INTRODUCTION
 A Grillage foundation is a special type of isolated
footing, generally provided for heavily loaded steel
stanchions.
 It is a type of shallow foundation.
 It is used in the location where safe bearing capacity of
soil is very poor .
 Its name define its function and structure as it is made
up of steel beams, structurally known as rolled steel
joist.
 It may also be provided for masonry walls.
METHOD OF CONSTRUCTION
 The depth of foundation is limited from 1m to 1.5m
, as its a type of shallow foundation. However it
should not be less then 90 cm.
 Steel beams are provide in
two or more tiers, the top tier
of grillage beam is laid at right
angles to the bottom tier.
 The beam of each tier are
held in position by 20 mm
diameter spacer bars with
25 mm diameter pipe separators.
METHOD OF CONSTRUCTION
 The grillage beam are then embedded in concrete , a
minimum gap of 8cm is kept between beams so the
concrete can be easily poured and properly compacted.
 After levelling the base and pouring the concrete its
should be checked that compaction is done properly
and formed an impervious layer of thickness not less
than 15 cm. This protect steel joist from groundwater,
which can cause corrosion.
 Then the first layer of beams are laid over concrete bed
at a distance of 100mm to 300mm, with the help of
pipe separators.
 The upper surface of all the steel beams should lies in
one horizontal plane.
METHOD OF CONSTRUCTION
 Rich cement grout is poured all around the lower
flanges of the beam so that they are secured to the
concrete bed.
 Concrete is poured between and around the beams of
first of first tier.
 The second tier of beam is then placed at the right
angle to the first tiers and over the top flanges of the
beams of the first tier.
 They are properly spaced with the help of pipe
separators
METHOD OF CONSTRUCTION
 Concrete is then poured between and around the
steel beams.
 The steel stanchions is then connected to the upper
tier with the help of a base plate, side angles, and a
gusset plate.
 These connecting elements are also embedded in the
concrete so that joint become rigid.
PRECAUTION TO BE TAKEN
 The depth of footing should not be less than 90cm.
 The distance between the flanges should not exceed
30cm so that filled concrete acts monolithically with
the beams.
 The concrete filling should not carry any load ; its
simply keeps the beams in the position.
 A minimum gap of 10cm is kept on the outer side of
the external beam, as well as the upper flanges of top
tier.
 The depth of concrete below lower tier should be
atlest 15cm.
PLAN OF STEEL GRILLAGE
ELEVATION AND SECTION
VIEW OF ELEMENTS OF FOOTING
BIBLIOGRAPHY
 Book Building Construction by Dr. B.C. Punmia,
Ashok Kumar Jain and Arun Kumar Jain.
 Google ; Wikipedia
 Class work sheets.
THANK YOU

More Related Content

What's hot (20)

Timber structure
Timber structureTimber structure
Timber structure
 
Arch System
Arch SystemArch System
Arch System
 
Prestressed concrete
Prestressed concretePrestressed concrete
Prestressed concrete
 
Cavity walls
Cavity wallsCavity walls
Cavity walls
 
Cable strucutres(presentation)
Cable strucutres(presentation)Cable strucutres(presentation)
Cable strucutres(presentation)
 
Foundations
FoundationsFoundations
Foundations
 
Basement construction report
Basement construction reportBasement construction report
Basement construction report
 
Structural systems notes
Structural systems notesStructural systems notes
Structural systems notes
 
Stone as a building material.
Stone as a building material.Stone as a building material.
Stone as a building material.
 
Stairs
StairsStairs
Stairs
 
High-rise structural systems
High-rise structural systemsHigh-rise structural systems
High-rise structural systems
 
Pre-stressed Concrete
Pre-stressed ConcretePre-stressed Concrete
Pre-stressed Concrete
 
Different rolled steel bars and sections
Different rolled steel bars and sectionsDifferent rolled steel bars and sections
Different rolled steel bars and sections
 
PreCast Construction
PreCast ConstructionPreCast Construction
PreCast Construction
 
ARCHS , VAULTS AND DOMES
ARCHS , VAULTS AND DOMES ARCHS , VAULTS AND DOMES
ARCHS , VAULTS AND DOMES
 
Case study on steel structure Shrikant
Case study on steel structure  ShrikantCase study on steel structure  Shrikant
Case study on steel structure Shrikant
 
Tall buildings case studies
Tall buildings   case studiesTall buildings   case studies
Tall buildings case studies
 
Concrete as a building material
Concrete as a building materialConcrete as a building material
Concrete as a building material
 
High rise building construction
High rise building constructionHigh rise building construction
High rise building construction
 
TYPES OF Foundation
TYPES OF FoundationTYPES OF Foundation
TYPES OF Foundation
 

Similar to Steel grillage fondation

Steel grillage foundation
Steel grillage foundationSteel grillage foundation
Steel grillage foundationRavi Saini
 
Building construction 4- steel connection, Trusses, Joints, Foundations
Building construction 4- steel connection, Trusses, Joints, FoundationsBuilding construction 4- steel connection, Trusses, Joints, Foundations
Building construction 4- steel connection, Trusses, Joints, Foundationsaayush koolwal
 
Masonry-Special-Features (1).pdf
Masonry-Special-Features (1).pdfMasonry-Special-Features (1).pdf
Masonry-Special-Features (1).pdfAnmolSharma668762
 
Masonry-Special-Features.pdf
Masonry-Special-Features.pdfMasonry-Special-Features.pdf
Masonry-Special-Features.pdfwoanumberdar
 
Assignment 2 (techniqes construction of mass building)
Assignment  2 (techniqes construction of mass building)Assignment  2 (techniqes construction of mass building)
Assignment 2 (techniqes construction of mass building)rajitk97
 
Masonry special features
Masonry special featuresMasonry special features
Masonry special featuresJitesh Dhule
 
Details of lintels
Details of  lintelsDetails of  lintels
Details of lintelssameer313
 
Tutor isolated and attached piers .ppt1
Tutor isolated and attached piers .ppt1Tutor isolated and attached piers .ppt1
Tutor isolated and attached piers .ppt1Luke D'Arcy
 
Partition wall
Partition wallPartition wall
Partition wallKris Kiran
 
Reinforcement ppt assignment
Reinforcement ppt assignmentReinforcement ppt assignment
Reinforcement ppt assignmenthailnur1794
 

Similar to Steel grillage fondation (20)

Steel grillage foundation
Steel grillage foundationSteel grillage foundation
Steel grillage foundation
 
Building construction 4- steel connection, Trusses, Joints, Foundations
Building construction 4- steel connection, Trusses, Joints, FoundationsBuilding construction 4- steel connection, Trusses, Joints, Foundations
Building construction 4- steel connection, Trusses, Joints, Foundations
 
Masonry-Special-Features (1).pdf
Masonry-Special-Features (1).pdfMasonry-Special-Features (1).pdf
Masonry-Special-Features (1).pdf
 
Masonry-Special-Features.pdf
Masonry-Special-Features.pdfMasonry-Special-Features.pdf
Masonry-Special-Features.pdf
 
Assignment 2 (techniqes construction of mass building)
Assignment  2 (techniqes construction of mass building)Assignment  2 (techniqes construction of mass building)
Assignment 2 (techniqes construction of mass building)
 
2.foundation
2.foundation2.foundation
2.foundation
 
Chap16 cbm&cw
Chap16 cbm&cwChap16 cbm&cw
Chap16 cbm&cw
 
Masonry special features
Masonry special featuresMasonry special features
Masonry special features
 
Details of lintels
Details of  lintelsDetails of  lintels
Details of lintels
 
bct%20final.pptx
bct%20final.pptxbct%20final.pptx
bct%20final.pptx
 
Tutor isolated and attached piers .ppt1
Tutor isolated and attached piers .ppt1Tutor isolated and attached piers .ppt1
Tutor isolated and attached piers .ppt1
 
Masonary structures
Masonary structuresMasonary structures
Masonary structures
 
Partition wall
Partition wallPartition wall
Partition wall
 
Reinforcement ppt assignment
Reinforcement ppt assignmentReinforcement ppt assignment
Reinforcement ppt assignment
 
Mat foundation
Mat foundationMat foundation
Mat foundation
 
Partition wall
Partition wallPartition wall
Partition wall
 
IPT Training
IPT TrainingIPT Training
IPT Training
 
Foundation.pdf
Foundation.pdfFoundation.pdf
Foundation.pdf
 
Foundation
FoundationFoundation
Foundation
 
Microtunel Construction / Secant Pile
Microtunel Construction / Secant PileMicrotunel Construction / Secant Pile
Microtunel Construction / Secant Pile
 

Recently uploaded

MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxthe ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxhumanexperienceaaa
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝soniya singh
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 

Recently uploaded (20)

MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxthe ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 

Steel grillage fondation

  • 1. STEEL GRILLAGE FONDATION Presented By : Name : Komal Prasad Roll No : 1405003 Semester : 4th Dept. of Architecture N.I.T. PATNA
  • 2. INTRODUCTION  A Grillage foundation is a special type of isolated footing, generally provided for heavily loaded steel stanchions.  It is a type of shallow foundation.  It is used in the location where safe bearing capacity of soil is very poor .  Its name define its function and structure as it is made up of steel beams, structurally known as rolled steel joist.  It may also be provided for masonry walls.
  • 3. METHOD OF CONSTRUCTION  The depth of foundation is limited from 1m to 1.5m , as its a type of shallow foundation. However it should not be less then 90 cm.  Steel beams are provide in two or more tiers, the top tier of grillage beam is laid at right angles to the bottom tier.  The beam of each tier are held in position by 20 mm diameter spacer bars with 25 mm diameter pipe separators.
  • 4. METHOD OF CONSTRUCTION  The grillage beam are then embedded in concrete , a minimum gap of 8cm is kept between beams so the concrete can be easily poured and properly compacted.  After levelling the base and pouring the concrete its should be checked that compaction is done properly and formed an impervious layer of thickness not less than 15 cm. This protect steel joist from groundwater, which can cause corrosion.  Then the first layer of beams are laid over concrete bed at a distance of 100mm to 300mm, with the help of pipe separators.  The upper surface of all the steel beams should lies in one horizontal plane.
  • 5. METHOD OF CONSTRUCTION  Rich cement grout is poured all around the lower flanges of the beam so that they are secured to the concrete bed.  Concrete is poured between and around the beams of first of first tier.  The second tier of beam is then placed at the right angle to the first tiers and over the top flanges of the beams of the first tier.  They are properly spaced with the help of pipe separators
  • 6. METHOD OF CONSTRUCTION  Concrete is then poured between and around the steel beams.  The steel stanchions is then connected to the upper tier with the help of a base plate, side angles, and a gusset plate.  These connecting elements are also embedded in the concrete so that joint become rigid.
  • 7. PRECAUTION TO BE TAKEN  The depth of footing should not be less than 90cm.  The distance between the flanges should not exceed 30cm so that filled concrete acts monolithically with the beams.  The concrete filling should not carry any load ; its simply keeps the beams in the position.  A minimum gap of 10cm is kept on the outer side of the external beam, as well as the upper flanges of top tier.  The depth of concrete below lower tier should be atlest 15cm.
  • 8. PLAN OF STEEL GRILLAGE