Functional Monthly Report - July
Content:
Comm, OD, PR, ER, Fin
Comm Monthly Report
July 2013
Comm – General Direction
Communication area is supporting ELD
programms effectiveness and works together
in strong synergy ensuring that our
communication is based on our services and
supply we can offer.
AIESEC brand as organization is positined in
our products.
Our communication through showcasing our
impact, authenticity is shaping desired
attitudes of leadership and enterprnerialship
in Poland.
Monthly Priorities Achievement
LC tracking& feedbacking
rules and standarts
NST long term planning
Social media strategy
DONE
DONE
UNDONE
Monthly Priorities Achievement
•  feedback rules DONE
•  NST planning DONE
•  commision partner DONE
•  International postioning DONE
•  MC Brand DONE
•  SumCo 50%
July – Results Overall
§  AIESEC Plad
1.07: 3424 2.08: 3483 Growth: 59
§  Global Citizen:
1.07: 31402.08: 3230 Growth: 90
§  AIESEC University
1.07: 4623 2.08: 4718 Growth: 95
§  Global Citizen: 82app convertion: 7.32%
§  Global Talents Jun-July: 234 app
convertion: 74%
§  AIESEC UNI: no data gathered
Communications in July 2013
Key Achievements:
§  Building commision
§  Pushing websites
implementation
§  NST planning
§  resources gathering
(graphics, materials,
knowledge)
§  Getting to know MKT
reality
Key Non-Achievements
§  Social media
management and
strategy creation
Communications in August 2013
Key strategies for next
month:
§  Materials creation for
GT, GC, TMP, @UNI
§  Preparation of LC VPs
Comm for hottest
season
Key challenges for next
month:
§  Time and lack of
knowledge about
processes
§  Depending on many
unstable factors: many
ppl involved- from
Poland and abroad,
logistic, virtual work
§  Handling 3 big
processes at the same
time
OD Monthly Report
July 2013
General Direction
Driving	
  
organiza+onal	
  
EFFECTIVENESS	
  
Area	
  based	
  LC	
  coaching	
  
implementa+on	
  
LC	
  planning	
  redefini+on	
  
Incien+ve	
  system	
  
flexibility	
  and	
  
automa+za+on	
  
LCs	
  MoS	
  achievement	
  
progress	
  management	
  
Processes	
  and	
  structures	
  
op+miza+on	
  (BOA)	
  
Business	
  Intelligence	
  
capitaliza+on	
  
Increasing	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  
ELD	
  REACH	
  
Expansion	
  in	
  the	
  city	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  
that	
  LC	
  exists	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  
(SU)	
  
Expansion	
  outside	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  
the	
  city	
  that	
  LC	
  exists	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  
(SU)	
  
Expansion	
  outside	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  
the	
  city	
  that	
  LC	
  exists	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  
(ELD	
  project)	
  
Ensuring	
  
SUSTAINABILITY	
  
and	
  HEALTH	
  of	
  
organiza+on	
  
Term	
  shiK	
  management	
  
Data	
  collec+on	
  system	
  
upgrade	
  
IGs/LCs	
  transforma+on	
  
En++es	
  types	
  
diversifica+on	
  	
  
Development	
  fund	
  	
  
redefini+on	
  
‚Begginers’	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  
health	
  development	
  
‚Pioniers’	
  long-­‐term	
  plan	
  
recommenda+ons	
  
Ensuring	
  
COHERENCY	
  of	
  
organiza+onal	
  
direc+on	
  at	
  all	
  
levels	
  
Educa+onal	
  plaQorms	
  
development	
  
Conference	
  cycle	
  
redefini+on	
  
LCPs	
  management	
  
I	
  K	
  R	
  
Monthly Priorities Achievement
Iza	
  
Conference	
  Cycle	
  BID	
  Releasment	
   SI	
  &	
  JD	
   -­‐	
   100%	
  
SumCo	
  management	
  and	
  prepera+on	
   JD	
   -­‐	
   80%	
  
Steering	
  Team	
  prepera+on	
   SI	
  and	
  JD	
   MCP	
   100%	
  
Rubi	
  
Coaching	
  Booklet	
  &	
  applica+on	
  releasment	
   JD	
  &	
  SI	
   MC	
   100%	
  
SumCo	
  prepara+on	
   JD	
   100%	
  
SONA	
  prepara+on	
   JD	
   Filipe	
   35%	
  
Krzysiek	
  
Existance	
  Criteria	
  &	
  Insen+ve	
  system	
  (quterly)	
   JD	
   OD	
   100%	
  
Expan+on	
  Strategy	
   SI	
   ELDs	
   100%	
  
SumCo	
  prepara+on	
  (sessions	
  and	
  track	
  for	
  IGs)	
   JD	
   OD	
   100%	
  
Organizational Development in July 2013
Key Achievements:
1.  Term shift decision process
management
2.  Coaching strategy
releasment & coaches
allocation
3.  Incentive system finalisation
4.  Expansion strategy creation
5.  LCs tracking towards
expansion
6.  IGs direction establishment
7.  Entities diversification
strategy creation
8.  National Conference Cycle
creation
9.  Successful SumCo delivery
Key Non-Achievements
1.  SumCo evaluation
2.  Team Box
I love you!
Key strategies for next
month:
•  To be revised on OD
team meeting
Key challenges for next
month:
•  OD Team Leader out of
office
•  Half of the team out of
office = coaching...
•  Half month less for
work
Organizational Development in August 2013
Operations Monthly Report - July
Content:
TM, IM
PR Monthly Report
July 2013
PR – General Direction
1) AIESEC as Youth Leadership Provider in Poland
- This is a strategic initiative to position AIESEC as the primary organisation for youth
leadership development, and to push youth leadership as a main issue in Poland.
Through this initiative we are developing Youth to Business Forum and working on
National Values Assesment.
2) B2B Marketing (support for ER and GIP)
- Participating in and attending events, providing content and expertise, and
showcasing our programmes towards the sectors our sub-products are being focused
on, maintainig government and non-governmental accounts, allumni relations.
3) Showcasing our impact (overall organisation credibility)
- Whether this is around our leadership development experiences, the impact our
GCDP projects are making, or where our alumni are now, we need to be showcasing
what our organisation is doing through multiple channels and partnerships.
Monthly Priorities Achievement
1. SumCo (overall – Conference Managament, session
preparation, delivering the conference) – done
2. Finilizaing Pland and MoS (projects planned and put into
timeline)
•  Y2B – done
•  NVA – in progress
•  Alumni projects – in progress
•  Conferences – done
3. Partnerships with organizagtions – in progress (ongoing
project)
Overall Factors
(positive or negative factors that influenced the
performance)
•  SumCo engagement (positive and
negative)
•  Feedback of plans (positive and
negative)
•  Too little time and too much work
•  People are very open towards our
initiatives – positive ! J
Public Relations in July 2013
Key Achievements:
•  New accounts and
cooperation
•  Alumni managament
started
•  Y2B frame prepared
•  EoY timeline planned,
work started
•  NVA preparation
Key Non-Achievements
•  Alumni projects are not
defined yet
•  Due to some changes
not all of the MoS are
defined yet
Public Relations in August 2013
Key strategies for next
month:
•  Account Mangament,
New Partnership
Managament
(Government, NGO)
•  Place for the
conferences
•  Alumni projects
definition
Key challenges for next
month:
•  Only 30 days and
vacation in the middle
•  Our organization is
changing all the time J
ER Monthly Report
July 2013
ER – General Direction
•  Quality management
•  Career Days changes
•  New products based on ELD
•  $$$
Monthly Priorities Achievement
•  Product portfolio
–  Changes in products
–  oGIP and oGCDP products added
–  Career Days changes included
•  Sales meetings
–  Meetings with Board of Partners
•  Vindication plan
–  788 540.00 PLN to vindicate
–  All companies have invoices / donation agreements
–  Clear ates of transfer income
•  Career Days
–  Autumn edition – dates, venue, changes, start work with OCPs,
–  Spring edition – dates with partenrs feedback
–  Meeting with website companies about changes
•  Ambasador Program
–  Plan of recruitment
–  LC support
•  Partners Gala with MC team 13.14
July – Results Overall
Plan Realizacja % Realizacji
Przychody przed
redystrybucją
49.76%
Przychody po
redystrybucji
49.23%
% Windykacji 12.13
32.50%
% Windykacji 13.14
100.00%
Overall Factors
NEGATIVE:
–  SumCo (taking out working days for meeting)
–  Too much meetings (no time for preparation and
operational work connected to account
management)
–  HR – only 3 people in NET
–  No MC CAR! L
POSITIVE:
–  Good contact with NET 12-.13
–  Having 2-3 meetings per day to have it mostly
closed in July
External Relations in July 2013
Key Achievements:
•  Debt collection
•  Closing deal with PG
•  Meetings with key
patners (BoP)
•  Partners Gala
•  Board of Partners
Key Non-Achievements
•  No presentation about
AIESEC for companies
•  Program ambasador
(no applicants for some
positions)
External Relations in August 2013
Key strategies for next
month:
•  Negotiations and closing
deals with BoP
•  BoP – career days
•  Career days marketing
strategy (including
website changes)
•  Program ambasador
recruitment
Key challenges for next
month:
•  Time!!! 2 meetings per
day is too much L
•  No MC car
•  Debt collection
•  Lack of HR
•  Holidays
Finance Monthly Report
July 2013
Finance – General Direction
•  We are not going to have any audit
untill IC
•  Right now main priority of the area
untill end of november is to gain
unqualified audit of both assosiation
and Ltd. for 12/13
•  Financial Model ending date will be
most probably postponed untill April
2014
Monthly Priorities Achievement
•  Main priority was to gain audit for
Financial Statement 11/12, but
unfortunetly it is not possible so this
priority was skipped in the 3rd weak of
July
•  Right now creation of Financial
Statement 12/13 is in progres, audit
company which was preparing previous
audit will help us in correcting mistakes
and preparing Financial Statement 12/13
July – Results Overall
•  Action Plan for regaining Full
Membership status
•  Finished all of work left of previous FD,
except MC-LC
•  Assosiation and Ltd. are registered in
KRS
•  First steps of creation Financial Model
were made
Overall Factors
(positive or negative factors that influenced the
performance)
Negative
•  Not knowing true current state of the organisation
•  Lots of cases poping out during this month which
should not have happened
Positive
•  Huge BoA support in both projects ( audit and
Financial Model )
Finance in July 2013
Key Achievements:
•  Action Plan for
regaining Full
Membership status
•  Finished all of work left
of previous FD, except
MC-LC
•  Assosiation and Ltd.
are registered in KRS
•  First steps of creation
Financial Model were
made
Key Non-Achievements
•  KRAP is still not
registered
•  MC-LC
•  @ Poland won’t regain
FM status on IC
•  Pretty much most of
the tasks and projects
were plan with the
earliest possible date to
finish, not the most
possible one
Finance in August 2013
Key strategies for next
month:
•  Recruting external help
for correction of
mistakes in
accountancy in
assosiation
•  FM WG and proper
timeline creation
•  Have unqualified audit
of financial statement
12/13 of Ltd.
Key challenges for next
month:
•  No one ever looked in
accountancy of Ltd.
•  Huge possibility of finding
new mistakes in
accountancy and our
internal procedures which
are nor coherent with
polish law
•  Common understanding
among @ PLAD of what
Financial Model is. ( will
be)

More Related Content

Viewers also liked

Capital en el limbo
Capital en el limboCapital en el limbo
Capital en el limboCarlos Asp
 
Carnaval En El Centro De Ecatepec
Carnaval En El Centro De EcatepecCarnaval En El Centro De Ecatepec
Carnaval En El Centro De Ecatepecacademica
 
Cartago - 50 mil personas exigieron la libertad de Dilian Francisca Toro.
Cartago - 50 mil personas exigieron la libertad de Dilian Francisca Toro.Cartago - 50 mil personas exigieron la libertad de Dilian Francisca Toro.
Cartago - 50 mil personas exigieron la libertad de Dilian Francisca Toro.Amigos de Dilian Toro T
 
CCA networking
CCA networkingCCA networking
CCA networkingYum Studio
 

Viewers also liked (8)

Cbm presentation
Cbm presentationCbm presentation
Cbm presentation
 
Capitialising on trends 2009
Capitialising on trends 2009Capitialising on trends 2009
Capitialising on trends 2009
 
Capital en el limbo
Capital en el limboCapital en el limbo
Capital en el limbo
 
cake1
cake1cake1
cake1
 
Carta infotur
Carta infoturCarta infotur
Carta infotur
 
Carnaval En El Centro De Ecatepec
Carnaval En El Centro De EcatepecCarnaval En El Centro De Ecatepec
Carnaval En El Centro De Ecatepec
 
Cartago - 50 mil personas exigieron la libertad de Dilian Francisca Toro.
Cartago - 50 mil personas exigieron la libertad de Dilian Francisca Toro.Cartago - 50 mil personas exigieron la libertad de Dilian Francisca Toro.
Cartago - 50 mil personas exigieron la libertad de Dilian Francisca Toro.
 
CCA networking
CCA networkingCCA networking
CCA networking
 

Similar to July 2013 functional plans review

Monthly review november funcional
Monthly review november   funcional Monthly review november   funcional
Monthly review november funcional 647435
 
Monthly reports december functional
Monthly reports december   functionalMonthly reports december   functional
Monthly reports december functional647435
 
Strategic Planning for Co_ops
Strategic Planning for Co_opsStrategic Planning for Co_ops
Strategic Planning for Co_opsjo bitonio
 
Monthly functional report january
Monthly functional report   januaryMonthly functional report   january
Monthly functional report january647435
 
Monthly functional report january
Monthly functional report   januaryMonthly functional report   january
Monthly functional report january647435
 
AIESEC in Bangalore - AGM Plan Presentation, 2014
AIESEC in Bangalore - AGM Plan Presentation, 2014AIESEC in Bangalore - AGM Plan Presentation, 2014
AIESEC in Bangalore - AGM Plan Presentation, 2014Soumil Kar
 
February review operations
February review   operationsFebruary review   operations
February review operations647435
 
Q3 strategic projects report
Q3   strategic projects reportQ3   strategic projects report
Q3 strategic projects report647435
 
Q3 strategic projects report
Q3   strategic projects reportQ3   strategic projects report
Q3 strategic projects report647435
 
Functional analysis aiesec in spain 1213
Functional analysis aiesec  in spain 1213Functional analysis aiesec  in spain 1213
Functional analysis aiesec in spain 1213Jeesoo
 
Scottish comms network paul njoku - 14 and 15 may 2014
Scottish comms network   paul njoku - 14 and 15 may 2014Scottish comms network   paul njoku - 14 and 15 may 2014
Scottish comms network paul njoku - 14 and 15 may 2014Jane Robson
 
The Very Last General Assembly
The Very Last General AssemblyThe Very Last General Assembly
The Very Last General Assembly647435
 
Peter Pichler Presentation Rio Tinto social / community development approach
Peter Pichler Presentation Rio Tinto social / community development approachPeter Pichler Presentation Rio Tinto social / community development approach
Peter Pichler Presentation Rio Tinto social / community development approachPeter Pichler
 
USER GUIDE M&E 2014 LENNY HIDAYAT
USER GUIDE M&E 2014 LENNY HIDAYATUSER GUIDE M&E 2014 LENNY HIDAYAT
USER GUIDE M&E 2014 LENNY HIDAYATLenny Hidayat
 
AIESEC Indonesia |1314| iGCDP Summer Structures
AIESEC Indonesia |1314| iGCDP Summer StructuresAIESEC Indonesia |1314| iGCDP Summer Structures
AIESEC Indonesia |1314| iGCDP Summer StructuresChristina Kelman
 

Similar to July 2013 functional plans review (20)

Monthly review november funcional
Monthly review november   funcional Monthly review november   funcional
Monthly review november funcional
 
Monthly reports december functional
Monthly reports december   functionalMonthly reports december   functional
Monthly reports december functional
 
Strategic Planning for Co_ops
Strategic Planning for Co_opsStrategic Planning for Co_ops
Strategic Planning for Co_ops
 
Monthly functional report january
Monthly functional report   januaryMonthly functional report   january
Monthly functional report january
 
Monthly functional report january
Monthly functional report   januaryMonthly functional report   january
Monthly functional report january
 
AIESEC in Bangalore - AGM Plan Presentation, 2014
AIESEC in Bangalore - AGM Plan Presentation, 2014AIESEC in Bangalore - AGM Plan Presentation, 2014
AIESEC in Bangalore - AGM Plan Presentation, 2014
 
LSS - 5 Year Strategy
LSS -  5 Year StrategyLSS -  5 Year Strategy
LSS - 5 Year Strategy
 
February review operations
February review   operationsFebruary review   operations
February review operations
 
Q3 strategic projects report
Q3   strategic projects reportQ3   strategic projects report
Q3 strategic projects report
 
Q3 strategic projects report
Q3   strategic projects reportQ3   strategic projects report
Q3 strategic projects report
 
Functional analysis aiesec in spain 1213
Functional analysis aiesec  in spain 1213Functional analysis aiesec  in spain 1213
Functional analysis aiesec in spain 1213
 
Scottish comms network paul njoku - 14 and 15 may 2014
Scottish comms network   paul njoku - 14 and 15 may 2014Scottish comms network   paul njoku - 14 and 15 may 2014
Scottish comms network paul njoku - 14 and 15 may 2014
 
The Very Last General Assembly
The Very Last General AssemblyThe Very Last General Assembly
The Very Last General Assembly
 
Initiatives of aiesec nku 1213
Initiatives of aiesec nku 1213Initiatives of aiesec nku 1213
Initiatives of aiesec nku 1213
 
Peter Pichler Presentation Rio Tinto social / community development approach
Peter Pichler Presentation Rio Tinto social / community development approachPeter Pichler Presentation Rio Tinto social / community development approach
Peter Pichler Presentation Rio Tinto social / community development approach
 
Cs6 p17 williams evidence-based prog planning for rural econ dev
Cs6 p17 williams   evidence-based prog planning for rural econ devCs6 p17 williams   evidence-based prog planning for rural econ dev
Cs6 p17 williams evidence-based prog planning for rural econ dev
 
USER GUIDE M&E 2014 LENNY HIDAYAT
USER GUIDE M&E 2014 LENNY HIDAYATUSER GUIDE M&E 2014 LENNY HIDAYAT
USER GUIDE M&E 2014 LENNY HIDAYAT
 
Global Expansion Drivers
Global Expansion DriversGlobal Expansion Drivers
Global Expansion Drivers
 
AIESEC Indonesia |1314| iGCDP Summer Structures
AIESEC Indonesia |1314| iGCDP Summer StructuresAIESEC Indonesia |1314| iGCDP Summer Structures
AIESEC Indonesia |1314| iGCDP Summer Structures
 
How to successfully deliver business change
How to successfully deliver business changeHow to successfully deliver business change
How to successfully deliver business change
 

More from 647435

Functional reports may 2014
Functional reports   may 2014Functional reports   may 2014
Functional reports may 2014647435
 
Operations reports may 2014
Operations reports   may 2014Operations reports   may 2014
Operations reports may 2014647435
 
Operations reports may 2014
Operations reports   may 2014Operations reports   may 2014
Operations reports may 2014647435
 
Quarter operations
Quarter operationsQuarter operations
Quarter operations647435
 
Q1 functional report
Q1 functional reportQ1 functional report
Q1 functional report647435
 
Q1 review strategic projects (1)
Q1 review   strategic projects (1)Q1 review   strategic projects (1)
Q1 review strategic projects (1)647435
 
Q1 review strategic projects (1)
Q1 review   strategic projects (1)Q1 review   strategic projects (1)
Q1 review strategic projects (1)647435
 
Monthly review financial model february
Monthly review   financial model februaryMonthly review   financial model february
Monthly review financial model february647435
 
Monthly review functional february
Monthly review   functional februaryMonthly review   functional february
Monthly review functional february647435
 
Monthly operational report january
Monthly operational report   januaryMonthly operational report   january
Monthly operational report january647435
 
Poland mc npm 2014 outputs going beyond and enjoying big aiesec poland
Poland mc npm 2014 outputs going beyond and enjoying big aiesec polandPoland mc npm 2014 outputs going beyond and enjoying big aiesec poland
Poland mc npm 2014 outputs going beyond and enjoying big aiesec poland647435
 
Monthly review december strategic projects
Monthly review december   strategic projectsMonthly review december   strategic projects
Monthly review december strategic projects647435
 
Monthly review november operations
Monthly review november   operationsMonthly review november   operations
Monthly review november operations647435
 
Operations monthly review october
Operations monthly review octoberOperations monthly review october
Operations monthly review october647435
 
Strategic projects report october
Strategic projects report   octoberStrategic projects report   october
Strategic projects report october647435
 
Q3 operations report
Q3   operations reportQ3   operations report
Q3 operations report647435
 
July 2013 operational plans review
July 2013   operational plans reviewJuly 2013   operational plans review
July 2013 operational plans review647435
 
July 2013 strategic projects monthly review
July 2013   strategic projects monthly reviewJuly 2013   strategic projects monthly review
July 2013 strategic projects monthly review647435
 

More from 647435 (18)

Functional reports may 2014
Functional reports   may 2014Functional reports   may 2014
Functional reports may 2014
 
Operations reports may 2014
Operations reports   may 2014Operations reports   may 2014
Operations reports may 2014
 
Operations reports may 2014
Operations reports   may 2014Operations reports   may 2014
Operations reports may 2014
 
Quarter operations
Quarter operationsQuarter operations
Quarter operations
 
Q1 functional report
Q1 functional reportQ1 functional report
Q1 functional report
 
Q1 review strategic projects (1)
Q1 review   strategic projects (1)Q1 review   strategic projects (1)
Q1 review strategic projects (1)
 
Q1 review strategic projects (1)
Q1 review   strategic projects (1)Q1 review   strategic projects (1)
Q1 review strategic projects (1)
 
Monthly review financial model february
Monthly review   financial model februaryMonthly review   financial model february
Monthly review financial model february
 
Monthly review functional february
Monthly review   functional februaryMonthly review   functional february
Monthly review functional february
 
Monthly operational report january
Monthly operational report   januaryMonthly operational report   january
Monthly operational report january
 
Poland mc npm 2014 outputs going beyond and enjoying big aiesec poland
Poland mc npm 2014 outputs going beyond and enjoying big aiesec polandPoland mc npm 2014 outputs going beyond and enjoying big aiesec poland
Poland mc npm 2014 outputs going beyond and enjoying big aiesec poland
 
Monthly review december strategic projects
Monthly review december   strategic projectsMonthly review december   strategic projects
Monthly review december strategic projects
 
Monthly review november operations
Monthly review november   operationsMonthly review november   operations
Monthly review november operations
 
Operations monthly review october
Operations monthly review octoberOperations monthly review october
Operations monthly review october
 
Strategic projects report october
Strategic projects report   octoberStrategic projects report   october
Strategic projects report october
 
Q3 operations report
Q3   operations reportQ3   operations report
Q3 operations report
 
July 2013 operational plans review
July 2013   operational plans reviewJuly 2013   operational plans review
July 2013 operational plans review
 
July 2013 strategic projects monthly review
July 2013   strategic projects monthly reviewJuly 2013   strategic projects monthly review
July 2013 strategic projects monthly review
 

Recently uploaded

DEPED Work From Home WORKWEEK-PLAN.docx
DEPED Work From Home  WORKWEEK-PLAN.docxDEPED Work From Home  WORKWEEK-PLAN.docx
DEPED Work From Home WORKWEEK-PLAN.docxRodelinaLaud
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.Aaiza Hassan
 
RE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman LeechRE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman LeechNewman George Leech
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth MarketingShawn Pang
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Dave Litwiller
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Roland Driesen
 
GD Birla and his contribution in management
GD Birla and his contribution in managementGD Birla and his contribution in management
GD Birla and his contribution in managementchhavia330
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayNZSG
 
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Tina Ji
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒anilsa9823
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Delhi Call girls
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...anilsa9823
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear RegressionRavindra Nath Shukla
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMANIlamathiKannappan
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMRavindra Nath Shukla
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Dipal Arora
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableDipal Arora
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLSeo
 

Recently uploaded (20)

DEPED Work From Home WORKWEEK-PLAN.docx
DEPED Work From Home  WORKWEEK-PLAN.docxDEPED Work From Home  WORKWEEK-PLAN.docx
DEPED Work From Home WORKWEEK-PLAN.docx
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.
 
RE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman LeechRE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman Leech
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...
 
GD Birla and his contribution in management
GD Birla and his contribution in managementGD Birla and his contribution in management
GD Birla and his contribution in management
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
 
Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517
Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517
Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear Regression
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMAN
 
Best Practices for Implementing an External Recruiting Partnership
Best Practices for Implementing an External Recruiting PartnershipBest Practices for Implementing an External Recruiting Partnership
Best Practices for Implementing an External Recruiting Partnership
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSM
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
 

July 2013 functional plans review

  • 1. Functional Monthly Report - July Content: Comm, OD, PR, ER, Fin
  • 3. Comm – General Direction Communication area is supporting ELD programms effectiveness and works together in strong synergy ensuring that our communication is based on our services and supply we can offer. AIESEC brand as organization is positined in our products. Our communication through showcasing our impact, authenticity is shaping desired attitudes of leadership and enterprnerialship in Poland.
  • 4. Monthly Priorities Achievement LC tracking& feedbacking rules and standarts NST long term planning Social media strategy DONE DONE UNDONE
  • 5. Monthly Priorities Achievement •  feedback rules DONE •  NST planning DONE •  commision partner DONE •  International postioning DONE •  MC Brand DONE •  SumCo 50%
  • 6. July – Results Overall §  AIESEC Plad 1.07: 3424 2.08: 3483 Growth: 59 §  Global Citizen: 1.07: 31402.08: 3230 Growth: 90 §  AIESEC University 1.07: 4623 2.08: 4718 Growth: 95 §  Global Citizen: 82app convertion: 7.32% §  Global Talents Jun-July: 234 app convertion: 74% §  AIESEC UNI: no data gathered
  • 7. Communications in July 2013 Key Achievements: §  Building commision §  Pushing websites implementation §  NST planning §  resources gathering (graphics, materials, knowledge) §  Getting to know MKT reality Key Non-Achievements §  Social media management and strategy creation
  • 8. Communications in August 2013 Key strategies for next month: §  Materials creation for GT, GC, TMP, @UNI §  Preparation of LC VPs Comm for hottest season Key challenges for next month: §  Time and lack of knowledge about processes §  Depending on many unstable factors: many ppl involved- from Poland and abroad, logistic, virtual work §  Handling 3 big processes at the same time
  • 10. General Direction Driving   organiza+onal   EFFECTIVENESS   Area  based  LC  coaching   implementa+on   LC  planning  redefini+on   Incien+ve  system   flexibility  and   automa+za+on   LCs  MoS  achievement   progress  management   Processes  and  structures   op+miza+on  (BOA)   Business  Intelligence   capitaliza+on   Increasing                                                   ELD  REACH   Expansion  in  the  city                                                             that  LC  exists                                                             (SU)   Expansion  outside                                                 the  city  that  LC  exists                                                         (SU)   Expansion  outside                                                   the  city  that  LC  exists                                                           (ELD  project)   Ensuring   SUSTAINABILITY   and  HEALTH  of   organiza+on   Term  shiK  management   Data  collec+on  system   upgrade   IGs/LCs  transforma+on   En++es  types   diversifica+on     Development  fund     redefini+on   ‚Begginers’                                                       health  development   ‚Pioniers’  long-­‐term  plan   recommenda+ons   Ensuring   COHERENCY  of   organiza+onal   direc+on  at  all   levels   Educa+onal  plaQorms   development   Conference  cycle   redefini+on   LCPs  management   I  K  R  
  • 11. Monthly Priorities Achievement Iza   Conference  Cycle  BID  Releasment   SI  &  JD   -­‐   100%   SumCo  management  and  prepera+on   JD   -­‐   80%   Steering  Team  prepera+on   SI  and  JD   MCP   100%   Rubi   Coaching  Booklet  &  applica+on  releasment   JD  &  SI   MC   100%   SumCo  prepara+on   JD   100%   SONA  prepara+on   JD   Filipe   35%   Krzysiek   Existance  Criteria  &  Insen+ve  system  (quterly)   JD   OD   100%   Expan+on  Strategy   SI   ELDs   100%   SumCo  prepara+on  (sessions  and  track  for  IGs)   JD   OD   100%  
  • 12. Organizational Development in July 2013 Key Achievements: 1.  Term shift decision process management 2.  Coaching strategy releasment & coaches allocation 3.  Incentive system finalisation 4.  Expansion strategy creation 5.  LCs tracking towards expansion 6.  IGs direction establishment 7.  Entities diversification strategy creation 8.  National Conference Cycle creation 9.  Successful SumCo delivery Key Non-Achievements 1.  SumCo evaluation 2.  Team Box I love you!
  • 13. Key strategies for next month: •  To be revised on OD team meeting Key challenges for next month: •  OD Team Leader out of office •  Half of the team out of office = coaching... •  Half month less for work Organizational Development in August 2013
  • 14. Operations Monthly Report - July Content: TM, IM
  • 16. PR – General Direction 1) AIESEC as Youth Leadership Provider in Poland - This is a strategic initiative to position AIESEC as the primary organisation for youth leadership development, and to push youth leadership as a main issue in Poland. Through this initiative we are developing Youth to Business Forum and working on National Values Assesment. 2) B2B Marketing (support for ER and GIP) - Participating in and attending events, providing content and expertise, and showcasing our programmes towards the sectors our sub-products are being focused on, maintainig government and non-governmental accounts, allumni relations. 3) Showcasing our impact (overall organisation credibility) - Whether this is around our leadership development experiences, the impact our GCDP projects are making, or where our alumni are now, we need to be showcasing what our organisation is doing through multiple channels and partnerships.
  • 17. Monthly Priorities Achievement 1. SumCo (overall – Conference Managament, session preparation, delivering the conference) – done 2. Finilizaing Pland and MoS (projects planned and put into timeline) •  Y2B – done •  NVA – in progress •  Alumni projects – in progress •  Conferences – done 3. Partnerships with organizagtions – in progress (ongoing project)
  • 18. Overall Factors (positive or negative factors that influenced the performance) •  SumCo engagement (positive and negative) •  Feedback of plans (positive and negative) •  Too little time and too much work •  People are very open towards our initiatives – positive ! J
  • 19. Public Relations in July 2013 Key Achievements: •  New accounts and cooperation •  Alumni managament started •  Y2B frame prepared •  EoY timeline planned, work started •  NVA preparation Key Non-Achievements •  Alumni projects are not defined yet •  Due to some changes not all of the MoS are defined yet
  • 20. Public Relations in August 2013 Key strategies for next month: •  Account Mangament, New Partnership Managament (Government, NGO) •  Place for the conferences •  Alumni projects definition Key challenges for next month: •  Only 30 days and vacation in the middle •  Our organization is changing all the time J
  • 22. ER – General Direction •  Quality management •  Career Days changes •  New products based on ELD •  $$$
  • 23. Monthly Priorities Achievement •  Product portfolio –  Changes in products –  oGIP and oGCDP products added –  Career Days changes included •  Sales meetings –  Meetings with Board of Partners •  Vindication plan –  788 540.00 PLN to vindicate –  All companies have invoices / donation agreements –  Clear ates of transfer income •  Career Days –  Autumn edition – dates, venue, changes, start work with OCPs, –  Spring edition – dates with partenrs feedback –  Meeting with website companies about changes •  Ambasador Program –  Plan of recruitment –  LC support •  Partners Gala with MC team 13.14
  • 24. July – Results Overall Plan Realizacja % Realizacji Przychody przed redystrybucją 49.76% Przychody po redystrybucji 49.23% % Windykacji 12.13 32.50% % Windykacji 13.14 100.00%
  • 25. Overall Factors NEGATIVE: –  SumCo (taking out working days for meeting) –  Too much meetings (no time for preparation and operational work connected to account management) –  HR – only 3 people in NET –  No MC CAR! L POSITIVE: –  Good contact with NET 12-.13 –  Having 2-3 meetings per day to have it mostly closed in July
  • 26. External Relations in July 2013 Key Achievements: •  Debt collection •  Closing deal with PG •  Meetings with key patners (BoP) •  Partners Gala •  Board of Partners Key Non-Achievements •  No presentation about AIESEC for companies •  Program ambasador (no applicants for some positions)
  • 27. External Relations in August 2013 Key strategies for next month: •  Negotiations and closing deals with BoP •  BoP – career days •  Career days marketing strategy (including website changes) •  Program ambasador recruitment Key challenges for next month: •  Time!!! 2 meetings per day is too much L •  No MC car •  Debt collection •  Lack of HR •  Holidays
  • 29. Finance – General Direction •  We are not going to have any audit untill IC •  Right now main priority of the area untill end of november is to gain unqualified audit of both assosiation and Ltd. for 12/13 •  Financial Model ending date will be most probably postponed untill April 2014
  • 30. Monthly Priorities Achievement •  Main priority was to gain audit for Financial Statement 11/12, but unfortunetly it is not possible so this priority was skipped in the 3rd weak of July •  Right now creation of Financial Statement 12/13 is in progres, audit company which was preparing previous audit will help us in correcting mistakes and preparing Financial Statement 12/13
  • 31. July – Results Overall •  Action Plan for regaining Full Membership status •  Finished all of work left of previous FD, except MC-LC •  Assosiation and Ltd. are registered in KRS •  First steps of creation Financial Model were made
  • 32. Overall Factors (positive or negative factors that influenced the performance) Negative •  Not knowing true current state of the organisation •  Lots of cases poping out during this month which should not have happened Positive •  Huge BoA support in both projects ( audit and Financial Model )
  • 33. Finance in July 2013 Key Achievements: •  Action Plan for regaining Full Membership status •  Finished all of work left of previous FD, except MC-LC •  Assosiation and Ltd. are registered in KRS •  First steps of creation Financial Model were made Key Non-Achievements •  KRAP is still not registered •  MC-LC •  @ Poland won’t regain FM status on IC •  Pretty much most of the tasks and projects were plan with the earliest possible date to finish, not the most possible one
  • 34. Finance in August 2013 Key strategies for next month: •  Recruting external help for correction of mistakes in accountancy in assosiation •  FM WG and proper timeline creation •  Have unqualified audit of financial statement 12/13 of Ltd. Key challenges for next month: •  No one ever looked in accountancy of Ltd. •  Huge possibility of finding new mistakes in accountancy and our internal procedures which are nor coherent with polish law •  Common understanding among @ PLAD of what Financial Model is. ( will be)