SlideShare a Scribd company logo
Planning Engineer
Birth date: Nov.1975
Mohammed Shaker Abdullah
+201128483507 / +201025235906
Email: emshaker@yahoo.com
I hold a B.Sc. in Mechanical Engineering and have 16 years’ experience in
project planning/ Controlling and O&M of power generation plants. As well as I
ability to follow up technical activities of super-heater and Re-heat coils changing
for unit’s manufacturer.
CHRONOLOGICAL EXPERIENCE RECORD
Job Title : Project Control Manager
Dates : June 2016 to in progress
Employer : PSC / Siemens CCPP 4 X 1200 MW (Bin Suef Project)
Project : Mechanical infrastructure and commissioning for full equipment of 2x GTG and 4 x
HRSG
Job Title : Senior Planning Engineer
Dates : Dec 2014 to May 2016
Employer : Al-Gihaz / ARAMCO in KSA (ARAMCO Certified) (LSTK project)
Project : Upgrading Transmission system, switching gear, Circuit Breakers, Battery and
Charging System, SCADA, OHTL, Under Ground Cables, Communication &
Instrumentations Systems and Buildings and Metering Rooms civil works for 37 sites
Job Title : Maintenance planning engineer.
Dates : June 2013 to Nov 2014
Employer : UEEPCo. Power generation plant 2*312 MW in Egypt
Work Scope : Rotating and Static equipment’s ( Pumps, Compressors, Electrical Motors, HVAC,
Steam Boilers, Air Fans, Water Treatment System, Switch Gears, GIS, Transformers,
Valves, Condensers, Steam heaters, heavy oil heaters ,……etc.)
Job Title : Planning Engineer
Date : Aug 2011 to May 2013
Employer : DOOSAN Korean Co. (AlEin Al Sokhna, project) in Egypt
Project : 2x650 MW Suppers Critical boilers electrical and instruments infrastructure and
commissioning
Job Title : Planning Engineer
Date : Jan 2009 to Mar 2011.
Employer : ABB- AG.(GE & Doosan QatalumLSTK project) in Qatar
Project : Electrical and controlling infrastructure and full commissioning for 400kv& 220kv
cables, GCBs, GIS, protection,Monitoring and SCADA systems, MV & LV switch
gears, TransformersAnd overhead lines)
Job Title : Planning Engineer
Date : Jan 2008 to Dec 2008
Employer : Mitsubishi Heavy Industry (MHI).(CCPP – 2x750 MW LSTK project)
Project : Mechanical and Electrical infrastructure and full commissioning for 2 X Gas
Turbines and Generators and 2 X HRSGs.
Job Title : Maintenance planning Engineer
Date : Jan 2006 to Dec 2007
Employer : Assuit Power plant 2x300 MW. In Egypt
Work Scope : Shutdown and starting up scheduler and overhaul maintenance planning for co-
generation steam plan equipment.
Job Title : Maintenance Engineer
Date : Mar 2001 to Dec 2005.
Employer : Assuit Power plant 2x300 MW. In Egypt
Work Scope : Maintenance of Co-generation steamturbine auxiliaries (Pumps, Air compressors,
Valves, Condensers, Steam heaters, heavy oil heaters….etc.)
Experience:
 Design the project master schedule for all levels
 Determine the project resources require for the plan.
 Analysis of data stored in the project management and cost control
 Define and determine the project risk plan.
 Implements and maintains Project Planning and Scheduling.
 Analyzes, evaluates, and forecasts current status against an established baseline schedule.
 Assesses the impact(s) of design or construction changes and schedule slippages.
 Implements and maintains an Earned Value Management System on the project.
 Analyzes cost and schedule performance indicators (CPI and SPI).
 Prepares and maintains project forecasts and status updates.
 Reports schedule status to all levels of project and Company management as well as to the Client.
 Implement and design the project curves are required for resources and cost.
 Provides assessment with corrective action recommendations to management.
 May provide guidance, direction, and specialized assistance to others in the resolution of project control
problems.
 Calculate EOT required for recovering the project schedule impacting.
 Understands and applies engineering, procurement, and construction terminology, concepts, and
relationships.
EDUCATION
: B.Sc. in Mechanical engineering 2000, (5 years).
: Assuit Faculty of Engineering
LANGUAGES
Arabic : Native Language
English : Very good
COMPUTER SKILLS
: Primavera EPM P6, MS Project
: Auto-Cad & Solid-Works.
: Microsoft office Word, Excel, Power point.
TRAINING COURSES AND CERTIFICATIONS
 PMP course
 Tutorial of operating and maintaining of high pressure vessel by ENPPI’s co instructors. 
 Trained on the modern steam power generation plant operation & maintenance. 
 Experience in reading the power generation mechanical/ instrumental drawings (PID). 

More Related Content

What's hot

Resume - MOSTAFA SAYED (C.V)
Resume - MOSTAFA SAYED (C.V)Resume - MOSTAFA SAYED (C.V)
Resume - MOSTAFA SAYED (C.V)
Mostafa Sayed
 
PIPING SUPERVISOR RESUME
PIPING SUPERVISOR RESUME  PIPING SUPERVISOR RESUME
PIPING SUPERVISOR RESUME
Raghavendra Velayutharaja
 
Quantity Surveyor
Quantity Surveyor Quantity Surveyor
Quantity Surveyor
Danger Riyas
 
Karthikeyan CIVIL Engg Resume (1)
Karthikeyan CIVIL Engg Resume (1)Karthikeyan CIVIL Engg Resume (1)
Karthikeyan CIVIL Engg Resume (1)
karthikeyan ramamoorthy
 
En-Waleed Ibrahim Sr. Construction Piping Engineer cv
En-Waleed Ibrahim Sr. Construction Piping Engineer     cvEn-Waleed Ibrahim Sr. Construction Piping Engineer     cv
En-Waleed Ibrahim Sr. Construction Piping Engineer cv
waleed ibrahim
 
CV_VEERAKAMU.C_PIPING_
CV_VEERAKAMU.C_PIPING_CV_VEERAKAMU.C_PIPING_
CV_VEERAKAMU.C_PIPING_
VEERAKAMU C
 
Romy George civil site engineer.
Romy George civil site engineer.Romy George civil site engineer.
Romy George civil site engineer.
Romy george
 
civil engineer Cv
civil engineer Cvcivil engineer Cv
civil engineer Cv
Rinu Chacko
 
Curriculum vitae of civil engineer for construction manager or Sr. project en...
Curriculum vitae of civil engineer for construction manager or Sr. project en...Curriculum vitae of civil engineer for construction manager or Sr. project en...
Curriculum vitae of civil engineer for construction manager or Sr. project en...
Amir Mohammed
 
HVAC DRAFTSMAN CV
HVAC DRAFTSMAN CVHVAC DRAFTSMAN CV
HVAC DRAFTSMAN CV
FAISAL YUSUF
 
CIVIL SUPERVISOR-CV-abdul shukoor
CIVIL SUPERVISOR-CV-abdul shukoorCIVIL SUPERVISOR-CV-abdul shukoor
CIVIL SUPERVISOR-CV-abdul shukoor
abdul shukoor
 
CV- Faraz Yasin, Planning Engineer 28-Nov-2016
CV- Faraz Yasin,  Planning Engineer 28-Nov-2016CV- Faraz Yasin,  Planning Engineer 28-Nov-2016
CV- Faraz Yasin, Planning Engineer 28-Nov-2016
Faraz Yasin
 
Sohail Afzaal CV for Site Engineer
Sohail Afzaal CV for Site EngineerSohail Afzaal CV for Site Engineer
Sohail Afzaal CV for Site Engineer
SOHAIL SHAH
 
Civil Engineer & Inspector
Civil Engineer & InspectorCivil Engineer & Inspector
Civil Engineer & Inspector
MOHAMED RASHEED
 
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
Sachin Chitnis
 
Planning Engineer _CV
Planning Engineer _CVPlanning Engineer _CV
Planning Engineer _CV
Sajith Nair
 
Iftekhar Civil Engineer CV
Iftekhar Civil Engineer CVIftekhar Civil Engineer CV
Iftekhar Civil Engineer CV
iftekhar Ahmad Baig
 
CV Senior Quantity Surveyor(CIVIL)
CV Senior Quantity Surveyor(CIVIL)CV Senior Quantity Surveyor(CIVIL)
CV Senior Quantity Surveyor(CIVIL)
Naeem Altaf Chughtai
 
CV-Thowfeek
CV-ThowfeekCV-Thowfeek
CV-Thowfeek
Thowfeek Haneefa
 
Cv s.sankarasubramanian - senior planning engineer
Cv   s.sankarasubramanian - senior planning engineerCv   s.sankarasubramanian - senior planning engineer
Cv s.sankarasubramanian - senior planning engineer
Sankar Sundaram PMP
 

What's hot (20)

Resume - MOSTAFA SAYED (C.V)
Resume - MOSTAFA SAYED (C.V)Resume - MOSTAFA SAYED (C.V)
Resume - MOSTAFA SAYED (C.V)
 
PIPING SUPERVISOR RESUME
PIPING SUPERVISOR RESUME  PIPING SUPERVISOR RESUME
PIPING SUPERVISOR RESUME
 
Quantity Surveyor
Quantity Surveyor Quantity Surveyor
Quantity Surveyor
 
Karthikeyan CIVIL Engg Resume (1)
Karthikeyan CIVIL Engg Resume (1)Karthikeyan CIVIL Engg Resume (1)
Karthikeyan CIVIL Engg Resume (1)
 
En-Waleed Ibrahim Sr. Construction Piping Engineer cv
En-Waleed Ibrahim Sr. Construction Piping Engineer     cvEn-Waleed Ibrahim Sr. Construction Piping Engineer     cv
En-Waleed Ibrahim Sr. Construction Piping Engineer cv
 
CV_VEERAKAMU.C_PIPING_
CV_VEERAKAMU.C_PIPING_CV_VEERAKAMU.C_PIPING_
CV_VEERAKAMU.C_PIPING_
 
Romy George civil site engineer.
Romy George civil site engineer.Romy George civil site engineer.
Romy George civil site engineer.
 
civil engineer Cv
civil engineer Cvcivil engineer Cv
civil engineer Cv
 
Curriculum vitae of civil engineer for construction manager or Sr. project en...
Curriculum vitae of civil engineer for construction manager or Sr. project en...Curriculum vitae of civil engineer for construction manager or Sr. project en...
Curriculum vitae of civil engineer for construction manager or Sr. project en...
 
HVAC DRAFTSMAN CV
HVAC DRAFTSMAN CVHVAC DRAFTSMAN CV
HVAC DRAFTSMAN CV
 
CIVIL SUPERVISOR-CV-abdul shukoor
CIVIL SUPERVISOR-CV-abdul shukoorCIVIL SUPERVISOR-CV-abdul shukoor
CIVIL SUPERVISOR-CV-abdul shukoor
 
CV- Faraz Yasin, Planning Engineer 28-Nov-2016
CV- Faraz Yasin,  Planning Engineer 28-Nov-2016CV- Faraz Yasin,  Planning Engineer 28-Nov-2016
CV- Faraz Yasin, Planning Engineer 28-Nov-2016
 
Sohail Afzaal CV for Site Engineer
Sohail Afzaal CV for Site EngineerSohail Afzaal CV for Site Engineer
Sohail Afzaal CV for Site Engineer
 
Civil Engineer & Inspector
Civil Engineer & InspectorCivil Engineer & Inspector
Civil Engineer & Inspector
 
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
 
Planning Engineer _CV
Planning Engineer _CVPlanning Engineer _CV
Planning Engineer _CV
 
Iftekhar Civil Engineer CV
Iftekhar Civil Engineer CVIftekhar Civil Engineer CV
Iftekhar Civil Engineer CV
 
CV Senior Quantity Surveyor(CIVIL)
CV Senior Quantity Surveyor(CIVIL)CV Senior Quantity Surveyor(CIVIL)
CV Senior Quantity Surveyor(CIVIL)
 
CV-Thowfeek
CV-ThowfeekCV-Thowfeek
CV-Thowfeek
 
Cv s.sankarasubramanian - senior planning engineer
Cv   s.sankarasubramanian - senior planning engineerCv   s.sankarasubramanian - senior planning engineer
Cv s.sankarasubramanian - senior planning engineer
 

Similar to Planning Engineer CV

Ahmed abd elazim c.v
Ahmed abd elazim c.vAhmed abd elazim c.v
Ahmed abd elazim c.v
Ahmed Abd elazim
 
Resume
Resume Resume
Resume
lipin Philip
 
d premanatha reddy_original (2)
d premanatha reddy_original (2)d premanatha reddy_original (2)
d premanatha reddy_original (2)
Reddy Premnath
 
MujibCV
MujibCVMujibCV
MujibCV
Mujib Khan
 
Mohamed saad cv 14-8-2018
Mohamed saad cv 14-8-2018Mohamed saad cv 14-8-2018
Mohamed saad cv 14-8-2018
MohamedSaad467
 
Nitin_Technical
Nitin_TechnicalNitin_Technical
Nitin_Technical
NITIN AGGRAWAL
 
Oct. -2015-CV
Oct. -2015-CVOct. -2015-CV
CURRICULUM VITAE 25.05.15
CURRICULUM VITAE 25.05.15CURRICULUM VITAE 25.05.15
CURRICULUM VITAE 25.05.15
Santosh Singh
 
Mohamed Farid Gomaa
Mohamed Farid Gomaa  Mohamed Farid Gomaa
Mohamed Farid Gomaa
mohamed farid
 
CV Ramiz Siddiq 6.5
CV Ramiz Siddiq 6.5CV Ramiz Siddiq 6.5
CV Ramiz Siddiq 6.5
Ramiz Siddiq
 
Hanif cv 2015 Project engineer (electrical)
Hanif cv 2015   Project engineer (electrical)Hanif cv 2015   Project engineer (electrical)
Hanif cv 2015 Project engineer (electrical)
Mohd Hanif Abd Hadi
 
100005_Ibrahim Ahmed Osman El-Sedy
100005_Ibrahim Ahmed Osman El-Sedy100005_Ibrahim Ahmed Osman El-Sedy
100005_Ibrahim Ahmed Osman El-Sedy
Eng. Ibrahim Ahmed Osman
 
Khalil Awwad
Khalil AwwadKhalil Awwad
Khalil Awwad
Khalil Awwad
 
CV_WALEED
CV_WALEEDCV_WALEED
CV_WALEED
waleed thabet
 
99855115 GHULAM ASZAD
99855115 GHULAM ASZAD99855115 GHULAM ASZAD
99855115 GHULAM ASZAD
Ghulam Aszad Aszad
 
ELECTRICAL SUPERVISOR CURRICULUM VITAE
ELECTRICAL SUPERVISOR CURRICULUM VITAEELECTRICAL SUPERVISOR CURRICULUM VITAE
ELECTRICAL SUPERVISOR CURRICULUM VITAE
sekar palani
 
Basil Resume
Basil Resume Basil Resume
Basil Resume
Basil T Mathai
 
Zuber Ahamed Resume _2016
Zuber Ahamed Resume _2016Zuber Ahamed Resume _2016
Zuber Ahamed Resume _2016
ZUBER AHAMED
 
New updated CV ( Siddesha.Maidur)
New updated CV ( Siddesha.Maidur)New updated CV ( Siddesha.Maidur)
New updated CV ( Siddesha.Maidur)
siddesh siddu
 
MDS CV 24.9.16
MDS CV 24.9.16MDS CV 24.9.16
MDS CV 24.9.16
Saleem MD
 

Similar to Planning Engineer CV (20)

Ahmed abd elazim c.v
Ahmed abd elazim c.vAhmed abd elazim c.v
Ahmed abd elazim c.v
 
Resume
Resume Resume
Resume
 
d premanatha reddy_original (2)
d premanatha reddy_original (2)d premanatha reddy_original (2)
d premanatha reddy_original (2)
 
MujibCV
MujibCVMujibCV
MujibCV
 
Mohamed saad cv 14-8-2018
Mohamed saad cv 14-8-2018Mohamed saad cv 14-8-2018
Mohamed saad cv 14-8-2018
 
Nitin_Technical
Nitin_TechnicalNitin_Technical
Nitin_Technical
 
Oct. -2015-CV
Oct. -2015-CVOct. -2015-CV
Oct. -2015-CV
 
CURRICULUM VITAE 25.05.15
CURRICULUM VITAE 25.05.15CURRICULUM VITAE 25.05.15
CURRICULUM VITAE 25.05.15
 
Mohamed Farid Gomaa
Mohamed Farid Gomaa  Mohamed Farid Gomaa
Mohamed Farid Gomaa
 
CV Ramiz Siddiq 6.5
CV Ramiz Siddiq 6.5CV Ramiz Siddiq 6.5
CV Ramiz Siddiq 6.5
 
Hanif cv 2015 Project engineer (electrical)
Hanif cv 2015   Project engineer (electrical)Hanif cv 2015   Project engineer (electrical)
Hanif cv 2015 Project engineer (electrical)
 
100005_Ibrahim Ahmed Osman El-Sedy
100005_Ibrahim Ahmed Osman El-Sedy100005_Ibrahim Ahmed Osman El-Sedy
100005_Ibrahim Ahmed Osman El-Sedy
 
Khalil Awwad
Khalil AwwadKhalil Awwad
Khalil Awwad
 
CV_WALEED
CV_WALEEDCV_WALEED
CV_WALEED
 
99855115 GHULAM ASZAD
99855115 GHULAM ASZAD99855115 GHULAM ASZAD
99855115 GHULAM ASZAD
 
ELECTRICAL SUPERVISOR CURRICULUM VITAE
ELECTRICAL SUPERVISOR CURRICULUM VITAEELECTRICAL SUPERVISOR CURRICULUM VITAE
ELECTRICAL SUPERVISOR CURRICULUM VITAE
 
Basil Resume
Basil Resume Basil Resume
Basil Resume
 
Zuber Ahamed Resume _2016
Zuber Ahamed Resume _2016Zuber Ahamed Resume _2016
Zuber Ahamed Resume _2016
 
New updated CV ( Siddesha.Maidur)
New updated CV ( Siddesha.Maidur)New updated CV ( Siddesha.Maidur)
New updated CV ( Siddesha.Maidur)
 
MDS CV 24.9.16
MDS CV 24.9.16MDS CV 24.9.16
MDS CV 24.9.16
 

Planning Engineer CV

  • 1. Planning Engineer Birth date: Nov.1975 Mohammed Shaker Abdullah +201128483507 / +201025235906 Email: emshaker@yahoo.com I hold a B.Sc. in Mechanical Engineering and have 16 years’ experience in project planning/ Controlling and O&M of power generation plants. As well as I ability to follow up technical activities of super-heater and Re-heat coils changing for unit’s manufacturer. CHRONOLOGICAL EXPERIENCE RECORD Job Title : Project Control Manager Dates : June 2016 to in progress Employer : PSC / Siemens CCPP 4 X 1200 MW (Bin Suef Project) Project : Mechanical infrastructure and commissioning for full equipment of 2x GTG and 4 x HRSG Job Title : Senior Planning Engineer Dates : Dec 2014 to May 2016 Employer : Al-Gihaz / ARAMCO in KSA (ARAMCO Certified) (LSTK project) Project : Upgrading Transmission system, switching gear, Circuit Breakers, Battery and Charging System, SCADA, OHTL, Under Ground Cables, Communication & Instrumentations Systems and Buildings and Metering Rooms civil works for 37 sites Job Title : Maintenance planning engineer. Dates : June 2013 to Nov 2014 Employer : UEEPCo. Power generation plant 2*312 MW in Egypt Work Scope : Rotating and Static equipment’s ( Pumps, Compressors, Electrical Motors, HVAC, Steam Boilers, Air Fans, Water Treatment System, Switch Gears, GIS, Transformers, Valves, Condensers, Steam heaters, heavy oil heaters ,……etc.) Job Title : Planning Engineer Date : Aug 2011 to May 2013 Employer : DOOSAN Korean Co. (AlEin Al Sokhna, project) in Egypt Project : 2x650 MW Suppers Critical boilers electrical and instruments infrastructure and commissioning Job Title : Planning Engineer Date : Jan 2009 to Mar 2011. Employer : ABB- AG.(GE & Doosan QatalumLSTK project) in Qatar Project : Electrical and controlling infrastructure and full commissioning for 400kv& 220kv cables, GCBs, GIS, protection,Monitoring and SCADA systems, MV & LV switch gears, TransformersAnd overhead lines) Job Title : Planning Engineer Date : Jan 2008 to Dec 2008 Employer : Mitsubishi Heavy Industry (MHI).(CCPP – 2x750 MW LSTK project) Project : Mechanical and Electrical infrastructure and full commissioning for 2 X Gas Turbines and Generators and 2 X HRSGs.
  • 2. Job Title : Maintenance planning Engineer Date : Jan 2006 to Dec 2007 Employer : Assuit Power plant 2x300 MW. In Egypt Work Scope : Shutdown and starting up scheduler and overhaul maintenance planning for co- generation steam plan equipment. Job Title : Maintenance Engineer Date : Mar 2001 to Dec 2005. Employer : Assuit Power plant 2x300 MW. In Egypt Work Scope : Maintenance of Co-generation steamturbine auxiliaries (Pumps, Air compressors, Valves, Condensers, Steam heaters, heavy oil heaters….etc.) Experience:  Design the project master schedule for all levels  Determine the project resources require for the plan.  Analysis of data stored in the project management and cost control  Define and determine the project risk plan.  Implements and maintains Project Planning and Scheduling.  Analyzes, evaluates, and forecasts current status against an established baseline schedule.  Assesses the impact(s) of design or construction changes and schedule slippages.  Implements and maintains an Earned Value Management System on the project.  Analyzes cost and schedule performance indicators (CPI and SPI).  Prepares and maintains project forecasts and status updates.  Reports schedule status to all levels of project and Company management as well as to the Client.  Implement and design the project curves are required for resources and cost.  Provides assessment with corrective action recommendations to management.  May provide guidance, direction, and specialized assistance to others in the resolution of project control problems.  Calculate EOT required for recovering the project schedule impacting.  Understands and applies engineering, procurement, and construction terminology, concepts, and relationships. EDUCATION : B.Sc. in Mechanical engineering 2000, (5 years). : Assuit Faculty of Engineering LANGUAGES Arabic : Native Language English : Very good COMPUTER SKILLS : Primavera EPM P6, MS Project : Auto-Cad & Solid-Works. : Microsoft office Word, Excel, Power point. TRAINING COURSES AND CERTIFICATIONS  PMP course  Tutorial of operating and maintaining of high pressure vessel by ENPPI’s co instructors.   Trained on the modern steam power generation plant operation & maintenance.   Experience in reading the power generation mechanical/ instrumental drawings (PID). 