driver to the proximity of the signals.
They are placed 400-500m ahead of the
signal to enable the driver to stop the train.
Visible Signals-
These signals are visible and draw the attention of the drivers because of
their strategic positions.
1. Hand signals
2. Fixed signals
Department of Civil Engineering, PCCOE, Pune – 411 044 8
Classification of Signals
Visible Signals-
1. Hand signals- done manually, given by flag or during night
using lamps with movable glass , guards or station master,
cabin man gives it. Red flag- STOP, Green flag- proceed, yellow-
proceed cautiously
2. Fixed signals
Functional characteristics-Fixed signals
Department of Civil Engineering, PCCOE, Pune – 411 044 9
Functional characteristics-Fixed signals
Department of Civil Engineering, PCCOE, Pune – 411 044 10
STOP or SEMAPHORE SIGNAL
The principle of design of semaphore signals is to show the stop
position of any failure that happens to be in the apparatus.
The signal mechanism is so arranged that in normal position it
indicates the Stop position.
Department of Civil Engineering, PCCOE, Pune – 411 044 11
Fixed Signals
Semaphore signals-Greek word-
Sema' means sign and 'phor' means
to bear.
A semaphore signal consists of a
movable arm pivoted on a vertical
post through a horizontal pin as
shown in Fig.
Semaphore stop signals are normally
provided as outer signals, home
signals, starter signals, advanced
starter signals, and warner signals.
Department of Civil Engineering, PCCOE, Pune – 411 044 12
Fixed Signals-
Semaphore signals-
• Lower quadrant semaphore signals
move only in the fourth quadrant
of a circle and have only two colour
aspects.
• In order to provide the drivers with
further information, multi-aspect
upper quadrant signalling (MAUQ)
is sometimes used on busy routes.
• These signals are operated by hand
levers or buttons located in a
central cabin near station master.
Department of Civil Engineering, PCCOE, Pune – 411 044 13
Stop signal in MAUQ, Signaling-
In this system, the arms of the
semaphore signals rest in three positions and
the signals have three colour aspects, namely
red, yellow, and green associated with the
horizontal, 45° above horizontal and vertical
directions, respectively.
Fixed Signals- Semaphore signals-
Permissive signal/ warner
or distant signal
• In order to ensure that trains
speed up safely, it is considered
necessary that warning be given
to drivers before they approach a
stop signal.
• In the case of a stop signal, the
driver has to stop the train when it
is in the ‘on’ position, but in the
case of a permissive signal, the
driver can pass through even
when it is in the ‘on’ position.
• The warner signal is similar to
semaphore signal in shape except
a v-notch at free end.
Department of Civil Engineering, PCCOE, Pune – 411 044 14
Permissive signal/
warner or distant signal
• Permissive signal—warner
Placed below outer signal
• In case a warner is fixed below
an outer signal the various
positions of the outer and
warner signals and their
corresponding indications are
given in Fig.
Department of Civil Engineering, PCCOE, Pune – 411 044 15
Department of Civil Engineering, PCCOE, Pune – 411 044 16
• These signals use coloured lights to indicate track conditions to the driver both
during the day and the night. The lights are fixed on a vertical post in such a way
that they are in line with the driver’s eye level.
• The system of interlocking is so arranged that only one aspect is displayed at a
time. Coloured light signals are normally used in suburban sections and sections
with a high traffic density. Coloured light signals can be of the following types.
Two-aspect, namely, green and red
(b) Three-aspect, namely, green, yellow, and red
(c) Four-aspect, namely, green, yellow (twice), and red.
• In India, mostly three-aspect or four-aspect coloured light signalling is used. In
the case of three-aspect signalling, green, yellow, and red lights are used.
• Green indicates ‘proceed’, yellow indicates ‘proceed with caution’, and red
indicates ‘stop’
Coloured light signals
Department of Civil Engineering, PCCOE, Pune – 411 044 17
Coloured light signals

More Related Content

Similar to RTH_3.1.pdf

Indian Railway Signals & Systems
Indian Railway Signals & SystemsIndian Railway Signals & Systems
Indian Railway Signals & Systems
Arbaz Kazi
 
AJAY CHAUHAN ppt
AJAY CHAUHAN  pptAJAY CHAUHAN  ppt
AJAY CHAUHAN ppt
Ajay Kumar
 
AJAY CHAUHAN ppt
AJAY CHAUHAN pptAJAY CHAUHAN ppt
AJAY CHAUHAN ppt
Ajay Kumar
 
railway presentation Ppt
railway presentation Pptrailway presentation Ppt
railway presentation Ppt
Sachin Singh
 
Signalling and Interlocking
Signalling and InterlockingSignalling and Interlocking
Signalling and Interlocking
srinivas2036
 
Uncover the Technology behind Indian Railways
Uncover the Technology behind Indian RailwaysUncover the Technology behind Indian Railways
Uncover the Technology behind Indian Railways
Nikita Khanna
 
Signaling system in metro systems and engineering
Signaling system in metro systems and engineeringSignaling system in metro systems and engineering
Signaling system in metro systems and engineering
ShubhamSharma775952
 
Next generation train positioning system
Next generation train positioning system  Next generation train positioning system
Next generation train positioning system
Shiv Mohan CEng, PMP, PGDBA ,MIRSE,MIEEE,MIET
 
10-Intersection Control ( Transportation and Traffic Engineering Dr. Sheriff ...
10-Intersection Control ( Transportation and Traffic Engineering Dr. Sheriff ...10-Intersection Control ( Transportation and Traffic Engineering Dr. Sheriff ...
10-Intersection Control ( Transportation and Traffic Engineering Dr. Sheriff ...
Hossam Shafiq I
 
Signalling System At railway
Signalling System At railwaySignalling System At railway
Signalling System At railway
Shikha Mishra
 
Basics of Metro Railway Signalling system
Basics of Metro Railway Signalling systemBasics of Metro Railway Signalling system
Basics of Metro Railway Signalling system
Bhaskar Kumar Dan
 
Surveillance and control systems for highway tunnels
Surveillance and control systems for highway tunnelsSurveillance and control systems for highway tunnels
Surveillance and control systems for highway tunnels
Sutikno Simanjuntak
 
signalling & Interlocking.pptx
signalling & Interlocking.pptxsignalling & Interlocking.pptx
signalling & Interlocking.pptx
Anujyadav514462
 
signals and GSM-R in railway ppt
signals and GSM-R in railway pptsignals and GSM-R in railway ppt
signals and GSM-R in railway ppt
Lokesh Gogia
 
Station yards
Station yardsStation yards
Station yards
jagadish108
 
Temporary Operations Working stage 1
Temporary Operations Working stage 1Temporary Operations Working stage 1
Temporary Operations Working stage 1
Abdul Rahim Mohd Yusoff
 
automation of railway gate using verilog, Documentation
automation of railway gate using verilog, Documentation  automation of railway gate using verilog, Documentation
automation of railway gate using verilog, Documentation
chendrashekar pabbaraju
 
Signals.pptx
Signals.pptxSignals.pptx
Signals.pptx
satish sajja
 
Indian railways traffic control (4)
Indian railways traffic control (4)Indian railways traffic control (4)
Indian railways traffic control (4)
Suraj Soni
 
Afasdhdfvjukgkrgdfbdzthgsdhgjjkvdxfhdfhfdh
AfasdhdfvjukgkrgdfbdzthgsdhgjjkvdxfhdfhfdhAfasdhdfvjukgkrgdfbdzthgsdhgjjkvdxfhdfhfdh
Afasdhdfvjukgkrgdfbdzthgsdhgjjkvdxfhdfhfdh
John Ajish
 

Similar to RTH_3.1.pdf (20)

Indian Railway Signals & Systems
Indian Railway Signals & SystemsIndian Railway Signals & Systems
Indian Railway Signals & Systems
 
AJAY CHAUHAN ppt
AJAY CHAUHAN  pptAJAY CHAUHAN  ppt
AJAY CHAUHAN ppt
 
AJAY CHAUHAN ppt
AJAY CHAUHAN pptAJAY CHAUHAN ppt
AJAY CHAUHAN ppt
 
railway presentation Ppt
railway presentation Pptrailway presentation Ppt
railway presentation Ppt
 
Signalling and Interlocking
Signalling and InterlockingSignalling and Interlocking
Signalling and Interlocking
 
Uncover the Technology behind Indian Railways
Uncover the Technology behind Indian RailwaysUncover the Technology behind Indian Railways
Uncover the Technology behind Indian Railways
 
Signaling system in metro systems and engineering
Signaling system in metro systems and engineeringSignaling system in metro systems and engineering
Signaling system in metro systems and engineering
 
Next generation train positioning system
Next generation train positioning system  Next generation train positioning system
Next generation train positioning system
 
10-Intersection Control ( Transportation and Traffic Engineering Dr. Sheriff ...
10-Intersection Control ( Transportation and Traffic Engineering Dr. Sheriff ...10-Intersection Control ( Transportation and Traffic Engineering Dr. Sheriff ...
10-Intersection Control ( Transportation and Traffic Engineering Dr. Sheriff ...
 
Signalling System At railway
Signalling System At railwaySignalling System At railway
Signalling System At railway
 
Basics of Metro Railway Signalling system
Basics of Metro Railway Signalling systemBasics of Metro Railway Signalling system
Basics of Metro Railway Signalling system
 
Surveillance and control systems for highway tunnels
Surveillance and control systems for highway tunnelsSurveillance and control systems for highway tunnels
Surveillance and control systems for highway tunnels
 
signalling & Interlocking.pptx
signalling & Interlocking.pptxsignalling & Interlocking.pptx
signalling & Interlocking.pptx
 
signals and GSM-R in railway ppt
signals and GSM-R in railway pptsignals and GSM-R in railway ppt
signals and GSM-R in railway ppt
 
Station yards
Station yardsStation yards
Station yards
 
Temporary Operations Working stage 1
Temporary Operations Working stage 1Temporary Operations Working stage 1
Temporary Operations Working stage 1
 
automation of railway gate using verilog, Documentation
automation of railway gate using verilog, Documentation  automation of railway gate using verilog, Documentation
automation of railway gate using verilog, Documentation
 
Signals.pptx
Signals.pptxSignals.pptx
Signals.pptx
 
Indian railways traffic control (4)
Indian railways traffic control (4)Indian railways traffic control (4)
Indian railways traffic control (4)
 
Afasdhdfvjukgkrgdfbdzthgsdhgjjkvdxfhdfhfdh
AfasdhdfvjukgkrgdfbdzthgsdhgjjkvdxfhdfhfdhAfasdhdfvjukgkrgdfbdzthgsdhgjjkvdxfhdfhfdh
Afasdhdfvjukgkrgdfbdzthgsdhgjjkvdxfhdfhfdh
 

More from SwapnilGorade1

ConstTech_Unit1.6.pptx
ConstTech_Unit1.6.pptxConstTech_Unit1.6.pptx
ConstTech_Unit1.6.pptx
SwapnilGorade1
 
Construction Technology
Construction TechnologyConstruction Technology
Construction Technology
SwapnilGorade1
 
CTRS unit 2_Lect 1.pptx
CTRS unit 2_Lect 1.pptxCTRS unit 2_Lect 1.pptx
CTRS unit 2_Lect 1.pptx
SwapnilGorade1
 
Virtual design element.ppt
Virtual design element.pptVirtual design element.ppt
Virtual design element.ppt
SwapnilGorade1
 
Virtual design element.ppt
Virtual design element.pptVirtual design element.ppt
Virtual design element.ppt
SwapnilGorade1
 
Road-Note-Method-No-4.ppt
Road-Note-Method-No-4.pptRoad-Note-Method-No-4.ppt
Road-Note-Method-No-4.ppt
SwapnilGorade1
 
ACT_unit1_3 QA QC_green conc.pdf
ACT_unit1_3 QA QC_green conc.pdfACT_unit1_3 QA QC_green conc.pdf
ACT_unit1_3 QA QC_green conc.pdf
SwapnilGorade1
 
ACT_unit1_2concrete properties_updated.pdf
ACT_unit1_2concrete properties_updated.pdfACT_unit1_2concrete properties_updated.pdf
ACT_unit1_2concrete properties_updated.pdf
SwapnilGorade1
 
Advance concrete technology.pdf
Advance concrete technology.pdfAdvance concrete technology.pdf
Advance concrete technology.pdf
SwapnilGorade1
 
ACT_unit2_1.pdf
ACT_unit2_1.pdfACT_unit2_1.pdf
ACT_unit2_1.pdf
SwapnilGorade1
 
scope of Infrastructure Engineering.pptx
scope of Infrastructure Engineering.pptxscope of Infrastructure Engineering.pptx
scope of Infrastructure Engineering.pptx
SwapnilGorade1
 
UNIT 2 Railway Engg.ppt
UNIT 2 Railway Engg.pptUNIT 2 Railway Engg.ppt
UNIT 2 Railway Engg.ppt
SwapnilGorade1
 
ConstTech_Unit 4.4.pdf
ConstTech_Unit 4.4.pdfConstTech_Unit 4.4.pdf
ConstTech_Unit 4.4.pdf
SwapnilGorade1
 
1_Project ID_01 poster.pdf
1_Project ID_01 poster.pdf1_Project ID_01 poster.pdf
1_Project ID_01 poster.pdf
SwapnilGorade1
 
Railway_Bridge_and_Tunnel_Engineering.pdf
Railway_Bridge_and_Tunnel_Engineering.pdfRailway_Bridge_and_Tunnel_Engineering.pdf
Railway_Bridge_and_Tunnel_Engineering.pdf
SwapnilGorade1
 

More from SwapnilGorade1 (15)

ConstTech_Unit1.6.pptx
ConstTech_Unit1.6.pptxConstTech_Unit1.6.pptx
ConstTech_Unit1.6.pptx
 
Construction Technology
Construction TechnologyConstruction Technology
Construction Technology
 
CTRS unit 2_Lect 1.pptx
CTRS unit 2_Lect 1.pptxCTRS unit 2_Lect 1.pptx
CTRS unit 2_Lect 1.pptx
 
Virtual design element.ppt
Virtual design element.pptVirtual design element.ppt
Virtual design element.ppt
 
Virtual design element.ppt
Virtual design element.pptVirtual design element.ppt
Virtual design element.ppt
 
Road-Note-Method-No-4.ppt
Road-Note-Method-No-4.pptRoad-Note-Method-No-4.ppt
Road-Note-Method-No-4.ppt
 
ACT_unit1_3 QA QC_green conc.pdf
ACT_unit1_3 QA QC_green conc.pdfACT_unit1_3 QA QC_green conc.pdf
ACT_unit1_3 QA QC_green conc.pdf
 
ACT_unit1_2concrete properties_updated.pdf
ACT_unit1_2concrete properties_updated.pdfACT_unit1_2concrete properties_updated.pdf
ACT_unit1_2concrete properties_updated.pdf
 
Advance concrete technology.pdf
Advance concrete technology.pdfAdvance concrete technology.pdf
Advance concrete technology.pdf
 
ACT_unit2_1.pdf
ACT_unit2_1.pdfACT_unit2_1.pdf
ACT_unit2_1.pdf
 
scope of Infrastructure Engineering.pptx
scope of Infrastructure Engineering.pptxscope of Infrastructure Engineering.pptx
scope of Infrastructure Engineering.pptx
 
UNIT 2 Railway Engg.ppt
UNIT 2 Railway Engg.pptUNIT 2 Railway Engg.ppt
UNIT 2 Railway Engg.ppt
 
ConstTech_Unit 4.4.pdf
ConstTech_Unit 4.4.pdfConstTech_Unit 4.4.pdf
ConstTech_Unit 4.4.pdf
 
1_Project ID_01 poster.pdf
1_Project ID_01 poster.pdf1_Project ID_01 poster.pdf
1_Project ID_01 poster.pdf
 
Railway_Bridge_and_Tunnel_Engineering.pdf
Railway_Bridge_and_Tunnel_Engineering.pdfRailway_Bridge_and_Tunnel_Engineering.pdf
Railway_Bridge_and_Tunnel_Engineering.pdf
 

Recently uploaded

5G Radio Network Througput Problem Analysis HCIA.pdf
5G Radio Network Througput Problem Analysis HCIA.pdf5G Radio Network Througput Problem Analysis HCIA.pdf
5G Radio Network Througput Problem Analysis HCIA.pdf
AlvianRamadhani5
 
OOPS_Lab_Manual - programs using C++ programming language
OOPS_Lab_Manual - programs using C++ programming languageOOPS_Lab_Manual - programs using C++ programming language
OOPS_Lab_Manual - programs using C++ programming language
PreethaV16
 
Mechatronics material . Mechanical engineering
Mechatronics material . Mechanical engineeringMechatronics material . Mechanical engineering
Mechatronics material . Mechanical engineering
sachin chaurasia
 
P5 Working Drawings.pdf floor plan, civil
P5 Working Drawings.pdf floor plan, civilP5 Working Drawings.pdf floor plan, civil
P5 Working Drawings.pdf floor plan, civil
AnasAhmadNoor
 
Open Channel Flow: fluid flow with a free surface
Open Channel Flow: fluid flow with a free surfaceOpen Channel Flow: fluid flow with a free surface
Open Channel Flow: fluid flow with a free surface
Indrajeet sahu
 
一比一原版(爱大毕业证书)爱荷华大学毕业证如何办理
一比一原版(爱大毕业证书)爱荷华大学毕业证如何办理一比一原版(爱大毕业证书)爱荷华大学毕业证如何办理
一比一原版(爱大毕业证书)爱荷华大学毕业证如何办理
nedcocy
 
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
ecqow
 
Software Engineering and Project Management - Introduction, Modeling Concepts...
Software Engineering and Project Management - Introduction, Modeling Concepts...Software Engineering and Project Management - Introduction, Modeling Concepts...
Software Engineering and Project Management - Introduction, Modeling Concepts...
Prakhyath Rai
 
Supermarket Management System Project Report.pdf
Supermarket Management System Project Report.pdfSupermarket Management System Project Report.pdf
Supermarket Management System Project Report.pdf
Kamal Acharya
 
Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...
Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...
Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...
PriyankaKilaniya
 
Accident detection system project report.pdf
Accident detection system project report.pdfAccident detection system project report.pdf
Accident detection system project report.pdf
Kamal Acharya
 
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Sinan KOZAK
 
smart pill dispenser is designed to improve medication adherence and safety f...
smart pill dispenser is designed to improve medication adherence and safety f...smart pill dispenser is designed to improve medication adherence and safety f...
smart pill dispenser is designed to improve medication adherence and safety f...
um7474492
 
ITSM Integration with MuleSoft.pptx
ITSM  Integration with MuleSoft.pptxITSM  Integration with MuleSoft.pptx
ITSM Integration with MuleSoft.pptx
VANDANAMOHANGOUDA
 
Generative AI Use cases applications solutions and implementation.pdf
Generative AI Use cases applications solutions and implementation.pdfGenerative AI Use cases applications solutions and implementation.pdf
Generative AI Use cases applications solutions and implementation.pdf
mahaffeycheryld
 
Applications of artificial Intelligence in Mechanical Engineering.pdf
Applications of artificial Intelligence in Mechanical Engineering.pdfApplications of artificial Intelligence in Mechanical Engineering.pdf
Applications of artificial Intelligence in Mechanical Engineering.pdf
Atif Razi
 
Tools & Techniques for Commissioning and Maintaining PV Systems W-Animations ...
Tools & Techniques for Commissioning and Maintaining PV Systems W-Animations ...Tools & Techniques for Commissioning and Maintaining PV Systems W-Animations ...
Tools & Techniques for Commissioning and Maintaining PV Systems W-Animations ...
Transcat
 
NATURAL DEEP EUTECTIC SOLVENTS AS ANTI-FREEZING AGENT
NATURAL DEEP EUTECTIC SOLVENTS AS ANTI-FREEZING AGENTNATURAL DEEP EUTECTIC SOLVENTS AS ANTI-FREEZING AGENT
NATURAL DEEP EUTECTIC SOLVENTS AS ANTI-FREEZING AGENT
Addu25809
 
SENTIMENT ANALYSIS ON PPT AND Project template_.pptx
SENTIMENT ANALYSIS ON PPT AND Project template_.pptxSENTIMENT ANALYSIS ON PPT AND Project template_.pptx
SENTIMENT ANALYSIS ON PPT AND Project template_.pptx
b0754201
 
Data Driven Maintenance | UReason Webinar
Data Driven Maintenance | UReason WebinarData Driven Maintenance | UReason Webinar
Data Driven Maintenance | UReason Webinar
UReason
 

Recently uploaded (20)

5G Radio Network Througput Problem Analysis HCIA.pdf
5G Radio Network Througput Problem Analysis HCIA.pdf5G Radio Network Througput Problem Analysis HCIA.pdf
5G Radio Network Througput Problem Analysis HCIA.pdf
 
OOPS_Lab_Manual - programs using C++ programming language
OOPS_Lab_Manual - programs using C++ programming languageOOPS_Lab_Manual - programs using C++ programming language
OOPS_Lab_Manual - programs using C++ programming language
 
Mechatronics material . Mechanical engineering
Mechatronics material . Mechanical engineeringMechatronics material . Mechanical engineering
Mechatronics material . Mechanical engineering
 
P5 Working Drawings.pdf floor plan, civil
P5 Working Drawings.pdf floor plan, civilP5 Working Drawings.pdf floor plan, civil
P5 Working Drawings.pdf floor plan, civil
 
Open Channel Flow: fluid flow with a free surface
Open Channel Flow: fluid flow with a free surfaceOpen Channel Flow: fluid flow with a free surface
Open Channel Flow: fluid flow with a free surface
 
一比一原版(爱大毕业证书)爱荷华大学毕业证如何办理
一比一原版(爱大毕业证书)爱荷华大学毕业证如何办理一比一原版(爱大毕业证书)爱荷华大学毕业证如何办理
一比一原版(爱大毕业证书)爱荷华大学毕业证如何办理
 
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
 
Software Engineering and Project Management - Introduction, Modeling Concepts...
Software Engineering and Project Management - Introduction, Modeling Concepts...Software Engineering and Project Management - Introduction, Modeling Concepts...
Software Engineering and Project Management - Introduction, Modeling Concepts...
 
Supermarket Management System Project Report.pdf
Supermarket Management System Project Report.pdfSupermarket Management System Project Report.pdf
Supermarket Management System Project Report.pdf
 
Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...
Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...
Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...
 
Accident detection system project report.pdf
Accident detection system project report.pdfAccident detection system project report.pdf
Accident detection system project report.pdf
 
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
 
smart pill dispenser is designed to improve medication adherence and safety f...
smart pill dispenser is designed to improve medication adherence and safety f...smart pill dispenser is designed to improve medication adherence and safety f...
smart pill dispenser is designed to improve medication adherence and safety f...
 
ITSM Integration with MuleSoft.pptx
ITSM  Integration with MuleSoft.pptxITSM  Integration with MuleSoft.pptx
ITSM Integration with MuleSoft.pptx
 
Generative AI Use cases applications solutions and implementation.pdf
Generative AI Use cases applications solutions and implementation.pdfGenerative AI Use cases applications solutions and implementation.pdf
Generative AI Use cases applications solutions and implementation.pdf
 
Applications of artificial Intelligence in Mechanical Engineering.pdf
Applications of artificial Intelligence in Mechanical Engineering.pdfApplications of artificial Intelligence in Mechanical Engineering.pdf
Applications of artificial Intelligence in Mechanical Engineering.pdf
 
Tools & Techniques for Commissioning and Maintaining PV Systems W-Animations ...
Tools & Techniques for Commissioning and Maintaining PV Systems W-Animations ...Tools & Techniques for Commissioning and Maintaining PV Systems W-Animations ...
Tools & Techniques for Commissioning and Maintaining PV Systems W-Animations ...
 
NATURAL DEEP EUTECTIC SOLVENTS AS ANTI-FREEZING AGENT
NATURAL DEEP EUTECTIC SOLVENTS AS ANTI-FREEZING AGENTNATURAL DEEP EUTECTIC SOLVENTS AS ANTI-FREEZING AGENT
NATURAL DEEP EUTECTIC SOLVENTS AS ANTI-FREEZING AGENT
 
SENTIMENT ANALYSIS ON PPT AND Project template_.pptx
SENTIMENT ANALYSIS ON PPT AND Project template_.pptxSENTIMENT ANALYSIS ON PPT AND Project template_.pptx
SENTIMENT ANALYSIS ON PPT AND Project template_.pptx
 
Data Driven Maintenance | UReason Webinar
Data Driven Maintenance | UReason WebinarData Driven Maintenance | UReason Webinar
Data Driven Maintenance | UReason Webinar
 

RTH_3.1.pdf

  • 1. Unit 3- Signaling & Control Systems Lecture 3.1 Department of Civil Engineering, PCCOE, Pune – 411 044 1 Objectives; Principles of signaling; Classification and types of signals; Control of movement of trains and monitoring; Track circuiting; Interlocking of signals & points: necessity and functions, methods of interlocking, devices for interlocking (names & figures)
  • 2. Signaling Department of Civil Engineering, PCCOE, Pune – 411 044 2 Signalling consists of the systems, devices and means by which trains are operated efficiently and tracks are used to maximum extent, maintaining the safety of the passengers, the staff and the rolling stock.
  • 3. Department of Civil Engineering, PCCOE, Pune – 411 044 3 Need/Objectives of Signalling The purpose of signalling and interlocking is primarily to control and regulate the movement of trains safely and efficiently. (a) To regulate the movement of trains so that they run safely at maximum permissible speeds. (b) To maintain a safe distance between trains that are running on the same line in the same direction. (c) To ensure the safety of two or more trains that have to cross or approach each other. (d) To provide facilities for safe and efficient shunting.
  • 4. Department of Civil Engineering, PCCOE, Pune – 411 044 4 Objectives of Signalling (e) To regulate the arrival and departure of trains from the station yard. (f) To guide the trains to run at restricted speeds during the maintenance and repair of tracks. (g) To ensure the safety of the train when it comes in contact with road traffic at level crossings.
  • 5. Department of Civil Engineering, PCCOE, Pune – 411 044 5 Classification of Signals Railway signals can be classified based on different characteristics as below Audible-Detonators Visual-Hand signal, fixed signal
  • 6. Department of Civil Engineering, PCCOE, Pune – 411 044 6 Classification of Signals Characteristics of operational Signals- audible and visible signals.
  • 7. Department of Civil Engineering, PCCOE, Pune – 411 044 7 Classification of Signals Audible Signals- (Also called detonating signals) are such as detonators and fog signals placed on the rails in cloudy and foggy weather when hand or fixed signals are not visible. -sound of detonator draws attention of the driver to the proximity of the signals. They are placed 400-500m ahead of the signal to enable the driver to stop the train. Visible Signals- These signals are visible and draw the attention of the drivers because of their strategic positions. 1. Hand signals 2. Fixed signals
  • 8. Department of Civil Engineering, PCCOE, Pune – 411 044 8 Classification of Signals Visible Signals- 1. Hand signals- done manually, given by flag or during night using lamps with movable glass , guards or station master, cabin man gives it. Red flag- STOP, Green flag- proceed, yellow- proceed cautiously 2. Fixed signals
  • 9. Functional characteristics-Fixed signals Department of Civil Engineering, PCCOE, Pune – 411 044 9
  • 10. Functional characteristics-Fixed signals Department of Civil Engineering, PCCOE, Pune – 411 044 10 STOP or SEMAPHORE SIGNAL The principle of design of semaphore signals is to show the stop position of any failure that happens to be in the apparatus. The signal mechanism is so arranged that in normal position it indicates the Stop position.
  • 11. Department of Civil Engineering, PCCOE, Pune – 411 044 11 Fixed Signals Semaphore signals-Greek word- Sema' means sign and 'phor' means to bear. A semaphore signal consists of a movable arm pivoted on a vertical post through a horizontal pin as shown in Fig. Semaphore stop signals are normally provided as outer signals, home signals, starter signals, advanced starter signals, and warner signals.
  • 12. Department of Civil Engineering, PCCOE, Pune – 411 044 12 Fixed Signals- Semaphore signals- • Lower quadrant semaphore signals move only in the fourth quadrant of a circle and have only two colour aspects. • In order to provide the drivers with further information, multi-aspect upper quadrant signalling (MAUQ) is sometimes used on busy routes. • These signals are operated by hand levers or buttons located in a central cabin near station master.
  • 13. Department of Civil Engineering, PCCOE, Pune – 411 044 13 Stop signal in MAUQ, Signaling- In this system, the arms of the semaphore signals rest in three positions and the signals have three colour aspects, namely red, yellow, and green associated with the horizontal, 45° above horizontal and vertical directions, respectively. Fixed Signals- Semaphore signals-
  • 14. Permissive signal/ warner or distant signal • In order to ensure that trains speed up safely, it is considered necessary that warning be given to drivers before they approach a stop signal. • In the case of a stop signal, the driver has to stop the train when it is in the ‘on’ position, but in the case of a permissive signal, the driver can pass through even when it is in the ‘on’ position. • The warner signal is similar to semaphore signal in shape except a v-notch at free end. Department of Civil Engineering, PCCOE, Pune – 411 044 14
  • 15. Permissive signal/ warner or distant signal • Permissive signal—warner Placed below outer signal • In case a warner is fixed below an outer signal the various positions of the outer and warner signals and their corresponding indications are given in Fig. Department of Civil Engineering, PCCOE, Pune – 411 044 15
  • 16. Department of Civil Engineering, PCCOE, Pune – 411 044 16 • These signals use coloured lights to indicate track conditions to the driver both during the day and the night. The lights are fixed on a vertical post in such a way that they are in line with the driver’s eye level. • The system of interlocking is so arranged that only one aspect is displayed at a time. Coloured light signals are normally used in suburban sections and sections with a high traffic density. Coloured light signals can be of the following types. Two-aspect, namely, green and red (b) Three-aspect, namely, green, yellow, and red (c) Four-aspect, namely, green, yellow (twice), and red. • In India, mostly three-aspect or four-aspect coloured light signalling is used. In the case of three-aspect signalling, green, yellow, and red lights are used. • Green indicates ‘proceed’, yellow indicates ‘proceed with caution’, and red indicates ‘stop’ Coloured light signals
  • 17. Department of Civil Engineering, PCCOE, Pune – 411 044 17 Coloured light signals