The document is a resume from Tanveer Ahmed Niazi applying for a position as a project manager. It summarizes his over 30 years of experience in project planning, controls, and delay analysis for construction projects in various countries. It also lists his expertise in using scheduling software like Primavera and Microsoft Project to develop project plans and monitor schedule and budget performance.
KEY COMPETENCIES AND SKILLS;
Highly experienced professional having ample capabilities, skills and enormous experience in Civil Construction and working for last 20 years in Gulf region and now in Kingdom of Saudi Arabia (CIVIL / OIL & GAS Sector) with following but not limited to;
Project management;
Building Construction Projects;
Site management;
Health & safety regulations;
Hiring construction staff;
Budget / cost control;
Financial management;
Operational management;
Contract negotiations;
Tender / Bid management;
Construction materials
Scheduling / Forecast
Procurement
Commissioning
Final Handing over
KEY COMPETENCIES AND SKILLS;
Highly experienced professional having ample capabilities, skills and enormous experience in Civil Construction and working for last 20 years in Gulf region and now in Kingdom of Saudi Arabia (CIVIL / OIL & GAS Sector) with following but not limited to;
Project management;
Building Construction Projects;
Site management;
Health & safety regulations;
Hiring construction staff;
Budget / cost control;
Financial management;
Operational management;
Contract negotiations;
Tender / Bid management;
Construction materials
Scheduling / Forecast
Procurement
Commissioning
Final Handing over
• Specialties:
• Excellent core design & execution skills including close monitoring Budgets and Schedules, Recovery Programs, instill Value Engineering mind-set during all design phases and throughout all construction activities.
• Bridges the operations/development team “gap”, ensuring that the teams remain focused on end-user service whilst achieving challenging commercial and time deadlines.
• I am adept handling of strategic positioning and branding of developments, reporting at Board Level
NHAI MORT&H as well as MSRDC are executing the National Highway projects on EPC mode. Many emerging companies are also part of the history being created for construction of national highways...........
This slideshare will help them to understand why support from consultants is necessary for such technologically advanced construction of highway projects
• Specialties:
• Excellent core design & execution skills including close monitoring Budgets and Schedules, Recovery Programs, instill Value Engineering mind-set during all design phases and throughout all construction activities.
• Bridges the operations/development team “gap”, ensuring that the teams remain focused on end-user service whilst achieving challenging commercial and time deadlines.
• I am adept handling of strategic positioning and branding of developments, reporting at Board Level
NHAI MORT&H as well as MSRDC are executing the National Highway projects on EPC mode. Many emerging companies are also part of the history being created for construction of national highways...........
This slideshare will help them to understand why support from consultants is necessary for such technologically advanced construction of highway projects
A bright, talented and ambitious technical project manager who has overall 15+ years of good experience in handling multiple projects with a track record of ensuring projects are delivered to the highest quality, within budget by effectively organizing, managing and utilizing all resources. I am able to lead teams on commercial, industrial, education and health projects where the highest standards are routinely demanded. Always wanted to be actively involved in all aspects of the project life cycle I can deliver high value projects in matrixed organizations and across different geographies. I take direction well and work hard to manage stakeholder expectations.
I am willing to travel and ready to spend long periods in abroad. I am currently looking for a suitable position with esteemed organization.
Collaborative Project Manager emphasizing over 15 years Oil and Gas of
expertise, organizing business operations, financial oversight and resource
management to achieve smooth flow and project processes. Leads
procurement of resources including equipment and supplies. Monitors
projects by adhering suitable schedule and budget, managing construction
team, identifying problems and providing targeted solutions. Knowledgeable
in accounting principles, bookkeeping, budget and financial management.
Comprehensive background in project planning at directing change
management and initiatives execution, offers in-depth understanding of
project lifecycles. Highly organized, methodical and skilled at overseeing daily
milestones across high-performance teams. Talented with excellent client
oversight, issue resolution and cost analysis skills. Highly effective at juggling
multiple projects at once. Ability to predict project duration, meeting
efficiency and schedule milestones. Gathers and interprets project
requirements to define scope and milestones. Adaptable with distinguished
knowledge of projects design and managing working infrastructure. Proactive
to produce high-quality work by applying determination and attention to
details. Performance-oriented and enterprising leader with organized nature
and analytical problem-solving approach.
The Impact of Artificial Intelligence on Modern Society.pdfssuser3e63fc
Just a game Assignment 3
1. What has made Louis Vuitton's business model successful in the Japanese luxury market?
2. What are the opportunities and challenges for Louis Vuitton in Japan?
3. What are the specifics of the Japanese fashion luxury market?
4. How did Louis Vuitton enter into the Japanese market originally? What were the other entry strategies it adopted later to strengthen its presence?
5. Will Louis Vuitton have any new challenges arise due to the global financial crisis? How does it overcome the new challenges?Assignment 3
1. What has made Louis Vuitton's business model successful in the Japanese luxury market?
2. What are the opportunities and challenges for Louis Vuitton in Japan?
3. What are the specifics of the Japanese fashion luxury market?
4. How did Louis Vuitton enter into the Japanese market originally? What were the other entry strategies it adopted later to strengthen its presence?
5. Will Louis Vuitton have any new challenges arise due to the global financial crisis? How does it overcome the new challenges?Assignment 3
1. What has made Louis Vuitton's business model successful in the Japanese luxury market?
2. What are the opportunities and challenges for Louis Vuitton in Japan?
3. What are the specifics of the Japanese fashion luxury market?
4. How did Louis Vuitton enter into the Japanese market originally? What were the other entry strategies it adopted later to strengthen its presence?
5. Will Louis Vuitton have any new challenges arise due to the global financial crisis? How does it overcome the new challenges?
Want to move your career forward? Looking to build your leadership skills while helping others learn, grow, and improve their skills? Seeking someone who can guide you in achieving these goals?
You can accomplish this through a mentoring partnership. Learn more about the PMISSC Mentoring Program, where you’ll discover the incredible benefits of becoming a mentor or mentee. This program is designed to foster professional growth, enhance skills, and build a strong network within the project management community. Whether you're looking to share your expertise or seeking guidance to advance your career, the PMI Mentoring Program offers valuable opportunities for personal and professional development.
Watch this to learn:
* Overview of the PMISSC Mentoring Program: Mission, vision, and objectives.
* Benefits for Volunteer Mentors: Professional development, networking, personal satisfaction, and recognition.
* Advantages for Mentees: Career advancement, skill development, networking, and confidence building.
* Program Structure and Expectations: Mentor-mentee matching process, program phases, and time commitment.
* Success Stories and Testimonials: Inspiring examples from past participants.
* How to Get Involved: Steps to participate and resources available for support throughout the program.
Learn how you can make a difference in the project management community and take the next step in your professional journey.
About Hector Del Castillo
Hector is VP of Professional Development at the PMI Silver Spring Chapter, and CEO of Bold PM. He's a mid-market growth product executive and changemaker. He works with mid-market product-driven software executives to solve their biggest growth problems. He scales product growth, optimizes ops and builds loyal customers. He has reduced customer churn 33%, and boosted sales 47% for clients. He makes a significant impact by building and launching world-changing AI-powered products. If you're looking for an engaging and inspiring speaker to spark creativity and innovation within your organization, set up an appointment to discuss your specific needs and identify a suitable topic to inspire your audience at your next corporate conference, symposium, executive summit, or planning retreat.
About PMI Silver Spring Chapter
We are a branch of the Project Management Institute. We offer a platform for project management professionals in Silver Spring, MD, and the DC/Baltimore metro area. Monthly meetings facilitate networking, knowledge sharing, and professional development. For event details, visit pmissc.org.
135. Reviewer Certificate in Journal of Engineering
Planner's Resume
1. Tanveer Ahmed Niazi
+974-6654-7875, +92 33-222-90-797, +971-50-120-4997
tanveeraniazi@yahoo.com Skype ID jubailrc
Manager HR,
Dear Sir/Madam,
As you already know that a project manager needs to make sure that his project is planned out
perfectly in order to ensure that all the scope has done perfectly (with in the given time) and
inexpensively (with in the budget). The planning engineer determines the best possible method and
sequence of execution of execution whether it is a Construction project, EPC or a Turn-Key.
Not only the above, the planning engineer determines the sequential order of the engineering &
design strategy, logistics of moving equipment, plant and material from one location to another.
Draw up the procurement plan. This planning oversees all the stages of the project. He must also
make sure that the safety standards are followed. Client often ask the planner that how long the
given project will take.
During the execution, the planning engineer is responsible for determining the most efficient and
effective method of executing the scope. The planner also studies the scope and resources available
in order to determine what the construction team is capable to do.
In order to foresee the labor, technical, equipment and material demands that will be placed
on the project, the planning engineer must have perfect computer skills.
My expertise in the area of project planning and controls and delay analysis, has helped me
evolve as a sound professional with capabilities to accept greater challenges and thus enlarge
my career canvass.
Attached is my resume for your kind perusal. I would appreciate an opportunity to discuss ways
in which I would be able to contribute towards the growth of the organization
Sincerely,
Tanveer Ahmed Niazi
+974-6654-7875, +92 33-222-90-797, +971-50-120-4997
tanveeraniazi@yahoo.com, Skype ID : jubailrc
Profile Link http://qa.linkedin.com/pub/tanveer-ahmed-niazi/2a/5a/8b9
2. Page 2 of 4Last Update August 17, 2012
Tanveer Ahmed Niazi,
+974-6654-7875, +92 33-222-90-797, +971-50-120-4997
tanveeraniazi@yahoo.com, Skype ID jubailrc
http://qa.linkedin.com/pub/tanveer-ahmed-niazi/2a/5a/8b9
Experience Summary
More then 30 years: KSA 5 years – UAE 5 years – Oman 1 year – 2 year Qatar and 21 years in home land.
High Reise Building Planning and large residential projects 8 years, Industrial & Road 7 years, Oil & Gas 1 year &
general (Construction, Maintenance & Operations) 18 years
Key Skills
Perfect command over (oracle) primavera p 6v7 & ms project.
Develop project execution master plan.
Preparation of mitigation plans, recovery plan and baseline revision.
Knowledge of FIDIC and other forms of contracts.
Identifying the best series of events in the correct order for the project to finish in time and budget.
Delay analysis using time impact & other methods. Delays assessment by as planned v/s. As built method &
"impacted as-planned" method.
Prepare extension of time claim (EOT) as per FIDIC & Local Authorities’ Protocol
Delivery of accurate and timely information to all stakeholders to the sanctioned cost, schedule and
performance criteria.
Motivate, teach & train others to make them aware of an overall aim.
The ability to remain flexible and calm under pressure and in the face of a tight deadline.
Creative, good numeracy skills, good literacy skills and technical mind.
Target-oriented, quality conscious and highly dependable team leader and mentor.
Proven record of utilizing technical and interpersonal skills to boost organizational efficiency, productivity
and profits.
Providing advice to people involved in the project.
Participate actively in career development of direct reports, and succession planning initiatives
to build future expertise.
General Responsibilities
Understanding the scope of the project in order to prepare Construction Program for the project with
proper logic and flow of the work in order to meet significant / contractual milestones, (detailed, baseline,
recovery, time impacted).
Update the project manager/stack holders through earned value analysis to improve project progress,
performance, & visibility of cash flow.
Management of the Project Controls function including participating in hiring (within guidelines),
Orchestration of the PC staff to meet the needs of the Project Manager with a customer service oriented
approach.
Project forecasting, reporting SPI & CPI,
Presenting the schedule performance and needs to concerns within the organization, client and the
influential stake holders of the project (as and when required).
Delivery of accurate and timely information to all stakeholders to the sanctioned cost, schedule and key
performance indicators.
Lead and/or participate in the identification of risks and eliminate or implement mitigation measures.
Producing visual aids to help explain the schedule of work, including bar charts and network diagrams.
Ensure project lessons learned are feed‐back to project stakeholders.
Keeping in contact & updating the project manager, higher management & client by presenting them the
daily/weekly and Monthly Progress Reports.
Updating the project manager with the current status of the project to take necessary action to
speed up the work if delay occurs.
Currently Employer : Bin Hafeez Gen. Cont. Est Abu Dhabi UAE P.O. Box 47180.
Period : Since July 2014
Position : Sr. Planning Engineer.
Project (Infrastructure) : Improvement Mafraq to Ghuweifat Border check post (Road) Hihway.
Responsibilities : Plan, organize, and coordinate planning activities, Select the most appropriate
techniques and logical sequence of activities to complete project scope Inputs the work breakdown structure
information in means to assess an accurate forecast on time, resources and cash flow of the project, Sets up alerts
for all important contractual and milestone dates, Prepares cash flow, charts and histograms on planning projects,
Updates the schedule based on inputs received from project team, Accumulates, collects and analyses data and
3. Page 3 of 4Last Update August 17, 2012
information required for planning, Prepare the "look-ahead" schedules weekly, monthly etc. as required, Physically
able to participate in training sessions, presentations, and meetings
1. Company Name : Power Line Engineering, P.O. Box 47270 Doha – Qatar.
Period : Sep. 2011 FEB 2014
Position : Sr. Planning Engineer.
Project : 2B+G+24 Residencial Floors Viva Behriyah Tower VB20 & VB21 in the Pearl
Qatar
Responsibilities : Preparing, monitoring and revision of construction master plan. Preparation of
high level analytical reports and progress reports on weekly, bi-weekly and monthly basis for
management and the client. Analyze the delay on monthly basis to help the management taking
actions to get the project back on to the track.
2. Company Name : Tiger Contracting Co. LLC. – P. O. Box 25411, Sharjah; UAE
From : Nov. 2009 to Jul. 2011.
Projects : 3B+G+M+21 Office Floors Silver Tower Businesses Bay Dubai, 2B+G+M+14
Office Floors Businesses Bay Dubai Office Floors Opel Tower
Position : Planning Engineer
Responsibilities : Reparation of clause 14 programs, recovery programs, crash/anticipated programs
etc. Understanding the scope of the project in order to prepare Construction Program for the project with
proper logic and flow of the work in order to meet significant / contractual milestones, (detailed, baseline,
recovery, time impacted, level 1 to level 6 programs). Update the PM of the current Schedule Performance
Index (SPI) and Cost Performance Index (CPI). Orchestration of the PC staff to meet the needs of the
Project Manager with a customer service oriented approach. Reschedule the project to improve the SPI &
CPI, project forecasting & cost variance analysis. Keep in contact & updating the project manager, higher
management & client by presenting them the daily/weekly and Monthly Progress Reports. Prepared an EOT
Claim for a commercial building (Opel Tower) Business bay Dubai.
3. Company Name : GECO Mechanical & Electrical– P.O. Box 1150, Sharjah; UAE.
From : June 2008 to Nov. 2009.
Position : Sr. Planning Engineer
Project : Sharjah University Teaching Hospital.
Responsibilities : Update the project manager/stack holders through earned value analysis to
improve project progress, performance, & visibility of cash flow. Producing visual aids to help explain the
schedule of work, including bar charts and network diagrams. Ensure project lessons learned are feed‐back
to project stakeholders. Making sure the achieved progress on the project fits the progress anticipated in
the schedule and daily/weekly updating of the schedule based on quantities consumed. Continuous
information to the project stakeholders of the schedule performance index (SPI) and the cost performance
index (CPI).
: Monitored the main program of Sharjah University Teaching Hospital.
4. Company Name : Techdynamic Contracting. Jubail; Kingdom of Saudi Arabia.
From : Nov. 2004 to Jan 2008
Position : Sr. Project / Planning Engineer.
Projects : Numerous residential, commercial and industrial buildings and other and
electrical, civil and mechanical projects.
Responsibilities : Understanding the scope of the project in order to prepare Construction
Program for the project with proper logic and flow of the work in order to meet significant /
contractual milestones, (detailed, baseline, recovery, time impacted), Casting & Estimation,
Procurement, dealing with the subcontractors and coordination with the client & third parties. Lead
and/or participate in the identification of risks and eliminate or implement mitigation measures and
Capitalize on potential opportunities. Produce visual aids to help explain the schedule of work,
including bar charts and network diagrams. Keeping in contact & updating the project manager,
higher management & client by presenting them the daily/weekly and Monthly Progress Reports.
5. Company Name : Mohammad Obaid Al-Marri Est. Jubail, kingdom of Saudi Arabia
From : May 2003 to Nov. 2004
Position : Field Engineer (Electrical)
Responsibilities : Preparation of submittals, shop drawings coordination with the client (Royal
Commission) and the third parties (SEC, Saudi Telecom, Road Department, Marafiq etc.), site
management and supervision.
6. Company Name : Pakistan Steel Mills Corp. Karachi Pakistan.
From : Aug. 1981 to May 1985 and from Oct 1986 to Oct 2001.
Position : Sr. Sub Engineer) AXEN (Assistant Executive Engineer)
Responsibilities : Supervision of the operational (shift) staff at Thermal Power Plant (TPP),
Sintering Plant, Iron Making Plant Complex (Blast Furnace) and Billet Mills.
Achievements : Revamping & Modernizing of Sintering Plant.
7. Company Name : The Oman Construction (TOCO-5); Muscat Oman.
Period : May 1985 to Feb 1986
4. Page 4 of 4Last Update August 17, 2012
Position : Instrument Site engineer
Responsibilities : Supervision and execution of the Instrumentation scope.
8. Company Name : Tyco Pakistan Limited
From : Jan. 2002 to Mar. 2003
Position : Manager Installation & Services.
Responsibilities : Estimation, Execution, and Commissioning
Personal Information:
F/Name : Mr. Minhaj Uddin (Late)
Contacts :+974-6654-7875, +92 33-222-90-797,+971-50-120-4997
: tanveeraniazi@yaahoo.com
Skype ID : jubailrcs
Nationality : Pakistani
Driving License : UAE – Pakistan
Availability : One Month
Reference : Personal reference may be furnished if required. Or
http://qa.linkedin.com/pub/tanveer-ahmed-niazi/2a/5a/8b9
Education
Three years Engineering Diploma of Associate Engineer in 1981from
GCT (Govt. College of Technology) SITE Karachi Pakistan.