SAJITH N NAIR
Phone: +91-9995395562 Email: saji194@gmail.com
EXPERIENCE SUMMARY- PLANNING ENGINEER
• Overall 8 years experienced in Oil & Gas Platform at Project Management Field, Project Controls
by using Primavera Software for Engineering, Procurement & Construction (EPC) Project,
Shutdown & Plant Maintenance Project. Engineering, Procurement, Construction Sequence of
activities in Process Plant.
EDUCATIONAL PROFILE
• Bachelor of Mechanical Engineering (BE) from Nitte Meenakshi Institute of Technology
/Visveswaraiah Technological University, Belgaum (2003- 2007)
SOFTWARE SKILLS
• Primavera P6.8.2
• MS Project.
• MS Excel, MS Word, MS Power point.
• Maximo
PROFESSIONAL PROFILE
Working as Planning Engineer in DOPET, Qatar. – November 2014 – Present.
• Projects:
1. Major Shutdown at North Field Alpha -2015 PS4 Platform(Offshore).
2. Mechanical Static Equipment Inspection and Overhauling During QATOFIN General
Shutdown.
3. Shutdown Maintenance works at FNGLCS TA-2014.
 Preparation of detailed shutdown schedule, daily monitoring, prepare daily schedule update
using Primavera 8.2.
 Monitoring of Progress on daily basis and preparation Daily, Weekly and Monthly project
progress reports.
 Preparation, submission and updating of the resource loaded Project Master Schedule using
primavera P6.
Sheet No: 1/5
 Preparation and updating of project S Curves, bar charts / manpower (histograms) & equipment.
 Close coordination with Planning Manager & Project Manager.
 Lead development of baseline schedule and support Project Manager (PM) in Integrated
Baseline Review (IBR).
 Preparation of 2-week schedule based on work front availability though Primavera P6.
 Preparation of Monthly cost/planning status reports to Management.
 Preparation of project budget including contractors tools, equipment and manpower.
 Preparation of close out report for shutdown projects.
Worked as Planning Engineer in Petrofac International UAE LLC. – October 2011 – September 2014
• Responsibilities in Inspection, Maintenance and Repair Contract, Rumaila Field – Southern Iraq
(Client : British Petroleum)
 Provide planning/Scheduling and system support for TAR maintenance work activities at Site.
 Close liaison with the BP TAR Planning Team and Maintenance group.
 Prepares TAR Maintenance schedules, monitors completion of the work carried out and
forecasts activities.
 Defines TAR maintenance activities, defining manpower and logistic requirements.
 Responsible to conduct planning, monitoring and control functions as per BP approved
procedure.
 Responsible for attending all the queries and clarification from client regarding the
Planning/scheduling.
 Preparation of Level 3 schedule for Total Station Shutdown and Turnaround of degassing
stations.
 Preparation & Implementation of the Progress Measurement System as per Progress
Measurement Procedure, & Schedule Levels, Work break down Structure, assign milestones and
constraints by using Critical Path Method (CPM).
 Monitoring of Progress on daily basis and preparation Daily, Weekly and Monthly project
progress reports.
 Preparation, submission and updating of the resource loaded Project Master Schedule using
primavera P6.
 Preparation and updating of project S Curves, bar charts / manpower (histograms) & equipment.
 Close coordination with Planning Manager & Project Manager.
 Lead development of baseline schedule and support Project Manager (PM) in Integrated
Baseline Review (IBR).
 Preparation of 2-week schedule based on work front availability though Primavera P6.
Sheet No: 2/5
 Preparation of Monthly cost/planning status reports to Management.
 Preparation of project budget including contractors tools, equipment and manpower.
 Plan, coordinate and monitor activities of assigned projects to develop and implement
procedures, processes and systems.
 Prepare short and long-term resource allocation plans.
 Oversee schedules and risk management plans and provide serious deviations warnings
hindering project results.
 Ensure to take appropriate planning measures with all clients to reassess, renegotiate and
amend scope of work responsibilities, proposals, contracts and budgets.
 Carrying out of cost and revenue variance analysis.
 Prepare and present regular internal and external project reports for management.
Worked as a Planning Engineer in Madina Group. W.L.L, Qatar – March 2010 – August 2011
• Responsibilities in PCI Service Contract for RAS GAS
 Develop & Maintain the Project Plan, Scheduling & monitoring the Project activities by Using
Primavera Project Planner for Enterprise P6.1 Software
 Prepare the Short term & Long term Construction Schedules & monitoring the completion of
Activities (Civil, Piping, Heat Exchangers, Pressure Vessels , Filters ,Structural works , E & I
Works)
 Preparation of Shutdown schedule for shutdown activities in various Trains.
 Coordinate with Operation Group to get the clear sequence of various activities in LNG Trains,
LNG Berth & Offshore Facilities
 Clearly Identify the Procurement & Construction Activities, Manpower, Tools, machineries &
Equipment requirement of each work packs.
 Preparation the Project Construction Reports (Daily, weekly, Monthly), which includes the
Project Schedule & S- curve, Resource Analysis, Material & document Status.
 Clearly Identify the Procurement & Construction Activities, Manpower, Tools, machineries &
Equipment requirement of each work packs.
 Preparation of Overall Weekly Progress Report & Productivity Report.
 Preparation of Manpower Histogram highlighting the manpower plan, forecast and updating the
actual.
 Reporting to Site Manager & Corporate Planning Manager
 Following Corporate HSE , Quality Procedures
Sheet No: 3/5
Worked as a Planning Engineer in Tech Sharp Engineers Pvt. Ltd. – July 2007 – March 2010
• Responsibilities in Capacity Expansion Projects in Bharat Petroleum Corporation Ltd.
 Develop & Maintain the Project Planning, Scheduling & monitoring the Project activities by Using
Primavera Project Planner for Enterprise P6.1 Software & MS Project.
 Coordination with Engineering, Procurement, Construction & Communicate with our Sub
contractors for Planning, Execution of the Projects on Time & on Budget.
 Study of Engineering drawings and technical specifications
 Define the WBS Levels & Activity code Levels for having effective control over the project.
 Identifying the Areas of concern and Critical path of the project.
 Preparation of the Look ahead Schedule that effectively drives and control the Project.
 Preparation & Maintaining the Progress Calculation, Estimated Bill of Quantity.
 Measuring the progress Performed and compare the Baseline Plan Vs Actual Progress to analyze
the delay.
 Monitoring and Update the day-to-day site activities, manpower, Equipments Utilization and
Construction activities.
 Preparation the Project Construction Reports (Daily, weekly, Monthly), which includes the
Project Schedule & S- curve, Resource Analysis, Material & document Status.
 Reporting to Site Manager & Site Project Control Manager
PROJECT DETAILS:
 Project Name: Inspection, Maintenance and Repair Contract, Rumaila Field – Southern Iraq
Client: British Petroleum, Iraq.
Project Overview: Inspection, Maintenance and Repair of Degassing stations, Rotating
equipments & Cluster stations.
 Project Name: PCI Service Contract for RAS GAS - CT/RG27/G204/08
Client: Rasgas Company Limited, Qatar
Project Overview: Procurement, Construction & Installation of LNG Train, Berth & Offshore
Facilities Maintenance works, which includes Civil, Piping, Equipment Erection (Heat Exchangers,
Turbine, Pressure Vessels, and Filters), Structural works and E & I Works.
 Project Name: CDU II Revamp for Capacity Expansion cum Modernization (CEMP Phase II)
Project.
Sheet No: 4/5
Client: Bharat Petroleum Corporation Ltd. Kochi Refinery.
Project Overview: Installation of Equipments (Heat Exchangers, Vessels, Columns and Pumps),
Modification of piping system.
 Project Name: Tankage work for Capacity Expansion cum Modernization (CEMP Phase II)
Project.
Client: Bharat Petroleum Corporation Ltd. Kochi Refinery.
Project Overview: Design, Fabrication and Erection of Storage Tanks.
PERSONAL PROFILE
Name
Address
SAJITH NEELAKANTAN NAIR
Sreesaji (H), Changampuzha Nagar P.O, Thrikkakara, Kerala.
Cochin-682033
D.O.B 26 April 1985
Age 30
Sex
Marital Status
Male
Married
Nationality Indian
Languages English, Hindi & Malayalam
Passport Z2305206
Alternate E-mail saji194@yahoo.com
Sheet No: 5/5
Client: Bharat Petroleum Corporation Ltd. Kochi Refinery.
Project Overview: Installation of Equipments (Heat Exchangers, Vessels, Columns and Pumps),
Modification of piping system.
 Project Name: Tankage work for Capacity Expansion cum Modernization (CEMP Phase II)
Project.
Client: Bharat Petroleum Corporation Ltd. Kochi Refinery.
Project Overview: Design, Fabrication and Erection of Storage Tanks.
PERSONAL PROFILE
Name
Address
SAJITH NEELAKANTAN NAIR
Sreesaji (H), Changampuzha Nagar P.O, Thrikkakara, Kerala.
Cochin-682033
D.O.B 26 April 1985
Age 30
Sex
Marital Status
Male
Married
Nationality Indian
Languages English, Hindi & Malayalam
Passport Z2305206
Alternate E-mail saji194@yahoo.com
Sheet No: 5/5

Planning Engineer _CV

  • 1.
    SAJITH N NAIR Phone:+91-9995395562 Email: saji194@gmail.com EXPERIENCE SUMMARY- PLANNING ENGINEER • Overall 8 years experienced in Oil & Gas Platform at Project Management Field, Project Controls by using Primavera Software for Engineering, Procurement & Construction (EPC) Project, Shutdown & Plant Maintenance Project. Engineering, Procurement, Construction Sequence of activities in Process Plant. EDUCATIONAL PROFILE • Bachelor of Mechanical Engineering (BE) from Nitte Meenakshi Institute of Technology /Visveswaraiah Technological University, Belgaum (2003- 2007) SOFTWARE SKILLS • Primavera P6.8.2 • MS Project. • MS Excel, MS Word, MS Power point. • Maximo PROFESSIONAL PROFILE Working as Planning Engineer in DOPET, Qatar. – November 2014 – Present. • Projects: 1. Major Shutdown at North Field Alpha -2015 PS4 Platform(Offshore). 2. Mechanical Static Equipment Inspection and Overhauling During QATOFIN General Shutdown. 3. Shutdown Maintenance works at FNGLCS TA-2014.  Preparation of detailed shutdown schedule, daily monitoring, prepare daily schedule update using Primavera 8.2.  Monitoring of Progress on daily basis and preparation Daily, Weekly and Monthly project progress reports.  Preparation, submission and updating of the resource loaded Project Master Schedule using primavera P6. Sheet No: 1/5
  • 2.
     Preparation andupdating of project S Curves, bar charts / manpower (histograms) & equipment.  Close coordination with Planning Manager & Project Manager.  Lead development of baseline schedule and support Project Manager (PM) in Integrated Baseline Review (IBR).  Preparation of 2-week schedule based on work front availability though Primavera P6.  Preparation of Monthly cost/planning status reports to Management.  Preparation of project budget including contractors tools, equipment and manpower.  Preparation of close out report for shutdown projects. Worked as Planning Engineer in Petrofac International UAE LLC. – October 2011 – September 2014 • Responsibilities in Inspection, Maintenance and Repair Contract, Rumaila Field – Southern Iraq (Client : British Petroleum)  Provide planning/Scheduling and system support for TAR maintenance work activities at Site.  Close liaison with the BP TAR Planning Team and Maintenance group.  Prepares TAR Maintenance schedules, monitors completion of the work carried out and forecasts activities.  Defines TAR maintenance activities, defining manpower and logistic requirements.  Responsible to conduct planning, monitoring and control functions as per BP approved procedure.  Responsible for attending all the queries and clarification from client regarding the Planning/scheduling.  Preparation of Level 3 schedule for Total Station Shutdown and Turnaround of degassing stations.  Preparation & Implementation of the Progress Measurement System as per Progress Measurement Procedure, & Schedule Levels, Work break down Structure, assign milestones and constraints by using Critical Path Method (CPM).  Monitoring of Progress on daily basis and preparation Daily, Weekly and Monthly project progress reports.  Preparation, submission and updating of the resource loaded Project Master Schedule using primavera P6.  Preparation and updating of project S Curves, bar charts / manpower (histograms) & equipment.  Close coordination with Planning Manager & Project Manager.  Lead development of baseline schedule and support Project Manager (PM) in Integrated Baseline Review (IBR).  Preparation of 2-week schedule based on work front availability though Primavera P6. Sheet No: 2/5
  • 3.
     Preparation ofMonthly cost/planning status reports to Management.  Preparation of project budget including contractors tools, equipment and manpower.  Plan, coordinate and monitor activities of assigned projects to develop and implement procedures, processes and systems.  Prepare short and long-term resource allocation plans.  Oversee schedules and risk management plans and provide serious deviations warnings hindering project results.  Ensure to take appropriate planning measures with all clients to reassess, renegotiate and amend scope of work responsibilities, proposals, contracts and budgets.  Carrying out of cost and revenue variance analysis.  Prepare and present regular internal and external project reports for management. Worked as a Planning Engineer in Madina Group. W.L.L, Qatar – March 2010 – August 2011 • Responsibilities in PCI Service Contract for RAS GAS  Develop & Maintain the Project Plan, Scheduling & monitoring the Project activities by Using Primavera Project Planner for Enterprise P6.1 Software  Prepare the Short term & Long term Construction Schedules & monitoring the completion of Activities (Civil, Piping, Heat Exchangers, Pressure Vessels , Filters ,Structural works , E & I Works)  Preparation of Shutdown schedule for shutdown activities in various Trains.  Coordinate with Operation Group to get the clear sequence of various activities in LNG Trains, LNG Berth & Offshore Facilities  Clearly Identify the Procurement & Construction Activities, Manpower, Tools, machineries & Equipment requirement of each work packs.  Preparation the Project Construction Reports (Daily, weekly, Monthly), which includes the Project Schedule & S- curve, Resource Analysis, Material & document Status.  Clearly Identify the Procurement & Construction Activities, Manpower, Tools, machineries & Equipment requirement of each work packs.  Preparation of Overall Weekly Progress Report & Productivity Report.  Preparation of Manpower Histogram highlighting the manpower plan, forecast and updating the actual.  Reporting to Site Manager & Corporate Planning Manager  Following Corporate HSE , Quality Procedures Sheet No: 3/5
  • 4.
    Worked as aPlanning Engineer in Tech Sharp Engineers Pvt. Ltd. – July 2007 – March 2010 • Responsibilities in Capacity Expansion Projects in Bharat Petroleum Corporation Ltd.  Develop & Maintain the Project Planning, Scheduling & monitoring the Project activities by Using Primavera Project Planner for Enterprise P6.1 Software & MS Project.  Coordination with Engineering, Procurement, Construction & Communicate with our Sub contractors for Planning, Execution of the Projects on Time & on Budget.  Study of Engineering drawings and technical specifications  Define the WBS Levels & Activity code Levels for having effective control over the project.  Identifying the Areas of concern and Critical path of the project.  Preparation of the Look ahead Schedule that effectively drives and control the Project.  Preparation & Maintaining the Progress Calculation, Estimated Bill of Quantity.  Measuring the progress Performed and compare the Baseline Plan Vs Actual Progress to analyze the delay.  Monitoring and Update the day-to-day site activities, manpower, Equipments Utilization and Construction activities.  Preparation the Project Construction Reports (Daily, weekly, Monthly), which includes the Project Schedule & S- curve, Resource Analysis, Material & document Status.  Reporting to Site Manager & Site Project Control Manager PROJECT DETAILS:  Project Name: Inspection, Maintenance and Repair Contract, Rumaila Field – Southern Iraq Client: British Petroleum, Iraq. Project Overview: Inspection, Maintenance and Repair of Degassing stations, Rotating equipments & Cluster stations.  Project Name: PCI Service Contract for RAS GAS - CT/RG27/G204/08 Client: Rasgas Company Limited, Qatar Project Overview: Procurement, Construction & Installation of LNG Train, Berth & Offshore Facilities Maintenance works, which includes Civil, Piping, Equipment Erection (Heat Exchangers, Turbine, Pressure Vessels, and Filters), Structural works and E & I Works.  Project Name: CDU II Revamp for Capacity Expansion cum Modernization (CEMP Phase II) Project. Sheet No: 4/5
  • 5.
    Client: Bharat PetroleumCorporation Ltd. Kochi Refinery. Project Overview: Installation of Equipments (Heat Exchangers, Vessels, Columns and Pumps), Modification of piping system.  Project Name: Tankage work for Capacity Expansion cum Modernization (CEMP Phase II) Project. Client: Bharat Petroleum Corporation Ltd. Kochi Refinery. Project Overview: Design, Fabrication and Erection of Storage Tanks. PERSONAL PROFILE Name Address SAJITH NEELAKANTAN NAIR Sreesaji (H), Changampuzha Nagar P.O, Thrikkakara, Kerala. Cochin-682033 D.O.B 26 April 1985 Age 30 Sex Marital Status Male Married Nationality Indian Languages English, Hindi & Malayalam Passport Z2305206 Alternate E-mail saji194@yahoo.com Sheet No: 5/5
  • 6.
    Client: Bharat PetroleumCorporation Ltd. Kochi Refinery. Project Overview: Installation of Equipments (Heat Exchangers, Vessels, Columns and Pumps), Modification of piping system.  Project Name: Tankage work for Capacity Expansion cum Modernization (CEMP Phase II) Project. Client: Bharat Petroleum Corporation Ltd. Kochi Refinery. Project Overview: Design, Fabrication and Erection of Storage Tanks. PERSONAL PROFILE Name Address SAJITH NEELAKANTAN NAIR Sreesaji (H), Changampuzha Nagar P.O, Thrikkakara, Kerala. Cochin-682033 D.O.B 26 April 1985 Age 30 Sex Marital Status Male Married Nationality Indian Languages English, Hindi & Malayalam Passport Z2305206 Alternate E-mail saji194@yahoo.com Sheet No: 5/5