Kiran Kumar Reddy has over 8 years of experience as a planning/schedule engineer. He has extensive experience using Primavera P6 and MS Project to plan large EPC projects in multiple industries. Some of the key projects he has worked on include DAP, phosphoric acid, and steam power plants in Morocco and olefins projects in Saudi Arabia. He is skilled at establishing baselines, monitoring progress, identifying delays, and ensuring timely project completion through scheduling.
Planning engineer cv with 9 yrs experience(1)S Ajith
I am having overall 9 years experience into project planning also i am expert in Project planning,scheduling,monitoring, cost controlling ,preparing master programe ,resource planning ,EOT , Project Invoice claiming ,tender packages(Experienced in Commercial, Highraise building, Infra projects and Oil & gas), Software expert in primavera p6.8.3, MS Office project, MS.Excel, 3D google sketchup, Autocad, 3DX Max etc, also i am available to join immediately.
Thanking you,
Thanks Regards,
S.Ajith,
Mob :UAE :+971-0527442745
:INDIA :+91-9994437210
Having 20+ experience in both Onshore and Offshore Oil & Gas, Petrochemicals, Fertilizer, Power Plants and Shutdown projects to develop the data/package such as Scheduling, Progress Measurements systems, reporting and trending and risk assessment for planning and project control. Also having well exposure in Earned Value Analysis, Costing, Budgeting, Risk Management, Fornesic delay analysis and EOT Claims
A Talented, Results-driven Civil Engineering Professional with 10 years 07 month of Experience in Construction of Infrastructure, Roads, utilities, and Landscaping in the site inspections, supervision, quality control and construction management. Possess excellent analytical, problem solving, negotiation, client-contractor-consultant coordination, technical correspondence, management, communication, interpersonal and computer skills.
Planning engineer cv with 9 yrs experience(1)S Ajith
I am having overall 9 years experience into project planning also i am expert in Project planning,scheduling,monitoring, cost controlling ,preparing master programe ,resource planning ,EOT , Project Invoice claiming ,tender packages(Experienced in Commercial, Highraise building, Infra projects and Oil & gas), Software expert in primavera p6.8.3, MS Office project, MS.Excel, 3D google sketchup, Autocad, 3DX Max etc, also i am available to join immediately.
Thanking you,
Thanks Regards,
S.Ajith,
Mob :UAE :+971-0527442745
:INDIA :+91-9994437210
Having 20+ experience in both Onshore and Offshore Oil & Gas, Petrochemicals, Fertilizer, Power Plants and Shutdown projects to develop the data/package such as Scheduling, Progress Measurements systems, reporting and trending and risk assessment for planning and project control. Also having well exposure in Earned Value Analysis, Costing, Budgeting, Risk Management, Fornesic delay analysis and EOT Claims
A Talented, Results-driven Civil Engineering Professional with 10 years 07 month of Experience in Construction of Infrastructure, Roads, utilities, and Landscaping in the site inspections, supervision, quality control and construction management. Possess excellent analytical, problem solving, negotiation, client-contractor-consultant coordination, technical correspondence, management, communication, interpersonal and computer skills.
7 years of experience in Oil & gas and Petrochemical industries, Renewable Energy project
P l a n n i n g , Scheduler, Control, Real Manager and Field, Leader. I analyses, plan, organize, negotiate, direct, control,
manage and evaluate.
I am also responsible for: the procurement budget, its policy and strategy, its logistics, an organization, a region and, in
particular, to identify opportunities to improve operations.
With developed skills in Primavera P6 and good knowledge of National Electrical Codes.
1. Curriculum Vitae
Planning Engineer Page 1
KIRAN KUMAR REDDY.D
Planning/Schedule Engineer (Engineering, Procurement and Construction)
Total: 8 years’ Experience.(India, gulf and Africa)
Email: kkreddymengg@gmail.com
Phone: +91 8885734088 (Ind) +212 (0)662839579 (Morocco)
Nationality: India
CAREER SUMMARY:
A competent Lead Planning/ScheduleEngineer with excellentPlanning,Scheduling,Co-ordinatingand Estimating
skills gained through work experience through all stages of project life Cycle of major international medium and
mega Projects with more than $5 bn, in several industries, Petrochemical, Acid projects, Refineries ,and fertilizer
Projects, In EPC, EPCI, EPCM roles for Cost plus and lump sum turnkey Contract type involved in Construction and
Maintenanceusingsoftware’s PRIMAVERA (P6 V8.3)&M.S PROJECT with Possessinga proven track of preparingand
executing projectplans and programs,preparing micro schedules in compliance with baselineschedules,monitoring
the schedules identifying critical paths for the projects, representing progress on S- curves follow up on weekly,
monthly basis to facilitatetimely completion of Projectthrough planningand monitoring,identifying theroot cause
for delay and preparing Recovery plans and finding solution to avoid further delays Identifying the scope of work
and raising the work orders if there are any deviations as per contract.
Consistent work performance on the basis of dedicated work approach.
PROFESSIONAL QUALIFICATION:
Bachelor of technology (Mechanical Engineering): Obtained First class Degree from Sri
Venkateswara College Engineering & Technology, Chittoor, afflicted to J.N.T.U, Hyderabad, Andhra
Pradesh,India.
Specialization: Certified With PRIMAVERA (P6 V 8.3), M.S PROJECT.
Expert in MSWord, Professional in Excel Formulatingand createpivot tables, Preparing PowerPoint
presentations for meetings.
Highly professional skills in computer operations and quick learningability.
Technical knowledge to review civil and mechanical drawings and estimatingthe work.
Review the PipingDesign Documents (P&ID,PFD Isometrics,Pipingplans,Supports Details,
Orientation drawings and Vendor drawings),Equipment drawingand Structural drawings.
Field experience in erection of Pipe lines & Equipments, coordinating theproject.
PERSONALITY SKILLS
Ability to work under pressure.
Ability to communicate effectively and shareskills with others
Good Communication Skills and leadership ability
Effectively to meet deadlines and maintain confidentiality of the company and disposition for field
work.
2. Curriculum Vitae
Planning Engineer Page 2
Creativity,troubleshootingskillsand quick problemsolving Self-Motivation.,Positivethinking,
Dedicated and Smart worker, Quick learner
EXPERIENCE SUMMARY:
Total: 8 years’ experience.
Company
Type of project
Duration (8 years) Projects
Client Type
Months From TO Description Country
EPC Project
36 Nov-2013 Till date
Dia-Ammonia-Phosphate
Sulfuric Acid
Phosphoric Acid
Steam Power plant
(2 projects) Morocco OCP/ JACOBS
Acid Plants/
Power plant
EPC Project
25 Sep-2011 Oct-2013 Sulfur Melting and Filtration
Madina Group W.L.L
Shut down Project
9 Jan-2010 Sep-2011 Oryx GTL Qatar Oryx
Oil & Gas
Construction
25 Nov-2008 Dec-2010
Phenolics Project
Saudi Arabia
Tecnicas
Reunidas (TR)
Olefins project,
Kellogg Brown &
Root (KBR).
Saudi kayan ,
TECHNICAL EXPERIENCE:
Technical skills:
Strong Technical skill with project management software, such as PRIMAVERA (P6), M.S PROJECT and
computer literate.
Planning & scheduling of construction activities for civil, structure, Mechanical, Piping Electrical and
Instrumentation with Technical logical links by using project management software such as PRIMAVERA
(P6), M.S PROJECT and tools.
Well experienced in dealingwith all type of equipments from construction phaseto commissioningphase
likeBoilers ,Steam Turbine Generators, Heat, Cold Heat exchangers ,Dryer, Granulator,all kind Horizontal
and vertical Pumps, converters, ducts and chutes, plant stacks and columns and static and dynamic
equipments, filters etc.
Experience with technical skills in converting construction phase schedule into system turnover schedule
Strong technical skill in preparing official letters based on project situation and contractual issues.
Well experienced in producing Baseline Schedules and breaking activities in to level-4 schedule with
competent S Curves and performance monitoring tools.
Experienced in estimating Man hours and durations based on MTO’s BOQ’s and Quantities, adaptable to
the country factorization for efficiency and productivity.
Ability to manage multiple Projects and 10000 activities in Primavera P6 and keeping track.
Experience in measuring Progress through Earned Value Management (EVM).
3. Curriculum Vitae
Planning Engineer Page 3
Experience in preparingSchedulePerformanceIndex (SPl) , ScheduleVariance(SV), CostPerformanceIndex
(CPI), To Complete Performance Index (TCPI), Cost Variance(CV) for Medium and major Projects with cost
of Billon Dolor Projects,
Monitoring all activities in the project schedule for potential delays, and regularly update claims and
variation logs.
Experienced in running the Schedule under different scenario to identify Rick involved in the schedule.
Ability to review the contractor's schedule and suggest changes/improvement.
Accumulates, collects and analyses data and information required for planning.
Updatingprogress reports& issuelook-ahead schedule,Daily,Weekly and Monthly Projectprogress reports
and reporting to Clients, Project management and construction team.
Identifying the scope of work and raising the work orders if there are any deviations from contractual
commitments.
Specialized in preparing Level-I, Level-II, Level-III and Level-IV schedules using P6 in line with contractual
commitments.
Preparing contracts by estimating the works with resources.
Review the PipingDesign Documents (P&ID,Isometrics,Pipingplans,Supports Details,Orientation drawings
and Vendor drawings),Equipment drawing and Structural drawings.
Planning the job by considering available manpower and resources to get best results and higher
productivity.
Experienced in analyzingdelays thatoccurred duringproject duration by usingwindow time sliceanalysis
(critical path analysis) and preparing extension of time (EOT) reports for submission of client and fair
knowledge on Prolongation cost.
Assistingthe Resident Engineer in contract administration and preparingend of transaction claimanalysis
and using as-built or as-planned delay analysis.
PROJECTS EXECUTED:
Dia Amonia Phosphate ,Phosphoric Acid, Sulfuric Acid and Steam Power plant (ODI-2&ODI-3) :
Company : SAMSUNG C&T Clients: OCP/JACOBS
Position : Lead PlanningEngineer
Duration : Nov-2013 to present
My Roll: Planning and Scheduling Engineer, for Engineering, Procurement, Construction and Commissioning
activities using Primavera P6, MS project and other tools.
As Lead planning/schedule Engineer
Established baselineschedules with loaded man hours and quantity for ODI 3 and ODI 4 projects (DAP,PAP,
SAP) by estimatingMan hours and duration based on BOQ Quantities and ROC for equipments by Selecting
4. Curriculum Vitae
Planning Engineer Page 4
most appropriate techniques and logical sequence to complete project scope as per contractual
requirement.
Risk analysiswas doneon scheduleto check the reliability of scheduleby keying Major risk involved in the
project.
Updating activity progress based on achieved quantity and earned man-hours on weekly basis.
Implementing cost efficient method for construction; tracking design approvals, construction / shop
drawings approvals, material approvals, delay in site inspection, bill of quantities variation & addition /
deletion and natural calamities, site instruction register, etc for applying Extension of time.
Keeping close watch on various activities of Project (like delivery of materials, site clearance, duration of
activities, Holds etc.) and updating the Project Manager on any Risk foreseen for project completion and
providing suggestions.
Preparing3 weeks look ahead schedules and quantity plan and monitoring projects based on plan vs
achieved quantity. Providingwork front and monthly targets to execution team and estimatingthe
balancework.
Identifying delayed activities and investigating the reasons for delay and reporting to my superior and
construction team leaders for necessary actions.
Analyze deviation, change of contract scope or delay and reschedule as required to meet target dates in
coordination with the construction Managers.
Sets up alerts for all important contractual and milestone dates.
Identification of required resources likeMaterials,Manpower, Contractingservices, Equipment, Tooling&
Facilities etc. for work completion.
Regularly monitoring critical path and preparing schedule impact reports for the project management.
Proactively assessingprogress,completion forecasts and providingsolutionsto mitigatescheduledelays or
to optimize project completion.
Evaluating project progress against historical indicators on weekly basis and providing the management
with comparative analysis. Responsible for day to day interaction with client / consultants / subcontracts
regarding the progress of the work
If any civil handovers and heavy equipment are delayed by client which is leading to delay of the project,
identifying them sending official letters to client to keep contractual rights.
Preparation daily, weekly and monthly reports based on site activity progress which includes resource
histograms and representing and reporting project progress on S-Curves for monitoring, forecasting and
Preparing Quantity and Material Takeoff Summaries.
Calculatingproductivity based on budgeted hours and actual hours by disciplinesand estimatingremaining
duration for activities
Preparing level 4 construction schedule in compliance with base line schedule to tack project.
5. Curriculum Vitae
Planning Engineer Page 5
Preparing amendment schedule for increase scope of work and identi fying the impact on the schedule.
Preparing expediting schedules as per client requirement.
Preparingprogress % calculation systems,earned man-hours,productivity & Trend analysis.
Conducting IAP Meetings to solve interface issues between design/ engineering/ procurement and
construction team for smooth running of constructions
Maintaining equipment delivery/ civil handover and construction activities history.
Determining appropriate logistics solution in managing resources
Responsiblefor cost control measures by optimum utilization of resources & eliminatingre-work, idlingof
manpower and equipment, wastageof material and consumables,etc.and Preparation of invoices,change
order and extra work claims for mechanical ,Piping and structure works .
Coordinating with commercial department, providing technical assistance in sub contractor selection and
making comparative statements, cost and time impacts for subcontracted activities.
Close coordination with technical and execution personnel for Time & Cos t Impact due to variations and
change orders.
Planningand attendingprogress review meeting with clients and sub-contractors.
Conducting meetings and preparingMOM to followthe activities.
Regularly communicatingthrough mails and remindingdelayed activities to the contractors and vendors
Ensure any deviation from plan is promptly spotted and analyzed,final timeimpactis estimated and the
effect of correctiveactions taken is monitored.
Monitor and track the deviation between the plan and actual. Record the areas of improvement for the
future requirements and prepare the post-turnaround report and organize the critical meetings.
Preparation Executive Progress Summary Report / Presentations to the Top Management on Project
Status for periodical review.
Establish and manage effective planning and progress control system in order to support the Project
Manager decision-makingProcessand allowhimto complete the projectaccordingto theBaselineschedule
and in compliance with the contractual dates and requirement.
Preparingcommissioningschedules in coordination with equipment supplier,erection agency, testing and
commissioning team to match with the project completion plan
Converting construction schedule into system turnover schedule to support pre commissioning and
commissioning process.
Sulphur melting and filtration project :
Company : FurnaceFabrica Clients : OCP/JACOBS
Position : Lead PlanningEngineer
Duration : Sep-2011 to Oct-2013
My Roll: Planning and scheduling the works using primavera p6 and MS project.
6. Curriculum Vitae
Planning Engineer Page 6
As a Planning engineer
Established baselineschedules for Sulphur meltingand filtration projectby estimating man-hours based
on local productivity and BOQ quantity as per contractual scope.
Identifyinglonglead equipments and expandingwith procurement team in order to delivery as per site
scheduleto avoid impact,
Preparingand updatingsite progress daily /weekly /Monthly reports and other supportingdocuments.
Conducting critical meetings and preparingMOM.
Managingsubcontractor schedules and converting them to meet baselinescheduleplan.
Reviewing the contractual scope and preparing the work break down structure (WBS) splitting WBS in to
activities assigning resources and reviewing the schedule on weekly and monthly basis.
Providingwork front and monthly targets to execution team and estimatingthe balancework.
Identifying the miss-matches and reworks at site, planning and estimating the works and submitting for
approval from clients.
JustifyingtheRunning billsbased on progress prorateto clients and raisinginvoices to maintain projectcash
flow.
Prepare Cost breakdown schedule for Milestone payment claim based on approval of Client.
Gas to liquid project
Client: Oryx GTL
Position: Maintenance planning engineer Duration: Jan-2011 to Sep-2011
My Roll: Planning engineer for shutdown project
Planning, scheduling & coordination of Critical Maintenance activities, Turnaround (TA) / Shutdown with
the help of MS-Project/ Primavera P6 tool.
Identification of required resources likeMaterials,Manpower, Contractingservices, Equipment, Tooling&
Facilities etc. for work completion.
Kick- startthe planningprocess by requisition of scopeinputfromthe operation, inspection,engineering&
maintenance. Develop, challenge and finalize the approved scope of work.
Identification the long lead materials,resources/ services required to execute the approved final scopeof
work. Draw out an execution plan by following the best practices.
Preparingof realistic and costeffectivemaintenance/ Turnaround budget based on final scopeof work and
execution plan.
Olefins project /Ethylene cracker
Clients : Saudi kayan, Kellogg Brown and Root (KBR)
Position:Planning Engineer.Duration:November-2008 to Dec 2010
Project Brief:Olefins project is one of the major projects in Saudi kayan petro chemical complex. Constructed with
high technical valves & standards which Produces products like Ethylene, Propylene and Benzene by feeding
predominately Butane and Ethane. Capacity of the project is 1.35 million metric tons per year (KTA).
My role: Planning engineer.
7. Curriculum Vitae
Planning Engineer Page 7
Preparing BOQ quantities from drawings
Creating baseline schedule for project
Updating progress and preparing reports
Worked as a site engineer and experienced all construction techniques.
Updating site progress based on quantities
PERSONAL PROFILE:
Name KiranReddy . D
Date of Birth 21-March-1987
Marital Status Single.
Nationality Indian
Languages known Telugu, Hindi & English.
Permanent Address #2-2128, Chennareddy Colony,
Piler,Chittoor District(A.P), India.
PASSPORT DETAILS:
Passport Number G8880778
Place of Issue HYDERABAD
Date of issue 21-05-2008
Date of Expiry 22-05-2018
DECLARATION:
I hereby declare that the information furnished above is true to the best of my knowledge.
Place :
Date: (KiranKumar.D)