This resume is for Asif Rashid, a senior planning engineer with over 12 years of experience in project planning, cost control, risk analysis, and contract management for oil, gas, petrochemical, and construction projects. He is seeking new opportunities and provides details of his work history and qualifications, including education in mechanical engineering and certification in project management. Key skills include planning, scheduling, cost estimation and control using Primavera and other software.
Having 20+ experience in both Onshore and Offshore Oil & Gas, Petrochemicals, Fertilizer, Power Plants and Shutdown projects to develop the data/package such as Scheduling, Progress Measurements systems, reporting and trending and risk assessment for planning and project control. Also having well exposure in Earned Value Analysis, Costing, Budgeting, Risk Management, Fornesic delay analysis and EOT Claims
Having 20+ experience in both Onshore and Offshore Oil & Gas, Petrochemicals, Fertilizer, Power Plants and Shutdown projects to develop the data/package such as Scheduling, Progress Measurements systems, reporting and trending and risk assessment for planning and project control. Also having well exposure in Earned Value Analysis, Costing, Budgeting, Risk Management, Fornesic delay analysis and EOT Claims
PENGARUH MOTIVASI DAN KEPUASAN KERJA TERHADAP KUALITAS PELAYANAN INTERNAL ...Eni Cahyani
Penelitian ini bertujuan untuk melihat pengaruh signifikan secara serentak dan parsial variabel motivasi dan kepuasan kerja terhadap kualitas pelayanan internal tenaga pendidik Politeknik Swasta di Sumatera Selatan. Populasi yang menjadi objek penelitian adalah Tenaga Pendidik Politeknik Swasta, dengan menggunakan sampel sensus (jenuh). Dalam penelitian ini dianalisis dengan menggunakan regresi berganda, beserta Uji F dan Uji t. Hipotesis ada pengaruh terhadap motivasi dan kepuasan kerja secara serentak dan parsial terhadap kualitas pelayanan internal terhadap tenaga pendidik.
Respected Sir/Madam
This covering letter is with reference to an advertisement that a post of Assessment Officer is vacant in your renowned organization. Sir I have done Master in (English Lang & Literature), Masters in Education. Thereafter gained more than Five Years of experience with different organizations & Colleges i.e.1.Lecturer in English in Young Muslims College and Jinnah Degree College Mansehra.2.Social Organizer & Community Mobilizer in NCHD (National Commission for Human Development), Mercy corps, Comsats Abbottabad (UNICEF project).3.Teachers Training Officer in USAID (RISE), Field Education Officer in IRC (International Rescue Committee). I also worked with pre-cadet college as Lecturer and in COMSATS University as Visiting Lecturer.
Besides this I have received trainings on EGRA( Early Grade Reading Assessment), ’ training on “Creating Reading Word Games to Further Reading Development in Urdu conducted by IRC Education Adviser Dr. Peter J. Foley and“Orientation to the Teaching and Assessing of Reading in Healing Classrooms” conducted by IRC Senior Technical Adviser Anita Anastacio.
I have completed an assignment of 21 days with MSI (Monitoring System International) as Master Trainer for EGRA activities and worked with BEFARe (MSI) as Field Supervisor to administer EGRA in the Field. Now I am working with World Learning as English Language Quality Manager Muzaffarabad.
I offer my services for the organization where I can utilize my experience and skills. If given a chance I’ll prove myself to the best of your selection.
As a Mechanical Engineer in the Oil and Gas Industry, would like to continue to expose to the challenges and latest Technology in this industry and make the best use my education, acquired skills and experience for personal and Organization growth.
I have used Oracle Primavera Project Management P6 to built my resume. I did the experience and it looks pretty well to me. Comments are welcome to further improve.
Project Engineer Possessing a proven track record of preparing and executing project plans and programs for structural steel and oil & gas refinery storage tank’s projects performs and ensures the work is carried out in accordance with the project Specifications, contractual requirements and company’s procedures.
Over 23 years of' experience as Planning / Contracts / Project Engineer & Manager, Oil & Gas onshore & Offshore projects. predominantly in EPC Projects Planning and Project Management, includes engineering (Basic, FEED and Detailed), Procurement and Construction
1. ASIF RASHID
SR.PLANNING ENGINEER
E-Mail:asifrashidw@yahoo.com
Cell:+971502246592
+92-3224288109
Resume Highlights:
ElevenYears’Experience (Eight
Years’Experience inKSA and three
yearsin PAK)
Experience of Constructionand EPC
Project
Engineering(B.E–Mechanical)
PMP course
Experience inOil &Gas Industry
Maintenance andShut down
Planning&Scheduling
Sub-Contracting
Cost Control
Cost Estimation
Cost andSchedule RiskAnalysis
Contract Management
ApprovedPlanningEngr.fromRC
CAREER PROFILE
Having12 yearsof diversifiedexperiencein constructionactivities andmaintenancemechanical invariousplants
such as petro-chemical,refinery,PowerPlants,AluminumRollingMill andRoyal CommissionProject(RC).
12 years multi-facet experience in Project planning, cost control, risk analysis, proposal costing, contract
managementandcoordination;Construction andEPCProjects of Oil & Gas, petrochemical plants;Proficientin using
project control applications and software
WORKHISTORY
Al Asab Contracting Company Abu Dhabi UAE 2016 to date
Sr.Planning Engineer
Responsibilities:
∞ Preparationof ProjectSchedule withresource loadedsuchas manpower,major material and Cost using P6-
PrimaVeraProject,Critical PathSchedulingandmonitoringof the projectsand updating every week on the
basis of progress achieved during the week.
∞ Providing next month's activities and targets to execution team in the light of master construction
schedule(Level-III Plan)
∞ Preparing and monitoring the 4-Week look-ahead plan Using Primavera Project Planner.
∞ Workout work front available with execution team to achieve the monthly targets given in the four-week
look-ahead plan based on access availability, drawing, material and consumable availability.
∞ Preparation of detail Level-4 Plan broken down to drawing/Isometric Level fixing the daily and weekly
Supervisor wise Quantities and work force.
∞ Generate andanalyze standardreportsrelatedtoprogressonweeklyandmonthly basis, Man hour analysis
reports, efficiency and cost reports on daily, weekly and monthly basis.
∞ Ensure proper implementation of PMS for proper effective planning, scheduling and monitoring.
∞ Coordinate with all departments regarding job schedules, constraints, material deliveries, Client
requirements and resource requirements for various disciplines in charges.
∞ Responsible for Coordinating with Client, s Engineering Department for the required Engineering
information for the project.
∞ Responsible for obtaining, reviewing and incorporate costs of materials and supply items such as, major
plants and equipment from vendors.
∞ Responsible for overall quantities of the project works and material take-offs or Bill of Quantities.
∞ Ensure timely collection of information on resources such as human resources, Material resources and
equipment and plant resources.
∞ Clarify queries raised internally by the execution teams or externally by the Client.
∞ Preparation and Submission of Monthly invoices along with the Supporting documents and administering
Change orders and its follow up.
∞ Resolve all the Contractual affairs with Client with the Consultation of Project Manager.
2. ∞ Coordinates with Sub-Contractors, checking their invoices and Claim as per Contract. Monitor of Project
Budget with the Actual Data of the Project.
∞ Preparationof CostReportand Monthly Cost to Complete Reports by collection data from accounts, Store,
payroll, E&P and Subcontract.
∞ Evaluate actual cost/expense againstall directandindirect cost Centers and analyze the data in the light of
Standard Budget.
∞ Monitor, compile and cost evaluate the extra work /re-work which comes out during Execution of Job,
design change or specification, modification and directly awarded by Client.
Major Project:
IGDE-E (PHASE-1) PACKAGE-3Civil andsteel structure work –HABSHAN-5GASCO
The scope of this project includes Procurement and Construction of Civil and steel structure project.
Petroleum Chemical and Mining Company KSA 2007 to 2015
Sr.Planning Engineer
Major Project:
SeaWater CoolingSupplyandReturnPipe lineWorks – Royal CommissionKSA
The scope of thisprojectincludesProcurementandConstruction(PC)of SeaWaterCoolingSupplyandReturn
Works (SWCSR) atRas Al-KhairIndustrial City(RIC)KSA withacapacityof 75,000m3/hour. The systemwill include
parallel supplylines,single returnpipelinewithemergencydischarge toon-site industrystormwatersystems,return
and drainage channels,outfall structure,systemisolationvalves,airvacuum/release valves,associatedelectrical,
and control components.
AluminumRollingMill Project-Ma'adenKSA
Scope of workcomprisedof Constructionof AluminumRollingMill Project.
Constructionof Amine Project- SaudiKayanJubail KSA
Scope of workcomprisedof Constructionof Amine Project.
Petro-Chemical complex- Saudi KayanJubail KSA
Scope of workcomprisedof Constructionof CoolingWaterIsland.
Turnarounds / Maintenance Project:
Sharq PlantOverhaul of utilityarea2007 –Eastern PetroChemical CompanyJubail KSA
Sasref oil refinery Overhaul of utilityarea2008 –Sasref Jubail KSA
Descon Engineering, Pakistan 2006 to 2007
Engineer Subcontracting
Responsibilities:
During my stay in Descon Engineering, I got training on Prima vera project Planner (P-3) and other company
software’s. I was involved in Subcontracts in project Support team.
∞ To arrange the vendors and preparation of comparative statement.
∞ Negotiate price of sub contract projects and work orders.
∞ Preparation of Sub-contract agreement document.
∞ Prepare Plan on P-3
Major Project:
DG CementandChakwal cement PlantProject-PAK
Scope includedconstructionof cementplant.
Sitara Energy Limited Pakistan 2004 - 2006
Maintenance Engineer – Plant Maintenance
Responsibilities:
∞ Maintained Equipment maintenance record.
∞ Equipment and repair parts data entry and management.
3. ∞ Scope the full extent of maintenance work needed to conduct the relevant preventive / predictive
maintenance of equipment / Plant.
∞ Prepared time scaled logic diagram for Major overhauling equipment which require Shut Down of Plant
∞ Assisted in Annual shutdown and routine maintenance of power Plants at various
∞ Assisted in preparation of annual budgets for maintenance activities.
∞ Maintained and Overhauled various models of engines (Niigata, Caterpillar), compressors and centrifugal
pumps
∞ Participates in plant safety, health and environmental programs.
∞ Got introduction to oil & gas exploration and Production.
Bachelorof Engineering(Mechanical), NationalUniversityof SciencesandTechnology(NUST) PakistaninJun2004.
PROFESSIONAL AFFILIATIONS
Member,Saudi EngineeringCouncil (SEC) as“Mechanical Engineer
Member,Pakistan EngineeringCouncil (PEC) as“Mechanical Engineer
Member,ProjectManagementInstitute (PMI) “MemberID4267850
PROFESSIONAL TRAININGS
∞ Fundamentalsof ProjectManagement (Contracts,ProjectPlanning,ProjectControls,Quality,HSSE&Closeout)
PCMC-Internal training
∞ P-6(PrimaveraProjectPlannerPCMCin-house)
∞ PMP Preparation Course from PMI Pakistan Lahore Chapter
SKILL SET
∞ Effective Team Player
∞ Adaptable and capable of interaction people with diverse background
∞ Eagerness and capabilities to learn new aspects in the field of work
COMPUTER SKILL
Proficient in computer software’s such as Primavera project planner P6, Primavera Risk Analysis (PRA), Microsoft
Office Package (Excel, Word, Power Point, Access), Pro-Engineering, Introduction of SAP
PERSONAL
Date of Birth : Jan15, 1980
Marital Status : Married
Passport# : BE9849582
INTERESTS
Watching TV and Sports including Badminton and Cricket
REFERENCES
Could be furnished if required
EDUCATION