SlideShare a Scribd company logo
1 Repairing of Kiln Shell Crack
Case History on
“Repair of Kiln Shell”
At
Ankit Metals & Power Limited, Jorehira.
Prepared By:-
ARGHOJYOTI DEY
APS - Asansol
Arghojyoti.dey@larsentoubro.com
2 Repairing of Kiln Shell Crack
INDEX
SL No. DESCRIPTION PAGES
1. About Ankit Metals & Power Ltd 3
2. Process Detail: Sponge Iron Plant 4
3. Job Details 5
4. EWAC Solution 6
5. Welding of Shell Crack 7-10
8. Do’s & Don’t 11
9. Service Report 12
3 Repairing of Kiln Shell Crack
About: Ankit Metals & Power Ltd., Jorehira
.
Ankit Metals & Power Limited has a unit in Chattna (Post- Jorehira, Dist.-Bankura). This
unit comprises of two phases. Phase-I consists of Sponge Iron unit having two units of
capacity 350 TPD each. Phase II consists of pelletizing plant of capacity 0.6 MT along with
the Captive power plant of 45 MW.
Ankit Metals & Power Limited is a part of the SKP group. The group is successful in all
the diverse aspects of business - Manufacturing, Trading, Import and Export. It is one of the
largest producers of Ferro chrome, Silicon manganese, Ferro manganese & Ferro silicon in
India and exports 70% of the ferro alloys manufactured to the countries all over the globe.
Ankit Metals & Power Limited,Chattna unit includes:
Phase I : Sponge Iron Plant (2*350 TPD)
Phase II :Pelletizing Plant ( 0.6 MT)
Captive Power plant (45 MW)
Rolling Mill (under construction)
4 Repairing of Kiln Shell Crack
Process Detail : Sponge Iron Plant
The Rotary Kiln or Reduction Kiln is a very important part of any Sponge Iron plant. This is the place where
reduction of the Iron ore takes place and as a result we get the finished product. The reduction of the Iron ore
can be achieved by using either carbon bearing material (such as non coking coal) or a suitable reducing gas in
the form of reformed natural gas. The processes employing coal are called Coal-based processes while the
processes employing reducing gases are called Gas-based processes.
The working of Ankit Metals & Power Limited which is primarily a Coal–based Sponge Iron plant is
mentioned below:
1. This type of plant generally utilizes non coking coal as a reducing agent along with the lumpy rich grade
Iron ore.
2. The reduction is carried out in an inclined horizontal rotary Kiln, which rotates at a predetermined
speed. A temperature range of 800-1050 degree centigrade is maintained throughout the length of the
Kiln. As the materials flows down due to the gravity the ore gets reduced.
3. The hot reduced sponge Iron along with the semi burnt Coal, discharged from the kiln is cooled in
water-cooled cylindrical rotary cooler to a temperature of 100-200 degree centigrade.
4. The discharge from the cooler consisting of Sponge Iron, Char and other contaminations are passed on
through Magnetic separators so that the Sponge Iron can be separated from the other impurities.
Later the Sponge Iron is screened in two size fractions i.e. -3 mm & +3 mm. +3 mm fraction directly
goes for usage and -3 mm fraction can be either used directly where ever it is possible or is to be briquetted by
using molasses and hydrated lime as binders.
5 Repairing of Kiln Shell Crack
Job Details
• Customer : Ankit Metal & Power Limited.
• Department : Sponge Iron
• Machine : Rotary Kiln
• Part : Kiln Shell
• Make : Hari Machinaries, Rourkela
• Capacity : 350 TPD
• Base Material : Boiler Quality Steel
• No. Of Kilns : 3 Nos.
• Kiln Shell Length : 82 Meter
• Shell Diameter : 4.2 Meter
• Temperature : 800-1300 degree centigrade
• Kiln RPM : 0.3-0.7
• Kiln tilt angle : 1.43 ˚
The case study is about the repair of Kiln Shell crack of Kiln-2 of 350 TPD capacities. This was earlier
repaired with E7018 alloy. During regular use a crack originated from the same repaired portion. The
crack actually generated from manhole adapter area in both the sides in semi circular fashion
Crack -1:
• Length of the Crack : 2000 mm.
• Depth of the Crack : 25 mm.
Crack-2:
• Length of the Crack : 800 mm.
• Depth of the Crack : 25 mm
Crack-3: (Adapter joining)
• Circumference of adapter: 2000 mm.
• Depth of the Crack : 25 mm
6 Repairing of Kiln Shell Crack
EWAC SOLUTION
Analysing the cause of crack & its nature & depending on the working parameters,
EWAC Alloys Limited suggested welding alloy CPHFD 011 for repairing of the complete
crack.
Product : CPHFD 011
Size : 3.15 mm ( Root Run) & 4.0 mm ( Final Layer)
CPHFD 011:
• An excellent welding alloy for joining, build-up & repair of new, worn-out or cracked steel
structures.
• Good resistance to cracks, moisture & having excellent mechanical strength.
• Excellent for machinery components & other heavy duty equipment.
• No temper embrittlement of weld deposit
• Dense deposit with excellent Bead formation.
• Tensile Strength : 67 kg/mm2 (96,500psi)
Welding Procedure
• Weld Process : MMAW
• Welding Machine : Rectifier (400 Amps)
• Electrode Diameter : 4.00 mm
• Polarity: DC +
• Current: 120-135 Amperes (Minimum current to be used)
• Welding technique: Stringer bead.
• Welding angle : Electrode angle to be 10° to the Normal to the base
• Before Welding: Surface preparation to be done. Tools & Tackles to be ready
(Wire brush, chipping hammer, etc.)
7 Repairing of Kiln Shell Crack
Welding of “ Rotary Kiln Shell” Crack
1. First of all DP test was carried out to find out the total length of the crack.
2. After analyzing the full crack length, a hole was drilled at both the crack ends to arrest the cracks.
3. Removal of refractory linings from inside the kiln shell.
4. Alignment of shell plate was done from inside using L & key arrangement so that proper welding
can be done.
8 Repairing of Kiln Shell Crack
5. After shell plate alignment, gouging has been started from outside the kiln shell. Since total plate
thickness is 25 mm hence double V was made.
6. Preheating at 300-350 deg Celcius & maintaining temperature throughout welding.
7. After heating the whole V portion, & setting the current to a minimum requirement, root run of
CPHFD 011 , 3.15 mm was given throughout the V groove crack from outside in a skip weld
technique.
9 Repairing of Kiln Shell Crack
8. After giving the root run grinding was done to ensure no slag presence.
9. DP test was carried out to ensure the absence of any crack.
10. After DP test, the whole V groove was build up by CPHFD 011 , 4.0 mm.
10 Repairing of Kiln Shell Crack
11. After complete welding of V groove from outside, gouging from inside was started followed by
grinding & surface preparation.
12. Following the similar steps of welding as done for outer groove , the inner V groove was welded.
13. After complete welding, slow cooling has been done in still air & then DP test was carried out to
ensure crack free welding.
11 Repairing of Kiln Shell Crack
Do’s & Don’ts :
Sl No. Do’s Don’t
1. Before starting welding, check your
PPE’s & set welding parameters on
waste work piece.
Don’t neglect safety, don’t set
current arbitrarily..
2 Using CPHFD 011, set minimum
current as per range given in instruction.
Don’t use high current for easy
Welding.
3 Electrode angle to be 10° to the normal/
perpendicular as per the crack position
Don’t neglect recommended
angle.
4 Use skip weld technique as crack length
is long.
Don’t do continuous welding
5 Make stringent bead. Don’t weave.
6 Chip slags, peen weld bead when red
hot.
Don’t peen when the bead has lost its
heat, its of no use
7 Maintain inter pass temperature. Don’t overheat the job, have time
gaps between two weld beads by
chipping & peening.
12 Repairing of Kiln Shell Crack
SERVICE REPORT
13 Repairing of Kiln Shell Crack

More Related Content

What's hot

Rotary Kiln Bricks Installation Guideline.pdf
Rotary Kiln Bricks Installation Guideline.pdfRotary Kiln Bricks Installation Guideline.pdf
Rotary Kiln Bricks Installation Guideline.pdfRushdanZaim4
 
Ref failur e analysis tip casting & retainer area f
Ref failur e analysis tip casting & retainer area  fRef failur e analysis tip casting & retainer area  f
Ref failur e analysis tip casting & retainer area fpradeepdeepi
 
Alignment of-kiln
Alignment of-kilnAlignment of-kiln
Alignment of-kilnmkpq pasha
 
Maximum Shell Temp Ok
Maximum Shell Temp OkMaximum Shell Temp Ok
Maximum Shell Temp OkRicardoMosci
 
Kiln measuring
Kiln measuringKiln measuring
Kiln measuringmkpq pasha
 
Exemplary report-rotary-kiln-alignment
Exemplary report-rotary-kiln-alignmentExemplary report-rotary-kiln-alignment
Exemplary report-rotary-kiln-alignmentmkpq pasha
 
Installation of Refractory Materials in Rotary Kilns ”Essential principles"
Installation of Refractory Materials in Rotary Kilns ”Essential principles"Installation of Refractory Materials in Rotary Kilns ”Essential principles"
Installation of Refractory Materials in Rotary Kilns ”Essential principles"Refratechnik Group
 
304372312-Kiln-Miscellaneous.pdf
304372312-Kiln-Miscellaneous.pdf304372312-Kiln-Miscellaneous.pdf
304372312-Kiln-Miscellaneous.pdfSuad45
 
Kiln Shell Corrosion
Kiln Shell CorrosionKiln Shell Corrosion
Kiln Shell CorrosionRicardoMosci
 
Reffailue nosering pradeep kumar
Reffailue nosering  pradeep kumarReffailue nosering  pradeep kumar
Reffailue nosering pradeep kumarpradeepdeepi
 
Kiln Hydraulic Thrust Device.pdf
Kiln Hydraulic Thrust Device.pdfKiln Hydraulic Thrust Device.pdf
Kiln Hydraulic Thrust Device.pdfHamedMostafa10
 
Kiln Condition Report (Line1)(March 2015)
Kiln Condition Report (Line1)(March 2015)Kiln Condition Report (Line1)(March 2015)
Kiln Condition Report (Line1)(March 2015)Mohamed Gomaa
 
Exemplary report-rotary-kiln-alignment
Exemplary report-rotary-kiln-alignmentExemplary report-rotary-kiln-alignment
Exemplary report-rotary-kiln-alignmentmkpq pasha
 
111658903 kiln-burning-systems
111658903 kiln-burning-systems111658903 kiln-burning-systems
111658903 kiln-burning-systemsIngrid McKenzie
 
Cement Manufacturing hrs_eng
Cement Manufacturing hrs_engCement Manufacturing hrs_eng
Cement Manufacturing hrs_engBhone Thant
 
Exemplary report-rotary-kiln-alignment
Exemplary report-rotary-kiln-alignmentExemplary report-rotary-kiln-alignment
Exemplary report-rotary-kiln-alignmentmkpq pasha
 

What's hot (20)

Rotary Kiln Bricks Installation Guideline.pdf
Rotary Kiln Bricks Installation Guideline.pdfRotary Kiln Bricks Installation Guideline.pdf
Rotary Kiln Bricks Installation Guideline.pdf
 
Ref failur e analysis tip casting & retainer area f
Ref failur e analysis tip casting & retainer area  fRef failur e analysis tip casting & retainer area  f
Ref failur e analysis tip casting & retainer area f
 
Alignment of-kiln
Alignment of-kilnAlignment of-kiln
Alignment of-kiln
 
Maximum Shell Temp Ok
Maximum Shell Temp OkMaximum Shell Temp Ok
Maximum Shell Temp Ok
 
Kiln measuring
Kiln measuringKiln measuring
Kiln measuring
 
Exemplary report-rotary-kiln-alignment
Exemplary report-rotary-kiln-alignmentExemplary report-rotary-kiln-alignment
Exemplary report-rotary-kiln-alignment
 
Installation of Refractory Materials in Rotary Kilns ”Essential principles"
Installation of Refractory Materials in Rotary Kilns ”Essential principles"Installation of Refractory Materials in Rotary Kilns ”Essential principles"
Installation of Refractory Materials in Rotary Kilns ”Essential principles"
 
304372312-Kiln-Miscellaneous.pdf
304372312-Kiln-Miscellaneous.pdf304372312-Kiln-Miscellaneous.pdf
304372312-Kiln-Miscellaneous.pdf
 
Rotary kiln
Rotary kilnRotary kiln
Rotary kiln
 
Rotary kiln
Rotary kilnRotary kiln
Rotary kiln
 
Kiln Shell Corrosion
Kiln Shell CorrosionKiln Shell Corrosion
Kiln Shell Corrosion
 
Reffailue nosering pradeep kumar
Reffailue nosering  pradeep kumarReffailue nosering  pradeep kumar
Reffailue nosering pradeep kumar
 
Kiln Hydraulic Thrust Device.pdf
Kiln Hydraulic Thrust Device.pdfKiln Hydraulic Thrust Device.pdf
Kiln Hydraulic Thrust Device.pdf
 
Formulas kiln
Formulas kilnFormulas kiln
Formulas kiln
 
Kiln Condition Report (Line1)(March 2015)
Kiln Condition Report (Line1)(March 2015)Kiln Condition Report (Line1)(March 2015)
Kiln Condition Report (Line1)(March 2015)
 
Exemplary report-rotary-kiln-alignment
Exemplary report-rotary-kiln-alignmentExemplary report-rotary-kiln-alignment
Exemplary report-rotary-kiln-alignment
 
111658903 kiln-burning-systems
111658903 kiln-burning-systems111658903 kiln-burning-systems
111658903 kiln-burning-systems
 
Cement Manufacturing hrs_eng
Cement Manufacturing hrs_engCement Manufacturing hrs_eng
Cement Manufacturing hrs_eng
 
Exemplary report-rotary-kiln-alignment
Exemplary report-rotary-kiln-alignmentExemplary report-rotary-kiln-alignment
Exemplary report-rotary-kiln-alignment
 
An Introduction to Rotary Kilns
An Introduction to Rotary KilnsAn Introduction to Rotary Kilns
An Introduction to Rotary Kilns
 

Similar to Repairing of kiln shell crack

Manufacturing of Large Electrical Machine
Manufacturing of Large Electrical MachineManufacturing of Large Electrical Machine
Manufacturing of Large Electrical MachineVAIBHAV SINGH
 
MANUFACTURING PROCESS OF STATOR BAR; 600 MW TURBO GENERATOR
MANUFACTURING PROCESS OF STATOR BAR; 600 MW TURBO GENERATORMANUFACTURING PROCESS OF STATOR BAR; 600 MW TURBO GENERATOR
MANUFACTURING PROCESS OF STATOR BAR; 600 MW TURBO GENERATORAnurag Verma
 
PPT ON CIM ,BHEL HARIDWAR
PPT ON CIM ,BHEL HARIDWARPPT ON CIM ,BHEL HARIDWAR
PPT ON CIM ,BHEL HARIDWARABHISHEK SINGH
 
STUDY OF MICRO STRUCTURE OF HEAT TREADTED EN8 STEEL
STUDY OF MICRO STRUCTURE OF HEAT TREADTED EN8 STEEL STUDY OF MICRO STRUCTURE OF HEAT TREADTED EN8 STEEL
STUDY OF MICRO STRUCTURE OF HEAT TREADTED EN8 STEEL Anis Haider
 
Heat treatment klp 4
Heat treatment klp 4Heat treatment klp 4
Heat treatment klp 4Edo Destrada
 
STUDY OF MICRO STRUCTURE OF HEAT TREATED EN8 STEEL
STUDY OF MICRO STRUCTURE OF HEAT TREATED EN8 STEELSTUDY OF MICRO STRUCTURE OF HEAT TREATED EN8 STEEL
STUDY OF MICRO STRUCTURE OF HEAT TREATED EN8 STEELAkhil Raj U R
 
Manufacturing of liquid propellant tank
Manufacturing of liquid propellant tankManufacturing of liquid propellant tank
Manufacturing of liquid propellant tankSai Malleswar
 
MANUFACTURING PROCESS OF 600 MW TURBO GENERTOR STATOR WINDING BAR
MANUFACTURING PROCESS OF 600 MW TURBO GENERTOR STATOR WINDING BAR MANUFACTURING PROCESS OF 600 MW TURBO GENERTOR STATOR WINDING BAR
MANUFACTURING PROCESS OF 600 MW TURBO GENERTOR STATOR WINDING BAR Shubham Kulshreshtha
 
Report of Pakistan Steel Mill
Report of Pakistan Steel MillReport of Pakistan Steel Mill
Report of Pakistan Steel MillMuhammad Ahmed
 
EM-Unit-IV- case hardening
EM-Unit-IV- case hardeningEM-Unit-IV- case hardening
EM-Unit-IV- case hardeningMohanumar S
 
Welding procedure and techniques and types of welding
Welding procedure and techniques and types of weldingWelding procedure and techniques and types of welding
Welding procedure and techniques and types of weldingSafyanManzoor1
 

Similar to Repairing of kiln shell crack (20)

SMS PROJECT
SMS PROJECTSMS PROJECT
SMS PROJECT
 
Manufacturing of Large Electrical Machine
Manufacturing of Large Electrical MachineManufacturing of Large Electrical Machine
Manufacturing of Large Electrical Machine
 
MANUFACTURING PROCESS OF STATOR BAR; 600 MW TURBO GENERATOR
MANUFACTURING PROCESS OF STATOR BAR; 600 MW TURBO GENERATORMANUFACTURING PROCESS OF STATOR BAR; 600 MW TURBO GENERATOR
MANUFACTURING PROCESS OF STATOR BAR; 600 MW TURBO GENERATOR
 
PPT ON CIM ,BHEL HARIDWAR
PPT ON CIM ,BHEL HARIDWARPPT ON CIM ,BHEL HARIDWAR
PPT ON CIM ,BHEL HARIDWAR
 
Harshitagarwal 111109034529-phpapp02
Harshitagarwal 111109034529-phpapp02Harshitagarwal 111109034529-phpapp02
Harshitagarwal 111109034529-phpapp02
 
STUDY OF MICRO STRUCTURE OF HEAT TREADTED EN8 STEEL
STUDY OF MICRO STRUCTURE OF HEAT TREADTED EN8 STEEL STUDY OF MICRO STRUCTURE OF HEAT TREADTED EN8 STEEL
STUDY OF MICRO STRUCTURE OF HEAT TREADTED EN8 STEEL
 
Heat treatment klp 4
Heat treatment klp 4Heat treatment klp 4
Heat treatment klp 4
 
Harshit agarwal
Harshit agarwalHarshit agarwal
Harshit agarwal
 
STUDY OF MICRO STRUCTURE OF HEAT TREATED EN8 STEEL
STUDY OF MICRO STRUCTURE OF HEAT TREATED EN8 STEELSTUDY OF MICRO STRUCTURE OF HEAT TREATED EN8 STEEL
STUDY OF MICRO STRUCTURE OF HEAT TREATED EN8 STEEL
 
sail bokaro
sail bokarosail bokaro
sail bokaro
 
Manufacturing of liquid propellant tank
Manufacturing of liquid propellant tankManufacturing of liquid propellant tank
Manufacturing of liquid propellant tank
 
MANUFACTURING PROCESS OF 600 MW TURBO GENERTOR STATOR WINDING BAR
MANUFACTURING PROCESS OF 600 MW TURBO GENERTOR STATOR WINDING BAR MANUFACTURING PROCESS OF 600 MW TURBO GENERTOR STATOR WINDING BAR
MANUFACTURING PROCESS OF 600 MW TURBO GENERTOR STATOR WINDING BAR
 
REPORT (1)
REPORT (1)REPORT (1)
REPORT (1)
 
Report of Pakistan Steel Mill
Report of Pakistan Steel MillReport of Pakistan Steel Mill
Report of Pakistan Steel Mill
 
Case Hardening
Case HardeningCase Hardening
Case Hardening
 
Case hardening
Case hardeningCase hardening
Case hardening
 
Case hardening
Case hardeningCase hardening
Case hardening
 
2 case hardening
2 case hardening2 case hardening
2 case hardening
 
EM-Unit-IV- case hardening
EM-Unit-IV- case hardeningEM-Unit-IV- case hardening
EM-Unit-IV- case hardening
 
Welding procedure and techniques and types of welding
Welding procedure and techniques and types of weldingWelding procedure and techniques and types of welding
Welding procedure and techniques and types of welding
 

More from mkpq pasha

Pipe line activities To know about fabrication and modifications work Instal...
Pipe line activities  To know about fabrication and modifications work Instal...Pipe line activities  To know about fabrication and modifications work Instal...
Pipe line activities To know about fabrication and modifications work Instal...mkpq pasha
 
Zig-zag-brick-kiln-operations_compressed.pdf
Zig-zag-brick-kiln-operations_compressed.pdfZig-zag-brick-kiln-operations_compressed.pdf
Zig-zag-brick-kiln-operations_compressed.pdfmkpq pasha
 
Strategic safety managment in construction and engineering
Strategic safety managment in construction and engineeringStrategic safety managment in construction and engineering
Strategic safety managment in construction and engineeringmkpq pasha
 
Job safety analysis jsa
Job safety analysis   jsaJob safety analysis   jsa
Job safety analysis jsamkpq pasha
 
Hazardous waste compliance
Hazardous waste complianceHazardous waste compliance
Hazardous waste compliancemkpq pasha
 
Safety procedures
Safety procedures Safety procedures
Safety procedures mkpq pasha
 
Erba katalog 2013.compressed6556
Erba katalog 2013.compressed6556Erba katalog 2013.compressed6556
Erba katalog 2013.compressed6556mkpq pasha
 
General v8.compressed15.compressed
General v8.compressed15.compressedGeneral v8.compressed15.compressed
General v8.compressed15.compressedmkpq pasha
 
Deca catalogo 2012 i en-fr
Deca catalogo 2012 i en-frDeca catalogo 2012 i en-fr
Deca catalogo 2012 i en-frmkpq pasha
 
Bag house dust-collection-system
Bag house dust-collection-systemBag house dust-collection-system
Bag house dust-collection-systemmkpq pasha
 
Brochure bag-houses
Brochure bag-housesBrochure bag-houses
Brochure bag-housesmkpq pasha
 
Bearing self study guide
Bearing self study guideBearing self study guide
Bearing self study guidemkpq pasha
 
Ln clinker cooler golden rules 2010 11 17
Ln clinker cooler golden rules 2010 11 17Ln clinker cooler golden rules 2010 11 17
Ln clinker cooler golden rules 2010 11 17mkpq pasha
 
Kiln tire tightening
Kiln tire tightening Kiln tire tightening
Kiln tire tightening mkpq pasha
 
داستورِ پاکستان ۱۹۷۳
داستورِ پاکستان ۱۹۷۳داستورِ پاکستان ۱۹۷۳
داستورِ پاکستان ۱۹۷۳mkpq pasha
 
مجموعہ فرامین امام خادم حسین رضوی رحمتہ اللہ علیہ
مجموعہ فرامین امام خادم حسین رضوی رحمتہ اللہ علیہمجموعہ فرامین امام خادم حسین رضوی رحمتہ اللہ علیہ
مجموعہ فرامین امام خادم حسین رضوی رحمتہ اللہ علیہmkpq pasha
 
Cyclone design
Cyclone design Cyclone design
Cyclone design mkpq pasha
 

More from mkpq pasha (20)

Pipe line activities To know about fabrication and modifications work Instal...
Pipe line activities  To know about fabrication and modifications work Instal...Pipe line activities  To know about fabrication and modifications work Instal...
Pipe line activities To know about fabrication and modifications work Instal...
 
Zig-zag-brick-kiln-operations_compressed.pdf
Zig-zag-brick-kiln-operations_compressed.pdfZig-zag-brick-kiln-operations_compressed.pdf
Zig-zag-brick-kiln-operations_compressed.pdf
 
Strategic safety managment in construction and engineering
Strategic safety managment in construction and engineeringStrategic safety managment in construction and engineering
Strategic safety managment in construction and engineering
 
Job safety analysis jsa
Job safety analysis   jsaJob safety analysis   jsa
Job safety analysis jsa
 
Hazardous waste compliance
Hazardous waste complianceHazardous waste compliance
Hazardous waste compliance
 
Guide to ehs
Guide to ehsGuide to ehs
Guide to ehs
 
Safety procedures
Safety procedures Safety procedures
Safety procedures
 
Erba katalog 2013.compressed6556
Erba katalog 2013.compressed6556Erba katalog 2013.compressed6556
Erba katalog 2013.compressed6556
 
General v8.compressed15.compressed
General v8.compressed15.compressedGeneral v8.compressed15.compressed
General v8.compressed15.compressed
 
Deca catalogo 2012 i en-fr
Deca catalogo 2012 i en-frDeca catalogo 2012 i en-fr
Deca catalogo 2012 i en-fr
 
Catalogo gga
Catalogo ggaCatalogo gga
Catalogo gga
 
Bag house dust-collection-system
Bag house dust-collection-systemBag house dust-collection-system
Bag house dust-collection-system
 
Brochure bag-houses
Brochure bag-housesBrochure bag-houses
Brochure bag-houses
 
Bearing self study guide
Bearing self study guideBearing self study guide
Bearing self study guide
 
Ln clinker cooler golden rules 2010 11 17
Ln clinker cooler golden rules 2010 11 17Ln clinker cooler golden rules 2010 11 17
Ln clinker cooler golden rules 2010 11 17
 
Kiln tire tightening
Kiln tire tightening Kiln tire tightening
Kiln tire tightening
 
Ya hafizo
Ya hafizoYa hafizo
Ya hafizo
 
داستورِ پاکستان ۱۹۷۳
داستورِ پاکستان ۱۹۷۳داستورِ پاکستان ۱۹۷۳
داستورِ پاکستان ۱۹۷۳
 
مجموعہ فرامین امام خادم حسین رضوی رحمتہ اللہ علیہ
مجموعہ فرامین امام خادم حسین رضوی رحمتہ اللہ علیہمجموعہ فرامین امام خادم حسین رضوی رحمتہ اللہ علیہ
مجموعہ فرامین امام خادم حسین رضوی رحمتہ اللہ علیہ
 
Cyclone design
Cyclone design Cyclone design
Cyclone design
 

Recently uploaded

Online resume builder management system project report.pdf
Online resume builder management system project report.pdfOnline resume builder management system project report.pdf
Online resume builder management system project report.pdfKamal Acharya
 
Introduction to Machine Learning Unit-4 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-4 Notes for II-II Mechanical EngineeringIntroduction to Machine Learning Unit-4 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-4 Notes for II-II Mechanical EngineeringC Sai Kiran
 
School management system project report.pdf
School management system project report.pdfSchool management system project report.pdf
School management system project report.pdfKamal Acharya
 
Pharmacy management system project report..pdf
Pharmacy management system project report..pdfPharmacy management system project report..pdf
Pharmacy management system project report..pdfKamal Acharya
 
Peek implant persentation - Copy (1).pdf
Peek implant persentation - Copy (1).pdfPeek implant persentation - Copy (1).pdf
Peek implant persentation - Copy (1).pdfAyahmorsy
 
Cloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptx
Cloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptxCloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptx
Cloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptxMd. Shahidul Islam Prodhan
 
Natalia Rutkowska - BIM School Course in Kraków
Natalia Rutkowska - BIM School Course in KrakówNatalia Rutkowska - BIM School Course in Kraków
Natalia Rutkowska - BIM School Course in Krakówbim.edu.pl
 
BRAKING SYSTEM IN INDIAN RAILWAY AutoCAD DRAWING
BRAKING SYSTEM IN INDIAN RAILWAY AutoCAD DRAWINGBRAKING SYSTEM IN INDIAN RAILWAY AutoCAD DRAWING
BRAKING SYSTEM IN INDIAN RAILWAY AutoCAD DRAWINGKOUSTAV SARKAR
 
ENERGY STORAGE DEVICES INTRODUCTION UNIT-I
ENERGY STORAGE DEVICES  INTRODUCTION UNIT-IENERGY STORAGE DEVICES  INTRODUCTION UNIT-I
ENERGY STORAGE DEVICES INTRODUCTION UNIT-IVigneshvaranMech
 
RS Khurmi Machine Design Clutch and Brake Exercise Numerical Solutions
RS Khurmi Machine Design Clutch and Brake Exercise Numerical SolutionsRS Khurmi Machine Design Clutch and Brake Exercise Numerical Solutions
RS Khurmi Machine Design Clutch and Brake Exercise Numerical SolutionsAtif Razi
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdfAhmedHussein950959
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationRobbie Edward Sayers
 
Online blood donation management system project.pdf
Online blood donation management system project.pdfOnline blood donation management system project.pdf
Online blood donation management system project.pdfKamal Acharya
 
Courier management system project report.pdf
Courier management system project report.pdfCourier management system project report.pdf
Courier management system project report.pdfKamal Acharya
 
Arduino based vehicle speed tracker project
Arduino based vehicle speed tracker projectArduino based vehicle speed tracker project
Arduino based vehicle speed tracker projectRased Khan
 
Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdfKamal Acharya
 
Scaling in conventional MOSFET for constant electric field and constant voltage
Scaling in conventional MOSFET for constant electric field and constant voltageScaling in conventional MOSFET for constant electric field and constant voltage
Scaling in conventional MOSFET for constant electric field and constant voltageRCC Institute of Information Technology
 
AI for workflow automation Use cases applications benefits and development.pdf
AI for workflow automation Use cases applications benefits and development.pdfAI for workflow automation Use cases applications benefits and development.pdf
AI for workflow automation Use cases applications benefits and development.pdfmahaffeycheryld
 
2024 DevOps Pro Europe - Growing at the edge
2024 DevOps Pro Europe - Growing at the edge2024 DevOps Pro Europe - Growing at the edge
2024 DevOps Pro Europe - Growing at the edgePaco Orozco
 

Recently uploaded (20)

Online resume builder management system project report.pdf
Online resume builder management system project report.pdfOnline resume builder management system project report.pdf
Online resume builder management system project report.pdf
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
 
Introduction to Machine Learning Unit-4 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-4 Notes for II-II Mechanical EngineeringIntroduction to Machine Learning Unit-4 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-4 Notes for II-II Mechanical Engineering
 
School management system project report.pdf
School management system project report.pdfSchool management system project report.pdf
School management system project report.pdf
 
Pharmacy management system project report..pdf
Pharmacy management system project report..pdfPharmacy management system project report..pdf
Pharmacy management system project report..pdf
 
Peek implant persentation - Copy (1).pdf
Peek implant persentation - Copy (1).pdfPeek implant persentation - Copy (1).pdf
Peek implant persentation - Copy (1).pdf
 
Cloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptx
Cloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptxCloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptx
Cloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptx
 
Natalia Rutkowska - BIM School Course in Kraków
Natalia Rutkowska - BIM School Course in KrakówNatalia Rutkowska - BIM School Course in Kraków
Natalia Rutkowska - BIM School Course in Kraków
 
BRAKING SYSTEM IN INDIAN RAILWAY AutoCAD DRAWING
BRAKING SYSTEM IN INDIAN RAILWAY AutoCAD DRAWINGBRAKING SYSTEM IN INDIAN RAILWAY AutoCAD DRAWING
BRAKING SYSTEM IN INDIAN RAILWAY AutoCAD DRAWING
 
ENERGY STORAGE DEVICES INTRODUCTION UNIT-I
ENERGY STORAGE DEVICES  INTRODUCTION UNIT-IENERGY STORAGE DEVICES  INTRODUCTION UNIT-I
ENERGY STORAGE DEVICES INTRODUCTION UNIT-I
 
RS Khurmi Machine Design Clutch and Brake Exercise Numerical Solutions
RS Khurmi Machine Design Clutch and Brake Exercise Numerical SolutionsRS Khurmi Machine Design Clutch and Brake Exercise Numerical Solutions
RS Khurmi Machine Design Clutch and Brake Exercise Numerical Solutions
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
 
Online blood donation management system project.pdf
Online blood donation management system project.pdfOnline blood donation management system project.pdf
Online blood donation management system project.pdf
 
Courier management system project report.pdf
Courier management system project report.pdfCourier management system project report.pdf
Courier management system project report.pdf
 
Arduino based vehicle speed tracker project
Arduino based vehicle speed tracker projectArduino based vehicle speed tracker project
Arduino based vehicle speed tracker project
 
Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdf
 
Scaling in conventional MOSFET for constant electric field and constant voltage
Scaling in conventional MOSFET for constant electric field and constant voltageScaling in conventional MOSFET for constant electric field and constant voltage
Scaling in conventional MOSFET for constant electric field and constant voltage
 
AI for workflow automation Use cases applications benefits and development.pdf
AI for workflow automation Use cases applications benefits and development.pdfAI for workflow automation Use cases applications benefits and development.pdf
AI for workflow automation Use cases applications benefits and development.pdf
 
2024 DevOps Pro Europe - Growing at the edge
2024 DevOps Pro Europe - Growing at the edge2024 DevOps Pro Europe - Growing at the edge
2024 DevOps Pro Europe - Growing at the edge
 

Repairing of kiln shell crack

  • 1. 1 Repairing of Kiln Shell Crack Case History on “Repair of Kiln Shell” At Ankit Metals & Power Limited, Jorehira. Prepared By:- ARGHOJYOTI DEY APS - Asansol Arghojyoti.dey@larsentoubro.com
  • 2. 2 Repairing of Kiln Shell Crack INDEX SL No. DESCRIPTION PAGES 1. About Ankit Metals & Power Ltd 3 2. Process Detail: Sponge Iron Plant 4 3. Job Details 5 4. EWAC Solution 6 5. Welding of Shell Crack 7-10 8. Do’s & Don’t 11 9. Service Report 12
  • 3. 3 Repairing of Kiln Shell Crack About: Ankit Metals & Power Ltd., Jorehira . Ankit Metals & Power Limited has a unit in Chattna (Post- Jorehira, Dist.-Bankura). This unit comprises of two phases. Phase-I consists of Sponge Iron unit having two units of capacity 350 TPD each. Phase II consists of pelletizing plant of capacity 0.6 MT along with the Captive power plant of 45 MW. Ankit Metals & Power Limited is a part of the SKP group. The group is successful in all the diverse aspects of business - Manufacturing, Trading, Import and Export. It is one of the largest producers of Ferro chrome, Silicon manganese, Ferro manganese & Ferro silicon in India and exports 70% of the ferro alloys manufactured to the countries all over the globe. Ankit Metals & Power Limited,Chattna unit includes: Phase I : Sponge Iron Plant (2*350 TPD) Phase II :Pelletizing Plant ( 0.6 MT) Captive Power plant (45 MW) Rolling Mill (under construction)
  • 4. 4 Repairing of Kiln Shell Crack Process Detail : Sponge Iron Plant The Rotary Kiln or Reduction Kiln is a very important part of any Sponge Iron plant. This is the place where reduction of the Iron ore takes place and as a result we get the finished product. The reduction of the Iron ore can be achieved by using either carbon bearing material (such as non coking coal) or a suitable reducing gas in the form of reformed natural gas. The processes employing coal are called Coal-based processes while the processes employing reducing gases are called Gas-based processes. The working of Ankit Metals & Power Limited which is primarily a Coal–based Sponge Iron plant is mentioned below: 1. This type of plant generally utilizes non coking coal as a reducing agent along with the lumpy rich grade Iron ore. 2. The reduction is carried out in an inclined horizontal rotary Kiln, which rotates at a predetermined speed. A temperature range of 800-1050 degree centigrade is maintained throughout the length of the Kiln. As the materials flows down due to the gravity the ore gets reduced. 3. The hot reduced sponge Iron along with the semi burnt Coal, discharged from the kiln is cooled in water-cooled cylindrical rotary cooler to a temperature of 100-200 degree centigrade. 4. The discharge from the cooler consisting of Sponge Iron, Char and other contaminations are passed on through Magnetic separators so that the Sponge Iron can be separated from the other impurities. Later the Sponge Iron is screened in two size fractions i.e. -3 mm & +3 mm. +3 mm fraction directly goes for usage and -3 mm fraction can be either used directly where ever it is possible or is to be briquetted by using molasses and hydrated lime as binders.
  • 5. 5 Repairing of Kiln Shell Crack Job Details • Customer : Ankit Metal & Power Limited. • Department : Sponge Iron • Machine : Rotary Kiln • Part : Kiln Shell • Make : Hari Machinaries, Rourkela • Capacity : 350 TPD • Base Material : Boiler Quality Steel • No. Of Kilns : 3 Nos. • Kiln Shell Length : 82 Meter • Shell Diameter : 4.2 Meter • Temperature : 800-1300 degree centigrade • Kiln RPM : 0.3-0.7 • Kiln tilt angle : 1.43 ˚ The case study is about the repair of Kiln Shell crack of Kiln-2 of 350 TPD capacities. This was earlier repaired with E7018 alloy. During regular use a crack originated from the same repaired portion. The crack actually generated from manhole adapter area in both the sides in semi circular fashion Crack -1: • Length of the Crack : 2000 mm. • Depth of the Crack : 25 mm. Crack-2: • Length of the Crack : 800 mm. • Depth of the Crack : 25 mm Crack-3: (Adapter joining) • Circumference of adapter: 2000 mm. • Depth of the Crack : 25 mm
  • 6. 6 Repairing of Kiln Shell Crack EWAC SOLUTION Analysing the cause of crack & its nature & depending on the working parameters, EWAC Alloys Limited suggested welding alloy CPHFD 011 for repairing of the complete crack. Product : CPHFD 011 Size : 3.15 mm ( Root Run) & 4.0 mm ( Final Layer) CPHFD 011: • An excellent welding alloy for joining, build-up & repair of new, worn-out or cracked steel structures. • Good resistance to cracks, moisture & having excellent mechanical strength. • Excellent for machinery components & other heavy duty equipment. • No temper embrittlement of weld deposit • Dense deposit with excellent Bead formation. • Tensile Strength : 67 kg/mm2 (96,500psi) Welding Procedure • Weld Process : MMAW • Welding Machine : Rectifier (400 Amps) • Electrode Diameter : 4.00 mm • Polarity: DC + • Current: 120-135 Amperes (Minimum current to be used) • Welding technique: Stringer bead. • Welding angle : Electrode angle to be 10° to the Normal to the base • Before Welding: Surface preparation to be done. Tools & Tackles to be ready (Wire brush, chipping hammer, etc.)
  • 7. 7 Repairing of Kiln Shell Crack Welding of “ Rotary Kiln Shell” Crack 1. First of all DP test was carried out to find out the total length of the crack. 2. After analyzing the full crack length, a hole was drilled at both the crack ends to arrest the cracks. 3. Removal of refractory linings from inside the kiln shell. 4. Alignment of shell plate was done from inside using L & key arrangement so that proper welding can be done.
  • 8. 8 Repairing of Kiln Shell Crack 5. After shell plate alignment, gouging has been started from outside the kiln shell. Since total plate thickness is 25 mm hence double V was made. 6. Preheating at 300-350 deg Celcius & maintaining temperature throughout welding. 7. After heating the whole V portion, & setting the current to a minimum requirement, root run of CPHFD 011 , 3.15 mm was given throughout the V groove crack from outside in a skip weld technique.
  • 9. 9 Repairing of Kiln Shell Crack 8. After giving the root run grinding was done to ensure no slag presence. 9. DP test was carried out to ensure the absence of any crack. 10. After DP test, the whole V groove was build up by CPHFD 011 , 4.0 mm.
  • 10. 10 Repairing of Kiln Shell Crack 11. After complete welding of V groove from outside, gouging from inside was started followed by grinding & surface preparation. 12. Following the similar steps of welding as done for outer groove , the inner V groove was welded. 13. After complete welding, slow cooling has been done in still air & then DP test was carried out to ensure crack free welding.
  • 11. 11 Repairing of Kiln Shell Crack Do’s & Don’ts : Sl No. Do’s Don’t 1. Before starting welding, check your PPE’s & set welding parameters on waste work piece. Don’t neglect safety, don’t set current arbitrarily.. 2 Using CPHFD 011, set minimum current as per range given in instruction. Don’t use high current for easy Welding. 3 Electrode angle to be 10° to the normal/ perpendicular as per the crack position Don’t neglect recommended angle. 4 Use skip weld technique as crack length is long. Don’t do continuous welding 5 Make stringent bead. Don’t weave. 6 Chip slags, peen weld bead when red hot. Don’t peen when the bead has lost its heat, its of no use 7 Maintain inter pass temperature. Don’t overheat the job, have time gaps between two weld beads by chipping & peening.
  • 12. 12 Repairing of Kiln Shell Crack SERVICE REPORT
  • 13. 13 Repairing of Kiln Shell Crack