SlideShare a Scribd company logo
Peter Strauss
  PM Strauss & Associates
 petestrauss1@comcast.net
Technical Advisor to community groups
           throughout the US
 Technical Advisor to Center for Public
Environmental Oversight (CPEO) on the
   Moffett Field and MEW Technical
           Assistance Grants
Remedial Process Optimization
• In June, EPA ordered that each of the
  MEW companies, the Navy and NASA to
  develop remedial process optimization
  (RPO) studies for each of the source
  areas and the regional system.
• As I understand it, after EPA provides
  comments on the RPOs, the FFS will
  continue and the results of the RPO
  studies will be melded into it.
Need for RPO
• The basic premise of RPO is a systematic
  evaluation and enhancement of remediation
  systems
• Systems at MEW/Moffett were designed with
  knowledge and conditions at the time
• New technology has developed
• Old systems haven’t worked as well as
  anticipated
• Extraction and monitoring wells were located in
  places that may not be ideal
• Land use has changed.
Need for RPO
      (Lenny’s Chart)

    Est.

M
a
s
    actual
s

r
e
             rpo
m
o
                    rpo
v
    MCL
a
l

             time
Potential Benefits
         Examples from other sites
• A well rehabilitation program was initiated to
  improve the well yields
• A removal technique focusing on the source
  area may allow discontinuation of all site-related
  active remediation in less than six months
  (reducing remediation time by 9 years if pump
  and treat continued).
• A Cost Effective Sampling process was
  developed that addressed the issue of sampling
  frequency. The above study examined where
  monitoring wells should be placed.
Concerns
• RPO means different things to different people.
• The RPO is a double edged sword: while it may
  accelerate and enhance remediation,
  responsible parties may see it as an opportunity
  to focus on what they can do less of (e.g., less
  extraction, less monitoring, abandonment of
  some extraction wells, opportunity to change
  remedial action objectives).
Remedial Process Optimization –
         Community Criteria

The community believes that RPO should
 focus on:
 Accelerating cleanup
 Reducing plume migration
 Increasing the rate of mass removal
 Improving health and safety (e.g., reducing risk).
 Improving the long-term monitoring system
 Cost and efficiency should be evaluated, but
 should not be the primary decision criteria.
Optimization of Remediation
                System
• Alternatives that replace current systems must speed up
  remediation, remove or destroy contaminants that are
  not being addressed by the current system, and/or
  increase mass removal rates.
• Delineate an exit strategy
• Consider natural resource use
• Evaluate the effectiveness of existing institutional
  controls as well as the need to establish new institutional
  controls
• Evaluate hot spot removal.
• Evaluate changes in systems to simplify them
Well Location, Removal and
        Extraction Rates

• If wells are being removed or extraction rates
  decreased, there should be a guarantee that
  capture zones will be maintained.
• Evaluate the need for additional wells and/or
  increasing extraction rates.
• Evaluate lateral dispersion/convection to
  identify preferential pathways.
• Evaluate the need to refurbish or replace
  extraction and monitoring wells.
Long-Term Monitoring

• Evaluate effectiveness of long term monitoring, as
  little attention is paid to this in the RI/FS process.
• Evaluate less costly/more accurate approaches to
  long-term monitoring
• If there are changes to the remediation system, the
  monitoring system should be adjusted accordingly so
  that it will monitor changes in performance.
• Long-term monitoring should also be integrated into a
  contingency plan (e.g., failure of slurry walls).
Health and Safety

• Ensure that the systems will be at a minimum
  as protective to environment, and health and
  safety, as systems already in place
• The RPO process should not be used to
  change Remedial Action Objectives; although
  it may provide basis for doing so, RAOs
  should only be changed by ROD amendment,
  with appropriate public participation.
• Assess changes in environmental conditions
  and land-use, and strategies should be
  developed that address these changes.
Examples of Recommendations

• Evaluate the frequency of monitoring and the
  efficiency of the program
• Discharge to the Palo Alto Regional Water
  Quality Control Plant (RWQCP) without
  pretreatment
• Reduce extraction rate/close some wells
• In conjunction with the optimization activities, the
  existing RAOs should be evaluated
• No modifications to the treatment system
  components are necessary to optimize its
  operations
Technologies Considered
• Pulsed Extraction
• Treat subsurface prior to extraction and treatment of the
  groundwater, such as surfactant flushing
• Treat VOCs in multiple matrices, e.g., dual-phase
  extraction
• Permeable Reactive Barriers (including modifying
  existing slurry walls)
• In-situ Bioremediation
• In-situ Chemical Oxidation
• Bioaugmentation
• Phytoremediation
• MNA (monitored natural attenuation)

More Related Content

What's hot

Using a system cost analysis to quantify drilling fluids and
Using a system cost analysis to quantify drilling fluids andUsing a system cost analysis to quantify drilling fluids and
Using a system cost analysis to quantify drilling fluids and
amrhaggag
 
Probabilistic Analysis of a Desalination Plant with Major and Minor Failures ...
Probabilistic Analysis of a Desalination Plant with Major and Minor Failures ...Probabilistic Analysis of a Desalination Plant with Major and Minor Failures ...
Probabilistic Analysis of a Desalination Plant with Major and Minor Failures ...
Waqas Tariq
 
Navy presentation to the Moffett Field Restoration Advisory Board on May 15, ...
Navy presentation to the Moffett Field Restoration Advisory Board on May 15, ...Navy presentation to the Moffett Field Restoration Advisory Board on May 15, ...
Navy presentation to the Moffett Field Restoration Advisory Board on May 15, ...
Steve Williams
 
Lake Ontario Waterkeeper's submissions for Pickering Waste Management Facilit...
Lake Ontario Waterkeeper's submissions for Pickering Waste Management Facilit...Lake Ontario Waterkeeper's submissions for Pickering Waste Management Facilit...
Lake Ontario Waterkeeper's submissions for Pickering Waste Management Facilit...
LOWaterkeeper
 
Andrews, Arlyn: Towards an International Reference Network for Greenhouse Gases
Andrews, Arlyn: Towards an International Reference Network for Greenhouse GasesAndrews, Arlyn: Towards an International Reference Network for Greenhouse Gases
Andrews, Arlyn: Towards an International Reference Network for Greenhouse Gases
Integrated Carbon Observation System (ICOS)
 
PA DEP White Paper: Utilization of Mine Influenced Water for Natural Gas Extr...
PA DEP White Paper: Utilization of Mine Influenced Water for Natural Gas Extr...PA DEP White Paper: Utilization of Mine Influenced Water for Natural Gas Extr...
PA DEP White Paper: Utilization of Mine Influenced Water for Natural Gas Extr...
Marcellus Drilling News
 
tu-f1-corrective-action-101-ice-&-nailor-2016-02-19-final
tu-f1-corrective-action-101-ice-&-nailor-2016-02-19-finaltu-f1-corrective-action-101-ice-&-nailor-2016-02-19-final
tu-f1-corrective-action-101-ice-&-nailor-2016-02-19-finalCharles Ice
 
Center for Sustainable Shale Development 15 Performance Standards
Center for Sustainable Shale Development 15 Performance StandardsCenter for Sustainable Shale Development 15 Performance Standards
Center for Sustainable Shale Development 15 Performance Standards
Marcellus Drilling News
 
Knowledge Management: Using A “Flight Simulator” Concept To Support Successio...
Knowledge Management: Using A “Flight Simulator” Concept To Support Successio...Knowledge Management: Using A “Flight Simulator” Concept To Support Successio...
Knowledge Management: Using A “Flight Simulator” Concept To Support Successio...
Malcolm Fabiyi
 
Item 6 position of aspac in GLOSOLAN
Item 6  position of aspac in GLOSOLANItem 6  position of aspac in GLOSOLAN
Item 6 position of aspac in GLOSOLAN
Soils FAO-GSP
 
A mathematical modeling proposal for a Multiple Tasks Periodic Capacitated Ar...
A mathematical modeling proposal for a Multiple Tasks Periodic Capacitated Ar...A mathematical modeling proposal for a Multiple Tasks Periodic Capacitated Ar...
A mathematical modeling proposal for a Multiple Tasks Periodic Capacitated Ar...
IJERA Editor
 
NJ Redevelopment Forum 2020 - Mahon
NJ Redevelopment Forum 2020 - MahonNJ Redevelopment Forum 2020 - Mahon
NJ Redevelopment Forum 2020 - Mahon
New Jersey Future
 
Moffett RAB Basewide Five-Year Review Update
Moffett RAB Basewide Five-Year Review UpdateMoffett RAB Basewide Five-Year Review Update
Moffett RAB Basewide Five-Year Review Update
Steve Williams
 
Business Planning WASAs
Business Planning WASAs Business Planning WASAs
Business Planning WASAs
Abid Hussainy
 
Gronstal Anderson, Ingrid, PAL Case Study Plant-Wide Applicability Limit for ...
Gronstal Anderson, Ingrid, PAL Case Study Plant-Wide Applicability Limit for ...Gronstal Anderson, Ingrid, PAL Case Study Plant-Wide Applicability Limit for ...
Gronstal Anderson, Ingrid, PAL Case Study Plant-Wide Applicability Limit for ...
Kevin Perry
 
Caroline Manning CV
Caroline Manning CVCaroline Manning CV
Caroline Manning CV
Caroline Manning
 
"We've got to do what now?" Webinar
"We've got to do what now?" Webinar"We've got to do what now?" Webinar
"We've got to do what now?" Webinar
New Jersey Future
 
Gap analysis & target setting
Gap analysis & target settingGap analysis & target setting
Gap analysis & target setting
Abid Hussainy
 
Performance Improvement Plan Water Utilities
Performance Improvement Plan  Water Utilities Performance Improvement Plan  Water Utilities
Performance Improvement Plan Water Utilities
Abid Hussainy
 

What's hot (20)

Using a system cost analysis to quantify drilling fluids and
Using a system cost analysis to quantify drilling fluids andUsing a system cost analysis to quantify drilling fluids and
Using a system cost analysis to quantify drilling fluids and
 
WWT Poster
WWT PosterWWT Poster
WWT Poster
 
Probabilistic Analysis of a Desalination Plant with Major and Minor Failures ...
Probabilistic Analysis of a Desalination Plant with Major and Minor Failures ...Probabilistic Analysis of a Desalination Plant with Major and Minor Failures ...
Probabilistic Analysis of a Desalination Plant with Major and Minor Failures ...
 
Navy presentation to the Moffett Field Restoration Advisory Board on May 15, ...
Navy presentation to the Moffett Field Restoration Advisory Board on May 15, ...Navy presentation to the Moffett Field Restoration Advisory Board on May 15, ...
Navy presentation to the Moffett Field Restoration Advisory Board on May 15, ...
 
Lake Ontario Waterkeeper's submissions for Pickering Waste Management Facilit...
Lake Ontario Waterkeeper's submissions for Pickering Waste Management Facilit...Lake Ontario Waterkeeper's submissions for Pickering Waste Management Facilit...
Lake Ontario Waterkeeper's submissions for Pickering Waste Management Facilit...
 
Andrews, Arlyn: Towards an International Reference Network for Greenhouse Gases
Andrews, Arlyn: Towards an International Reference Network for Greenhouse GasesAndrews, Arlyn: Towards an International Reference Network for Greenhouse Gases
Andrews, Arlyn: Towards an International Reference Network for Greenhouse Gases
 
PA DEP White Paper: Utilization of Mine Influenced Water for Natural Gas Extr...
PA DEP White Paper: Utilization of Mine Influenced Water for Natural Gas Extr...PA DEP White Paper: Utilization of Mine Influenced Water for Natural Gas Extr...
PA DEP White Paper: Utilization of Mine Influenced Water for Natural Gas Extr...
 
tu-f1-corrective-action-101-ice-&-nailor-2016-02-19-final
tu-f1-corrective-action-101-ice-&-nailor-2016-02-19-finaltu-f1-corrective-action-101-ice-&-nailor-2016-02-19-final
tu-f1-corrective-action-101-ice-&-nailor-2016-02-19-final
 
Center for Sustainable Shale Development 15 Performance Standards
Center for Sustainable Shale Development 15 Performance StandardsCenter for Sustainable Shale Development 15 Performance Standards
Center for Sustainable Shale Development 15 Performance Standards
 
Knowledge Management: Using A “Flight Simulator” Concept To Support Successio...
Knowledge Management: Using A “Flight Simulator” Concept To Support Successio...Knowledge Management: Using A “Flight Simulator” Concept To Support Successio...
Knowledge Management: Using A “Flight Simulator” Concept To Support Successio...
 
Item 6 position of aspac in GLOSOLAN
Item 6  position of aspac in GLOSOLANItem 6  position of aspac in GLOSOLAN
Item 6 position of aspac in GLOSOLAN
 
A mathematical modeling proposal for a Multiple Tasks Periodic Capacitated Ar...
A mathematical modeling proposal for a Multiple Tasks Periodic Capacitated Ar...A mathematical modeling proposal for a Multiple Tasks Periodic Capacitated Ar...
A mathematical modeling proposal for a Multiple Tasks Periodic Capacitated Ar...
 
NJ Redevelopment Forum 2020 - Mahon
NJ Redevelopment Forum 2020 - MahonNJ Redevelopment Forum 2020 - Mahon
NJ Redevelopment Forum 2020 - Mahon
 
Moffett RAB Basewide Five-Year Review Update
Moffett RAB Basewide Five-Year Review UpdateMoffett RAB Basewide Five-Year Review Update
Moffett RAB Basewide Five-Year Review Update
 
Business Planning WASAs
Business Planning WASAs Business Planning WASAs
Business Planning WASAs
 
Gronstal Anderson, Ingrid, PAL Case Study Plant-Wide Applicability Limit for ...
Gronstal Anderson, Ingrid, PAL Case Study Plant-Wide Applicability Limit for ...Gronstal Anderson, Ingrid, PAL Case Study Plant-Wide Applicability Limit for ...
Gronstal Anderson, Ingrid, PAL Case Study Plant-Wide Applicability Limit for ...
 
Caroline Manning CV
Caroline Manning CVCaroline Manning CV
Caroline Manning CV
 
"We've got to do what now?" Webinar
"We've got to do what now?" Webinar"We've got to do what now?" Webinar
"We've got to do what now?" Webinar
 
Gap analysis & target setting
Gap analysis & target settingGap analysis & target setting
Gap analysis & target setting
 
Performance Improvement Plan Water Utilities
Performance Improvement Plan  Water Utilities Performance Improvement Plan  Water Utilities
Performance Improvement Plan Water Utilities
 

Viewers also liked

Pre-Cal 20S January 8, 2008
Pre-Cal 20S January 8, 2008Pre-Cal 20S January 8, 2008
Pre-Cal 20S January 8, 2008
Darren Kuropatwa
 
Zion NP Images I
Zion NP Images IZion NP Images I
Zion NP Images I
paulmaxim
 
800 MúSic..
800 MúSic..800 MúSic..
800 MúSic..Caro Lina
 
Datos de Admisión 2009 UC
Datos de Admisión 2009 UCDatos de Admisión 2009 UC
Datos de Admisión 2009 UCpuc
 
Modelo de Gestión de los Cursos del Catálogo Modular
Modelo de Gestión de los Cursos del Catálogo ModularModelo de Gestión de los Cursos del Catálogo Modular
Modelo de Gestión de los Cursos del Catálogo ModularHoBe - Innovación y Mejora
 
Pl Monetization v2
Pl Monetization v2Pl Monetization v2
Pl Monetization v2guest422fcc
 
Music Room 5
Music Room 5Music Room 5
Music Room 5
jim hopkins
 

Viewers also liked (8)

Pre-Cal 20S January 8, 2008
Pre-Cal 20S January 8, 2008Pre-Cal 20S January 8, 2008
Pre-Cal 20S January 8, 2008
 
Zion NP Images I
Zion NP Images IZion NP Images I
Zion NP Images I
 
800 MúSic..
800 MúSic..800 MúSic..
800 MúSic..
 
Datos de Admisión 2009 UC
Datos de Admisión 2009 UCDatos de Admisión 2009 UC
Datos de Admisión 2009 UC
 
exposicion
exposicionexposicion
exposicion
 
Modelo de Gestión de los Cursos del Catálogo Modular
Modelo de Gestión de los Cursos del Catálogo ModularModelo de Gestión de los Cursos del Catálogo Modular
Modelo de Gestión de los Cursos del Catálogo Modular
 
Pl Monetization v2
Pl Monetization v2Pl Monetization v2
Pl Monetization v2
 
Music Room 5
Music Room 5Music Room 5
Music Room 5
 

Similar to Remedial Process Optimization - Moffett RAB

Application of Monitoring to Inform Policy and Achieve Water Quality Goals
Application of Monitoring to Inform Policy and Achieve Water Quality GoalsApplication of Monitoring to Inform Policy and Achieve Water Quality Goals
Application of Monitoring to Inform Policy and Achieve Water Quality Goals
Soil and Water Conservation Society
 
Srivastav, Piyush, NAQS Environmental Experts, Crash Course in PSD Permitting...
Srivastav, Piyush, NAQS Environmental Experts, Crash Course in PSD Permitting...Srivastav, Piyush, NAQS Environmental Experts, Crash Course in PSD Permitting...
Srivastav, Piyush, NAQS Environmental Experts, Crash Course in PSD Permitting...
Kevin Perry
 
GUIDELINES FOR DEVELOPER
GUIDELINES FOR DEVELOPERGUIDELINES FOR DEVELOPER
GUIDELINES FOR DEVELOPER
nuramiradayang
 
Set up and implementing an effective wmp
Set up and implementing an effective wmpSet up and implementing an effective wmp
Set up and implementing an effective wmp
Wanjiru Gachugi-Waweru
 
FRESHWATER RESOURCE USE AS PART OF A RESPONSIBLY SOURCED GAS STRATEGY
FRESHWATER RESOURCE USE AS PART OF A RESPONSIBLY SOURCED GAS STRATEGYFRESHWATER RESOURCE USE AS PART OF A RESPONSIBLY SOURCED GAS STRATEGY
FRESHWATER RESOURCE USE AS PART OF A RESPONSIBLY SOURCED GAS STRATEGY
iQHub
 
ATEF CV Updated in June 2015
ATEF CV Updated in June 2015ATEF CV Updated in June 2015
ATEF CV Updated in June 2015Atef Farouk
 
Download-manuals-ground water-manual-standardsforg-wmonitoring
 Download-manuals-ground water-manual-standardsforg-wmonitoring Download-manuals-ground water-manual-standardsforg-wmonitoring
Download-manuals-ground water-manual-standardsforg-wmonitoringhydrologyproject001
 
Cleaner Production Management
Cleaner Production Management Cleaner Production Management
Cleaner Production Management
Ambika Thakur
 
Duriancik - Applying Monitoring Projects
Duriancik - Applying Monitoring ProjectsDuriancik - Applying Monitoring Projects
Duriancik - Applying Monitoring Projects
Soil and Water Conservation Society
 
15 Reasons Not to Use Percent Removals
15 Reasons Not to Use Percent Removals15 Reasons Not to Use Percent Removals
15 Reasons Not to Use Percent RemovalsMarcus Quigley
 
Cleaner production
Cleaner productionCleaner production
Cleaner production
HectorUrielOropezaAl
 
LIFE CYCLE ASSESSMENT POWERPOINT SLIDES. PPT
LIFE CYCLE ASSESSMENT POWERPOINT SLIDES. PPTLIFE CYCLE ASSESSMENT POWERPOINT SLIDES. PPT
LIFE CYCLE ASSESSMENT POWERPOINT SLIDES. PPT
ThinagaranNManiam1
 
Contemporary issues in environmental impact assessment
Contemporary issues in environmental impact assessmentContemporary issues in environmental impact assessment
Contemporary issues in environmental impact assessment
Nasiru Ibrahim Barda
 
Optimisation of dewatering systems
Optimisation of dewatering systemsOptimisation of dewatering systems
Optimisation of dewatering systems
Martin Preene
 
Pendergrass, Gary, GeoEngineers Inc., USEPA Coal Combustion Residuals Rule, I...
Pendergrass, Gary, GeoEngineers Inc., USEPA Coal Combustion Residuals Rule, I...Pendergrass, Gary, GeoEngineers Inc., USEPA Coal Combustion Residuals Rule, I...
Pendergrass, Gary, GeoEngineers Inc., USEPA Coal Combustion Residuals Rule, I...
Kevin Perry
 
#2/9 Review of post-consent monitoring (PCM) and regulators response
#2/9 Review of post-consent monitoring (PCM) and regulators response#2/9 Review of post-consent monitoring (PCM) and regulators response
#2/9 Review of post-consent monitoring (PCM) and regulators response
NaturalEngland
 
Thailand UNDP-GIZ workshop on CBA - Appraisal outcomes
Thailand UNDP-GIZ workshop on CBA - Appraisal outcomesThailand UNDP-GIZ workshop on CBA - Appraisal outcomes
Thailand UNDP-GIZ workshop on CBA - Appraisal outcomes
UNDP Climate
 
Hydromod Tools Eric Stein
Hydromod Tools Eric SteinHydromod Tools Eric Stein
Hydromod Tools Eric SteinGreg Gearheart
 
Update on-pda-tr22-revisions-for-aseptic-process-simulations
Update on-pda-tr22-revisions-for-aseptic-process-simulationsUpdate on-pda-tr22-revisions-for-aseptic-process-simulations
Update on-pda-tr22-revisions-for-aseptic-process-simulations
Hainer Martínez Cabrera
 
Air Quality and the DMRB
Air Quality and the DMRBAir Quality and the DMRB
Air Quality and the DMRBMark Chapman
 

Similar to Remedial Process Optimization - Moffett RAB (20)

Application of Monitoring to Inform Policy and Achieve Water Quality Goals
Application of Monitoring to Inform Policy and Achieve Water Quality GoalsApplication of Monitoring to Inform Policy and Achieve Water Quality Goals
Application of Monitoring to Inform Policy and Achieve Water Quality Goals
 
Srivastav, Piyush, NAQS Environmental Experts, Crash Course in PSD Permitting...
Srivastav, Piyush, NAQS Environmental Experts, Crash Course in PSD Permitting...Srivastav, Piyush, NAQS Environmental Experts, Crash Course in PSD Permitting...
Srivastav, Piyush, NAQS Environmental Experts, Crash Course in PSD Permitting...
 
GUIDELINES FOR DEVELOPER
GUIDELINES FOR DEVELOPERGUIDELINES FOR DEVELOPER
GUIDELINES FOR DEVELOPER
 
Set up and implementing an effective wmp
Set up and implementing an effective wmpSet up and implementing an effective wmp
Set up and implementing an effective wmp
 
FRESHWATER RESOURCE USE AS PART OF A RESPONSIBLY SOURCED GAS STRATEGY
FRESHWATER RESOURCE USE AS PART OF A RESPONSIBLY SOURCED GAS STRATEGYFRESHWATER RESOURCE USE AS PART OF A RESPONSIBLY SOURCED GAS STRATEGY
FRESHWATER RESOURCE USE AS PART OF A RESPONSIBLY SOURCED GAS STRATEGY
 
ATEF CV Updated in June 2015
ATEF CV Updated in June 2015ATEF CV Updated in June 2015
ATEF CV Updated in June 2015
 
Download-manuals-ground water-manual-standardsforg-wmonitoring
 Download-manuals-ground water-manual-standardsforg-wmonitoring Download-manuals-ground water-manual-standardsforg-wmonitoring
Download-manuals-ground water-manual-standardsforg-wmonitoring
 
Cleaner Production Management
Cleaner Production Management Cleaner Production Management
Cleaner Production Management
 
Duriancik - Applying Monitoring Projects
Duriancik - Applying Monitoring ProjectsDuriancik - Applying Monitoring Projects
Duriancik - Applying Monitoring Projects
 
15 Reasons Not to Use Percent Removals
15 Reasons Not to Use Percent Removals15 Reasons Not to Use Percent Removals
15 Reasons Not to Use Percent Removals
 
Cleaner production
Cleaner productionCleaner production
Cleaner production
 
LIFE CYCLE ASSESSMENT POWERPOINT SLIDES. PPT
LIFE CYCLE ASSESSMENT POWERPOINT SLIDES. PPTLIFE CYCLE ASSESSMENT POWERPOINT SLIDES. PPT
LIFE CYCLE ASSESSMENT POWERPOINT SLIDES. PPT
 
Contemporary issues in environmental impact assessment
Contemporary issues in environmental impact assessmentContemporary issues in environmental impact assessment
Contemporary issues in environmental impact assessment
 
Optimisation of dewatering systems
Optimisation of dewatering systemsOptimisation of dewatering systems
Optimisation of dewatering systems
 
Pendergrass, Gary, GeoEngineers Inc., USEPA Coal Combustion Residuals Rule, I...
Pendergrass, Gary, GeoEngineers Inc., USEPA Coal Combustion Residuals Rule, I...Pendergrass, Gary, GeoEngineers Inc., USEPA Coal Combustion Residuals Rule, I...
Pendergrass, Gary, GeoEngineers Inc., USEPA Coal Combustion Residuals Rule, I...
 
#2/9 Review of post-consent monitoring (PCM) and regulators response
#2/9 Review of post-consent monitoring (PCM) and regulators response#2/9 Review of post-consent monitoring (PCM) and regulators response
#2/9 Review of post-consent monitoring (PCM) and regulators response
 
Thailand UNDP-GIZ workshop on CBA - Appraisal outcomes
Thailand UNDP-GIZ workshop on CBA - Appraisal outcomesThailand UNDP-GIZ workshop on CBA - Appraisal outcomes
Thailand UNDP-GIZ workshop on CBA - Appraisal outcomes
 
Hydromod Tools Eric Stein
Hydromod Tools Eric SteinHydromod Tools Eric Stein
Hydromod Tools Eric Stein
 
Update on-pda-tr22-revisions-for-aseptic-process-simulations
Update on-pda-tr22-revisions-for-aseptic-process-simulationsUpdate on-pda-tr22-revisions-for-aseptic-process-simulations
Update on-pda-tr22-revisions-for-aseptic-process-simulations
 
Air Quality and the DMRB
Air Quality and the DMRBAir Quality and the DMRB
Air Quality and the DMRB
 

More from Steve Williams

RAB NASA Update
RAB NASA UpdateRAB NASA Update
RAB NASA Update
Steve Williams
 
RAB Vapor Intrusion Mitigation
RAB Vapor Intrusion MitigationRAB Vapor Intrusion Mitigation
RAB Vapor Intrusion Mitigation
Steve Williams
 
RAB Vapor Intrusion Update, Installation Restoration (IR) Site 28
RAB Vapor Intrusion Update, Installation Restoration (IR) Site 28RAB Vapor Intrusion Update, Installation Restoration (IR) Site 28
RAB Vapor Intrusion Update, Installation Restoration (IR) Site 28
Steve Williams
 
RAB Community Presentation
RAB Community PresentationRAB Community Presentation
RAB Community Presentation
Steve Williams
 
Endophyte Assisted Phytoremediation of TCE and Derivatives Using Hybrid Popla...
Endophyte Assisted Phytoremediation of TCE and Derivatives Using Hybrid Popla...Endophyte Assisted Phytoremediation of TCE and Derivatives Using Hybrid Popla...
Endophyte Assisted Phytoremediation of TCE and Derivatives Using Hybrid Popla...
Steve Williams
 
NASA Ames Update to Restoration Advisory Board
NASA Ames Update to Restoration Advisory BoardNASA Ames Update to Restoration Advisory Board
NASA Ames Update to Restoration Advisory Board
Steve Williams
 
Moffett RAB: EPA MEW Superfund Study Area Update
Moffett RAB: EPA MEW Superfund Study Area UpdateMoffett RAB: EPA MEW Superfund Study Area Update
Moffett RAB: EPA MEW Superfund Study Area Update
Steve Williams
 
Moffett RAB: EPA Update on Environmental Issues Management Plan
Moffett RAB: EPA Update on Environmental Issues Management PlanMoffett RAB: EPA Update on Environmental Issues Management Plan
Moffett RAB: EPA Update on Environmental Issues Management Plan
Steve Williams
 
EPA MEW Study Area TCE Source Investigation
EPA MEW Study Area TCE Source InvestigationEPA MEW Study Area TCE Source Investigation
EPA MEW Study Area TCE Source Investigation
Steve Williams
 
NASA Update on Planetary Ventures Lease of Moffett Field
NASA Update on Planetary Ventures Lease of Moffett FieldNASA Update on Planetary Ventures Lease of Moffett Field
NASA Update on Planetary Ventures Lease of Moffett Field
Steve Williams
 
Moffett Site 1, 22, 26, and 28 Five Year Review
Moffett Site 1, 22, 26, and 28 Five Year ReviewMoffett Site 1, 22, 26, and 28 Five Year Review
Moffett Site 1, 22, 26, and 28 Five Year Review
Steve Williams
 
Orion Park Housing Area VOC Plume Assessment
Orion Park Housing Area VOC Plume AssessmentOrion Park Housing Area VOC Plume Assessment
Orion Park Housing Area VOC Plume Assessment
Steve Williams
 
Epa vi and source investigation rab mtg update august 7 2014rv1
Epa vi  and source investigation rab mtg update    august 7 2014rv1Epa vi  and source investigation rab mtg update    august 7 2014rv1
Epa vi and source investigation rab mtg update august 7 2014rv1
Steve Williams
 
Moffett RAB: Navy EPA Intrusion Update
Moffett RAB: Navy EPA Intrusion UpdateMoffett RAB: Navy EPA Intrusion Update
Moffett RAB: Navy EPA Intrusion Update
Steve Williams
 
Moffett RAB: Navy Vapor Intrusion Update
Moffett RAB: Navy Vapor Intrusion UpdateMoffett RAB: Navy Vapor Intrusion Update
Moffett RAB: Navy Vapor Intrusion Update
Steve Williams
 
Moffett RAB: 2014 Planned Environmental Activities
Moffett RAB: 2014 Planned Environmental ActivitiesMoffett RAB: 2014 Planned Environmental Activities
Moffett RAB: 2014 Planned Environmental Activities
Steve Williams
 
EPA MEW Sampling Update, Moffett RAB, November 14, 2013
EPA MEW Sampling Update, Moffett RAB, November 14, 2013EPA MEW Sampling Update, Moffett RAB, November 14, 2013
EPA MEW Sampling Update, Moffett RAB, November 14, 2013
Steve Williams
 
Site 28 Update, Moffett RAB, November 14, 2013
Site 28 Update, Moffett RAB, November 14, 2013Site 28 Update, Moffett RAB, November 14, 2013
Site 28 Update, Moffett RAB, November 14, 2013
Steve Williams
 
US Army Corps of Engineers BUILDING STRONG® Air Sampling at the Former Orion ...
US Army Corps of Engineers BUILDING STRONG® Air Sampling at the Former Orion ...US Army Corps of Engineers BUILDING STRONG® Air Sampling at the Former Orion ...
US Army Corps of Engineers BUILDING STRONG® Air Sampling at the Former Orion ...
Steve Williams
 
Hazardous Substances at Moffett Field’s Hangar One: Challenges and Opportunities
Hazardous Substances at Moffett Field’s Hangar One: Challenges and OpportunitiesHazardous Substances at Moffett Field’s Hangar One: Challenges and Opportunities
Hazardous Substances at Moffett Field’s Hangar One: Challenges and Opportunities
Steve Williams
 

More from Steve Williams (20)

RAB NASA Update
RAB NASA UpdateRAB NASA Update
RAB NASA Update
 
RAB Vapor Intrusion Mitigation
RAB Vapor Intrusion MitigationRAB Vapor Intrusion Mitigation
RAB Vapor Intrusion Mitigation
 
RAB Vapor Intrusion Update, Installation Restoration (IR) Site 28
RAB Vapor Intrusion Update, Installation Restoration (IR) Site 28RAB Vapor Intrusion Update, Installation Restoration (IR) Site 28
RAB Vapor Intrusion Update, Installation Restoration (IR) Site 28
 
RAB Community Presentation
RAB Community PresentationRAB Community Presentation
RAB Community Presentation
 
Endophyte Assisted Phytoremediation of TCE and Derivatives Using Hybrid Popla...
Endophyte Assisted Phytoremediation of TCE and Derivatives Using Hybrid Popla...Endophyte Assisted Phytoremediation of TCE and Derivatives Using Hybrid Popla...
Endophyte Assisted Phytoremediation of TCE and Derivatives Using Hybrid Popla...
 
NASA Ames Update to Restoration Advisory Board
NASA Ames Update to Restoration Advisory BoardNASA Ames Update to Restoration Advisory Board
NASA Ames Update to Restoration Advisory Board
 
Moffett RAB: EPA MEW Superfund Study Area Update
Moffett RAB: EPA MEW Superfund Study Area UpdateMoffett RAB: EPA MEW Superfund Study Area Update
Moffett RAB: EPA MEW Superfund Study Area Update
 
Moffett RAB: EPA Update on Environmental Issues Management Plan
Moffett RAB: EPA Update on Environmental Issues Management PlanMoffett RAB: EPA Update on Environmental Issues Management Plan
Moffett RAB: EPA Update on Environmental Issues Management Plan
 
EPA MEW Study Area TCE Source Investigation
EPA MEW Study Area TCE Source InvestigationEPA MEW Study Area TCE Source Investigation
EPA MEW Study Area TCE Source Investigation
 
NASA Update on Planetary Ventures Lease of Moffett Field
NASA Update on Planetary Ventures Lease of Moffett FieldNASA Update on Planetary Ventures Lease of Moffett Field
NASA Update on Planetary Ventures Lease of Moffett Field
 
Moffett Site 1, 22, 26, and 28 Five Year Review
Moffett Site 1, 22, 26, and 28 Five Year ReviewMoffett Site 1, 22, 26, and 28 Five Year Review
Moffett Site 1, 22, 26, and 28 Five Year Review
 
Orion Park Housing Area VOC Plume Assessment
Orion Park Housing Area VOC Plume AssessmentOrion Park Housing Area VOC Plume Assessment
Orion Park Housing Area VOC Plume Assessment
 
Epa vi and source investigation rab mtg update august 7 2014rv1
Epa vi  and source investigation rab mtg update    august 7 2014rv1Epa vi  and source investigation rab mtg update    august 7 2014rv1
Epa vi and source investigation rab mtg update august 7 2014rv1
 
Moffett RAB: Navy EPA Intrusion Update
Moffett RAB: Navy EPA Intrusion UpdateMoffett RAB: Navy EPA Intrusion Update
Moffett RAB: Navy EPA Intrusion Update
 
Moffett RAB: Navy Vapor Intrusion Update
Moffett RAB: Navy Vapor Intrusion UpdateMoffett RAB: Navy Vapor Intrusion Update
Moffett RAB: Navy Vapor Intrusion Update
 
Moffett RAB: 2014 Planned Environmental Activities
Moffett RAB: 2014 Planned Environmental ActivitiesMoffett RAB: 2014 Planned Environmental Activities
Moffett RAB: 2014 Planned Environmental Activities
 
EPA MEW Sampling Update, Moffett RAB, November 14, 2013
EPA MEW Sampling Update, Moffett RAB, November 14, 2013EPA MEW Sampling Update, Moffett RAB, November 14, 2013
EPA MEW Sampling Update, Moffett RAB, November 14, 2013
 
Site 28 Update, Moffett RAB, November 14, 2013
Site 28 Update, Moffett RAB, November 14, 2013Site 28 Update, Moffett RAB, November 14, 2013
Site 28 Update, Moffett RAB, November 14, 2013
 
US Army Corps of Engineers BUILDING STRONG® Air Sampling at the Former Orion ...
US Army Corps of Engineers BUILDING STRONG® Air Sampling at the Former Orion ...US Army Corps of Engineers BUILDING STRONG® Air Sampling at the Former Orion ...
US Army Corps of Engineers BUILDING STRONG® Air Sampling at the Former Orion ...
 
Hazardous Substances at Moffett Field’s Hangar One: Challenges and Opportunities
Hazardous Substances at Moffett Field’s Hangar One: Challenges and OpportunitiesHazardous Substances at Moffett Field’s Hangar One: Challenges and Opportunities
Hazardous Substances at Moffett Field’s Hangar One: Challenges and Opportunities
 

Recently uploaded

The approach at University of Liverpool.pptx
The approach at University of Liverpool.pptxThe approach at University of Liverpool.pptx
The approach at University of Liverpool.pptx
Jisc
 
Honest Reviews of Tim Han LMA Course Program.pptx
Honest Reviews of Tim Han LMA Course Program.pptxHonest Reviews of Tim Han LMA Course Program.pptx
Honest Reviews of Tim Han LMA Course Program.pptx
timhan337
 
Unit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdfUnit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdf
Thiyagu K
 
Marketing internship report file for MBA
Marketing internship report file for MBAMarketing internship report file for MBA
Marketing internship report file for MBA
gb193092
 
Unit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdfUnit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdf
Thiyagu K
 
1.4 modern child centered education - mahatma gandhi-2.pptx
1.4 modern child centered education - mahatma gandhi-2.pptx1.4 modern child centered education - mahatma gandhi-2.pptx
1.4 modern child centered education - mahatma gandhi-2.pptx
JosvitaDsouza2
 
Synthetic Fiber Construction in lab .pptx
Synthetic Fiber Construction in lab .pptxSynthetic Fiber Construction in lab .pptx
Synthetic Fiber Construction in lab .pptx
Pavel ( NSTU)
 
TESDA TM1 REVIEWER FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
TESDA TM1 REVIEWER  FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...TESDA TM1 REVIEWER  FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
TESDA TM1 REVIEWER FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
EugeneSaldivar
 
June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...
June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...
June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...
Levi Shapiro
 
Home assignment II on Spectroscopy 2024 Answers.pdf
Home assignment II on Spectroscopy 2024 Answers.pdfHome assignment II on Spectroscopy 2024 Answers.pdf
Home assignment II on Spectroscopy 2024 Answers.pdf
Tamralipta Mahavidyalaya
 
A Survey of Techniques for Maximizing LLM Performance.pptx
A Survey of Techniques for Maximizing LLM Performance.pptxA Survey of Techniques for Maximizing LLM Performance.pptx
A Survey of Techniques for Maximizing LLM Performance.pptx
thanhdowork
 
How to Make a Field invisible in Odoo 17
How to Make a Field invisible in Odoo 17How to Make a Field invisible in Odoo 17
How to Make a Field invisible in Odoo 17
Celine George
 
Model Attribute Check Company Auto Property
Model Attribute  Check Company Auto PropertyModel Attribute  Check Company Auto Property
Model Attribute Check Company Auto Property
Celine George
 
STRAND 3 HYGIENIC PRACTICES.pptx GRADE 7 CBC
STRAND 3 HYGIENIC PRACTICES.pptx GRADE 7 CBCSTRAND 3 HYGIENIC PRACTICES.pptx GRADE 7 CBC
STRAND 3 HYGIENIC PRACTICES.pptx GRADE 7 CBC
kimdan468
 
special B.ed 2nd year old paper_20240531.pdf
special B.ed 2nd year old paper_20240531.pdfspecial B.ed 2nd year old paper_20240531.pdf
special B.ed 2nd year old paper_20240531.pdf
Special education needs
 
Lapbook sobre os Regimes Totalitários.pdf
Lapbook sobre os Regimes Totalitários.pdfLapbook sobre os Regimes Totalitários.pdf
Lapbook sobre os Regimes Totalitários.pdf
Jean Carlos Nunes Paixão
 
CACJapan - GROUP Presentation 1- Wk 4.pdf
CACJapan - GROUP Presentation 1- Wk 4.pdfCACJapan - GROUP Presentation 1- Wk 4.pdf
CACJapan - GROUP Presentation 1- Wk 4.pdf
camakaiclarkmusic
 
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
siemaillard
 
Francesca Gottschalk - How can education support child empowerment.pptx
Francesca Gottschalk - How can education support child empowerment.pptxFrancesca Gottschalk - How can education support child empowerment.pptx
Francesca Gottschalk - How can education support child empowerment.pptx
EduSkills OECD
 
"Protectable subject matters, Protection in biotechnology, Protection of othe...
"Protectable subject matters, Protection in biotechnology, Protection of othe..."Protectable subject matters, Protection in biotechnology, Protection of othe...
"Protectable subject matters, Protection in biotechnology, Protection of othe...
SACHIN R KONDAGURI
 

Recently uploaded (20)

The approach at University of Liverpool.pptx
The approach at University of Liverpool.pptxThe approach at University of Liverpool.pptx
The approach at University of Liverpool.pptx
 
Honest Reviews of Tim Han LMA Course Program.pptx
Honest Reviews of Tim Han LMA Course Program.pptxHonest Reviews of Tim Han LMA Course Program.pptx
Honest Reviews of Tim Han LMA Course Program.pptx
 
Unit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdfUnit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdf
 
Marketing internship report file for MBA
Marketing internship report file for MBAMarketing internship report file for MBA
Marketing internship report file for MBA
 
Unit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdfUnit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdf
 
1.4 modern child centered education - mahatma gandhi-2.pptx
1.4 modern child centered education - mahatma gandhi-2.pptx1.4 modern child centered education - mahatma gandhi-2.pptx
1.4 modern child centered education - mahatma gandhi-2.pptx
 
Synthetic Fiber Construction in lab .pptx
Synthetic Fiber Construction in lab .pptxSynthetic Fiber Construction in lab .pptx
Synthetic Fiber Construction in lab .pptx
 
TESDA TM1 REVIEWER FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
TESDA TM1 REVIEWER  FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...TESDA TM1 REVIEWER  FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
TESDA TM1 REVIEWER FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
 
June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...
June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...
June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...
 
Home assignment II on Spectroscopy 2024 Answers.pdf
Home assignment II on Spectroscopy 2024 Answers.pdfHome assignment II on Spectroscopy 2024 Answers.pdf
Home assignment II on Spectroscopy 2024 Answers.pdf
 
A Survey of Techniques for Maximizing LLM Performance.pptx
A Survey of Techniques for Maximizing LLM Performance.pptxA Survey of Techniques for Maximizing LLM Performance.pptx
A Survey of Techniques for Maximizing LLM Performance.pptx
 
How to Make a Field invisible in Odoo 17
How to Make a Field invisible in Odoo 17How to Make a Field invisible in Odoo 17
How to Make a Field invisible in Odoo 17
 
Model Attribute Check Company Auto Property
Model Attribute  Check Company Auto PropertyModel Attribute  Check Company Auto Property
Model Attribute Check Company Auto Property
 
STRAND 3 HYGIENIC PRACTICES.pptx GRADE 7 CBC
STRAND 3 HYGIENIC PRACTICES.pptx GRADE 7 CBCSTRAND 3 HYGIENIC PRACTICES.pptx GRADE 7 CBC
STRAND 3 HYGIENIC PRACTICES.pptx GRADE 7 CBC
 
special B.ed 2nd year old paper_20240531.pdf
special B.ed 2nd year old paper_20240531.pdfspecial B.ed 2nd year old paper_20240531.pdf
special B.ed 2nd year old paper_20240531.pdf
 
Lapbook sobre os Regimes Totalitários.pdf
Lapbook sobre os Regimes Totalitários.pdfLapbook sobre os Regimes Totalitários.pdf
Lapbook sobre os Regimes Totalitários.pdf
 
CACJapan - GROUP Presentation 1- Wk 4.pdf
CACJapan - GROUP Presentation 1- Wk 4.pdfCACJapan - GROUP Presentation 1- Wk 4.pdf
CACJapan - GROUP Presentation 1- Wk 4.pdf
 
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
 
Francesca Gottschalk - How can education support child empowerment.pptx
Francesca Gottschalk - How can education support child empowerment.pptxFrancesca Gottschalk - How can education support child empowerment.pptx
Francesca Gottschalk - How can education support child empowerment.pptx
 
"Protectable subject matters, Protection in biotechnology, Protection of othe...
"Protectable subject matters, Protection in biotechnology, Protection of othe..."Protectable subject matters, Protection in biotechnology, Protection of othe...
"Protectable subject matters, Protection in biotechnology, Protection of othe...
 

Remedial Process Optimization - Moffett RAB

  • 1. Peter Strauss PM Strauss & Associates petestrauss1@comcast.net Technical Advisor to community groups throughout the US Technical Advisor to Center for Public Environmental Oversight (CPEO) on the Moffett Field and MEW Technical Assistance Grants
  • 2. Remedial Process Optimization • In June, EPA ordered that each of the MEW companies, the Navy and NASA to develop remedial process optimization (RPO) studies for each of the source areas and the regional system. • As I understand it, after EPA provides comments on the RPOs, the FFS will continue and the results of the RPO studies will be melded into it.
  • 3. Need for RPO • The basic premise of RPO is a systematic evaluation and enhancement of remediation systems • Systems at MEW/Moffett were designed with knowledge and conditions at the time • New technology has developed • Old systems haven’t worked as well as anticipated • Extraction and monitoring wells were located in places that may not be ideal • Land use has changed.
  • 4. Need for RPO (Lenny’s Chart) Est. M a s actual s r e rpo m o rpo v MCL a l time
  • 5. Potential Benefits Examples from other sites • A well rehabilitation program was initiated to improve the well yields • A removal technique focusing on the source area may allow discontinuation of all site-related active remediation in less than six months (reducing remediation time by 9 years if pump and treat continued). • A Cost Effective Sampling process was developed that addressed the issue of sampling frequency. The above study examined where monitoring wells should be placed.
  • 6. Concerns • RPO means different things to different people. • The RPO is a double edged sword: while it may accelerate and enhance remediation, responsible parties may see it as an opportunity to focus on what they can do less of (e.g., less extraction, less monitoring, abandonment of some extraction wells, opportunity to change remedial action objectives).
  • 7. Remedial Process Optimization – Community Criteria The community believes that RPO should focus on: Accelerating cleanup Reducing plume migration Increasing the rate of mass removal Improving health and safety (e.g., reducing risk). Improving the long-term monitoring system Cost and efficiency should be evaluated, but should not be the primary decision criteria.
  • 8. Optimization of Remediation System • Alternatives that replace current systems must speed up remediation, remove or destroy contaminants that are not being addressed by the current system, and/or increase mass removal rates. • Delineate an exit strategy • Consider natural resource use • Evaluate the effectiveness of existing institutional controls as well as the need to establish new institutional controls • Evaluate hot spot removal. • Evaluate changes in systems to simplify them
  • 9. Well Location, Removal and Extraction Rates • If wells are being removed or extraction rates decreased, there should be a guarantee that capture zones will be maintained. • Evaluate the need for additional wells and/or increasing extraction rates. • Evaluate lateral dispersion/convection to identify preferential pathways. • Evaluate the need to refurbish or replace extraction and monitoring wells.
  • 10. Long-Term Monitoring • Evaluate effectiveness of long term monitoring, as little attention is paid to this in the RI/FS process. • Evaluate less costly/more accurate approaches to long-term monitoring • If there are changes to the remediation system, the monitoring system should be adjusted accordingly so that it will monitor changes in performance. • Long-term monitoring should also be integrated into a contingency plan (e.g., failure of slurry walls).
  • 11. Health and Safety • Ensure that the systems will be at a minimum as protective to environment, and health and safety, as systems already in place • The RPO process should not be used to change Remedial Action Objectives; although it may provide basis for doing so, RAOs should only be changed by ROD amendment, with appropriate public participation. • Assess changes in environmental conditions and land-use, and strategies should be developed that address these changes.
  • 12. Examples of Recommendations • Evaluate the frequency of monitoring and the efficiency of the program • Discharge to the Palo Alto Regional Water Quality Control Plant (RWQCP) without pretreatment • Reduce extraction rate/close some wells • In conjunction with the optimization activities, the existing RAOs should be evaluated • No modifications to the treatment system components are necessary to optimize its operations
  • 13. Technologies Considered • Pulsed Extraction • Treat subsurface prior to extraction and treatment of the groundwater, such as surfactant flushing • Treat VOCs in multiple matrices, e.g., dual-phase extraction • Permeable Reactive Barriers (including modifying existing slurry walls) • In-situ Bioremediation • In-situ Chemical Oxidation • Bioaugmentation • Phytoremediation • MNA (monitored natural attenuation)