SlideShare a Scribd company logo
1
Resume
Name: DEVENDER GUPTA
Address: B-164, NIRMAN VIHAR
NEW DELHI-110092 (INDIA)
Communication: Résidence : 011-22411741
Mobile : +91-9650992270 / 09868390270
e-mail : dgupta.dg@gmail.com
Present Position: Chief Infra-tech
VVR Consultant & Enterprises Pvt. Ltd.,Gurgaon
Date of birth: 3rd
May, 1956
Total Experience: 38 Years
Nationality: Indian
EDUCATIONAL QUALIFICATIONS:
B.Sc. (Honours) with 2nd
Position in Civil Engineering in the Year 1977
from National Institute of Technology, Kurukshetra (Formerly Regional
Engineering College, Kurukshetra) –Haryana.
FUNCTIONAL EXCELLENCE:
 Successfully managed Planning, Engineering and Execution of
- 3X660MW Lalitpur Thermal Project owned by Shishir Bajaj Group
- Various Thermal, Gas and Hydro Power Projects of NTPC, including
their O&M supports
- Sardar Sarovar’s lift pumping stations on Saurashtra Branch and
Kutch Branch canal system as Project Manager for consultancy
assignments
- Hydro Project of Govt. of Bhutan by leading teams of professionals of
Civil, Mech. Electrical, C&I as well as HR and Finance.
 Delivering cost effective & quality results in all spheres of Thermal, Gas
and Hydro Power Projects with focus on completion within or before the
scheduled targets. COST OPTIMISATION is the prime focus while
delivering the required results for the project.
 In depth experience of Detailed Structural Design & Detailing of all types
of Steel / Concrete Structures of Thermal Power Projects of
660MW/500MW/200MW capacity, large Gas based Combined Cycle
Power Projects as well as Hydro Electric Power Projects
2
 Well conversant in use of various computer applications like MS Office,
Power Point presentations, STAAD, SAP etc.
KEY ASSIGNMENTS:
Engineering / Project Management of Thermal, Gas & Hydro Electric Power
Projects including preparation of Feasibility Studies / Reports, Design
Memorandum, DPRs, Tender / Bid documents, Detailed Technical Evaluation
and Award Recommendations.
Detailed Structural Design & Detailing of Structures of various systems involved
in a Power Plant for Thermal Projects, large Gas based Combined Cycle
Projects as well as large Hydro Electric Power Projects. The specialized areas /
structures for which in-house engineering was carried out includes Main Power
House Building (Structural Steel construction), TG & BFP Foundations, Mills &
Fan Foundation etc, Water Intake Structures in Rivers/ Canals/ Sea (based
upon the studies carried out in association with expert agencies like CWPRS,
NIOT, IITs etc), Coal Handling and Ash Handling Structures, Fuel oil Handling
Systems, Switchyard Structures, MGR / Railway System etc.
Extensive experience in follow-up of project site’s problems during the course
of execution / construction as well as during operation stage of various Power
Projects. After completing the engineering activities of various packages,
currently looking after both execution and balance engineering activities of
Lalitpur Power Project where Civil Works are at peak and BLU is planned in
next 1-2 months.
Rich experience in handling of post award techno-commercial issues related to
various packages of a power plant.
Formerly Project Manager for Sardar Sarovar Narmada Nigam’s Consultancy
Assignment for Kutch Branch Canal Pumping System involving lifting of Kutch
Branch canal to 60 meters in three stages.
EMPLOYMENT RECORD:
Present Position: Chief Infra-tech,VVR Consultants and Enterprises Pvt.
Ltd. 4th
Floor, Motorola Building, Sector-14, Gurgaon
VVR Cosultant is a self-promoted consultancy company
along with 3 more senior colleagues of Power Sector. We
have started in January-2015 with World Bank assignments
on Power sector reforms in Egypt. We also have
consultancy assignments on Floating Solar Project from
one of the leading private sector Power Generator firm.
3
March-2011: Head (Civil) – Lalitpur Power Generation Co. Ltd. Noida
December-2014 CTC dawn at the time of Leaving LPGCL = Rs 72 L
Leading a team of engineers from Planning, Engineering
and site Execution, successfully completed the concept to
commissioning works related to civil designs & execution of
Lalitpur Super Thermal Power Project (3X660MW). Was
responsible for the basic engineering, detailed engineering
& construction drawings of civil structures of entire Power
Plant with cost effective techno-economic solutions. Later
deputed to site for leading site execution team. Savings of
more than Rs.200 Crs. had been achieved due to cost
optimization at each and every stage and meticulous
planning, designs and execution of civil structures of
this Power Plant.
December 2006: Addl. General Manager (Civil) – NTPC
March-2011 - Engineering Management of NTPC’s various upcoming
projects as head of Water System, Chimney and
Switchyard Group. The projects dealt consists of Barh-I
(3x660MW), Sipat-I (3x660MW), NCTPP (Dadri) II -
2x490MW, Simhadari–1x500MW, Farakka-III – 1x500MW,
Aravali JV (Jhajjar)-3x500MW, NTECL JV (Ennore)-
2x500MW.
- Project Manager for Sardar Sarovar Narmada Nigam’s
Consultancy Assignment for Kutch Branch Canal
Pumping System by leading a cross-functional team of
Engineers from Mechanical, Electrical, C&I and Civil.
- Project Manager for preparation of DPR of Amochhu
reservoir HEP in Bhutan, Preparation of PFR for Siang
Upper HEP (10,000MW) in Arunachal Pradesh.
- Engineering, Designs of various Project components &
Preparation of Technical Specification, BOQs, Cost
Estimates, Tender Drawings & Contract documents as well
as Techno-Commercial Bid Evaluation for NTPC’s
Rammam, Lata Tapovan and Rupsia Khasiabara Hydro
Electric Projects.
Dec-.2001 to : Dy. General Manager (Civil) - NTPC
Nov-2006 Engineering Management of NTPC’s various projects as
Group Head. Work involved supervision of preparation of
Feasibility Reports, Design Memorandum, Tender / Bid
documents, detailed Technical Evaluation and Award
Recommendations, Detailed Structural Design /
Construction Drawings for Make Up Water System, CW
System, Pre-Treatment Plant, DM Plant, CPU &
Chlorination Plant, Effluent Treatment Plant, Fire Protection
& Detection System, Switchyard Civil Works, Multi-Flue
RCC Chimney etc. for Ramagundam STPP-III, Rihand-II,
VSTPP-III, KhSTPP-II & III, Sipat-I & II, Barh STPP-I,
4
Kawas Gas Based Project-II (1320 MW), Gandhar Gas
Based Project-II (1320 MW)
Project Manager for Sardar Sarovar Consultancy Project
for 3 nos. lift pump stations on Kachch Branch canal
1996 to 2001 : Chief Design Engineer (Civil) - NTPC
Detailed Engineering &. supervision for complete
Faridabad Gas Power Project, Detailed Engineering for
Foundation Systems (including Turbo Generator, Steam
Generator, PA,ID & FD Fan Foundations), Coal Handling
Plant, Merry- Go- Round (MGR) Railway System and
various other civil works of Talcher STPP-II and VSTPP-II,
Sipat-I & II, Feasibility Reports for KhSTPP-II & Barh STPP
projects.
1991 to 1996 : Dy.Chief Design Engineer (Civil) - NTPC
Carrying on with the engineering activities of Talcher-II
(4x500MW), Farakka STPP-II & KhSTPP-I detailed above,
the Engineering for Fuel Oil (Naphtha) handling system
inclusive of Naphtha Storage Tanks of Kayamkulam Gas
based Combined Power Project, various Civil Works for
VSTPP-II (3x 500MW) thermal project.
1987 to 1991 : Asstt.Chief Design Engineer (Civil) - NTPC
Detailed engineering of various civil works of Talcher
STPP-I (2x500MW) project as indicated for Senior
Engineer below. The detailed Engineering for Fuel Oil
System Civil Works, Coal Handling Plant Civil Works, Ash
Handling Plant Civil Works of Farakka STPP-II (2x500MW)
and KhSTPP-I (5x210MW) thermal projects. Wagon
Tippler and CHP augmentation works for Ramagundam
Project.
1984 to 1987 : Senior Design Engineer (Civil) - NTPC
In addition to works as indicated for Engineer below the
Preparation of FR DIM & Tender Documents for various
civil packages like Foundation Systems, Ash handling
Plant Civil Works, Main Power House Civil Works
packages of Talcher STPP-I (2x500MW) thermal project.
Active interaction with project sites (average two visits in a
month)
1982 to 1984 : Design Engineer (Civil) - NTPC
Preparation of Tender documents, bid evaluation, and
detailed Engineering for Foundation Systems (including
Turbo Generator, Steam Generator, PA,ID & FD Fan
Foundations, Coal Mill foundations and Main Power House
Building), Civil and Structural Works for Main Power House
5
& Boiler Structures, Ash Handling Plant Civil Works etc. for
Ramagundam STPP-II(3x500MW) thermal project.
Jan.1981 to Design Engineer in GILCON PROJECT SERVICES LTD
May-1982 (Design arm of Gammon India Ltd.). Worked for pre-stress
RCC and other types of Bridges for clients in India and
abroad.
July 1977 to Astt. Design Engineer in Haryana Public Works Deptt.
Dec.1981 (B&R) – Chandigarh (Gazetted Post thru’ Public Service
Commission-Haryana) Design of various types of RCC and
Steel Bridges.
MEMBERSHIPS OF PROFESSIONAL BODIES:
i) Life member of “Institution of Engineers (India)”, Kolkatta.
ii) Life member of “The Indian Society for Hydraulics” - India.
TRAINING PROGRAMME ATTENDED:
 Advanced Management Programme at Administrative Staff College of
India, Hyderabad --- Feburary-2005 (3 Weeks)
 Strategic Management –Year 2004 (One Week)
 Capsule Course in Management – Year 2000 (Three Weeks)
 Foundation course in General Management– 1989 (15 days)
 Various Computer Application courses in Windows, Internet, Power
Point, Graphics and Animation – From year 1985 to 1989 (approximately
3 days to 7 days each)
TRAVELLED ALMOST ALL SUB-CONTINENTS AND MAJOR COUNTRIES/CITES
ALROUND THE GLOBE.
PAPERS PRESENTED / TRAININGS IMPARTED:
Faculty member in various programs on Civil Engineering systems of a Power
Plant in the Power Management Institute, NTPC, Noida.
LANGUAGES:
English : Good written and oral proficiency.
Hindi : Good written and oral proficiency.
(DEVENDER GUPTA)

More Related Content

What's hot

Training reporton ka tpp by naval kishor
Training reporton ka tpp by naval kishorTraining reporton ka tpp by naval kishor
Training reporton ka tpp by naval kishor
NAVAL KISHOR
 
Madhankumar new cv 2016 june6985
Madhankumar new cv 2016 june6985Madhankumar new cv 2016 june6985
Madhankumar new cv 2016 june6985
Madhan kumar Thangaraj (International Relationship)
 
Madhankumar new cv 2016 june6985
Madhankumar new cv 2016 june6985Madhankumar new cv 2016 june6985
Madhankumar new cv 2016 june6985
Madhan kumar Thangaraj (International Relationship)
 
Ntpc dadri
Ntpc dadriNtpc dadri
Ntpc dadri
Ishant Gautam.
 
Vignesh_Sr.Elec Designer
Vignesh_Sr.Elec DesignerVignesh_Sr.Elec Designer
Vignesh_Sr.Elec DesignerVignesh V
 
Gurpreet singh (MEP services manager with 9.8 year Exp)
Gurpreet singh (MEP services manager with 9.8 year Exp)Gurpreet singh (MEP services manager with 9.8 year Exp)
Gurpreet singh (MEP services manager with 9.8 year Exp)Gurpreet Singh
 
CV-AnirbanDatta-Stress Analysis-2016-03-25
CV-AnirbanDatta-Stress Analysis-2016-03-25CV-AnirbanDatta-Stress Analysis-2016-03-25
CV-AnirbanDatta-Stress Analysis-2016-03-25Anirban Datta, CEng
 
TPL Corporate Presentation
TPL Corporate PresentationTPL Corporate Presentation
TPL Corporate PresentationArpita Pattnayak
 

What's hot (20)

Training reporton ka tpp by naval kishor
Training reporton ka tpp by naval kishorTraining reporton ka tpp by naval kishor
Training reporton ka tpp by naval kishor
 
Ravi Resume
Ravi ResumeRavi Resume
Ravi Resume
 
MOHAN_Final
MOHAN_FinalMOHAN_Final
MOHAN_Final
 
SMP_BIO_S.M. Patil
SMP_BIO_S.M. PatilSMP_BIO_S.M. Patil
SMP_BIO_S.M. Patil
 
BAZYAN CCPP – Phase 1
BAZYAN CCPP – Phase 1BAZYAN CCPP – Phase 1
BAZYAN CCPP – Phase 1
 
FIELD EXPERIENCE RK
FIELD EXPERIENCE RKFIELD EXPERIENCE RK
FIELD EXPERIENCE RK
 
Madhankumar new cv 2016 june6985
Madhankumar new cv 2016 june6985Madhankumar new cv 2016 june6985
Madhankumar new cv 2016 june6985
 
Madhankumar new cv 2016 june6985
Madhankumar new cv 2016 june6985Madhankumar new cv 2016 june6985
Madhankumar new cv 2016 june6985
 
Ntpc dadri
Ntpc dadriNtpc dadri
Ntpc dadri
 
Amarnath RESUME
Amarnath RESUMEAmarnath RESUME
Amarnath RESUME
 
Vignesh_Sr.Elec Designer
Vignesh_Sr.Elec DesignerVignesh_Sr.Elec Designer
Vignesh_Sr.Elec Designer
 
Resume-up-Aug-16
Resume-up-Aug-16Resume-up-Aug-16
Resume-up-Aug-16
 
profile
profileprofile
profile
 
Gurpreet singh (MEP services manager with 9.8 year Exp)
Gurpreet singh (MEP services manager with 9.8 year Exp)Gurpreet singh (MEP services manager with 9.8 year Exp)
Gurpreet singh (MEP services manager with 9.8 year Exp)
 
CV-AnirbanDatta-Stress Analysis-2016-03-25
CV-AnirbanDatta-Stress Analysis-2016-03-25CV-AnirbanDatta-Stress Analysis-2016-03-25
CV-AnirbanDatta-Stress Analysis-2016-03-25
 
TPL Corporate Presentation
TPL Corporate PresentationTPL Corporate Presentation
TPL Corporate Presentation
 
Final Year Review
Final Year ReviewFinal Year Review
Final Year Review
 
CV-Goutam Sen
CV-Goutam SenCV-Goutam Sen
CV-Goutam Sen
 
CV Kitjuk Harijanto
CV Kitjuk HarijantoCV Kitjuk Harijanto
CV Kitjuk Harijanto
 
Report ON NTPC DADRI .BY ....EMAM
Report ON NTPC DADRI  .BY ....EMAMReport ON NTPC DADRI  .BY ....EMAM
Report ON NTPC DADRI .BY ....EMAM
 

Viewers also liked

Smart pitch phase 3
Smart pitch phase 3  Smart pitch phase 3
Smart pitch phase 3
kareif
 
Strategies for Telefunding | Paul Larson
Strategies for Telefunding | Paul LarsonStrategies for Telefunding | Paul Larson
Strategies for Telefunding | Paul Larson
OPERA America
 
Lesson 1
Lesson 1Lesson 1
Gltrm
GltrmGltrm
Gltrm
smarak2
 
Lesson 3
Lesson 3Lesson 3
suresh_kumar
suresh_kumarsuresh_kumar
suresh_kumarSuresh .K
 
Ms independent FINISHED
Ms independent FINISHEDMs independent FINISHED
Ms independent FINISHEDAisha Kamara
 
Time Management Skills Workshop | Susan Levin
Time Management Skills Workshop | Susan LevinTime Management Skills Workshop | Susan Levin
Time Management Skills Workshop | Susan Levin
OPERA America
 
New Generations of Donor Engagement | Kim Parker
New Generations of Donor Engagement | Kim ParkerNew Generations of Donor Engagement | Kim Parker
New Generations of Donor Engagement | Kim Parker
OPERA America
 
Is it time to consider Outsource Marketing?
Is it time to consider Outsource Marketing?Is it time to consider Outsource Marketing?
Is it time to consider Outsource Marketing?
Gloss Digital
 
Top 8 assistant project engineer resume samples
Top 8 assistant project engineer resume samplesTop 8 assistant project engineer resume samples
Top 8 assistant project engineer resume samplestonychoper5705
 
Hoag, trevor - vita (fall 2016)
Hoag, trevor  - vita (fall 2016)Hoag, trevor  - vita (fall 2016)
Hoag, trevor - vita (fall 2016)
Christopher Newport University
 
bảng giá thiết kế clip quảng cáo 3d
bảng giá thiết kế clip quảng cáo 3dbảng giá thiết kế clip quảng cáo 3d
bảng giá thiết kế clip quảng cáo 3dtonita740
 
Docbyte Company Presentation
Docbyte Company PresentationDocbyte Company Presentation
Docbyte Company Presentation
Maxime Vermeir
 
Top 8 produce associate resume samples
Top 8 produce associate resume samplesTop 8 produce associate resume samples
Top 8 produce associate resume samplesdavimores
 
Top 8 jcpenney sales associate resume samples
Top 8 jcpenney sales associate resume samplesTop 8 jcpenney sales associate resume samples
Top 8 jcpenney sales associate resume samplesdavimores
 

Viewers also liked (20)

Smart pitch phase 3
Smart pitch phase 3  Smart pitch phase 3
Smart pitch phase 3
 
DRJ_INVITECARD2015[1]
DRJ_INVITECARD2015[1]DRJ_INVITECARD2015[1]
DRJ_INVITECARD2015[1]
 
Strategies for Telefunding | Paul Larson
Strategies for Telefunding | Paul LarsonStrategies for Telefunding | Paul Larson
Strategies for Telefunding | Paul Larson
 
Lesson 1
Lesson 1Lesson 1
Lesson 1
 
Gltrm
GltrmGltrm
Gltrm
 
Lesson 3
Lesson 3Lesson 3
Lesson 3
 
suresh_kumar
suresh_kumarsuresh_kumar
suresh_kumar
 
Brett Powell
Brett PowellBrett Powell
Brett Powell
 
Ms independent FINISHED
Ms independent FINISHEDMs independent FINISHED
Ms independent FINISHED
 
TKO SAM JA
TKO SAM JATKO SAM JA
TKO SAM JA
 
Time Management Skills Workshop | Susan Levin
Time Management Skills Workshop | Susan LevinTime Management Skills Workshop | Susan Levin
Time Management Skills Workshop | Susan Levin
 
New Generations of Donor Engagement | Kim Parker
New Generations of Donor Engagement | Kim ParkerNew Generations of Donor Engagement | Kim Parker
New Generations of Donor Engagement | Kim Parker
 
Is it time to consider Outsource Marketing?
Is it time to consider Outsource Marketing?Is it time to consider Outsource Marketing?
Is it time to consider Outsource Marketing?
 
Top 8 assistant project engineer resume samples
Top 8 assistant project engineer resume samplesTop 8 assistant project engineer resume samples
Top 8 assistant project engineer resume samples
 
FakrulHassan(2)
FakrulHassan(2)FakrulHassan(2)
FakrulHassan(2)
 
Hoag, trevor - vita (fall 2016)
Hoag, trevor  - vita (fall 2016)Hoag, trevor  - vita (fall 2016)
Hoag, trevor - vita (fall 2016)
 
bảng giá thiết kế clip quảng cáo 3d
bảng giá thiết kế clip quảng cáo 3dbảng giá thiết kế clip quảng cáo 3d
bảng giá thiết kế clip quảng cáo 3d
 
Docbyte Company Presentation
Docbyte Company PresentationDocbyte Company Presentation
Docbyte Company Presentation
 
Top 8 produce associate resume samples
Top 8 produce associate resume samplesTop 8 produce associate resume samples
Top 8 produce associate resume samples
 
Top 8 jcpenney sales associate resume samples
Top 8 jcpenney sales associate resume samplesTop 8 jcpenney sales associate resume samples
Top 8 jcpenney sales associate resume samples
 

Similar to Resume140515

Pradeep resume feb 2017
Pradeep resume feb 2017Pradeep resume feb 2017
Pradeep resume feb 2017
Pradeep Sharma
 
Prime Consulting Group Profile
Prime Consulting Group ProfilePrime Consulting Group Profile
Prime Consulting Group Profile
MANOJ PATNE
 
Subhankar resumé-2016
Subhankar  resumé-2016Subhankar  resumé-2016
Subhankar resumé-2016
subhankar saha
 
Prime consulting group brochure
Prime consulting group brochurePrime consulting group brochure
Prime consulting group brochure
MANOJ PATNE
 
CV - Rakesh Arya Jan'16
CV - Rakesh Arya Jan'16CV - Rakesh Arya Jan'16
CV - Rakesh Arya Jan'16Rakesh Arya
 
Rajib Ali CV (Final)
Rajib Ali CV (Final)Rajib Ali CV (Final)
Rajib Ali CV (Final)Rajib Ali
 
AjayasankarK M _ Engineer
AjayasankarK M _ EngineerAjayasankarK M _ Engineer
AjayasankarK M _ EngineerAjay Sankar
 
d premanatha reddy_original (2)
d premanatha reddy_original (2)d premanatha reddy_original (2)
d premanatha reddy_original (2)Reddy Premnath
 
CV-_SDhiman_27-04-2016
CV-_SDhiman_27-04-2016CV-_SDhiman_27-04-2016
CV-_SDhiman_27-04-2016Subhash Dhiman
 
Hanif cv 2015 Project engineer (electrical)
Hanif cv 2015   Project engineer (electrical)Hanif cv 2015   Project engineer (electrical)
Hanif cv 2015 Project engineer (electrical)
Mohd Hanif Abd Hadi
 
Updated cv (2)
Updated cv (2)Updated cv (2)
Updated cv (2)
Satyeshwar Sharma
 

Similar to Resume140515 (20)

Pradeep resume feb 2017
Pradeep resume feb 2017Pradeep resume feb 2017
Pradeep resume feb 2017
 
CV - VAC-JUL 2015
CV - VAC-JUL 2015CV - VAC-JUL 2015
CV - VAC-JUL 2015
 
Arvinder Singh CV
Arvinder Singh CVArvinder Singh CV
Arvinder Singh CV
 
2016 CV
2016 CV2016 CV
2016 CV
 
Prime Consulting Group Profile
Prime Consulting Group ProfilePrime Consulting Group Profile
Prime Consulting Group Profile
 
Subhankar resumé-2016
Subhankar  resumé-2016Subhankar  resumé-2016
Subhankar resumé-2016
 
Prime consulting group brochure
Prime consulting group brochurePrime consulting group brochure
Prime consulting group brochure
 
CV - Rakesh Arya Jan'16
CV - Rakesh Arya Jan'16CV - Rakesh Arya Jan'16
CV - Rakesh Arya Jan'16
 
Rajib Ali CV (Final)
Rajib Ali CV (Final)Rajib Ali CV (Final)
Rajib Ali CV (Final)
 
AjayasankarK M _ Engineer
AjayasankarK M _ EngineerAjayasankarK M _ Engineer
AjayasankarK M _ Engineer
 
RESUME-1
RESUME-1RESUME-1
RESUME-1
 
New CV of VRB
New CV of VRBNew CV of VRB
New CV of VRB
 
d premanatha reddy_original (2)
d premanatha reddy_original (2)d premanatha reddy_original (2)
d premanatha reddy_original (2)
 
CV-_SDhiman_27-04-2016
CV-_SDhiman_27-04-2016CV-_SDhiman_27-04-2016
CV-_SDhiman_27-04-2016
 
Hanif cv 2015 Project engineer (electrical)
Hanif cv 2015   Project engineer (electrical)Hanif cv 2015   Project engineer (electrical)
Hanif cv 2015 Project engineer (electrical)
 
NIRMAL_MECH ENGINEER
NIRMAL_MECH ENGINEERNIRMAL_MECH ENGINEER
NIRMAL_MECH ENGINEER
 
CV PMG
CV PMGCV PMG
CV PMG
 
SANJEEV KUMAR
SANJEEV KUMARSANJEEV KUMAR
SANJEEV KUMAR
 
Updated cv (2)
Updated cv (2)Updated cv (2)
Updated cv (2)
 
PECL PROJECTS
PECL PROJECTSPECL PROJECTS
PECL PROJECTS
 

Resume140515

  • 1. 1 Resume Name: DEVENDER GUPTA Address: B-164, NIRMAN VIHAR NEW DELHI-110092 (INDIA) Communication: Résidence : 011-22411741 Mobile : +91-9650992270 / 09868390270 e-mail : dgupta.dg@gmail.com Present Position: Chief Infra-tech VVR Consultant & Enterprises Pvt. Ltd.,Gurgaon Date of birth: 3rd May, 1956 Total Experience: 38 Years Nationality: Indian EDUCATIONAL QUALIFICATIONS: B.Sc. (Honours) with 2nd Position in Civil Engineering in the Year 1977 from National Institute of Technology, Kurukshetra (Formerly Regional Engineering College, Kurukshetra) –Haryana. FUNCTIONAL EXCELLENCE:  Successfully managed Planning, Engineering and Execution of - 3X660MW Lalitpur Thermal Project owned by Shishir Bajaj Group - Various Thermal, Gas and Hydro Power Projects of NTPC, including their O&M supports - Sardar Sarovar’s lift pumping stations on Saurashtra Branch and Kutch Branch canal system as Project Manager for consultancy assignments - Hydro Project of Govt. of Bhutan by leading teams of professionals of Civil, Mech. Electrical, C&I as well as HR and Finance.  Delivering cost effective & quality results in all spheres of Thermal, Gas and Hydro Power Projects with focus on completion within or before the scheduled targets. COST OPTIMISATION is the prime focus while delivering the required results for the project.  In depth experience of Detailed Structural Design & Detailing of all types of Steel / Concrete Structures of Thermal Power Projects of 660MW/500MW/200MW capacity, large Gas based Combined Cycle Power Projects as well as Hydro Electric Power Projects
  • 2. 2  Well conversant in use of various computer applications like MS Office, Power Point presentations, STAAD, SAP etc. KEY ASSIGNMENTS: Engineering / Project Management of Thermal, Gas & Hydro Electric Power Projects including preparation of Feasibility Studies / Reports, Design Memorandum, DPRs, Tender / Bid documents, Detailed Technical Evaluation and Award Recommendations. Detailed Structural Design & Detailing of Structures of various systems involved in a Power Plant for Thermal Projects, large Gas based Combined Cycle Projects as well as large Hydro Electric Power Projects. The specialized areas / structures for which in-house engineering was carried out includes Main Power House Building (Structural Steel construction), TG & BFP Foundations, Mills & Fan Foundation etc, Water Intake Structures in Rivers/ Canals/ Sea (based upon the studies carried out in association with expert agencies like CWPRS, NIOT, IITs etc), Coal Handling and Ash Handling Structures, Fuel oil Handling Systems, Switchyard Structures, MGR / Railway System etc. Extensive experience in follow-up of project site’s problems during the course of execution / construction as well as during operation stage of various Power Projects. After completing the engineering activities of various packages, currently looking after both execution and balance engineering activities of Lalitpur Power Project where Civil Works are at peak and BLU is planned in next 1-2 months. Rich experience in handling of post award techno-commercial issues related to various packages of a power plant. Formerly Project Manager for Sardar Sarovar Narmada Nigam’s Consultancy Assignment for Kutch Branch Canal Pumping System involving lifting of Kutch Branch canal to 60 meters in three stages. EMPLOYMENT RECORD: Present Position: Chief Infra-tech,VVR Consultants and Enterprises Pvt. Ltd. 4th Floor, Motorola Building, Sector-14, Gurgaon VVR Cosultant is a self-promoted consultancy company along with 3 more senior colleagues of Power Sector. We have started in January-2015 with World Bank assignments on Power sector reforms in Egypt. We also have consultancy assignments on Floating Solar Project from one of the leading private sector Power Generator firm.
  • 3. 3 March-2011: Head (Civil) – Lalitpur Power Generation Co. Ltd. Noida December-2014 CTC dawn at the time of Leaving LPGCL = Rs 72 L Leading a team of engineers from Planning, Engineering and site Execution, successfully completed the concept to commissioning works related to civil designs & execution of Lalitpur Super Thermal Power Project (3X660MW). Was responsible for the basic engineering, detailed engineering & construction drawings of civil structures of entire Power Plant with cost effective techno-economic solutions. Later deputed to site for leading site execution team. Savings of more than Rs.200 Crs. had been achieved due to cost optimization at each and every stage and meticulous planning, designs and execution of civil structures of this Power Plant. December 2006: Addl. General Manager (Civil) – NTPC March-2011 - Engineering Management of NTPC’s various upcoming projects as head of Water System, Chimney and Switchyard Group. The projects dealt consists of Barh-I (3x660MW), Sipat-I (3x660MW), NCTPP (Dadri) II - 2x490MW, Simhadari–1x500MW, Farakka-III – 1x500MW, Aravali JV (Jhajjar)-3x500MW, NTECL JV (Ennore)- 2x500MW. - Project Manager for Sardar Sarovar Narmada Nigam’s Consultancy Assignment for Kutch Branch Canal Pumping System by leading a cross-functional team of Engineers from Mechanical, Electrical, C&I and Civil. - Project Manager for preparation of DPR of Amochhu reservoir HEP in Bhutan, Preparation of PFR for Siang Upper HEP (10,000MW) in Arunachal Pradesh. - Engineering, Designs of various Project components & Preparation of Technical Specification, BOQs, Cost Estimates, Tender Drawings & Contract documents as well as Techno-Commercial Bid Evaluation for NTPC’s Rammam, Lata Tapovan and Rupsia Khasiabara Hydro Electric Projects. Dec-.2001 to : Dy. General Manager (Civil) - NTPC Nov-2006 Engineering Management of NTPC’s various projects as Group Head. Work involved supervision of preparation of Feasibility Reports, Design Memorandum, Tender / Bid documents, detailed Technical Evaluation and Award Recommendations, Detailed Structural Design / Construction Drawings for Make Up Water System, CW System, Pre-Treatment Plant, DM Plant, CPU & Chlorination Plant, Effluent Treatment Plant, Fire Protection & Detection System, Switchyard Civil Works, Multi-Flue RCC Chimney etc. for Ramagundam STPP-III, Rihand-II, VSTPP-III, KhSTPP-II & III, Sipat-I & II, Barh STPP-I,
  • 4. 4 Kawas Gas Based Project-II (1320 MW), Gandhar Gas Based Project-II (1320 MW) Project Manager for Sardar Sarovar Consultancy Project for 3 nos. lift pump stations on Kachch Branch canal 1996 to 2001 : Chief Design Engineer (Civil) - NTPC Detailed Engineering &. supervision for complete Faridabad Gas Power Project, Detailed Engineering for Foundation Systems (including Turbo Generator, Steam Generator, PA,ID & FD Fan Foundations), Coal Handling Plant, Merry- Go- Round (MGR) Railway System and various other civil works of Talcher STPP-II and VSTPP-II, Sipat-I & II, Feasibility Reports for KhSTPP-II & Barh STPP projects. 1991 to 1996 : Dy.Chief Design Engineer (Civil) - NTPC Carrying on with the engineering activities of Talcher-II (4x500MW), Farakka STPP-II & KhSTPP-I detailed above, the Engineering for Fuel Oil (Naphtha) handling system inclusive of Naphtha Storage Tanks of Kayamkulam Gas based Combined Power Project, various Civil Works for VSTPP-II (3x 500MW) thermal project. 1987 to 1991 : Asstt.Chief Design Engineer (Civil) - NTPC Detailed engineering of various civil works of Talcher STPP-I (2x500MW) project as indicated for Senior Engineer below. The detailed Engineering for Fuel Oil System Civil Works, Coal Handling Plant Civil Works, Ash Handling Plant Civil Works of Farakka STPP-II (2x500MW) and KhSTPP-I (5x210MW) thermal projects. Wagon Tippler and CHP augmentation works for Ramagundam Project. 1984 to 1987 : Senior Design Engineer (Civil) - NTPC In addition to works as indicated for Engineer below the Preparation of FR DIM & Tender Documents for various civil packages like Foundation Systems, Ash handling Plant Civil Works, Main Power House Civil Works packages of Talcher STPP-I (2x500MW) thermal project. Active interaction with project sites (average two visits in a month) 1982 to 1984 : Design Engineer (Civil) - NTPC Preparation of Tender documents, bid evaluation, and detailed Engineering for Foundation Systems (including Turbo Generator, Steam Generator, PA,ID & FD Fan Foundations, Coal Mill foundations and Main Power House Building), Civil and Structural Works for Main Power House
  • 5. 5 & Boiler Structures, Ash Handling Plant Civil Works etc. for Ramagundam STPP-II(3x500MW) thermal project. Jan.1981 to Design Engineer in GILCON PROJECT SERVICES LTD May-1982 (Design arm of Gammon India Ltd.). Worked for pre-stress RCC and other types of Bridges for clients in India and abroad. July 1977 to Astt. Design Engineer in Haryana Public Works Deptt. Dec.1981 (B&R) – Chandigarh (Gazetted Post thru’ Public Service Commission-Haryana) Design of various types of RCC and Steel Bridges. MEMBERSHIPS OF PROFESSIONAL BODIES: i) Life member of “Institution of Engineers (India)”, Kolkatta. ii) Life member of “The Indian Society for Hydraulics” - India. TRAINING PROGRAMME ATTENDED:  Advanced Management Programme at Administrative Staff College of India, Hyderabad --- Feburary-2005 (3 Weeks)  Strategic Management –Year 2004 (One Week)  Capsule Course in Management – Year 2000 (Three Weeks)  Foundation course in General Management– 1989 (15 days)  Various Computer Application courses in Windows, Internet, Power Point, Graphics and Animation – From year 1985 to 1989 (approximately 3 days to 7 days each) TRAVELLED ALMOST ALL SUB-CONTINENTS AND MAJOR COUNTRIES/CITES ALROUND THE GLOBE. PAPERS PRESENTED / TRAININGS IMPARTED: Faculty member in various programs on Civil Engineering systems of a Power Plant in the Power Management Institute, NTPC, Noida. LANGUAGES: English : Good written and oral proficiency. Hindi : Good written and oral proficiency. (DEVENDER GUPTA)