MARY, O. E.
 DEMING CYCLE: PDCA
 SIX SIGMA: REDUCE
ERRORS, BY
ELIMINATING WASTE
99.99999%
 MODEL CYCLE:
Essentially all models
are wrong, but some
are useful
1. To UNDERSTAND the meaning of Quality
Assurance
2. To KNOW the importance of Quality
Assurance
3. To REVIEW the Quality Assurance
processes in QES
4. To ADOPT a Quality Assurance Model
 What is Quality Assurance (QA)?
QA is an organisation’s guarantee that the product or services it
offers meets the accepted quality standards. It is achieved by
identifying what “quality” means in context; specifying methods
by which its presence can be measured to ensure conformance.
 Why Quality Assurance (QA)?
QA is imperative in every organisation, because its ensures
that organizational policies and standards are strictly
adhered and implemented in every process, product, and
services, to ensure that only the best results are achieved.
Some of the importance of QA are:
No.1
It creates an opportunity to monitor and to
continually improve the development process until
the final product simultaneously meets the
development firm and the customer’s standards.
No. 2
QA is crucial to making sure that standards and
procedures are followed
No. 3
To ensure the founding problems are fixed.
No. 4
It will improve customer satisfaction.
A Review of QA
In
Quanteq Enterprise Solutions
Start
Business
Development
Requirement
Gathering
Yes/No
Implement
Needs
Assessment
End
Profile
Organization
Marketing
Event,
Business
Analysis
Propose Solution
Get approval for
client site
visitation
Get Project
Award Letter System Analysis
Building &
Testing
Approved/
Disapproved
Training/ Support
Yes
Approved
Disapproved
NO
Yes/ No YES
NO
Blueprint
Design
KEY DESCRIPTION
A Business idea is initiated, and the steps to achieve it
commences
Major business/ project process activities.
Sub-business/ project process activities
Documents obtained at various stages of the process
Decisions determining whether the project can proceed or
terminate
Blueprint Design
End of business process
Start
Blueprint
Design
Yes/ No
End
PROCESS NAME BUSINESS DEVELOPMENT AND PROJECT MANAGEMENT
PROCESS DESCRIPTION The complete process for business development, through
needs assessment up till project award, development and
deployment for QES.
TOTAL NUMBER OF
PROCESSES
8
DEPARTMENT QUANTEQ ENTERPRISE SOLUTIONS (QES)
PROCESS LABEL DESCRIPTION
BUSINESS
DEVELOPMENT
A meeting is conducted in the practice on how to develop business; the
Practice head and business development team meet and plan on various
ways to get clients, or meet with organizations.
PROCESS RECIPIENT Practice Heads and Business Development Team
DURATION 3 weeks – 1 month period for planning for, and organizing
INPUT  Business development team
 Financial resources
 Documentation
 Invited guests of organizations
ACTION  Marketing Events
 One-on-one
 Profiling Organizations
OUTPUT  Established contact within an organization
 Letter of Approval for client site visitation
DECISION If the above action is successfully established, the organization may
approve a client site visitation or disapprove of it.
REQUIREMENT
GATHERING
IT Strategic Planning
PROCESS RECIPIENT Business Analyst, Business Developers, Client
DURATION 2 weeks – 1 month period
INPUT Business Analyst, Business Developers, Stakeholders
Questionnaires
One-on-one
ACTION Needs Assessment
Gap Analysis
OUTPUT IT requirements document
Proposal Document
PROPOSE SOLUTION
With the information gathered during the IT strategic
planning, the BD team writes a proposal to the
organization, stating their IT needs.
PROCESS RECIPIENT Business and Systems Analysis
DURATION 1 week
INPUT Business Analyst and Systems Analyst of ESG
ACTION Draft a proposal letter to organization stating findings and
best solutions to achieve client organizational objectives/
goals.
Meet with stakeholder of the organization to conduct an
analysis of clients needs.
OUTPUT Proposal Document
Business Requirement Document
Service Level Agreement (SLA)
Project Award Letter
DECISION If the proposal is accepted, the client approves for a Business
Analysis of the solution and a Project Award Letter is issued; If
rejected, the team goes back to review their findings.
SYSTEM ANALYSIS
With the project awarded, roles and responsibilities are
assigned to various teams that are set up. The Infrastructure
specialist receives the Business Requirement Document and
commence work. He designs a blueprint document,
mapping out the design of the project.
PROCESS RECIPIENT Infrastructure Specialist
DURATION 3 – 4 weeks
INPUT Infrastructure Specialist
Team leads
ACTION Infrastructure Specialist reviews Business Requirement
Document
Project is planned, teams are set up
Roles and Responsibilities are assigned to various teams
Design blueprint document
OUTPUT Project Blueprint Design
BUILDING AND
TESTING
With the blueprint design as a guide, a team of infrastructure
personnel commence work on building the project.
PROCESS RECIPIENT IT Infrastructure team
DURATION 3 months – 1 year, depending on the project
INPUT IT Infrastructure team
Materials needed for building the project
ACTION Building the solution
Testing
OUTPUT Completed project
DECISION If the solution is tested and working fine, the client approves it to
be implemented; otherwise, it is rejected and the Infrastructure
team goes back to review the Blueprint design, and correct their
lapses.
IMPLEMENTATION
With the approval for deployment, the IT team
proceeds to implement the designed solution at client
site.
PROCESS RECIPIENT Client
INPUT Project Team
ACTION Client Check
Sign Off
TRAINING/SUPPORT
After the project has been implemented, the client staff or IT
personnels are trained on how to use the solution.
INPUT Trainers
Staff of the organization
Training manuals
DURATION 1 – 2 weeks
ACTION Training of staff on usage of solution, and how it works.
Send support staff to client location (if stated in SLA)
Documentation of lessons learnt.
OUTPUT Knowledge gained
Certificate of Project Completion
END End of business development
QUALITY ASSURANCE

More Related Content

What's hot

Mapa procesos pmbok 5
Mapa procesos pmbok 5Mapa procesos pmbok 5
Mapa procesos pmbok 5Pedro Arcas
 
Project health check updated and improved
Project health check updated and improvedProject health check updated and improved
Project health check updated and improved
Project Management Solutions
 
Software Project Success Through Value Assurance
Software Project Success Through Value AssuranceSoftware Project Success Through Value Assurance
Software Project Success Through Value AssuranceValueware
 
Mikel huth
Mikel huthMikel huth
Mikel huth
Mikel Huth
 
HOD - Job Description
HOD - Job DescriptionHOD - Job Description
HOD - Job Description
Sanjay Sheth
 
Implementing InfinityHR
Implementing InfinityHRImplementing InfinityHR
Implementing InfinityHR
Infinity Software Solutions
 
FCB Partners Course Overview: Process Redesign
FCB Partners Course Overview: Process RedesignFCB Partners Course Overview: Process Redesign
FCB Partners Course Overview: Process Redesign
FCBPartners
 
Project management Critical Success Factor
Project management Critical Success FactorProject management Critical Success Factor
Project management Critical Success Factor
Venture Advisors
 
Idea Management & Systems
Idea Management & SystemsIdea Management & Systems
Idea Management & Systems
Anand Subramaniam
 
Project management issues and their solution
Project management issues and their solutionProject management issues and their solution
Project management issues and their solution
Orangescrum
 
Detailed concepts of the Plan Do Check Act Process – Critical to achieving an...
Detailed concepts of the Plan Do Check Act Process – Critical to achieving an...Detailed concepts of the Plan Do Check Act Process – Critical to achieving an...
Detailed concepts of the Plan Do Check Act Process – Critical to achieving an...
ASQ Buffalo NY
 
CHAPMO brochure
CHAPMO brochureCHAPMO brochure
SITB130: Project Management for the Digitally Enabled
SITB130: Project Management for the Digitally EnabledSITB130: Project Management for the Digitally Enabled
SITB130: Project Management for the Digitally Enabled
Ivanti
 
FCB Partners Course Overview: Process Owners in Action
FCB Partners Course Overview: Process Owners in ActionFCB Partners Course Overview: Process Owners in Action
FCB Partners Course Overview: Process Owners in Action
FCBPartners
 
Project Management Value Proposition V1.0
Project Management Value Proposition V1.0Project Management Value Proposition V1.0
Project Management Value Proposition V1.0
Catalyst Project Solutions
 
7.0 Delivering in an Agile Environment
7.0 Delivering in an Agile Environment7.0 Delivering in an Agile Environment
7.0 Delivering in an Agile Environment
DavidMcLachlan1
 
Quality Improvement Techniques
Quality Improvement TechniquesQuality Improvement Techniques
Quality Improvement Techniques
Shreeya Jain
 
Project Execution & Control Checklist
Project Execution & Control ChecklistProject Execution & Control Checklist
Project Execution & Control Checklist
Anand Subramaniam
 
Project Managment
Project Managment Project Managment
Project Managment
Reema
 

What's hot (20)

Mapa procesos pmbok 5
Mapa procesos pmbok 5Mapa procesos pmbok 5
Mapa procesos pmbok 5
 
Project health check updated and improved
Project health check updated and improvedProject health check updated and improved
Project health check updated and improved
 
Software Project Success Through Value Assurance
Software Project Success Through Value AssuranceSoftware Project Success Through Value Assurance
Software Project Success Through Value Assurance
 
Mikel huth
Mikel huthMikel huth
Mikel huth
 
HOD - Job Description
HOD - Job DescriptionHOD - Job Description
HOD - Job Description
 
Implementing InfinityHR
Implementing InfinityHRImplementing InfinityHR
Implementing InfinityHR
 
FCB Partners Course Overview: Process Redesign
FCB Partners Course Overview: Process RedesignFCB Partners Course Overview: Process Redesign
FCB Partners Course Overview: Process Redesign
 
Project management Critical Success Factor
Project management Critical Success FactorProject management Critical Success Factor
Project management Critical Success Factor
 
Paper-Milestone_met_what_next_1.0
Paper-Milestone_met_what_next_1.0Paper-Milestone_met_what_next_1.0
Paper-Milestone_met_what_next_1.0
 
Idea Management & Systems
Idea Management & SystemsIdea Management & Systems
Idea Management & Systems
 
Project management issues and their solution
Project management issues and their solutionProject management issues and their solution
Project management issues and their solution
 
Detailed concepts of the Plan Do Check Act Process – Critical to achieving an...
Detailed concepts of the Plan Do Check Act Process – Critical to achieving an...Detailed concepts of the Plan Do Check Act Process – Critical to achieving an...
Detailed concepts of the Plan Do Check Act Process – Critical to achieving an...
 
CHAPMO brochure
CHAPMO brochureCHAPMO brochure
CHAPMO brochure
 
SITB130: Project Management for the Digitally Enabled
SITB130: Project Management for the Digitally EnabledSITB130: Project Management for the Digitally Enabled
SITB130: Project Management for the Digitally Enabled
 
FCB Partners Course Overview: Process Owners in Action
FCB Partners Course Overview: Process Owners in ActionFCB Partners Course Overview: Process Owners in Action
FCB Partners Course Overview: Process Owners in Action
 
Project Management Value Proposition V1.0
Project Management Value Proposition V1.0Project Management Value Proposition V1.0
Project Management Value Proposition V1.0
 
7.0 Delivering in an Agile Environment
7.0 Delivering in an Agile Environment7.0 Delivering in an Agile Environment
7.0 Delivering in an Agile Environment
 
Quality Improvement Techniques
Quality Improvement TechniquesQuality Improvement Techniques
Quality Improvement Techniques
 
Project Execution & Control Checklist
Project Execution & Control ChecklistProject Execution & Control Checklist
Project Execution & Control Checklist
 
Project Managment
Project Managment Project Managment
Project Managment
 

Viewers also liked

ABHILASHA FORGING Presentation
ABHILASHA FORGING PresentationABHILASHA FORGING Presentation
ABHILASHA FORGING PresentationRajesh Zalavadia
 
Oeufs brouillés
Oeufs brouillésOeufs brouillés
Oeufs brouillésOscar Chu
 
Christopher_Bates_Spring_16_Collection_Runway_Show_TOM
Christopher_Bates_Spring_16_Collection_Runway_Show_TOMChristopher_Bates_Spring_16_Collection_Runway_Show_TOM
Christopher_Bates_Spring_16_Collection_Runway_Show_TOMChristopher Bates
 
UNIFIED COMMUNICATION SYSTEM
UNIFIED COMMUNICATION SYSTEMUNIFIED COMMUNICATION SYSTEM
UNIFIED COMMUNICATION SYSTEMMerrymary Tom
 
sewage thingy
sewage thingysewage thingy
sewage thingyOscar Chu
 
Shopkeeper3
Shopkeeper3Shopkeeper3
Shopkeeper3
Merrymary Tom
 
Développer sur la console Xbox One avec une application UWP. Les retours d'éx...
Développer sur la console Xbox One avec une application UWP. Les retours d'éx...Développer sur la console Xbox One avec une application UWP. Les retours d'éx...
Développer sur la console Xbox One avec une application UWP. Les retours d'éx...
Dailymotion
 
AvePoint - Death of the FileShare, as you know it.
AvePoint - Death of the FileShare, as you know it.AvePoint - Death of the FileShare, as you know it.
AvePoint - Death of the FileShare, as you know it.
garthluke
 
Tools In An Indian kitchen – Utensils
Tools In An Indian kitchen – UtensilsTools In An Indian kitchen – Utensils
Tools In An Indian kitchen – Utensils
Ram Gupta, CHA, MIH
 
Varroc Corporate Presentation - Forging Division
Varroc Corporate Presentation - Forging DivisionVarroc Corporate Presentation - Forging Division
Varroc Corporate Presentation - Forging Division
Chetan Mangaonkar
 
Must have tools for SharePoint
Must have tools for SharePointMust have tools for SharePoint
Must have tools for SharePoint
Alistair Pugin
 

Viewers also liked (11)

ABHILASHA FORGING Presentation
ABHILASHA FORGING PresentationABHILASHA FORGING Presentation
ABHILASHA FORGING Presentation
 
Oeufs brouillés
Oeufs brouillésOeufs brouillés
Oeufs brouillés
 
Christopher_Bates_Spring_16_Collection_Runway_Show_TOM
Christopher_Bates_Spring_16_Collection_Runway_Show_TOMChristopher_Bates_Spring_16_Collection_Runway_Show_TOM
Christopher_Bates_Spring_16_Collection_Runway_Show_TOM
 
UNIFIED COMMUNICATION SYSTEM
UNIFIED COMMUNICATION SYSTEMUNIFIED COMMUNICATION SYSTEM
UNIFIED COMMUNICATION SYSTEM
 
sewage thingy
sewage thingysewage thingy
sewage thingy
 
Shopkeeper3
Shopkeeper3Shopkeeper3
Shopkeeper3
 
Développer sur la console Xbox One avec une application UWP. Les retours d'éx...
Développer sur la console Xbox One avec une application UWP. Les retours d'éx...Développer sur la console Xbox One avec une application UWP. Les retours d'éx...
Développer sur la console Xbox One avec une application UWP. Les retours d'éx...
 
AvePoint - Death of the FileShare, as you know it.
AvePoint - Death of the FileShare, as you know it.AvePoint - Death of the FileShare, as you know it.
AvePoint - Death of the FileShare, as you know it.
 
Tools In An Indian kitchen – Utensils
Tools In An Indian kitchen – UtensilsTools In An Indian kitchen – Utensils
Tools In An Indian kitchen – Utensils
 
Varroc Corporate Presentation - Forging Division
Varroc Corporate Presentation - Forging DivisionVarroc Corporate Presentation - Forging Division
Varroc Corporate Presentation - Forging Division
 
Must have tools for SharePoint
Must have tools for SharePointMust have tools for SharePoint
Must have tools for SharePoint
 

Similar to QUALITY ASSURANCE

Ray Business Technologies Process Methodology
Ray Business Technologies Process MethodologyRay Business Technologies Process Methodology
Ray Business Technologies Process Methodology
ray biztech
 
Principles of effective software quality management
Principles of effective software quality managementPrinciples of effective software quality management
Principles of effective software quality management
Neeraj Tripathi
 
Process Improvement Teams.pptx
Process Improvement Teams.pptxProcess Improvement Teams.pptx
Process Improvement Teams.pptx
bill671640
 
Is your project not going well this will help you get it back on track
Is your project not going well this will help you get it back on trackIs your project not going well this will help you get it back on track
Is your project not going well this will help you get it back on track
Project Management Solutions
 
Psp Tsp Agile 3 1 En
Psp Tsp Agile 3 1 EnPsp Tsp Agile 3 1 En
Psp Tsp Agile 3 1 En
Frederick Lussier
 
3 Involving Key Stakeholders
3 Involving Key Stakeholders3 Involving Key Stakeholders
3 Involving Key Stakeholders
designer DATA
 
#Fundamental understanding of agile - By SN Panigrahi
#Fundamental understanding of agile - By SN Panigrahi#Fundamental understanding of agile - By SN Panigrahi
#Fundamental understanding of agile - By SN Panigrahi
SN Panigrahi, PMP
 
8 Steps to Effective and Successful Business Analysis
8 Steps to Effective and Successful Business Analysis8 Steps to Effective and Successful Business Analysis
8 Steps to Effective and Successful Business AnalysisNelson Huffman
 
IT Project and Digital Media Marketing Consulting
IT Project and Digital Media Marketing ConsultingIT Project and Digital Media Marketing Consulting
IT Project and Digital Media Marketing Consulting
DIgitalLeverage Consultancy Services
 
Certified Quality Business Analyst
Certified Quality Business AnalystCertified Quality Business Analyst
Certified Quality Business Analyst
DigiLEAF Inc
 
Максим Круковський «Сертифікація Agile від Project Management Institute» Kyiv...
Максим Круковський «Сертифікація Agile від Project Management Institute» Kyiv...Максим Круковський «Сертифікація Agile від Project Management Institute» Kyiv...
Максим Круковський «Сертифікація Agile від Project Management Institute» Kyiv...
Lviv Startup Club
 
Quality Control Report
Quality Control ReportQuality Control Report
Quality Control ReportEzevillo Zim
 
QM-009-Design for Six Sigma 2
QM-009-Design for Six Sigma 2QM-009-Design for Six Sigma 2
QM-009-Design for Six Sigma 2handbook
 
Methodologies 3: Using Spira for Waterfall
Methodologies 3: Using Spira for WaterfallMethodologies 3: Using Spira for Waterfall
Methodologies 3: Using Spira for Waterfall
Inflectra
 
PMI - ACP (Agile Certified Practitionar) Certification Exam Prep
PMI - ACP (Agile Certified Practitionar) Certification Exam PrepPMI - ACP (Agile Certified Practitionar) Certification Exam Prep
PMI - ACP (Agile Certified Practitionar) Certification Exam Prep
PrudentialSolutions
 
Agile ncr pramila hitachi consulting_future_coaching
Agile ncr pramila hitachi consulting_future_coachingAgile ncr pramila hitachi consulting_future_coaching
Agile ncr pramila hitachi consulting_future_coaching
AgileNCR2016
 

Similar to QUALITY ASSURANCE (20)

build-for-speed-brochure
build-for-speed-brochurebuild-for-speed-brochure
build-for-speed-brochure
 
Ray Business Technologies Process Methodology
Ray Business Technologies Process MethodologyRay Business Technologies Process Methodology
Ray Business Technologies Process Methodology
 
Principles of effective software quality management
Principles of effective software quality managementPrinciples of effective software quality management
Principles of effective software quality management
 
Types of Management
Types of ManagementTypes of Management
Types of Management
 
Process Improvement Teams.pptx
Process Improvement Teams.pptxProcess Improvement Teams.pptx
Process Improvement Teams.pptx
 
Is your project not going well this will help you get it back on track
Is your project not going well this will help you get it back on trackIs your project not going well this will help you get it back on track
Is your project not going well this will help you get it back on track
 
Psp Tsp Agile 3 1 En
Psp Tsp Agile 3 1 EnPsp Tsp Agile 3 1 En
Psp Tsp Agile 3 1 En
 
3 Involving Key Stakeholders
3 Involving Key Stakeholders3 Involving Key Stakeholders
3 Involving Key Stakeholders
 
#Fundamental understanding of agile - By SN Panigrahi
#Fundamental understanding of agile - By SN Panigrahi#Fundamental understanding of agile - By SN Panigrahi
#Fundamental understanding of agile - By SN Panigrahi
 
8 Steps to Effective and Successful Business Analysis
8 Steps to Effective and Successful Business Analysis8 Steps to Effective and Successful Business Analysis
8 Steps to Effective and Successful Business Analysis
 
IT Project and Digital Media Marketing Consulting
IT Project and Digital Media Marketing ConsultingIT Project and Digital Media Marketing Consulting
IT Project and Digital Media Marketing Consulting
 
Certified Quality Business Analyst
Certified Quality Business AnalystCertified Quality Business Analyst
Certified Quality Business Analyst
 
Максим Круковський «Сертифікація Agile від Project Management Institute» Kyiv...
Максим Круковський «Сертифікація Agile від Project Management Institute» Kyiv...Максим Круковський «Сертифікація Agile від Project Management Institute» Kyiv...
Максим Круковський «Сертифікація Agile від Project Management Institute» Kyiv...
 
Quality Control Report
Quality Control ReportQuality Control Report
Quality Control Report
 
QM-009-Design for Six Sigma 2
QM-009-Design for Six Sigma 2QM-009-Design for Six Sigma 2
QM-009-Design for Six Sigma 2
 
Pm audit and assessment approach final
Pm audit and assessment approach   finalPm audit and assessment approach   final
Pm audit and assessment approach final
 
Methodologies 3: Using Spira for Waterfall
Methodologies 3: Using Spira for WaterfallMethodologies 3: Using Spira for Waterfall
Methodologies 3: Using Spira for Waterfall
 
PMI - ACP (Agile Certified Practitionar) Certification Exam Prep
PMI - ACP (Agile Certified Practitionar) Certification Exam PrepPMI - ACP (Agile Certified Practitionar) Certification Exam Prep
PMI - ACP (Agile Certified Practitionar) Certification Exam Prep
 
Software Quality Assurance
Software Quality AssuranceSoftware Quality Assurance
Software Quality Assurance
 
Agile ncr pramila hitachi consulting_future_coaching
Agile ncr pramila hitachi consulting_future_coachingAgile ncr pramila hitachi consulting_future_coaching
Agile ncr pramila hitachi consulting_future_coaching
 

QUALITY ASSURANCE

  • 2.  DEMING CYCLE: PDCA  SIX SIGMA: REDUCE ERRORS, BY ELIMINATING WASTE 99.99999%  MODEL CYCLE: Essentially all models are wrong, but some are useful
  • 3. 1. To UNDERSTAND the meaning of Quality Assurance 2. To KNOW the importance of Quality Assurance 3. To REVIEW the Quality Assurance processes in QES 4. To ADOPT a Quality Assurance Model
  • 4.  What is Quality Assurance (QA)? QA is an organisation’s guarantee that the product or services it offers meets the accepted quality standards. It is achieved by identifying what “quality” means in context; specifying methods by which its presence can be measured to ensure conformance.
  • 5.  Why Quality Assurance (QA)? QA is imperative in every organisation, because its ensures that organizational policies and standards are strictly adhered and implemented in every process, product, and services, to ensure that only the best results are achieved. Some of the importance of QA are:
  • 6. No.1 It creates an opportunity to monitor and to continually improve the development process until the final product simultaneously meets the development firm and the customer’s standards.
  • 7. No. 2 QA is crucial to making sure that standards and procedures are followed
  • 8. No. 3 To ensure the founding problems are fixed.
  • 9. No. 4 It will improve customer satisfaction.
  • 10. A Review of QA In Quanteq Enterprise Solutions
  • 11. Start Business Development Requirement Gathering Yes/No Implement Needs Assessment End Profile Organization Marketing Event, Business Analysis Propose Solution Get approval for client site visitation Get Project Award Letter System Analysis Building & Testing Approved/ Disapproved Training/ Support Yes Approved Disapproved NO Yes/ No YES NO Blueprint Design
  • 12. KEY DESCRIPTION A Business idea is initiated, and the steps to achieve it commences Major business/ project process activities. Sub-business/ project process activities Documents obtained at various stages of the process Decisions determining whether the project can proceed or terminate Blueprint Design End of business process Start Blueprint Design Yes/ No End
  • 13. PROCESS NAME BUSINESS DEVELOPMENT AND PROJECT MANAGEMENT PROCESS DESCRIPTION The complete process for business development, through needs assessment up till project award, development and deployment for QES. TOTAL NUMBER OF PROCESSES 8 DEPARTMENT QUANTEQ ENTERPRISE SOLUTIONS (QES)
  • 14. PROCESS LABEL DESCRIPTION BUSINESS DEVELOPMENT A meeting is conducted in the practice on how to develop business; the Practice head and business development team meet and plan on various ways to get clients, or meet with organizations. PROCESS RECIPIENT Practice Heads and Business Development Team DURATION 3 weeks – 1 month period for planning for, and organizing INPUT  Business development team  Financial resources  Documentation  Invited guests of organizations ACTION  Marketing Events  One-on-one  Profiling Organizations OUTPUT  Established contact within an organization  Letter of Approval for client site visitation DECISION If the above action is successfully established, the organization may approve a client site visitation or disapprove of it.
  • 15. REQUIREMENT GATHERING IT Strategic Planning PROCESS RECIPIENT Business Analyst, Business Developers, Client DURATION 2 weeks – 1 month period INPUT Business Analyst, Business Developers, Stakeholders Questionnaires One-on-one ACTION Needs Assessment Gap Analysis OUTPUT IT requirements document Proposal Document
  • 16. PROPOSE SOLUTION With the information gathered during the IT strategic planning, the BD team writes a proposal to the organization, stating their IT needs. PROCESS RECIPIENT Business and Systems Analysis DURATION 1 week INPUT Business Analyst and Systems Analyst of ESG ACTION Draft a proposal letter to organization stating findings and best solutions to achieve client organizational objectives/ goals. Meet with stakeholder of the organization to conduct an analysis of clients needs. OUTPUT Proposal Document Business Requirement Document Service Level Agreement (SLA) Project Award Letter DECISION If the proposal is accepted, the client approves for a Business Analysis of the solution and a Project Award Letter is issued; If rejected, the team goes back to review their findings.
  • 17. SYSTEM ANALYSIS With the project awarded, roles and responsibilities are assigned to various teams that are set up. The Infrastructure specialist receives the Business Requirement Document and commence work. He designs a blueprint document, mapping out the design of the project. PROCESS RECIPIENT Infrastructure Specialist DURATION 3 – 4 weeks INPUT Infrastructure Specialist Team leads ACTION Infrastructure Specialist reviews Business Requirement Document Project is planned, teams are set up Roles and Responsibilities are assigned to various teams Design blueprint document OUTPUT Project Blueprint Design
  • 18. BUILDING AND TESTING With the blueprint design as a guide, a team of infrastructure personnel commence work on building the project. PROCESS RECIPIENT IT Infrastructure team DURATION 3 months – 1 year, depending on the project INPUT IT Infrastructure team Materials needed for building the project ACTION Building the solution Testing OUTPUT Completed project DECISION If the solution is tested and working fine, the client approves it to be implemented; otherwise, it is rejected and the Infrastructure team goes back to review the Blueprint design, and correct their lapses.
  • 19. IMPLEMENTATION With the approval for deployment, the IT team proceeds to implement the designed solution at client site. PROCESS RECIPIENT Client INPUT Project Team ACTION Client Check Sign Off
  • 20. TRAINING/SUPPORT After the project has been implemented, the client staff or IT personnels are trained on how to use the solution. INPUT Trainers Staff of the organization Training manuals DURATION 1 – 2 weeks ACTION Training of staff on usage of solution, and how it works. Send support staff to client location (if stated in SLA) Documentation of lessons learnt. OUTPUT Knowledge gained Certificate of Project Completion END End of business development