Unit 1
Infrastructure Engineering
A. Meaning & scope of Infrastructure
Engineering
INFRASTRUCTURE
INFRASTRUCTURE REPORT CARD
Grading Scale
EXCEPTIONAL
Fit for Future
GOOD
Adequate for Now MEDIOCRE
Requires Attention
POOR
At Risk
FAILING
Critical, Unfit for Purpose
Grades for different categories (2017)
Category Grade Category Grade
Aviation D Public Parks D+
Bridges C+ Railways B
Dams D Roads D
Drinking Water D Schools D+
Energy D+ Transit D-
Hazardous Waste D+ Solid Waste C+
Inland Waterways D Wastewater D+
Ports C+
Overall America’s
Infrastructure
D+
Activity
Go to the website
www.infrastructurereportcard.org
Browse (Don’t just scroll but read & understand)
through all the webpages on the site & think
over it.
See if you get any such infrastructure
assessment report for India.
Public Private Partnership (PPP)
• PPP is a long-term contract between two or
more private party and government entity, for
providing a public asset or service, in which
the private party bears significant risk and
management responsibility, and remuneration
is linked to performance.
• It is a funding model for public infrastructure
project
Definition as per Govt. of India
PPP is a partnership between a public sector
entity (sponsoring authority) and a private sector
entity (a legal entity in which 51% or more of
equity is with the private partner/s) for the
creation and/or management of infrastructure for
public purpose for a specified period of time
(concession period) on commercial terms and in
which the private partner has been procured
through a transparent and open procurement
system.
Basic types of PPP models
1. PPP Annuity
2. PPP Toll
3. EPC (Engineering, Procurement, Construction)
 Hybrid Annuity Model (HAM):
Specially developed for highway construction
(40% fixed annuity for first 5 years & then variable
annuity depending on performance of the asset
built)
Different PPP models
1. Design-Build (DB)
2. Operation & Maintenance (O&M)
3. Design-Build-Finance-Operate-Transfer (DBFOT)
4. Build-Own-Operate (BOO)
5. Build-Own-Operate-Transfer (BOOT)
6. Buy-Build-Operate (BBO)
7. Build-Lease-Operate-Transfer (BLOT)
Dedicated Right of Way
Busway alignment
Busway alignment

scope of Infrastructure Engineering.pptx

  • 1.
    Unit 1 Infrastructure Engineering A.Meaning & scope of Infrastructure Engineering
  • 2.
  • 3.
    INFRASTRUCTURE REPORT CARD GradingScale EXCEPTIONAL Fit for Future GOOD Adequate for Now MEDIOCRE Requires Attention POOR At Risk FAILING Critical, Unfit for Purpose
  • 4.
    Grades for differentcategories (2017) Category Grade Category Grade Aviation D Public Parks D+ Bridges C+ Railways B Dams D Roads D Drinking Water D Schools D+ Energy D+ Transit D- Hazardous Waste D+ Solid Waste C+ Inland Waterways D Wastewater D+ Ports C+ Overall America’s Infrastructure D+
  • 5.
    Activity Go to thewebsite www.infrastructurereportcard.org Browse (Don’t just scroll but read & understand) through all the webpages on the site & think over it. See if you get any such infrastructure assessment report for India.
  • 6.
    Public Private Partnership(PPP) • PPP is a long-term contract between two or more private party and government entity, for providing a public asset or service, in which the private party bears significant risk and management responsibility, and remuneration is linked to performance. • It is a funding model for public infrastructure project
  • 7.
    Definition as perGovt. of India PPP is a partnership between a public sector entity (sponsoring authority) and a private sector entity (a legal entity in which 51% or more of equity is with the private partner/s) for the creation and/or management of infrastructure for public purpose for a specified period of time (concession period) on commercial terms and in which the private partner has been procured through a transparent and open procurement system.
  • 8.
    Basic types ofPPP models 1. PPP Annuity 2. PPP Toll 3. EPC (Engineering, Procurement, Construction)  Hybrid Annuity Model (HAM): Specially developed for highway construction (40% fixed annuity for first 5 years & then variable annuity depending on performance of the asset built)
  • 9.
    Different PPP models 1.Design-Build (DB) 2. Operation & Maintenance (O&M) 3. Design-Build-Finance-Operate-Transfer (DBFOT) 4. Build-Own-Operate (BOO) 5. Build-Own-Operate-Transfer (BOOT) 6. Buy-Build-Operate (BBO) 7. Build-Lease-Operate-Transfer (BLOT)
  • 10.
  • 11.
  • 12.