Project Planning and Management
Roger Tatoud, Ph.D.
Senior Programme Manager
International HIV Clinical Trials Research Management Office
Imperial College London
DPFS/DCS Workshop: 15 February 2013
Introduction
• Background
• From Bench to Bedside
• Project Management
• Why Project Management
• Management Structure
• Planning
• Gantt Chart
• Setting Milestones
• Risk Management
• Project Monitoring
• Budget and MRC T&C
• Your Project Manager
1
Background
2
Translational Medicine as a Linear Path
Basic
research
Prototype
Discovery &
Design
Pre-clinical
Develop-
ment
Early clinical
trials (I/II)
Late clinical
trials (III/IV)
Regulatory
approval
Marketing
Post
marketing
compliance
Patient
DPFS/DCS
3
Translational Medicine as a Mosaic
4
Systemic overview
5
What to do? Where to Start?
6
... Project Management is here to help!
• Poor definition of objectives
• Inadequate resources
• Poor team and capacity issues
• Poor communication
• Lack of a cross functional team
• Resistance to change
• Lack of top management commitment
• Poor leadership
• Poor baseline management
• Poor planning and control
• Technical problems not resolved
• Failure to anticipate problems
• Too many uncontrolled changes
• Lack of customer/user involvement
Why Projects Fail?
Adapted from HANDBOOK OF PROJECT MANAGEMENT © Trevor L Young January 2003
7
Leadership
Team Work
Management
• Assumed competency
• Specification (scope) not specific
• What are we doing?
• Who does what and when?
• Lack of individual commitment
• Resistance to change
• “I’ll do it my way” (great song, poor management)
• The feeling that planning is an unnatural act
• “I don’t work like that”
• Over-optimism supported by our keen ability to
underestimate everything
• Bérézina Complex: “We will cross that bridge when
we reach it”
Why Projects Fail? Being Human
8
1. Control scope and manage change
2. Deliver project results on time and on budget
3. Focus the project team on the solution
4. Obtain project buy-in from disparate groups
5. Define the critical path to optimally complete
your project
6. Provide a process for estimating project resources,
time, and costs
7. Communicate project progress, risks, and changes
8. Surface and explore project assumptions
9. Prepare for unexpected project issues
10. Document, transfer, and apply lessons learned from
your projects
Source: http://www.bizmanualz.com
Why Project management?
9
3D Approach to Project Management
Manage
Processes
10
Essential elements of Project Management
• Good management
• Effective record keeping
• Good filing practices
• Budget management
• Good communication
• On progress (looking backward)
• On planning (looking forward)
• Good project planning
• Identify critical path & rate limiting activities
• Enable allocation of sufficient time and resources
• Good scenario planning / Risk management
• Go/NoGo decision points
• Be one step ahead of the game
11
Project Management
A dynamic action cycle
PHASE 1 PHASE 2
PHASE 4PHASE 3
CONCEPTION & DEFINITION
EXECUTING THE WORK
HANDOVER&CLOSURE
PLANNING&SCHEDULING
DEFINE
OBJECTIVES
PLAN THE WORK
COMMUNICATE
THE PLAN
MONITOR
PROGRESS
REVIEW
& EVALUATE
INSTITUTIONAL
LEARNING
PHASE 0 SELECTION
Opportunities
Identified
Adapted from HANDBOOK OF PROJECT MANAGEMENT
© Trevor L Young January 2003
Redefine
12
13
SC
eGroup
PMG
TMG
• Don’t recycle old management structures
• Identify the needs of the project…
• Bring together people that can contribute to issues
arising in the project through…
• Groups that will meet and communicate regularly.
The Project Management Structure
Research
Stats
Regulator
Finance
Clinical
Database
Admin
Comm.
IP
Research
Regulator
Clinical
Database
IP
Industry
Industry
Contract
Contract Finance
Stats
Strategy
Comm.
Admin
Strategy
Operation
The Project Management Group
Principal Investigator
Strategic focus
Project Manager
Operational focus
Project Management Group
Experienced team members
responsible for other roles
PM+PI
(PMG)
Industry
Regulators
Clinical
Researchers
Funder
University
14
Choosing a Project Manager
• Appointed and involved at an early stage
• Central point of contact for Project Team and
Stakeholders
• Empowered to do his/her job
• Good organisation skills
• Good communicator
• Flexible, creative, resilient
• Multitasker
• Show initiative – know what (s)he knows and doesn’t
• Think globally, act locally
15
Project Planning
• First you need a plan!
• A good project plan should monitor:
• Timelines
• Milestones
• Budget
• Resources
Progress
• Identify critical path / rate limiting activities
• Enable allocation of sufficient time and resources
• Project plans are dynamic - evolve as project develops
• Level of detail will depend on target audience
• The Gantt Chart...
16
• A graphical method of showing a project schedule
that shows project time, dates of all activities and
their relationships
• For planning
• For identifying dependencies
• For identifying a Critical Path
• For determining Milestones
• For monitoring
The Gantt Chart
17
18
Gantt Chart - Planning of a Phase I trial
From Idea to Phase I - Manufacturing
19
Milestones - be SMART
• Specific: objectives should be specific and written in clear,
concise, and understandable terms.
• Measurable: measurable outcomes allow determination of
delivery. Set realistic and justifiable success criteria: Target
value range and acceptable (cut-off) values.
• Achievable: objectives must be aggressive but realistic –
don’t be too ambitious!
• Relevant: tasks and deliverables must focus on progressing
the project along an appropriate (critical) development path.
• Timely (deadlines not durations): objectives should have a
realistic timeframe with an end date assigned to them.
20
Be SMART
Objectives (ex: Detection of virus sequences in blood using new qPCR plateform)
• 1. qPCR primer sets capable of amplifying 15 of 16 diverse blood samples
tested with a combination of the assays targeting 3 virus genes using the
fluorescent detection system
• 2. The positive assays will yield a Ct of <10 and the negative control a Ct >38
• 3. The clinical isolates tested will yield Ct below background (sensitivity) and the
correct positive call (specificity) on the Q-PCR platform
21
Success Criteria
1. qPCR primer sets amplifies 15 of 16 diverse blood samples tested with a
combination of the assays targeting 3 virus genes using the fluorescent detection
system.
2. The positive assays yields a Ct <10 and the negative control a Ct >38
3. The clinical isolates tested yields a Ct below background and the correct positive
call on the Q-PCR platform
22
• Example: development of an ultra low viral load assay
• What?
• How?
• Results?
• Variance
• Go/No Go
• What’s next?
Identifying and writing milestones
M Start
Date
End
Date
Month What is
measured?
How is it
measured?
What are the
possible results?
(Go/No go)
Acceptable
variance
What happens
then?
Worded Milestone
1 01/10/12 31/03/13 6 Sensitivity of
UL VL assay
Lab assays <0.2 RNA copy/mL
10%
Proceed to Stage 2
An UL VL assay with a sensitivity
below 0.2 RNA copy/mL has been
developed by Milestone End date>0.2 RNA copy/mL Contract Assay to
Company X.
Risk and its management
Project Schedule
Issues
RISKS
Contains inherent…
Which if they
Occur become…
Which if unresolved
impact on…
• Identify & evaluate risks
• Identify risk ownership
• Mitigation
• Prepare a response &
contingency plans
• Continuous process
• Identify early & resolve
promptly
• Constraints # Risks
23
• Strategic risks concern long-term strategic objectives of the project. This
type of project risks affects such areas as initial project financing, technology,
reputation, changes in the physical environment, etc.
• Operational risks concern issues and problems that project participants are
confronted with from day to day. Mitigation of operational risks contributes to
reducing of strategic risks.
• Compliance risks concern issues associated with the need to comply the
project course with documented statements and regulations. Managing
compliance risks lets ensure that current project activities are undertaken in the
manner which project stakeholders and customers expect.
• Financial risks are associated with existing financial structure of the project
and with all the transactions made to carry out the project. Identification of
financial risks involves examining daily operations. Financial risks are an
indicator that shows whether current project has serious implications for
viability.
• Knowledge risks are associated with effective management and control of
knowledge resources, communication mechanisms, and protection systems.
Project knowledge risks may include abuse of intellectual property, loss of the
key project staff, system malfunction, etc.
Type of risk and their estimation
24
Quantifying risk – Assessing impact
• Probability of occurrence
• Impact on the project
• Decided by team consensus
• Identified at the start
• Added as required
• Reviewed regularly
Impact on the project (conservative matrix)
Low Medium High
Probability
0.65 - 1.00 Medium High
Not
acceptable
0.30 – 0.64 Low High
Not
acceptable
0.0 – 0.29 Low
Medium
High
• HIGH: Major Impact, serious consequences. Likely to affect a Milestone,
must be monitored regularly and closely
• MEDIUM: Significant impact, not expected to affect a Milestone, monitor
regularly
• LOW: Not expected to have a serious impact. Review regularly for ranking
25
• Progress
• Risks
• Finance
• Monthly PMG meeting (TMG, SC, eGroup)
• Ad hoc meetings (milestones, finance)
• Quarterly Reports
• Milestones Reports
• End of grant report
• Publications
• Capacity building
• Commercialisation
Project Monitoring & Evaluation
26
Good Meeting Management practice
• Schedule regular meetings – with reminders (use Outlook!)
• Request status report (provide template!)
• Circulate agenda in advance – seek input from team members
• Circulate status report and relevant papers (early enough)
• Chair meeting – keep to time (park what needs to be parked)
• Start by reviewing previous Action Points– close completed APs
• Identify issues requiring a decision by whom and when
• Identify Action Points, their owner(s) and a due date
• Circulate minutes/actions for comment within 2-3 days
• Sooner if some actions require immediate action
• Finalise sign-off minutes at next meeting
• Follow up 10 days later
27
• When setting budgets consider cost beyond basic
research and clinics
• Travel, publications, samples shipment
• Regulatory support (consultants)
• Regulatory meetings in response to data
• Storage cost IMP (GMP)
• Storage cost samples (short and long term)
• Labelling, packaging, shipping
• Pharmacy (equipment), set up fees (clinical site)
• Ensure grant is set up in your system and that your
finance and admin people know about it
Budget and resources
28
Conclusion
• Diversity
• Complexity
• Relationships
• Dependencies
• Stakeholders
 Managing a Project…
…is managing change
29
• Trevor L. Young
Young is an expert project management practitioner and his book
provides everything needed to manage a project from start to finish in
a clear, concise and to the point style. Many of the templates I use
are based on his work.
• The Handbook of Project Management: A Practical Guide to
Effective Policies, Techniques and Processes
• Scott Berkun
Berkun’s books are an everyday reminder that tools are as good as
those who use them and that however good they may be, they are no
magic bullet for successful project management. Berkun also debunk
a number of myths about project management and challenges many
management clichés (such as “thinking outside of the box”).
• Julie Warneck Protogenia Consulting Ltd
• Loic Lhuillier Translational Research Portfolio Manager King’s College
London/NIHR BRC
30
Acknowledgement

More Related Content

What's hot

Understanding clinical data management
Understanding clinical data managementUnderstanding clinical data management
Understanding clinical data management
finenessinstitute
 
Monitoring Of Clinical Trial by Rishabh Sharma
Monitoring Of Clinical Trial by Rishabh SharmaMonitoring Of Clinical Trial by Rishabh Sharma
Monitoring Of Clinical Trial by Rishabh Sharma
Rishabh Sharma
 
Clinical Data Management: Best Practices and Key Considerations
Clinical Data Management: Best Practices and Key ConsiderationsClinical Data Management: Best Practices and Key Considerations
Clinical Data Management: Best Practices and Key Considerations
ClinosolIndia
 
1 b. project monitoring and control
1 b. project monitoring and control1 b. project monitoring and control
1 b. project monitoring and control
Dr.R. SELVAM
 
Challenges in clinical research
Challenges in clinical researchChallenges in clinical research
Challenges in clinical research
scanFOAM
 
Handling Investigational Product at Clinical Site
Handling Investigational Product at Clinical SiteHandling Investigational Product at Clinical Site
Handling Investigational Product at Clinical Site
Sarah Wilson
 
What is implementation science and why should you care
What is implementation science and why should you careWhat is implementation science and why should you care
What is implementation science and why should you care
Lisa Muldrew
 
Scientific writing anita goel du
Scientific writing   anita goel duScientific writing   anita goel du
Scientific writing anita goel du
Dr. Anita Goel
 
Intro to Data Management Plans
Intro to Data Management PlansIntro to Data Management Plans
Intro to Data Management Plans
Sarah Jones
 
Efficient Data Reviews and Quality in Clinical Trials - Kelci Miclaus
Efficient Data Reviews and Quality in Clinical Trials - Kelci MiclausEfficient Data Reviews and Quality in Clinical Trials - Kelci Miclaus
Efficient Data Reviews and Quality in Clinical Trials - Kelci Miclaus
Quanticate
 
Electronic Data Capture & Remote Data Capture
Electronic Data Capture & Remote  Data CaptureElectronic Data Capture & Remote  Data Capture
Electronic Data Capture & Remote Data Capture
CRB Tech
 
How to Identify the Research Gap While Writing a PhD Dissertation Literature ...
How to Identify the Research Gap While Writing a PhD Dissertation Literature ...How to Identify the Research Gap While Writing a PhD Dissertation Literature ...
How to Identify the Research Gap While Writing a PhD Dissertation Literature ...
PhD Assistance
 
Sponsor/CRO Responsibilities-GCP Workshop 27 FEB 2017
Sponsor/CRO Responsibilities-GCP Workshop 27 FEB 2017Sponsor/CRO Responsibilities-GCP Workshop 27 FEB 2017
Sponsor/CRO Responsibilities-GCP Workshop 27 FEB 2017
Hanaa Abdel-Maguid
 
Clinical research
Clinical researchClinical research
Clinical research
Pristyn Research Solutions
 
Research Projec & Research Designt.pptx
Research Projec & Research Designt.pptxResearch Projec & Research Designt.pptx
Research Projec & Research Designt.pptx
SaiPrasad247616
 
Research Methods
Research MethodsResearch Methods
Research Methods
DJ CrissCross
 
How to write great research papers
How to write great research papersHow to write great research papers
How to write great research papers
Khalid Hakeem
 
Research problem and its identification, its source, statement of a Problem
Research problem and its identification, its source, statement of a ProblemResearch problem and its identification, its source, statement of a Problem
Research problem and its identification, its source, statement of a Problem
Vikramjit Singh
 
CLINICAL DATA MANAGEMENT.pptx
CLINICAL DATA MANAGEMENT.pptxCLINICAL DATA MANAGEMENT.pptx
CLINICAL DATA MANAGEMENT.pptx
Akshata Kawaste
 
Research paper structure
Research paper structureResearch paper structure
Research paper structure
cqshuey
 

What's hot (20)

Understanding clinical data management
Understanding clinical data managementUnderstanding clinical data management
Understanding clinical data management
 
Monitoring Of Clinical Trial by Rishabh Sharma
Monitoring Of Clinical Trial by Rishabh SharmaMonitoring Of Clinical Trial by Rishabh Sharma
Monitoring Of Clinical Trial by Rishabh Sharma
 
Clinical Data Management: Best Practices and Key Considerations
Clinical Data Management: Best Practices and Key ConsiderationsClinical Data Management: Best Practices and Key Considerations
Clinical Data Management: Best Practices and Key Considerations
 
1 b. project monitoring and control
1 b. project monitoring and control1 b. project monitoring and control
1 b. project monitoring and control
 
Challenges in clinical research
Challenges in clinical researchChallenges in clinical research
Challenges in clinical research
 
Handling Investigational Product at Clinical Site
Handling Investigational Product at Clinical SiteHandling Investigational Product at Clinical Site
Handling Investigational Product at Clinical Site
 
What is implementation science and why should you care
What is implementation science and why should you careWhat is implementation science and why should you care
What is implementation science and why should you care
 
Scientific writing anita goel du
Scientific writing   anita goel duScientific writing   anita goel du
Scientific writing anita goel du
 
Intro to Data Management Plans
Intro to Data Management PlansIntro to Data Management Plans
Intro to Data Management Plans
 
Efficient Data Reviews and Quality in Clinical Trials - Kelci Miclaus
Efficient Data Reviews and Quality in Clinical Trials - Kelci MiclausEfficient Data Reviews and Quality in Clinical Trials - Kelci Miclaus
Efficient Data Reviews and Quality in Clinical Trials - Kelci Miclaus
 
Electronic Data Capture & Remote Data Capture
Electronic Data Capture & Remote  Data CaptureElectronic Data Capture & Remote  Data Capture
Electronic Data Capture & Remote Data Capture
 
How to Identify the Research Gap While Writing a PhD Dissertation Literature ...
How to Identify the Research Gap While Writing a PhD Dissertation Literature ...How to Identify the Research Gap While Writing a PhD Dissertation Literature ...
How to Identify the Research Gap While Writing a PhD Dissertation Literature ...
 
Sponsor/CRO Responsibilities-GCP Workshop 27 FEB 2017
Sponsor/CRO Responsibilities-GCP Workshop 27 FEB 2017Sponsor/CRO Responsibilities-GCP Workshop 27 FEB 2017
Sponsor/CRO Responsibilities-GCP Workshop 27 FEB 2017
 
Clinical research
Clinical researchClinical research
Clinical research
 
Research Projec & Research Designt.pptx
Research Projec & Research Designt.pptxResearch Projec & Research Designt.pptx
Research Projec & Research Designt.pptx
 
Research Methods
Research MethodsResearch Methods
Research Methods
 
How to write great research papers
How to write great research papersHow to write great research papers
How to write great research papers
 
Research problem and its identification, its source, statement of a Problem
Research problem and its identification, its source, statement of a ProblemResearch problem and its identification, its source, statement of a Problem
Research problem and its identification, its source, statement of a Problem
 
CLINICAL DATA MANAGEMENT.pptx
CLINICAL DATA MANAGEMENT.pptxCLINICAL DATA MANAGEMENT.pptx
CLINICAL DATA MANAGEMENT.pptx
 
Research paper structure
Research paper structureResearch paper structure
Research paper structure
 

Viewers also liked

Research project mgt
Research project mgtResearch project mgt
Research project mgt
Alberta Lomotey
 
Managing a project and research team
Managing a project and research teamManaging a project and research team
Managing a project and research team
Learning Development Centre
 
Perfect Practices and Perils in Research Project Management
Perfect Practices and Perils in Research Project ManagementPerfect Practices and Perils in Research Project Management
Perfect Practices and Perils in Research Project Management
AMA DocSIG
 
Project Management for PhD Research
Project Management for PhD ResearchProject Management for PhD Research
Project Management for PhD Research
Digital Arts and Humanities
 
Gantt chart_Project PHD
Gantt chart_Project PHDGantt chart_Project PHD
Gantt chart_Project PHD
Nadzirah Hanis
 
Research Presentation Format
Research Presentation FormatResearch Presentation Format
Research Presentation Format
Lifelong Learning
 
Research project ppt
Research project pptResearch project ppt
Research project ppt
John McKeown
 
DISNEY DOES DATA: Data management implications of using animated video as tra...
DISNEY DOES DATA: Data management implications of using animated video as tra...DISNEY DOES DATA: Data management implications of using animated video as tra...
DISNEY DOES DATA: Data management implications of using animated video as tra...
Louise Patterton
 
Sample PPT ON Research Project by Global Assignment Help
Sample PPT ON Research Project by Global Assignment Help  Sample PPT ON Research Project by Global Assignment Help
Sample PPT ON Research Project by Global Assignment Help
Amelia Jones
 
Session 3 part 2
Session 3 part 2Session 3 part 2
Session 3 part 2
plmiami
 
Bolet im04torneio
Bolet im04torneioBolet im04torneio
Bolet im04torneio
Carlos Daliga
 
Amanda harris Research Methods Introduction
Amanda harris Research Methods IntroductionAmanda harris Research Methods Introduction
Amanda harris Research Methods Introduction
Amanda Harris
 
1000 days: 3 years of phd
1000 days: 3 years of phd1000 days: 3 years of phd
1000 days: 3 years of phd
Stefano Tranquillini
 
Neil Morgan- Applying for Jobs
Neil Morgan- Applying for JobsNeil Morgan- Applying for Jobs
Neil Morgan- Applying for Jobs
AMA DocSIG
 
Christine Moorman- First Year Out
Christine Moorman- First Year OutChristine Moorman- First Year Out
Christine Moorman- First Year Out
AMA DocSIG
 
Project managing your ph d 24 nov 2011
Project managing your ph d 24 nov 2011Project managing your ph d 24 nov 2011
Project managing your ph d 24 nov 2011
carolynejacobs
 
Balancing Theory With Hot Topic Relevant Research - Andrew Stephen
Balancing Theory With Hot Topic Relevant Research - Andrew StephenBalancing Theory With Hot Topic Relevant Research - Andrew Stephen
Balancing Theory With Hot Topic Relevant Research - Andrew Stephen
AMA DocSIG
 
Kevin Keller- Tenure
Kevin Keller- TenureKevin Keller- Tenure
Kevin Keller- Tenure
AMA DocSIG
 
Natalie Mizik- Surviving the First Year
Natalie Mizik- Surviving the First YearNatalie Mizik- Surviving the First Year
Natalie Mizik- Surviving the First Year
AMA DocSIG
 
Gerri Henderson- Applying for Jobs
Gerri Henderson- Applying for JobsGerri Henderson- Applying for Jobs
Gerri Henderson- Applying for Jobs
AMA DocSIG
 

Viewers also liked (20)

Research project mgt
Research project mgtResearch project mgt
Research project mgt
 
Managing a project and research team
Managing a project and research teamManaging a project and research team
Managing a project and research team
 
Perfect Practices and Perils in Research Project Management
Perfect Practices and Perils in Research Project ManagementPerfect Practices and Perils in Research Project Management
Perfect Practices and Perils in Research Project Management
 
Project Management for PhD Research
Project Management for PhD ResearchProject Management for PhD Research
Project Management for PhD Research
 
Gantt chart_Project PHD
Gantt chart_Project PHDGantt chart_Project PHD
Gantt chart_Project PHD
 
Research Presentation Format
Research Presentation FormatResearch Presentation Format
Research Presentation Format
 
Research project ppt
Research project pptResearch project ppt
Research project ppt
 
DISNEY DOES DATA: Data management implications of using animated video as tra...
DISNEY DOES DATA: Data management implications of using animated video as tra...DISNEY DOES DATA: Data management implications of using animated video as tra...
DISNEY DOES DATA: Data management implications of using animated video as tra...
 
Sample PPT ON Research Project by Global Assignment Help
Sample PPT ON Research Project by Global Assignment Help  Sample PPT ON Research Project by Global Assignment Help
Sample PPT ON Research Project by Global Assignment Help
 
Session 3 part 2
Session 3 part 2Session 3 part 2
Session 3 part 2
 
Bolet im04torneio
Bolet im04torneioBolet im04torneio
Bolet im04torneio
 
Amanda harris Research Methods Introduction
Amanda harris Research Methods IntroductionAmanda harris Research Methods Introduction
Amanda harris Research Methods Introduction
 
1000 days: 3 years of phd
1000 days: 3 years of phd1000 days: 3 years of phd
1000 days: 3 years of phd
 
Neil Morgan- Applying for Jobs
Neil Morgan- Applying for JobsNeil Morgan- Applying for Jobs
Neil Morgan- Applying for Jobs
 
Christine Moorman- First Year Out
Christine Moorman- First Year OutChristine Moorman- First Year Out
Christine Moorman- First Year Out
 
Project managing your ph d 24 nov 2011
Project managing your ph d 24 nov 2011Project managing your ph d 24 nov 2011
Project managing your ph d 24 nov 2011
 
Balancing Theory With Hot Topic Relevant Research - Andrew Stephen
Balancing Theory With Hot Topic Relevant Research - Andrew StephenBalancing Theory With Hot Topic Relevant Research - Andrew Stephen
Balancing Theory With Hot Topic Relevant Research - Andrew Stephen
 
Kevin Keller- Tenure
Kevin Keller- TenureKevin Keller- Tenure
Kevin Keller- Tenure
 
Natalie Mizik- Surviving the First Year
Natalie Mizik- Surviving the First YearNatalie Mizik- Surviving the First Year
Natalie Mizik- Surviving the First Year
 
Gerri Henderson- Applying for Jobs
Gerri Henderson- Applying for JobsGerri Henderson- Applying for Jobs
Gerri Henderson- Applying for Jobs
 

Similar to Introduction to Project Management for Researchers

project mgmt chapter 1.pptx
project mgmt chapter 1.pptxproject mgmt chapter 1.pptx
project mgmt chapter 1.pptx
DejeneDay
 
2. Risk Management Analysis and Register.pptx
2. Risk Management Analysis and Register.pptx2. Risk Management Analysis and Register.pptx
2. Risk Management Analysis and Register.pptx
robmente
 
Project Management
Project ManagementProject Management
Project Management
Mark Roman
 
02.pptx
02.pptx02.pptx
02.pptx
Maryam522887
 
Project Risk Management
Project Risk ManagementProject Risk Management
Project Risk Management
Kaustubh Gupta
 
Getting the basics right
Getting the basics rightGetting the basics right
Getting the basics right
Thomas Cream
 
PJM6000Project Management PracticesWeek 5Deb Cote,.docx
PJM6000Project Management PracticesWeek 5Deb Cote,.docxPJM6000Project Management PracticesWeek 5Deb Cote,.docx
PJM6000Project Management PracticesWeek 5Deb Cote,.docx
ARIV4
 
PJM6000Project Management PracticesWeek 5Deb Cote,.docx
PJM6000Project Management PracticesWeek 5Deb Cote,.docxPJM6000Project Management PracticesWeek 5Deb Cote,.docx
PJM6000Project Management PracticesWeek 5Deb Cote,.docx
stilliegeorgiana
 
Mpug 111208 generic
Mpug 111208 genericMpug 111208 generic
Mpug 111208 generic
Moritz Farbstein
 
10 me667 chap1 project management
10 me667 chap1 project management10 me667 chap1 project management
10 me667 chap1 project management
Pavan Kumar
 
Basics in Project Management
Basics in Project ManagementBasics in Project Management
Basics in Project Management
chaitanyakrsk
 
Projectriskmanagement pmbok5
Projectriskmanagement pmbok5Projectriskmanagement pmbok5
Projectriskmanagement pmbok5
Dhamo daran
 
It project management and best practices
It project management and best practicesIt project management and best practices
It project management and best practices
Naresh Pokhriyal
 
Risk management
Risk managementRisk management
Risk management
ZainabAbbas45
 
Software Project Management(Unit-1). ppt
Software Project Management(Unit-1). pptSoftware Project Management(Unit-1). ppt
Software Project Management(Unit-1). ppt
ghatak2042
 
bpm-risk-analysis
bpm-risk-analysisbpm-risk-analysis
bpm-risk-analysis
Holly E. Rogers
 
Risk management concepts and learning
Risk management   concepts and learningRisk management   concepts and learning
Risk management concepts and learning
Vanita Ahuja
 
PROJECT CHARTER TEMPLATE GENERAL PROJECT INFORMATIONProject Na.docx
PROJECT CHARTER TEMPLATE GENERAL PROJECT INFORMATIONProject Na.docxPROJECT CHARTER TEMPLATE GENERAL PROJECT INFORMATIONProject Na.docx
PROJECT CHARTER TEMPLATE GENERAL PROJECT INFORMATIONProject Na.docx
wkyra78
 
APM Practitioner Qualification revision cards
APM Practitioner Qualification revision cardsAPM Practitioner Qualification revision cards
APM Practitioner Qualification revision cards
Jacobs Engineering
 
EDT Project Management Workshop
EDT Project Management WorkshopEDT Project Management Workshop
EDT Project Management Workshop
aprice102
 

Similar to Introduction to Project Management for Researchers (20)

project mgmt chapter 1.pptx
project mgmt chapter 1.pptxproject mgmt chapter 1.pptx
project mgmt chapter 1.pptx
 
2. Risk Management Analysis and Register.pptx
2. Risk Management Analysis and Register.pptx2. Risk Management Analysis and Register.pptx
2. Risk Management Analysis and Register.pptx
 
Project Management
Project ManagementProject Management
Project Management
 
02.pptx
02.pptx02.pptx
02.pptx
 
Project Risk Management
Project Risk ManagementProject Risk Management
Project Risk Management
 
Getting the basics right
Getting the basics rightGetting the basics right
Getting the basics right
 
PJM6000Project Management PracticesWeek 5Deb Cote,.docx
PJM6000Project Management PracticesWeek 5Deb Cote,.docxPJM6000Project Management PracticesWeek 5Deb Cote,.docx
PJM6000Project Management PracticesWeek 5Deb Cote,.docx
 
PJM6000Project Management PracticesWeek 5Deb Cote,.docx
PJM6000Project Management PracticesWeek 5Deb Cote,.docxPJM6000Project Management PracticesWeek 5Deb Cote,.docx
PJM6000Project Management PracticesWeek 5Deb Cote,.docx
 
Mpug 111208 generic
Mpug 111208 genericMpug 111208 generic
Mpug 111208 generic
 
10 me667 chap1 project management
10 me667 chap1 project management10 me667 chap1 project management
10 me667 chap1 project management
 
Basics in Project Management
Basics in Project ManagementBasics in Project Management
Basics in Project Management
 
Projectriskmanagement pmbok5
Projectriskmanagement pmbok5Projectriskmanagement pmbok5
Projectriskmanagement pmbok5
 
It project management and best practices
It project management and best practicesIt project management and best practices
It project management and best practices
 
Risk management
Risk managementRisk management
Risk management
 
Software Project Management(Unit-1). ppt
Software Project Management(Unit-1). pptSoftware Project Management(Unit-1). ppt
Software Project Management(Unit-1). ppt
 
bpm-risk-analysis
bpm-risk-analysisbpm-risk-analysis
bpm-risk-analysis
 
Risk management concepts and learning
Risk management   concepts and learningRisk management   concepts and learning
Risk management concepts and learning
 
PROJECT CHARTER TEMPLATE GENERAL PROJECT INFORMATIONProject Na.docx
PROJECT CHARTER TEMPLATE GENERAL PROJECT INFORMATIONProject Na.docxPROJECT CHARTER TEMPLATE GENERAL PROJECT INFORMATIONProject Na.docx
PROJECT CHARTER TEMPLATE GENERAL PROJECT INFORMATIONProject Na.docx
 
APM Practitioner Qualification revision cards
APM Practitioner Qualification revision cardsAPM Practitioner Qualification revision cards
APM Practitioner Qualification revision cards
 
EDT Project Management Workshop
EDT Project Management WorkshopEDT Project Management Workshop
EDT Project Management Workshop
 

Recently uploaded

Hemodialysis: Chapter 4, Dialysate Circuit - Dr.Gawad
Hemodialysis: Chapter 4, Dialysate Circuit - Dr.GawadHemodialysis: Chapter 4, Dialysate Circuit - Dr.Gawad
Hemodialysis: Chapter 4, Dialysate Circuit - Dr.Gawad
NephroTube - Dr.Gawad
 
The Best Ayurvedic Antacid Tablets in India
The Best Ayurvedic Antacid Tablets in IndiaThe Best Ayurvedic Antacid Tablets in India
The Best Ayurvedic Antacid Tablets in India
Swastik Ayurveda
 
Adhd Medication Shortage Uk - trinexpharmacy.com
Adhd Medication Shortage Uk - trinexpharmacy.comAdhd Medication Shortage Uk - trinexpharmacy.com
Adhd Medication Shortage Uk - trinexpharmacy.com
reignlana06
 
Best Ayurvedic medicine for Gas and Indigestion
Best Ayurvedic medicine for Gas and IndigestionBest Ayurvedic medicine for Gas and Indigestion
Best Ayurvedic medicine for Gas and Indigestion
Swastik Ayurveda
 
Top Effective Soaps for Fungal Skin Infections in India
Top Effective Soaps for Fungal Skin Infections in IndiaTop Effective Soaps for Fungal Skin Infections in India
Top Effective Soaps for Fungal Skin Infections in India
SwisschemDerma
 
CHEMOTHERAPY_RDP_CHAPTER 3_ANTIFUNGAL AGENT.pdf
CHEMOTHERAPY_RDP_CHAPTER 3_ANTIFUNGAL AGENT.pdfCHEMOTHERAPY_RDP_CHAPTER 3_ANTIFUNGAL AGENT.pdf
CHEMOTHERAPY_RDP_CHAPTER 3_ANTIFUNGAL AGENT.pdf
rishi2789
 
Part II - Body Grief: Losing parts of ourselves and our identity before, duri...
Part II - Body Grief: Losing parts of ourselves and our identity before, duri...Part II - Body Grief: Losing parts of ourselves and our identity before, duri...
Part II - Body Grief: Losing parts of ourselves and our identity before, duri...
bkling
 
Light House Retreats: Plant Medicine Retreat Europe
Light House Retreats: Plant Medicine Retreat EuropeLight House Retreats: Plant Medicine Retreat Europe
Light House Retreats: Plant Medicine Retreat Europe
Lighthouse Retreat
 
Phone Us ❤8107221448❤ #ℂall #gIRLS In Dehradun By Dehradun @ℂall @Girls Hotel...
Phone Us ❤8107221448❤ #ℂall #gIRLS In Dehradun By Dehradun @ℂall @Girls Hotel...Phone Us ❤8107221448❤ #ℂall #gIRLS In Dehradun By Dehradun @ℂall @Girls Hotel...
Phone Us ❤8107221448❤ #ℂall #gIRLS In Dehradun By Dehradun @ℂall @Girls Hotel...
chandankumarsmartiso
 
Role of Mukta Pishti in the Management of Hyperthyroidism
Role of Mukta Pishti in the Management of HyperthyroidismRole of Mukta Pishti in the Management of Hyperthyroidism
Role of Mukta Pishti in the Management of Hyperthyroidism
Dr. Jyothirmai Paindla
 
8 Surprising Reasons To Meditate 40 Minutes A Day That Can Change Your Life.pptx
8 Surprising Reasons To Meditate 40 Minutes A Day That Can Change Your Life.pptx8 Surprising Reasons To Meditate 40 Minutes A Day That Can Change Your Life.pptx
8 Surprising Reasons To Meditate 40 Minutes A Day That Can Change Your Life.pptx
Holistified Wellness
 
Promoting Wellbeing - Applied Social Psychology - Psychology SuperNotes
Promoting Wellbeing - Applied Social Psychology - Psychology SuperNotesPromoting Wellbeing - Applied Social Psychology - Psychology SuperNotes
Promoting Wellbeing - Applied Social Psychology - Psychology SuperNotes
PsychoTech Services
 
THERAPEUTIC ANTISENSE MOLECULES .pptx
THERAPEUTIC ANTISENSE MOLECULES    .pptxTHERAPEUTIC ANTISENSE MOLECULES    .pptx
THERAPEUTIC ANTISENSE MOLECULES .pptx
70KRISHPATEL
 
Netter's Atlas of Human Anatomy 7.ed.pdf
Netter's Atlas of Human Anatomy 7.ed.pdfNetter's Atlas of Human Anatomy 7.ed.pdf
Netter's Atlas of Human Anatomy 7.ed.pdf
BrissaOrtiz3
 
Basavarajeeyam - Ayurvedic heritage book of Andhra pradesh
Basavarajeeyam - Ayurvedic heritage book of Andhra pradeshBasavarajeeyam - Ayurvedic heritage book of Andhra pradesh
Basavarajeeyam - Ayurvedic heritage book of Andhra pradesh
Dr. Madduru Muni Haritha
 
A Classical Text Review on Basavarajeeyam
A Classical Text Review on BasavarajeeyamA Classical Text Review on Basavarajeeyam
A Classical Text Review on Basavarajeeyam
Dr. Jyothirmai Paindla
 
Histololgy of Female Reproductive System.pptx
Histololgy of Female Reproductive System.pptxHistololgy of Female Reproductive System.pptx
Histololgy of Female Reproductive System.pptx
AyeshaZaid1
 
CHEMOTHERAPY_RDP_CHAPTER 1_ANTI TB DRUGS.pdf
CHEMOTHERAPY_RDP_CHAPTER 1_ANTI TB DRUGS.pdfCHEMOTHERAPY_RDP_CHAPTER 1_ANTI TB DRUGS.pdf
CHEMOTHERAPY_RDP_CHAPTER 1_ANTI TB DRUGS.pdf
rishi2789
 
Efficacy of Avartana Sneha in Ayurveda
Efficacy of Avartana Sneha in AyurvedaEfficacy of Avartana Sneha in Ayurveda
Efficacy of Avartana Sneha in Ayurveda
Dr. Jyothirmai Paindla
 
How STIs Influence the Development of Pelvic Inflammatory Disease.pptx
How STIs Influence the Development of Pelvic Inflammatory Disease.pptxHow STIs Influence the Development of Pelvic Inflammatory Disease.pptx
How STIs Influence the Development of Pelvic Inflammatory Disease.pptx
FFragrant
 

Recently uploaded (20)

Hemodialysis: Chapter 4, Dialysate Circuit - Dr.Gawad
Hemodialysis: Chapter 4, Dialysate Circuit - Dr.GawadHemodialysis: Chapter 4, Dialysate Circuit - Dr.Gawad
Hemodialysis: Chapter 4, Dialysate Circuit - Dr.Gawad
 
The Best Ayurvedic Antacid Tablets in India
The Best Ayurvedic Antacid Tablets in IndiaThe Best Ayurvedic Antacid Tablets in India
The Best Ayurvedic Antacid Tablets in India
 
Adhd Medication Shortage Uk - trinexpharmacy.com
Adhd Medication Shortage Uk - trinexpharmacy.comAdhd Medication Shortage Uk - trinexpharmacy.com
Adhd Medication Shortage Uk - trinexpharmacy.com
 
Best Ayurvedic medicine for Gas and Indigestion
Best Ayurvedic medicine for Gas and IndigestionBest Ayurvedic medicine for Gas and Indigestion
Best Ayurvedic medicine for Gas and Indigestion
 
Top Effective Soaps for Fungal Skin Infections in India
Top Effective Soaps for Fungal Skin Infections in IndiaTop Effective Soaps for Fungal Skin Infections in India
Top Effective Soaps for Fungal Skin Infections in India
 
CHEMOTHERAPY_RDP_CHAPTER 3_ANTIFUNGAL AGENT.pdf
CHEMOTHERAPY_RDP_CHAPTER 3_ANTIFUNGAL AGENT.pdfCHEMOTHERAPY_RDP_CHAPTER 3_ANTIFUNGAL AGENT.pdf
CHEMOTHERAPY_RDP_CHAPTER 3_ANTIFUNGAL AGENT.pdf
 
Part II - Body Grief: Losing parts of ourselves and our identity before, duri...
Part II - Body Grief: Losing parts of ourselves and our identity before, duri...Part II - Body Grief: Losing parts of ourselves and our identity before, duri...
Part II - Body Grief: Losing parts of ourselves and our identity before, duri...
 
Light House Retreats: Plant Medicine Retreat Europe
Light House Retreats: Plant Medicine Retreat EuropeLight House Retreats: Plant Medicine Retreat Europe
Light House Retreats: Plant Medicine Retreat Europe
 
Phone Us ❤8107221448❤ #ℂall #gIRLS In Dehradun By Dehradun @ℂall @Girls Hotel...
Phone Us ❤8107221448❤ #ℂall #gIRLS In Dehradun By Dehradun @ℂall @Girls Hotel...Phone Us ❤8107221448❤ #ℂall #gIRLS In Dehradun By Dehradun @ℂall @Girls Hotel...
Phone Us ❤8107221448❤ #ℂall #gIRLS In Dehradun By Dehradun @ℂall @Girls Hotel...
 
Role of Mukta Pishti in the Management of Hyperthyroidism
Role of Mukta Pishti in the Management of HyperthyroidismRole of Mukta Pishti in the Management of Hyperthyroidism
Role of Mukta Pishti in the Management of Hyperthyroidism
 
8 Surprising Reasons To Meditate 40 Minutes A Day That Can Change Your Life.pptx
8 Surprising Reasons To Meditate 40 Minutes A Day That Can Change Your Life.pptx8 Surprising Reasons To Meditate 40 Minutes A Day That Can Change Your Life.pptx
8 Surprising Reasons To Meditate 40 Minutes A Day That Can Change Your Life.pptx
 
Promoting Wellbeing - Applied Social Psychology - Psychology SuperNotes
Promoting Wellbeing - Applied Social Psychology - Psychology SuperNotesPromoting Wellbeing - Applied Social Psychology - Psychology SuperNotes
Promoting Wellbeing - Applied Social Psychology - Psychology SuperNotes
 
THERAPEUTIC ANTISENSE MOLECULES .pptx
THERAPEUTIC ANTISENSE MOLECULES    .pptxTHERAPEUTIC ANTISENSE MOLECULES    .pptx
THERAPEUTIC ANTISENSE MOLECULES .pptx
 
Netter's Atlas of Human Anatomy 7.ed.pdf
Netter's Atlas of Human Anatomy 7.ed.pdfNetter's Atlas of Human Anatomy 7.ed.pdf
Netter's Atlas of Human Anatomy 7.ed.pdf
 
Basavarajeeyam - Ayurvedic heritage book of Andhra pradesh
Basavarajeeyam - Ayurvedic heritage book of Andhra pradeshBasavarajeeyam - Ayurvedic heritage book of Andhra pradesh
Basavarajeeyam - Ayurvedic heritage book of Andhra pradesh
 
A Classical Text Review on Basavarajeeyam
A Classical Text Review on BasavarajeeyamA Classical Text Review on Basavarajeeyam
A Classical Text Review on Basavarajeeyam
 
Histololgy of Female Reproductive System.pptx
Histololgy of Female Reproductive System.pptxHistololgy of Female Reproductive System.pptx
Histololgy of Female Reproductive System.pptx
 
CHEMOTHERAPY_RDP_CHAPTER 1_ANTI TB DRUGS.pdf
CHEMOTHERAPY_RDP_CHAPTER 1_ANTI TB DRUGS.pdfCHEMOTHERAPY_RDP_CHAPTER 1_ANTI TB DRUGS.pdf
CHEMOTHERAPY_RDP_CHAPTER 1_ANTI TB DRUGS.pdf
 
Efficacy of Avartana Sneha in Ayurveda
Efficacy of Avartana Sneha in AyurvedaEfficacy of Avartana Sneha in Ayurveda
Efficacy of Avartana Sneha in Ayurveda
 
How STIs Influence the Development of Pelvic Inflammatory Disease.pptx
How STIs Influence the Development of Pelvic Inflammatory Disease.pptxHow STIs Influence the Development of Pelvic Inflammatory Disease.pptx
How STIs Influence the Development of Pelvic Inflammatory Disease.pptx
 

Introduction to Project Management for Researchers

  • 1. Project Planning and Management Roger Tatoud, Ph.D. Senior Programme Manager International HIV Clinical Trials Research Management Office Imperial College London DPFS/DCS Workshop: 15 February 2013
  • 2. Introduction • Background • From Bench to Bedside • Project Management • Why Project Management • Management Structure • Planning • Gantt Chart • Setting Milestones • Risk Management • Project Monitoring • Budget and MRC T&C • Your Project Manager 1
  • 4. Translational Medicine as a Linear Path Basic research Prototype Discovery & Design Pre-clinical Develop- ment Early clinical trials (I/II) Late clinical trials (III/IV) Regulatory approval Marketing Post marketing compliance Patient DPFS/DCS 3
  • 7. What to do? Where to Start? 6 ... Project Management is here to help!
  • 8. • Poor definition of objectives • Inadequate resources • Poor team and capacity issues • Poor communication • Lack of a cross functional team • Resistance to change • Lack of top management commitment • Poor leadership • Poor baseline management • Poor planning and control • Technical problems not resolved • Failure to anticipate problems • Too many uncontrolled changes • Lack of customer/user involvement Why Projects Fail? Adapted from HANDBOOK OF PROJECT MANAGEMENT © Trevor L Young January 2003 7 Leadership Team Work Management
  • 9. • Assumed competency • Specification (scope) not specific • What are we doing? • Who does what and when? • Lack of individual commitment • Resistance to change • “I’ll do it my way” (great song, poor management) • The feeling that planning is an unnatural act • “I don’t work like that” • Over-optimism supported by our keen ability to underestimate everything • Bérézina Complex: “We will cross that bridge when we reach it” Why Projects Fail? Being Human 8
  • 10. 1. Control scope and manage change 2. Deliver project results on time and on budget 3. Focus the project team on the solution 4. Obtain project buy-in from disparate groups 5. Define the critical path to optimally complete your project 6. Provide a process for estimating project resources, time, and costs 7. Communicate project progress, risks, and changes 8. Surface and explore project assumptions 9. Prepare for unexpected project issues 10. Document, transfer, and apply lessons learned from your projects Source: http://www.bizmanualz.com Why Project management? 9
  • 11. 3D Approach to Project Management Manage Processes 10
  • 12. Essential elements of Project Management • Good management • Effective record keeping • Good filing practices • Budget management • Good communication • On progress (looking backward) • On planning (looking forward) • Good project planning • Identify critical path & rate limiting activities • Enable allocation of sufficient time and resources • Good scenario planning / Risk management • Go/NoGo decision points • Be one step ahead of the game 11
  • 13. Project Management A dynamic action cycle PHASE 1 PHASE 2 PHASE 4PHASE 3 CONCEPTION & DEFINITION EXECUTING THE WORK HANDOVER&CLOSURE PLANNING&SCHEDULING DEFINE OBJECTIVES PLAN THE WORK COMMUNICATE THE PLAN MONITOR PROGRESS REVIEW & EVALUATE INSTITUTIONAL LEARNING PHASE 0 SELECTION Opportunities Identified Adapted from HANDBOOK OF PROJECT MANAGEMENT © Trevor L Young January 2003 Redefine 12
  • 14. 13 SC eGroup PMG TMG • Don’t recycle old management structures • Identify the needs of the project… • Bring together people that can contribute to issues arising in the project through… • Groups that will meet and communicate regularly. The Project Management Structure Research Stats Regulator Finance Clinical Database Admin Comm. IP Research Regulator Clinical Database IP Industry Industry Contract Contract Finance Stats Strategy Comm. Admin Strategy Operation
  • 15. The Project Management Group Principal Investigator Strategic focus Project Manager Operational focus Project Management Group Experienced team members responsible for other roles PM+PI (PMG) Industry Regulators Clinical Researchers Funder University 14
  • 16. Choosing a Project Manager • Appointed and involved at an early stage • Central point of contact for Project Team and Stakeholders • Empowered to do his/her job • Good organisation skills • Good communicator • Flexible, creative, resilient • Multitasker • Show initiative – know what (s)he knows and doesn’t • Think globally, act locally 15
  • 17. Project Planning • First you need a plan! • A good project plan should monitor: • Timelines • Milestones • Budget • Resources Progress • Identify critical path / rate limiting activities • Enable allocation of sufficient time and resources • Project plans are dynamic - evolve as project develops • Level of detail will depend on target audience • The Gantt Chart... 16
  • 18. • A graphical method of showing a project schedule that shows project time, dates of all activities and their relationships • For planning • For identifying dependencies • For identifying a Critical Path • For determining Milestones • For monitoring The Gantt Chart 17
  • 19. 18 Gantt Chart - Planning of a Phase I trial
  • 20. From Idea to Phase I - Manufacturing 19
  • 21. Milestones - be SMART • Specific: objectives should be specific and written in clear, concise, and understandable terms. • Measurable: measurable outcomes allow determination of delivery. Set realistic and justifiable success criteria: Target value range and acceptable (cut-off) values. • Achievable: objectives must be aggressive but realistic – don’t be too ambitious! • Relevant: tasks and deliverables must focus on progressing the project along an appropriate (critical) development path. • Timely (deadlines not durations): objectives should have a realistic timeframe with an end date assigned to them. 20
  • 22. Be SMART Objectives (ex: Detection of virus sequences in blood using new qPCR plateform) • 1. qPCR primer sets capable of amplifying 15 of 16 diverse blood samples tested with a combination of the assays targeting 3 virus genes using the fluorescent detection system • 2. The positive assays will yield a Ct of <10 and the negative control a Ct >38 • 3. The clinical isolates tested will yield Ct below background (sensitivity) and the correct positive call (specificity) on the Q-PCR platform 21 Success Criteria 1. qPCR primer sets amplifies 15 of 16 diverse blood samples tested with a combination of the assays targeting 3 virus genes using the fluorescent detection system. 2. The positive assays yields a Ct <10 and the negative control a Ct >38 3. The clinical isolates tested yields a Ct below background and the correct positive call on the Q-PCR platform
  • 23. 22 • Example: development of an ultra low viral load assay • What? • How? • Results? • Variance • Go/No Go • What’s next? Identifying and writing milestones M Start Date End Date Month What is measured? How is it measured? What are the possible results? (Go/No go) Acceptable variance What happens then? Worded Milestone 1 01/10/12 31/03/13 6 Sensitivity of UL VL assay Lab assays <0.2 RNA copy/mL 10% Proceed to Stage 2 An UL VL assay with a sensitivity below 0.2 RNA copy/mL has been developed by Milestone End date>0.2 RNA copy/mL Contract Assay to Company X.
  • 24. Risk and its management Project Schedule Issues RISKS Contains inherent… Which if they Occur become… Which if unresolved impact on… • Identify & evaluate risks • Identify risk ownership • Mitigation • Prepare a response & contingency plans • Continuous process • Identify early & resolve promptly • Constraints # Risks 23
  • 25. • Strategic risks concern long-term strategic objectives of the project. This type of project risks affects such areas as initial project financing, technology, reputation, changes in the physical environment, etc. • Operational risks concern issues and problems that project participants are confronted with from day to day. Mitigation of operational risks contributes to reducing of strategic risks. • Compliance risks concern issues associated with the need to comply the project course with documented statements and regulations. Managing compliance risks lets ensure that current project activities are undertaken in the manner which project stakeholders and customers expect. • Financial risks are associated with existing financial structure of the project and with all the transactions made to carry out the project. Identification of financial risks involves examining daily operations. Financial risks are an indicator that shows whether current project has serious implications for viability. • Knowledge risks are associated with effective management and control of knowledge resources, communication mechanisms, and protection systems. Project knowledge risks may include abuse of intellectual property, loss of the key project staff, system malfunction, etc. Type of risk and their estimation 24
  • 26. Quantifying risk – Assessing impact • Probability of occurrence • Impact on the project • Decided by team consensus • Identified at the start • Added as required • Reviewed regularly Impact on the project (conservative matrix) Low Medium High Probability 0.65 - 1.00 Medium High Not acceptable 0.30 – 0.64 Low High Not acceptable 0.0 – 0.29 Low Medium High • HIGH: Major Impact, serious consequences. Likely to affect a Milestone, must be monitored regularly and closely • MEDIUM: Significant impact, not expected to affect a Milestone, monitor regularly • LOW: Not expected to have a serious impact. Review regularly for ranking 25
  • 27. • Progress • Risks • Finance • Monthly PMG meeting (TMG, SC, eGroup) • Ad hoc meetings (milestones, finance) • Quarterly Reports • Milestones Reports • End of grant report • Publications • Capacity building • Commercialisation Project Monitoring & Evaluation 26
  • 28. Good Meeting Management practice • Schedule regular meetings – with reminders (use Outlook!) • Request status report (provide template!) • Circulate agenda in advance – seek input from team members • Circulate status report and relevant papers (early enough) • Chair meeting – keep to time (park what needs to be parked) • Start by reviewing previous Action Points– close completed APs • Identify issues requiring a decision by whom and when • Identify Action Points, their owner(s) and a due date • Circulate minutes/actions for comment within 2-3 days • Sooner if some actions require immediate action • Finalise sign-off minutes at next meeting • Follow up 10 days later 27
  • 29. • When setting budgets consider cost beyond basic research and clinics • Travel, publications, samples shipment • Regulatory support (consultants) • Regulatory meetings in response to data • Storage cost IMP (GMP) • Storage cost samples (short and long term) • Labelling, packaging, shipping • Pharmacy (equipment), set up fees (clinical site) • Ensure grant is set up in your system and that your finance and admin people know about it Budget and resources 28
  • 30. Conclusion • Diversity • Complexity • Relationships • Dependencies • Stakeholders  Managing a Project… …is managing change 29
  • 31. • Trevor L. Young Young is an expert project management practitioner and his book provides everything needed to manage a project from start to finish in a clear, concise and to the point style. Many of the templates I use are based on his work. • The Handbook of Project Management: A Practical Guide to Effective Policies, Techniques and Processes • Scott Berkun Berkun’s books are an everyday reminder that tools are as good as those who use them and that however good they may be, they are no magic bullet for successful project management. Berkun also debunk a number of myths about project management and challenges many management clichés (such as “thinking outside of the box”). • Julie Warneck Protogenia Consulting Ltd • Loic Lhuillier Translational Research Portfolio Manager King’s College London/NIHR BRC 30 Acknowledgement