1     Abstract
The new Euro code BS EN 1991-4 actions on silos has significant impact when compared to other
commonly used codes such as the Din 1055 part 6 or ACI313-18 when considering the eccentric
discharge , previous codes states only there will be significant wall moment without stating how to
calculate it.
This paper will highlight the impact of the asymmetric loading in designing silos with eccentric discharge
                                                                  3
by presenting a practical case study comparison for a 14000 m raw meal homo inverted cone silo 52
meter height and 23 meter diameter designed by ACI and the new Euro code, keeping the same wall
thickness to identify the effect on pre stressing, conventional steel reinforcement, cost and design time.

2     Introduction
Silos is generally used in storing granular and powder material in industrial planet most of the large silos
are in cement planet, silos either concrete or steel filled from top by either conveyors, bucket elevators or
airlift and discharged from the bottom by either from the center or eccentric through discharge gates as in
inverted cone silos which is our case study
The designer should consider the construction method which is usually constructed by the slip form
technology
Design of silos in the past was based only on static pressure with no allowance to of pressure difference
due to material flow which resulting to a bending moment stress, there is no direct software for predicting
the walls stress on silos during filling and discharge that makes the silo design requires a very specialized
mechanical/structural skills.
Footing should be noticed for any differential settlement will cause significant redistribution of loads the
remain supports, there were many reported case of silo collapse plus many other unreported.

According to silo geometry there are 4 types classification types.

    1. Slender silo: where 2≤hc/dc
    2. Intermediate slenderness silos where 1.0<hc/dc
    3. Squat silo where 0.4<hc/dc ≤1.0
    4. Retiling silo where bottom is flat and hc/dc ≤1.0
dc dimension of inside silo diameter
h height of vertical walled from transition to the equivalent surface


3     Type of material flow
The Euro code states 3 main types of material flow


3.1    Mass flow
In this follow al the material flow in the same time at
the same speed.
Pressures in a mass flow bins are relatively uniform
across any horizontal cross
section of the hopper.

3.2    Pipe flow
A funnel flow bin is a bin in which the flow channel do
not intersect the silo wall, part of the stored material is
in motion while the rest is stagnant. If not properly
designed the non-flowing solids might consolidate and
a pipe will form through which the material will flow
while the rest will remain stagnant.
Discharge pressure can be ignored, in case of squat
silos wit concentric gravity discharge and silo wit top
mechanical discharge



3.3    Mixed flow
A funnel flow pattern in which the flow channel intersect the vertical wall of the silo at a point below the
silo surface the designer un that case should consider the unsymmetrical pressure.




`
Flow channels in an IBAU central cone silo
4    Pressure and loads

The ACI design during filling and according to 4.4.1 provides calculation for wall friction , lateral load and
vertical load with an increasing factor of 1.35 for concrete and 1.5 for steel discharge load pressure

4.1.1    Filling pressure

All loading code use janssen formula to determine the filling pressure which the horizontal pressure
increase with height from top to bottom, based on an e-function and with the silo diameter, the wall friction
coefficient, the material specific weight and the horizontal pressure ratio as the main parameters


4.1.2    Discharge pressure
Symmetrical discharge load equals the horizontal filling pressure, in case of circular silos with large out
eccentricities the Euro code gives 3 values of radius of the flow channel rc as 0.25r , 0.4r and 0.6r where r is the silo
inner radius.



4.1.3    Patch loading
Patch loading that represents the small eccentricity during filling and discharge by adding local load acting over
specified zone on any part of the vertical wall of a silo considering only the case that produce the great effect.




The brand new 9 000ton bolted steel silo split apart
about two weeks after it was first filled to capacity
J. W. Carson and T. Holmes




4.1.4    Eccentric discharge :
when discharge opening is not centered in the bottom bin the material flow during discharge will be
through eccentric channel in this case the ratio of horizontal pressure in the follow channel to the rest of
the bin is direct proportion to the radii of the follow channel
P0/Pn=r/R (ref A.wjenike)
       2
M=KR P




5     Case study
In the following will introduce a case study for
designing a new inverted cone Homogenizing
circular silo by both the ACI and the Euro code in a
1.6 million ton/year, all wall above the cone level are
post tensioned supported on non pre-stressed wall
resting on a ring footing.
The silo covered with a horizontal steel metal deck



5.1    General input data

Filing System            multiple points

Discharge System         multiple points


Silo bottom             Inverted cone
Bulk Density for volume Calculation        1.300
         t/m3

Bulk Density for Load Calculation          1.500
       t/m3

Materials

Fcu (Non Pre stressed) 35.000 N/mm2
Fcu (Pre stressed)     40.000 N/mm2

Steel Grade 40/60


DESIGN CODES
Load on Silos            ACI-313-97                        Diameter(DI)                               22.500
                                                                  m
SILO GEOMETERY
STORAGE COMPATEMENT DIMENSIONS                             Storage Volume                             14,072
Height(H)       52.000 12.750 39.250                              m3
        m
                                                           Wall Thickness                             34.000
                                                                   cm

NON STORAGE DIMENSIONS
Height (H)       12.750 0.000     12.750 m                 Overall DIMENSIONS

Diameter (DI)    21.780 m                                  Height (H)       52.000 0.000      52.000 meter

Wall Thickness 70.000 cm                                   Diameter (DO) 23.180 meter



5.2   Output data


The difference in the horizontal wall pressure is not significant but the effect of the shear force and
bending resulting from Euro code is governing
the wall design reinforcement. The maximum
moment usually occurs with case of eccentric
flow channel while the ACI produces zero
moment.

The amount of pres stressed cable increases in
case by around of 38% , for conventional
reinforcement an increases by 42% and the
overall coast increase by nearly 20% but
design time jumps to 3 times more.
800
           700
           600
           500
           400
           300                                                       ACI
           200
                                                                     Euro Code
           100
             0
                   Total     Reinforce   Cost per    Total cost
                  cables     ment ton    Storage       factor
     ACI         268.4016      263        337.03      585.50
     Euro Code 371.9516        376        446.85      700.35




6    Conclusion
The designer must have a full prediction of load combination and load path especial consideration and
care to be taken in eccentric discharge flow channel, possibility of unexpected loading cases such as
non-uniform and thermal effects. Special attention must be given to how the most critical details in the silo
and its supporting structure will be constructed and fabricated, always try to use standard method else all
details to be clearly provided. Extreme care to the foundation settlement which must be avoided and
monitored during and after construction.

The new Euro code method is time consuming than previous design codes but recommendation for new
silos to be designed with the Euro code as the ACI will lead to underestimate the wall loads, the
discharge from single outlet to be minimized to the shortest period. High quality control on site during
construction is a must. Previous silos also may be reassert by the Euro code especially for eccentric
discharge silos



7   References

    1. Hug Mckay “Implication of the new Euro code on the design of cement raw meal silo”
    2. ACI Standards 313-97 standard practice for design and construction of concrete silos and
       stacking tubes for storing granular materials.
    3. Din 1055-6 “loads in silo bin”
    4. IBAU HAMBURG “Central Cone Silos from the structural point of view silos.
    5. John W. Carson and Tracy Holmes “Silo failure: why do they happen?”

More Related Content

What's hot

Design of column base plates anchor bolt
Design of column base plates anchor boltDesign of column base plates anchor bolt
Design of column base plates anchor bolt
Khaled Eid
 
Eccentric Loading In Welded Connections
Eccentric Loading In Welded ConnectionsEccentric Loading In Welded Connections
Eccentric Loading In Welded Connections
Abhishek Kansara
 
Settlement of piles
Settlement of pilesSettlement of piles
Settlement of piles
Latif Hyder Wadho
 
Rc corbel example
Rc corbel exampleRc corbel example
Rc corbel example
mamilli
 
Anchor bolt design
Anchor bolt designAnchor bolt design
Anchor bolt design
Varadaraj Ck
 
Shear lug verification example
Shear lug verification exampleShear lug verification example
Shear lug verification example
Joseph Marie TCHOUANI NANA
 
Roof truss design
Roof truss designRoof truss design
Roof truss design
FOYSOLMAHMUD1
 
2911 1 3
2911 1 32911 1 3
Pile cap design structural guide
Pile cap design   structural guidePile cap design   structural guide
Pile cap design structural guide
Alberto Rosado
 
Deflection & cracking of RC structure(limit state method)
Deflection & cracking of RC structure(limit state method)Deflection & cracking of RC structure(limit state method)
Deflection & cracking of RC structure(limit state method)
gudtik
 
12-Examples on Compression Members (Steel Structural Design & Prof. Shehab Mo...
12-Examples on Compression Members (Steel Structural Design & Prof. Shehab Mo...12-Examples on Compression Members (Steel Structural Design & Prof. Shehab Mo...
12-Examples on Compression Members (Steel Structural Design & Prof. Shehab Mo...
Hossam Shafiq II
 
Bs procedure
Bs procedureBs procedure
Bs procedure
hlksd
 
Tensile strength test for concrete
Tensile strength test for concreteTensile strength test for concrete
Tensile strength test for concrete
Ayaz khan
 
Seismic Design Of Structures Project
Seismic Design Of Structures ProjectSeismic Design Of Structures Project
Seismic Design Of Structures Project
Gunjan Shetye
 
Machine Foundation Design
Machine Foundation Design Machine Foundation Design
Machine Foundation Design
VARANASI RAMA RAO
 
Class 7 Consolidation Test ( Geotechnical Engineering )
Class 7    Consolidation Test ( Geotechnical Engineering )Class 7    Consolidation Test ( Geotechnical Engineering )
Class 7 Consolidation Test ( Geotechnical Engineering )
Hossam Shafiq I
 
Theory for Welded connection.pdf
Theory for Welded connection.pdfTheory for Welded connection.pdf
Theory for Welded connection.pdf
YatiTank
 
Cable Layout, Continuous Beam & Load Balancing Method
 Cable Layout, Continuous Beam & Load Balancing Method Cable Layout, Continuous Beam & Load Balancing Method
Cable Layout, Continuous Beam & Load Balancing Method
Md Tanvir Alam
 
AS4100 Steel Design Webinar Worked Examples
AS4100 Steel Design Webinar Worked ExamplesAS4100 Steel Design Webinar Worked Examples
AS4100 Steel Design Webinar Worked Examples
ClearCalcs
 
Analysis and Design of Plate Girder Bridges_.docx
Analysis and Design of Plate Girder Bridges_.docxAnalysis and Design of Plate Girder Bridges_.docx
Analysis and Design of Plate Girder Bridges_.docx
Adnan Lazem
 

What's hot (20)

Design of column base plates anchor bolt
Design of column base plates anchor boltDesign of column base plates anchor bolt
Design of column base plates anchor bolt
 
Eccentric Loading In Welded Connections
Eccentric Loading In Welded ConnectionsEccentric Loading In Welded Connections
Eccentric Loading In Welded Connections
 
Settlement of piles
Settlement of pilesSettlement of piles
Settlement of piles
 
Rc corbel example
Rc corbel exampleRc corbel example
Rc corbel example
 
Anchor bolt design
Anchor bolt designAnchor bolt design
Anchor bolt design
 
Shear lug verification example
Shear lug verification exampleShear lug verification example
Shear lug verification example
 
Roof truss design
Roof truss designRoof truss design
Roof truss design
 
2911 1 3
2911 1 32911 1 3
2911 1 3
 
Pile cap design structural guide
Pile cap design   structural guidePile cap design   structural guide
Pile cap design structural guide
 
Deflection & cracking of RC structure(limit state method)
Deflection & cracking of RC structure(limit state method)Deflection & cracking of RC structure(limit state method)
Deflection & cracking of RC structure(limit state method)
 
12-Examples on Compression Members (Steel Structural Design & Prof. Shehab Mo...
12-Examples on Compression Members (Steel Structural Design & Prof. Shehab Mo...12-Examples on Compression Members (Steel Structural Design & Prof. Shehab Mo...
12-Examples on Compression Members (Steel Structural Design & Prof. Shehab Mo...
 
Bs procedure
Bs procedureBs procedure
Bs procedure
 
Tensile strength test for concrete
Tensile strength test for concreteTensile strength test for concrete
Tensile strength test for concrete
 
Seismic Design Of Structures Project
Seismic Design Of Structures ProjectSeismic Design Of Structures Project
Seismic Design Of Structures Project
 
Machine Foundation Design
Machine Foundation Design Machine Foundation Design
Machine Foundation Design
 
Class 7 Consolidation Test ( Geotechnical Engineering )
Class 7    Consolidation Test ( Geotechnical Engineering )Class 7    Consolidation Test ( Geotechnical Engineering )
Class 7 Consolidation Test ( Geotechnical Engineering )
 
Theory for Welded connection.pdf
Theory for Welded connection.pdfTheory for Welded connection.pdf
Theory for Welded connection.pdf
 
Cable Layout, Continuous Beam & Load Balancing Method
 Cable Layout, Continuous Beam & Load Balancing Method Cable Layout, Continuous Beam & Load Balancing Method
Cable Layout, Continuous Beam & Load Balancing Method
 
AS4100 Steel Design Webinar Worked Examples
AS4100 Steel Design Webinar Worked ExamplesAS4100 Steel Design Webinar Worked Examples
AS4100 Steel Design Webinar Worked Examples
 
Analysis and Design of Plate Girder Bridges_.docx
Analysis and Design of Plate Girder Bridges_.docxAnalysis and Design of Plate Girder Bridges_.docx
Analysis and Design of Plate Girder Bridges_.docx
 

Viewers also liked

STORAGE - Silo design & construction
STORAGE - Silo design & constructionSTORAGE - Silo design & construction
STORAGE - Silo design & construction
Milling and Grain magazine
 
Calculation note 29 11-2014
Calculation note 29 11-2014Calculation note 29 11-2014
Calculation note 29 11-2014
Khaled Eid
 
51989151 din-1055-6-2005 silos
51989151 din-1055-6-2005 silos51989151 din-1055-6-2005 silos
51989151 din-1055-6-2005 silos
141jdf
 
Episode 38 : Bin and Hopper Design
Episode 38 :  Bin and Hopper DesignEpisode 38 :  Bin and Hopper Design
Episode 38 : Bin and Hopper Design
SAJJAD KHUDHUR ABBAS
 
Storage bins and hoppers
Storage bins and hoppersStorage bins and hoppers
Storage bins and hoppers
physics101
 
Feeders and storage silos
Feeders and storage silosFeeders and storage silos
Feeders and storage silos
physics101
 
Finite Element Analysis of Concrete Filled Steel Tube (CFT’s) Subjected to F...
Finite Element Analysis of Concrete Filled Steel Tube (CFT’s)  Subjected to F...Finite Element Analysis of Concrete Filled Steel Tube (CFT’s)  Subjected to F...
Finite Element Analysis of Concrete Filled Steel Tube (CFT’s) Subjected to F...
International Journal of Engineering Inventions www.ijeijournal.com
 
Trishul Presentation 2012
Trishul Presentation 2012Trishul Presentation 2012
Trishul Presentation 2012
yogeshtrishul
 
Cfst slideshow 110104
Cfst slideshow 110104Cfst slideshow 110104
Cfst slideshow 110104
Peter Scott
 
ANALYSIS & DESIGN ASPECTS OF PRE-STRESSED MEMBERS USING F.R.P. TENDONS
ANALYSIS & DESIGN ASPECTS OF PRE-STRESSED MEMBERS USING F.R.P. TENDONSANALYSIS & DESIGN ASPECTS OF PRE-STRESSED MEMBERS USING F.R.P. TENDONS
ANALYSIS & DESIGN ASPECTS OF PRE-STRESSED MEMBERS USING F.R.P. TENDONS
Girish Singh
 
Concrete filled steel tubes subjected to axial compression
Concrete filled steel tubes subjected to axial compressionConcrete filled steel tubes subjected to axial compression
Concrete filled steel tubes subjected to axial compression
eSAT Journals
 
Xi. prestressed concrete circular storage tanks and shell roof
Xi. prestressed concrete circular storage tanks and shell roofXi. prestressed concrete circular storage tanks and shell roof
Xi. prestressed concrete circular storage tanks and shell roof
Chhay Teng
 
Industrial chimneys
Industrial chimneysIndustrial chimneys
Industrial chimneys
Manjunath Sn
 
ELECTROSTATIC PRECIPITATOR
ELECTROSTATIC PRECIPITATORELECTROSTATIC PRECIPITATOR
ELECTROSTATIC PRECIPITATOR
karangoyal972
 
CFST
CFSTCFST
ESP (Electrostatic precipitator)
ESP (Electrostatic precipitator)ESP (Electrostatic precipitator)
ESP (Electrostatic precipitator)
Gaurav Kaushik
 
Cfst columns
Cfst columns Cfst columns
Cfst columns
amits2280
 
Electrostatic precipitator (esp) - working function
Electrostatic precipitator (esp) - working functionElectrostatic precipitator (esp) - working function
Electrostatic precipitator (esp) - working function
Yokesh Mech
 
Bamboo construction (final ppt)
Bamboo construction (final ppt)Bamboo construction (final ppt)
Bamboo construction (final ppt)
Tushar Choudhari
 
Electrostatic precipitator design
Electrostatic precipitator designElectrostatic precipitator design
Electrostatic precipitator design
IRS srl
 

Viewers also liked (20)

STORAGE - Silo design & construction
STORAGE - Silo design & constructionSTORAGE - Silo design & construction
STORAGE - Silo design & construction
 
Calculation note 29 11-2014
Calculation note 29 11-2014Calculation note 29 11-2014
Calculation note 29 11-2014
 
51989151 din-1055-6-2005 silos
51989151 din-1055-6-2005 silos51989151 din-1055-6-2005 silos
51989151 din-1055-6-2005 silos
 
Episode 38 : Bin and Hopper Design
Episode 38 :  Bin and Hopper DesignEpisode 38 :  Bin and Hopper Design
Episode 38 : Bin and Hopper Design
 
Storage bins and hoppers
Storage bins and hoppersStorage bins and hoppers
Storage bins and hoppers
 
Feeders and storage silos
Feeders and storage silosFeeders and storage silos
Feeders and storage silos
 
Finite Element Analysis of Concrete Filled Steel Tube (CFT’s) Subjected to F...
Finite Element Analysis of Concrete Filled Steel Tube (CFT’s)  Subjected to F...Finite Element Analysis of Concrete Filled Steel Tube (CFT’s)  Subjected to F...
Finite Element Analysis of Concrete Filled Steel Tube (CFT’s) Subjected to F...
 
Trishul Presentation 2012
Trishul Presentation 2012Trishul Presentation 2012
Trishul Presentation 2012
 
Cfst slideshow 110104
Cfst slideshow 110104Cfst slideshow 110104
Cfst slideshow 110104
 
ANALYSIS & DESIGN ASPECTS OF PRE-STRESSED MEMBERS USING F.R.P. TENDONS
ANALYSIS & DESIGN ASPECTS OF PRE-STRESSED MEMBERS USING F.R.P. TENDONSANALYSIS & DESIGN ASPECTS OF PRE-STRESSED MEMBERS USING F.R.P. TENDONS
ANALYSIS & DESIGN ASPECTS OF PRE-STRESSED MEMBERS USING F.R.P. TENDONS
 
Concrete filled steel tubes subjected to axial compression
Concrete filled steel tubes subjected to axial compressionConcrete filled steel tubes subjected to axial compression
Concrete filled steel tubes subjected to axial compression
 
Xi. prestressed concrete circular storage tanks and shell roof
Xi. prestressed concrete circular storage tanks and shell roofXi. prestressed concrete circular storage tanks and shell roof
Xi. prestressed concrete circular storage tanks and shell roof
 
Industrial chimneys
Industrial chimneysIndustrial chimneys
Industrial chimneys
 
ELECTROSTATIC PRECIPITATOR
ELECTROSTATIC PRECIPITATORELECTROSTATIC PRECIPITATOR
ELECTROSTATIC PRECIPITATOR
 
CFST
CFSTCFST
CFST
 
ESP (Electrostatic precipitator)
ESP (Electrostatic precipitator)ESP (Electrostatic precipitator)
ESP (Electrostatic precipitator)
 
Cfst columns
Cfst columns Cfst columns
Cfst columns
 
Electrostatic precipitator (esp) - working function
Electrostatic precipitator (esp) - working functionElectrostatic precipitator (esp) - working function
Electrostatic precipitator (esp) - working function
 
Bamboo construction (final ppt)
Bamboo construction (final ppt)Bamboo construction (final ppt)
Bamboo construction (final ppt)
 
Electrostatic precipitator design
Electrostatic precipitator designElectrostatic precipitator design
Electrostatic precipitator design
 

Similar to Impact of new codes in silos design

IRJET- Analysis of Steel Silos Subjected to Wind Load with Various Slendernes...
IRJET- Analysis of Steel Silos Subjected to Wind Load with Various Slendernes...IRJET- Analysis of Steel Silos Subjected to Wind Load with Various Slendernes...
IRJET- Analysis of Steel Silos Subjected to Wind Load with Various Slendernes...
IRJET Journal
 
GROUP_6_YOUNGMAN_L_ANNEX_15-16
GROUP_6_YOUNGMAN_L_ANNEX_15-16GROUP_6_YOUNGMAN_L_ANNEX_15-16
GROUP_6_YOUNGMAN_L_ANNEX_15-16
Leo Youngman
 
A Study of Dynamic Response of Circular Water Tank with Baffle Walls
A Study of Dynamic Response of Circular Water Tank with Baffle WallsA Study of Dynamic Response of Circular Water Tank with Baffle Walls
A Study of Dynamic Response of Circular Water Tank with Baffle Walls
IRJET Journal
 
IRJET- A Study on Seismic Analysis of RC Framed Structures on Varying Slo...
IRJET-  	  A Study on Seismic Analysis of RC Framed Structures on Varying Slo...IRJET-  	  A Study on Seismic Analysis of RC Framed Structures on Varying Slo...
IRJET- A Study on Seismic Analysis of RC Framed Structures on Varying Slo...
IRJET Journal
 
slovak journal_lukas kowalski
slovak journal_lukas kowalskislovak journal_lukas kowalski
slovak journal_lukas kowalski
Lukas Kowalski
 
Retrofitting of Bridge with Voided Slab to raise the Deck Level
Retrofitting of Bridge with Voided Slab to raise the Deck LevelRetrofitting of Bridge with Voided Slab to raise the Deck Level
Retrofitting of Bridge with Voided Slab to raise the Deck Level
IRJET Journal
 
ANALYSIS OF PRE-STRESSED BRIDGE CONSTRUCTION
ANALYSIS OF PRE-STRESSED BRIDGE CONSTRUCTIONANALYSIS OF PRE-STRESSED BRIDGE CONSTRUCTION
ANALYSIS OF PRE-STRESSED BRIDGE CONSTRUCTION
atchitect and design
 
Practical Experince Steps in detail with expamples
Practical Experince Steps in detail with expamplesPractical Experince Steps in detail with expamples
Practical Experince Steps in detail with expamples
Daniyalsaqib3
 
Seismic response of steel beams coupling concrete walls
Seismic response of steel beams coupling concrete wallsSeismic response of steel beams coupling concrete walls
Seismic response of steel beams coupling concrete walls
Yahya Ali
 
IRJET - Experimental Investigation of flexural member of Beam Opening in ...
IRJET -  	  Experimental Investigation of flexural member of Beam Opening in ...IRJET -  	  Experimental Investigation of flexural member of Beam Opening in ...
IRJET - Experimental Investigation of flexural member of Beam Opening in ...
IRJET Journal
 
Steel stacks guide
Steel stacks guideSteel stacks guide
Steel stacks guide
Khaled Eid
 
Rectangular tank
Rectangular tankRectangular tank
Rectangular tank
JayswalShashank1
 
structural-calculations-balcony-1.pdf
structural-calculations-balcony-1.pdfstructural-calculations-balcony-1.pdf
structural-calculations-balcony-1.pdf
ssusere0c44d
 
Drilling Engineering - Casing Design
Drilling Engineering - Casing DesignDrilling Engineering - Casing Design
Drilling Engineering - Casing Design
James Craig
 
STRUCTURAL POLYMER CONCRETE - SPC
STRUCTURAL POLYMER CONCRETE - SPCSTRUCTURAL POLYMER CONCRETE - SPC
SPC
SPCSPC
Intze PPT
Intze PPTIntze PPT
PIPERACK
PIPERACKPIPERACK
PIPERACK
Azadeh Aria
 
Lincoln arc welding article183
Lincoln arc welding article183Lincoln arc welding article183
Lincoln arc welding article183
Miklos Peller, Sr.
 
Large Span Lattice Frame Industrial Roof Structure
Large Span Lattice Frame Industrial Roof StructureLarge Span Lattice Frame Industrial Roof Structure
Large Span Lattice Frame Industrial Roof Structure
IOSR Journals
 

Similar to Impact of new codes in silos design (20)

IRJET- Analysis of Steel Silos Subjected to Wind Load with Various Slendernes...
IRJET- Analysis of Steel Silos Subjected to Wind Load with Various Slendernes...IRJET- Analysis of Steel Silos Subjected to Wind Load with Various Slendernes...
IRJET- Analysis of Steel Silos Subjected to Wind Load with Various Slendernes...
 
GROUP_6_YOUNGMAN_L_ANNEX_15-16
GROUP_6_YOUNGMAN_L_ANNEX_15-16GROUP_6_YOUNGMAN_L_ANNEX_15-16
GROUP_6_YOUNGMAN_L_ANNEX_15-16
 
A Study of Dynamic Response of Circular Water Tank with Baffle Walls
A Study of Dynamic Response of Circular Water Tank with Baffle WallsA Study of Dynamic Response of Circular Water Tank with Baffle Walls
A Study of Dynamic Response of Circular Water Tank with Baffle Walls
 
IRJET- A Study on Seismic Analysis of RC Framed Structures on Varying Slo...
IRJET-  	  A Study on Seismic Analysis of RC Framed Structures on Varying Slo...IRJET-  	  A Study on Seismic Analysis of RC Framed Structures on Varying Slo...
IRJET- A Study on Seismic Analysis of RC Framed Structures on Varying Slo...
 
slovak journal_lukas kowalski
slovak journal_lukas kowalskislovak journal_lukas kowalski
slovak journal_lukas kowalski
 
Retrofitting of Bridge with Voided Slab to raise the Deck Level
Retrofitting of Bridge with Voided Slab to raise the Deck LevelRetrofitting of Bridge with Voided Slab to raise the Deck Level
Retrofitting of Bridge with Voided Slab to raise the Deck Level
 
ANALYSIS OF PRE-STRESSED BRIDGE CONSTRUCTION
ANALYSIS OF PRE-STRESSED BRIDGE CONSTRUCTIONANALYSIS OF PRE-STRESSED BRIDGE CONSTRUCTION
ANALYSIS OF PRE-STRESSED BRIDGE CONSTRUCTION
 
Practical Experince Steps in detail with expamples
Practical Experince Steps in detail with expamplesPractical Experince Steps in detail with expamples
Practical Experince Steps in detail with expamples
 
Seismic response of steel beams coupling concrete walls
Seismic response of steel beams coupling concrete wallsSeismic response of steel beams coupling concrete walls
Seismic response of steel beams coupling concrete walls
 
IRJET - Experimental Investigation of flexural member of Beam Opening in ...
IRJET -  	  Experimental Investigation of flexural member of Beam Opening in ...IRJET -  	  Experimental Investigation of flexural member of Beam Opening in ...
IRJET - Experimental Investigation of flexural member of Beam Opening in ...
 
Steel stacks guide
Steel stacks guideSteel stacks guide
Steel stacks guide
 
Rectangular tank
Rectangular tankRectangular tank
Rectangular tank
 
structural-calculations-balcony-1.pdf
structural-calculations-balcony-1.pdfstructural-calculations-balcony-1.pdf
structural-calculations-balcony-1.pdf
 
Drilling Engineering - Casing Design
Drilling Engineering - Casing DesignDrilling Engineering - Casing Design
Drilling Engineering - Casing Design
 
STRUCTURAL POLYMER CONCRETE - SPC
STRUCTURAL POLYMER CONCRETE - SPCSTRUCTURAL POLYMER CONCRETE - SPC
STRUCTURAL POLYMER CONCRETE - SPC
 
SPC
SPCSPC
SPC
 
Intze PPT
Intze PPTIntze PPT
Intze PPT
 
PIPERACK
PIPERACKPIPERACK
PIPERACK
 
Lincoln arc welding article183
Lincoln arc welding article183Lincoln arc welding article183
Lincoln arc welding article183
 
Large Span Lattice Frame Industrial Roof Structure
Large Span Lattice Frame Industrial Roof StructureLarge Span Lattice Frame Industrial Roof Structure
Large Span Lattice Frame Industrial Roof Structure
 

More from Khaled Eid

What every engineer should know
What every engineer should know What every engineer should know
What every engineer should know
Khaled Eid
 
Loading
LoadingLoading
Loading
Khaled Eid
 
Steel silo failure case study
Steel silo failure case study  Steel silo failure case study
Steel silo failure case study
Khaled Eid
 
Estimation
EstimationEstimation
Estimation
Khaled Eid
 
Quality managment impacts in construction
Quality managment impacts in constructionQuality managment impacts in construction
Quality managment impacts in construction
Khaled Eid
 
Opera sydney case study analysis
Opera sydney case study analysisOpera sydney case study analysis
Opera sydney case study analysis
Khaled Eid
 
Cheq plate span
Cheq plate spanCheq plate span
Cheq plate span
Khaled Eid
 
Mathcad anchors (2)
Mathcad   anchors (2)Mathcad   anchors (2)
Mathcad anchors (2)
Khaled Eid
 
Writing engineering report
Writing engineering reportWriting engineering report
Writing engineering report
Khaled Eid
 
Steel detailing guide scope document
Steel detailing guide scope documentSteel detailing guide scope document
Steel detailing guide scope document
Khaled Eid
 
Khaled(beca)
Khaled(beca)Khaled(beca)
Khaled(beca)
Khaled Eid
 

More from Khaled Eid (11)

What every engineer should know
What every engineer should know What every engineer should know
What every engineer should know
 
Loading
LoadingLoading
Loading
 
Steel silo failure case study
Steel silo failure case study  Steel silo failure case study
Steel silo failure case study
 
Estimation
EstimationEstimation
Estimation
 
Quality managment impacts in construction
Quality managment impacts in constructionQuality managment impacts in construction
Quality managment impacts in construction
 
Opera sydney case study analysis
Opera sydney case study analysisOpera sydney case study analysis
Opera sydney case study analysis
 
Cheq plate span
Cheq plate spanCheq plate span
Cheq plate span
 
Mathcad anchors (2)
Mathcad   anchors (2)Mathcad   anchors (2)
Mathcad anchors (2)
 
Writing engineering report
Writing engineering reportWriting engineering report
Writing engineering report
 
Steel detailing guide scope document
Steel detailing guide scope documentSteel detailing guide scope document
Steel detailing guide scope document
 
Khaled(beca)
Khaled(beca)Khaled(beca)
Khaled(beca)
 

Recently uploaded

一比一原版(UoB毕业证)英国伯明翰大学毕业证如何办理
一比一原版(UoB毕业证)英国伯明翰大学毕业证如何办理一比一原版(UoB毕业证)英国伯明翰大学毕业证如何办理
一比一原版(UoB毕业证)英国伯明翰大学毕业证如何办理
zv943dhb
 
一比一原版美国旧金山大学毕业证(USF学位证)如何办理
一比一原版美国旧金山大学毕业证(USF学位证)如何办理一比一原版美国旧金山大学毕业证(USF学位证)如何办理
一比一原版美国旧金山大学毕业证(USF学位证)如何办理
xnhwr8v
 
原版制作(MDIS毕业证书)新加坡管理发展学院毕业证学位证一模一样
原版制作(MDIS毕业证书)新加坡管理发展学院毕业证学位证一模一样原版制作(MDIS毕业证书)新加坡管理发展学院毕业证学位证一模一样
原版制作(MDIS毕业证书)新加坡管理发展学院毕业证学位证一模一样
hw2xf1m
 
一比一原版(ututaustin毕业证书)美国德克萨斯大学奥斯汀分校毕业证如何办理
一比一原版(ututaustin毕业证书)美国德克萨斯大学奥斯汀分校毕业证如何办理一比一原版(ututaustin毕业证书)美国德克萨斯大学奥斯汀分校毕业证如何办理
一比一原版(ututaustin毕业证书)美国德克萨斯大学奥斯汀分校毕业证如何办理
yqyquge
 
一比一原版(ECU毕业证)澳洲埃迪斯科文大学毕业证如何办理
一比一原版(ECU毕业证)澳洲埃迪斯科文大学毕业证如何办理一比一原版(ECU毕业证)澳洲埃迪斯科文大学毕业证如何办理
一比一原版(ECU毕业证)澳洲埃迪斯科文大学毕业证如何办理
kohd1ci2
 
Heuristics Evaluation - How to Guide.pdf
Heuristics Evaluation - How to Guide.pdfHeuristics Evaluation - How to Guide.pdf
Heuristics Evaluation - How to Guide.pdf
Jaime Brown
 
欧洲杯买球-欧洲杯买球买球网好的网站-欧洲杯买球哪里有正规的买球网站|【​网址​🎉ac123.net🎉​】
欧洲杯买球-欧洲杯买球买球网好的网站-欧洲杯买球哪里有正规的买球网站|【​网址​🎉ac123.net🎉​】欧洲杯买球-欧洲杯买球买球网好的网站-欧洲杯买球哪里有正规的买球网站|【​网址​🎉ac123.net🎉​】
欧洲杯买球-欧洲杯买球买球网好的网站-欧洲杯买球哪里有正规的买球网站|【​网址​🎉ac123.net🎉​】
jafiradnan336
 
International Upcycling Research Network advisory board meeting 4
International Upcycling Research Network advisory board meeting 4International Upcycling Research Network advisory board meeting 4
International Upcycling Research Network advisory board meeting 4
Kyungeun Sung
 
一比一原版(CSUEB毕业证)美国加州州立大学东湾分校毕业证如何办理
一比一原版(CSUEB毕业证)美国加州州立大学东湾分校毕业证如何办理一比一原版(CSUEB毕业证)美国加州州立大学东湾分校毕业证如何办理
一比一原版(CSUEB毕业证)美国加州州立大学东湾分校毕业证如何办理
stgq9v39
 
一比一原版(LSE毕业证书)伦敦政治经济学院毕业证如何办理
一比一原版(LSE毕业证书)伦敦政治经济学院毕业证如何办理一比一原版(LSE毕业证书)伦敦政治经济学院毕业证如何办理
一比一原版(LSE毕业证书)伦敦政治经济学院毕业证如何办理
340qn0m1
 
ADESGN3S_Case-Study-Municipal-Health-Center.pdf
ADESGN3S_Case-Study-Municipal-Health-Center.pdfADESGN3S_Case-Study-Municipal-Health-Center.pdf
ADESGN3S_Case-Study-Municipal-Health-Center.pdf
GregMichaelTapawan
 
一比一原版美国哥伦比亚大学毕业证Columbia成绩单一模一样
一比一原版美国哥伦比亚大学毕业证Columbia成绩单一模一样一比一原版美国哥伦比亚大学毕业证Columbia成绩单一模一样
一比一原版美国哥伦比亚大学毕业证Columbia成绩单一模一样
881evgn0
 
NHL Stenden University of Applied Sciences Diploma Degree Transcript
NHL Stenden University of Applied Sciences Diploma Degree TranscriptNHL Stenden University of Applied Sciences Diploma Degree Transcript
NHL Stenden University of Applied Sciences Diploma Degree Transcript
lhtvqoag
 
一比一原版南安普顿索伦特大学毕业证Southampton成绩单一模一样
一比一原版南安普顿索伦特大学毕业证Southampton成绩单一模一样一比一原版南安普顿索伦特大学毕业证Southampton成绩单一模一样
一比一原版南安普顿索伦特大学毕业证Southampton成绩单一模一样
3vgr39kx
 
NHR Engineers Portfolio 2023 2024 NISHANT RATHI
NHR Engineers Portfolio 2023 2024 NISHANT RATHINHR Engineers Portfolio 2023 2024 NISHANT RATHI
NHR Engineers Portfolio 2023 2024 NISHANT RATHI
NishantRathi18
 
Design Thinking: Madhu Prabakaran 17th July 2024
Design Thinking: Madhu Prabakaran 17th July 2024Design Thinking: Madhu Prabakaran 17th July 2024
Design Thinking: Madhu Prabakaran 17th July 2024
Madhu Prabakaran
 
UXpert_Report (UALR Mapping Renewal 2022).pdf
UXpert_Report (UALR Mapping Renewal 2022).pdfUXpert_Report (UALR Mapping Renewal 2022).pdf
UXpert_Report (UALR Mapping Renewal 2022).pdf
anthonylin333
 
一比一原版亚利桑那大学毕业证(UA毕业证书)如何办理
一比一原版亚利桑那大学毕业证(UA毕业证书)如何办理一比一原版亚利桑那大学毕业证(UA毕业证书)如何办理
一比一原版亚利桑那大学毕业证(UA毕业证书)如何办理
21uul8se
 
一比一原版(CSU毕业证书)查尔斯特大学毕业证如何办理
一比一原版(CSU毕业证书)查尔斯特大学毕业证如何办理一比一原版(CSU毕业证书)查尔斯特大学毕业证如何办理
一比一原版(CSU毕业证书)查尔斯特大学毕业证如何办理
67n7f53
 
一比一原版(UoN毕业证书)纽卡斯尔大学毕业证如何办理
一比一原版(UoN毕业证书)纽卡斯尔大学毕业证如何办理一比一原版(UoN毕业证书)纽卡斯尔大学毕业证如何办理
一比一原版(UoN毕业证书)纽卡斯尔大学毕业证如何办理
f22b6g9c
 

Recently uploaded (20)

一比一原版(UoB毕业证)英国伯明翰大学毕业证如何办理
一比一原版(UoB毕业证)英国伯明翰大学毕业证如何办理一比一原版(UoB毕业证)英国伯明翰大学毕业证如何办理
一比一原版(UoB毕业证)英国伯明翰大学毕业证如何办理
 
一比一原版美国旧金山大学毕业证(USF学位证)如何办理
一比一原版美国旧金山大学毕业证(USF学位证)如何办理一比一原版美国旧金山大学毕业证(USF学位证)如何办理
一比一原版美国旧金山大学毕业证(USF学位证)如何办理
 
原版制作(MDIS毕业证书)新加坡管理发展学院毕业证学位证一模一样
原版制作(MDIS毕业证书)新加坡管理发展学院毕业证学位证一模一样原版制作(MDIS毕业证书)新加坡管理发展学院毕业证学位证一模一样
原版制作(MDIS毕业证书)新加坡管理发展学院毕业证学位证一模一样
 
一比一原版(ututaustin毕业证书)美国德克萨斯大学奥斯汀分校毕业证如何办理
一比一原版(ututaustin毕业证书)美国德克萨斯大学奥斯汀分校毕业证如何办理一比一原版(ututaustin毕业证书)美国德克萨斯大学奥斯汀分校毕业证如何办理
一比一原版(ututaustin毕业证书)美国德克萨斯大学奥斯汀分校毕业证如何办理
 
一比一原版(ECU毕业证)澳洲埃迪斯科文大学毕业证如何办理
一比一原版(ECU毕业证)澳洲埃迪斯科文大学毕业证如何办理一比一原版(ECU毕业证)澳洲埃迪斯科文大学毕业证如何办理
一比一原版(ECU毕业证)澳洲埃迪斯科文大学毕业证如何办理
 
Heuristics Evaluation - How to Guide.pdf
Heuristics Evaluation - How to Guide.pdfHeuristics Evaluation - How to Guide.pdf
Heuristics Evaluation - How to Guide.pdf
 
欧洲杯买球-欧洲杯买球买球网好的网站-欧洲杯买球哪里有正规的买球网站|【​网址​🎉ac123.net🎉​】
欧洲杯买球-欧洲杯买球买球网好的网站-欧洲杯买球哪里有正规的买球网站|【​网址​🎉ac123.net🎉​】欧洲杯买球-欧洲杯买球买球网好的网站-欧洲杯买球哪里有正规的买球网站|【​网址​🎉ac123.net🎉​】
欧洲杯买球-欧洲杯买球买球网好的网站-欧洲杯买球哪里有正规的买球网站|【​网址​🎉ac123.net🎉​】
 
International Upcycling Research Network advisory board meeting 4
International Upcycling Research Network advisory board meeting 4International Upcycling Research Network advisory board meeting 4
International Upcycling Research Network advisory board meeting 4
 
一比一原版(CSUEB毕业证)美国加州州立大学东湾分校毕业证如何办理
一比一原版(CSUEB毕业证)美国加州州立大学东湾分校毕业证如何办理一比一原版(CSUEB毕业证)美国加州州立大学东湾分校毕业证如何办理
一比一原版(CSUEB毕业证)美国加州州立大学东湾分校毕业证如何办理
 
一比一原版(LSE毕业证书)伦敦政治经济学院毕业证如何办理
一比一原版(LSE毕业证书)伦敦政治经济学院毕业证如何办理一比一原版(LSE毕业证书)伦敦政治经济学院毕业证如何办理
一比一原版(LSE毕业证书)伦敦政治经济学院毕业证如何办理
 
ADESGN3S_Case-Study-Municipal-Health-Center.pdf
ADESGN3S_Case-Study-Municipal-Health-Center.pdfADESGN3S_Case-Study-Municipal-Health-Center.pdf
ADESGN3S_Case-Study-Municipal-Health-Center.pdf
 
一比一原版美国哥伦比亚大学毕业证Columbia成绩单一模一样
一比一原版美国哥伦比亚大学毕业证Columbia成绩单一模一样一比一原版美国哥伦比亚大学毕业证Columbia成绩单一模一样
一比一原版美国哥伦比亚大学毕业证Columbia成绩单一模一样
 
NHL Stenden University of Applied Sciences Diploma Degree Transcript
NHL Stenden University of Applied Sciences Diploma Degree TranscriptNHL Stenden University of Applied Sciences Diploma Degree Transcript
NHL Stenden University of Applied Sciences Diploma Degree Transcript
 
一比一原版南安普顿索伦特大学毕业证Southampton成绩单一模一样
一比一原版南安普顿索伦特大学毕业证Southampton成绩单一模一样一比一原版南安普顿索伦特大学毕业证Southampton成绩单一模一样
一比一原版南安普顿索伦特大学毕业证Southampton成绩单一模一样
 
NHR Engineers Portfolio 2023 2024 NISHANT RATHI
NHR Engineers Portfolio 2023 2024 NISHANT RATHINHR Engineers Portfolio 2023 2024 NISHANT RATHI
NHR Engineers Portfolio 2023 2024 NISHANT RATHI
 
Design Thinking: Madhu Prabakaran 17th July 2024
Design Thinking: Madhu Prabakaran 17th July 2024Design Thinking: Madhu Prabakaran 17th July 2024
Design Thinking: Madhu Prabakaran 17th July 2024
 
UXpert_Report (UALR Mapping Renewal 2022).pdf
UXpert_Report (UALR Mapping Renewal 2022).pdfUXpert_Report (UALR Mapping Renewal 2022).pdf
UXpert_Report (UALR Mapping Renewal 2022).pdf
 
一比一原版亚利桑那大学毕业证(UA毕业证书)如何办理
一比一原版亚利桑那大学毕业证(UA毕业证书)如何办理一比一原版亚利桑那大学毕业证(UA毕业证书)如何办理
一比一原版亚利桑那大学毕业证(UA毕业证书)如何办理
 
一比一原版(CSU毕业证书)查尔斯特大学毕业证如何办理
一比一原版(CSU毕业证书)查尔斯特大学毕业证如何办理一比一原版(CSU毕业证书)查尔斯特大学毕业证如何办理
一比一原版(CSU毕业证书)查尔斯特大学毕业证如何办理
 
一比一原版(UoN毕业证书)纽卡斯尔大学毕业证如何办理
一比一原版(UoN毕业证书)纽卡斯尔大学毕业证如何办理一比一原版(UoN毕业证书)纽卡斯尔大学毕业证如何办理
一比一原版(UoN毕业证书)纽卡斯尔大学毕业证如何办理
 

Impact of new codes in silos design

  • 1. Impact of the new codes for design of Cement silos Khaled Eid, PE M.Eng. Head of Steel Department RHI Egypt, Consultant Engineer. 1 Abstract The new Euro code BS EN 1991-4 actions on silos has significant impact when compared to other commonly used codes such as the Din 1055 part 6 or ACI313-18 when considering the eccentric discharge , previous codes states only there will be significant wall moment without stating how to calculate it. This paper will highlight the impact of the asymmetric loading in designing silos with eccentric discharge 3 by presenting a practical case study comparison for a 14000 m raw meal homo inverted cone silo 52 meter height and 23 meter diameter designed by ACI and the new Euro code, keeping the same wall thickness to identify the effect on pre stressing, conventional steel reinforcement, cost and design time. 2 Introduction Silos is generally used in storing granular and powder material in industrial planet most of the large silos are in cement planet, silos either concrete or steel filled from top by either conveyors, bucket elevators or airlift and discharged from the bottom by either from the center or eccentric through discharge gates as in inverted cone silos which is our case study The designer should consider the construction method which is usually constructed by the slip form technology Design of silos in the past was based only on static pressure with no allowance to of pressure difference due to material flow which resulting to a bending moment stress, there is no direct software for predicting the walls stress on silos during filling and discharge that makes the silo design requires a very specialized mechanical/structural skills. Footing should be noticed for any differential settlement will cause significant redistribution of loads the remain supports, there were many reported case of silo collapse plus many other unreported. According to silo geometry there are 4 types classification types. 1. Slender silo: where 2≤hc/dc 2. Intermediate slenderness silos where 1.0<hc/dc 3. Squat silo where 0.4<hc/dc ≤1.0 4. Retiling silo where bottom is flat and hc/dc ≤1.0 dc dimension of inside silo diameter h height of vertical walled from transition to the equivalent surface 3 Type of material flow The Euro code states 3 main types of material flow 3.1 Mass flow
  • 2. In this follow al the material flow in the same time at the same speed. Pressures in a mass flow bins are relatively uniform across any horizontal cross section of the hopper. 3.2 Pipe flow A funnel flow bin is a bin in which the flow channel do not intersect the silo wall, part of the stored material is in motion while the rest is stagnant. If not properly designed the non-flowing solids might consolidate and a pipe will form through which the material will flow while the rest will remain stagnant. Discharge pressure can be ignored, in case of squat silos wit concentric gravity discharge and silo wit top mechanical discharge 3.3 Mixed flow A funnel flow pattern in which the flow channel intersect the vertical wall of the silo at a point below the silo surface the designer un that case should consider the unsymmetrical pressure. ` Flow channels in an IBAU central cone silo
  • 3. 4 Pressure and loads The ACI design during filling and according to 4.4.1 provides calculation for wall friction , lateral load and vertical load with an increasing factor of 1.35 for concrete and 1.5 for steel discharge load pressure 4.1.1 Filling pressure All loading code use janssen formula to determine the filling pressure which the horizontal pressure increase with height from top to bottom, based on an e-function and with the silo diameter, the wall friction coefficient, the material specific weight and the horizontal pressure ratio as the main parameters 4.1.2 Discharge pressure Symmetrical discharge load equals the horizontal filling pressure, in case of circular silos with large out eccentricities the Euro code gives 3 values of radius of the flow channel rc as 0.25r , 0.4r and 0.6r where r is the silo inner radius. 4.1.3 Patch loading Patch loading that represents the small eccentricity during filling and discharge by adding local load acting over specified zone on any part of the vertical wall of a silo considering only the case that produce the great effect. The brand new 9 000ton bolted steel silo split apart about two weeks after it was first filled to capacity J. W. Carson and T. Holmes 4.1.4 Eccentric discharge :
  • 4. when discharge opening is not centered in the bottom bin the material flow during discharge will be through eccentric channel in this case the ratio of horizontal pressure in the follow channel to the rest of the bin is direct proportion to the radii of the follow channel P0/Pn=r/R (ref A.wjenike) 2 M=KR P 5 Case study In the following will introduce a case study for designing a new inverted cone Homogenizing circular silo by both the ACI and the Euro code in a 1.6 million ton/year, all wall above the cone level are post tensioned supported on non pre-stressed wall resting on a ring footing. The silo covered with a horizontal steel metal deck 5.1 General input data Filing System multiple points Discharge System multiple points Silo bottom Inverted cone Bulk Density for volume Calculation 1.300 t/m3 Bulk Density for Load Calculation 1.500 t/m3 Materials Fcu (Non Pre stressed) 35.000 N/mm2 Fcu (Pre stressed) 40.000 N/mm2 Steel Grade 40/60 DESIGN CODES Load on Silos ACI-313-97 Diameter(DI) 22.500 m SILO GEOMETERY STORAGE COMPATEMENT DIMENSIONS Storage Volume 14,072 Height(H) 52.000 12.750 39.250 m3 m Wall Thickness 34.000 cm NON STORAGE DIMENSIONS
  • 5. Height (H) 12.750 0.000 12.750 m Overall DIMENSIONS Diameter (DI) 21.780 m Height (H) 52.000 0.000 52.000 meter Wall Thickness 70.000 cm Diameter (DO) 23.180 meter 5.2 Output data The difference in the horizontal wall pressure is not significant but the effect of the shear force and bending resulting from Euro code is governing the wall design reinforcement. The maximum moment usually occurs with case of eccentric flow channel while the ACI produces zero moment. The amount of pres stressed cable increases in case by around of 38% , for conventional reinforcement an increases by 42% and the overall coast increase by nearly 20% but design time jumps to 3 times more.
  • 6. 800 700 600 500 400 300 ACI 200 Euro Code 100 0 Total Reinforce Cost per Total cost cables ment ton Storage factor ACI 268.4016 263 337.03 585.50 Euro Code 371.9516 376 446.85 700.35 6 Conclusion The designer must have a full prediction of load combination and load path especial consideration and care to be taken in eccentric discharge flow channel, possibility of unexpected loading cases such as non-uniform and thermal effects. Special attention must be given to how the most critical details in the silo and its supporting structure will be constructed and fabricated, always try to use standard method else all
  • 7. details to be clearly provided. Extreme care to the foundation settlement which must be avoided and monitored during and after construction. The new Euro code method is time consuming than previous design codes but recommendation for new silos to be designed with the Euro code as the ACI will lead to underestimate the wall loads, the discharge from single outlet to be minimized to the shortest period. High quality control on site during construction is a must. Previous silos also may be reassert by the Euro code especially for eccentric discharge silos 7 References 1. Hug Mckay “Implication of the new Euro code on the design of cement raw meal silo” 2. ACI Standards 313-97 standard practice for design and construction of concrete silos and stacking tubes for storing granular materials. 3. Din 1055-6 “loads in silo bin” 4. IBAU HAMBURG “Central Cone Silos from the structural point of view silos. 5. John W. Carson and Tracy Holmes “Silo failure: why do they happen?”