SlideShare a Scribd company logo
SCHOOL OF MANAGEMENT STUDIES
Project Management
B20BH5030
Program: BBA(H)
Course Title: PROEJCT MANAGEMENT
Course Code: B20BH5030
Course Type: HC
Course Presenter: PROF. MANIKRISHNA
Semester & Section: V-B
Academic Year: 2022-23
Course Pre-requisites: -
L T P: [3] [1] [0]
Pedagogy: ICT & E-CONTENT
Course Objectives:
Course Outcomes:
After the completion of the course, students will be able to:
1. .
1.To equip them with the knowledge and skills required to be successful in applying Project Management.
2.To make them understand techniques for Project planning, scheduling and Execution Control
3.To make them understand the concepts of Project Management for planning to execution of projects and to make
them understand the feasibility analysis in Project Management and network analysis tools for cost and time
estimation.
4. To enable them to comprehend the fundamentals of Contract Administration, Costing and Budgeting,
Methodologies in Indian context.
1. To equip them with the knowledge and skills required to be successful in applying Project Management.
2.To make them understand techniques for Project planning, scheduling and Execution Control
3.To make them understand the concepts of Project Management for planning to execution of projects and to make them
understand the feasibility analysis in Project Management and network analysis tools for cost and time estimation.
4. Analyse the environmental issues which have an impact on the execution of Project Management.
Syllabus:
Unit Topics
Course
Outcomes
Program
Outcome
s
I
Introduction to Applied Project Management: Project Definition, Project Feasibility
Analysis, Developing a Project Execution Plan, Setting up a Project Organization ,Project
Identification, Project Formulation, Project Selection, Project Planning, Project Appraisal,
Project Implementation and Integrated Project Management
1 1,2
II
Resource Scheduling, and Cost Estimating: Controlling Project Execution, Project
Control, Project Planning and Scheduling Module ,Project Cost Engineering and Detailed
Engineering, Project Success and Failure, Project Auditing and Project Termination, E-
Tendering
2 2,3
III
Project Procurement and Construction Management: Construction, Progress,
Productivity and Supervision, Subcontract Administration and Control ,Human aspects of
project management –Project Monitoring and Control, Project Evaluation, Prerequisites
for successful project implementation
3 2,5
IV
Project Leadership, Audit and Closure Project Leadership: Managing vs leading a
project, Managing project stake holders, Qualities of an effective project manager,
Managing project teams, Issues arising out of globalization, Communication, Conflict
management. Project Audit and Closure: Audit process, project closure, project
documentation, evaluation of project manager, team and members.
4 3,5
Reference Books:
E-Resources:
1. https://nptel.ac.in/
2. https://learn.saylor.org
1. Vasant Desai, Project Management, Himalaya Publishing House, 2011.
2. Prasanna Chandra, Project, Planning and Analysis, Financing, Implementation, TMH, New Delhi 7/e, 2009.
3. Narendra Singh, “Project Management and Control”, Himalaya Publishing House, 2009.
4. SitangshuKhatua, “Project Management and Appraisal” Oxford Higher education, 2012.
5. Kerzner H.; Project Management, II Edition, CBS Publishers
6. Meredith Jack R., Mantel Samuel J.; Project Management, IV Edition, John Wiley & Sons
7. Gopalakrishnan P., Ramamoorthy V.E; Textbook of Project Management, MacMillan Publishers
Presentation Topics:
PEST analysis industry specific
Assignment:
Feasibility study of dummy project
“Plans are only good intentions unless they
immediately degenerate into hard work.” –
Peter Drucker
What is Project?
A Temporary endeavour undertaken to create a unique product,
Service or result. The temporary nature of projects indicate a
definite beginning and end.
What is Project?
A project can create:
• A product that can be either a component of another item or an end item in itself,
• A capability to perform a service (e.g., a business function that supports production or distribution),
or
• A result such as an outcome or document (e.g., a research project that develops knowledge that
can be used to determine whether a trend is present or a new process will benefit society).
What is Project?
Examples of projects include, but are not limited to:
• Developing a new product or service,
• Effecting a change in the structure, staffing, or style of an organization,
• Developing or acquiring a new or modified information system,
• Constructing a building or infrastructure, or
• Implementing a new business process or procedure.
What is project management?
• Project management is the application of knowledge, skills, tools, and techniques to project
activities to meet the project requirements. Project management is accomplished through the
appropriate application and integration of the 42 logically grouped project management processes
comprising the 5 Process Groups. These 5 Process Groups are:
• Initiating,
• Planning,
• Executing,
• Monitoring and Controlling, and
• Closing.
Managing a project typically includes:
• Identifying requirements,
• Addressing the various needs, concerns, and expectations of the stakeholders as the project is
planned and carried out,
• Balancing the competing project constraints including, but not limited to:
Scope,
Quality,
Schedule,
Budget,
Resources, and
Risk.
A Project occurs when you have a goal and a plan to achieve that
goal.
Project management is the application of processes, methods,
skills, knowledge and experience to achieve specific
project objectives according to the project acceptance criteria within
agreed parameters. Project management has final
deliverables that are constrained to a finite timescale and budget.
PROJECT FEASIBILITY ANALYSIS
A Project feasibility study is defined as an evaluation or analysis of
the potential impact of a proposed project or program. The
purpose of a Feasibility Study is to identify the likelihood of one or
more solutions meeting the stated business requirements.
Technical
Economical
Commercial
Financial
Environmental
Economic Feasibility
• This assessment typically involves a cost/ benefits analysis of
the project, helping organizations determine the viability, cost,
and benefits associated with a project before financial
resources are allocated. It also serves as an independent
project assessment and enhances project credibility—helping
decision-makers determine the positive economic benefits to
the organization that the proposed project will provide.
Technical feasibility
• This assessment focuses on the technical resources available
to the organization. It helps organizations determine whether
the technical resources meet capacity and whether the
technical team is capable of converting the ideas into working
systems. Technical feasibility also involves the evaluation of the
hardware, software, and other technical requirements of the
proposed system. As an exaggerated example, an organization
wouldn’t want to try to put Star Trek’s transporters in their
building—currently, this project is not technically feasible.
Commercial feasibility
• Commercial feasibility is an element of the study focused on
the probability of commercial success. It's mainly focused on
studying the new business or a new product or service and
whether your organisation can create enough profit with it.
Financial feasibility
• Financial feasibility describes whether or not your project is
fiscally viable. A financial feasibility report includes a
cost/benefit analysis of the project. It also forecasts an expected
return on investment (ROI), as well as outlines any financial
risks. The goal at the end of the financial feasibility study is to
understand the economic benefits the project will drive.
Environment feasibility
• An Environmental Feasibility Study assesses the viability of a
proposed development from an environmental and social
perspective, identifying potential issues and threats to the
successful completion of the proposed development.
Solutions and mitigative measures are investigated.
Steps involved in Feasibility Study
1. Project Description – Identify the project name and purpose. Include details including
stakeholders, and end result expected.
2. Goals – List long and short-term goals and what processes will be needed to achieve those
goals.
3. Timeline – What will be the estimated time until project completion?
4. Costs and Budgeting – Include all costs incurred for the project including the cost of the feasibility
study itself.
5. Market Analysis – If applicable, will the market or market environment benefit from the project. If
so, list out.
6. Resources – Identify all the resources both IT, technical, inventory, and human that will be
needed to complete the project.
7. Project Process – How will the project flow? Include flow charts showing project stages.
8. Management and Teams – Who will manage and who will work on scheduled tasks? Will project
management outsourcing be needed?
9. Observations– Statements that do or don’t support the project should be included
Project identification
• Project identification: A search for promising project ideas could contribute towards achieving specified
development objectives. Project identification should be an integral part of the Macro-planning exercise of the
state with sectored information and strategies as the main source of the ideas.
• Good project ideas are the key to success. Therefore a wide variety of sources should be tapped to analyze
them. To have a wide range of options, the sources of project ideas can be categorized into two they are:
A. Micro level sources
B. Macro level sources
Project identification
A] Micro level
• 1. Analysis of the performance of existing industries
• 2. Examination of the input-outputs of various industries
• 3. Review of imports and exports
• 4. Investigation of local materials and resources
• 5. Analysis of economic and social changes
• 6. Study of new technological developments
• 7. Exploring the possibility of reviving sick units
• 8. Identification of unfulfilled psychological needs
• 9. Attending trade fairs
• 10. Stimulating creativity for generation’s new product lines
Project identification
B. At Macro level
• 1. Project ideas from government policies and plan
• 2. Project ideas from technical specifications
• 3. Project ideas from local leaders
• 4. Project ideas from Entrepreneurs
Project Management U 1.pptx

More Related Content

Similar to Project Management U 1.pptx

Project planning.pptx
Project planning.pptxProject planning.pptx
Project planning.pptx
HarsimratDeo1
 
Project planning.pptx
Project planning.pptxProject planning.pptx
Project planning.pptx
HarsimratDeo1
 
PMP Training - 01 introduction to framework
PMP Training - 01 introduction to frameworkPMP Training - 01 introduction to framework
PMP Training - 01 introduction to frameworkejlp12
 
Basics in Project Management
Basics in Project ManagementBasics in Project Management
Basics in Project Management
chaitanyakrsk
 
Project M&E (unit 1-4)
Project M&E (unit 1-4)Project M&E (unit 1-4)
Project M&E (unit 1-4)
Regmi Milan
 
PM-1 Overview.ppt
PM-1 Overview.pptPM-1 Overview.ppt
PM-1 Overview.ppt
natisil1
 
Project management revised
Project management revisedProject management revised
Project management revised
Jubayer Alam Shoikat
 
PMBOK 5th Planning Process Group Part One
PMBOK 5th Planning Process Group Part OnePMBOK 5th Planning Process Group Part One
PMBOK 5th Planning Process Group Part One
Hossam Maghrabi
 
Project management slide show
Project management slide showProject management slide show
Project management slide show
Tanvir Anwar
 
INTRO.pptx
INTRO.pptxINTRO.pptx
INTRO.pptx
Sankalp Sharma
 
UNIT-01_Fundamentals_ Project management
UNIT-01_Fundamentals_ Project managementUNIT-01_Fundamentals_ Project management
UNIT-01_Fundamentals_ Project management
sdbhosale860
 
Project planning and feasibility study
Project planning and feasibility studyProject planning and feasibility study
Project planning and feasibility studyMars Mfyam
 
Project management
Project managementProject management
Project management
Biswa Prusty
 
E book project-management
E book project-managementE book project-management
E book project-management
GuruK32
 
04 project integration management
04  project integration management04  project integration management
04 project integration management
Ala Ibrahim
 
PROJECT PLANNING AND MANAGEMENT
PROJECT PLANNING AND MANAGEMENTPROJECT PLANNING AND MANAGEMENT
PROJECT PLANNING AND MANAGEMENT
Abraham Ncunge
 
Introduction to Project Management
Introduction to Project ManagementIntroduction to Project Management
Introduction to Project Management
muhammadyasirsaeedqa
 
The World of Project Management; What is project Management
The World of Project Management; What is project ManagementThe World of Project Management; What is project Management
The World of Project Management; What is project Management
muhammadyasirsaeedqa
 
Project Management Msc. 7Pjmn009W Project Management Project.
Project Management Msc. 7Pjmn009W Project Management Project.Project Management Msc. 7Pjmn009W Project Management Project.
Project Management Msc. 7Pjmn009W Project Management Project.
Renee Jones
 

Similar to Project Management U 1.pptx (20)

Project planning.pptx
Project planning.pptxProject planning.pptx
Project planning.pptx
 
Project planning.pptx
Project planning.pptxProject planning.pptx
Project planning.pptx
 
PMP Training - 01 introduction to framework
PMP Training - 01 introduction to frameworkPMP Training - 01 introduction to framework
PMP Training - 01 introduction to framework
 
Basics in Project Management
Basics in Project ManagementBasics in Project Management
Basics in Project Management
 
Project M&E (unit 1-4)
Project M&E (unit 1-4)Project M&E (unit 1-4)
Project M&E (unit 1-4)
 
PM-1 Overview.ppt
PM-1 Overview.pptPM-1 Overview.ppt
PM-1 Overview.ppt
 
Project management revised
Project management revisedProject management revised
Project management revised
 
PMBOK 5th Planning Process Group Part One
PMBOK 5th Planning Process Group Part OnePMBOK 5th Planning Process Group Part One
PMBOK 5th Planning Process Group Part One
 
Project management slide show
Project management slide showProject management slide show
Project management slide show
 
INTRO.pptx
INTRO.pptxINTRO.pptx
INTRO.pptx
 
UNIT-01_Fundamentals_ Project management
UNIT-01_Fundamentals_ Project managementUNIT-01_Fundamentals_ Project management
UNIT-01_Fundamentals_ Project management
 
Cs244 w10ch1
Cs244 w10ch1Cs244 w10ch1
Cs244 w10ch1
 
Project planning and feasibility study
Project planning and feasibility studyProject planning and feasibility study
Project planning and feasibility study
 
Project management
Project managementProject management
Project management
 
E book project-management
E book project-managementE book project-management
E book project-management
 
04 project integration management
04  project integration management04  project integration management
04 project integration management
 
PROJECT PLANNING AND MANAGEMENT
PROJECT PLANNING AND MANAGEMENTPROJECT PLANNING AND MANAGEMENT
PROJECT PLANNING AND MANAGEMENT
 
Introduction to Project Management
Introduction to Project ManagementIntroduction to Project Management
Introduction to Project Management
 
The World of Project Management; What is project Management
The World of Project Management; What is project ManagementThe World of Project Management; What is project Management
The World of Project Management; What is project Management
 
Project Management Msc. 7Pjmn009W Project Management Project.
Project Management Msc. 7Pjmn009W Project Management Project.Project Management Msc. 7Pjmn009W Project Management Project.
Project Management Msc. 7Pjmn009W Project Management Project.
 

Recently uploaded

Event Management System Vb Net Project Report.pdf
Event Management System Vb Net  Project Report.pdfEvent Management System Vb Net  Project Report.pdf
Event Management System Vb Net Project Report.pdf
Kamal Acharya
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
bakpo1
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
Kamal Acharya
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
AafreenAbuthahir2
 
Democratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek AryaDemocratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek Arya
abh.arya
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
AhmedHussein950959
 
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdfCOLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
Kamal Acharya
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Teleport Manpower Consultant
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
AJAYKUMARPUND1
 
Forklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella PartsForklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella Parts
Intella Parts
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
fxintegritypublishin
 
LIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.pptLIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.ppt
ssuser9bd3ba
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Dr.Costas Sachpazis
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
Kamal Acharya
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
VENKATESHvenky89705
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
TeeVichai
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
gdsczhcet
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
Robbie Edward Sayers
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
Pratik Pawar
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
Amil Baba Dawood bangali
 

Recently uploaded (20)

Event Management System Vb Net Project Report.pdf
Event Management System Vb Net  Project Report.pdfEvent Management System Vb Net  Project Report.pdf
Event Management System Vb Net Project Report.pdf
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
 
Democratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek AryaDemocratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek Arya
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
 
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdfCOLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
 
Forklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella PartsForklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella Parts
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
 
LIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.pptLIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.ppt
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
 

Project Management U 1.pptx

  • 1. SCHOOL OF MANAGEMENT STUDIES Project Management B20BH5030
  • 2. Program: BBA(H) Course Title: PROEJCT MANAGEMENT Course Code: B20BH5030 Course Type: HC Course Presenter: PROF. MANIKRISHNA Semester & Section: V-B Academic Year: 2022-23 Course Pre-requisites: - L T P: [3] [1] [0] Pedagogy: ICT & E-CONTENT
  • 3. Course Objectives: Course Outcomes: After the completion of the course, students will be able to: 1. . 1.To equip them with the knowledge and skills required to be successful in applying Project Management. 2.To make them understand techniques for Project planning, scheduling and Execution Control 3.To make them understand the concepts of Project Management for planning to execution of projects and to make them understand the feasibility analysis in Project Management and network analysis tools for cost and time estimation. 4. To enable them to comprehend the fundamentals of Contract Administration, Costing and Budgeting, Methodologies in Indian context. 1. To equip them with the knowledge and skills required to be successful in applying Project Management. 2.To make them understand techniques for Project planning, scheduling and Execution Control 3.To make them understand the concepts of Project Management for planning to execution of projects and to make them understand the feasibility analysis in Project Management and network analysis tools for cost and time estimation. 4. Analyse the environmental issues which have an impact on the execution of Project Management.
  • 4. Syllabus: Unit Topics Course Outcomes Program Outcome s I Introduction to Applied Project Management: Project Definition, Project Feasibility Analysis, Developing a Project Execution Plan, Setting up a Project Organization ,Project Identification, Project Formulation, Project Selection, Project Planning, Project Appraisal, Project Implementation and Integrated Project Management 1 1,2 II Resource Scheduling, and Cost Estimating: Controlling Project Execution, Project Control, Project Planning and Scheduling Module ,Project Cost Engineering and Detailed Engineering, Project Success and Failure, Project Auditing and Project Termination, E- Tendering 2 2,3 III Project Procurement and Construction Management: Construction, Progress, Productivity and Supervision, Subcontract Administration and Control ,Human aspects of project management –Project Monitoring and Control, Project Evaluation, Prerequisites for successful project implementation 3 2,5 IV Project Leadership, Audit and Closure Project Leadership: Managing vs leading a project, Managing project stake holders, Qualities of an effective project manager, Managing project teams, Issues arising out of globalization, Communication, Conflict management. Project Audit and Closure: Audit process, project closure, project documentation, evaluation of project manager, team and members. 4 3,5
  • 5. Reference Books: E-Resources: 1. https://nptel.ac.in/ 2. https://learn.saylor.org 1. Vasant Desai, Project Management, Himalaya Publishing House, 2011. 2. Prasanna Chandra, Project, Planning and Analysis, Financing, Implementation, TMH, New Delhi 7/e, 2009. 3. Narendra Singh, “Project Management and Control”, Himalaya Publishing House, 2009. 4. SitangshuKhatua, “Project Management and Appraisal” Oxford Higher education, 2012. 5. Kerzner H.; Project Management, II Edition, CBS Publishers 6. Meredith Jack R., Mantel Samuel J.; Project Management, IV Edition, John Wiley & Sons 7. Gopalakrishnan P., Ramamoorthy V.E; Textbook of Project Management, MacMillan Publishers
  • 6. Presentation Topics: PEST analysis industry specific Assignment: Feasibility study of dummy project
  • 7. “Plans are only good intentions unless they immediately degenerate into hard work.” – Peter Drucker
  • 8. What is Project? A Temporary endeavour undertaken to create a unique product, Service or result. The temporary nature of projects indicate a definite beginning and end.
  • 9. What is Project? A project can create: • A product that can be either a component of another item or an end item in itself, • A capability to perform a service (e.g., a business function that supports production or distribution), or • A result such as an outcome or document (e.g., a research project that develops knowledge that can be used to determine whether a trend is present or a new process will benefit society).
  • 10. What is Project? Examples of projects include, but are not limited to: • Developing a new product or service, • Effecting a change in the structure, staffing, or style of an organization, • Developing or acquiring a new or modified information system, • Constructing a building or infrastructure, or • Implementing a new business process or procedure.
  • 11. What is project management? • Project management is the application of knowledge, skills, tools, and techniques to project activities to meet the project requirements. Project management is accomplished through the appropriate application and integration of the 42 logically grouped project management processes comprising the 5 Process Groups. These 5 Process Groups are: • Initiating, • Planning, • Executing, • Monitoring and Controlling, and • Closing.
  • 12. Managing a project typically includes: • Identifying requirements, • Addressing the various needs, concerns, and expectations of the stakeholders as the project is planned and carried out, • Balancing the competing project constraints including, but not limited to: Scope, Quality, Schedule, Budget, Resources, and Risk.
  • 13. A Project occurs when you have a goal and a plan to achieve that goal. Project management is the application of processes, methods, skills, knowledge and experience to achieve specific project objectives according to the project acceptance criteria within agreed parameters. Project management has final deliverables that are constrained to a finite timescale and budget.
  • 14. PROJECT FEASIBILITY ANALYSIS A Project feasibility study is defined as an evaluation or analysis of the potential impact of a proposed project or program. The purpose of a Feasibility Study is to identify the likelihood of one or more solutions meeting the stated business requirements. Technical Economical Commercial Financial Environmental
  • 15. Economic Feasibility • This assessment typically involves a cost/ benefits analysis of the project, helping organizations determine the viability, cost, and benefits associated with a project before financial resources are allocated. It also serves as an independent project assessment and enhances project credibility—helping decision-makers determine the positive economic benefits to the organization that the proposed project will provide.
  • 16. Technical feasibility • This assessment focuses on the technical resources available to the organization. It helps organizations determine whether the technical resources meet capacity and whether the technical team is capable of converting the ideas into working systems. Technical feasibility also involves the evaluation of the hardware, software, and other technical requirements of the proposed system. As an exaggerated example, an organization wouldn’t want to try to put Star Trek’s transporters in their building—currently, this project is not technically feasible.
  • 17. Commercial feasibility • Commercial feasibility is an element of the study focused on the probability of commercial success. It's mainly focused on studying the new business or a new product or service and whether your organisation can create enough profit with it.
  • 18. Financial feasibility • Financial feasibility describes whether or not your project is fiscally viable. A financial feasibility report includes a cost/benefit analysis of the project. It also forecasts an expected return on investment (ROI), as well as outlines any financial risks. The goal at the end of the financial feasibility study is to understand the economic benefits the project will drive.
  • 19. Environment feasibility • An Environmental Feasibility Study assesses the viability of a proposed development from an environmental and social perspective, identifying potential issues and threats to the successful completion of the proposed development. Solutions and mitigative measures are investigated.
  • 20. Steps involved in Feasibility Study 1. Project Description – Identify the project name and purpose. Include details including stakeholders, and end result expected. 2. Goals – List long and short-term goals and what processes will be needed to achieve those goals. 3. Timeline – What will be the estimated time until project completion? 4. Costs and Budgeting – Include all costs incurred for the project including the cost of the feasibility study itself. 5. Market Analysis – If applicable, will the market or market environment benefit from the project. If so, list out. 6. Resources – Identify all the resources both IT, technical, inventory, and human that will be needed to complete the project. 7. Project Process – How will the project flow? Include flow charts showing project stages. 8. Management and Teams – Who will manage and who will work on scheduled tasks? Will project management outsourcing be needed? 9. Observations– Statements that do or don’t support the project should be included
  • 21. Project identification • Project identification: A search for promising project ideas could contribute towards achieving specified development objectives. Project identification should be an integral part of the Macro-planning exercise of the state with sectored information and strategies as the main source of the ideas. • Good project ideas are the key to success. Therefore a wide variety of sources should be tapped to analyze them. To have a wide range of options, the sources of project ideas can be categorized into two they are: A. Micro level sources B. Macro level sources
  • 22. Project identification A] Micro level • 1. Analysis of the performance of existing industries • 2. Examination of the input-outputs of various industries • 3. Review of imports and exports • 4. Investigation of local materials and resources • 5. Analysis of economic and social changes • 6. Study of new technological developments • 7. Exploring the possibility of reviving sick units • 8. Identification of unfulfilled psychological needs • 9. Attending trade fairs • 10. Stimulating creativity for generation’s new product lines
  • 23. Project identification B. At Macro level • 1. Project ideas from government policies and plan • 2. Project ideas from technical specifications • 3. Project ideas from local leaders • 4. Project ideas from Entrepreneurs