1. Temporary Operations Working (Hand Signalling and Ground
frame Working) For Sentul Station During SRSB Stage Work 1.
1.Introduction:
This type of working had been used before on the KTMB System.
This working only applies to the Station Section during the
rebuilding, Construction and transition of works when building of
new station or reconstruction of new signaling system. This working
will be applied during emergencies and it is base on the Signalling
non interlock system which has certain provisions added to it as to
make safer and reliable for operations than the actual a non
interlock system as to avoid any occurrence of human errors. This
type of working is in accordance to the KTMB Rules & Regulations,
General Manuals and Standard Operations Procedures. This
working will enable the operations Department (Station Managers)
to monitor, planned and control the movements of all trains and
vehicles routed in and out of Sentul Station into the block section
safely without any disruption to train services.
2.Objectives:
• This is the Temporary Operations Working (Hand Signalling &
Ground Frame Working) where the departure and admission of
trains are carefully planned, Monitored and executed safely by
competent personnel’s of KTMB. This type of working have been
used before on KTMB network during several projects on going and
signalling interfacing and staging works without any mishap
recorded. This working will also ensure that no human error can
occur if it is done in accordance to these procedures, KTMB Rule &
Regulations, Safety Procedures, Standard Operations Procedures
and Station Working Order for emergencies. This working will also
ensure that there will be no disruptions to train services which are
utmost importance for the KTMB Operation Department. This
Temporary Operations Working (Hand Signalling & Ground Frame
working) will be used for a certain period till the staging work are
commissioned by stages from Stage work 1 through Stage work 2c
or until the implementation of the PBI interlocking.
• This working is needed due to transition work of the upgrading as
per on the site changes where signals and track circuits are
relocated to new temporary track, new installations of points,
signals, tracks and also due to changes of the interlocking which
are made as required for the movements of trains in and out of
Sentul Station safely without any disruption.
2. • SRSB will ensure the most minimum changes are made or required
and the ground frame working are made much safe and simple for
operations.( Points are set to normal or reverse by switching of
buttons from the existing station panel).The proceed and admission
signals in and out of Sentul Station are by Hand Signalling or by
Shunt signal only. Only during and after the upgrading works to the
interlocking as this is the most crucial and safety critical for the safe
movement of trains. This needs to be tested to ensure safety
certified and handover to KTMB Operation Department.
3. Signalling Philosophy:
The Hand Signalling and Ground Frame Working philosophy will be
integrated with the Railway Signalling Principles as to ensure safety
for the movements of trains routed in and out of Sentul Station
without any disruption or mishap. The Philosophy is as follows:
• Route Setting: Is to identify the track sections which the train or
vehicle are to be routed to, (Entrance and destination) are cleared
of any obstruction or no movement contrasting towards that
particular track sections. This can be monitored by the magnetic
tiles with the train configurations on them on the local Panel and
communications to Simpang Batu or CTC and Station Manager in
charge og Ground Frame Working.
• Points Call: The points will be set correctly by the switches at the
Local Panel or hand cranking to the normal or reverse position as
required by the route that are to be taken by the train. This is to be
check and certify by the Station Manager in charge of Ground
Frame Working.
• Points Detected:The points at the track sections that the trains or
vehicles are traveling are correctly set and detected means that the
points are clip lock, checked and certify by the Station Manger ground
frame, the padlock keys are handed over to the Station Manager of
Operations.
• Signal to proceed: When the route for the trains or vehicles are identify
and set, the points are call and detected than only the signal to proceed
is given via Shunt Signal or hand signaling by the Station Manager in
charge of Operations.
3. 4. Staffs For the Hand Signalling and Ground Frame
Working.
Competent Staffs for these working shall be provided by KTMB
Operations Department. This is the only department that has the
knowledge and trained personals for this working. All safe
movements of trains and vehicles and Station Working comes
under the jurisdiction of the Operations Department of KTMB. The
staffs needed are Station Managers and Points man.
5. Person In Charge of Possession.(PICOP).
This person will be appointed and assigned by
KTMB. He will arrange all matters of possession. (Line Blocks).He
does not have other responsibilities unless specifically agreed at
the pre planning meeting.
Duties of PICOP:
a. The PICOP must be familiar with the line and locations concern.
b The PICOP must have a good knowledge of the works and
movements of Engineering Train, vehicles and Mechineneries that
is going to
that place before he applies for the possession.
c He must update to the CTC Operator or The Station Manager on
the work and the movements of engineering train, vehicles and
mechineneries during the possession.
d The PICOP must ensure that all safety precautions have been
taken such as Signals and detonators protections, points clip and
spike, Warning Tape erected before applying for possession at the
Sentul Station.
e The PICOP must be in agreement with the CTC Operator or The
Station Manger in Charge `who is in control of the Signals leading
to the line or areas of works concern the actual time when the
possession may start.
f Once the Possession is granted by the CTC Operator or the Station
Manger by filling the Possession form. Details of the possession,
engineering train, rail vehicles and mechinenries must be recorded
in the Station Train Register Book and signed by the PICOP and
the Station Manager or The CTC Operator.
g The PICOP must retain the possession form until the possession is
given up.
4. h The PICOP must record details of the arrangements of the
possession and the time when work at each site starts and finishes
in the form KTMB 032.
i The CTC Operator or the Station Manager must not authorize any
work to start until the possession have been granted by them.
6. Certified SRSB personals as required as in accordance
to KTMB rule & regulations.
• Chief PICOW: Overall in charge of all the PICOW’s for SRSB
Works at all sites and will notify all SRSB work concerns to the
KTMB PICOP.
• PICOW: Person In Charge of work at SRSB Work site who will
oversee all safety concerns and will be notify all works to the Chief
PICOW.
• Look out man: will be placed at strategic placed at work sites and
carry out their duties as stipulated in KTMB Safety book under the
supervision of their PICOW.
7. Responsibilities of the Station Manager in charge of
Operations:
• The Station Manager in charge of operations shall be responsible
for the efficient discharge of duties devolving the staffs under his
orders at the station or within the station limits and such staffs shall
be subjected to his authority and direction in the working of this
Temporary Operations Working at Sentul Station.
• The Station Manager in charge of operations Shall be responsible
to see that the Temporary Operations Working of Sentul Station is
carried out strictly in accordance to the rule and regulations for the
time being in force, No other person than the Station Manager in
charge of Operations shall ask or give line clear, or give authority to
proceed,
• He will be responsible to monitor and operates the magnetic white
board or the station local panel and record all train movements in
the Train register book, He will always in constant contacts with the
CTC operator and Simpang Batu Signalman as for train movement.
5. • The Station Manager in charge of operations will hand over duties
to the next Station Manager in charge of operations taking over his
duty and to update on the Train movements and conditions of the
Sentull Station during that particular time.
8. Responsibilities of the Station Manager in charge of
Ground Frame work.
• The Station Manager in charge of Ground Frame will take orders
for all movements f trains and vehicles within the Sentul Station
Limits from the Sentul Station Manager in charge of Operations.
• The Station Manager in charge of Ground Frame Work shall be
responsible for the efficient discharge of his duties devolving the
staffs under his orders within the Ground Frame within the Sentul
Station Limits and certified that the points are set correctly and
ensure safety to the direction of the route of the train movement.
9. Responsibilities of the Points man for Hand Signalling
and Ground Frame Working.
The Point mans will adhere and understand to all instructions given
by the Station Mangers. If they do not understand, ask the Station
Managers to repeat the instructions again. Do not hesitate to do so
as this regards to safety.
10. Communications:
Hand Held Radios will be provided by SRSB as to avoid any
misconception between EMU Depot and Sentul Station train
movements. Any movements from EMU Depot to Sentul Station will
be by KTMB radios and vice versa.
6. 11. Example of Hand Signalling & Ground Frame Working
Communications and Work flow Chart:
Example of Acceptance of Emu from Klang enroute to
Sentul
Example of EMU departing From Platform N0:3 to Klang.
Example acceptance of the cement train Perak Hanjoong from
Pandang Rengas to Batu Caves.
Simpang Batu Signalman
Once He has given the line clear to Sentul Station Manager Operations he will
also set route for the EMU on the downline towards Putra halt.
Station Manager Ground Frame Sentul
Once notification receive from the Station Manager Operations Sebtul
he will set, clip and verify points107 reverse, 109a&c normal, 108a&b
normal 110a&b reverse for the departure of the EMU from platform
N0:3 Sentul and notify this to Station Manager Operations Sentul.
CTC Operator
Upon the arrival or the departure of the cement train Perak Hanjoong
at Kepong the CTC Operator will notify the Sentul Station Mananger
and the Simpang Batu Signalman as the traveling time is about 25
minutes to Sentul.
CTC Operator
Emu depart KLO or Bank Negara Halt the CTC
Operator will notify Station Manager Sentul. The
estimate traveling time is 10 to 12 minutes s per normal
direction
Station Manager ground Frame Sentul
Will set points 110a&b, 108a&b, 109a&c, 107, 106a&b to normal
position as EMU traveling from up line to platform N0:2 Sentul and
verify points already set and clip with help of the points man to admit
EMU to platform N0:2 to Station Manager Operation Sentul
Station Manager Operations Sentul
Once notification received from CTC Operator he will check the
clearance for routing of the EMU from up line to Sentul platform N0:2.
He will set the points 110a&b, 108a&b, 109a&c, 107, 106a&b to
normal position via the local panel or instruct the Station Manager
ground Frame to do so and verify. This will be recorded in the train
register book.
Station Manager Operations Sentul
Once notify and verification by Station Manager Ground Frame Sentul
he will send a Points man to signal STN2 to give the proceed signal
for the EMU to proceed to platform N0:2 Sentul
Signalling Points man
Once the EMU has pass the signal STN2 he will notify the Station
Manager operations Sentul.
Station Manager Operations Sentul
Once the EMU has arrived safely at platformN0:2 Sentul, He will
notify and verify the safe arrival of the EMU at platform N0:2 Sentul to
CTC Operator and record this in the Train Register Book
Station Manager Operations Sentul
As per Schedule he will check and verify for clearance of the block
section form the Simpang Batu Signalman and CTC Operator for the
departure of the EMU From Platform N0:3 enroute to Klang via the
Down line and instruct the Station Manager Ground Frame to Set
points 107 reverse, 109a&c normal, 108a&b normal 110a&b reverse.
This will be recorded in the Train register book..
Station Manager Operations Sentul
Upon Line clear is given by Simpang Batu Signalman and notification and verification
received from the Station Manager Ground Frame that the points are already set and clip
for the departure of the EMU from platform N0:3 to down line. He will set the shunt
signal STT35 or instruct the Signalling points man to give the proceed signal to the
EMU to depart from platform N0:3 Sentul
Station Manager Operations Sentul
Upon receiving the notification of the Perak Hanjoong Train he will check
and plan the clearence for the routing of the train from the simpang Batu
Signalman. The train is routed to the Up line to Sentul..He will set the
points 110a&b normal, 108 a&b reverse, 106a&b normal and105a&b
reverse for receiving the train on line N0;1.via the local panel or instruct
the Station Manager Ground Frame to set, clip and verify the points This
will be recorded in the Train Register Book
Signalling Points man
He will give the proceed signal to the EMU at platform N0;2 Sentul. He will notify
to the Station Manager Operations once the EMU has pass the signal STT35
Station Manager Operations Sentul
Once notification of the EMU has depart Platform N0:3 Sentul he will notify this to
the Simpang Batu Signalman and the CTC Operator. He will record this in the
Train Register Book
Station Manager Ground Frame Sentul
Once received the notification he will set, clip and verify the set ting of the
points 110a&b normal, 108a7b reverse, 106a&b normal and 105a&b
reverse for the routing of thr train to line N0:1 Sentul and notify this to the
Station Manager Operations Sentul.
Station Manager Operations Sentul
Once the train arrived at Sentul Line N0:1 He will notify this to the
Simpang Batu Signallingman and CTC Operator. And record this in the
train register book. He will instruct the points man to board the train
enroute to Batu Caves via the temporary washing plant line. He will set the
points 103 normal, 104a&c normal and 100a&c normal via the local panel
or instruct the Station Manager Ground Frame to set, clip and verify the
points.
Station Manager Ground Frame Sentul
Once notify he will set, clip and verify the points 103 normal, 104a&c normal
and 100a&c normal and notify to the Station Manager Operations
7. Station Manager Operation Sentul
Upon the notification by the Station Manager Ground Frame he will set the
Proceed aspect for shunt signal ST N30 via the Station local panel or send a
signalling points man to signal ST N30 to give the proceed signal.
Signalling Points man
Upon the instruction of the Station Manager Operations Sentul he will
proceed to Signal ST N30 and give the proceed signal to the train on line
N0:1 to depart to Batu Caves. After the passing of the train at Signal ST N30
he will notify the Station Manage Operations.
Station Manager Operations Sentul
After getting the notification of the departure of the train he will notify this to
the CTC Operator.and record this in the Train Register Book.
Points Man accompany the Train or the SRSB Look Out Man
Will notify the arrival of the Perak Hanjoong Train at Batu Caves via Radio to
the Station Manager Operations in Sentul.
Station Manager Operations Sentul
Upon getting the notification of the train arrival at Batu Caves he will record
this in the Train Register Book and Notify this to the CTC Operator.