Strategic Projects – Q1 Report
MC-LC Cooperation Customization
Term Shift Management
Term Shift Mgmt Report
Q1 2014
Goals of the project
Optimizing timeline of organizational
general processes towards external,
internal & network realities to boost ELD
long term performance while
maintaining members’ high quality
AIESEC experience.
Milestones of the project
•  Presentation of the idea during SumCo, gaining trust of AIESEC in Poland
towards possible change
•  Data collection and preperations
•  ST work
•  Gathering BOA feedback
•  Compendium correction preperation – I + II
•  Voting for the change on General Assembly - I
•  Presentation of the proposal to the LCPs with gathering topics to work on
•  Voting for the change on General Assembly - II
•  Providing education towards change management
•  Monitoring Implementation
•  Timeline revision during Re-planning
•  Discussion about correction with LCP current & LCP elect
•  Discussion about correction in EBs
•  Voting on GA
I – term shift 13.14
II – term shift 2015
III – term shift 14.15
Overall Factors
•  Replanning with MC Team – P
•  NPM - P
Term Shift Mgmt in Q3 2013
Key Achievements:
•  Timeline review with MC
Team during re-planning
and common
understanding around
correction
•  Building understanding
among LCPs Currects
•  Building understanding
among LCPs Elects
•  Building understaning in
Local Committees
•  GA preperation for voting
Key Non-Achievements
•  Need for correction after
1st timeline suggestion
Term Shift Mgmt
in upcoming time
Priorities for April:
•  Voting for change
during GA
Priorities for Q4:
•  Voting for change
during GA
MC-LC Cooperation
Customization Report
Q1 2014
Goals of the project
Designing & providing strategic
organizational initiatives connecting MC
and LC in a way to:
•  enable LCs’ short-term growth
•  enable LCs’ capitalization on own potential
•  address diversity of LC realities
•  maximize on the limited limeline &
resources
Piliars of the project
Coaching	
  
Na+onal	
  
Conference	
  
Cycle	
  
LC	
  Planning	
  
Milestones of the
Coaching sub-project
•  Current state analysis
•  Desired state envisioning
•  Coaching strategy creation
•  Feedback gathering & correction
•  Coaching application releasment
•  LC Coaches allocation
•  LC Coaches announcement
•  Creation of coaching tools
•  Coaches education
•  Coaches and coaching timeline management
•  Coaching round feedback gathering & evaluation
•  Coaching strategy improvement
Overall Factors
•  Lack of response from the LC level – EBs where not
answering at the end of their term.
•  Overpack MC calendar which will limit our delivery.
•  OD NST creation & launch
•  Coaching Strategy Part 2 done – launch and
assignation
Coaching sub-project
in Q1 2014
Key Achievements:
•  Closure of 1st part of
the strategy with final
LC touchpoint.
•  Analysis of the strategy
with great results
•  Launch 2nd part of
coaching
•  New assignation of
coachees
•  LC touchpoint at NFS.
Key Non-Achievements
•  Calendar is overpack
and due to this LC visits
will be limited (less
than for the 1st part of
the strategy)
Coaching sub-project
in upcoming time
Priorities for April:
•  Coaching Visits
•  OD Task force with NST
•  OD NST follow up about
GDC framework and
delivery.
Priorities for Q1:
•  Deliver 2nd part of
coaching visits.
•  GDC framework with
NST to be deliver in
transition.
Coaching sub-project:
Contribution Needed (who & what)
•  All MC members that have LC
assigned to deliver the coaching.
Milestones of the National
Conference Cycle sub-project
•  Current state analysis
•  Desired state envisioning
•  National Conference Cycle creation
•  Feedback gathering & correction
•  Conference Cycle I + application
releasment
•  SumCo preperations & delivery
management
•  SumCo evaluation
Milestones of the National
Conference Cycle sub-project
•  Summits preperations & delivery management
•  Conference Cycle II + application releasment
•  Summits preperations & delivery management
•  Summits evaluation
•  Winco preperations & delivery management
•  Winco evaluation
•  NPM preperations & delivery management
•  NPM evaluation
•  MultiTo preperations & delivery management
•  Multito evaluation
•  LeadCo Host LC selection
•  LeadCo preperations & delivery management
•  LeadCo evaluation
•  Further platforms preperations & delivery management
•  Further platforms evaluation
Overall Factors
•  High ammount of conferences in a short period of
time - N
•  Lack of LCPs responsibility for common good lack of
hosting LC – N
•  Lack of Conference Manager role assignment for
LeadCo at the beginning of the term – N
•  Lack of proper internet connection for online
evaluations - N
National Conference Cycle
in Q3 2013
Key Achievements:
•  NPM Delivery
•  MultiTo Delivery
•  NFS Delivery
Key Non-Achievements:
•  Lack of host LC for
LeadCo
•  Lack of virtual
evaluations from NFS
National Conference Cycle
in upcoming time
Priorities for April:
•  LeadCo Agenda &
Conference
Management
•  LeadCo delivery
Priorities for Q1:
•  Revision of Conference
Cycle for the whole 14.15
term and ahead
•  Transition about
Conference
Management for L&D
•  SumCo BID releasment
Milestones of the LC Planning
sub-project
•  Planning 2013 evaluation [MCVP OD, BOA, ST]
•  Desired state envisioning
•  Planning process creation
•  Feedback gathering & correction
•  Planning process elements delegating
•  Providing feedback & correction
•  Planning process consolidation
•  Planning process educating [NMP]
•  Planning process implementation monitoring
•  LC plans gathering
•  Feedback towards LC plans by MC team
•  LC plans correction
•  Final consolidation of LC plans
•  Sending plans to Market Place
Overall Factors
•  Absence of VP OD and IM Manager – N
•  Need for changes after IMP – N (for pace of the
process)
•  Physical touchpoint during NFS – P
LC Planning in Q1 2014
Key Achievements:
•  2014 January plans
consolidation
•  Feedback and
recommendations
delivery for LCPs Elects
and Currents during
NFS
Key Non-Achievements
•  Not all of the LCs
making corrections
Key priorities in April:
•  LC Planning
consolidation
•  LC Plans realization Q1
Sum up
Key priorities in Q2:
•  Planning 2014 final
consolidation
•  Planning 2015
preperations for
SumCo
LC Planning in upcoming time

More Related Content

What's hot

Practical Guide to Useful Project Management Plan
Practical Guide to Useful Project Management PlanPractical Guide to Useful Project Management Plan
Practical Guide to Useful Project Management PlanDmitriy Nizhebetskiy
 
Rising from projects to programs and improve accountability - Oracle Primaver...
Rising from projects to programs and improve accountability - Oracle Primaver...Rising from projects to programs and improve accountability - Oracle Primaver...
Rising from projects to programs and improve accountability - Oracle Primaver...p6academy
 
Projectplanningandprojectworkplan Amit Payal
Projectplanningandprojectworkplan Amit PayalProjectplanningandprojectworkplan Amit Payal
Projectplanningandprojectworkplan Amit PayalAMIT PAYAL
 
Project Implementation Process
Project Implementation ProcessProject Implementation Process
Project Implementation Processeklaksh
 
Jennifer Heggs current resume as at January June 2015 Optus - public
Jennifer Heggs current resume as at January June 2015 Optus - publicJennifer Heggs current resume as at January June 2015 Optus - public
Jennifer Heggs current resume as at January June 2015 Optus - publicJennifer Heggs
 
Program management at an electric utility
Program management at an electric utilityProgram management at an electric utility
Program management at an electric utilityp6academy
 
Schedule Development
Schedule DevelopmentSchedule Development
Schedule DevelopmentChris Carson
 
Agile Program Management Process
Agile Program Management ProcessAgile Program Management Process
Agile Program Management ProcessGlen Alleman
 
Better release planning for Feature Teams
Better release planning for Feature TeamsBetter release planning for Feature Teams
Better release planning for Feature TeamsAmit Singh
 
PMP Exam Prep - Time Management
PMP Exam Prep - Time ManagementPMP Exam Prep - Time Management
PMP Exam Prep - Time Managementtkrikau
 
Za project & project cycle management
Za   project & project cycle managementZa   project & project cycle management
Za project & project cycle managementhamza khwaja
 
Gestione della pianificazione e controllo
Gestione della pianificazione e controlloGestione della pianificazione e controllo
Gestione della pianificazione e controlloManager.it
 
Scala signature introduction
Scala signature introductionScala signature introduction
Scala signature introductionBoyan Yordanov
 
Fairfax County's Public Facilities Manual (PFM): Update to the Providence Dis...
Fairfax County's Public Facilities Manual (PFM): Update to the Providence Dis...Fairfax County's Public Facilities Manual (PFM): Update to the Providence Dis...
Fairfax County's Public Facilities Manual (PFM): Update to the Providence Dis...Fairfax County
 
Project Management: Cost Management Knowledge Area
Project Management: Cost Management Knowledge AreaProject Management: Cost Management Knowledge Area
Project Management: Cost Management Knowledge AreaJoshua Render
 

What's hot (20)

Project Monitoring System (PMIS)
Project Monitoring System (PMIS)Project Monitoring System (PMIS)
Project Monitoring System (PMIS)
 
Project Control
Project ControlProject Control
Project Control
 
Practical Guide to Useful Project Management Plan
Practical Guide to Useful Project Management PlanPractical Guide to Useful Project Management Plan
Practical Guide to Useful Project Management Plan
 
Rising from projects to programs and improve accountability - Oracle Primaver...
Rising from projects to programs and improve accountability - Oracle Primaver...Rising from projects to programs and improve accountability - Oracle Primaver...
Rising from projects to programs and improve accountability - Oracle Primaver...
 
GWP Programme Management presentation
GWP Programme Management presentationGWP Programme Management presentation
GWP Programme Management presentation
 
Projectplanningandprojectworkplan Amit Payal
Projectplanningandprojectworkplan Amit PayalProjectplanningandprojectworkplan Amit Payal
Projectplanningandprojectworkplan Amit Payal
 
Project Implementation Process
Project Implementation ProcessProject Implementation Process
Project Implementation Process
 
Jennifer Heggs current resume as at January June 2015 Optus - public
Jennifer Heggs current resume as at January June 2015 Optus - publicJennifer Heggs current resume as at January June 2015 Optus - public
Jennifer Heggs current resume as at January June 2015 Optus - public
 
Program management at an electric utility
Program management at an electric utilityProgram management at an electric utility
Program management at an electric utility
 
Schedule Development
Schedule DevelopmentSchedule Development
Schedule Development
 
Agile Program Management Process
Agile Program Management ProcessAgile Program Management Process
Agile Program Management Process
 
Better release planning for Feature Teams
Better release planning for Feature TeamsBetter release planning for Feature Teams
Better release planning for Feature Teams
 
PMP Exam Prep - Time Management
PMP Exam Prep - Time ManagementPMP Exam Prep - Time Management
PMP Exam Prep - Time Management
 
Za project & project cycle management
Za   project & project cycle managementZa   project & project cycle management
Za project & project cycle management
 
Gestione della pianificazione e controllo
Gestione della pianificazione e controlloGestione della pianificazione e controllo
Gestione della pianificazione e controllo
 
Scala signature introduction
Scala signature introductionScala signature introduction
Scala signature introduction
 
Fairfax County's Public Facilities Manual (PFM): Update to the Providence Dis...
Fairfax County's Public Facilities Manual (PFM): Update to the Providence Dis...Fairfax County's Public Facilities Manual (PFM): Update to the Providence Dis...
Fairfax County's Public Facilities Manual (PFM): Update to the Providence Dis...
 
Nine Things-in-the-PMBoK
Nine Things-in-the-PMBoKNine Things-in-the-PMBoK
Nine Things-in-the-PMBoK
 
PP action plans
PP action plansPP action plans
PP action plans
 
Project Management: Cost Management Knowledge Area
Project Management: Cost Management Knowledge AreaProject Management: Cost Management Knowledge Area
Project Management: Cost Management Knowledge Area
 

Viewers also liked

Point Of Sales
Point Of SalesPoint Of Sales
Point Of Saleslohch3
 
Superior Glove: Construction Safety Mistakes You’re Probably Making & How to ...
Superior Glove: Construction Safety Mistakes You’re Probably Making & How to ...Superior Glove: Construction Safety Mistakes You’re Probably Making & How to ...
Superior Glove: Construction Safety Mistakes You’re Probably Making & How to ...Superior Glove Works Ltd.
 
Water for domestic use
Water for domestic useWater for domestic use
Water for domestic useZTE Nepal
 
Construction Industry Augmented Reality
Construction Industry Augmented RealityConstruction Industry Augmented Reality
Construction Industry Augmented RealityARMarketing.org
 
Armour Tec AC-910 Presentation Portable Building Market
Armour Tec AC-910 Presentation Portable Building MarketArmour Tec AC-910 Presentation Portable Building Market
Armour Tec AC-910 Presentation Portable Building MarketAnthony Kershaw
 
Rainwater Collecting to Offset Existing Water Uses
Rainwater Collecting to Offset Existing Water UsesRainwater Collecting to Offset Existing Water Uses
Rainwater Collecting to Offset Existing Water UsesBrian Gregson
 
3rd grade weather lesson
3rd grade weather lesson3rd grade weather lesson
3rd grade weather lessonskrombach
 
Construction safety
Construction  safetyConstruction  safety
Construction safetyRanty Poddar
 
Construction Safety Presentation
Construction Safety PresentationConstruction Safety Presentation
Construction Safety Presentationheatherscott01
 
Water quality and sampling
Water quality and samplingWater quality and sampling
Water quality and samplingJasmine John
 
Construction safety management
Construction safety managementConstruction safety management
Construction safety managementGERServices
 
Construction site safety
Construction site safetyConstruction site safety
Construction site safetyDebajit Roy
 
Slideshare Powerpoint presentation
Slideshare Powerpoint presentationSlideshare Powerpoint presentation
Slideshare Powerpoint presentationelliehood
 

Viewers also liked (15)

Point Of Sales
Point Of SalesPoint Of Sales
Point Of Sales
 
Superior Glove: Construction Safety Mistakes You’re Probably Making & How to ...
Superior Glove: Construction Safety Mistakes You’re Probably Making & How to ...Superior Glove: Construction Safety Mistakes You’re Probably Making & How to ...
Superior Glove: Construction Safety Mistakes You’re Probably Making & How to ...
 
Water for domestic use
Water for domestic useWater for domestic use
Water for domestic use
 
Construction Industry Augmented Reality
Construction Industry Augmented RealityConstruction Industry Augmented Reality
Construction Industry Augmented Reality
 
Armour Tec AC-910 Presentation Portable Building Market
Armour Tec AC-910 Presentation Portable Building MarketArmour Tec AC-910 Presentation Portable Building Market
Armour Tec AC-910 Presentation Portable Building Market
 
What is water
What is waterWhat is water
What is water
 
Rainwater Collecting to Offset Existing Water Uses
Rainwater Collecting to Offset Existing Water UsesRainwater Collecting to Offset Existing Water Uses
Rainwater Collecting to Offset Existing Water Uses
 
Quality of potable water
Quality of potable waterQuality of potable water
Quality of potable water
 
3rd grade weather lesson
3rd grade weather lesson3rd grade weather lesson
3rd grade weather lesson
 
Construction safety
Construction  safetyConstruction  safety
Construction safety
 
Construction Safety Presentation
Construction Safety PresentationConstruction Safety Presentation
Construction Safety Presentation
 
Water quality and sampling
Water quality and samplingWater quality and sampling
Water quality and sampling
 
Construction safety management
Construction safety managementConstruction safety management
Construction safety management
 
Construction site safety
Construction site safetyConstruction site safety
Construction site safety
 
Slideshare Powerpoint presentation
Slideshare Powerpoint presentationSlideshare Powerpoint presentation
Slideshare Powerpoint presentation
 

Similar to Q1 review strategic projects (1)

Q1 functional report
Q1 functional reportQ1 functional report
Q1 functional report647435
 
Functional reports may 2014
Functional reports   may 2014Functional reports   may 2014
Functional reports may 2014647435
 
Monthly functional report january
Monthly functional report   januaryMonthly functional report   january
Monthly functional report january647435
 
Monthly functional report january
Monthly functional report   januaryMonthly functional report   january
Monthly functional report january647435
 
February review operations
February review   operationsFebruary review   operations
February review operations647435
 
Project Cycle Management WG5.ppt
Project Cycle Management WG5.pptProject Cycle Management WG5.ppt
Project Cycle Management WG5.pptMdFarhanShahriar3
 
Spending reviews: recent PB reform Agenda in Korea -- Nowook Park, Korea
Spending reviews: recent PB reform Agenda in Korea -- Nowook Park, KoreaSpending reviews: recent PB reform Agenda in Korea -- Nowook Park, Korea
Spending reviews: recent PB reform Agenda in Korea -- Nowook Park, KoreaOECD Governance
 
Accelerating your chapters goals by levergaing a lean pmo pmoday
Accelerating your chapters goals by levergaing a lean pmo   pmodayAccelerating your chapters goals by levergaing a lean pmo   pmoday
Accelerating your chapters goals by levergaing a lean pmo pmodayGuilherme Souto, MBA, PMP, CSM
 
Q3 functional report
Q3   functional reportQ3   functional report
Q3 functional report647435
 
Operations reports may 2014
Operations reports   may 2014Operations reports   may 2014
Operations reports may 2014647435
 
CGIAR Site Integration: Site Integration Plans – next steps
CGIAR Site Integration: Site Integration Plans – next stepsCGIAR Site Integration: Site Integration Plans – next steps
CGIAR Site Integration: Site Integration Plans – next stepsCGIAR
 
PMO Assurance: getting value from management information: Jon Street and Jez ...
PMO Assurance: getting value from management information: Jon Street and Jez ...PMO Assurance: getting value from management information: Jon Street and Jez ...
PMO Assurance: getting value from management information: Jon Street and Jez ...Association for Project Management
 
M&E of development projects and role of imed dr taibur
M&E of development projects and role of imed dr taiburM&E of development projects and role of imed dr taibur
M&E of development projects and role of imed dr taiburDr. Md. Taibur Rahman
 
Quarter operations
Quarter operationsQuarter operations
Quarter operations647435
 
Entity framework final
Entity framework finalEntity framework final
Entity framework finalArdian Widjaja
 
Strategy Implementation for Institutional Services Department of PANELCO III
Strategy Implementation for Institutional Services Department of PANELCO IIIStrategy Implementation for Institutional Services Department of PANELCO III
Strategy Implementation for Institutional Services Department of PANELCO IIIJo Balucanag - Bitonio
 
Punjab resource management programme; intervention in finance department
Punjab resource management programme; intervention in finance departmentPunjab resource management programme; intervention in finance department
Punjab resource management programme; intervention in finance departmentJean-Marc Lepain
 

Similar to Q1 review strategic projects (1) (20)

Q1 functional report
Q1 functional reportQ1 functional report
Q1 functional report
 
Functional reports may 2014
Functional reports   may 2014Functional reports   may 2014
Functional reports may 2014
 
Monthly functional report january
Monthly functional report   januaryMonthly functional report   january
Monthly functional report january
 
Monthly functional report january
Monthly functional report   januaryMonthly functional report   january
Monthly functional report january
 
February review operations
February review   operationsFebruary review   operations
February review operations
 
Project Cycle Management WG5.ppt
Project Cycle Management WG5.pptProject Cycle Management WG5.ppt
Project Cycle Management WG5.ppt
 
Spending reviews: recent PB reform Agenda in Korea -- Nowook Park, Korea
Spending reviews: recent PB reform Agenda in Korea -- Nowook Park, KoreaSpending reviews: recent PB reform Agenda in Korea -- Nowook Park, Korea
Spending reviews: recent PB reform Agenda in Korea -- Nowook Park, Korea
 
Accelerating your chapters goals by levergaing a lean pmo pmoday
Accelerating your chapters goals by levergaing a lean pmo   pmodayAccelerating your chapters goals by levergaing a lean pmo   pmoday
Accelerating your chapters goals by levergaing a lean pmo pmoday
 
Q3 functional report
Q3   functional reportQ3   functional report
Q3 functional report
 
Operations reports may 2014
Operations reports   may 2014Operations reports   may 2014
Operations reports may 2014
 
CGIAR Site Integration: Site Integration Plans – next steps
CGIAR Site Integration: Site Integration Plans – next stepsCGIAR Site Integration: Site Integration Plans – next steps
CGIAR Site Integration: Site Integration Plans – next steps
 
PMO Assurance: getting value from management information: Jon Street and Jez ...
PMO Assurance: getting value from management information: Jon Street and Jez ...PMO Assurance: getting value from management information: Jon Street and Jez ...
PMO Assurance: getting value from management information: Jon Street and Jez ...
 
Pm audit and assessment approach final
Pm audit and assessment approach   finalPm audit and assessment approach   final
Pm audit and assessment approach final
 
M&E of development projects and role of imed dr taibur
M&E of development projects and role of imed dr taiburM&E of development projects and role of imed dr taibur
M&E of development projects and role of imed dr taibur
 
Quarter operations
Quarter operationsQuarter operations
Quarter operations
 
Entity framework final
Entity framework finalEntity framework final
Entity framework final
 
Strategy Implementation for Institutional Services Department of PANELCO III
Strategy Implementation for Institutional Services Department of PANELCO IIIStrategy Implementation for Institutional Services Department of PANELCO III
Strategy Implementation for Institutional Services Department of PANELCO III
 
Starting up a project. Things to do.pptx
Starting up a project. Things to do.pptxStarting up a project. Things to do.pptx
Starting up a project. Things to do.pptx
 
Punjab resource management programme; intervention in finance department
Punjab resource management programme; intervention in finance departmentPunjab resource management programme; intervention in finance department
Punjab resource management programme; intervention in finance department
 
From Strategy to Operations ProjectWorld 2013
From Strategy to Operations ProjectWorld 2013From Strategy to Operations ProjectWorld 2013
From Strategy to Operations ProjectWorld 2013
 

More from 647435

The Very Last General Assembly
The Very Last General AssemblyThe Very Last General Assembly
The Very Last General Assembly647435
 
Operations reports may 2014
Operations reports   may 2014Operations reports   may 2014
Operations reports may 2014647435
 
Q1 review strategic projects (1)
Q1 review   strategic projects (1)Q1 review   strategic projects (1)
Q1 review strategic projects (1)647435
 
Monthly review financial model february
Monthly review   financial model februaryMonthly review   financial model february
Monthly review financial model february647435
 
Monthly review functional february
Monthly review   functional februaryMonthly review   functional february
Monthly review functional february647435
 
Monthly operational report january
Monthly operational report   januaryMonthly operational report   january
Monthly operational report january647435
 
Poland mc npm 2014 outputs going beyond and enjoying big aiesec poland
Poland mc npm 2014 outputs going beyond and enjoying big aiesec polandPoland mc npm 2014 outputs going beyond and enjoying big aiesec poland
Poland mc npm 2014 outputs going beyond and enjoying big aiesec poland647435
 
Monthly review december strategic projects
Monthly review december   strategic projectsMonthly review december   strategic projects
Monthly review december strategic projects647435
 
Monthly review december operations
Monthly review december   operationsMonthly review december   operations
Monthly review december operations647435
 
Monthly reports december functional
Monthly reports december   functionalMonthly reports december   functional
Monthly reports december functional647435
 
Monthly review november funcional
Monthly review november   funcional Monthly review november   funcional
Monthly review november funcional 647435
 
Monthly review november operations
Monthly review november   operationsMonthly review november   operations
Monthly review november operations647435
 
Functional monthly report october
Functional monthly report   october Functional monthly report   october
Functional monthly report october 647435
 
Operations monthly review october
Operations monthly review octoberOperations monthly review october
Operations monthly review october647435
 
Strategic projects report october
Strategic projects report   octoberStrategic projects report   october
Strategic projects report october647435
 
Q3 operations report
Q3   operations reportQ3   operations report
Q3 operations report647435
 
July 2013 functional plans review
July 2013   functional plans reviewJuly 2013   functional plans review
July 2013 functional plans review647435
 
August 2013 functional projects monthly review
August 2013   functional projects monthly reviewAugust 2013   functional projects monthly review
August 2013 functional projects monthly review647435
 
July 2013 operational plans review
July 2013   operational plans reviewJuly 2013   operational plans review
July 2013 operational plans review647435
 

More from 647435 (19)

The Very Last General Assembly
The Very Last General AssemblyThe Very Last General Assembly
The Very Last General Assembly
 
Operations reports may 2014
Operations reports   may 2014Operations reports   may 2014
Operations reports may 2014
 
Q1 review strategic projects (1)
Q1 review   strategic projects (1)Q1 review   strategic projects (1)
Q1 review strategic projects (1)
 
Monthly review financial model february
Monthly review   financial model februaryMonthly review   financial model february
Monthly review financial model february
 
Monthly review functional february
Monthly review   functional februaryMonthly review   functional february
Monthly review functional february
 
Monthly operational report january
Monthly operational report   januaryMonthly operational report   january
Monthly operational report january
 
Poland mc npm 2014 outputs going beyond and enjoying big aiesec poland
Poland mc npm 2014 outputs going beyond and enjoying big aiesec polandPoland mc npm 2014 outputs going beyond and enjoying big aiesec poland
Poland mc npm 2014 outputs going beyond and enjoying big aiesec poland
 
Monthly review december strategic projects
Monthly review december   strategic projectsMonthly review december   strategic projects
Monthly review december strategic projects
 
Monthly review december operations
Monthly review december   operationsMonthly review december   operations
Monthly review december operations
 
Monthly reports december functional
Monthly reports december   functionalMonthly reports december   functional
Monthly reports december functional
 
Monthly review november funcional
Monthly review november   funcional Monthly review november   funcional
Monthly review november funcional
 
Monthly review november operations
Monthly review november   operationsMonthly review november   operations
Monthly review november operations
 
Functional monthly report october
Functional monthly report   october Functional monthly report   october
Functional monthly report october
 
Operations monthly review october
Operations monthly review octoberOperations monthly review october
Operations monthly review october
 
Strategic projects report october
Strategic projects report   octoberStrategic projects report   october
Strategic projects report october
 
Q3 operations report
Q3   operations reportQ3   operations report
Q3 operations report
 
July 2013 functional plans review
July 2013   functional plans reviewJuly 2013   functional plans review
July 2013 functional plans review
 
August 2013 functional projects monthly review
August 2013   functional projects monthly reviewAugust 2013   functional projects monthly review
August 2013 functional projects monthly review
 
July 2013 operational plans review
July 2013   operational plans reviewJuly 2013   operational plans review
July 2013 operational plans review
 

Recently uploaded

Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesDipal Arora
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLSeo
 
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetCreating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetDenis Gagné
 
Socio-economic-Impact-of-business-consumers-suppliers-and.pptx
Socio-economic-Impact-of-business-consumers-suppliers-and.pptxSocio-economic-Impact-of-business-consumers-suppliers-and.pptx
Socio-economic-Impact-of-business-consumers-suppliers-and.pptxtrishalcan8
 
RE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman LeechRE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman LeechNewman George Leech
 
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service Pune
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service PuneVIP Call Girls Pune Kirti 8617697112 Independent Escort Service Pune
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service PuneCall girls in Ahmedabad High profile
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communicationskarancommunications
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Roland Driesen
 
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurVIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurSuhani Kapoor
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Neil Kimberley
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Dipal Arora
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...lizamodels9
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024christinemoorman
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayNZSG
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Serviceritikaroy0888
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Dave Litwiller
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst SummitHolger Mueller
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableDipal Arora
 

Recently uploaded (20)

Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
 
Forklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Operations: Safety through Cartoons
Forklift Operations: Safety through Cartoons
 
Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517
Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517
Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
 
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetCreating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
 
Socio-economic-Impact-of-business-consumers-suppliers-and.pptx
Socio-economic-Impact-of-business-consumers-suppliers-and.pptxSocio-economic-Impact-of-business-consumers-suppliers-and.pptx
Socio-economic-Impact-of-business-consumers-suppliers-and.pptx
 
RE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman LeechRE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman Leech
 
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service Pune
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service PuneVIP Call Girls Pune Kirti 8617697112 Independent Escort Service Pune
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service Pune
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communications
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...
 
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurVIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Service
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst Summit
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
 

Q1 review strategic projects (1)

  • 1. Strategic Projects – Q1 Report MC-LC Cooperation Customization Term Shift Management
  • 2. Term Shift Mgmt Report Q1 2014
  • 3. Goals of the project Optimizing timeline of organizational general processes towards external, internal & network realities to boost ELD long term performance while maintaining members’ high quality AIESEC experience.
  • 4. Milestones of the project •  Presentation of the idea during SumCo, gaining trust of AIESEC in Poland towards possible change •  Data collection and preperations •  ST work •  Gathering BOA feedback •  Compendium correction preperation – I + II •  Voting for the change on General Assembly - I •  Presentation of the proposal to the LCPs with gathering topics to work on •  Voting for the change on General Assembly - II •  Providing education towards change management •  Monitoring Implementation •  Timeline revision during Re-planning •  Discussion about correction with LCP current & LCP elect •  Discussion about correction in EBs •  Voting on GA I – term shift 13.14 II – term shift 2015 III – term shift 14.15
  • 5. Overall Factors •  Replanning with MC Team – P •  NPM - P
  • 6. Term Shift Mgmt in Q3 2013 Key Achievements: •  Timeline review with MC Team during re-planning and common understanding around correction •  Building understanding among LCPs Currects •  Building understanding among LCPs Elects •  Building understaning in Local Committees •  GA preperation for voting Key Non-Achievements •  Need for correction after 1st timeline suggestion
  • 7. Term Shift Mgmt in upcoming time Priorities for April: •  Voting for change during GA Priorities for Q4: •  Voting for change during GA
  • 9. Goals of the project Designing & providing strategic organizational initiatives connecting MC and LC in a way to: •  enable LCs’ short-term growth •  enable LCs’ capitalization on own potential •  address diversity of LC realities •  maximize on the limited limeline & resources
  • 10. Piliars of the project Coaching   Na+onal   Conference   Cycle   LC  Planning  
  • 11. Milestones of the Coaching sub-project •  Current state analysis •  Desired state envisioning •  Coaching strategy creation •  Feedback gathering & correction •  Coaching application releasment •  LC Coaches allocation •  LC Coaches announcement •  Creation of coaching tools •  Coaches education •  Coaches and coaching timeline management •  Coaching round feedback gathering & evaluation •  Coaching strategy improvement
  • 12. Overall Factors •  Lack of response from the LC level – EBs where not answering at the end of their term. •  Overpack MC calendar which will limit our delivery. •  OD NST creation & launch •  Coaching Strategy Part 2 done – launch and assignation
  • 13. Coaching sub-project in Q1 2014 Key Achievements: •  Closure of 1st part of the strategy with final LC touchpoint. •  Analysis of the strategy with great results •  Launch 2nd part of coaching •  New assignation of coachees •  LC touchpoint at NFS. Key Non-Achievements •  Calendar is overpack and due to this LC visits will be limited (less than for the 1st part of the strategy)
  • 14. Coaching sub-project in upcoming time Priorities for April: •  Coaching Visits •  OD Task force with NST •  OD NST follow up about GDC framework and delivery. Priorities for Q1: •  Deliver 2nd part of coaching visits. •  GDC framework with NST to be deliver in transition.
  • 15. Coaching sub-project: Contribution Needed (who & what) •  All MC members that have LC assigned to deliver the coaching.
  • 16. Milestones of the National Conference Cycle sub-project •  Current state analysis •  Desired state envisioning •  National Conference Cycle creation •  Feedback gathering & correction •  Conference Cycle I + application releasment •  SumCo preperations & delivery management •  SumCo evaluation
  • 17. Milestones of the National Conference Cycle sub-project •  Summits preperations & delivery management •  Conference Cycle II + application releasment •  Summits preperations & delivery management •  Summits evaluation •  Winco preperations & delivery management •  Winco evaluation •  NPM preperations & delivery management •  NPM evaluation •  MultiTo preperations & delivery management •  Multito evaluation •  LeadCo Host LC selection •  LeadCo preperations & delivery management •  LeadCo evaluation •  Further platforms preperations & delivery management •  Further platforms evaluation
  • 18. Overall Factors •  High ammount of conferences in a short period of time - N •  Lack of LCPs responsibility for common good lack of hosting LC – N •  Lack of Conference Manager role assignment for LeadCo at the beginning of the term – N •  Lack of proper internet connection for online evaluations - N
  • 19. National Conference Cycle in Q3 2013 Key Achievements: •  NPM Delivery •  MultiTo Delivery •  NFS Delivery Key Non-Achievements: •  Lack of host LC for LeadCo •  Lack of virtual evaluations from NFS
  • 20. National Conference Cycle in upcoming time Priorities for April: •  LeadCo Agenda & Conference Management •  LeadCo delivery Priorities for Q1: •  Revision of Conference Cycle for the whole 14.15 term and ahead •  Transition about Conference Management for L&D •  SumCo BID releasment
  • 21. Milestones of the LC Planning sub-project •  Planning 2013 evaluation [MCVP OD, BOA, ST] •  Desired state envisioning •  Planning process creation •  Feedback gathering & correction •  Planning process elements delegating •  Providing feedback & correction •  Planning process consolidation •  Planning process educating [NMP] •  Planning process implementation monitoring •  LC plans gathering •  Feedback towards LC plans by MC team •  LC plans correction •  Final consolidation of LC plans •  Sending plans to Market Place
  • 22. Overall Factors •  Absence of VP OD and IM Manager – N •  Need for changes after IMP – N (for pace of the process) •  Physical touchpoint during NFS – P
  • 23. LC Planning in Q1 2014 Key Achievements: •  2014 January plans consolidation •  Feedback and recommendations delivery for LCPs Elects and Currents during NFS Key Non-Achievements •  Not all of the LCs making corrections
  • 24. Key priorities in April: •  LC Planning consolidation •  LC Plans realization Q1 Sum up Key priorities in Q2: •  Planning 2014 final consolidation •  Planning 2015 preperations for SumCo LC Planning in upcoming time