SlideShare a Scribd company logo
RCC Floor
Hrishi Desai
0813
Introduction
A Reinforced Concrete Slab is the one of the most important component in a
building. It is a structural element of modern buildings. Slabs are supported on
Columns and Beams.
RCC Slabs whose thickness ranges from 10 to 50 centimetres are most often used
for the construction of floors and ceilings
Thin concrete slabs are also used for exterior paving purpose.
In many domestic and industrial buildings a thick concrete slab, supported on
foundations or directly on the sub soil, is used to construct the ground floor of a
building.
In high rises buildings and skyscrapers, thinner, pre-cast concrete slabs are slung
between the steel frames to form the floors and ceilings on each level.
While making structural drawings of the reinforced concrete slab, the slabs are
abbreviated to “r.c.slab” or simply “r.c.”.
!
Types of Design
For a suspended slab, there are a number of designs to improve the strength-
to-weight ratio. In all cases the top surface remains flat, and the underside is
modulated:
Corrugated Slab, usually where the concrete is poured into a corrugated
steel tray. This improves strength and prevents the slab bending under its own
weight. The corrugations run across the short dimension, from side to side.
Ribbed Slab, giving considerable extra strength on one direction.
Waffle Slab, giving added strength in both directions.
Waffle Slab Corrugated Slab
Single Ribbed Slab
Construction
A concrete slab can be cast in two ways: It could either be prefabricated or
cast in situ.
Prefabricated concrete slabs are cast in a factory and then transported to
the site ready to be lowered into place between steel or concrete beams.
They may be pre-stressed (in the factory), post-stressed (on site), or
unstressed. Care should be taken to see that the supporting structure is built to
the correct dimensions to avoid trouble with the fitting of slabs over the
supporting structure.
In situ (locally on site) concrete slabs are built on the building site using
formwork. Formwork is a box-like setup in which concrete is poured for the
construction of slabs.
For reinforced concrete slabs, reinforcing steel bars are placed
within the formwork and then the concrete is poured.
Plastic tipped metal, or plastic bar chairs are used to hold the
reinforcing steel bars away from the bottom and sides of the form-
work, so that when the concrete sets it completely envelops the
reinforcement.
Formwork differs with the kind of slab. For a ground slab, the
form-work may consist only of sidewalls pushed into the ground
whereas for a suspended slab, the form-work is shaped like a
tray, often supported by a temporary scaffold until the concrete
sets.
Materials used for the formwork
The formwork is commonly built from wooden planks and boards,
plastic, or steel. On commercial building sites today, plastic and
steel are more common as they save labour.
On low-budget sites, for instance when laying a concrete garden
path, wooden planks are very common. After the concrete has set
the wood may be removed, or left there permanently.
In some cases formwork is not necessary – for instance, a ground
slab surrounded by brick or block foundation walls, where the
walls act as the sides of the tray and hardcore acts as the base.
Span – Effective Depth ratios
Excessive deflections of slabs will cause damage to the ceiling, floor finishes
and other architectural details. To avoid this, limits are set on the span-
depth ratios.
These limits are exactly the same as those for beams. As a slab is usually a
slender member the restriction on the span-depth ratio becomes more
important and this can often control the depth of slab required in terms of
the span – effective depth ratio is given by,
Minimum effective depth = span/(basic ratio x modification factor)
The modification factor is based on the area of tension steel in the shorter
span when a slab is singly reinforced at midspan, the modification factors
for the areas of tensions and compression steel are as given in the figure 2
and 4 of the code.
Process
Shuttering
The process of constructing the
RCC slab commences by erecting
the centring and shuttering.
Wooden shuttering is usually
provided for the purpose although
steel shuttering is recommended
for getting a good under surface
of the slab. Once the shuttering
has been laid in a level, it has to
be cleaned properly.
Reinforcement - The reinforcement
bars are then laid as per design in both
directions and tied properly with
binding wire.
Mixing concrete - All raw materials,
cement, sand, coarse aggregates and
water should be measured as per
requirement of mix design
The raw materials are then mixed
uniformly, while ensuring that a proper
water-cement ratio is maintained which
is just enough to impart sufficient
workability needed to pour concrete.
Ideally, the mixing should be done in a
mechanical mixer. The concrete mixer
should be allowed to rotate for at least
2 minutes.
Pouring Concrete
The concrete is then laid
continuously to the required
thickness and compacted using
a needle vibrator to ensure that
the cement slurry adequately fills
the gaps between aggregates.
Vibrated effectively such that no
air gaps are left in the concrete
After the concrete has been
poured, it should be finished with
a steel float to ensure that the
top surface is finished smooth
and to make fine adjustments for
uniform slab thickness.
Curing
Curing is critical for a good quality
concrete slab and is is commonly
done by flooding the slab with
water after dividing the slab into
smaller portions with cement
mortar partitions. The curing of
slab should begin the next day of
casting and continue for at least
14 days for adequate concrete
strength. Inadequate curing will
result in poor quality concrete
and can undo the benefit of an
appropriate mix and good quality
mixing and compaction
De-shuttering
The last, but very important step.
The side shuttering of the slab can be removed after 48 hours.
The bottom shuttering should not be removed before 14 days.
The under surface of the concrete should be cleaned with steel
brushes such that no impurities are left on the surface.
Although the slab should be constructed under the supervision of a
professional, the owner should oversee that all the precautions are
being taken during construction
Advantages
Easy to construct, the raw materials are
easily available in almost all places.
Fire resistant
Provides permanent durable roofing,
capable of multi-storied construction
Very versatile and can be cast in any form.
Being a conventional option, the skill level
for casting RCC slabs is commonly available
Requires very low maintenance.
Limitations
A typical 120 mm slab weighs 300kg/m2.
 This has to be designed for a live load of at
least 150kg/m2. This makes the self weight
of the slab as 50% of the design load
resulting in 50% structural efficiency.
The concrete in the tension zone does not
take any stress and thus it is expensive to
provide the same in the tension zone.
The embodied energy of a conventional RCC
slab is high because of its two main energy
intensive constituents cement and steel.
Hrishi Desai

0813
Thank You!

More Related Content

What's hot

What's hot (20)

Roof covering
Roof coveringRoof covering
Roof covering
 
Arches
ArchesArches
Arches
 
Raft foundation ppt by kamal bhatia
Raft foundation ppt by kamal bhatiaRaft foundation ppt by kamal bhatia
Raft foundation ppt by kamal bhatia
 
Reinforced cement concrete
Reinforced cement concreteReinforced cement concrete
Reinforced cement concrete
 
Bamboo as construction material
Bamboo as construction materialBamboo as construction material
Bamboo as construction material
 
Tiles
TilesTiles
Tiles
 
Concrete
ConcreteConcrete
Concrete
 
Brick bond
Brick bondBrick bond
Brick bond
 
types of Flooring in construction
types of Flooring in constructiontypes of Flooring in construction
types of Flooring in construction
 
Types of floor finishes
Types of floor finishesTypes of floor finishes
Types of floor finishes
 
Brickwork bond ppt
Brickwork bond pptBrickwork bond ppt
Brickwork bond ppt
 
Timber staircase
Timber staircaseTimber staircase
Timber staircase
 
r.c.c.
r.c.c.r.c.c.
r.c.c.
 
STAIRS 1
 STAIRS 1 STAIRS 1
STAIRS 1
 
Plastering ppt
Plastering pptPlastering ppt
Plastering ppt
 
Report on roof and roof covering
Report on roof and roof coveringReport on roof and roof covering
Report on roof and roof covering
 
Timber ppt-1
Timber ppt-1Timber ppt-1
Timber ppt-1
 
Reinforced brickwork
Reinforced brickworkReinforced brickwork
Reinforced brickwork
 
Timber floor
Timber floorTimber floor
Timber floor
 
Grid/ Waffle Slabs
Grid/ Waffle SlabsGrid/ Waffle Slabs
Grid/ Waffle Slabs
 

Viewers also liked (7)

Civil Engineering (Beams,Columns)
Civil Engineering (Beams,Columns)Civil Engineering (Beams,Columns)
Civil Engineering (Beams,Columns)
 
Damp proofing course archna
Damp proofing course archnaDamp proofing course archna
Damp proofing course archna
 
Damp Proof Course
Damp Proof Course Damp Proof Course
Damp Proof Course
 
Bar bending schedule(by akhil)
Bar bending schedule(by akhil)Bar bending schedule(by akhil)
Bar bending schedule(by akhil)
 
Presentation on Slab, Beam & Column
Presentation on Slab, Beam & ColumnPresentation on Slab, Beam & Column
Presentation on Slab, Beam & Column
 
Construction process''column,beam,slab''
Construction process''column,beam,slab''Construction process''column,beam,slab''
Construction process''column,beam,slab''
 
PreCast Construction
PreCast ConstructionPreCast Construction
PreCast Construction
 

Similar to RCC Floor

1 CE133P Introduction to Reinforced Concrete Design (Robles) 2.pdf
1 CE133P Introduction to Reinforced Concrete Design  (Robles) 2.pdf1 CE133P Introduction to Reinforced Concrete Design  (Robles) 2.pdf
1 CE133P Introduction to Reinforced Concrete Design (Robles) 2.pdf
joerennelapore
 
CT 3 +5 prestressing b+
CT 3 +5 prestressing b+CT 3 +5 prestressing b+
CT 3 +5 prestressing b+
Est
 

Similar to RCC Floor (20)

Formwork
FormworkFormwork
Formwork
 
04. superstructure
04. superstructure04. superstructure
04. superstructure
 
Temporary Works (Form Work)
Temporary Works (Form Work)Temporary Works (Form Work)
Temporary Works (Form Work)
 
Ppt supersstructure
Ppt supersstructurePpt supersstructure
Ppt supersstructure
 
Reinforced Cement Concrete (RCC)
Reinforced Cement Concrete (RCC) Reinforced Cement Concrete (RCC)
Reinforced Cement Concrete (RCC)
 
Concrete presentation(interior design student work)
Concrete presentation(interior design student work)Concrete presentation(interior design student work)
Concrete presentation(interior design student work)
 
REINFORCED CEMENT CONCRETE
REINFORCED CEMENT CONCRETEREINFORCED CEMENT CONCRETE
REINFORCED CEMENT CONCRETE
 
Sample copy of IT PPT.pptx
Sample copy of IT PPT.pptxSample copy of IT PPT.pptx
Sample copy of IT PPT.pptx
 
Site Report
Site Report Site Report
Site Report
 
Formwork-Types and Their Advantages
Formwork-Types and Their AdvantagesFormwork-Types and Their Advantages
Formwork-Types and Their Advantages
 
1 CE133P Introduction to Reinforced Concrete Design (Robles) 2.pdf
1 CE133P Introduction to Reinforced Concrete Design  (Robles) 2.pdf1 CE133P Introduction to Reinforced Concrete Design  (Robles) 2.pdf
1 CE133P Introduction to Reinforced Concrete Design (Robles) 2.pdf
 
Form Work
Form Work Form Work
Form Work
 
Reinforced Concrete
Reinforced ConcreteReinforced Concrete
Reinforced Concrete
 
RCC Elements column, beam.
RCC Elements  column, beam.RCC Elements  column, beam.
RCC Elements column, beam.
 
CONCRETE TECHNOLOGY
CONCRETE TECHNOLOGYCONCRETE TECHNOLOGY
CONCRETE TECHNOLOGY
 
Speedy construction- FORMS AND MATERIALS
Speedy construction- FORMS AND MATERIALSSpeedy construction- FORMS AND MATERIALS
Speedy construction- FORMS AND MATERIALS
 
specification of Rcc
specification of Rccspecification of Rcc
specification of Rcc
 
Ishfaq Rashid.pptx
Ishfaq Rashid.pptxIshfaq Rashid.pptx
Ishfaq Rashid.pptx
 
CT 3 +5 prestressing b+
CT 3 +5 prestressing b+CT 3 +5 prestressing b+
CT 3 +5 prestressing b+
 
Experimental Investigation on Steel Concrete Composite Floor Slab
Experimental Investigation on Steel Concrete Composite Floor SlabExperimental Investigation on Steel Concrete Composite Floor Slab
Experimental Investigation on Steel Concrete Composite Floor Slab
 

More from Hrishi Desai (8)

Urban Street Edge
Urban Street EdgeUrban Street Edge
Urban Street Edge
 
Wada Architecture
Wada ArchitectureWada Architecture
Wada Architecture
 
Steel Roof Truss
Steel Roof TrussSteel Roof Truss
Steel Roof Truss
 
Coin Age - India
Coin Age - IndiaCoin Age - India
Coin Age - India
 
Aam Khas Bagh Sarai, Punjab
Aam Khas Bagh Sarai, PunjabAam Khas Bagh Sarai, Punjab
Aam Khas Bagh Sarai, Punjab
 
7 Cities of Delhi
7 Cities of Delhi7 Cities of Delhi
7 Cities of Delhi
 
Moti Masjid (Pearl Mosque), Agra Fort
Moti Masjid (Pearl Mosque), Agra FortMoti Masjid (Pearl Mosque), Agra Fort
Moti Masjid (Pearl Mosque), Agra Fort
 
Lifts and Escalators (Schindler)
Lifts and Escalators (Schindler)Lifts and Escalators (Schindler)
Lifts and Escalators (Schindler)
 

Recently uploaded

National-Learning-Camp 2024 deped....pptx
National-Learning-Camp 2024 deped....pptxNational-Learning-Camp 2024 deped....pptx
National-Learning-Camp 2024 deped....pptx
AlecAnidul
 
Heuristic Evaluation of System & Application
Heuristic Evaluation of System & ApplicationHeuristic Evaluation of System & Application
Heuristic Evaluation of System & Application
Jaime Brown
 
Research about Venice ppt for grade 6f anas
Research about Venice ppt for grade 6f anasResearch about Venice ppt for grade 6f anas
Research about Venice ppt for grade 6f anas
anasabutalha2013
 

Recently uploaded (16)

BIT- Pinal .H. Prajapati Graphic Designer
BIT- Pinal .H. Prajapati  Graphic DesignerBIT- Pinal .H. Prajapati  Graphic Designer
BIT- Pinal .H. Prajapati Graphic Designer
 
Extended Reality(XR) Development in immersive design
Extended Reality(XR) Development in immersive designExtended Reality(XR) Development in immersive design
Extended Reality(XR) Development in immersive design
 
Claire's designing portfolio presentation
Claire's designing portfolio presentationClaire's designing portfolio presentation
Claire's designing portfolio presentation
 
National-Learning-Camp 2024 deped....pptx
National-Learning-Camp 2024 deped....pptxNational-Learning-Camp 2024 deped....pptx
National-Learning-Camp 2024 deped....pptx
 
Spring 2024 wkrm_Enhancing Campus Mobility.pdf
Spring 2024 wkrm_Enhancing Campus Mobility.pdfSpring 2024 wkrm_Enhancing Campus Mobility.pdf
Spring 2024 wkrm_Enhancing Campus Mobility.pdf
 
The Evolution of Fashion Trends: History to Fashion
The Evolution of Fashion Trends: History to FashionThe Evolution of Fashion Trends: History to Fashion
The Evolution of Fashion Trends: History to Fashion
 
The Design Code Google Developer Student Club.pptx
The Design Code Google Developer Student Club.pptxThe Design Code Google Developer Student Club.pptx
The Design Code Google Developer Student Club.pptx
 
Pitch Presentation for Service Design in Technology
Pitch Presentation for Service Design in TechnologyPitch Presentation for Service Design in Technology
Pitch Presentation for Service Design in Technology
 
Heuristic Evaluation of System & Application
Heuristic Evaluation of System & ApplicationHeuristic Evaluation of System & Application
Heuristic Evaluation of System & Application
 
FW25-26 Fashion Key Items Trend Book Peclers Paris
FW25-26 Fashion Key Items Trend Book Peclers ParisFW25-26 Fashion Key Items Trend Book Peclers Paris
FW25-26 Fashion Key Items Trend Book Peclers Paris
 
CA OFFICE office office office _VIEWS.pdf
CA OFFICE office office office _VIEWS.pdfCA OFFICE office office office _VIEWS.pdf
CA OFFICE office office office _VIEWS.pdf
 
Dos And Dont's Of Logo Design For 2024..
Dos And Dont's Of Logo Design For 2024..Dos And Dont's Of Logo Design For 2024..
Dos And Dont's Of Logo Design For 2024..
 
Art Nouveau Movement Presentation for Art History.
Art Nouveau Movement Presentation for Art History.Art Nouveau Movement Presentation for Art History.
Art Nouveau Movement Presentation for Art History.
 
Common Designing Mistakes and How to avoid them
Common Designing Mistakes and How to avoid themCommon Designing Mistakes and How to avoid them
Common Designing Mistakes and How to avoid them
 
Design lessons from Singapore | Volume 3
Design lessons from Singapore | Volume 3Design lessons from Singapore | Volume 3
Design lessons from Singapore | Volume 3
 
Research about Venice ppt for grade 6f anas
Research about Venice ppt for grade 6f anasResearch about Venice ppt for grade 6f anas
Research about Venice ppt for grade 6f anas
 

RCC Floor

  • 2. Introduction A Reinforced Concrete Slab is the one of the most important component in a building. It is a structural element of modern buildings. Slabs are supported on Columns and Beams. RCC Slabs whose thickness ranges from 10 to 50 centimetres are most often used for the construction of floors and ceilings Thin concrete slabs are also used for exterior paving purpose. In many domestic and industrial buildings a thick concrete slab, supported on foundations or directly on the sub soil, is used to construct the ground floor of a building. In high rises buildings and skyscrapers, thinner, pre-cast concrete slabs are slung between the steel frames to form the floors and ceilings on each level. While making structural drawings of the reinforced concrete slab, the slabs are abbreviated to “r.c.slab” or simply “r.c.”. !
  • 3. Types of Design For a suspended slab, there are a number of designs to improve the strength- to-weight ratio. In all cases the top surface remains flat, and the underside is modulated: Corrugated Slab, usually where the concrete is poured into a corrugated steel tray. This improves strength and prevents the slab bending under its own weight. The corrugations run across the short dimension, from side to side. Ribbed Slab, giving considerable extra strength on one direction. Waffle Slab, giving added strength in both directions.
  • 4. Waffle Slab Corrugated Slab Single Ribbed Slab
  • 5. Construction A concrete slab can be cast in two ways: It could either be prefabricated or cast in situ. Prefabricated concrete slabs are cast in a factory and then transported to the site ready to be lowered into place between steel or concrete beams. They may be pre-stressed (in the factory), post-stressed (on site), or unstressed. Care should be taken to see that the supporting structure is built to the correct dimensions to avoid trouble with the fitting of slabs over the supporting structure. In situ (locally on site) concrete slabs are built on the building site using formwork. Formwork is a box-like setup in which concrete is poured for the construction of slabs.
  • 6. For reinforced concrete slabs, reinforcing steel bars are placed within the formwork and then the concrete is poured. Plastic tipped metal, or plastic bar chairs are used to hold the reinforcing steel bars away from the bottom and sides of the form- work, so that when the concrete sets it completely envelops the reinforcement. Formwork differs with the kind of slab. For a ground slab, the form-work may consist only of sidewalls pushed into the ground whereas for a suspended slab, the form-work is shaped like a tray, often supported by a temporary scaffold until the concrete sets.
  • 7. Materials used for the formwork The formwork is commonly built from wooden planks and boards, plastic, or steel. On commercial building sites today, plastic and steel are more common as they save labour. On low-budget sites, for instance when laying a concrete garden path, wooden planks are very common. After the concrete has set the wood may be removed, or left there permanently. In some cases formwork is not necessary – for instance, a ground slab surrounded by brick or block foundation walls, where the walls act as the sides of the tray and hardcore acts as the base.
  • 8. Span – Effective Depth ratios Excessive deflections of slabs will cause damage to the ceiling, floor finishes and other architectural details. To avoid this, limits are set on the span- depth ratios. These limits are exactly the same as those for beams. As a slab is usually a slender member the restriction on the span-depth ratio becomes more important and this can often control the depth of slab required in terms of the span – effective depth ratio is given by, Minimum effective depth = span/(basic ratio x modification factor) The modification factor is based on the area of tension steel in the shorter span when a slab is singly reinforced at midspan, the modification factors for the areas of tensions and compression steel are as given in the figure 2 and 4 of the code.
  • 9. Process Shuttering The process of constructing the RCC slab commences by erecting the centring and shuttering. Wooden shuttering is usually provided for the purpose although steel shuttering is recommended for getting a good under surface of the slab. Once the shuttering has been laid in a level, it has to be cleaned properly.
  • 10. Reinforcement - The reinforcement bars are then laid as per design in both directions and tied properly with binding wire. Mixing concrete - All raw materials, cement, sand, coarse aggregates and water should be measured as per requirement of mix design The raw materials are then mixed uniformly, while ensuring that a proper water-cement ratio is maintained which is just enough to impart sufficient workability needed to pour concrete. Ideally, the mixing should be done in a mechanical mixer. The concrete mixer should be allowed to rotate for at least 2 minutes.
  • 11. Pouring Concrete The concrete is then laid continuously to the required thickness and compacted using a needle vibrator to ensure that the cement slurry adequately fills the gaps between aggregates. Vibrated effectively such that no air gaps are left in the concrete After the concrete has been poured, it should be finished with a steel float to ensure that the top surface is finished smooth and to make fine adjustments for uniform slab thickness.
  • 12. Curing Curing is critical for a good quality concrete slab and is is commonly done by flooding the slab with water after dividing the slab into smaller portions with cement mortar partitions. The curing of slab should begin the next day of casting and continue for at least 14 days for adequate concrete strength. Inadequate curing will result in poor quality concrete and can undo the benefit of an appropriate mix and good quality mixing and compaction
  • 13. De-shuttering The last, but very important step. The side shuttering of the slab can be removed after 48 hours. The bottom shuttering should not be removed before 14 days. The under surface of the concrete should be cleaned with steel brushes such that no impurities are left on the surface. Although the slab should be constructed under the supervision of a professional, the owner should oversee that all the precautions are being taken during construction
  • 14.
  • 15. Advantages Easy to construct, the raw materials are easily available in almost all places. Fire resistant Provides permanent durable roofing, capable of multi-storied construction Very versatile and can be cast in any form. Being a conventional option, the skill level for casting RCC slabs is commonly available Requires very low maintenance. Limitations A typical 120 mm slab weighs 300kg/m2.  This has to be designed for a live load of at least 150kg/m2. This makes the self weight of the slab as 50% of the design load resulting in 50% structural efficiency. The concrete in the tension zone does not take any stress and thus it is expensive to provide the same in the tension zone. The embodied energy of a conventional RCC slab is high because of its two main energy intensive constituents cement and steel.