SlideShare a Scribd company logo
2
GE Title or job number
4/20/2017
Alstom in India
3
GE Title or job number
4/20/2017
Integral part of India’s economy for over a century
Alstom’s Presence
Delhi / NCR
• Corporate Office Alstom India
• Head Office ALSTOM India Limited
• Head Office ALSTOM T&D India Limited
• Sales Office
4
GE Title or job number
4/20/2017
Delhi / NCR Bangalore-Transport Information
Systems [TIS] Site-Systems design
• Sales, Service, Systems Offices
• Automation manufacturing Units Application Engineering
Software Factory
Mundra
• Alstom Bharat Forge Plant Site Hosur-Sales Office
Instrument Transformers
Vadodara
Coimbatore-Transport
Components
• Sales Office Traction Equipment
• Power Transformers Looming of wiring harness
Audio Frequency Track Circuits
and Point Machines
Vadodara Padappai-Circuit Breakers, Gas –
Insulated Substation, Disconnectors
• Hydro Manufacturing and Assembly unit
• Thermal Services and R&D Centre
5
GE Title or job number
4/20/2017
Mumbai Durgapur-Power boilers
• Registered Office Coal-fired boilers
• Sales Office Industrial and HRSGs
Bangalore-Alstom and Infosys R&D Centre Naini-Allahabad
Power Transformers
Sri City
Metro Rolling Stock Delhi / NCR
Engineering Centre for
Steam & PAC
Shahabad-Coal Pulverisers & Milling System Alstom Bharat Forge Head
Office
Kolkata- NTPC Alstom Power
Service Limited (NASL)
• ECS and Thermal Service
• Sales Office Delhi / NCR
• Engineering Centre Transport HQ & Sales
Office/Global Sourcing
6
GE Title or job number
4/20/2017
KEY DATA
More than 10,000 Employees in India
4 R&D Centres in Bangalore (Power and Transport), Vadodara (Power) & Hosur (Grid)
2 Engineering Centres for Power in Noida, Kolkata
Power - Vadodara, Durgapur, Shahabad, Mundra*
Transport – Coimbatore, Sricity
Grid - Padappai, Pallavaram, Hosur, Vadodara, Naini
Global Engineering & Software Centre for Railway & Metro in Bangalore for Transport
7
GE Title or job number
4/20/2017
Alstom in India
Integral part of India’s economy for over a century
History
1911: First factory built in Kolkata.
1950: Participated in setting up the first major manufacturing unit of BHEL, Bhopal
1959: Power Boilers facility established in Durgapur
1963: Boiler/Mill facility established in Shahabad
1992: Asea Brown Boveri Management Limited (ABBML) established in Bombay
1999: Asea Brown Boveri Management Limited (ABBML) became ABB ALSTOM Power
India Limited (ABBPL)
2000: ABB ALSTOM Power India Limited (ABBPL) became ALSTOM Power India Limited
2002: ALSTOM Power India Limited became ALSTOM Projects India Ltd.
2004: Hydro manufacturing facility established in Vadodara
2005: Strategic partnership with Infosys in the areas of Global R&D, Engineering and
Engineering services
8
GE Title or job number
4/20/2017
2008: Global Technological Centre (GTC) established in Vadodara
2009: - Foundation stone laid of power equipment manufacturing plant at Mundra in
Gujarat.
Three Green Field manufacturing units were setup in Hosur, Padappai and Vadodara
2012: - Areva T&D became Alstom T&D India Limited
ALSTOM Projects India Limited became ALSTOM India Limited
2014-GE Alstom Integration
9
GE Title or job number
4/20/2017
Partnerships
Alstom in India has made strategic partnerships with strong local players to bring in
frontline technologies, to enhance the quality and efficiency of the
power sector
Alstom and Bharat Forge Ltd. JV in 2009
The JV will manufacture steam turbines and auxiliary equipment with an annual capacity
of 5000 MW
Alstom and BHEL in 2005
Alstom and BHEL entered into a 15-year License agreement for manufacture, supply and
technology transfer for supercritical boilers
Alstom and Infosys in 2005
Strategic partnership in areas of global R&D, Engineering and Engineering IT services to
develop next generation solutions for the power sector
Alstom and NTPC in 1999
This 50:50 joint venture undertakes renovation, modernization, retrofit and refurbishment
of old and ageing power plants
10
GE Title or job number
4/20/2017
References and Ongoing Projects
Power
Alstom in India has full capabilities in engineering, manufacturing, project management
and supply of power generation equipment and solutions for
Renewable and Thermal Power. Alstom combines local presence and knowledge with
global resources to deliver world–class services and solutions.
Alstom’s Achievements
First to deliver and install high efficiency advanced class gas turbines
India’s first GT26 technology based CCPP – Utran
• More than 90% of the country’s aluminium smelters use our pollution control systems
• Boilers from the largest local manufacturer come with Alstom technology
• Supplying hydro equipment to the upcoming single largest hydro power project in the
country – Subansiri 2000 MW for NHPC
for Manufactured first largest Francis runner in India of the size, 6100 mm diameter, 3600
mm height, 105 tons of weight for this project
11
GE Title or job number
4/20/2017
• Emerged as the L1 bidder for the NTPC Bulk I (Supercritical Turbine Generator Island)
• Secured order for one of the largest ESP retrofit contracts in India
Renewable Power-Hydro
Chamera I – 3 x 180 MW for NHPC – 1994
Chamera II – 3 x 100 MW for NHPC – 2004
Vishnuprayag 4 x 100 MW for Jaiprakash Power ventures Ltd. – 2005
Dhauliganga 4 x 70 MW for NHPC – 2005-06
Dulhasti 3 x 130 MW for NHPC – 2006-07
12
GE Title or job number
4/20/2017
Ongoing Projects
• Tehri 1000MW for THDC
• Phatabyung 2 x 38MW for Lanco
• Subansiri 8 x 250 MW for NHPC
• Jorethang 2x50 MW for Dans Energy
• Chuzachen 2 x 55 MW for GATI Infrastructure
• Uri-II - 4 x 60 MW for NHPC
• Lower Jurala - 6 x 40 MW for APGENCO
• Teesta VI – 4 x 125 MW for Lanco
• Chamera Stage III – 3 x 77 MW for NHPC
Thermal Power-Steam Power Plants, Boiler Plants
• STCMS – Neyveli ‘0’, 1 x 250 MW Lignite Fired Power Plant full turnkey – 2002
• CSEB – Korba – 4x 50 MW R&M – 2007
13
GE Title or job number
4/20/2017
Ongoing Projects
• NTPC – Barh II – Supercritical Boilers – 2 x 660 MW - under execution*
• APGENCO – Krishnapatnam - Supercritical Boilers – 2 x 800 MW - under execution*
• Jay Pee - Bara - Supercritical Boilers – 3 x 660 MW - under execution
Gas Power Plants
• Anta 414 MW CCPP for NTPC – 1990
• Kawas 656 MW CCPP for NTPC –1991
• Gandhar 657 MW CCPP for NTPC – 1995
• Jegurupadu Phase I - 235 MW for GVK – 1997
• Hazira 156 MW for GSEG – 2002
• Jegurupadu Phase II - 228 MW for GVK –2006
• Utran 370 MW CCPP for GSECL – 2009
• Gautami 469 MW CCPP for GVK -2009
Ongoing Projects-Khulna 180 MW for NWPGCL
14
GE Title or job number
4/20/2017
Air Quality Control Systems (AQCS)
References
• Nalco - EPC turnkey contract for 8 GTCs
• Balco - 2GTC of 250K/Ton (Korba) – 2004
• NTPC – Talcher, ESP for 4 X 500 MW – 2006
Ongoing Projects
• Hindalco – EPC turnkey contract for 4GTC of 2 x369K/annum (Aditya & Mahan)
• Vedanta – EPC turnkey contract for 8GTC of 1.2M/Ton (Jharsuguda)
• JSW – Supply of sea water FGD plant for 4 x 300MW units coal fired power plants
15
GE Title or job number
4/20/2017
Power Automation and Control
• GVK, Jegurupadu Phase II, 235 MW (CCPP) - 2006
• GVK, Gautami, 469 MW (CCPP) – 2008
• GSECL, Utran, 370 MW (CCPP) – 2009
• NHPC, Chamera Stage I, 3 X 180 MW (Hydro) – 2011
• NHPC, Chamera Stage II, 3 X 100 MW (Hydro) - 2011
• NHPC, Chamera Stage III, 3 X 77 MW (Hydro) – 2011
NHPC, Chamera Stage III, 3 X 77 MW (Hydro) – 2011
Ongoing Projects
• Lanco, Kondapalli, 120 MW (STPP)
• Panduranga Energy, Panduranga, 100 MW (CCPP)
• NTPC, Solapur and Mouda II (Maharashtra) 660 MW (Supercritical projects)
16
GE Title or job number
4/20/2017
Services
• Major Overhaul – 100 to 500 MW Units at NTPC, MSPGCL, TNEB, DPL, UPRVUNL, NPCIL
and many others
• Rihand 500 MW Generator excitor repair
• Mill upgrades at various plants
• Various ESP retrofits & upgrades – Various SEBs, Nalco, Vedanta
Ongoing Projects
• Utran O&M and other Annual maintenance contract (AMCs) on Turbine Generator,
Boiler and Environment
• GVK – LTSA (Long Term Service Agreement)
17
GE Title or job number
4/20/2017
Transport
Alstom today is the leading supplier of train control and signalling system for metros in
India. It has worked diligently to equip the first two lines of
Delhi metro and is currently working on the first two lines of Bengaluru metro
Our Achievements
• Alstom’s first metro rolling stock factory in India for Chennai Metro (CMRL)
• Ballast less track for Chennai Metro
• Alstom design LHB coaches used on India’s fastest trains - Shatabdi and Rajdhani
• Alstom Signalling and Train control systems on Delhi and Bangalore (operational) metro
network
• Associated with the Delhi and Bengaluru Metro networks, covering more than 100 Kms
and 96 stations
Completed Projects
Train Control System to Corridor 2 of the new Jaipur Metro
• Design, Manufacture, Supply, Installation, Testing and Commissioning of the complete
Train control, Traffic management and Signalling
systems for Corridor 2 (EW-A section) of Phase I of Jaipur metro
18
GE Title or job number
4/20/2017
Completed Projects
Train Control System to Corridor 2 of the new Jaipur Metro
• Design, Manufacture, Supply, Installation, Testing and Commissioning of the complete
Train control, Traffic management and Signaling
systems for Corridor 2 (EW-A section) of Phase I of Jaipur metro
Metro rolling stock contract for Chennai Metro (CMRL)
• First metro rolling stock contract in India for supplying 168 cars and 16 additional metro
cars to Chennai Metro
Rail infrastructure contract for Chennai Metro (CMRL)
• Alstom - L&T JV contract for design and construction of track work in viaduct, tunnel,
underground and depot for corridors I & II for Chennai
metro
Signalling system for Bangalore Metro Rail Corp. (BMRC)
• Design, manufacture, supply, installation, testing and commissioning of train
control/signalling systems
• North-South Line (23,6 km/ 24 stations) and the East-West Line(18,1km/ 17 stations)
References
Signalling system for Delhi Metro Rail Corp. (DMRC)
• Design, manufacture, supply, installation, testing and commissioning of train
control/signalling systems
• (Phase 1): 32.90 kms covering 28 stations and 2 depots
• (Phase 2): 36.80 kms covering 27 stations and 1 depot
Electric traction components
• Converters / inverters & control box, static inverters as per Mitsubishi Electric Corp
(MELCO) design to Delhi Metro Rail Corporation (DMRC)
RS1 project.
• Auxiliary converters
• 11 kV DC circuit breakers
• 135 kVA aux converters for locomotives
20
GE Title or job number
4/20/2017
References with Indian Railways
• Design, supply, installation, testing and commissioning of 3-phase propulsion equipment
for refurbishment of 38 motor coaches from existing technology into GTO based 3-phase
technology for Western Railway
• Design, supply, installation, testing and commissioning of audio frequency track circuits
(AFTC) for zonal railways and Mumbai Railway Vikas Corporation Ltd (MRVC)
• Technology for manufacture of Alstom LHB design railway coaches to RCF, Kapurthala
21
GE Title or job number
4/20/2017
Grid
Alstom Grid is one of the leading global players in electrical transmission and is the market
leader in transmission business in India since 2008. Armed
with technological expertise, it has always ensured higher safety, reliability and capacity of
power grids around the world.
At the heart of the development of Smart Grid, Alstom Grid offers products, services and
integrated energy management solutions across the full energy
value chain. Alstom Grid's solutions bring electricity from the source onto the power
network through high-voltage substations and technologies to
manage power grids worldwide.
Our Achievements
• Manufactured India's first 1200 kV Capacitor Voltage Transformer
• Commissioned India's first 765 KV indigenously developed substation
• 70% of India’s power flows through the networks managed by our Network
Management System
• Over 50% of India's 765kV Extra High Voltage substations are built with Alstom's
technology and solutions
22
GE Title or job number
4/20/2017
Projects
• Awarded Sasaram 765 kV substation contract from Power Grid
• Awarded Supply and installation of a 132/33 kV AIS at the Nazipur plant in Pirojpur
(northern West Bengal), as well as two bay extension
projects for the 132 kV AIS at Amtola, Kolkata.
• Awarded project for the manufacture and installation of a 132 kV Air-insulated
Substation (AIS) at the Patan plant (central Chhattisgarh)
• Awarded project for the manufacture and installation of a 220 kV (AIS) at the
Vishrampur plant (northern Chhattisgarh).
• 2 major GIS Substations orders by Delhi Transco Ltd (DTL) - New Delhi
• Awarded two contracts for Extra High Voltage turnkey projects at the Moga (Punjab) and
Bhiwani (Haryana) plants by Power Grid
Corporation of India Limited (PGCIL).
• Awarded contract for Electrical Balance of Plant (eBOP) for Madhya Pradesh Power
Generating Company Ltd for the supply and installation
of electrical Balance of Plant solutions for two 600 MW thermal power plants at Malwa in
southwest Madhya Pradesh
23
GE Title or job number
4/20/2017
• Wins 1300 MINR eBOP contract for GMR Group's Warora Thermal Power Plant for the
supply and installation of electrical Balance of Plant
solutions for 2x300 MW thermal power plants in Warora Taluka, District Chandrapur, and
Maharashtra.
• Wins 765 kV Extra High - Voltage substation order from Uttar Pradesh Power
Transmission Corporation for 765 kV Extra High-Voltage
(EHV) substation at the Anpara "D" thermal power plant in the state of Uttar Pradesh.
• Awarded a contract for a Gas-insulated Substation (GIS) package by Bharat Heavy
Electricals (BHEL), in Chennai for the manufacture and
installation of 420 kV and 230 kV GIS for the Tamil Nadu state utility's North Chennai
Thermal Power Project.
• Awarded a prestigious contract for Generator Transformers Package by Indiabulls for
their upcoming Power Projects at Nandgaonpeth,
Amravati District (5x270 MW) and Sinnar, Nasik district (5x270 MW). Both plants are
located in Maharashtra
24
GE Title or job number
4/20/2017
Thank You
Anshul Tripathi
Sr.Sourcing,R&D Specialist
Use divider slides to separate
different sections of your pitch
Use divider slides to separate
different sections of your pitch
Use divider slides to separate
different sections of your pitch
Use divider slides to separate
different sections of your pitch
Use divider slides to separate
different sections of your pitch
Use divider slides to separate
different sections of your pitch
Use divider slides to separate
different sections of your pitch
33
GE Title or job number
4/20/2017
Colors in this template (RGB)
R- 30
G- 65
B- 145
R- 0
G- 170
B- 80
R- 255
G- 102
B- 0
R- 155
G- 80
B- 212
R- 40
G- 185
B- 245
R- 118
G- 185
B- 0
Abc123
ABC123
Abc123
ABC123
Abc123
ABC123
Abc123
ABC123
Abc123
ABC123
Abc123
ABC123
R- 238
G- 51
B- 36
Abc123
ABC123
R- 235
G- 215
B- 10
Abc123
ABC123
Alstom india

More Related Content

What's hot

Off Grid Electrification
Off Grid ElectrificationOff Grid Electrification
Off Grid Electrification
Dilip Krishnan
 
IRJET- Ultracapacitor Operated Bus
IRJET- Ultracapacitor Operated BusIRJET- Ultracapacitor Operated Bus
IRJET- Ultracapacitor Operated Bus
IRJET Journal
 
Ev charging with solar &high energy storage
Ev charging with solar &high energy storageEv charging with solar &high energy storage
Ev charging with solar &high energy storage
Mahesh Chandra Manav
 
101572 low cap lcv16 press release_lowcap_and_ep_tender
101572 low cap lcv16 press release_lowcap_and_ep_tender101572 low cap lcv16 press release_lowcap_and_ep_tender
101572 low cap lcv16 press release_lowcap_and_ep_tender
Jean-Baptiste Segard
 
Bus Karo: Future of Electric Buses
Bus Karo: Future of Electric Buses Bus Karo: Future of Electric Buses
Bus Karo: Future of Electric Buses
WRI India
 
Electric Vehicle Grid Simulator
Electric Vehicle Grid SimulatorElectric Vehicle Grid Simulator
Electric Vehicle Grid Simulator
World Resources Institute (WRI)
 
CK2017: Business Models for Low- and Zero-Emission Buses
CK2017: Business Models for Low- and Zero-Emission BusesCK2017: Business Models for Low- and Zero-Emission Buses
CK2017: Business Models for Low- and Zero-Emission Buses
WRI Ross Center for Sustainable Cities
 
ABB Contact: Sustainable mobility (India) 2 I14
ABB Contact:  Sustainable mobility (India) 2 I14ABB Contact:  Sustainable mobility (India) 2 I14
ABB Contact: Sustainable mobility (India) 2 I14
ABBCONTACT
 
Electric vehicle charging information. by linkvue system
Electric vehicle charging   information. by linkvue systemElectric vehicle charging   information. by linkvue system
Electric vehicle charging information. by linkvue system
Mahesh Chandra Manav
 
CK2017: Future of Electric Bus: e-Bus
CK2017: Future of Electric Bus: e-BusCK2017: Future of Electric Bus: e-Bus
CK2017: Future of Electric Bus: e-Bus
WRI Ross Center for Sustainable Cities
 
ABB Contact - 2/13 India : Oil and Gas issue
ABB Contact - 2/13 India : Oil and Gas issueABB Contact - 2/13 India : Oil and Gas issue
ABB Contact - 2/13 India : Oil and Gas issue
ABBCONTACT
 
Dynamic charging latest developments
Dynamic charging latest developmentsDynamic charging latest developments
Dynamic charging latest developmentsBill St. Arnaud
 
Powering rail networks across the world
Powering rail networks across the worldPowering rail networks across the world
Powering rail networks across the worldmoneycontrol.com
 
Grinntech introduction
Grinntech introductionGrinntech introduction
Grinntech introduction
grinntech
 
Contact (1/14) Service - India
Contact (1/14) Service  - India Contact (1/14) Service  - India
Contact (1/14) Service - India
ABBCONTACT
 
Online Electric Vehicle
Online Electric VehicleOnline Electric Vehicle
Online Electric VehicleRehan Fazal
 
IRJET- Optimization of Required Power for an Electric Vehicle
IRJET-  	  Optimization of Required Power for an Electric VehicleIRJET-  	  Optimization of Required Power for an Electric Vehicle
IRJET- Optimization of Required Power for an Electric Vehicle
IRJET Journal
 
Electric and Automated Trucks IAA Commercial Vehicles
Electric and Automated Trucks IAA Commercial VehiclesElectric and Automated Trucks IAA Commercial Vehicles
Electric and Automated Trucks IAA Commercial Vehicles
Wilfried. Aulbur
 
Solar and ev charging station
Solar and ev charging stationSolar and ev charging station
Solar and ev charging station
Mahesh Chandra Manav
 

What's hot (20)

Off Grid Electrification
Off Grid ElectrificationOff Grid Electrification
Off Grid Electrification
 
IRJET- Ultracapacitor Operated Bus
IRJET- Ultracapacitor Operated BusIRJET- Ultracapacitor Operated Bus
IRJET- Ultracapacitor Operated Bus
 
Ev charging with solar &high energy storage
Ev charging with solar &high energy storageEv charging with solar &high energy storage
Ev charging with solar &high energy storage
 
101572 low cap lcv16 press release_lowcap_and_ep_tender
101572 low cap lcv16 press release_lowcap_and_ep_tender101572 low cap lcv16 press release_lowcap_and_ep_tender
101572 low cap lcv16 press release_lowcap_and_ep_tender
 
Bus Karo: Future of Electric Buses
Bus Karo: Future of Electric Buses Bus Karo: Future of Electric Buses
Bus Karo: Future of Electric Buses
 
Powergridppt
PowergridpptPowergridppt
Powergridppt
 
Electric Vehicle Grid Simulator
Electric Vehicle Grid SimulatorElectric Vehicle Grid Simulator
Electric Vehicle Grid Simulator
 
CK2017: Business Models for Low- and Zero-Emission Buses
CK2017: Business Models for Low- and Zero-Emission BusesCK2017: Business Models for Low- and Zero-Emission Buses
CK2017: Business Models for Low- and Zero-Emission Buses
 
ABB Contact: Sustainable mobility (India) 2 I14
ABB Contact:  Sustainable mobility (India) 2 I14ABB Contact:  Sustainable mobility (India) 2 I14
ABB Contact: Sustainable mobility (India) 2 I14
 
Electric vehicle charging information. by linkvue system
Electric vehicle charging   information. by linkvue systemElectric vehicle charging   information. by linkvue system
Electric vehicle charging information. by linkvue system
 
CK2017: Future of Electric Bus: e-Bus
CK2017: Future of Electric Bus: e-BusCK2017: Future of Electric Bus: e-Bus
CK2017: Future of Electric Bus: e-Bus
 
ABB Contact - 2/13 India : Oil and Gas issue
ABB Contact - 2/13 India : Oil and Gas issueABB Contact - 2/13 India : Oil and Gas issue
ABB Contact - 2/13 India : Oil and Gas issue
 
Dynamic charging latest developments
Dynamic charging latest developmentsDynamic charging latest developments
Dynamic charging latest developments
 
Powering rail networks across the world
Powering rail networks across the worldPowering rail networks across the world
Powering rail networks across the world
 
Grinntech introduction
Grinntech introductionGrinntech introduction
Grinntech introduction
 
Contact (1/14) Service - India
Contact (1/14) Service  - India Contact (1/14) Service  - India
Contact (1/14) Service - India
 
Online Electric Vehicle
Online Electric VehicleOnline Electric Vehicle
Online Electric Vehicle
 
IRJET- Optimization of Required Power for an Electric Vehicle
IRJET-  	  Optimization of Required Power for an Electric VehicleIRJET-  	  Optimization of Required Power for an Electric Vehicle
IRJET- Optimization of Required Power for an Electric Vehicle
 
Electric and Automated Trucks IAA Commercial Vehicles
Electric and Automated Trucks IAA Commercial VehiclesElectric and Automated Trucks IAA Commercial Vehicles
Electric and Automated Trucks IAA Commercial Vehicles
 
Solar and ev charging station
Solar and ev charging stationSolar and ev charging station
Solar and ev charging station
 

Similar to Alstom india

TPL Corporate Presentation
TPL Corporate PresentationTPL Corporate Presentation
TPL Corporate PresentationArpita Pattnayak
 
Detailed Profile K Soma Sekhar
Detailed Profile K Soma SekharDetailed Profile K Soma Sekhar
Detailed Profile K Soma Sekhar
Kaladi Soma Sekhar
 
CV-Basu Sujit 6th July 2016
CV-Basu Sujit 6th July 2016CV-Basu Sujit 6th July 2016
CV-Basu Sujit 6th July 2016Sujit Basu
 
Gujarat Ambuja-Cost Leader in the Indian Cement Industry
Gujarat Ambuja-Cost Leader in the Indian Cement IndustryGujarat Ambuja-Cost Leader in the Indian Cement Industry
Gujarat Ambuja-Cost Leader in the Indian Cement Industry
Jugal Thakkar
 
AK-BIODATA-Sep-2016
AK-BIODATA-Sep-2016AK-BIODATA-Sep-2016
AK-BIODATA-Sep-2016ANIYAN KUNJU
 
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
haxxo24
 
Corporate presentation of P & R Infraprojects Ltd
Corporate presentation of P & R Infraprojects LtdCorporate presentation of P & R Infraprojects Ltd
Corporate presentation of P & R Infraprojects Ltd
Ashish Kumar Yadav
 
Resume_Ravinder Kumar Raina dtd 080516
Resume_Ravinder Kumar Raina dtd 080516Resume_Ravinder Kumar Raina dtd 080516
Resume_Ravinder Kumar Raina dtd 080516Ravinder Raina
 
Company profile updated on 11.03.2016
Company profile updated on 11.03.2016Company profile updated on 11.03.2016
Company profile updated on 11.03.2016
Ulaga Nathan
 

Similar to Alstom india (20)

TPL Corporate Presentation
TPL Corporate PresentationTPL Corporate Presentation
TPL Corporate Presentation
 
Encotec -Company Presentation_Apr 2016
Encotec -Company Presentation_Apr 2016Encotec -Company Presentation_Apr 2016
Encotec -Company Presentation_Apr 2016
 
Detailed Profile K Soma Sekhar
Detailed Profile K Soma SekharDetailed Profile K Soma Sekhar
Detailed Profile K Soma Sekhar
 
final resume
final resumefinal resume
final resume
 
CV-Basu Sujit 6th July 2016
CV-Basu Sujit 6th July 2016CV-Basu Sujit 6th July 2016
CV-Basu Sujit 6th July 2016
 
Etricals - Profile
Etricals - ProfileEtricals - Profile
Etricals - Profile
 
Gujarat Ambuja-Cost Leader in the Indian Cement Industry
Gujarat Ambuja-Cost Leader in the Indian Cement IndustryGujarat Ambuja-Cost Leader in the Indian Cement Industry
Gujarat Ambuja-Cost Leader in the Indian Cement Industry
 
AK-BIODATA-Sep-2016
AK-BIODATA-Sep-2016AK-BIODATA-Sep-2016
AK-BIODATA-Sep-2016
 
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
 
Corporate presentation of P & R Infraprojects Ltd
Corporate presentation of P & R Infraprojects LtdCorporate presentation of P & R Infraprojects Ltd
Corporate presentation of P & R Infraprojects Ltd
 
Resume 2016
Resume 2016Resume 2016
Resume 2016
 
Resume Kallol Chatterjee
Resume Kallol ChatterjeeResume Kallol Chatterjee
Resume Kallol Chatterjee
 
CV_Raja
CV_RajaCV_Raja
CV_Raja
 
Resume_Ravinder Kumar Raina dtd 080516
Resume_Ravinder Kumar Raina dtd 080516Resume_Ravinder Kumar Raina dtd 080516
Resume_Ravinder Kumar Raina dtd 080516
 
Resume
ResumeResume
Resume
 
My resume updated
My resume updatedMy resume updated
My resume updated
 
THARANG A KUTTY
THARANG A KUTTYTHARANG A KUTTY
THARANG A KUTTY
 
CV_MCSHARMA
CV_MCSHARMACV_MCSHARMA
CV_MCSHARMA
 
Company profile updated on 11.03.2016
Company profile updated on 11.03.2016Company profile updated on 11.03.2016
Company profile updated on 11.03.2016
 
PowerBrochure
PowerBrochurePowerBrochure
PowerBrochure
 

Recently uploaded

Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
Massimo Talia
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Dr.Costas Sachpazis
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
Forklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella PartsForklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella Parts
Intella Parts
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation & Control
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
karthi keyan
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
AafreenAbuthahir2
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
fxintegritypublishin
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
seandesed
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
AJAYKUMARPUND1
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
Divya Somashekar
 
LIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.pptLIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.ppt
ssuser9bd3ba
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
obonagu
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
Kamal Acharya
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
bakpo1
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
Pratik Pawar
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
Kamal Acharya
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
Robbie Edward Sayers
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
Amil Baba Dawood bangali
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
Pipe Restoration Solutions
 

Recently uploaded (20)

Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
 
Forklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella PartsForklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella Parts
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
 
LIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.pptLIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.ppt
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
 

Alstom india

  • 1.
  • 2. 2 GE Title or job number 4/20/2017 Alstom in India
  • 3. 3 GE Title or job number 4/20/2017 Integral part of India’s economy for over a century Alstom’s Presence Delhi / NCR • Corporate Office Alstom India • Head Office ALSTOM India Limited • Head Office ALSTOM T&D India Limited • Sales Office
  • 4. 4 GE Title or job number 4/20/2017 Delhi / NCR Bangalore-Transport Information Systems [TIS] Site-Systems design • Sales, Service, Systems Offices • Automation manufacturing Units Application Engineering Software Factory Mundra • Alstom Bharat Forge Plant Site Hosur-Sales Office Instrument Transformers Vadodara Coimbatore-Transport Components • Sales Office Traction Equipment • Power Transformers Looming of wiring harness Audio Frequency Track Circuits and Point Machines Vadodara Padappai-Circuit Breakers, Gas – Insulated Substation, Disconnectors • Hydro Manufacturing and Assembly unit • Thermal Services and R&D Centre
  • 5. 5 GE Title or job number 4/20/2017 Mumbai Durgapur-Power boilers • Registered Office Coal-fired boilers • Sales Office Industrial and HRSGs Bangalore-Alstom and Infosys R&D Centre Naini-Allahabad Power Transformers Sri City Metro Rolling Stock Delhi / NCR Engineering Centre for Steam & PAC Shahabad-Coal Pulverisers & Milling System Alstom Bharat Forge Head Office Kolkata- NTPC Alstom Power Service Limited (NASL) • ECS and Thermal Service • Sales Office Delhi / NCR • Engineering Centre Transport HQ & Sales Office/Global Sourcing
  • 6. 6 GE Title or job number 4/20/2017 KEY DATA More than 10,000 Employees in India 4 R&D Centres in Bangalore (Power and Transport), Vadodara (Power) & Hosur (Grid) 2 Engineering Centres for Power in Noida, Kolkata Power - Vadodara, Durgapur, Shahabad, Mundra* Transport – Coimbatore, Sricity Grid - Padappai, Pallavaram, Hosur, Vadodara, Naini Global Engineering & Software Centre for Railway & Metro in Bangalore for Transport
  • 7. 7 GE Title or job number 4/20/2017 Alstom in India Integral part of India’s economy for over a century History 1911: First factory built in Kolkata. 1950: Participated in setting up the first major manufacturing unit of BHEL, Bhopal 1959: Power Boilers facility established in Durgapur 1963: Boiler/Mill facility established in Shahabad 1992: Asea Brown Boveri Management Limited (ABBML) established in Bombay 1999: Asea Brown Boveri Management Limited (ABBML) became ABB ALSTOM Power India Limited (ABBPL) 2000: ABB ALSTOM Power India Limited (ABBPL) became ALSTOM Power India Limited 2002: ALSTOM Power India Limited became ALSTOM Projects India Ltd. 2004: Hydro manufacturing facility established in Vadodara 2005: Strategic partnership with Infosys in the areas of Global R&D, Engineering and Engineering services
  • 8. 8 GE Title or job number 4/20/2017 2008: Global Technological Centre (GTC) established in Vadodara 2009: - Foundation stone laid of power equipment manufacturing plant at Mundra in Gujarat. Three Green Field manufacturing units were setup in Hosur, Padappai and Vadodara 2012: - Areva T&D became Alstom T&D India Limited ALSTOM Projects India Limited became ALSTOM India Limited 2014-GE Alstom Integration
  • 9. 9 GE Title or job number 4/20/2017 Partnerships Alstom in India has made strategic partnerships with strong local players to bring in frontline technologies, to enhance the quality and efficiency of the power sector Alstom and Bharat Forge Ltd. JV in 2009 The JV will manufacture steam turbines and auxiliary equipment with an annual capacity of 5000 MW Alstom and BHEL in 2005 Alstom and BHEL entered into a 15-year License agreement for manufacture, supply and technology transfer for supercritical boilers Alstom and Infosys in 2005 Strategic partnership in areas of global R&D, Engineering and Engineering IT services to develop next generation solutions for the power sector Alstom and NTPC in 1999 This 50:50 joint venture undertakes renovation, modernization, retrofit and refurbishment of old and ageing power plants
  • 10. 10 GE Title or job number 4/20/2017 References and Ongoing Projects Power Alstom in India has full capabilities in engineering, manufacturing, project management and supply of power generation equipment and solutions for Renewable and Thermal Power. Alstom combines local presence and knowledge with global resources to deliver world–class services and solutions. Alstom’s Achievements First to deliver and install high efficiency advanced class gas turbines India’s first GT26 technology based CCPP – Utran • More than 90% of the country’s aluminium smelters use our pollution control systems • Boilers from the largest local manufacturer come with Alstom technology • Supplying hydro equipment to the upcoming single largest hydro power project in the country – Subansiri 2000 MW for NHPC for Manufactured first largest Francis runner in India of the size, 6100 mm diameter, 3600 mm height, 105 tons of weight for this project
  • 11. 11 GE Title or job number 4/20/2017 • Emerged as the L1 bidder for the NTPC Bulk I (Supercritical Turbine Generator Island) • Secured order for one of the largest ESP retrofit contracts in India Renewable Power-Hydro Chamera I – 3 x 180 MW for NHPC – 1994 Chamera II – 3 x 100 MW for NHPC – 2004 Vishnuprayag 4 x 100 MW for Jaiprakash Power ventures Ltd. – 2005 Dhauliganga 4 x 70 MW for NHPC – 2005-06 Dulhasti 3 x 130 MW for NHPC – 2006-07
  • 12. 12 GE Title or job number 4/20/2017 Ongoing Projects • Tehri 1000MW for THDC • Phatabyung 2 x 38MW for Lanco • Subansiri 8 x 250 MW for NHPC • Jorethang 2x50 MW for Dans Energy • Chuzachen 2 x 55 MW for GATI Infrastructure • Uri-II - 4 x 60 MW for NHPC • Lower Jurala - 6 x 40 MW for APGENCO • Teesta VI – 4 x 125 MW for Lanco • Chamera Stage III – 3 x 77 MW for NHPC Thermal Power-Steam Power Plants, Boiler Plants • STCMS – Neyveli ‘0’, 1 x 250 MW Lignite Fired Power Plant full turnkey – 2002 • CSEB – Korba – 4x 50 MW R&M – 2007
  • 13. 13 GE Title or job number 4/20/2017 Ongoing Projects • NTPC – Barh II – Supercritical Boilers – 2 x 660 MW - under execution* • APGENCO – Krishnapatnam - Supercritical Boilers – 2 x 800 MW - under execution* • Jay Pee - Bara - Supercritical Boilers – 3 x 660 MW - under execution Gas Power Plants • Anta 414 MW CCPP for NTPC – 1990 • Kawas 656 MW CCPP for NTPC –1991 • Gandhar 657 MW CCPP for NTPC – 1995 • Jegurupadu Phase I - 235 MW for GVK – 1997 • Hazira 156 MW for GSEG – 2002 • Jegurupadu Phase II - 228 MW for GVK –2006 • Utran 370 MW CCPP for GSECL – 2009 • Gautami 469 MW CCPP for GVK -2009 Ongoing Projects-Khulna 180 MW for NWPGCL
  • 14. 14 GE Title or job number 4/20/2017 Air Quality Control Systems (AQCS) References • Nalco - EPC turnkey contract for 8 GTCs • Balco - 2GTC of 250K/Ton (Korba) – 2004 • NTPC – Talcher, ESP for 4 X 500 MW – 2006 Ongoing Projects • Hindalco – EPC turnkey contract for 4GTC of 2 x369K/annum (Aditya & Mahan) • Vedanta – EPC turnkey contract for 8GTC of 1.2M/Ton (Jharsuguda) • JSW – Supply of sea water FGD plant for 4 x 300MW units coal fired power plants
  • 15. 15 GE Title or job number 4/20/2017 Power Automation and Control • GVK, Jegurupadu Phase II, 235 MW (CCPP) - 2006 • GVK, Gautami, 469 MW (CCPP) – 2008 • GSECL, Utran, 370 MW (CCPP) – 2009 • NHPC, Chamera Stage I, 3 X 180 MW (Hydro) – 2011 • NHPC, Chamera Stage II, 3 X 100 MW (Hydro) - 2011 • NHPC, Chamera Stage III, 3 X 77 MW (Hydro) – 2011 NHPC, Chamera Stage III, 3 X 77 MW (Hydro) – 2011 Ongoing Projects • Lanco, Kondapalli, 120 MW (STPP) • Panduranga Energy, Panduranga, 100 MW (CCPP) • NTPC, Solapur and Mouda II (Maharashtra) 660 MW (Supercritical projects)
  • 16. 16 GE Title or job number 4/20/2017 Services • Major Overhaul – 100 to 500 MW Units at NTPC, MSPGCL, TNEB, DPL, UPRVUNL, NPCIL and many others • Rihand 500 MW Generator excitor repair • Mill upgrades at various plants • Various ESP retrofits & upgrades – Various SEBs, Nalco, Vedanta Ongoing Projects • Utran O&M and other Annual maintenance contract (AMCs) on Turbine Generator, Boiler and Environment • GVK – LTSA (Long Term Service Agreement)
  • 17. 17 GE Title or job number 4/20/2017 Transport Alstom today is the leading supplier of train control and signalling system for metros in India. It has worked diligently to equip the first two lines of Delhi metro and is currently working on the first two lines of Bengaluru metro Our Achievements • Alstom’s first metro rolling stock factory in India for Chennai Metro (CMRL) • Ballast less track for Chennai Metro • Alstom design LHB coaches used on India’s fastest trains - Shatabdi and Rajdhani • Alstom Signalling and Train control systems on Delhi and Bangalore (operational) metro network • Associated with the Delhi and Bengaluru Metro networks, covering more than 100 Kms and 96 stations Completed Projects Train Control System to Corridor 2 of the new Jaipur Metro • Design, Manufacture, Supply, Installation, Testing and Commissioning of the complete Train control, Traffic management and Signalling systems for Corridor 2 (EW-A section) of Phase I of Jaipur metro
  • 18. 18 GE Title or job number 4/20/2017 Completed Projects Train Control System to Corridor 2 of the new Jaipur Metro • Design, Manufacture, Supply, Installation, Testing and Commissioning of the complete Train control, Traffic management and Signaling systems for Corridor 2 (EW-A section) of Phase I of Jaipur metro Metro rolling stock contract for Chennai Metro (CMRL) • First metro rolling stock contract in India for supplying 168 cars and 16 additional metro cars to Chennai Metro Rail infrastructure contract for Chennai Metro (CMRL) • Alstom - L&T JV contract for design and construction of track work in viaduct, tunnel, underground and depot for corridors I & II for Chennai metro Signalling system for Bangalore Metro Rail Corp. (BMRC) • Design, manufacture, supply, installation, testing and commissioning of train control/signalling systems • North-South Line (23,6 km/ 24 stations) and the East-West Line(18,1km/ 17 stations)
  • 19. References Signalling system for Delhi Metro Rail Corp. (DMRC) • Design, manufacture, supply, installation, testing and commissioning of train control/signalling systems • (Phase 1): 32.90 kms covering 28 stations and 2 depots • (Phase 2): 36.80 kms covering 27 stations and 1 depot Electric traction components • Converters / inverters & control box, static inverters as per Mitsubishi Electric Corp (MELCO) design to Delhi Metro Rail Corporation (DMRC) RS1 project. • Auxiliary converters • 11 kV DC circuit breakers • 135 kVA aux converters for locomotives
  • 20. 20 GE Title or job number 4/20/2017 References with Indian Railways • Design, supply, installation, testing and commissioning of 3-phase propulsion equipment for refurbishment of 38 motor coaches from existing technology into GTO based 3-phase technology for Western Railway • Design, supply, installation, testing and commissioning of audio frequency track circuits (AFTC) for zonal railways and Mumbai Railway Vikas Corporation Ltd (MRVC) • Technology for manufacture of Alstom LHB design railway coaches to RCF, Kapurthala
  • 21. 21 GE Title or job number 4/20/2017 Grid Alstom Grid is one of the leading global players in electrical transmission and is the market leader in transmission business in India since 2008. Armed with technological expertise, it has always ensured higher safety, reliability and capacity of power grids around the world. At the heart of the development of Smart Grid, Alstom Grid offers products, services and integrated energy management solutions across the full energy value chain. Alstom Grid's solutions bring electricity from the source onto the power network through high-voltage substations and technologies to manage power grids worldwide. Our Achievements • Manufactured India's first 1200 kV Capacitor Voltage Transformer • Commissioned India's first 765 KV indigenously developed substation • 70% of India’s power flows through the networks managed by our Network Management System • Over 50% of India's 765kV Extra High Voltage substations are built with Alstom's technology and solutions
  • 22. 22 GE Title or job number 4/20/2017 Projects • Awarded Sasaram 765 kV substation contract from Power Grid • Awarded Supply and installation of a 132/33 kV AIS at the Nazipur plant in Pirojpur (northern West Bengal), as well as two bay extension projects for the 132 kV AIS at Amtola, Kolkata. • Awarded project for the manufacture and installation of a 132 kV Air-insulated Substation (AIS) at the Patan plant (central Chhattisgarh) • Awarded project for the manufacture and installation of a 220 kV (AIS) at the Vishrampur plant (northern Chhattisgarh). • 2 major GIS Substations orders by Delhi Transco Ltd (DTL) - New Delhi • Awarded two contracts for Extra High Voltage turnkey projects at the Moga (Punjab) and Bhiwani (Haryana) plants by Power Grid Corporation of India Limited (PGCIL). • Awarded contract for Electrical Balance of Plant (eBOP) for Madhya Pradesh Power Generating Company Ltd for the supply and installation of electrical Balance of Plant solutions for two 600 MW thermal power plants at Malwa in southwest Madhya Pradesh
  • 23. 23 GE Title or job number 4/20/2017 • Wins 1300 MINR eBOP contract for GMR Group's Warora Thermal Power Plant for the supply and installation of electrical Balance of Plant solutions for 2x300 MW thermal power plants in Warora Taluka, District Chandrapur, and Maharashtra. • Wins 765 kV Extra High - Voltage substation order from Uttar Pradesh Power Transmission Corporation for 765 kV Extra High-Voltage (EHV) substation at the Anpara "D" thermal power plant in the state of Uttar Pradesh. • Awarded a contract for a Gas-insulated Substation (GIS) package by Bharat Heavy Electricals (BHEL), in Chennai for the manufacture and installation of 420 kV and 230 kV GIS for the Tamil Nadu state utility's North Chennai Thermal Power Project. • Awarded a prestigious contract for Generator Transformers Package by Indiabulls for their upcoming Power Projects at Nandgaonpeth, Amravati District (5x270 MW) and Sinnar, Nasik district (5x270 MW). Both plants are located in Maharashtra
  • 24. 24 GE Title or job number 4/20/2017 Thank You Anshul Tripathi Sr.Sourcing,R&D Specialist
  • 25. Use divider slides to separate different sections of your pitch
  • 26.
  • 27. Use divider slides to separate different sections of your pitch
  • 28. Use divider slides to separate different sections of your pitch
  • 29. Use divider slides to separate different sections of your pitch
  • 30. Use divider slides to separate different sections of your pitch
  • 31. Use divider slides to separate different sections of your pitch
  • 32. Use divider slides to separate different sections of your pitch
  • 33. 33 GE Title or job number 4/20/2017 Colors in this template (RGB) R- 30 G- 65 B- 145 R- 0 G- 170 B- 80 R- 255 G- 102 B- 0 R- 155 G- 80 B- 212 R- 40 G- 185 B- 245 R- 118 G- 185 B- 0 Abc123 ABC123 Abc123 ABC123 Abc123 ABC123 Abc123 ABC123 Abc123 ABC123 Abc123 ABC123 R- 238 G- 51 B- 36 Abc123 ABC123 R- 235 G- 215 B- 10 Abc123 ABC123