NASA Condition Assessment and Rehabilitation Plan for Hangar OneSteve Williams
The project is a study that investigates current conditions and the expected condition after the
remediation project by the Navy of Hangar One, as well as cost estimates for potential rehabilitation
options.
NASA Condition Assessment and Rehabilitation Plan for Hangar OneSteve Williams
The project is a study that investigates current conditions and the expected condition after the
remediation project by the Navy of Hangar One, as well as cost estimates for potential rehabilitation
options.
Catherine Dunwoody presents on fuel cell electric vehicles and hydrogen in California at the Department of Energy's Annual Merit Review in Washington, DC.
TANAP - Trans Anatolian Natural Gas Pipeline ProjectITE Oil&Gas
Presentation at TUROGE 2014 (Turkish International Oil and Gas Conference) on the Trans Anatolian Natural Gas Pipeline Project. The speaker provides an update on the TANAP project.
By Saltuk Düzyol - General Manager, TANAP
Brooks Road Environmental Limited (formerly Edwards Landfill), Vertical Capacity Expansion Environmental Assessment has opened a Public Open House to present the contents for the draft EA report,describe the draft EA review process, meet the Project Team & ask questions and outline the next steps in the EA process.Visit website for more info: http://www.brenvironmental.com/history.
This is the presentation given by AGDC to the Alaska State Legislature Joint Resources Committee on October 16, 2017. Source: http://www.akleg.gov/basis/Meeting/Detail?Meeting=HRES%202017-10-16%2013:00:00#tab4_4
Catherine Dunwoody presents on fuel cell electric vehicles and hydrogen in California at the Department of Energy's Annual Merit Review in Washington, DC.
TANAP - Trans Anatolian Natural Gas Pipeline ProjectITE Oil&Gas
Presentation at TUROGE 2014 (Turkish International Oil and Gas Conference) on the Trans Anatolian Natural Gas Pipeline Project. The speaker provides an update on the TANAP project.
By Saltuk Düzyol - General Manager, TANAP
Brooks Road Environmental Limited (formerly Edwards Landfill), Vertical Capacity Expansion Environmental Assessment has opened a Public Open House to present the contents for the draft EA report,describe the draft EA review process, meet the Project Team & ask questions and outline the next steps in the EA process.Visit website for more info: http://www.brenvironmental.com/history.
This is the presentation given by AGDC to the Alaska State Legislature Joint Resources Committee on October 16, 2017. Source: http://www.akleg.gov/basis/Meeting/Detail?Meeting=HRES%202017-10-16%2013:00:00#tab4_4
The Chicago Department of Aviation owns and manages both O'Hare and Midway International Airports. Annually O'Hare and Midway account for over 1.13 million operations as well as 99 million passengers combined with an annual operating budget of over $1 billion dollars. Mr. Leach's responsibilities include overseeing all planning, design and construction activities at O'Hare and Midway including O'Hare 21 and the Modernization Program; maintenance and operation of the terminals, parking and automated transit system; annual FAA inspection and certification.
NASA Airports as Energy Nodes Sustainable Energy Hubs to Benefit AAM Users an...Dr. Pankaj Dhussa
NASA
National Aeronautics and Space Administration
NASA Airports as Energy Nodes
Sustainable Energy Hubs to Benefit AAM Users and Local Communities
By
Dr. Pankaj Dhussa
Moffett RAB: EPA MEW Superfund Study Area UpdateSteve Williams
EPA Status Update
Middlefield-Ellis-Whisman (MEW) Superfund Study Area
Mountain View and Moffett Field, CA
Presentation to Former NAS Moffett Field Restoration Advisory Board
August 13, 2015
Alana Lee, EPA
Moffett RAB: EPA Update on Environmental Issues Management PlanSteve Williams
Update on Environmental Issues Management Plan (EIMP)
Presentation to the Former NAS Moffett Field RAB Meeting
August 13, 2015
By Alana Lee, EPA
Elizabeth Wells, Water Board
EPA MEW Study Area TCE Source InvestigationSteve Williams
EPA TCE Source Investigation Findings
Middlefield-Ellis-Whisman (MEW)
Superfund Study Area
Mountain View and Moffett Field, CA
Former NAS Moffett Field
Restoration Advisory Board Meeting
February 12, 2015
Moffett Site 1, 22, 26, and 28 Five Year ReviewSteve Williams
Five Year Review for Installation Restoration Sites 1, 22, 26 and 28, Former Naval Air Station Moffett Field: Presentation to the Moffett Restoration Advisory Board Meeting, February 12, 2015, by Wilson Doctor, Navy Project Manager
Orion Park Housing Area VOC Plume AssessmentSteve Williams
Presentation by the Army Environmental Command to the Moffett Field Restoration Advisory Board, November 20, 2014: Orion Park Housing Area Volatile Organic Compound Plume Assessment. Speaker: Matt Dayoc
EPA MEW Sampling Update, Moffett RAB, November 14, 2013Steve Williams
EPA update to the Moffett Restoration Advisory Board November 14, 2013, describing the investigation of TCE hotspots near Evandale Avenue, Leong Drive, and the Gateway Property (former County Vector Control Yard) adjacent to the MEW Superfund site in Mountain View, CA.
The French Revolution, which began in 1789, was a period of radical social and political upheaval in France. It marked the decline of absolute monarchies, the rise of secular and democratic republics, and the eventual rise of Napoleon Bonaparte. This revolutionary period is crucial in understanding the transition from feudalism to modernity in Europe.
For more information, visit-www.vavaclasses.com
The Indian economy is classified into different sectors to simplify the analysis and understanding of economic activities. For Class 10, it's essential to grasp the sectors of the Indian economy, understand their characteristics, and recognize their importance. This guide will provide detailed notes on the Sectors of the Indian Economy Class 10, using specific long-tail keywords to enhance comprehension.
For more information, visit-www.vavaclasses.com
Ethnobotany and Ethnopharmacology:
Ethnobotany in herbal drug evaluation,
Impact of Ethnobotany in traditional medicine,
New development in herbals,
Bio-prospecting tools for drug discovery,
Role of Ethnopharmacology in drug evaluation,
Reverse Pharmacology.
Palestine last event orientationfvgnh .pptxRaedMohamed3
An EFL lesson about the current events in Palestine. It is intended to be for intermediate students who wish to increase their listening skills through a short lesson in power point.
Students, digital devices and success - Andreas Schleicher - 27 May 2024..pptxEduSkills OECD
Andreas Schleicher presents at the OECD webinar ‘Digital devices in schools: detrimental distraction or secret to success?’ on 27 May 2024. The presentation was based on findings from PISA 2022 results and the webinar helped launch the PISA in Focus ‘Managing screen time: How to protect and equip students against distraction’ https://www.oecd-ilibrary.org/education/managing-screen-time_7c225af4-en and the OECD Education Policy Perspective ‘Students, digital devices and success’ can be found here - https://oe.cd/il/5yV
Welcome to TechSoup New Member Orientation and Q&A (May 2024).pdfTechSoup
In this webinar you will learn how your organization can access TechSoup's wide variety of product discount and donation programs. From hardware to software, we'll give you a tour of the tools available to help your nonprofit with productivity, collaboration, financial management, donor tracking, security, and more.
Model Attribute Check Company Auto PropertyCeline George
In Odoo, the multi-company feature allows you to manage multiple companies within a single Odoo database instance. Each company can have its own configurations while still sharing common resources such as products, customers, and suppliers.
The Art Pastor's Guide to Sabbath | Steve ThomasonSteve Thomason
What is the purpose of the Sabbath Law in the Torah. It is interesting to compare how the context of the law shifts from Exodus to Deuteronomy. Who gets to rest, and why?
How to Make a Field invisible in Odoo 17Celine George
It is possible to hide or invisible some fields in odoo. Commonly using “invisible” attribute in the field definition to invisible the fields. This slide will show how to make a field invisible in odoo 17.
2. 1. Rehabilitate and maintain historic integrity of Hangar One and
Shenandoah Plaza Historic District;
2. Eliminate NASA’s operating and maintenance costs to operate MFA;
3. Leverage the expertise of the real estate industry to reposition MFA
as a valuable asset to support Government and controlled public and
private flight operations;
4. MFA outlease consistent with the 2002 NASA Ames Development
Plan and Final Programmatic EIS (FPEIS);
5. Provide net financial proceeds to the Government; and
6. Obtain best value for the Government through open public
competition.
VISION AND GOALS FOR MFA LEASE
2
4. LEASE PREMISES
The lease premises contains 1,000.1 acres, consisting of the following buildings and facilities:
Hangar One, Hangar Two, Hangar Three, Building 158, the Airfield and the Golf Course.
4
5. • Initial Term: Sixty (60) Years.
• Right to Terminate: Due to significant investment, PV has the
unilateral right to terminate as of each of the following dates:
September 30, 2029; September 30, 2044; and September 30,
2059. PV cannot terminate prior to Hangar 1 re-skinning.
• Extension Terms: PV has the unilateral right to extend the Initial
Term for up to three (3) additional consecutive twelve (12) year
periods.
• PV and NASA are currently in a lease transition period. The lease
will commence 10 business days after PV receives acceptable Bona
Fide Prospective Lessee Letters from the EPA and Water Board.
LEASE TERM
5
6. • Formulated as part of MFA lease
• Prioritizes the preservation of historic resources at MFA and protects
MFA’s historic integrity and/or character
• Six separate but interconnected projects:
– Hangar One: re-skin and rehabilitate for R&D use
– Hangars Two and Three: immediately rehabilitate for R&D uses
– Airfield: refurbish (concrete, NAVAIDS, lights) and operate to Part 139 Class
4 standard; install LED airfield lighting and possibly GPS WAAS approach
– B158 (Control Tower): evaluate structure for continued use for air traffic
control; potentially rehabilitate or replace with new construction
– Golf Course: refurbish course and clubhouse w/eco-friendly approach;
upgrades to course to enhance playing experience; relocate CANG
munitions storage areas to CANG Cantonment Area
– Education Facility: select best site and construct 90,000 sq. ft. education
and public use facility
CONCEPTUAL DEVELOPMENT PLAN
6
7. • PV to rehabilitate and adaptively reuse historic Hangars One, Two and
Three
• Hangar One
– Re-skinning: 2 years from approval of all permits and approvals by NASA & other
regulatory agencies
• Hangar Uses
– R&D, including testing and light assembly uses related to space, aviation,
rover/robotics and other emerging technologies
• MFA Lease revenue can be used for repair and rehabilitation of other
historic resources across the Agency
• Permits NASA to meet its mandates under NHPA to protect and
preserve historic assets across the Agency
1) REHABILITATE AND MAINTAIN HISTORIC INTEGRITY OF
HANGAR ONE AND SHENANDOAH PLAZA HISTORIC DISTRICT
7
8. • NASA currently spends $7.4 million annually on MFA
– Of this total, NASA will save $6.3 million annually (based on 2013 dollars)
– Over 60 years these savings will total $378 million
• NASA reserves 8,000 operations for itself, CANG, and Army
– No charges to NASA, CANG, or Army for take-off, landing and through the gate
operations
– CANG to continue to provide ATC services
– NASA Research Park partners’ use of MFA subject to PV’s MFA charges
• NASA to pay its pro rata share of Airfield Rescue and Fire Fighting
(ARFF) costs
– 8 percent of airfield rescue and fire fighting service costs
– NASA and PV to explore how to lower ARFF costs in future
2) REDUCE NASA’S O&M COSTS TO OPERATE MFA
Pre-decisional – Not for Public Release 8
9. 3) LEVERAGE THE EXPERTISE OF THE REAL ESTATE INDUSTRY
TO REPOSITION MFA AS A VALUABLE ASSET
9
• PV/Google real estate department professionally managed and
operates at a large scale
• PV has prepared a Conceptual Development Plan for MFA
– Identified Initial Projects and uses of MFA
– Enhances MFA assets and results in full utilization
– Returns Hangar One to productive use
• Government use of Airfield will benefit from PV’s proposed
improvements to Airfield
– Refurbished runways and taxiways to reach Pavement Condition Index of PCI
60+
– Refurbished air traffic control facility
10. • PV’s planned use of the Premises is anticipated to be in
conformance with 2002 NADP FPEIS
• Lease allocates 90,000 square feet of existing NADP entitlement for
new development
• PV to cover NASA’s full costs in serving as the lead agency for
NEPA compliance
4) MFA OUTLEASE CONSISTENT WITH THE 2002 NASA AMES
DEVELOPMENT PLAN AND FINAL PROGRAMMATIC EIS (FPEIS)
10
11. • Base Rent:
– $10.25M in Lease Years 1 through 3
– $15.5M in Lease Years 4 through 10
– $15.75M in Lease Year 11
– $20.5M in Lease Years 12 through 60
• Total Base Rent Payments: $1.16 billion (cumulative) over 60 years
• Security Deposit: $2 million
– Deposit forfeited if Hangar One is not re-skinned
• Institutional Shared Service (ISP) costs included in Base Rent
• Reimbursement of NASA Costs for:
– Demand services
– Utility O&M costs for portions of NASA-managed utility systems within Premises
– ARFF Services
5) PROVIDE NET FINANCIAL PROCEEDS TO THE GOVERNMENT
11
12. • Over $200M of investment on the leased Premises
– Rehabilitation of Hangar One
– Rehabilitation of Hangars 2 and 3
– Renovation of Golf Course and club house
– Runways and air traffic control facility refurbished
• 8,000 reserved flights for NASA, CANG and Army at no additional charge
• Saving of approximately $6.3M annual costs on MFA (includes savings
related to operating and maintaining airfield and ARFF services), $378M of
cost savings over 60 years
• Rent revenue of $1.16B over initial term ($10M years 1-3, $15.5M years 4-
10, $15.75M year 11 and $20.5M in years 12-60)
• Reimbursement to NASA for demand services, utility O&M and ARFF
services
• Future improvements to infrastructure and utility systems
FINANCIAL CONSIDERATIONS
12
13. • RFP advertised in FedBizOpps and local business Journal
• Tours conducted May 19th to July 19, 2013
• Two qualified proposals received
• Proposer presentations held January 2014
• PV offered best terms to Government – selected in February 2014
6) OBTAIN BEST VALUE FOR GOVERNMENT THROUGH OPEN
PUBLIC COMPETITION
13