SAFETY
ASSIGNMENT
Roman Man Shrestha st120294
Thae Nu San st120432
Shwe Yee Oo st120321
Kaung Wunna Kyaw st120332
Y.D. Gopal Rayadu st120357
We Assumed a 4 Storey Building for
Working in a Height
SAFETY CRITERIA SAFE UNSAFE % SAFE
1. GUARD RAILS SYSTEM
 Top rails
• Height of top rails should be 42 inches (1.1 m) plus or minus
3 inches (8cm) above the walking/working level.
1926.502(b)(1)
 Mid rails
• Mid rails should be installed between the top edge of the guard
rail system and walking/working surface when there is no wall
or parapet wall at least 21 inches (53cm) high. 1926.502(b)(2)
 Toe boards
• Toe boards should be at a minimum of 3.5 inches (9 cm) in
vertical height from their top edge to the level of the
walking/working surface. They shall have not more than 1/4
inch (0.6 cm) clearance above the walking/working surface.
1926.502(j)(3)
75%
88%
75%
SAFETY CRITERIA SAFE UNSAFE % SAFE
2. PERSONAL FALLARREST SYSTEM
 Anchorage connector
• Connector shall have a corrosion-resistant finish and all
surfaces and edges shall be smooth to prevent damage to
interfacing part of the system. 1926.502(d)(2)
• Connectors should be pressed or formed steel or made of
equivalent materials. 1926.502(d)(1)
63%
SAFETY CRITERIA SAFE UNSAFE % SAFE
 Body belts
• Body belts shall be at least one and five-eight(1 5/8) inches
(4.1 cm) wide. 1926.502(d)(22)
 Connecting devices
• Lanyards and vertical lifelines shall have a minimum breaking
strength of 5000 pounds (22.2KN). 1926.502(e)(5)
• Lifelines shall be protected against being cut or abraded. 1926.
502(d)(11)
63%
38%
SAFETY CRITERIA SAFE UNSAFE % SAFE
3. SAFETY NET SYSTEM
 Safety net shall be installed as close as practicable under the walking
/working surface on which employees are walking.1926.502(c)(1)
 Safety net shall extend outward from the outermost projection of wo
rk surface. 1926.502(c)(2)
50%
Score sheet used in 4 Storey Building as trial
CRITERIA CORRECT TOTAL INCORRECT TOTAL %SAFE
1 GUARD RAILS SYSTEM
i. Top Rail
6 2 75%
ii. Mid Rail 7 1
iii.Toe Board 6 2 75%
2. PERSONAL FALL
ARREST SYSTEM
i. Anchorage connector 5 3 63%
ii. Body belts 5 3 63%
iii. Connecting Devices 3 5 38%
3. SAFETY NET SYSTEM 4 4 50%
Total Correct 36 Total Incorrect 20
Safety Score:
Total "correct
Total "correct" + Total "Incorrect"
X 100 = 64.28%
• Inspect before each use. Fall protection exhibiting any of these faults shall be removed from service and destro
yed.
• Take photo of unsafe behavior and condition during construction.
• Record these files in the documents.
• Explain worker about unsafe activities by showing the record.
• Apply Fall Protection Training.
• A fall arrest occurs on site, personnel, using an articulating man lift or ladders where feasible, will rescue all em
ployees. Alternate rescue would be through local emergency services.
• All fall investigations will be conducted by (insert the title{s} or name{s} of person).
• Evaluate the fall protection program to determine its effectiveness.
• Staff feedback and interviews.
• To follow the guidelines set forth in this fall protection program.
Corrective Actions should be taken by safety supervisor
Risk assesment of 4 storey building

More Related Content

Similar to Risk assesment of 4 storey building

working at height
working at heightworking at height
working at heightJYOTHISHKT
 
National Safety Fall_protection_Presentation.ppt
National Safety Fall_protection_Presentation.pptNational Safety Fall_protection_Presentation.ppt
National Safety Fall_protection_Presentation.pptDavidWhitlock17
 
9 Fall Protection at conestruction work.ppt
9 Fall Protection at conestruction work.ppt9 Fall Protection at conestruction work.ppt
9 Fall Protection at conestruction work.pptIslamMarzoky1
 
OLEAMS PRESENTATION-Fall Protection & Rescue Solutions for Industries 2016
OLEAMS PRESENTATION-Fall Protection & Rescue Solutions for Industries 2016OLEAMS PRESENTATION-Fall Protection & Rescue Solutions for Industries 2016
OLEAMS PRESENTATION-Fall Protection & Rescue Solutions for Industries 2016Michael Odiase
 
OSHA demolition
OSHA demolitionOSHA demolition
OSHA demolitionHni Amiera
 
Working_At_Height_01.ppt
Working_At_Height_01.pptWorking_At_Height_01.ppt
Working_At_Height_01.ppthossam74752
 
Subpart X - Ladders
Subpart X -  LaddersSubpart X -  Ladders
Subpart X - LaddersFFSafety
 
Safety at construction site
Safety at construction siteSafety at construction site
Safety at construction siteNMRD Ltd
 
Working at Heights
Working at Heights Working at Heights
Working at Heights FTERIESW
 
Module 3.pptx
Module 3.pptxModule 3.pptx
Module 3.pptxShijo25
 
WORKING AT HEIGHT pptx
WORKING AT HEIGHT pptxWORKING AT HEIGHT pptx
WORKING AT HEIGHT pptxDavidNanda3
 
SCAFFOLDING Safety Training
SCAFFOLDING Safety TrainingSCAFFOLDING Safety Training
SCAFFOLDING Safety TrainingWilliam York
 
Safety at construction site
Safety at construction siteSafety at construction site
Safety at construction siteNMRD Ltd
 

Similar to Risk assesment of 4 storey building (20)

Ladders 5 31 11
Ladders 5 31 11Ladders 5 31 11
Ladders 5 31 11
 
osha3252.pdf
osha3252.pdfosha3252.pdf
osha3252.pdf
 
working at height
working at heightworking at height
working at height
 
National Safety Fall_protection_Presentation.ppt
National Safety Fall_protection_Presentation.pptNational Safety Fall_protection_Presentation.ppt
National Safety Fall_protection_Presentation.ppt
 
9 Fall Protection at conestruction work.ppt
9 Fall Protection at conestruction work.ppt9 Fall Protection at conestruction work.ppt
9 Fall Protection at conestruction work.ppt
 
OLEAMS PRESENTATION-Fall Protection & Rescue Solutions for Industries 2016
OLEAMS PRESENTATION-Fall Protection & Rescue Solutions for Industries 2016OLEAMS PRESENTATION-Fall Protection & Rescue Solutions for Industries 2016
OLEAMS PRESENTATION-Fall Protection & Rescue Solutions for Industries 2016
 
OSHA demolition
OSHA demolitionOSHA demolition
OSHA demolition
 
Scaffolding2. CO3.ppt
Scaffolding2. CO3.pptScaffolding2. CO3.ppt
Scaffolding2. CO3.ppt
 
Working_At_Height_01.ppt
Working_At_Height_01.pptWorking_At_Height_01.ppt
Working_At_Height_01.ppt
 
Lifting practices for engineers
Lifting practices for engineersLifting practices for engineers
Lifting practices for engineers
 
Working at-heights
Working at-heightsWorking at-heights
Working at-heights
 
Subpart X - Ladders
Subpart X -  LaddersSubpart X -  Ladders
Subpart X - Ladders
 
Safety at construction site
Safety at construction siteSafety at construction site
Safety at construction site
 
Safety while working at height
Safety while working at heightSafety while working at height
Safety while working at height
 
Unirail designers guide eng
Unirail designers guide engUnirail designers guide eng
Unirail designers guide eng
 
Working at Heights
Working at Heights Working at Heights
Working at Heights
 
Module 3.pptx
Module 3.pptxModule 3.pptx
Module 3.pptx
 
WORKING AT HEIGHT pptx
WORKING AT HEIGHT pptxWORKING AT HEIGHT pptx
WORKING AT HEIGHT pptx
 
SCAFFOLDING Safety Training
SCAFFOLDING Safety TrainingSCAFFOLDING Safety Training
SCAFFOLDING Safety Training
 
Safety at construction site
Safety at construction siteSafety at construction site
Safety at construction site
 

More from Roman Shrestha

RM Roman man shrestha.pptx
RM Roman man shrestha.pptxRM Roman man shrestha.pptx
RM Roman man shrestha.pptxRoman Shrestha
 
Strategic Marketing Plan for Sitaljyoti Academy: A +2 Hotel Management College
Strategic Marketing Plan for Sitaljyoti Academy: A +2 Hotel Management CollegeStrategic Marketing Plan for Sitaljyoti Academy: A +2 Hotel Management College
Strategic Marketing Plan for Sitaljyoti Academy: A +2 Hotel Management CollegeRoman Shrestha
 
Brand Positioning of Nepali Carpet.pptx
Brand Positioning of Nepali Carpet.pptxBrand Positioning of Nepali Carpet.pptx
Brand Positioning of Nepali Carpet.pptxRoman Shrestha
 
Informatics college week 2.pptx
Informatics college week 2.pptxInformatics college week 2.pptx
Informatics college week 2.pptxRoman Shrestha
 
Boo hoo – learning from the largest European.pptx
Boo hoo – learning from the largest European.pptxBoo hoo – learning from the largest European.pptx
Boo hoo – learning from the largest European.pptxRoman Shrestha
 
Analysis-of-Accommodation-Facility-Service-Quality-Aspects-and-Students-Satis...
Analysis-of-Accommodation-Facility-Service-Quality-Aspects-and-Students-Satis...Analysis-of-Accommodation-Facility-Service-Quality-Aspects-and-Students-Satis...
Analysis-of-Accommodation-Facility-Service-Quality-Aspects-and-Students-Satis...Roman Shrestha
 
FRC final presentation
FRC final presentationFRC final presentation
FRC final presentationRoman Shrestha
 
BUSINESS PERFORMANCE OF SMALL SIZE ENTERPRISES IN NEPAL.pptx
BUSINESS PERFORMANCE OF SMALL SIZE ENTERPRISES IN NEPAL.pptxBUSINESS PERFORMANCE OF SMALL SIZE ENTERPRISES IN NEPAL.pptx
BUSINESS PERFORMANCE OF SMALL SIZE ENTERPRISES IN NEPAL.pptxRoman Shrestha
 
BANCHAK COMPETITION WASTE FOR THE BEST.pptx
BANCHAK COMPETITION WASTE FOR THE BEST.pptxBANCHAK COMPETITION WASTE FOR THE BEST.pptx
BANCHAK COMPETITION WASTE FOR THE BEST.pptxRoman Shrestha
 
IPD using BIM BY Pisut Aunwong
IPD using BIM BY Pisut Aunwong  IPD using BIM BY Pisut Aunwong
IPD using BIM BY Pisut Aunwong Roman Shrestha
 
AIT Indoor Gaming Center.
AIT Indoor Gaming Center.AIT Indoor Gaming Center.
AIT Indoor Gaming Center.Roman Shrestha
 
INTEGRATED PROJECT PLANNING AND CONTROL
INTEGRATED PROJECT PLANNING AND CONTROLINTEGRATED PROJECT PLANNING AND CONTROL
INTEGRATED PROJECT PLANNING AND CONTROLRoman Shrestha
 
Modified nepali chulo
Modified nepali chulo Modified nepali chulo
Modified nepali chulo Roman Shrestha
 
Writing research paper
Writing research paperWriting research paper
Writing research paperRoman Shrestha
 
Project selection and report writing
Project selection and report writingProject selection and report writing
Project selection and report writingRoman Shrestha
 
Water movement in kathmandu
Water movement in kathmanduWater movement in kathmandu
Water movement in kathmanduRoman Shrestha
 
Safety Procedures while working in height
Safety Procedures while working in heightSafety Procedures while working in height
Safety Procedures while working in heightRoman Shrestha
 

More from Roman Shrestha (20)

RM Roman man shrestha.pptx
RM Roman man shrestha.pptxRM Roman man shrestha.pptx
RM Roman man shrestha.pptx
 
Strategic Marketing Plan for Sitaljyoti Academy: A +2 Hotel Management College
Strategic Marketing Plan for Sitaljyoti Academy: A +2 Hotel Management CollegeStrategic Marketing Plan for Sitaljyoti Academy: A +2 Hotel Management College
Strategic Marketing Plan for Sitaljyoti Academy: A +2 Hotel Management College
 
Eco homes in Nepal
Eco homes in NepalEco homes in Nepal
Eco homes in Nepal
 
Brand Positioning of Nepali Carpet.pptx
Brand Positioning of Nepali Carpet.pptxBrand Positioning of Nepali Carpet.pptx
Brand Positioning of Nepali Carpet.pptx
 
Informatics college week 2.pptx
Informatics college week 2.pptxInformatics college week 2.pptx
Informatics college week 2.pptx
 
Boo hoo – learning from the largest European.pptx
Boo hoo – learning from the largest European.pptxBoo hoo – learning from the largest European.pptx
Boo hoo – learning from the largest European.pptx
 
Research-Cycle-Group
Research-Cycle-GroupResearch-Cycle-Group
Research-Cycle-Group
 
Analysis-of-Accommodation-Facility-Service-Quality-Aspects-and-Students-Satis...
Analysis-of-Accommodation-Facility-Service-Quality-Aspects-and-Students-Satis...Analysis-of-Accommodation-Facility-Service-Quality-Aspects-and-Students-Satis...
Analysis-of-Accommodation-Facility-Service-Quality-Aspects-and-Students-Satis...
 
FRC final presentation
FRC final presentationFRC final presentation
FRC final presentation
 
BUSINESS PERFORMANCE OF SMALL SIZE ENTERPRISES IN NEPAL.pptx
BUSINESS PERFORMANCE OF SMALL SIZE ENTERPRISES IN NEPAL.pptxBUSINESS PERFORMANCE OF SMALL SIZE ENTERPRISES IN NEPAL.pptx
BUSINESS PERFORMANCE OF SMALL SIZE ENTERPRISES IN NEPAL.pptx
 
BANCHAK COMPETITION WASTE FOR THE BEST.pptx
BANCHAK COMPETITION WASTE FOR THE BEST.pptxBANCHAK COMPETITION WASTE FOR THE BEST.pptx
BANCHAK COMPETITION WASTE FOR THE BEST.pptx
 
IPD using BIM BY Pisut Aunwong
IPD using BIM BY Pisut Aunwong  IPD using BIM BY Pisut Aunwong
IPD using BIM BY Pisut Aunwong
 
AIT Indoor Gaming Center.
AIT Indoor Gaming Center.AIT Indoor Gaming Center.
AIT Indoor Gaming Center.
 
INTEGRATED PROJECT PLANNING AND CONTROL
INTEGRATED PROJECT PLANNING AND CONTROLINTEGRATED PROJECT PLANNING AND CONTROL
INTEGRATED PROJECT PLANNING AND CONTROL
 
Modified nepali chulo
Modified nepali chulo Modified nepali chulo
Modified nepali chulo
 
Writing research paper
Writing research paperWriting research paper
Writing research paper
 
Project selection and report writing
Project selection and report writingProject selection and report writing
Project selection and report writing
 
Water movement in kathmandu
Water movement in kathmanduWater movement in kathmandu
Water movement in kathmandu
 
Safety Procedures while working in height
Safety Procedures while working in heightSafety Procedures while working in height
Safety Procedures while working in height
 
Waste for the best
Waste for the bestWaste for the best
Waste for the best
 

Recently uploaded

Augmented Reality (AR) with Augin Software.pptx
Augmented Reality (AR) with Augin Software.pptxAugmented Reality (AR) with Augin Software.pptx
Augmented Reality (AR) with Augin Software.pptxMustafa Ahmed
 
☎️Looking for Abortion Pills? Contact +27791653574.. 💊💊Available in Gaborone ...
☎️Looking for Abortion Pills? Contact +27791653574.. 💊💊Available in Gaborone ...☎️Looking for Abortion Pills? Contact +27791653574.. 💊💊Available in Gaborone ...
☎️Looking for Abortion Pills? Contact +27791653574.. 💊💊Available in Gaborone ...mikehavy0
 
Fuzzy logic method-based stress detector with blood pressure and body tempera...
Fuzzy logic method-based stress detector with blood pressure and body tempera...Fuzzy logic method-based stress detector with blood pressure and body tempera...
Fuzzy logic method-based stress detector with blood pressure and body tempera...IJECEIAES
 
Max. shear stress theory-Maximum Shear Stress Theory ​ Maximum Distortional ...
Max. shear stress theory-Maximum Shear Stress Theory ​  Maximum Distortional ...Max. shear stress theory-Maximum Shear Stress Theory ​  Maximum Distortional ...
Max. shear stress theory-Maximum Shear Stress Theory ​ Maximum Distortional ...ronahami
 
Dynamo Scripts for Task IDs and Space Naming.pptx
Dynamo Scripts for Task IDs and Space Naming.pptxDynamo Scripts for Task IDs and Space Naming.pptx
Dynamo Scripts for Task IDs and Space Naming.pptxMustafa Ahmed
 
21P35A0312 Internship eccccccReport.docx
21P35A0312 Internship eccccccReport.docx21P35A0312 Internship eccccccReport.docx
21P35A0312 Internship eccccccReport.docxrahulmanepalli02
 
History of Indian Railways - the story of Growth & Modernization
History of Indian Railways - the story of Growth & ModernizationHistory of Indian Railways - the story of Growth & Modernization
History of Indian Railways - the story of Growth & ModernizationEmaan Sharma
 
DBMS-Report on Student management system.pptx
DBMS-Report on Student management system.pptxDBMS-Report on Student management system.pptx
DBMS-Report on Student management system.pptxrajjais1221
 
Path loss model, OKUMURA Model, Hata Model
Path loss model, OKUMURA Model, Hata ModelPath loss model, OKUMURA Model, Hata Model
Path loss model, OKUMURA Model, Hata ModelDrAjayKumarYadav4
 
Basics of Relay for Engineering Students
Basics of Relay for Engineering StudentsBasics of Relay for Engineering Students
Basics of Relay for Engineering Studentskannan348865
 
8th International Conference on Soft Computing, Mathematics and Control (SMC ...
8th International Conference on Soft Computing, Mathematics and Control (SMC ...8th International Conference on Soft Computing, Mathematics and Control (SMC ...
8th International Conference on Soft Computing, Mathematics and Control (SMC ...josephjonse
 
What is Coordinate Measuring Machine? CMM Types, Features, Functions
What is Coordinate Measuring Machine? CMM Types, Features, FunctionsWhat is Coordinate Measuring Machine? CMM Types, Features, Functions
What is Coordinate Measuring Machine? CMM Types, Features, FunctionsVIEW
 
SLIDESHARE PPT-DECISION MAKING METHODS.pptx
SLIDESHARE PPT-DECISION MAKING METHODS.pptxSLIDESHARE PPT-DECISION MAKING METHODS.pptx
SLIDESHARE PPT-DECISION MAKING METHODS.pptxCHAIRMAN M
 
Geometric constructions Engineering Drawing.pdf
Geometric constructions Engineering Drawing.pdfGeometric constructions Engineering Drawing.pdf
Geometric constructions Engineering Drawing.pdfJNTUA
 
一比一原版(NEU毕业证书)东北大学毕业证成绩单原件一模一样
一比一原版(NEU毕业证书)东北大学毕业证成绩单原件一模一样一比一原版(NEU毕业证书)东北大学毕业证成绩单原件一模一样
一比一原版(NEU毕业证书)东北大学毕业证成绩单原件一模一样A
 
Working Principle of Echo Sounder and Doppler Effect.pdf
Working Principle of Echo Sounder and Doppler Effect.pdfWorking Principle of Echo Sounder and Doppler Effect.pdf
Working Principle of Echo Sounder and Doppler Effect.pdfSkNahidulIslamShrabo
 
analog-vs-digital-communication (concept of analog and digital).pptx
analog-vs-digital-communication (concept of analog and digital).pptxanalog-vs-digital-communication (concept of analog and digital).pptx
analog-vs-digital-communication (concept of analog and digital).pptxKarpagam Institute of Teechnology
 
CLOUD COMPUTING SERVICES - Cloud Reference Modal
CLOUD COMPUTING SERVICES - Cloud Reference ModalCLOUD COMPUTING SERVICES - Cloud Reference Modal
CLOUD COMPUTING SERVICES - Cloud Reference ModalSwarnaSLcse
 
Worksharing and 3D Modeling with Revit.pptx
Worksharing and 3D Modeling with Revit.pptxWorksharing and 3D Modeling with Revit.pptx
Worksharing and 3D Modeling with Revit.pptxMustafa Ahmed
 
Artificial intelligence presentation2-171219131633.pdf
Artificial intelligence presentation2-171219131633.pdfArtificial intelligence presentation2-171219131633.pdf
Artificial intelligence presentation2-171219131633.pdfKira Dess
 

Recently uploaded (20)

Augmented Reality (AR) with Augin Software.pptx
Augmented Reality (AR) with Augin Software.pptxAugmented Reality (AR) with Augin Software.pptx
Augmented Reality (AR) with Augin Software.pptx
 
☎️Looking for Abortion Pills? Contact +27791653574.. 💊💊Available in Gaborone ...
☎️Looking for Abortion Pills? Contact +27791653574.. 💊💊Available in Gaborone ...☎️Looking for Abortion Pills? Contact +27791653574.. 💊💊Available in Gaborone ...
☎️Looking for Abortion Pills? Contact +27791653574.. 💊💊Available in Gaborone ...
 
Fuzzy logic method-based stress detector with blood pressure and body tempera...
Fuzzy logic method-based stress detector with blood pressure and body tempera...Fuzzy logic method-based stress detector with blood pressure and body tempera...
Fuzzy logic method-based stress detector with blood pressure and body tempera...
 
Max. shear stress theory-Maximum Shear Stress Theory ​ Maximum Distortional ...
Max. shear stress theory-Maximum Shear Stress Theory ​  Maximum Distortional ...Max. shear stress theory-Maximum Shear Stress Theory ​  Maximum Distortional ...
Max. shear stress theory-Maximum Shear Stress Theory ​ Maximum Distortional ...
 
Dynamo Scripts for Task IDs and Space Naming.pptx
Dynamo Scripts for Task IDs and Space Naming.pptxDynamo Scripts for Task IDs and Space Naming.pptx
Dynamo Scripts for Task IDs and Space Naming.pptx
 
21P35A0312 Internship eccccccReport.docx
21P35A0312 Internship eccccccReport.docx21P35A0312 Internship eccccccReport.docx
21P35A0312 Internship eccccccReport.docx
 
History of Indian Railways - the story of Growth & Modernization
History of Indian Railways - the story of Growth & ModernizationHistory of Indian Railways - the story of Growth & Modernization
History of Indian Railways - the story of Growth & Modernization
 
DBMS-Report on Student management system.pptx
DBMS-Report on Student management system.pptxDBMS-Report on Student management system.pptx
DBMS-Report on Student management system.pptx
 
Path loss model, OKUMURA Model, Hata Model
Path loss model, OKUMURA Model, Hata ModelPath loss model, OKUMURA Model, Hata Model
Path loss model, OKUMURA Model, Hata Model
 
Basics of Relay for Engineering Students
Basics of Relay for Engineering StudentsBasics of Relay for Engineering Students
Basics of Relay for Engineering Students
 
8th International Conference on Soft Computing, Mathematics and Control (SMC ...
8th International Conference on Soft Computing, Mathematics and Control (SMC ...8th International Conference on Soft Computing, Mathematics and Control (SMC ...
8th International Conference on Soft Computing, Mathematics and Control (SMC ...
 
What is Coordinate Measuring Machine? CMM Types, Features, Functions
What is Coordinate Measuring Machine? CMM Types, Features, FunctionsWhat is Coordinate Measuring Machine? CMM Types, Features, Functions
What is Coordinate Measuring Machine? CMM Types, Features, Functions
 
SLIDESHARE PPT-DECISION MAKING METHODS.pptx
SLIDESHARE PPT-DECISION MAKING METHODS.pptxSLIDESHARE PPT-DECISION MAKING METHODS.pptx
SLIDESHARE PPT-DECISION MAKING METHODS.pptx
 
Geometric constructions Engineering Drawing.pdf
Geometric constructions Engineering Drawing.pdfGeometric constructions Engineering Drawing.pdf
Geometric constructions Engineering Drawing.pdf
 
一比一原版(NEU毕业证书)东北大学毕业证成绩单原件一模一样
一比一原版(NEU毕业证书)东北大学毕业证成绩单原件一模一样一比一原版(NEU毕业证书)东北大学毕业证成绩单原件一模一样
一比一原版(NEU毕业证书)东北大学毕业证成绩单原件一模一样
 
Working Principle of Echo Sounder and Doppler Effect.pdf
Working Principle of Echo Sounder and Doppler Effect.pdfWorking Principle of Echo Sounder and Doppler Effect.pdf
Working Principle of Echo Sounder and Doppler Effect.pdf
 
analog-vs-digital-communication (concept of analog and digital).pptx
analog-vs-digital-communication (concept of analog and digital).pptxanalog-vs-digital-communication (concept of analog and digital).pptx
analog-vs-digital-communication (concept of analog and digital).pptx
 
CLOUD COMPUTING SERVICES - Cloud Reference Modal
CLOUD COMPUTING SERVICES - Cloud Reference ModalCLOUD COMPUTING SERVICES - Cloud Reference Modal
CLOUD COMPUTING SERVICES - Cloud Reference Modal
 
Worksharing and 3D Modeling with Revit.pptx
Worksharing and 3D Modeling with Revit.pptxWorksharing and 3D Modeling with Revit.pptx
Worksharing and 3D Modeling with Revit.pptx
 
Artificial intelligence presentation2-171219131633.pdf
Artificial intelligence presentation2-171219131633.pdfArtificial intelligence presentation2-171219131633.pdf
Artificial intelligence presentation2-171219131633.pdf
 

Risk assesment of 4 storey building

  • 1. SAFETY ASSIGNMENT Roman Man Shrestha st120294 Thae Nu San st120432 Shwe Yee Oo st120321 Kaung Wunna Kyaw st120332 Y.D. Gopal Rayadu st120357
  • 2. We Assumed a 4 Storey Building for Working in a Height
  • 3. SAFETY CRITERIA SAFE UNSAFE % SAFE 1. GUARD RAILS SYSTEM  Top rails • Height of top rails should be 42 inches (1.1 m) plus or minus 3 inches (8cm) above the walking/working level. 1926.502(b)(1)  Mid rails • Mid rails should be installed between the top edge of the guard rail system and walking/working surface when there is no wall or parapet wall at least 21 inches (53cm) high. 1926.502(b)(2)  Toe boards • Toe boards should be at a minimum of 3.5 inches (9 cm) in vertical height from their top edge to the level of the walking/working surface. They shall have not more than 1/4 inch (0.6 cm) clearance above the walking/working surface. 1926.502(j)(3) 75% 88% 75%
  • 4. SAFETY CRITERIA SAFE UNSAFE % SAFE 2. PERSONAL FALLARREST SYSTEM  Anchorage connector • Connector shall have a corrosion-resistant finish and all surfaces and edges shall be smooth to prevent damage to interfacing part of the system. 1926.502(d)(2) • Connectors should be pressed or formed steel or made of equivalent materials. 1926.502(d)(1) 63%
  • 5. SAFETY CRITERIA SAFE UNSAFE % SAFE  Body belts • Body belts shall be at least one and five-eight(1 5/8) inches (4.1 cm) wide. 1926.502(d)(22)  Connecting devices • Lanyards and vertical lifelines shall have a minimum breaking strength of 5000 pounds (22.2KN). 1926.502(e)(5) • Lifelines shall be protected against being cut or abraded. 1926. 502(d)(11) 63% 38%
  • 6. SAFETY CRITERIA SAFE UNSAFE % SAFE 3. SAFETY NET SYSTEM  Safety net shall be installed as close as practicable under the walking /working surface on which employees are walking.1926.502(c)(1)  Safety net shall extend outward from the outermost projection of wo rk surface. 1926.502(c)(2) 50%
  • 7. Score sheet used in 4 Storey Building as trial CRITERIA CORRECT TOTAL INCORRECT TOTAL %SAFE 1 GUARD RAILS SYSTEM i. Top Rail 6 2 75% ii. Mid Rail 7 1 iii.Toe Board 6 2 75% 2. PERSONAL FALL ARREST SYSTEM i. Anchorage connector 5 3 63% ii. Body belts 5 3 63% iii. Connecting Devices 3 5 38% 3. SAFETY NET SYSTEM 4 4 50% Total Correct 36 Total Incorrect 20 Safety Score: Total "correct Total "correct" + Total "Incorrect" X 100 = 64.28%
  • 8. • Inspect before each use. Fall protection exhibiting any of these faults shall be removed from service and destro yed. • Take photo of unsafe behavior and condition during construction. • Record these files in the documents. • Explain worker about unsafe activities by showing the record. • Apply Fall Protection Training. • A fall arrest occurs on site, personnel, using an articulating man lift or ladders where feasible, will rescue all em ployees. Alternate rescue would be through local emergency services. • All fall investigations will be conducted by (insert the title{s} or name{s} of person). • Evaluate the fall protection program to determine its effectiveness. • Staff feedback and interviews. • To follow the guidelines set forth in this fall protection program. Corrective Actions should be taken by safety supervisor