INTRODUCTION / OVERVIEW
 SISCO is a 100% Saudi Owned Limited Liability Company
established in the year 1990, growing with 30% CAGR
 Strategically located Offices, Laydown Yards and Camps
 An ISO 9000 accredited company, executing projects in Plant
Construction, Piping, Pipe Line & Maintenance
 With 2000 skilled manpower; 700 light & heavy equipment and
vehicles, SISCO operates in CMEI areas in Oil & Gas Sector –
Refineries, Petrochemical, Fertilizer and Utility Plants
COMPANY AT A GLANCE
INDUSTRIAL
CONSTRUCTION
SHUTDOWN,
OPERATION &
MAINTENANCE
IN-PLANT PIPING
PROJECTS
CROSS COUNTRY
PIPELINE PROJECTS
ENGINEERING &
TECHNICAL
SUPPORT
AREA OF BUSINESS / SECTORS
 Civil, Mechanical, Electrical & Instrumentation on LSTK basis
 Cross-country Pipeline, In-Plant Piping & Industrial Construction
 Plant - Operation, Maintenance & Turn Around
 Refineries, Petrochemical, Fertilizer & GOSPs
 Power, Water & Civil Infrastructure
RESOURCES
Employees
Equipment & Vehicles
Laydown Yard
Block Visas
Camp Facilities
Jubail Rahima Yanbu
Khafji Jeddah Riyadh
Camp & Office
Locations
2000 Nos.
700 Nos.
50,000 SqM at Jubail & Ras Tanura
Accommodate Over 4,500 Senior
& Junior Staff
400 Nos.
SAUDI ARAMCO
SABIC
SATORP
SADARA
KJO
CAPABILITIES
Pipe Erection & Welding 35,000 Ø Inch / Month
Steel Fabrication & Erection 300 Ton / Month
Reinforced Concreting 1,500 CM / Month
TASNEE
SAUDI CHEVRON
MA’ADEN
JANA
MARAFIQ
CLIENTELE
JESCO
APPC
SIPCHEM
SASREF
SAHARA
EQUIPMENT & VEHICLES
FACILITIES
HIGHLIGHTS
 SAUDI ARAMCO
1. Northern Area (NAPD) 2005-12 : General Construction Services
2. RT Terminal 2011-16 : General Maintanence of Onshore Plants
3. RT Refinery 2006-13 : Mechanical & Civil Maintenance Services
4. Riyadh Refinery 2008-12 : Mechanical Pipeline & Plant Maint. Services
5. Install Sanitary Waste Water Facilities @ Ras Tanura (12 KM RTR Piping)
6. Safaniyah Tank Farm : 9,000 CM Concrete Paving & Dykewall
7. Khurzaniya Gas Plant : Slope Protection (65,000 CM Marl)
8. Southern Area : Flare Up-gradation of 29 GOSPs
9. RT Refinery: Replace Control System; Crude Oil & Sulfur Recovery System
10. Riyadh Refinery Chlorination & Condensate System Upgrade
11. FCV Piping Replacement Work at Abu-Ali Plant
12. Plant-471 Shutdown Activities @ Berri Gas Plant
13. Install Fuel Metering Station for AAC Block Factory, Jubail Ind. City
14. Demolish/Relocate Loads of MCC-01,9&10 @ Air & Water Plt. Abqaiq
15. Various Short Form /Mid Form/Shutdown Project at Northern & Sothern Area
HIGHLIGHTS
 SATORP (JV SAUDI ARAMCO & TOTAL)
1. Jubail Export Refinery Package - 8 Piping - Install & Weld 150 KM 6ӯ
- 36”Ø CS Pipelines Included 300,000 Ø Inch Welding
2. 150 KM Heat Tubes Installation
3. Repair / Replace 6.5 KM X 36ӯ Crude Oil Pipe Line
4. Piping & Structural Works at KFIP Sea-Port, JUBAIL
5. 8" & 6" Propylene Line from JERP to APPC & TASNEE
6. 6" Benzene Line at Saudi Chevron Site, JUBAIL
7. Dismantling of Naphtha/ Diesel Jump Over @ SASREF
 SADARA (JV SAUDI ARAMCO & DOW CHEMICALS)
1. PE LSPB-1, Train-01, Aboveground Piping Erection Works
2. In Plant Work Support Services (2014-2016)
 SABIC (SAUDI BASIC INDUSTRIES CORPORATION)
1. IBN-BAYTAR : Installation & Commissioning of HD Crusher
2. SHARQ : Isolation Valve Tie-In for LP De-Ethanizer Reboiler Column
3. SHARQ: Gas Cooler Drill 3" & Nozzle Welding (Shutdown)
4. IBN-ZAHR : Demolish & Reconstruct 4 Ea. Culverts & Channel Covers
HIGHLIGHTS
 TASNEE
1. Purging Speed up & Installation of C-2 Bypass Strainers for De-Ethanizer
2. Install Duplex Filters & Replace Slice Gate @ SW Return
3. Install Ammonia & Water Pumps
 JANA
1. LSTK Civil & MEI Works for New NACL Incinerator Plant
2. Electrical & Instrumentation work for CCL Plant
3. Piping Works & Supports For Foam & Fire Water Sprinkler Systems -
 SABIC (Contin’d…)
5. SAFCO: M Port Deducting System Modification in truck unloading Section
6. SAUDI KAYAN: Structural & Deluge Sys. for Tanks & Piping for U&O Nest
7. AR-RAZI & IBN-ZAHR: Utilities & Yard Development
8. HADEED : Mech Maint, FMT / BMT (2009, 2010, 2011, 2013)
9. IBN-ZAHR : Repairs of MTBE-1 & 2 Catofin Reactor Header (2007, 2009)
10. SHARQ Shipping & Logistics Support (1996-2014)
11. Global Contract Mobile Workforce (2007-14)
12. UNITED Golden Sand Housing Maint (2007-14)
H S E RECORDS
INJURY REPORTING & RECORD KEEPING Report Date: 31/July/2014
Year 2014 2013 2012 2011 2010
Man-hours Worked 3,297,924 5,762,272 5,690,551 6,186,520 5,679,822
First Aid Injury/Illness (FAI) Cases 2 5 6 6 5
Medical Treatment Cases (MTC) 1 5 5 6 6
Lost Time Injury/Illness (LTI) Cases 0 1 3 4 3
Fatalities 0 0 0 0 0
Industrial Disabling Injuries (IDI) 0 0 0 0 0
Restricted Duty Incidents (RDI) 0 1 2 1 2
Total Lost Manhour 0 20 40 30 40
ISO CERTIFICATE
CREDENTIALS
CREDENTIALS
CREDENTIALS
CREDENTIALS
Contract Title : SABIC General Construction Services
(Global Contract)
Client : All SABIC Affiliates
Project Duration : 5 Years (From 22 July 2014 To 21 July 2019)
Scope of Work : Civil, Structural, Mechanical, Piping, Static &
Rotating Equipment, Electrical, Instrumentation
Painting & Insulation including Material supply.
Mode of Contract : Work Unit Rates, Material, Time Unit Rates and
Equipment Rates for undertaking construction
activities in all SABIC affiliates.
Other : Special Material & Services as may be required
CONTRACT FEATURES
PROJECT ORGANOGRAM
Project
Manager
Construction
Manager
(Civil)
Proj. Engr.
(Civil) Nos. to
Depend on
the Workload
Supervisor
Civil
Work Permit
Receiver
Surveyor
Mason-1
Carpenter-1
Steel Fixer-1
Plumber-1
Helper-1
Supervisor
Structural
Work permit
Receiver
Structural
Fabricator-1
Erector-1
Fitter-1
Helper-2
Construction
Manger
(Mech.)
Proj. Engr.
(Mech.) Nos.
to Depend
on Workload
Supervisor
Piping
Work permit
Receiver
Pipe
Fabricator-1
Welder-4 (CS/
SS/AS/Monel)
Pipe Fitter-1
RTR Fitter-1
RTR Bonder-1
Rigger-1
Helper-2
Supervisor
Static Eqpt.
Work permit
Receiver
Millwright-1
Helpers-2
Supervisor
Rotat’g Eqpt
Work Permit
Receiver
Millwright-1
Helpers-2
Supervisor
Paint/Insul’n
Work Permit
Receiver
Sand
Blaster-2
Spray
Painter-1
Brush
Painter-1
Insulators-2
Helpers-2
Construction
Manager
(E&I)
Proj. Engr.
(E&I) Nos. to
Depend on
Workload
Supervisor
Electrical
Work Permit
Receiver
Industrial
Elctrician-2
Electrical
Technician-2
Fitter-1
Helpers-2
Supervisor
Instrument’n
Work Permit
Receiver
Instrument
Technician-2
Instr. Fitter-2
Splicers-2
Helpers-2
QC Manager
Civil &
Structural
Inspectors - 2
Mech. QC – 2
Piping QC – 2
Welding QC - 2
E & I
Inspectors - 2
HSE Manager
Safety
Supervisor -2
Safety
Officer - 6
Fire Watch /
Flag man
Planning &
Coordination
Planning
Engineer
Documentation
/ Document
Controller - 2
Quantity
Surveyor
PRO
ID Coordinator
Procurement
Manager
Procurement
Coordination
Material
Coordinator
Store Keeper
WORK FLOW DIAGRAM
Introduction/Marketing
(BD/PM)
Assignment in
Estimation
Dept.(Biju/John)
Recieve Scope
(PM/CM/CD)
Job Ex / Site Visit
(Est./Exec. Dept.)
Preparation of
BOQ
Approval
From
Client (SABIC)
Sub-Contracts
Rates/
Quotations
Recieving
Budget
Preparation &
Manpower &
Equip.
Finalzation
If Not Approved
By Client the
process will repeat
Preparation Tech.
Documents &
Mobilization
Activites
Specific
Project Quality
Plan
SHE
Documentation
Qualifying SHE
Personnel
Planning &
Scheduling
Direct &
Indirect
Manpower
Allocation
Equipment
Inspection &
Approval
Material
Approval &
Placing P.O
Materials Store
in Central
Store
ID Processing
Approved &
Service Order
Release
Mobilization
Hand Over of Site
& QC Dossier
Submission &
Approval
Execution of Works
as per Scope
QC Inspections
Punch List
Clearence &
Approval of Work
Invoicing
(Incl.Retention &
Warranty)
End of Work Flow and
repeats for every S.O
BASIC WORK FLOW CHART FOR SABIC GLOBAL GENERAL CONTRUCTION CONTRACT
Variations &
Change orders
(If Any)
Current Manpower : 2000 Nos.
Engineers 500, Skilled 700
Block Visa Availability : 400 Nos.
Mobilization Phase-1 : 300 Employees Readily Available
Phase-2 : 200 Employees by 01 October 2014
Phase-3 : 300 Employees by 01 January 2015.
Phase-4 : Fresh Recruits depending on Additional
Visa Recommendation from SABIC
Equipment : Adequate Vehicles & Equipment available
for mobilization (Phase1 & 2).
We are capable to meet any additional
Requirements as and when required.
MOBILIZATION PLAN
We Continually Strive to
Improve our Performance for the Betterment
of all the Stakeholders.
Thank You!

More Related Content

What's hot

Operations Enginner CV
Operations   Enginner CVOperations   Enginner CV
Operations Enginner CVRahul Shinde
 
Vedam Design:- BWTS - Retrofits Services
Vedam Design:-  BWTS - Retrofits Services Vedam Design:-  BWTS - Retrofits Services
Vedam Design:- BWTS - Retrofits Services
Vedam design & Techincal Consultancy Pvt Ltd.
 
Surajit cv.doc
Surajit cv.docSurajit cv.doc
Surajit cv.doc
surajit das
 
Premier Oil - Decommissioning Oil Projects In The North Sea Case Study
Premier Oil - Decommissioning Oil Projects In The North Sea Case StudyPremier Oil - Decommissioning Oil Projects In The North Sea Case Study
Premier Oil - Decommissioning Oil Projects In The North Sea Case Study
Thorne & Derrick International
 
updated Trupti Goswami_Resume 281015
updated Trupti Goswami_Resume 281015updated Trupti Goswami_Resume 281015
updated Trupti Goswami_Resume 281015Trupti Goswami
 
Piping & Static Equipment Draftsman CV
Piping & Static Equipment Draftsman CVPiping & Static Equipment Draftsman CV
Piping & Static Equipment Draftsman CV
Muhammad Kashif
 
John P Henderson Resume- Jan 2016PDF
John P Henderson Resume- Jan 2016PDFJohn P Henderson Resume- Jan 2016PDF
John P Henderson Resume- Jan 2016PDFJohn P. Henderson
 
JCBagnodResumeEnglish March 2016
JCBagnodResumeEnglish March 2016JCBagnodResumeEnglish March 2016
JCBagnodResumeEnglish March 2016Juan Carlos Bagnod
 
Mechanical cv
Mechanical cvMechanical cv
Mechanical cv
Umar Faruque
 
MCS Presentation
MCS PresentationMCS Presentation
MCS Presentation
ArranEwan
 
cvPaoloAguzziNov16
cvPaoloAguzziNov16cvPaoloAguzziNov16
cvPaoloAguzziNov16Paolo Aguzzi
 

What's hot (19)

Resume
ResumeResume
Resume
 
Operations Enginner CV
Operations   Enginner CVOperations   Enginner CV
Operations Enginner CV
 
Vedam Design:- BWTS - Retrofits Services
Vedam Design:-  BWTS - Retrofits Services Vedam Design:-  BWTS - Retrofits Services
Vedam Design:- BWTS - Retrofits Services
 
Surajit cv.doc
Surajit cv.docSurajit cv.doc
Surajit cv.doc
 
Jack Oler 1
Jack Oler 1Jack Oler 1
Jack Oler 1
 
My Cv 05-2014
My Cv 05-2014My Cv 05-2014
My Cv 05-2014
 
Premier Oil - Decommissioning Oil Projects In The North Sea Case Study
Premier Oil - Decommissioning Oil Projects In The North Sea Case StudyPremier Oil - Decommissioning Oil Projects In The North Sea Case Study
Premier Oil - Decommissioning Oil Projects In The North Sea Case Study
 
updated Trupti Goswami_Resume 281015
updated Trupti Goswami_Resume 281015updated Trupti Goswami_Resume 281015
updated Trupti Goswami_Resume 281015
 
mmd cv1
mmd cv1mmd cv1
mmd cv1
 
Moore Subsea Dossier
Moore   Subsea DossierMoore   Subsea Dossier
Moore Subsea Dossier
 
Piping & Static Equipment Draftsman CV
Piping & Static Equipment Draftsman CVPiping & Static Equipment Draftsman CV
Piping & Static Equipment Draftsman CV
 
John P Henderson Resume- Jan 2016PDF
John P Henderson Resume- Jan 2016PDFJohn P Henderson Resume- Jan 2016PDF
John P Henderson Resume- Jan 2016PDF
 
Zane P Engelbrecht CV-1
Zane P Engelbrecht CV-1Zane P Engelbrecht CV-1
Zane P Engelbrecht CV-1
 
JCBagnodResumeEnglish March 2016
JCBagnodResumeEnglish March 2016JCBagnodResumeEnglish March 2016
JCBagnodResumeEnglish March 2016
 
Mechanical cv
Mechanical cvMechanical cv
Mechanical cv
 
MCS Presentation
MCS PresentationMCS Presentation
MCS Presentation
 
C.V.-Mohamed Alsharkawy-2016
C.V.-Mohamed Alsharkawy-2016 C.V.-Mohamed Alsharkawy-2016
C.V.-Mohamed Alsharkawy-2016
 
Arsalan 1
Arsalan 1Arsalan 1
Arsalan 1
 
cvPaoloAguzziNov16
cvPaoloAguzziNov16cvPaoloAguzziNov16
cvPaoloAguzziNov16
 

Similar to SISCO - Presentation

Introduction letter pbc
Introduction letter pbcIntroduction letter pbc
Introduction letter pbc
Pankaj Chakraborty
 
CV_Electrical and Instrumentation Engineer
CV_Electrical and Instrumentation EngineerCV_Electrical and Instrumentation Engineer
CV_Electrical and Instrumentation EngineerDeva Narayanan
 
updated Cv 04-01-2017 (1)
updated Cv 04-01-2017 (1)updated Cv 04-01-2017 (1)
updated Cv 04-01-2017 (1)ABDUL QADIR
 
CV-Engineering Manager-Lead Electrical Eng_RFSIASAT
CV-Engineering Manager-Lead Electrical Eng_RFSIASATCV-Engineering Manager-Lead Electrical Eng_RFSIASAT
CV-Engineering Manager-Lead Electrical Eng_RFSIASATRommel Siasat
 
Alumiunium casting
Alumiunium castingAlumiunium casting
Alumiunium casting
Dhananjay Sargar
 
CV-_SDhiman_27-04-2016
CV-_SDhiman_27-04-2016CV-_SDhiman_27-04-2016
CV-_SDhiman_27-04-2016Subhash Dhiman
 
Vasanth_Electrical Engineer_CV_new
Vasanth_Electrical Engineer_CV_newVasanth_Electrical Engineer_CV_new
Vasanth_Electrical Engineer_CV_newvasanth morais
 
Psn resume
Psn   resume Psn   resume
Psn resume
PramodShankarNair
 
Cv of mr.Jefferson Tomas Tulabot
Cv of mr.Jefferson Tomas TulabotCv of mr.Jefferson Tomas Tulabot
Cv of mr.Jefferson Tomas Tulabot
Jefferson Tomas Tulabot
 
Amjad survey inspector
Amjad survey inspectorAmjad survey inspector
Amjad survey inspector
Muhammad Amjad
 
resume_2015_11_19_11_22_24_986
resume_2015_11_19_11_22_24_986resume_2015_11_19_11_22_24_986
resume_2015_11_19_11_22_24_986sheik syedali
 
Robin dargavel consutant mechanical - facilities engineer
Robin dargavel   consutant mechanical - facilities engineerRobin dargavel   consutant mechanical - facilities engineer
Robin dargavel consutant mechanical - facilities engineer
Robin Dargavel BEng (Hons)
 

Similar to SISCO - Presentation (20)

SISCO - Presentation SABIC
SISCO - Presentation SABICSISCO - Presentation SABIC
SISCO - Presentation SABIC
 
Introduction letter pbc
Introduction letter pbcIntroduction letter pbc
Introduction letter pbc
 
CV Yasin
CV YasinCV Yasin
CV Yasin
 
CV_Electrical and Instrumentation Engineer
CV_Electrical and Instrumentation EngineerCV_Electrical and Instrumentation Engineer
CV_Electrical and Instrumentation Engineer
 
updated Cv 04-01-2017 (1)
updated Cv 04-01-2017 (1)updated Cv 04-01-2017 (1)
updated Cv 04-01-2017 (1)
 
chris's CV
chris's CVchris's CV
chris's CV
 
CV-Engineering Manager-Lead Electrical Eng_RFSIASAT
CV-Engineering Manager-Lead Electrical Eng_RFSIASATCV-Engineering Manager-Lead Electrical Eng_RFSIASAT
CV-Engineering Manager-Lead Electrical Eng_RFSIASAT
 
Mohamed Behiry CV
Mohamed Behiry CVMohamed Behiry CV
Mohamed Behiry CV
 
Alumiunium casting
Alumiunium castingAlumiunium casting
Alumiunium casting
 
CV-_SDhiman_27-04-2016
CV-_SDhiman_27-04-2016CV-_SDhiman_27-04-2016
CV-_SDhiman_27-04-2016
 
Vasanth_Electrical Engineer_CV_new
Vasanth_Electrical Engineer_CV_newVasanth_Electrical Engineer_CV_new
Vasanth_Electrical Engineer_CV_new
 
Psn resume
Psn   resume Psn   resume
Psn resume
 
Cv of mr.Jefferson Tomas Tulabot
Cv of mr.Jefferson Tomas TulabotCv of mr.Jefferson Tomas Tulabot
Cv of mr.Jefferson Tomas Tulabot
 
CV_Nabil Abuaziz
CV_Nabil AbuazizCV_Nabil Abuaziz
CV_Nabil Abuaziz
 
Cpcl
CpclCpcl
Cpcl
 
Cpcl
CpclCpcl
Cpcl
 
Amjad survey inspector
Amjad survey inspectorAmjad survey inspector
Amjad survey inspector
 
resume_2015_11_19_11_22_24_986
resume_2015_11_19_11_22_24_986resume_2015_11_19_11_22_24_986
resume_2015_11_19_11_22_24_986
 
Robin dargavel consutant mechanical - facilities engineer
Robin dargavel   consutant mechanical - facilities engineerRobin dargavel   consutant mechanical - facilities engineer
Robin dargavel consutant mechanical - facilities engineer
 
khalid mowafy CV
khalid mowafy CVkhalid mowafy CV
khalid mowafy CV
 

SISCO - Presentation

  • 1.
  • 2. INDEX  Introduction / Overview  Company at a Glance  Area of Business  Resources  Capability & Clientele  Equipment, Vehicles & Facilities  Highlights  H S E Records & Credentials  Contract Features  Project Organogram & Work Flow Diagram  Mobilization Plan  Your Feed Back
  • 3. INTRODUCTION / OVERVIEW  SISCO is a 100% Saudi Owned Limited Liability Company established in the year 1990, growing with 30% CAGR  Strategically located Offices, Laydown Yards and Camps  An ISO 9000 accredited company, executing projects in Plant Construction, Piping, Pipe Line & Maintenance  With 2000 skilled manpower; 700 light & heavy equipment and vehicles, SISCO operates in CMEI areas in Oil & Gas Sector – Refineries, Petrochemical, Fertilizer and Utility Plants
  • 4. COMPANY AT A GLANCE INDUSTRIAL CONSTRUCTION SHUTDOWN, OPERATION & MAINTENANCE IN-PLANT PIPING PROJECTS CROSS COUNTRY PIPELINE PROJECTS ENGINEERING & TECHNICAL SUPPORT
  • 5. AREA OF BUSINESS / SECTORS  Civil, Mechanical, Electrical & Instrumentation on LSTK basis  Cross-country Pipeline, In-Plant Piping & Industrial Construction  Plant - Operation, Maintenance & Turn Around  Refineries, Petrochemical, Fertilizer & GOSPs  Power, Water & Civil Infrastructure
  • 6. RESOURCES Employees Equipment & Vehicles Laydown Yard Block Visas Camp Facilities Jubail Rahima Yanbu Khafji Jeddah Riyadh Camp & Office Locations 2000 Nos. 700 Nos. 50,000 SqM at Jubail & Ras Tanura Accommodate Over 4,500 Senior & Junior Staff 400 Nos.
  • 7. SAUDI ARAMCO SABIC SATORP SADARA KJO CAPABILITIES Pipe Erection & Welding 35,000 Ø Inch / Month Steel Fabrication & Erection 300 Ton / Month Reinforced Concreting 1,500 CM / Month TASNEE SAUDI CHEVRON MA’ADEN JANA MARAFIQ CLIENTELE JESCO APPC SIPCHEM SASREF SAHARA
  • 10. HIGHLIGHTS  SAUDI ARAMCO 1. Northern Area (NAPD) 2005-12 : General Construction Services 2. RT Terminal 2011-16 : General Maintanence of Onshore Plants 3. RT Refinery 2006-13 : Mechanical & Civil Maintenance Services 4. Riyadh Refinery 2008-12 : Mechanical Pipeline & Plant Maint. Services 5. Install Sanitary Waste Water Facilities @ Ras Tanura (12 KM RTR Piping) 6. Safaniyah Tank Farm : 9,000 CM Concrete Paving & Dykewall 7. Khurzaniya Gas Plant : Slope Protection (65,000 CM Marl) 8. Southern Area : Flare Up-gradation of 29 GOSPs 9. RT Refinery: Replace Control System; Crude Oil & Sulfur Recovery System 10. Riyadh Refinery Chlorination & Condensate System Upgrade 11. FCV Piping Replacement Work at Abu-Ali Plant 12. Plant-471 Shutdown Activities @ Berri Gas Plant 13. Install Fuel Metering Station for AAC Block Factory, Jubail Ind. City 14. Demolish/Relocate Loads of MCC-01,9&10 @ Air & Water Plt. Abqaiq 15. Various Short Form /Mid Form/Shutdown Project at Northern & Sothern Area
  • 11. HIGHLIGHTS  SATORP (JV SAUDI ARAMCO & TOTAL) 1. Jubail Export Refinery Package - 8 Piping - Install & Weld 150 KM 6”Ø - 36”Ø CS Pipelines Included 300,000 Ø Inch Welding 2. 150 KM Heat Tubes Installation 3. Repair / Replace 6.5 KM X 36”Ø Crude Oil Pipe Line 4. Piping & Structural Works at KFIP Sea-Port, JUBAIL 5. 8" & 6" Propylene Line from JERP to APPC & TASNEE 6. 6" Benzene Line at Saudi Chevron Site, JUBAIL 7. Dismantling of Naphtha/ Diesel Jump Over @ SASREF  SADARA (JV SAUDI ARAMCO & DOW CHEMICALS) 1. PE LSPB-1, Train-01, Aboveground Piping Erection Works 2. In Plant Work Support Services (2014-2016)  SABIC (SAUDI BASIC INDUSTRIES CORPORATION) 1. IBN-BAYTAR : Installation & Commissioning of HD Crusher 2. SHARQ : Isolation Valve Tie-In for LP De-Ethanizer Reboiler Column 3. SHARQ: Gas Cooler Drill 3" & Nozzle Welding (Shutdown) 4. IBN-ZAHR : Demolish & Reconstruct 4 Ea. Culverts & Channel Covers
  • 12. HIGHLIGHTS  TASNEE 1. Purging Speed up & Installation of C-2 Bypass Strainers for De-Ethanizer 2. Install Duplex Filters & Replace Slice Gate @ SW Return 3. Install Ammonia & Water Pumps  JANA 1. LSTK Civil & MEI Works for New NACL Incinerator Plant 2. Electrical & Instrumentation work for CCL Plant 3. Piping Works & Supports For Foam & Fire Water Sprinkler Systems -  SABIC (Contin’d…) 5. SAFCO: M Port Deducting System Modification in truck unloading Section 6. SAUDI KAYAN: Structural & Deluge Sys. for Tanks & Piping for U&O Nest 7. AR-RAZI & IBN-ZAHR: Utilities & Yard Development 8. HADEED : Mech Maint, FMT / BMT (2009, 2010, 2011, 2013) 9. IBN-ZAHR : Repairs of MTBE-1 & 2 Catofin Reactor Header (2007, 2009) 10. SHARQ Shipping & Logistics Support (1996-2014) 11. Global Contract Mobile Workforce (2007-14) 12. UNITED Golden Sand Housing Maint (2007-14)
  • 13. H S E RECORDS INJURY REPORTING & RECORD KEEPING Report Date: 31/July/2014 Year 2014 2013 2012 2011 2010 Man-hours Worked 3,297,924 5,762,272 5,690,551 6,186,520 5,679,822 First Aid Injury/Illness (FAI) Cases 2 5 6 6 5 Medical Treatment Cases (MTC) 1 5 5 6 6 Lost Time Injury/Illness (LTI) Cases 0 1 3 4 3 Fatalities 0 0 0 0 0 Industrial Disabling Injuries (IDI) 0 0 0 0 0 Restricted Duty Incidents (RDI) 0 1 2 1 2 Total Lost Manhour 0 20 40 30 40
  • 19. Contract Title : SABIC General Construction Services (Global Contract) Client : All SABIC Affiliates Project Duration : 5 Years (From 22 July 2014 To 21 July 2019) Scope of Work : Civil, Structural, Mechanical, Piping, Static & Rotating Equipment, Electrical, Instrumentation Painting & Insulation including Material supply. Mode of Contract : Work Unit Rates, Material, Time Unit Rates and Equipment Rates for undertaking construction activities in all SABIC affiliates. Other : Special Material & Services as may be required CONTRACT FEATURES
  • 20. PROJECT ORGANOGRAM Project Manager Construction Manager (Civil) Proj. Engr. (Civil) Nos. to Depend on the Workload Supervisor Civil Work Permit Receiver Surveyor Mason-1 Carpenter-1 Steel Fixer-1 Plumber-1 Helper-1 Supervisor Structural Work permit Receiver Structural Fabricator-1 Erector-1 Fitter-1 Helper-2 Construction Manger (Mech.) Proj. Engr. (Mech.) Nos. to Depend on Workload Supervisor Piping Work permit Receiver Pipe Fabricator-1 Welder-4 (CS/ SS/AS/Monel) Pipe Fitter-1 RTR Fitter-1 RTR Bonder-1 Rigger-1 Helper-2 Supervisor Static Eqpt. Work permit Receiver Millwright-1 Helpers-2 Supervisor Rotat’g Eqpt Work Permit Receiver Millwright-1 Helpers-2 Supervisor Paint/Insul’n Work Permit Receiver Sand Blaster-2 Spray Painter-1 Brush Painter-1 Insulators-2 Helpers-2 Construction Manager (E&I) Proj. Engr. (E&I) Nos. to Depend on Workload Supervisor Electrical Work Permit Receiver Industrial Elctrician-2 Electrical Technician-2 Fitter-1 Helpers-2 Supervisor Instrument’n Work Permit Receiver Instrument Technician-2 Instr. Fitter-2 Splicers-2 Helpers-2 QC Manager Civil & Structural Inspectors - 2 Mech. QC – 2 Piping QC – 2 Welding QC - 2 E & I Inspectors - 2 HSE Manager Safety Supervisor -2 Safety Officer - 6 Fire Watch / Flag man Planning & Coordination Planning Engineer Documentation / Document Controller - 2 Quantity Surveyor PRO ID Coordinator Procurement Manager Procurement Coordination Material Coordinator Store Keeper
  • 21. WORK FLOW DIAGRAM Introduction/Marketing (BD/PM) Assignment in Estimation Dept.(Biju/John) Recieve Scope (PM/CM/CD) Job Ex / Site Visit (Est./Exec. Dept.) Preparation of BOQ Approval From Client (SABIC) Sub-Contracts Rates/ Quotations Recieving Budget Preparation & Manpower & Equip. Finalzation If Not Approved By Client the process will repeat Preparation Tech. Documents & Mobilization Activites Specific Project Quality Plan SHE Documentation Qualifying SHE Personnel Planning & Scheduling Direct & Indirect Manpower Allocation Equipment Inspection & Approval Material Approval & Placing P.O Materials Store in Central Store ID Processing Approved & Service Order Release Mobilization Hand Over of Site & QC Dossier Submission & Approval Execution of Works as per Scope QC Inspections Punch List Clearence & Approval of Work Invoicing (Incl.Retention & Warranty) End of Work Flow and repeats for every S.O BASIC WORK FLOW CHART FOR SABIC GLOBAL GENERAL CONTRUCTION CONTRACT Variations & Change orders (If Any)
  • 22. Current Manpower : 2000 Nos. Engineers 500, Skilled 700 Block Visa Availability : 400 Nos. Mobilization Phase-1 : 300 Employees Readily Available Phase-2 : 200 Employees by 01 October 2014 Phase-3 : 300 Employees by 01 January 2015. Phase-4 : Fresh Recruits depending on Additional Visa Recommendation from SABIC Equipment : Adequate Vehicles & Equipment available for mobilization (Phase1 & 2). We are capable to meet any additional Requirements as and when required. MOBILIZATION PLAN
  • 23. We Continually Strive to Improve our Performance for the Betterment of all the Stakeholders. Thank You!