The document provides a summary of the professional experience and qualifications of K V V RAMANA RAO, including:
- Over 25 years of experience in project management and construction management for various industries including pulp and paper, water, minerals, bulk material handling, oil and gas, and petrochemicals.
- Experience managing EPC projects, project execution, project controls, maintenance, and operations for pulp and paper mills, chemical plants, power plants, and other facilities.
- Held positions including General Manager, Head of Projects, and Deputy General Manager for companies such as Reliance Industries, Tenova Bateman, Elecon EPC Projects, Hindustan Dorr Oliver, and Ballarp
Top 10 mine interview questions with answersharrisaimee4
In this file, you can ref interview materials for mine such as, mine situational interview, mine behavioral interview, mine phone interview, mine interview thank you letter, mine interview tips …
I am a Diploma in Mechanical Engineer with 25 years of experience in Oil & Gas,Power Plant(Combined cycle & Thermal),Steel,Cement,Material Handling. Returned from Abu-Dhabi(Combined cycle power project) under HYUNDAI Engg & Constrn.
I had overseas experience in Saudi Arabia,U.A.E,China.
I have 25 years hands – on experience in Construction, Operation, maintenance, commissioning, Overhauling, Fault diagnosis & trouble shooting of large capacity of All Rotating & Static Equipments, Install, align, dismantling, examine and re-assembling, adjust and repair or replace of defective parts of mechanical equipment, such as Boiler,Turbine,Large Gear & centrifugal pumps, Compressors, Turbochargers, Heat exchangers, HFO & lub oil separators, all types of Valves, and other general mechanical maintenance works. I will do independently , as well as team work.
I would like to discuss further suitability to my position at an interview stage to work in your esteemed organization.
1. K V V RAMANA RAO
+918197000664 kvvrrao@yahoo.com
A Mechanical Engineering Professional with 25 year experience with
Core Experience of Project Management,Construction Management
Pulp&Paper,water,Mineral,BulkMaterialHandling,Water,Effluent,Chemical
Plants,Power Plants,Oil & gas ,Petro Chemical Complex etc,Maintenance
Management in paper mills,Chemical Plants,Water & Effluent treatment
plants,Operation & Maintenance of Power Plants upto 50 MW Coal based
Power Plants
• Proven abilities in handling in EPC Projects Project Management,Project
Execution,Project Controls In various segments-Pulp & PaperMill,Chemical Plants
with Piping(Clo2,Hypo,Casutic,H2O2,Chlorine,HCl ,H2s04,Brine),Ash Handling
Plant, Power -Coal Handling Plants, Eqipments with Piping for RODM Plants,Water
Treatment Plants,Waste water Treatment Plants,Oil & Gas Refinery Piping,Petro
chemicals Complex Piping Material Handling Systems etc
• Proven Ability in Business Development,Proposals & Estimation, Scheduling the
Project,Material Planning ,Production planning in the manufacturing of Process E
quipments,Pressure Vessels & Heat Exchangers,Piping Skids in Hydro Carbon
Sector, Clarifiers for Water /Effluent Treatment plants.
• Extensive Experience in heavy Erection in pulp & Paper ,Power ,Oil& Gas , Petro
Chemical Complex Equipments & Utilities piping.
• Opreartion & Maintenance of 12.06 /5.6 MW Coal Based Thermal Power Plants.
(FBC/Stoker Fired Boilers, DM Plants, Raw Water/ Waste Water Treatment Plants)
& Maintenance of Liquor Fired Boiler,Evaporator,Causticizing and Lime Kiln for
Sludge Reburning.
• Shut down Planning, Spares Planning,Inventory Control,Vendor Development,
Contract Management.
Proffessional Experience : 25 Years
Name of the Company Position Held Duration Years
Reliance Industries Limited
Jamnagar
World Largest Refinery & Petro
Chemical Complex
Project Cost : Rs 75000 Crores
General Manager
-Projects
Reporting to Sector
Head
Since
Feb 15
Tenova Bateman Engg India
(p) Ltd-Bangalore
(Project Cost : Rs 500 Crs)
Head Projects –
Construction.
Reporting to MD
Mar13-
Nov14
1.8
Elecon EPC Projects Ltd
Gujarat.
(Multiple Projects:Rs 750Cr)
Gen.Manager-Projects
Reporting to CEO
Aug 11 –
Feb13
1.6
Page 1 of 7
2. Hindustan Dorr Oiliver Ltd,
Ahmedabad ,Gujarat.
(Projects Handled : 150 Crs)
Sr Deputy General
Manager-Projects
Reporting to VP-Oper
Nov 08 –
Aug 11
2.7
Bahia Pulp ,Salvador,Brasil
(4500000TPA RG Grade Pulp)
Manager –Projects
Reporting to GM
June 08 –
Sept 08
0.4
Ballarpur Industries Ltd
Dissolving Grade Pulp
(100000 TPA )Unit:APRayons
Kamalapuram,Warangal,AP,
India (Thapar Group)
(Projects Handled : 200 Crs)
Deputy General
Manager Power Plant
Report to Unit Head
Dec 91 –
May 08
17
CharminarPapers Ltd,
Hyderabad
Maintenance Engineer
Reporting to MD
May91-
Dec91
0.7
Sri Venkateswara Industrial
Consultants ,Rajahmundry
Site Engineer
Reporting to Partner
May-89 –
May 91
2.0
• Reliance Industries Limited ,Jamnagar, Gujarat ,India (2015-Till Date)
Position : General Manager –Projects Piping
Project Management ,Erected & Commisssioning of Oil & Gas Refinery
Piping and petro chemical complex ,Utilities Piping ,Unit Piping etc pipe
spools fabrication,Laying & Erection of various piping CS /LTCS/Alloy Steel
P-11,P-22 ,P-91, SS 304 / SS 316 ,Under Ground Piping, GRP Piping
,PVC ,HDPE Piping etc for Pet Coke Gassificastion unit,ROGC,MEG LDPE,
PX4 ,BRU ,Scanfiner, Rubber Plant ( Eqpt & Piping) ,Cooling
Tower( Equipemnt & Piping) sizing from ½” to 114” etc.
Created pipe fabrication shop capacity of 100000 ID/month to cater Petro
chemical Complex Piping spools,
Executed 2500000 Inch Meter pipe Laying
Erection of 5 nos of Pipe Rack Structures ( Approx 25000MT) to facilitate
the pipe laying.
• Bateman Engg India (P) Ltd ,Bangalore,India (2013-Till Date)
Position : Head –Project & Construction
Page 2 of 7
3. Project Management ,Erected & Commisssioned EPC LSTK Project of
Bauxite Feeding & Crushing Plant ( Capacity : 1500 TPH) at UTKAL Alumina
Refinery Inernational ,Odisha. (1.5 MTPA Capacity) including Utilities
(Equipment & Piping).
Project Management ,Erection and Commissioning of EPC LSTK Contract of
18.50 KM Belt Conveyor for Transporting Bauxite from Mines - Refinery)
consists 18000 MT Structural Fabrication (Rectangular Gantry type)&
Erection, 30000 M3 RCC ,2000 MT Equipment Erection,300 KM of HT Cable
Laying for a Bauxite Handling system for 1.5 MTPA Alumina Refinery at
UTKAL Alumina International Odisha (Under Erection) including Utilities
( Equipment & Piping).
• ELECON EPC PROJECTS ,VV Nagar Gujarat ,India (2011-2013)
Position : General Manager –Projects
Project Management,Erection & Commissioning of Coal Handling Plant for 2
x 300 MW Power Plant at GMR Warora.(Wagon Tipler ,Apron Feeder,Belt
Conveyors,Bucket Wheel Reclaimer,Utliities ( E quipment & Piping) and
other accessories).
Responsible for Project Management for all EPC and Non EPC Projects (Project
Planning ,Project Monitoring ,Review,Project controls and Project cost control)
for supply,Erection & Comissioning of Coal Handling Plants (2500 TPH)
including all Utlilities ( Equipment & Piping) for Major /Mega power plants upto
660 MW, BOP Package and major material Handling projects for
steel,cement,ports and Fertliser plants
o (NTPC,BHEL,SAIL.NMDC,TECPRO,MAHAGENCO,APGENCO,LANCO,GVK
o ,GMR,KSK.MANIKGARH,ULTRATECH,SHREE & SIDDHIVINAYAK,IFFCO.)
Responsible for Project Management of Coal Handling Plant EPC Project at NTPC Mouda -2000
TPH Coal Conveying System along with all accessories. (Coal Handling Plant for 2 X 660MW Super
Thermal Power at NTPC – Mouda,Maharastra )
• Hindustan Dorr Oliver Ltd,Ahmedabad ,Gujarat,India(2008-2011)
Position : Sr Deputy General Manager –Projects
Supply & Erection of 130 Mld Raw Water Treatment Plant, 21 Mld RODM Plant
Equipment along with Piping for 165 MW Captive Power Plant for IOCL
Paradeep
21 Mld RODM Plant Equipment along with Pipingfor 165 MW Captive Power
Plant at Hindustan Mittal EnergyporLimited ,Bhatinda.(Guru Gobind Singh Oil
Refinery Limited) & IOCL Paradeep.
Supply & Erection of Various Effluent,Raw Water Treatment Plants Capacity of
9-30MLD Equipments and piping for Oil Refineries -Viz Indian Oil
Corporation,,Hindustan Petroleum Corporation,Bharat Petroleum Corporation.
Supply & Erection of Various Raw Water,Effluent Treatment Plants Equipments
along with piping for Municipal Corporations of CIDCO,CPCL,Nirma,Coromondal
Fertlilisers,and Uranium Corporation Limited.
Page 3 of 7
4. Supply of 180 TPD Paper Plant Pulpmill Equipment at KR Pulp&Papers & 300
TPD Pulp Mill Bindal Papers Limited.
Responsible for Business Development,Proposal & Estimation,Material
Planning, Production Planning,Project Planning,Project Execution ,Project cost
Control for above EPC Projects related to manufacturing of Heavy
Equipment, Static & Rotating Equipments , Pressure Vessels and Heat
Exchangers.Equipments for Piping Skids for water/Gas.
Coordination with design for modifications to be carried out for cost control
before and after Project Execution.
Responsible for Estimation of the Process Equipment Group Equipment orders.
• BAHIA PULP –SALVADOR BRASIL,SA (2008)
Position : Manager – Projects.
Involved in Erection & Commissioning of Utilities for 2x 50 MW Power Plant
related to 1500 TPD Dissolving grade Pulp.
• Ballarpur Industries Limited Unit : AP Rayons ,Warangal AP ,India
( 1991-2008)
Position : Deputy General Manager –Projects / Power Plant
Erection & Commissioning of 300 TPD Fibre line (Digesters,Washplant &
Bleach Plant, Sheeting Machine) Supplied by M/s Andritz,Ahlstrom,ABB
Sweden,Lamb Switzerland .
Erection of All Utilities ( Equipment & Piping) related to Paper Machine -II
Project ( Unit : Sewa) HP ,MP LP Hot Water ,Chiiled Water,Air ,drinking
water,white water ,Cooling water , Stock, Wam water Fire Hydrant Piping)
Erection& Commissioning of 4TPD Integrated Chlorine Dioxide Plant
(R-6Process)Equipments and Piping (CS,LTCS,Titanium,Monel,PVDF LINED,
FRP,CPVC,PVDF,HDPE etc) Supplied by Kaverner Chemetics ,Canada
Erection & Commissioning of Chemical Complex Equipment along with piping
Consisting of Plants for handling & preparation of
Clo2,Hypo,Casutic,H2O2,Chlroine,HCl ,H2s04,Brine.
Erection & Commissioning of Carbotech PSA Oxygen Gas & Nitrogen Gas
Generation Plants of 100 NM3 /Hr & 20 Nm3 /hr along with handling system
Equipment including piping.
Erection & Commisioning of Vapor Absorption Chiller machines along with Air
Conditioning system with piping.
Erection & Commissioning of All Utility Systems related ( Equipment &
Piping) to 12.04 MW Power Plant for a 300 TPD Rayon Grade Dissolving Pulp
Industry.
Page 4 of 7
5. Erection & Commissioning of ESP for Coal fired Boiler FBC Boiler & Dense
Phase Ash Handling system for 32 TPH ,45 Kg/cm2 FBC Boiler
Erection & Commissioning of Water Evaporation Plant along with piping
supplied by M/s Enmas Ahsltrom .
Erection & Commissioning of 120 TPD Lime Reburning System ( Lime Kiln
supplied by FL Smidth along with Fuel oil handling system.
Erection & Commisioning of Recausticizing Plants for 300 TPD & 200 TPD Paper
Mills supplied by M/s HDO.
Assisting GM-Engineering for Coodrination with all the departments to
maintain the plant in his absence.
Operation & Maintenance of 12.06 MW and 5.6 MW Captive Power Plants –Coal
based Thermal power Plant ( BTG & BOP)
Maintenance of Liquor Fired Boiler to fire 617 TPD Dry Solids capacity of
make Ahlstrom-Enmas,Falling Film/ Shell &Tube type Evaporator Ahlstrom,
L&T, Recausticizing Plant of make Hindustan Dorr Oliver,120 TPD Sludge
Reburning system of make FL Smidth.
Conducting Condition Monitoring techniques for Predictive, preventive &
breakdown maintenance to maintain the Uptime of the Plant.
Responsible for Inventory Control & Spares Management.
Responsible for functioning of Design & Drawing Office for all development
jobs and spare parts development.
Progress Monitiroing of the Capex and Maintenance Budget Review on
monthly basis.
Responsible for Estimation of all the Projects ,Capex Jobs.
Create quality consciousness through total Quality management by making
the operators /Technicians as members of the team to improve the
productivity.
Responsible for implementation of Total Quality Management,EVA
Techniques,Energy Conservation measures.
• Charminar Papers Limited,Hyderabad,India (1991)
Position : Maintenance Engineer
Maintenance of 10 TPD Kraft Paper Mill including Utilities.
• Sri Venkateswra Industrial Consultants,Rajahmundry, AP India (1989-
91)
Page 5 of 7
6. Position : Site Engineer
Erection & Commissioning of 20 TPH Wood Chip Plant along with Chip
conveying system at International Paper ,Rajahmundry ,AP,India
Erection & Commissioning of 8 TPH Husk Cethar Make FBC boiler along
with Fuel Handling system,Piping at Kanakadurga Agro Oils
,Vijayawada,AP,India.
PROFESSIONAL ACHIEVEMENTS
Design & Exceution of Utlitiy Piping for for 10 MW Power Plant in
a Paper Mili capacity of 200TPD.
Implenmentation of Energy Conservation measures in the Plant
to achieve 75 Kwh /ton of Pulp .
Implenmentation of Water Conservation measures in the Entire
Plant to achieve 100 m3 /ton of Pulp .
Reduction of Digester Cooking Cycle time by Vapor Phase
Balancing of the Equipment capacities to achieve Sustainable
production designed capacity of the dissolving grade pulp Mill.
Reduction of cycle time in manufacturing of process Equipment
Turnover Increase at HDO Manufacturing Unit & Elecon Engg
Software Proficiency
MS Project ,Primavera.
Auto-Cad R14,
MS Office (Excel, Access, Word, PowerPoint
Implementation of ERP & SAP
Professional Trainings Attended.
Total Quality Management ( ANAAR ,USA)
Energy Conservation & Energy Audit
Finance Management for Non Finance Managers
Traning Programme on Selection & Maintenance of Pumps
Bearings,Compressors,Turbo Feed Pumps
Condition Monitoring Techniques.
Training on Energy Conservation Measures.
PROFESSIONAL & EDUCATIONAL QUALIFICATIONS
Class School /College Year of Pass %Marks
X MTH School ,Rajahmundry 1982 69
XII CGTM Jr College,Rajahmumdry 1984 64.3
B.Tech
(Mech)
SVH College of Engineeering,
Machilipatnam,Nagarjuna University
1989 65
Page 6 of 7
7. Personal Particulars
Date of Birth : 11.12.1966
Age : 48 Yrs
Languages known : English, Hindi & Telugu
Passport details : J7160322 valid upto 2021
Marital Status : Married.
Date : 01.01.2016
Place: Jamnagar ,Gujarat KVV Ramana Rao
101, Krishnam Apts
ParkColony
Jamnagar-366001
Gujarat
Page 7 of 7