A PRACTICAL TRAINING SEMINAR ON
KOTA SUPER THERMAL POWER STATION,KOTA
GOVT. ENGG. COLLEGE
BHARATPUR
Presented to :- Mr. Rahul Srivastava
Presented by:- Pukhraj mali
Branch :- Mechanical Engineering
Semester :- 7th sem.
KSTPS is first coal based power plant in
Rajasthan.
It is located ideally on the left bank of chambal
river at the upstream of kota barrage.
In 1973 Central Electricity Authority prepared a
project report for power station.
In 1976 Planning Commission cleared project
report.
Its first unit of capacity 110 MW is synchronized
on 17 Jan 1983.
STAGES
Unit 6 – 195 MW
Cost : 635
Unit 1 –110 MW
Unit 2 – 110 MW
Cost : 143
Unit 3 – 210 MW
Unit 4 – 210 MW
Cost : 480
Unit 5 – 210 MW
Cost : 480
Unit 7 – 195 MW
Cost : 880
Stage II
Stage III
Stage IV
Total Electricity Generation: 1240 MW
* All costs are in cores (Rs.)
SALIENT FEATURES
LOCATION
Ideally on the left bank of Chambal River at Up Stream of
Kota Barrage.
COAL
Coal India limited supply coal from its coal producing
subsidiaries BCCL, SECL & ECL through railway wagons
WATER
The source of water for power station is reservoir formed
by Kota Barrage on the Chambal River
LAND
Land measuring approx. 250 hectares was required for
the project in 1976
GENERAL LAYOUT AND BASIC IDEA:
 The conversion from coal to electricity takes place in three
stages.
 Stage 1
 The first conversion of energy takes place in the boiler.
Coal is burnt in the boiler furnace to produce heat.
Carbon in the coal and Oxygen in the air combine to
produce Carbon Dioxide and heat.
 Stage 2
 The second stage is the thermodynamic process.
 The heat from combustion of the coal boils water in the
boiler to produce steam. In modern power plant, boilers
produce steam at a high pressure and temperature.
 The steam is then piped to a turbine.
 The high pressure steam impinges and expands across a
number of sets of blades in the turbine.
 The impulse and the thrust created rotates the turbine.
 The steam is then condensed and pumped back into the
boiler to repeat the cycle.
 Stage 3
 In the third stage, rotation of the turbine rotates
the generator rotor to produce electricity based of Faraday’s
Principle of electromagnetic induction.
 Control system of station is based on Rankin Cycle.
 To increase the heat economy and efficiency we use
number of modification in the plant.
COAL HANDLING PLANT
SALIENT FEATURES
The coal is brought to the KSTPS
from BHARAT COKING COAL
LTD.
There are 14 tracks for
transportation.
Everyday 3- 4 trains of coal are
unloaded, each train consists 58
wagons.
Coal is unloaded from wagons by
means of WAGON TRIPPLER.
a. Wagons are rotated upside down
through an angle 180 degree.
b. The unloaded coal is transported to
crusher house with the help of
conveyer belts.
Boiler is a closed vessel in
which water, under
pressure, is converted into
steam by absorbing heat
released in process of
combustion.
In KSTPS boiler used is
water tube; pulverised fuel
fired; single drum type;
tangential firing system.
Technical Specifications
 1).Type Water Tube Boiler
 2).Make BHEL
 3).Capacity 375 tonnes per hour
 4).Steam pressure 139 kg/ sq. cm
 5).Efficiency 86.6%
 6).Steam temperature 540 deg.
Air pre heater
Heat energy contained by flue gases is utilized to increase
the temperature of air entering the boiler.
Reheater
Heats up steam going from high pressure turbine to
intermediate pressure turbine.
Super heater
Removes moisture present in steam going to turbine.
Economiser
Flue gases leaving boiler is passed through economiser to
increase temperature of water entering boiler drum.
STEAM TURBINE
INTRODUCTION
 Steam Turbine is a machine in which a shaft is
rotated steadily by impact or reaction steam
upon blades of a wheel.
 It converts the potential or kinetic energy of
the working substance into mechanical power
by virtue of dynamic action of working
substance.
PRINCIPLE OF OPERATION
 Working of the steam turbine depends upon
the dynamic action of Steam.
 The steam is caused to fall in pressure in a
passage of nozzle: due to this fall in pressure
a certain amount of heat energy is converted
into mechanical kinetic energy and the
steam is set moving with a greater velocity.
STEAM TURBINE
BOILER & SUPERHEATER
M P TURBINE
H P TURBINE
L P TURBINE
REHEATER
STEAM AT
545 C
STEAM AT
545 C
STEAM AT
535 C
STEAM AT
535 C
Designed for continuous operation at the rated
output.
Directly coupled with steam turbine, rotated at
high speed of 3000 RPM.
Two major parts:-
(i) Stator
(ii) Rotor
Major parts of stator are
(i) Stator frame.
(ii)Stator core.
(iii)Stator bars.
(iv)Stator windings.
Condenses steam coming out from turbine back into
water
Cooling System
 In KSTPS hydrogen cooling system
is employed for generator cooling.
 Hydrogen is used because of its
superior cooling properties & low
density.
 Thermal conductivity of H2 7.3
times of air.
 Seal oil system are used in
turbine for less friction in
bearing.
 Water cooling also used for any
kind of fire.
ASH HANDLING PLANT
This plant can be divided into three sub plants as follows :-
1)Fuel and Ash Plant:-
It is specially designed for bottom ash and fly ash in electro
static precipitator economizer and air pre-
heaters hoppers.
2)Air and Gas Plant:-
The flue gases after passing through the Electro-
Static Precipitator is exhausted through chimney.
3) Ash Disposal and & Dust Collection Plant:-
Dry free fly ash is collected in two number of 31 fly ash hopper
which are handled by two independent fly ash system.
Presentation on Kota super Thermal Power Station

More Related Content

What's hot

Kota Thermal Training report by Abhishk mathur
Kota Thermal Training report by Abhishk mathurKota Thermal Training report by Abhishk mathur
Kota Thermal Training report by Abhishk mathur
Abhishek Mathur
 
Kota Super Thermal Power Plant
Kota Super Thermal Power PlantKota Super Thermal Power Plant
Kota Super Thermal Power Plant
Himanshu Dixit
 
Kstps ppt
Kstps pptKstps ppt
KOTA SUPER THERMAL POWER STATION PPT
KOTA SUPER THERMAL POWER STATION PPTKOTA SUPER THERMAL POWER STATION PPT
KOTA SUPER THERMAL POWER STATION PPT
Mukesh Taneja
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
Rahul Jalan
 
Thermal Power plant visit Report by Amit Hinge
Thermal Power plant visit Report by Amit HingeThermal Power plant visit Report by Amit Hinge
Thermal Power plant visit Report by Amit Hinge
amit307
 
Power Plant Familiarization
Power Plant FamiliarizationPower Plant Familiarization
Power Plant Familiarization
Aanand Kumar
 
Thermal power plant ppt
Thermal power plant pptThermal power plant ppt
Thermal power plant ppt
ayushi kesarvani
 
Best ppt on thermal power station working
Best ppt on thermal power station workingBest ppt on thermal power station working
Best ppt on thermal power station working
Ronak Thakare
 
Thermal Power Generation Report
Thermal Power Generation ReportThermal Power Generation Report
Thermal Power Generation Report
Manish Kumar
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
Shikhar Sodhani
 
Training Report, Thermal Power Plant Report, KSTPS Report
Training Report, Thermal Power Plant Report, KSTPS ReportTraining Report, Thermal Power Plant Report, KSTPS Report
Training Report, Thermal Power Plant Report, KSTPS Report
Poornima Group of Institutions, Jaipur
 
Thermal Plant report (Mechanical)
Thermal Plant report (Mechanical)Thermal Plant report (Mechanical)
Thermal Plant report (Mechanical)
sometech
 
TPS training report Gandhinagar, coal base power plant
TPS training report Gandhinagar, coal base power plant TPS training report Gandhinagar, coal base power plant
TPS training report Gandhinagar, coal base power plant
vishal patel
 
Presentation on thermal power plant
Presentation on thermal power plantPresentation on thermal power plant
Presentation on thermal power plant
Rashmi Nimje
 
Mejia Thermal Power Station
Mejia Thermal Power StationMejia Thermal Power Station
Mejia Thermal Power Station
sagnikchoudhury
 
FAMILIRIZATION OF THERMAL POWER PLANT
FAMILIRIZATION OF THERMAL POWER PLANTFAMILIRIZATION OF THERMAL POWER PLANT
FAMILIRIZATION OF THERMAL POWER PLANT
Ravindra Kumar
 
Ntpc training ppt
Ntpc training pptNtpc training ppt
Ntpc training ppt
Ambuj Kumar Singh
 
Thermal power plant
Thermal power plantThermal power plant
Parichha thermal power point PPT
Parichha thermal power point PPTParichha thermal power point PPT
Parichha thermal power point PPT
ankit shrivastava
 

What's hot (20)

Kota Thermal Training report by Abhishk mathur
Kota Thermal Training report by Abhishk mathurKota Thermal Training report by Abhishk mathur
Kota Thermal Training report by Abhishk mathur
 
Kota Super Thermal Power Plant
Kota Super Thermal Power PlantKota Super Thermal Power Plant
Kota Super Thermal Power Plant
 
Kstps ppt
Kstps pptKstps ppt
Kstps ppt
 
KOTA SUPER THERMAL POWER STATION PPT
KOTA SUPER THERMAL POWER STATION PPTKOTA SUPER THERMAL POWER STATION PPT
KOTA SUPER THERMAL POWER STATION PPT
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
 
Thermal Power plant visit Report by Amit Hinge
Thermal Power plant visit Report by Amit HingeThermal Power plant visit Report by Amit Hinge
Thermal Power plant visit Report by Amit Hinge
 
Power Plant Familiarization
Power Plant FamiliarizationPower Plant Familiarization
Power Plant Familiarization
 
Thermal power plant ppt
Thermal power plant pptThermal power plant ppt
Thermal power plant ppt
 
Best ppt on thermal power station working
Best ppt on thermal power station workingBest ppt on thermal power station working
Best ppt on thermal power station working
 
Thermal Power Generation Report
Thermal Power Generation ReportThermal Power Generation Report
Thermal Power Generation Report
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
 
Training Report, Thermal Power Plant Report, KSTPS Report
Training Report, Thermal Power Plant Report, KSTPS ReportTraining Report, Thermal Power Plant Report, KSTPS Report
Training Report, Thermal Power Plant Report, KSTPS Report
 
Thermal Plant report (Mechanical)
Thermal Plant report (Mechanical)Thermal Plant report (Mechanical)
Thermal Plant report (Mechanical)
 
TPS training report Gandhinagar, coal base power plant
TPS training report Gandhinagar, coal base power plant TPS training report Gandhinagar, coal base power plant
TPS training report Gandhinagar, coal base power plant
 
Presentation on thermal power plant
Presentation on thermal power plantPresentation on thermal power plant
Presentation on thermal power plant
 
Mejia Thermal Power Station
Mejia Thermal Power StationMejia Thermal Power Station
Mejia Thermal Power Station
 
FAMILIRIZATION OF THERMAL POWER PLANT
FAMILIRIZATION OF THERMAL POWER PLANTFAMILIRIZATION OF THERMAL POWER PLANT
FAMILIRIZATION OF THERMAL POWER PLANT
 
Ntpc training ppt
Ntpc training pptNtpc training ppt
Ntpc training ppt
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
 
Parichha thermal power point PPT
Parichha thermal power point PPTParichha thermal power point PPT
Parichha thermal power point PPT
 

Viewers also liked

HMT Machine Tools Ltd Ajmer Summer Training Presentation
HMT Machine Tools Ltd Ajmer Summer Training PresentationHMT Machine Tools Ltd Ajmer Summer Training Presentation
HMT Machine Tools Ltd Ajmer Summer Training Presentation
Siddharth Bhatnagar
 
HMT MACHINE TOOLS PINJORE
HMT MACHINE TOOLS PINJORE HMT MACHINE TOOLS PINJORE
HMT MACHINE TOOLS PINJORE
Praveen Kumar
 
PPT on Service and maintainence By pukhraj palariya
PPT on Service and maintainence By pukhraj palariyaPPT on Service and maintainence By pukhraj palariya
PPT on Service and maintainence By pukhraj palariya
pukhraj palariya
 
HMT Machine Tools Ltd Ajmer Practical Summer Training Report
HMT Machine Tools Ltd Ajmer Practical Summer Training ReportHMT Machine Tools Ltd Ajmer Practical Summer Training Report
HMT Machine Tools Ltd Ajmer Practical Summer Training Report
Siddharth Bhatnagar
 
PPT on HMT Ajmer unit By Pukhraj palariya
PPT on HMT Ajmer  unit By Pukhraj palariyaPPT on HMT Ajmer  unit By Pukhraj palariya
PPT on HMT Ajmer unit By Pukhraj palariya
pukhraj palariya
 
New hmt ppt
New hmt pptNew hmt ppt
New hmt ppt
Jimmy Garg
 
Hmt
HmtHmt
Hmt
FNian
 
Hmt
HmtHmt
Hmt
JIBU AB
 
Hmt ppt
Hmt pptHmt ppt
PPT on HMT Ajmer (Mechanical Dept.)
PPT on HMT Ajmer (Mechanical Dept.)PPT on HMT Ajmer (Mechanical Dept.)
PPT on HMT Ajmer (Mechanical Dept.)
asu21
 
PPT ON CONTINUOUSLY VARIABLE TRANSMISSION CVT by Pukhraj Palariya
PPT ON CONTINUOUSLY VARIABLE   TRANSMISSION CVT by Pukhraj PalariyaPPT ON CONTINUOUSLY VARIABLE   TRANSMISSION CVT by Pukhraj Palariya
PPT ON CONTINUOUSLY VARIABLE TRANSMISSION CVT by Pukhraj Palariya
pukhraj palariya
 
Fund flow ppt
Fund flow pptFund flow ppt
Fund flow ppt
Swarnima Tiwari
 
Fund flow statement ppt
Fund flow statement pptFund flow statement ppt
Fund flow statement ppt
Deepak Vanjara
 
Fund flow statement
Fund flow statementFund flow statement
Fund flow statement
Ritesh Tiwari
 
Scheduling and sequencing
Scheduling and sequencingScheduling and sequencing
Scheduling and sequencing
Akanksha Gupta
 
Maintenance Management
Maintenance ManagementMaintenance Management
Maintenance Management
Bisina Keshara
 

Viewers also liked (16)

HMT Machine Tools Ltd Ajmer Summer Training Presentation
HMT Machine Tools Ltd Ajmer Summer Training PresentationHMT Machine Tools Ltd Ajmer Summer Training Presentation
HMT Machine Tools Ltd Ajmer Summer Training Presentation
 
HMT MACHINE TOOLS PINJORE
HMT MACHINE TOOLS PINJORE HMT MACHINE TOOLS PINJORE
HMT MACHINE TOOLS PINJORE
 
PPT on Service and maintainence By pukhraj palariya
PPT on Service and maintainence By pukhraj palariyaPPT on Service and maintainence By pukhraj palariya
PPT on Service and maintainence By pukhraj palariya
 
HMT Machine Tools Ltd Ajmer Practical Summer Training Report
HMT Machine Tools Ltd Ajmer Practical Summer Training ReportHMT Machine Tools Ltd Ajmer Practical Summer Training Report
HMT Machine Tools Ltd Ajmer Practical Summer Training Report
 
PPT on HMT Ajmer unit By Pukhraj palariya
PPT on HMT Ajmer  unit By Pukhraj palariyaPPT on HMT Ajmer  unit By Pukhraj palariya
PPT on HMT Ajmer unit By Pukhraj palariya
 
New hmt ppt
New hmt pptNew hmt ppt
New hmt ppt
 
Hmt
HmtHmt
Hmt
 
Hmt
HmtHmt
Hmt
 
Hmt ppt
Hmt pptHmt ppt
Hmt ppt
 
PPT on HMT Ajmer (Mechanical Dept.)
PPT on HMT Ajmer (Mechanical Dept.)PPT on HMT Ajmer (Mechanical Dept.)
PPT on HMT Ajmer (Mechanical Dept.)
 
PPT ON CONTINUOUSLY VARIABLE TRANSMISSION CVT by Pukhraj Palariya
PPT ON CONTINUOUSLY VARIABLE   TRANSMISSION CVT by Pukhraj PalariyaPPT ON CONTINUOUSLY VARIABLE   TRANSMISSION CVT by Pukhraj Palariya
PPT ON CONTINUOUSLY VARIABLE TRANSMISSION CVT by Pukhraj Palariya
 
Fund flow ppt
Fund flow pptFund flow ppt
Fund flow ppt
 
Fund flow statement ppt
Fund flow statement pptFund flow statement ppt
Fund flow statement ppt
 
Fund flow statement
Fund flow statementFund flow statement
Fund flow statement
 
Scheduling and sequencing
Scheduling and sequencingScheduling and sequencing
Scheduling and sequencing
 
Maintenance Management
Maintenance ManagementMaintenance Management
Maintenance Management
 

Similar to Presentation on Kota super Thermal Power Station

Kota super thermal power plant
Kota super thermal power plantKota super thermal power plant
Kota super thermal power plant
R G Sanjay Prakash
 
KSTPS PPT Astha.pptx
KSTPS PPT Astha.pptxKSTPS PPT Astha.pptx
KSTPS PPT Astha.pptx
ssuser4c2635
 
Kota super thermal power plant seminar
Kota super thermal power plant seminarKota super thermal power plant seminar
Kota super thermal power plant seminar
Century Rayon
 
Anil thermal power plant
Anil thermal power plantAnil thermal power plant
Anil thermal power plant
ANIL SHARMA
 
Internship Report on thermal power station in vizag steel plant
Internship Report on thermal power station in vizag steel plantInternship Report on thermal power station in vizag steel plant
Internship Report on thermal power station in vizag steel plant
Abhishek Kumar
 
Thermal power plant from A.I.C.E Jaipur
Thermal power plant from A.I.C.E JaipurThermal power plant from A.I.C.E Jaipur
Thermal power plant from A.I.C.E Jaipur
Chandra veer singh
 
KTPS
KTPSKTPS
Bathinda thermal power plant mid semester report
Bathinda thermal power plant mid semester reportBathinda thermal power plant mid semester report
Bathinda thermal power plant mid semester report
Lovesh Singla
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
Rabi Kumar
 
report on VTPS
report on VTPSreport on VTPS
report on VTPS
Hari Priya Meegada
 
power plant ppt
power plant pptpower plant ppt
power plant ppt
rajgilljaat
 
Attachment.doc
Attachment.docAttachment.doc
Attachment.doc
CHANDAN JAISWAL
 
Ntpc2
Ntpc2Ntpc2
Presentation on THERMAL POWER PLANT
Presentation on THERMAL POWER PLANT Presentation on THERMAL POWER PLANT
Presentation on THERMAL POWER PLANT
Abhijeet Thakur
 
NTPC Singrauli
NTPC SingrauliNTPC Singrauli
NTPC Singrauli
Vinay Vishwakarma
 
suratgarh thermal power station by mk yadav
suratgarh thermal power station by mk yadavsuratgarh thermal power station by mk yadav
suratgarh thermal power station by mk yadav
mukesh yadav
 
vocational training at DVC andal
 vocational training at DVC andal vocational training at DVC andal
vocational training at DVC andal
ANIL kumar
 
Complete report
Complete reportComplete report
Complete report
Maneesh Kumar Shukla
 
CSTPS training REPORT
CSTPS training REPORTCSTPS training REPORT
CSTPS training REPORT
Uday Wankar
 
Suratgarh Super Thermal Power Plant
Suratgarh Super Thermal Power PlantSuratgarh Super Thermal Power Plant
Suratgarh Super Thermal Power Plant
Harshit Madaan
 

Similar to Presentation on Kota super Thermal Power Station (20)

Kota super thermal power plant
Kota super thermal power plantKota super thermal power plant
Kota super thermal power plant
 
KSTPS PPT Astha.pptx
KSTPS PPT Astha.pptxKSTPS PPT Astha.pptx
KSTPS PPT Astha.pptx
 
Kota super thermal power plant seminar
Kota super thermal power plant seminarKota super thermal power plant seminar
Kota super thermal power plant seminar
 
Anil thermal power plant
Anil thermal power plantAnil thermal power plant
Anil thermal power plant
 
Internship Report on thermal power station in vizag steel plant
Internship Report on thermal power station in vizag steel plantInternship Report on thermal power station in vizag steel plant
Internship Report on thermal power station in vizag steel plant
 
Thermal power plant from A.I.C.E Jaipur
Thermal power plant from A.I.C.E JaipurThermal power plant from A.I.C.E Jaipur
Thermal power plant from A.I.C.E Jaipur
 
KTPS
KTPSKTPS
KTPS
 
Bathinda thermal power plant mid semester report
Bathinda thermal power plant mid semester reportBathinda thermal power plant mid semester report
Bathinda thermal power plant mid semester report
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
 
report on VTPS
report on VTPSreport on VTPS
report on VTPS
 
power plant ppt
power plant pptpower plant ppt
power plant ppt
 
Attachment.doc
Attachment.docAttachment.doc
Attachment.doc
 
Ntpc2
Ntpc2Ntpc2
Ntpc2
 
Presentation on THERMAL POWER PLANT
Presentation on THERMAL POWER PLANT Presentation on THERMAL POWER PLANT
Presentation on THERMAL POWER PLANT
 
NTPC Singrauli
NTPC SingrauliNTPC Singrauli
NTPC Singrauli
 
suratgarh thermal power station by mk yadav
suratgarh thermal power station by mk yadavsuratgarh thermal power station by mk yadav
suratgarh thermal power station by mk yadav
 
vocational training at DVC andal
 vocational training at DVC andal vocational training at DVC andal
vocational training at DVC andal
 
Complete report
Complete reportComplete report
Complete report
 
CSTPS training REPORT
CSTPS training REPORTCSTPS training REPORT
CSTPS training REPORT
 
Suratgarh Super Thermal Power Plant
Suratgarh Super Thermal Power PlantSuratgarh Super Thermal Power Plant
Suratgarh Super Thermal Power Plant
 

Recently uploaded

Community pharmacy- Social and preventive pharmacy UNIT 5
Community pharmacy- Social and preventive pharmacy UNIT 5Community pharmacy- Social and preventive pharmacy UNIT 5
Community pharmacy- Social and preventive pharmacy UNIT 5
sayalidalavi006
 
Pengantar Penggunaan Flutter - Dart programming language1.pptx
Pengantar Penggunaan Flutter - Dart programming language1.pptxPengantar Penggunaan Flutter - Dart programming language1.pptx
Pengantar Penggunaan Flutter - Dart programming language1.pptx
Fajar Baskoro
 
The History of Stoke Newington Street Names
The History of Stoke Newington Street NamesThe History of Stoke Newington Street Names
The History of Stoke Newington Street Names
History of Stoke Newington
 
C1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptx
C1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptxC1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptx
C1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptx
mulvey2
 
Chapter 4 - Islamic Financial Institutions in Malaysia.pptx
Chapter 4 - Islamic Financial Institutions in Malaysia.pptxChapter 4 - Islamic Financial Institutions in Malaysia.pptx
Chapter 4 - Islamic Financial Institutions in Malaysia.pptx
Mohd Adib Abd Muin, Senior Lecturer at Universiti Utara Malaysia
 
DRUGS AND ITS classification slide share
DRUGS AND ITS classification slide shareDRUGS AND ITS classification slide share
DRUGS AND ITS classification slide share
taiba qazi
 
Hindi varnamala | hindi alphabet PPT.pdf
Hindi varnamala | hindi alphabet PPT.pdfHindi varnamala | hindi alphabet PPT.pdf
Hindi varnamala | hindi alphabet PPT.pdf
Dr. Mulla Adam Ali
 
Pollock and Snow "DEIA in the Scholarly Landscape, Session One: Setting Expec...
Pollock and Snow "DEIA in the Scholarly Landscape, Session One: Setting Expec...Pollock and Snow "DEIA in the Scholarly Landscape, Session One: Setting Expec...
Pollock and Snow "DEIA in the Scholarly Landscape, Session One: Setting Expec...
National Information Standards Organization (NISO)
 
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...
Nguyen Thanh Tu Collection
 
How to Build a Module in Odoo 17 Using the Scaffold Method
How to Build a Module in Odoo 17 Using the Scaffold MethodHow to Build a Module in Odoo 17 Using the Scaffold Method
How to Build a Module in Odoo 17 Using the Scaffold Method
Celine George
 
How to Make a Field Mandatory in Odoo 17
How to Make a Field Mandatory in Odoo 17How to Make a Field Mandatory in Odoo 17
How to Make a Field Mandatory in Odoo 17
Celine George
 
PIMS Job Advertisement 2024.pdf Islamabad
PIMS Job Advertisement 2024.pdf IslamabadPIMS Job Advertisement 2024.pdf Islamabad
PIMS Job Advertisement 2024.pdf Islamabad
AyyanKhan40
 
Advanced Java[Extra Concepts, Not Difficult].docx
Advanced Java[Extra Concepts, Not Difficult].docxAdvanced Java[Extra Concepts, Not Difficult].docx
Advanced Java[Extra Concepts, Not Difficult].docx
adhitya5119
 
South African Journal of Science: Writing with integrity workshop (2024)
South African Journal of Science: Writing with integrity workshop (2024)South African Journal of Science: Writing with integrity workshop (2024)
South African Journal of Science: Writing with integrity workshop (2024)
Academy of Science of South Africa
 
Digital Artefact 1 - Tiny Home Environmental Design
Digital Artefact 1 - Tiny Home Environmental DesignDigital Artefact 1 - Tiny Home Environmental Design
Digital Artefact 1 - Tiny Home Environmental Design
amberjdewit93
 
The basics of sentences session 6pptx.pptx
The basics of sentences session 6pptx.pptxThe basics of sentences session 6pptx.pptx
The basics of sentences session 6pptx.pptx
heathfieldcps1
 
Natural birth techniques - Mrs.Akanksha Trivedi Rama University
Natural birth techniques - Mrs.Akanksha Trivedi Rama UniversityNatural birth techniques - Mrs.Akanksha Trivedi Rama University
Natural birth techniques - Mrs.Akanksha Trivedi Rama University
Akanksha trivedi rama nursing college kanpur.
 
PCOS corelations and management through Ayurveda.
PCOS corelations and management through Ayurveda.PCOS corelations and management through Ayurveda.
PCOS corelations and management through Ayurveda.
Dr. Shivangi Singh Parihar
 
Film vocab for eal 3 students: Australia the movie
Film vocab for eal 3 students: Australia the movieFilm vocab for eal 3 students: Australia the movie
Film vocab for eal 3 students: Australia the movie
Nicholas Montgomery
 
Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...
Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...
Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...
Dr. Vinod Kumar Kanvaria
 

Recently uploaded (20)

Community pharmacy- Social and preventive pharmacy UNIT 5
Community pharmacy- Social and preventive pharmacy UNIT 5Community pharmacy- Social and preventive pharmacy UNIT 5
Community pharmacy- Social and preventive pharmacy UNIT 5
 
Pengantar Penggunaan Flutter - Dart programming language1.pptx
Pengantar Penggunaan Flutter - Dart programming language1.pptxPengantar Penggunaan Flutter - Dart programming language1.pptx
Pengantar Penggunaan Flutter - Dart programming language1.pptx
 
The History of Stoke Newington Street Names
The History of Stoke Newington Street NamesThe History of Stoke Newington Street Names
The History of Stoke Newington Street Names
 
C1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptx
C1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptxC1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptx
C1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptx
 
Chapter 4 - Islamic Financial Institutions in Malaysia.pptx
Chapter 4 - Islamic Financial Institutions in Malaysia.pptxChapter 4 - Islamic Financial Institutions in Malaysia.pptx
Chapter 4 - Islamic Financial Institutions in Malaysia.pptx
 
DRUGS AND ITS classification slide share
DRUGS AND ITS classification slide shareDRUGS AND ITS classification slide share
DRUGS AND ITS classification slide share
 
Hindi varnamala | hindi alphabet PPT.pdf
Hindi varnamala | hindi alphabet PPT.pdfHindi varnamala | hindi alphabet PPT.pdf
Hindi varnamala | hindi alphabet PPT.pdf
 
Pollock and Snow "DEIA in the Scholarly Landscape, Session One: Setting Expec...
Pollock and Snow "DEIA in the Scholarly Landscape, Session One: Setting Expec...Pollock and Snow "DEIA in the Scholarly Landscape, Session One: Setting Expec...
Pollock and Snow "DEIA in the Scholarly Landscape, Session One: Setting Expec...
 
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...
 
How to Build a Module in Odoo 17 Using the Scaffold Method
How to Build a Module in Odoo 17 Using the Scaffold MethodHow to Build a Module in Odoo 17 Using the Scaffold Method
How to Build a Module in Odoo 17 Using the Scaffold Method
 
How to Make a Field Mandatory in Odoo 17
How to Make a Field Mandatory in Odoo 17How to Make a Field Mandatory in Odoo 17
How to Make a Field Mandatory in Odoo 17
 
PIMS Job Advertisement 2024.pdf Islamabad
PIMS Job Advertisement 2024.pdf IslamabadPIMS Job Advertisement 2024.pdf Islamabad
PIMS Job Advertisement 2024.pdf Islamabad
 
Advanced Java[Extra Concepts, Not Difficult].docx
Advanced Java[Extra Concepts, Not Difficult].docxAdvanced Java[Extra Concepts, Not Difficult].docx
Advanced Java[Extra Concepts, Not Difficult].docx
 
South African Journal of Science: Writing with integrity workshop (2024)
South African Journal of Science: Writing with integrity workshop (2024)South African Journal of Science: Writing with integrity workshop (2024)
South African Journal of Science: Writing with integrity workshop (2024)
 
Digital Artefact 1 - Tiny Home Environmental Design
Digital Artefact 1 - Tiny Home Environmental DesignDigital Artefact 1 - Tiny Home Environmental Design
Digital Artefact 1 - Tiny Home Environmental Design
 
The basics of sentences session 6pptx.pptx
The basics of sentences session 6pptx.pptxThe basics of sentences session 6pptx.pptx
The basics of sentences session 6pptx.pptx
 
Natural birth techniques - Mrs.Akanksha Trivedi Rama University
Natural birth techniques - Mrs.Akanksha Trivedi Rama UniversityNatural birth techniques - Mrs.Akanksha Trivedi Rama University
Natural birth techniques - Mrs.Akanksha Trivedi Rama University
 
PCOS corelations and management through Ayurveda.
PCOS corelations and management through Ayurveda.PCOS corelations and management through Ayurveda.
PCOS corelations and management through Ayurveda.
 
Film vocab for eal 3 students: Australia the movie
Film vocab for eal 3 students: Australia the movieFilm vocab for eal 3 students: Australia the movie
Film vocab for eal 3 students: Australia the movie
 
Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...
Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...
Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...
 

Presentation on Kota super Thermal Power Station

  • 1. A PRACTICAL TRAINING SEMINAR ON KOTA SUPER THERMAL POWER STATION,KOTA GOVT. ENGG. COLLEGE BHARATPUR Presented to :- Mr. Rahul Srivastava Presented by:- Pukhraj mali Branch :- Mechanical Engineering Semester :- 7th sem.
  • 2. KSTPS is first coal based power plant in Rajasthan. It is located ideally on the left bank of chambal river at the upstream of kota barrage. In 1973 Central Electricity Authority prepared a project report for power station. In 1976 Planning Commission cleared project report. Its first unit of capacity 110 MW is synchronized on 17 Jan 1983.
  • 3. STAGES Unit 6 – 195 MW Cost : 635 Unit 1 –110 MW Unit 2 – 110 MW Cost : 143 Unit 3 – 210 MW Unit 4 – 210 MW Cost : 480 Unit 5 – 210 MW Cost : 480 Unit 7 – 195 MW Cost : 880 Stage II Stage III Stage IV Total Electricity Generation: 1240 MW * All costs are in cores (Rs.)
  • 4. SALIENT FEATURES LOCATION Ideally on the left bank of Chambal River at Up Stream of Kota Barrage. COAL Coal India limited supply coal from its coal producing subsidiaries BCCL, SECL & ECL through railway wagons WATER The source of water for power station is reservoir formed by Kota Barrage on the Chambal River LAND Land measuring approx. 250 hectares was required for the project in 1976
  • 5. GENERAL LAYOUT AND BASIC IDEA:  The conversion from coal to electricity takes place in three stages.  Stage 1  The first conversion of energy takes place in the boiler. Coal is burnt in the boiler furnace to produce heat. Carbon in the coal and Oxygen in the air combine to produce Carbon Dioxide and heat.  Stage 2  The second stage is the thermodynamic process.  The heat from combustion of the coal boils water in the boiler to produce steam. In modern power plant, boilers produce steam at a high pressure and temperature.  The steam is then piped to a turbine.  The high pressure steam impinges and expands across a number of sets of blades in the turbine.
  • 6.  The impulse and the thrust created rotates the turbine.  The steam is then condensed and pumped back into the boiler to repeat the cycle.  Stage 3  In the third stage, rotation of the turbine rotates the generator rotor to produce electricity based of Faraday’s Principle of electromagnetic induction.  Control system of station is based on Rankin Cycle.  To increase the heat economy and efficiency we use number of modification in the plant.
  • 7.
  • 9. SALIENT FEATURES The coal is brought to the KSTPS from BHARAT COKING COAL LTD. There are 14 tracks for transportation. Everyday 3- 4 trains of coal are unloaded, each train consists 58 wagons. Coal is unloaded from wagons by means of WAGON TRIPPLER. a. Wagons are rotated upside down through an angle 180 degree. b. The unloaded coal is transported to crusher house with the help of conveyer belts.
  • 10. Boiler is a closed vessel in which water, under pressure, is converted into steam by absorbing heat released in process of combustion. In KSTPS boiler used is water tube; pulverised fuel fired; single drum type; tangential firing system.
  • 11. Technical Specifications  1).Type Water Tube Boiler  2).Make BHEL  3).Capacity 375 tonnes per hour  4).Steam pressure 139 kg/ sq. cm  5).Efficiency 86.6%  6).Steam temperature 540 deg.
  • 12. Air pre heater Heat energy contained by flue gases is utilized to increase the temperature of air entering the boiler. Reheater Heats up steam going from high pressure turbine to intermediate pressure turbine. Super heater Removes moisture present in steam going to turbine. Economiser Flue gases leaving boiler is passed through economiser to increase temperature of water entering boiler drum.
  • 14. INTRODUCTION  Steam Turbine is a machine in which a shaft is rotated steadily by impact or reaction steam upon blades of a wheel.  It converts the potential or kinetic energy of the working substance into mechanical power by virtue of dynamic action of working substance.
  • 15. PRINCIPLE OF OPERATION  Working of the steam turbine depends upon the dynamic action of Steam.  The steam is caused to fall in pressure in a passage of nozzle: due to this fall in pressure a certain amount of heat energy is converted into mechanical kinetic energy and the steam is set moving with a greater velocity.
  • 16. STEAM TURBINE BOILER & SUPERHEATER M P TURBINE H P TURBINE L P TURBINE REHEATER STEAM AT 545 C STEAM AT 545 C STEAM AT 535 C STEAM AT 535 C
  • 17. Designed for continuous operation at the rated output. Directly coupled with steam turbine, rotated at high speed of 3000 RPM. Two major parts:- (i) Stator (ii) Rotor Major parts of stator are (i) Stator frame. (ii)Stator core. (iii)Stator bars. (iv)Stator windings.
  • 18. Condenses steam coming out from turbine back into water
  • 19. Cooling System  In KSTPS hydrogen cooling system is employed for generator cooling.  Hydrogen is used because of its superior cooling properties & low density.  Thermal conductivity of H2 7.3 times of air.  Seal oil system are used in turbine for less friction in bearing.  Water cooling also used for any kind of fire.
  • 20. ASH HANDLING PLANT This plant can be divided into three sub plants as follows :- 1)Fuel and Ash Plant:- It is specially designed for bottom ash and fly ash in electro static precipitator economizer and air pre- heaters hoppers. 2)Air and Gas Plant:- The flue gases after passing through the Electro- Static Precipitator is exhausted through chimney. 3) Ash Disposal and & Dust Collection Plant:- Dry free fly ash is collected in two number of 31 fly ash hopper which are handled by two independent fly ash system.