Strategies for Improvement
Performance Improvement Plan
Water Supply
What is a Strategy ?
• a plan of action designed to achieve a long-
term or overall aim.
• A method or plan chosen to bring about a
desired future, such as achievement of a goal
or solution to a problem.
What is our strategy based on the gap analysis
to achieve our kPI of Water supply or improve
water supply operations and service delivery
Group Work
Strategies
1. Pressurised system is introduced –OHR
2. 24/7 is introduced – selection of area
3. Removal of all illegal connections and suction
pumps that people install on the water
mains.
4. Effective billing and collection system
5. Effective O&M System & Monitoring system
Strategies
1. Water Quality Monitoring system
2. Effective complain management system
3. Leakage detection program
4. Asset Replacement Plan of Poor or non
performing asset
5. Efficiency of tube wells is improved
Group work
• Select any 5 strategies'
• Add any strategy you wish to use
• Match strategies to your SWOT
• Check with mission and statement
• On the Map of zone or sub division select
area and mark the strategy to be implemented
Step
• Map or select Sub Division /Area
• Location of OHR and pressurised system
• Location of 24/7 zone
• Location of leakage detection program
• Selection of replacement area lines, TWs etc
• Area of water quality samples
• Illegal connections
• After completing the exercise – Check the work of
same sub division in the IDAMP
Prepare Performance improvement
Plan
• Discuss the Framework
• Start working on the Framework of PIP based
on selected area and strategies
Example- demonstration
• O&M system for WASAs
• AMIS System for WASAs
• Consumer Survey for WASAs
• GIS system for WASAs
Service Improvement by Replacement
& Extension of Water Supply Network
Steps:
1. Marking of lines to be replaced on GIS base map
2. Marking of New lines on GIS base map for improving %
of water supply coverage
3. Tube well Rehabilitation
4. Operationalization of OHRs
5. Making Project in phased manners
6. Costing of Projects based on pipe length
2
Business Planning B1131 Module 1 : Business Planning & GAP Analysis Session 1
Costing
Project Cost
Water Supply Pipe replacement or New Installation
Diameter Length Unit Cost (Per meter)
Pipe Cost
(A)
Construction Cost
(B)
Total Cost
(A+B)
3"
4"
6"
3
Business Planning B1131 Module 1 : Business Planning & GAP Analysis Session 1

Performance Improvement Plan Water Utilities

  • 1.
    1 Business Planning B1131Module 1 : Business Planning & GAP Analysis Session 2 Abid Hussiny & Aneeqa Azeem Strategies for Improvement Performance Improvement Plan Water Supply
  • 2.
    What is aStrategy ? • a plan of action designed to achieve a long- term or overall aim. • A method or plan chosen to bring about a desired future, such as achievement of a goal or solution to a problem. What is our strategy based on the gap analysis to achieve our kPI of Water supply or improve water supply operations and service delivery
  • 3.
  • 4.
    Strategies 1. Pressurised systemis introduced –OHR 2. 24/7 is introduced – selection of area 3. Removal of all illegal connections and suction pumps that people install on the water mains. 4. Effective billing and collection system 5. Effective O&M System & Monitoring system
  • 5.
    Strategies 1. Water QualityMonitoring system 2. Effective complain management system 3. Leakage detection program 4. Asset Replacement Plan of Poor or non performing asset 5. Efficiency of tube wells is improved
  • 6.
    Group work • Selectany 5 strategies' • Add any strategy you wish to use • Match strategies to your SWOT • Check with mission and statement • On the Map of zone or sub division select area and mark the strategy to be implemented
  • 7.
    Step • Map orselect Sub Division /Area • Location of OHR and pressurised system • Location of 24/7 zone • Location of leakage detection program • Selection of replacement area lines, TWs etc • Area of water quality samples • Illegal connections • After completing the exercise – Check the work of same sub division in the IDAMP
  • 8.
    Prepare Performance improvement Plan •Discuss the Framework • Start working on the Framework of PIP based on selected area and strategies
  • 9.
    Example- demonstration • O&Msystem for WASAs • AMIS System for WASAs • Consumer Survey for WASAs • GIS system for WASAs
  • 10.
    Service Improvement byReplacement & Extension of Water Supply Network Steps: 1. Marking of lines to be replaced on GIS base map 2. Marking of New lines on GIS base map for improving % of water supply coverage 3. Tube well Rehabilitation 4. Operationalization of OHRs 5. Making Project in phased manners 6. Costing of Projects based on pipe length 2 Business Planning B1131 Module 1 : Business Planning & GAP Analysis Session 1
  • 11.
    Costing Project Cost Water SupplyPipe replacement or New Installation Diameter Length Unit Cost (Per meter) Pipe Cost (A) Construction Cost (B) Total Cost (A+B) 3" 4" 6" 3 Business Planning B1131 Module 1 : Business Planning & GAP Analysis Session 1