Project & Resources Management:
Managing project executions with a view to ensure timely accomplishment of
targets within specified time.
Managing the available resources for getting optimum output.
Piping Erection, Testing & Commissioning and ,Structural Fabrication :
Analyzing drawings of piping & structures as per the needs; mapping shapes
and other measurements on the metal as well as handling fabrications for all
kinds of job as per drawing.
Managing erection & commissioning of DHDS-1&2, involved in mechanical
clearance, testing, box up of various grades of pipes to facilitate smooth
project progress.
Reviewing engineering drawings, layouts, diagrams, technical specifications,
for erection & commission of the plant.
Billing & Documentation:
Quantity Verification and Certification of piping, structural fabrication,
erection painting & sheeting bills.
Maintaining the bill data, drawings & correspondence records as database for
future reference.
2. Current Status:
i) Organisation: Jindal Steel & Power Limited, Angul, Orissa
ii) Name of the Project: RMHS for 6 X 135 MW CPP & 6 MTPA Steel Plant.
iii) Designation: Deputy Manager.
iv)Duration: September 2010 to Till Date.
v) Key Responsibilities: Responsible for erection & commissioning of Utility
project for RMHS.
Site monitoring of erection and commissioning of DFDS & plain water
sprinkler system at Raw material yards, Track hopper & wagon tippler in
RMHS
Site execution for Structural Fabrication & Erection for compressor unit &
pump house.
Successfully erection & trail of 3nos screw compressor with high pressure
8Kg/cm2 including header & distribution line.
Commissioning & handing over of 10nos centrifugal water pump at pump
house including header & distribution pipe line.
Monitoring of MS, SS & GI pipe line fabrication, joints, fittings of various
accessories including different types valves, filter, dryer, strainer etc in dia up
to 300NB.
Erection of underground pipe line with wrapping coating.
Administered entire activities pertaining to structural fabrication, erection,
execution as per drawing & estimations of structural steel approx. 10,000 MT
to facilitate crushed coal shed, Junction house, conveyor gallery etc.
Ensuring safe work procedure & quality check during execution of the project
on daily basis.
PROJECT ACHIEVEMENT IN JSPL:-
Successful commissioned contingency CHP of capacity 450TPH crusher house.
This is a close circuit coal handling plant having feed size 200mm to size
reduction up to 8mm. This project is only for emergency feed of coal to the
power plant (135MW*6Nos) as the main CHP project was delaying to start.
Previous Organization :-
3. Organization : - Satnam Global Infratech Ltd. New Delhi
Responsibility :-Worked as a Sr. Piping Engineer, Responsible for Piping Erection of
sulphur block in Bhatinda , In HPCL-Mittal Energy Ltd.
Duration :-17th
. Feb 2010 to 25 May - 2010.
Organization : - Reliance Engineering Associates Pvt. Ltd., Jamnagar.
Responsibility :- Worked as a Piping Engineer, responsible for Piping
Erection/Testing/Commissioning of clean fuel complex “Jamnagar Export Refinery
Project”. During above period I was involved in day to day activity like Erection/ Loop
Clearance /Hydro testing /Pre commissioning etc.
Duration :- . From Dec-2006 to Aug-2009
Organization : - Popuri Plant Tech. Pvt. Ltd. Jharsugudra.
Responsibility: - Fabrication, erection, equipment installation & commissioning of 6X100
TPD coal based DRI plant.
Duration :- October 2004 to November 2006
Organization : - Globalin Hydraulic, Rourkela.
Responsibility: - Hose pipe assembly of earthmovers, Testing of hose pipe &
Maintenance of hydraulic machines.
Duration :- December 1997 to June 2004.
Organization : - Simplex Engineering & Foundry Works Ltd. Rourkela.
Responsibility: - Erection of various types of valves like Audco valves, Quick action
valves, Butterfly valves, Gate valves, Globe valves.
Duration :- July 1996 to October 1996.
Organization : - Orissa Industries Ltd.:- Rourkela from Nov-93 to Mar-94
Responsibility: - Maintenance of Press machines, Vibrating Tube mill, Rollers, Vibrating
Screens, Jaw Crushers.
Duration :- November 1993 to March 1994
Educational Credential:-
4. E Examination Passed Year of
Passing
Percentage P Passed From
H.S.C. 1986 61% B.S.E. Orissa
+2 (Science) 1989 47% C.H.S.E Orissa
Diploma in
Mechanical Engineering
1992 58% S.C.T.E & V.T Orissa
Personal Detail:-
NAME : MANOJ KUMAR
Father’s Name : R. D. Sharma
Date of Birth : 24.12.1970
Marital Status : Married
Nationality : Indian
Languages Known : English, Hindi, Oriya
Present CTC : 9 lakhs / Annum
Permanent Address : QR No. A/138
Sector-22
Rourkela
Odisha.
Pin-769007
MANOJ KUMAR