Planning Engineer
Birth date: Nov.1975
Mohammed Shaker Abdullah
+201128483507 / +201025235906
Email: emshaker@yahoo.com
I hold a B.Sc. in Mechanical Engineering and have 16 years’ experience in
project planning/ Controlling and O&M of power generation plants. As well as I
ability to follow up technical activities of super-heater and Re-heat coils changing
for unit’s manufacturer.
CHRONOLOGICAL EXPERIENCE RECORD
Job Title : Project Control Manager
Dates : June 2016 to in progress
Employer : PSC / Siemens CCPP 4 X 1200 MW (Bin Suef Project)
Project : Mechanical infrastructure and commissioning for full equipment of 2x GTG and 4 x
HRSG
Job Title : Senior Planning Engineer
Dates : Dec 2014 to May 2016
Employer : Al-Gihaz / ARAMCO in KSA (ARAMCO Certified) (LSTK project)
Project : Upgrading Transmission system, switching gear, Circuit Breakers, Battery and
Charging System, SCADA, OHTL, Under Ground Cables, Communication &
Instrumentations Systems and Buildings and Metering Rooms civil works for 37 sites
Job Title : Maintenance planning engineer.
Dates : June 2013 to Nov 2014
Employer : UEEPCo. Power generation plant 2*312 MW in Egypt
Work Scope : Rotating and Static equipment’s ( Pumps, Compressors, Electrical Motors, HVAC,
Steam Boilers, Air Fans, Water Treatment System, Switch Gears, GIS, Transformers,
Valves, Condensers, Steam heaters, heavy oil heaters ,……etc.)
Job Title : Planning Engineer
Date : Aug 2011 to May 2013
Employer : DOOSAN Korean Co. (AlEin Al Sokhna, project) in Egypt
Project : 2x650 MW Suppers Critical boilers electrical and instruments infrastructure and
commissioning
Job Title : Planning Engineer
Date : Jan 2009 to Mar 2011.
Employer : ABB- AG.(GE & Doosan QatalumLSTK project) in Qatar
Project : Electrical and controlling infrastructure and full commissioning for 400kv& 220kv
cables, GCBs, GIS, protection,Monitoring and SCADA systems, MV & LV switch
gears, TransformersAnd overhead lines)
Job Title : Planning Engineer
Date : Jan 2008 to Dec 2008
Employer : Mitsubishi Heavy Industry (MHI).(CCPP – 2x750 MW LSTK project)
Project : Mechanical and Electrical infrastructure and full commissioning for 2 X Gas
Turbines and Generators and 2 X HRSGs.
Job Title : Maintenance planning Engineer
Date : Jan 2006 to Dec 2007
Employer : Assuit Power plant 2x300 MW. In Egypt
Work Scope : Shutdown and starting up scheduler and overhaul maintenance planning for co-
generation steam plan equipment.
Job Title : Maintenance Engineer
Date : Mar 2001 to Dec 2005.
Employer : Assuit Power plant 2x300 MW. In Egypt
Work Scope : Maintenance of Co-generation steamturbine auxiliaries (Pumps, Air compressors,
Valves, Condensers, Steam heaters, heavy oil heaters….etc.)
Experience:
 Design the project master schedule for all levels
 Determine the project resources require for the plan.
 Analysis of data stored in the project management and cost control
 Define and determine the project risk plan.
 Implements and maintains Project Planning and Scheduling.
 Analyzes, evaluates, and forecasts current status against an established baseline schedule.
 Assesses the impact(s) of design or construction changes and schedule slippages.
 Implements and maintains an Earned Value Management System on the project.
 Analyzes cost and schedule performance indicators (CPI and SPI).
 Prepares and maintains project forecasts and status updates.
 Reports schedule status to all levels of project and Company management as well as to the Client.
 Implement and design the project curves are required for resources and cost.
 Provides assessment with corrective action recommendations to management.
 May provide guidance, direction, and specialized assistance to others in the resolution of project control
problems.
 Calculate EOT required for recovering the project schedule impacting.
 Understands and applies engineering, procurement, and construction terminology, concepts, and
relationships.
EDUCATION
: B.Sc. in Mechanical engineering 2000, (5 years).
: Assuit Faculty of Engineering
LANGUAGES
Arabic : Native Language
English : Very good
COMPUTER SKILLS
: Primavera EPM P6, MS Project
: Auto-Cad & Solid-Works.
: Microsoft office Word, Excel, Power point.
TRAINING COURSES AND CERTIFICATIONS
 PMP course
 Tutorial of operating and maintaining of high pressure vessel by ENPPI’s co instructors. 
 Trained on the modern steam power generation plant operation & maintenance. 
 Experience in reading the power generation mechanical/ instrumental drawings (PID). 

Planning Engineer CV

  • 1.
    Planning Engineer Birth date:Nov.1975 Mohammed Shaker Abdullah +201128483507 / +201025235906 Email: emshaker@yahoo.com I hold a B.Sc. in Mechanical Engineering and have 16 years’ experience in project planning/ Controlling and O&M of power generation plants. As well as I ability to follow up technical activities of super-heater and Re-heat coils changing for unit’s manufacturer. CHRONOLOGICAL EXPERIENCE RECORD Job Title : Project Control Manager Dates : June 2016 to in progress Employer : PSC / Siemens CCPP 4 X 1200 MW (Bin Suef Project) Project : Mechanical infrastructure and commissioning for full equipment of 2x GTG and 4 x HRSG Job Title : Senior Planning Engineer Dates : Dec 2014 to May 2016 Employer : Al-Gihaz / ARAMCO in KSA (ARAMCO Certified) (LSTK project) Project : Upgrading Transmission system, switching gear, Circuit Breakers, Battery and Charging System, SCADA, OHTL, Under Ground Cables, Communication & Instrumentations Systems and Buildings and Metering Rooms civil works for 37 sites Job Title : Maintenance planning engineer. Dates : June 2013 to Nov 2014 Employer : UEEPCo. Power generation plant 2*312 MW in Egypt Work Scope : Rotating and Static equipment’s ( Pumps, Compressors, Electrical Motors, HVAC, Steam Boilers, Air Fans, Water Treatment System, Switch Gears, GIS, Transformers, Valves, Condensers, Steam heaters, heavy oil heaters ,……etc.) Job Title : Planning Engineer Date : Aug 2011 to May 2013 Employer : DOOSAN Korean Co. (AlEin Al Sokhna, project) in Egypt Project : 2x650 MW Suppers Critical boilers electrical and instruments infrastructure and commissioning Job Title : Planning Engineer Date : Jan 2009 to Mar 2011. Employer : ABB- AG.(GE & Doosan QatalumLSTK project) in Qatar Project : Electrical and controlling infrastructure and full commissioning for 400kv& 220kv cables, GCBs, GIS, protection,Monitoring and SCADA systems, MV & LV switch gears, TransformersAnd overhead lines) Job Title : Planning Engineer Date : Jan 2008 to Dec 2008 Employer : Mitsubishi Heavy Industry (MHI).(CCPP – 2x750 MW LSTK project) Project : Mechanical and Electrical infrastructure and full commissioning for 2 X Gas Turbines and Generators and 2 X HRSGs.
  • 2.
    Job Title :Maintenance planning Engineer Date : Jan 2006 to Dec 2007 Employer : Assuit Power plant 2x300 MW. In Egypt Work Scope : Shutdown and starting up scheduler and overhaul maintenance planning for co- generation steam plan equipment. Job Title : Maintenance Engineer Date : Mar 2001 to Dec 2005. Employer : Assuit Power plant 2x300 MW. In Egypt Work Scope : Maintenance of Co-generation steamturbine auxiliaries (Pumps, Air compressors, Valves, Condensers, Steam heaters, heavy oil heaters….etc.) Experience:  Design the project master schedule for all levels  Determine the project resources require for the plan.  Analysis of data stored in the project management and cost control  Define and determine the project risk plan.  Implements and maintains Project Planning and Scheduling.  Analyzes, evaluates, and forecasts current status against an established baseline schedule.  Assesses the impact(s) of design or construction changes and schedule slippages.  Implements and maintains an Earned Value Management System on the project.  Analyzes cost and schedule performance indicators (CPI and SPI).  Prepares and maintains project forecasts and status updates.  Reports schedule status to all levels of project and Company management as well as to the Client.  Implement and design the project curves are required for resources and cost.  Provides assessment with corrective action recommendations to management.  May provide guidance, direction, and specialized assistance to others in the resolution of project control problems.  Calculate EOT required for recovering the project schedule impacting.  Understands and applies engineering, procurement, and construction terminology, concepts, and relationships. EDUCATION : B.Sc. in Mechanical engineering 2000, (5 years). : Assuit Faculty of Engineering LANGUAGES Arabic : Native Language English : Very good COMPUTER SKILLS : Primavera EPM P6, MS Project : Auto-Cad & Solid-Works. : Microsoft office Word, Excel, Power point. TRAINING COURSES AND CERTIFICATIONS  PMP course  Tutorial of operating and maintaining of high pressure vessel by ENPPI’s co instructors.   Trained on the modern steam power generation plant operation & maintenance.   Experience in reading the power generation mechanical/ instrumental drawings (PID). 