Kiln Condition Report (Line 1)
(March 2015)
Contents
1 Executive Summary .................................................................................................. 1
2 Resume of Recommendations............................................................................... 2
3 Kiln Condition .............................................................................................................. 3
3.1 Support Rollers Condition................................................................................... 3
3.2 Migration.................................................................................................................... 4
3.3 Kiln Crank.................................................................................................................. 5
3.4 Kiln Support Bearing Temperature.................................................................. 6
3.5 Kiln Pinion Temperature ...................................................................................... 7
3.6 Girth Gear spray Pattern..................................................................................... 9
3.7 Visual Inspection.................................................................................................. 10
1 Executive Summary
 Kiln running during the month except interval 13 to 17 February 2015 due
to red spot at M25.
 Found Diesel Oil in Main burner’s natural gas inlet port.
 Scuffing of kiln pinions and girth gear is under monitoring.
 Wear of support rollers (station 3) increased when measured in the last
shutdown.
 Temperature difference of kiln pinions tooth is within acceptable limits.
 Spray pattern distribution of both systems is good.
 Thermal crank measurements of Kiln shell show that the thermal crank
beside each tyre is within accepted limits.
Ramliya Cement Plant (Egypt)
Preventive Maintenance Department
Inspection Section
Page 2
2 Resume of Recommendations
 Grind both right and left side support rollers at station no.3.
 Required repair the kiln shovel next overhauling shutdown.
 Required to change natural gas nozzle tip next overhauling shutdown.
Ramliya Cement Plant (Egypt)
Preventive Maintenance Department
Inspection Section
Page 3
3 Kiln Condition
3.1 Support Rollers Condition
 Wear on kiln supporting rollers had measured by using filler and straight
edge during at April 2014
1 2 3 4 5 6 7 8 9 10
Station
no. I
Left roller 0 0.05 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.05
Right roller 0 0.05 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.05
Station
no. II
Left roller 0 0.05 0.1 0.1 0.05 0.05 0.05 0.05 0 0
Right roller 0 0.05 0.1 0.1 0.05 0.05 0.05 0.05 0 0
Station
no. III
Left roller 0.05 0.05 0.1 2.1 3.5 3 2.5 2 0.1 0.05
Right roller 0.05 0.05 2 2 3 2 2 2 0.1 0.05
Dim. in mm
 Above measurements shows high wear at kiln support rollers of station III.
Ramliya Cement Plant (Egypt)
Preventive Maintenance Department
Inspection Section
Page 4
3.2 Migration
 The kiln supports are designed so that there will be a minimum diameter
difference between hot kiln tube and live-ring, this difference causes the
relative motion which is called the kiln migration
 So, we measured it in the 3 support stations and compared it with the
reading in the CCR and we found them closed to the CCR reading.
Kiln support station
Hand measured migration
(mm/rev.)
CCR migration
(mm/rev.)
Station 1 8.2 10.3
Station 2 7.3 8.2
Station 3 11.3 11.3
 Migration at stations no.2&3 was high so added 2mm shims at both
stations in order to maintain the migration at both stations within
acceptable ranges at April 2014.
Ramliya Cement Plant (Egypt)
Preventive Maintenance Department
Inspection Section
Page 5
3.3 Kiln Crank
 The kiln shell may in itself be bent in the longitudinal direction.
If this bending extends over a section of the length that covers at least
one of the supports, the kiln is said to be cranked
 In most cases, such cranks develop as a result of irregular thickness of the
coating causing uneven heating of the kiln shell in the burning zone of the
kiln. This type of crank, called a “thermal crank”, can be reduced by
changing the composition of the raw materials and/or the burning process
and by choosing the right type of lining.
 Our main concern is not to have a temperature difference of kiln shell on
same area more than 100 degrees (especially on the tyres heavy sections)
 Below measurements are showing the temperature difference beside each
tyre from inlet and outlet sides.
Tyre no.
Inlet side Outlet side
Temperature Difference Temperature Difference
I 39.9 56.8
II 28.6 22.3
III 6.8 9.1
 Above measurements taken on 27 March 2015 shows that the thermal
crank beside each tyre within accepted limits.
Ramliya Cement Plant (Egypt)
Preventive Maintenance Department
Inspection Section
Page 6
3.4 Kiln Support Bearing Temperature
 One of the important measurements is
measuring the temperature of the thrust collar
and supporting roller shaft in order to indicate
the condition and loads by means of T
Ramliya Cement Plant (Egypt)
Preventive Maintenance Department
Inspection Section
Page 7
3.5 Kiln Pinion Temperature
 A scheduled routine measurement for kiln pinions temperature is done on
a weekly basis.
 We use a hand pyrometer (Fluke 63) and readings are in degree
centigrade, in additional to thermograph images to detect any abnormal
loads.
Reading
date.
Right hand pinion Left hand pinion
1.2.2015 54 56 56.8 55.8 55 56.1 58.8 56.5 54.3 54.5
8.2.2015 60.1 61.2 60.7 60.1 59.7 62.2 63.6 63.4 62.1 62.1
23.2.2015 62.2 63.2 65.1 65.6 64.3 67.6 68.4 65.5 63.1 63.0
9.3.2015 52 52.6 52.8 51.6 51.2 50.4 51.2 51.4 51.4 51.2
Ramliya Cement Plant (Egypt)
Preventive Maintenance Department
Inspection Section
Page 8
 Backlash and root clearance measurement was performed at April 2014
Left pinion,Measuringofbacklash and root clearance (mm)
Pos.No 1 2 3 4 5 6 7 8 9 10 11 12 Avg.
Backlash in 2.2 2 3 3.8 2.75
Backlash out 3 2 2.5 3.8 2.80
Root clear.in 3.2 2.1 5.8 7.4 4.60
Root clear.out 3 2.2 5.8 7.4 4.60
Right pinion,Measuringof backlash and root clearance (mm)
Pos.No 1 2 3 4 5 6 7 8 9 10 11 12
Backlash in 3.5 2.4 2.5 4 3.10
Backlash out 3.5 3 3 4 3.37
Root clear.in 4.9 4 4 5.9 4.70
Root clear.out 4.5 3.3 3.9 5.6 4.30
Ramliya Cement Plant (Egypt)
Preventive Maintenance Department
Inspection Section
Page 9
3.6 Girth Gear spray Pattern
 The spray lubrication print was taken for system A and B, pattern for both
systems are OK.
Ramliya Cement Plant (Egypt)
Preventive Maintenance Department
Inspection Section
Page 10
3.7 Visual Inspection
We have checked main burner and found
 Damaged in cooling air ring.
 Damaged in natural gas nozzle tip ,found oil in natural gas channel
 Damage in castables at 50 cm of Jacket
Also, during kiln stoppage
 Changed Shell Bricks at in many places Meter 25, Meter 29 and Ring after
nose ring.
 Found Damaged Castables on tip of one Z-Plate of Kiln inlet.
 Damaged Kiln inlet shelf made contact with Castables of Z-Plate
 Damaged Kiln Shovels need repair next Kiln Shutdown.

More Related Content

What's hot

Atox 22.50 coal mill optimization
Atox 22.50 coal mill optimizationAtox 22.50 coal mill optimization
Atox 22.50 coal mill optimization
NITIN ASNANI
 
Burning and cooling
Burning and coolingBurning and cooling
Burning and coolingirrraju1976
 
Ref failur e analysis tip casting & retainer area f
Ref failur e analysis tip casting & retainer area  fRef failur e analysis tip casting & retainer area  f
Ref failur e analysis tip casting & retainer area fpradeepdeepi
 
Kiln measuring
Kiln measuringKiln measuring
Kiln measuring
mkpq pasha
 
Exemplary report-rotary-kiln-alignment
Exemplary report-rotary-kiln-alignmentExemplary report-rotary-kiln-alignment
Exemplary report-rotary-kiln-alignment
mkpq pasha
 
Reffailue nosering pradeep kumar
Reffailue nosering  pradeep kumarReffailue nosering  pradeep kumar
Reffailue nosering pradeep kumarpradeepdeepi
 
Vertical raw mill pradeep kumar
Vertical raw mill pradeep kumarVertical raw mill pradeep kumar
Vertical raw mill pradeep kumarpradeepdeepi
 
Rotary kiln
Rotary kilnRotary kiln
Rotary kiln
Aree Salah
 
Kiln tire tightening
Kiln tire tightening Kiln tire tightening
Kiln tire tightening
mkpq pasha
 
Cement rotary kiln questions & answers
Cement rotary kiln questions & answersCement rotary kiln questions & answers
Cement rotary kiln questions & answers
Nael Shabana
 
Exemplary report-rotary-kiln-alignment
Exemplary report-rotary-kiln-alignmentExemplary report-rotary-kiln-alignment
Exemplary report-rotary-kiln-alignment
mkpq pasha
 
Kiln shell
Kiln shellKiln shell
Kiln shell
MarionosJohn
 
Kiln Training Module - kali.pptx
Kiln Training Module - kali.pptxKiln Training Module - kali.pptx
Kiln Training Module - kali.pptx
Ja Ti
 
Cement plant-operation-handbook by yaser elkelawy
Cement plant-operation-handbook by yaser elkelawyCement plant-operation-handbook by yaser elkelawy
Cement plant-operation-handbook by yaser elkelawy
Yasser Mohamed abbas elkelawy
 
Rotary Kiln Construction
Rotary Kiln ConstructionRotary Kiln Construction
Rotary Kiln Construction
FEECO International, Inc.
 
Maximum Shell Temp Ok
Maximum Shell Temp OkMaximum Shell Temp Ok
Maximum Shell Temp OkRicardoMosci
 
Cement rotary kiln
Cement rotary kilnCement rotary kiln
Cement rotary kiln
mkpq pasha
 
Rotary kiln
Rotary kilnRotary kiln
Rotary kiln
chinadjks
 
Vrm roller bearing_r3_maintenance_report
Vrm roller bearing_r3_maintenance_reportVrm roller bearing_r3_maintenance_report
Vrm roller bearing_r3_maintenance_report
mkpq pasha
 
Snow ball formation pradeep kumar
Snow ball formation  pradeep kumarSnow ball formation  pradeep kumar
Snow ball formation pradeep kumarpradeepdeepi
 

What's hot (20)

Atox 22.50 coal mill optimization
Atox 22.50 coal mill optimizationAtox 22.50 coal mill optimization
Atox 22.50 coal mill optimization
 
Burning and cooling
Burning and coolingBurning and cooling
Burning and cooling
 
Ref failur e analysis tip casting & retainer area f
Ref failur e analysis tip casting & retainer area  fRef failur e analysis tip casting & retainer area  f
Ref failur e analysis tip casting & retainer area f
 
Kiln measuring
Kiln measuringKiln measuring
Kiln measuring
 
Exemplary report-rotary-kiln-alignment
Exemplary report-rotary-kiln-alignmentExemplary report-rotary-kiln-alignment
Exemplary report-rotary-kiln-alignment
 
Reffailue nosering pradeep kumar
Reffailue nosering  pradeep kumarReffailue nosering  pradeep kumar
Reffailue nosering pradeep kumar
 
Vertical raw mill pradeep kumar
Vertical raw mill pradeep kumarVertical raw mill pradeep kumar
Vertical raw mill pradeep kumar
 
Rotary kiln
Rotary kilnRotary kiln
Rotary kiln
 
Kiln tire tightening
Kiln tire tightening Kiln tire tightening
Kiln tire tightening
 
Cement rotary kiln questions & answers
Cement rotary kiln questions & answersCement rotary kiln questions & answers
Cement rotary kiln questions & answers
 
Exemplary report-rotary-kiln-alignment
Exemplary report-rotary-kiln-alignmentExemplary report-rotary-kiln-alignment
Exemplary report-rotary-kiln-alignment
 
Kiln shell
Kiln shellKiln shell
Kiln shell
 
Kiln Training Module - kali.pptx
Kiln Training Module - kali.pptxKiln Training Module - kali.pptx
Kiln Training Module - kali.pptx
 
Cement plant-operation-handbook by yaser elkelawy
Cement plant-operation-handbook by yaser elkelawyCement plant-operation-handbook by yaser elkelawy
Cement plant-operation-handbook by yaser elkelawy
 
Rotary Kiln Construction
Rotary Kiln ConstructionRotary Kiln Construction
Rotary Kiln Construction
 
Maximum Shell Temp Ok
Maximum Shell Temp OkMaximum Shell Temp Ok
Maximum Shell Temp Ok
 
Cement rotary kiln
Cement rotary kilnCement rotary kiln
Cement rotary kiln
 
Rotary kiln
Rotary kilnRotary kiln
Rotary kiln
 
Vrm roller bearing_r3_maintenance_report
Vrm roller bearing_r3_maintenance_reportVrm roller bearing_r3_maintenance_report
Vrm roller bearing_r3_maintenance_report
 
Snow ball formation pradeep kumar
Snow ball formation  pradeep kumarSnow ball formation  pradeep kumar
Snow ball formation pradeep kumar
 

Viewers also liked

VEGA Pressure & Level Measurement - Cement Industry Applications
VEGA Pressure & Level Measurement - Cement Industry ApplicationsVEGA Pressure & Level Measurement - Cement Industry Applications
VEGA Pressure & Level Measurement - Cement Industry ApplicationsThorne & Derrick UK
 
أجهزة القياس والدارات المنطقية تطبيقات في صناعة الاسمنت
أجهزة القياس والدارات المنطقية تطبيقات في صناعة الاسمنتأجهزة القياس والدارات المنطقية تطبيقات في صناعة الاسمنت
أجهزة القياس والدارات المنطقية تطبيقات في صناعة الاسمنت
JoshWa2el
 
Proximity Switches
Proximity SwitchesProximity Switches
SD_Group12_Midterm_Presentation
SD_Group12_Midterm_PresentationSD_Group12_Midterm_Presentation
SD_Group12_Midterm_PresentationTyler Grubb
 
Acid Rain
Acid RainAcid Rain
FLSmidth Report final
FLSmidth Report finalFLSmidth Report final
FLSmidth Report finalShahid Faizee
 
Introduction to sensors
Introduction to sensorsIntroduction to sensors
Introduction to sensors
Chandan Singh
 
Paz2017
Paz2017Paz2017
Paz2017
Mar Jurado
 
Presentation1
Presentation1Presentation1
Presentation1
raju_786
 
Training
TrainingTraining
Training
kulrao
 
Types of sensors
Types of sensorsTypes of sensors
Types of sensors
Ebin Robinson
 
Cement Plant Process and Instruments Used
Cement Plant Process and Instruments UsedCement Plant Process and Instruments Used
Cement Plant Process and Instruments Used
Ravi Roy
 
Cement Manufacturing Plant, Detailed Project Report, Profile, Business Plan, ...
Cement Manufacturing Plant, Detailed Project Report, Profile, Business Plan, ...Cement Manufacturing Plant, Detailed Project Report, Profile, Business Plan, ...
Cement Manufacturing Plant, Detailed Project Report, Profile, Business Plan, ...
Ajjay Kumar Gupta
 
Cement supply chain
Cement supply chainCement supply chain
Cement supply chain
Puneet Mishra
 
cement-plant-operation-handbook
cement-plant-operation-handbookcement-plant-operation-handbook
cement-plant-operation-handbook
Vijay Kumar
 
Lafarge Cement Value Chain
Lafarge Cement Value ChainLafarge Cement Value Chain
Lafarge Cement Value Chain
ASAD ALI
 
Automation lecture 2
Automation lecture 2Automation lecture 2
Automation lecture 2
Mahmoud Hussein
 
Sensors
SensorsSensors

Viewers also liked (20)

VEGA Pressure & Level Measurement - Cement Industry Applications
VEGA Pressure & Level Measurement - Cement Industry ApplicationsVEGA Pressure & Level Measurement - Cement Industry Applications
VEGA Pressure & Level Measurement - Cement Industry Applications
 
أجهزة القياس والدارات المنطقية تطبيقات في صناعة الاسمنت
أجهزة القياس والدارات المنطقية تطبيقات في صناعة الاسمنتأجهزة القياس والدارات المنطقية تطبيقات في صناعة الاسمنت
أجهزة القياس والدارات المنطقية تطبيقات في صناعة الاسمنت
 
Proximity Switches
Proximity SwitchesProximity Switches
Proximity Switches
 
SD_Group12_Midterm_Presentation
SD_Group12_Midterm_PresentationSD_Group12_Midterm_Presentation
SD_Group12_Midterm_Presentation
 
Acid Rain
Acid RainAcid Rain
Acid Rain
 
FLSmidth Report final
FLSmidth Report finalFLSmidth Report final
FLSmidth Report final
 
Introduction to sensors
Introduction to sensorsIntroduction to sensors
Introduction to sensors
 
Paz2017
Paz2017Paz2017
Paz2017
 
Presentation1
Presentation1Presentation1
Presentation1
 
Training
TrainingTraining
Training
 
Types of sensors
Types of sensorsTypes of sensors
Types of sensors
 
Sensors
SensorsSensors
Sensors
 
Cement Plant Process and Instruments Used
Cement Plant Process and Instruments UsedCement Plant Process and Instruments Used
Cement Plant Process and Instruments Used
 
Cement Manufacturing Plant, Detailed Project Report, Profile, Business Plan, ...
Cement Manufacturing Plant, Detailed Project Report, Profile, Business Plan, ...Cement Manufacturing Plant, Detailed Project Report, Profile, Business Plan, ...
Cement Manufacturing Plant, Detailed Project Report, Profile, Business Plan, ...
 
Cement supply chain
Cement supply chainCement supply chain
Cement supply chain
 
cement-plant-operation-handbook
cement-plant-operation-handbookcement-plant-operation-handbook
cement-plant-operation-handbook
 
Lafarge Cement Value Chain
Lafarge Cement Value ChainLafarge Cement Value Chain
Lafarge Cement Value Chain
 
Cement
CementCement
Cement
 
Automation lecture 2
Automation lecture 2Automation lecture 2
Automation lecture 2
 
Sensors
SensorsSensors
Sensors
 

Similar to Kiln Condition Report (Line1)(March 2015)

Exemplary report-rotary-kiln-alignment
Exemplary report-rotary-kiln-alignmentExemplary report-rotary-kiln-alignment
Exemplary report-rotary-kiln-alignment
mkpq pasha
 
Bearing Failure on Coke Cart
Bearing Failure on Coke CartBearing Failure on Coke Cart
Bearing Failure on Coke CartLiam McCabe
 
Yale e813 glp3.5 5.5 mj lift truck (europe) service repair manual
Yale e813 glp3.5 5.5 mj lift truck (europe) service repair manualYale e813 glp3.5 5.5 mj lift truck (europe) service repair manual
Yale e813 glp3.5 5.5 mj lift truck (europe) service repair manual
fjkskekdmmenm
 
Yale e813 gdp3.5 5.5 lj lift truck (europe) service repair manual
Yale e813 gdp3.5 5.5 lj lift truck (europe) service repair manualYale e813 gdp3.5 5.5 lj lift truck (europe) service repair manual
Yale e813 gdp3.5 5.5 lj lift truck (europe) service repair manual
fjjsekkmdmes
 
Yale e813 glp3.5 5.5 lj lift truck (europe) service repair manual
Yale e813 glp3.5 5.5 lj lift truck (europe) service repair manualYale e813 glp3.5 5.5 lj lift truck (europe) service repair manual
Yale e813 glp3.5 5.5 lj lift truck (europe) service repair manual
fjjskkdmnsme
 
Yale e813 gdp3.5 5.5 mj lift truck (europe) service repair manual
Yale e813 gdp3.5 5.5 mj lift truck (europe) service repair manualYale e813 gdp3.5 5.5 mj lift truck (europe) service repair manual
Yale e813 gdp3.5 5.5 mj lift truck (europe) service repair manual
fjjskekdmnsme
 
Yale e813 gdp3.5 5.5 mj lift truck (europe) service repair manual
Yale e813 gdp3.5 5.5 mj lift truck (europe) service repair manualYale e813 gdp3.5 5.5 mj lift truck (europe) service repair manual
Yale e813 gdp3.5 5.5 mj lift truck (europe) service repair manual
fujjsjefkskekmm
 
Jcb vmt860 tier 3 vibromax service repair manual
Jcb vmt860 tier 3 vibromax service repair manualJcb vmt860 tier 3 vibromax service repair manual
Jcb vmt860 tier 3 vibromax service repair manual
fjskekazxdmmme
 

Similar to Kiln Condition Report (Line1)(March 2015) (8)

Exemplary report-rotary-kiln-alignment
Exemplary report-rotary-kiln-alignmentExemplary report-rotary-kiln-alignment
Exemplary report-rotary-kiln-alignment
 
Bearing Failure on Coke Cart
Bearing Failure on Coke CartBearing Failure on Coke Cart
Bearing Failure on Coke Cart
 
Yale e813 glp3.5 5.5 mj lift truck (europe) service repair manual
Yale e813 glp3.5 5.5 mj lift truck (europe) service repair manualYale e813 glp3.5 5.5 mj lift truck (europe) service repair manual
Yale e813 glp3.5 5.5 mj lift truck (europe) service repair manual
 
Yale e813 gdp3.5 5.5 lj lift truck (europe) service repair manual
Yale e813 gdp3.5 5.5 lj lift truck (europe) service repair manualYale e813 gdp3.5 5.5 lj lift truck (europe) service repair manual
Yale e813 gdp3.5 5.5 lj lift truck (europe) service repair manual
 
Yale e813 glp3.5 5.5 lj lift truck (europe) service repair manual
Yale e813 glp3.5 5.5 lj lift truck (europe) service repair manualYale e813 glp3.5 5.5 lj lift truck (europe) service repair manual
Yale e813 glp3.5 5.5 lj lift truck (europe) service repair manual
 
Yale e813 gdp3.5 5.5 mj lift truck (europe) service repair manual
Yale e813 gdp3.5 5.5 mj lift truck (europe) service repair manualYale e813 gdp3.5 5.5 mj lift truck (europe) service repair manual
Yale e813 gdp3.5 5.5 mj lift truck (europe) service repair manual
 
Yale e813 gdp3.5 5.5 mj lift truck (europe) service repair manual
Yale e813 gdp3.5 5.5 mj lift truck (europe) service repair manualYale e813 gdp3.5 5.5 mj lift truck (europe) service repair manual
Yale e813 gdp3.5 5.5 mj lift truck (europe) service repair manual
 
Jcb vmt860 tier 3 vibromax service repair manual
Jcb vmt860 tier 3 vibromax service repair manualJcb vmt860 tier 3 vibromax service repair manual
Jcb vmt860 tier 3 vibromax service repair manual
 

Kiln Condition Report (Line1)(March 2015)

  • 1. Ramliya Cement Plant (Egypt) Preventive Maintenance Department Inspection Section Page 1 Kiln Condition Report (Line 1) (March 2015) Contents 1 Executive Summary .................................................................................................. 1 2 Resume of Recommendations............................................................................... 2 3 Kiln Condition .............................................................................................................. 3 3.1 Support Rollers Condition................................................................................... 3 3.2 Migration.................................................................................................................... 4 3.3 Kiln Crank.................................................................................................................. 5 3.4 Kiln Support Bearing Temperature.................................................................. 6 3.5 Kiln Pinion Temperature ...................................................................................... 7 3.6 Girth Gear spray Pattern..................................................................................... 9 3.7 Visual Inspection.................................................................................................. 10 1 Executive Summary  Kiln running during the month except interval 13 to 17 February 2015 due to red spot at M25.  Found Diesel Oil in Main burner’s natural gas inlet port.  Scuffing of kiln pinions and girth gear is under monitoring.  Wear of support rollers (station 3) increased when measured in the last shutdown.  Temperature difference of kiln pinions tooth is within acceptable limits.  Spray pattern distribution of both systems is good.  Thermal crank measurements of Kiln shell show that the thermal crank beside each tyre is within accepted limits.
  • 2. Ramliya Cement Plant (Egypt) Preventive Maintenance Department Inspection Section Page 2 2 Resume of Recommendations  Grind both right and left side support rollers at station no.3.  Required repair the kiln shovel next overhauling shutdown.  Required to change natural gas nozzle tip next overhauling shutdown.
  • 3. Ramliya Cement Plant (Egypt) Preventive Maintenance Department Inspection Section Page 3 3 Kiln Condition 3.1 Support Rollers Condition  Wear on kiln supporting rollers had measured by using filler and straight edge during at April 2014 1 2 3 4 5 6 7 8 9 10 Station no. I Left roller 0 0.05 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.05 Right roller 0 0.05 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.05 Station no. II Left roller 0 0.05 0.1 0.1 0.05 0.05 0.05 0.05 0 0 Right roller 0 0.05 0.1 0.1 0.05 0.05 0.05 0.05 0 0 Station no. III Left roller 0.05 0.05 0.1 2.1 3.5 3 2.5 2 0.1 0.05 Right roller 0.05 0.05 2 2 3 2 2 2 0.1 0.05 Dim. in mm  Above measurements shows high wear at kiln support rollers of station III.
  • 4. Ramliya Cement Plant (Egypt) Preventive Maintenance Department Inspection Section Page 4 3.2 Migration  The kiln supports are designed so that there will be a minimum diameter difference between hot kiln tube and live-ring, this difference causes the relative motion which is called the kiln migration  So, we measured it in the 3 support stations and compared it with the reading in the CCR and we found them closed to the CCR reading. Kiln support station Hand measured migration (mm/rev.) CCR migration (mm/rev.) Station 1 8.2 10.3 Station 2 7.3 8.2 Station 3 11.3 11.3  Migration at stations no.2&3 was high so added 2mm shims at both stations in order to maintain the migration at both stations within acceptable ranges at April 2014.
  • 5. Ramliya Cement Plant (Egypt) Preventive Maintenance Department Inspection Section Page 5 3.3 Kiln Crank  The kiln shell may in itself be bent in the longitudinal direction. If this bending extends over a section of the length that covers at least one of the supports, the kiln is said to be cranked  In most cases, such cranks develop as a result of irregular thickness of the coating causing uneven heating of the kiln shell in the burning zone of the kiln. This type of crank, called a “thermal crank”, can be reduced by changing the composition of the raw materials and/or the burning process and by choosing the right type of lining.  Our main concern is not to have a temperature difference of kiln shell on same area more than 100 degrees (especially on the tyres heavy sections)  Below measurements are showing the temperature difference beside each tyre from inlet and outlet sides. Tyre no. Inlet side Outlet side Temperature Difference Temperature Difference I 39.9 56.8 II 28.6 22.3 III 6.8 9.1  Above measurements taken on 27 March 2015 shows that the thermal crank beside each tyre within accepted limits.
  • 6. Ramliya Cement Plant (Egypt) Preventive Maintenance Department Inspection Section Page 6 3.4 Kiln Support Bearing Temperature  One of the important measurements is measuring the temperature of the thrust collar and supporting roller shaft in order to indicate the condition and loads by means of T
  • 7. Ramliya Cement Plant (Egypt) Preventive Maintenance Department Inspection Section Page 7 3.5 Kiln Pinion Temperature  A scheduled routine measurement for kiln pinions temperature is done on a weekly basis.  We use a hand pyrometer (Fluke 63) and readings are in degree centigrade, in additional to thermograph images to detect any abnormal loads. Reading date. Right hand pinion Left hand pinion 1.2.2015 54 56 56.8 55.8 55 56.1 58.8 56.5 54.3 54.5 8.2.2015 60.1 61.2 60.7 60.1 59.7 62.2 63.6 63.4 62.1 62.1 23.2.2015 62.2 63.2 65.1 65.6 64.3 67.6 68.4 65.5 63.1 63.0 9.3.2015 52 52.6 52.8 51.6 51.2 50.4 51.2 51.4 51.4 51.2
  • 8. Ramliya Cement Plant (Egypt) Preventive Maintenance Department Inspection Section Page 8  Backlash and root clearance measurement was performed at April 2014 Left pinion,Measuringofbacklash and root clearance (mm) Pos.No 1 2 3 4 5 6 7 8 9 10 11 12 Avg. Backlash in 2.2 2 3 3.8 2.75 Backlash out 3 2 2.5 3.8 2.80 Root clear.in 3.2 2.1 5.8 7.4 4.60 Root clear.out 3 2.2 5.8 7.4 4.60 Right pinion,Measuringof backlash and root clearance (mm) Pos.No 1 2 3 4 5 6 7 8 9 10 11 12 Backlash in 3.5 2.4 2.5 4 3.10 Backlash out 3.5 3 3 4 3.37 Root clear.in 4.9 4 4 5.9 4.70 Root clear.out 4.5 3.3 3.9 5.6 4.30
  • 9. Ramliya Cement Plant (Egypt) Preventive Maintenance Department Inspection Section Page 9 3.6 Girth Gear spray Pattern  The spray lubrication print was taken for system A and B, pattern for both systems are OK.
  • 10. Ramliya Cement Plant (Egypt) Preventive Maintenance Department Inspection Section Page 10 3.7 Visual Inspection We have checked main burner and found  Damaged in cooling air ring.  Damaged in natural gas nozzle tip ,found oil in natural gas channel  Damage in castables at 50 cm of Jacket Also, during kiln stoppage  Changed Shell Bricks at in many places Meter 25, Meter 29 and Ring after nose ring.  Found Damaged Castables on tip of one Z-Plate of Kiln inlet.  Damaged Kiln inlet shelf made contact with Castables of Z-Plate  Damaged Kiln Shovels need repair next Kiln Shutdown.