Arpit Budania 
11ESEEE015 
B.Tech 
Electrical Engineering 
S.E.C,Dundlod 
By :
Topic
Introduction Of The Thermal Power 
Plant 
• It was established in 1983 
• It was located on the left bank of the Chambal river at the upstream of Kota 
Barrage 
• 1st & 2nd unit are of 110 MW each 
• 3rd,4th&5th units are of 210 MW each 
• 6th & 7th unit are of 195 MW each 
• Total generation capacity is (110+110+210+210+210+195+195)=1240MW 
• Favorable condition 
 Abundant Quantity of clean cooling water 
 Good transport facility 
 Concentration of load in kota region due to large number of industries
Installed Capacity 
Stage Unit Number Installed Capacity (MW) Cost (Rs. Crore) Date Of Comisioning Status 
Stage I 1 110 143 January,1983 Running 
2 110 July,1983 Running 
Stage II 3 210 480 September,1988 Running 
4 210 May,1989 Running 
Stage III 5 210 480 March,1994 Running 
Stage IV 6 195 635 July,2003 Running 
Stage V 7 195 880 May,2009 Running
Main Parts of Kota Super Thermal 
Power Station 
• Principle 
• Layout 
• Coal Handling Plant 
• Boiler 
• Super Heater 
• Steam Turbine 
• Economizer 
• Generator 
• Water Treatment Plant 
• Ash Handling Plant 
• Control Room
The Principle of a Classical Power Plant
Technical Layout Of KSTPS
Coal Handling Plant
Wagon Uploading System 
• Unload the coal from wagon 
to hopper with the help of 
wagon Tripler 
• Hopper allows to pass coal 
pieces =< 200mm 
• From hopper coal fall on 
vibrator which is supported 
by roller
Conveying System 
• Belt are used to convey coal from coal 
handling plant to furnace 
• Specification 
• Belt width : 1400mm 
• Speed : 2.2m/sec 
• Total install power : 360kw 
• Capacity : 1350/750 ton/hr 
• Number of conveyor : 38
Crushing System 
• CRUSHER HOUSE :- It consists of 
crusher which are used to crush the 
coal to 20mm size 
• Two types 
 Primary crusher 
o Rail crusher 
o Rotary breaker 
 Secondary crusher
Boiler 
• It is a closed vessel in which water under pressure is 
converted into steam. 
• Hot water used to transfer heat to a process. 
• A boiler is always designed to absorb maximum amount 
of heat released in process of combustion. 
• Furnace:- It is primary part of boiler where the fuel is 
burnt to liberate heat energy.
Boiler
Super Heater 
• Super heater consists group of tubes. 
• The tubes are heated b the heat of combustion gases during 
their passage from furnace to chimney, so temperature 
increased. 
• Super heater remove the moisture from the steam leaving 
from boiler tubes.
Steam Turbine 
• It is a machine in which a shaft is 
rotated by reaction of a wheel. 
• When steam is used to ratate 
turbine then it is called steam 
turbine 
• It will convert kinetic energy to 
mechanical energy
Economizer 
• Economizer is a device which recover the heat from the flue 
gases on their way to chimney. 
• It increases the 10-12% efficiency of the plant.
Generator 
• An electrical generator is a device which is used to convert the 
mechanical energy into electrical energy through electro 
mechanical energy conversion. 
• The generator is driven by directly coupled steam turbine at a 
speed of 3000 r.p.m .
Water Treatment Plant 
• Pressure filter removes the undisclosed impurities from raw water. 
• Carbon filter removes excess chlorine from clarified water. 
• D.M. plant removes dissolved impurities from clarified water. 
• Conductivity, pH & silica content of this water must be checked 
time to time 
• D.M. water must be in the ratio 1:8.
Ash Handling Plant 
• In thermal plant 25% is 
furnace bottom ash and 
75% is pulverized fuel 
ash. 
• Electrostatic 
precipitator is used in 
ash handling plant to 
remove fly ash.
Ash Hanling Plant
Thank You
Any Queries

More Related Content

What's hot

Kota Super Thermal Power Plant
Kota Super Thermal Power PlantKota Super Thermal Power Plant
Kota Super Thermal Power PlantHimanshu Dixit
 
Kota super thermal power station ppt, rtu
Kota super thermal power station ppt, rtuKota super thermal power station ppt, rtu
Kota super thermal power station ppt, rtuRaghav Chittora
 
kota thermal power plant
kota thermal power plantkota thermal power plant
kota thermal power plantravi kant
 
KOTA SUPER THERMAL POWER STATION PPT
KOTA SUPER THERMAL POWER STATION PPTKOTA SUPER THERMAL POWER STATION PPT
KOTA SUPER THERMAL POWER STATION PPTMukesh Taneja
 
Kota Super Thermal Power Station Training report
Kota Super Thermal Power Station Training reportKota Super Thermal Power Station Training report
Kota Super Thermal Power Station Training reportDeepak Solanki
 
Ntpc dadri thermal power plant & switchyard
Ntpc dadri thermal power plant & switchyardNtpc dadri thermal power plant & switchyard
Ntpc dadri thermal power plant & switchyardI.E.T. lucknow
 
Mejia Thermal Power Station
Mejia Thermal Power StationMejia Thermal Power Station
Mejia Thermal Power Stationsagnikchoudhury
 
THERMAL POWER STATION PPT.
THERMAL POWER STATION PPT.THERMAL POWER STATION PPT.
THERMAL POWER STATION PPT.Anish Anand
 
INTERNSHIP REPORT NTPC
INTERNSHIP REPORT NTPCINTERNSHIP REPORT NTPC
INTERNSHIP REPORT NTPCADITYA ARYAN
 
Summer training report at uttpar pradesh rajay viduat utpadan nigam ...
Summer training report at uttpar pradesh rajay viduat utpadan          nigam ...Summer training report at uttpar pradesh rajay viduat utpadan          nigam ...
Summer training report at uttpar pradesh rajay viduat utpadan nigam ...Navin Pathak
 
VOCATIONAL TRAINING REPORT ON NTPC KORBA
VOCATIONAL TRAINING REPORT ON NTPC KORBAVOCATIONAL TRAINING REPORT ON NTPC KORBA
VOCATIONAL TRAINING REPORT ON NTPC KORBAVIKASH BAGHEL
 
rajwest thermal power plant
rajwest thermal power plantrajwest thermal power plant
rajwest thermal power plantRama Charan
 
Vocational Training Report in DVC DSTPS Andal
Vocational Training Report in DVC DSTPS AndalVocational Training Report in DVC DSTPS Andal
Vocational Training Report in DVC DSTPS AndalSuvodipSom
 
Operational description of 400kv switchyard NTPC Ramagundam RSTPS
Operational description of 400kv switchyard NTPC Ramagundam RSTPSOperational description of 400kv switchyard NTPC Ramagundam RSTPS
Operational description of 400kv switchyard NTPC Ramagundam RSTPSPradeep Avanigadda
 
Presentation on thermal power plant
Presentation on thermal power plantPresentation on thermal power plant
Presentation on thermal power plantRashmi Nimje
 
C ktps training-report
C ktps training-reportC ktps training-report
C ktps training-reportAnil Saharan
 
Thermal power Plant presentation
Thermal power Plant presentationThermal power Plant presentation
Thermal power Plant presentationShahzaib Hussain
 

What's hot (20)

Kota Super Thermal Power Plant
Kota Super Thermal Power PlantKota Super Thermal Power Plant
Kota Super Thermal Power Plant
 
Kota super thermal power station ppt, rtu
Kota super thermal power station ppt, rtuKota super thermal power station ppt, rtu
Kota super thermal power station ppt, rtu
 
kota thermal power plant
kota thermal power plantkota thermal power plant
kota thermal power plant
 
Thermal power plant ppt
Thermal power plant pptThermal power plant ppt
Thermal power plant ppt
 
KOTA SUPER THERMAL POWER STATION PPT
KOTA SUPER THERMAL POWER STATION PPTKOTA SUPER THERMAL POWER STATION PPT
KOTA SUPER THERMAL POWER STATION PPT
 
Kota Super Thermal Power Station Training report
Kota Super Thermal Power Station Training reportKota Super Thermal Power Station Training report
Kota Super Thermal Power Station Training report
 
Ntpc dadri thermal power plant & switchyard
Ntpc dadri thermal power plant & switchyardNtpc dadri thermal power plant & switchyard
Ntpc dadri thermal power plant & switchyard
 
Mejia Thermal Power Station
Mejia Thermal Power StationMejia Thermal Power Station
Mejia Thermal Power Station
 
THERMAL POWER STATION PPT.
THERMAL POWER STATION PPT.THERMAL POWER STATION PPT.
THERMAL POWER STATION PPT.
 
INTERNSHIP REPORT NTPC
INTERNSHIP REPORT NTPCINTERNSHIP REPORT NTPC
INTERNSHIP REPORT NTPC
 
Summer training report at uttpar pradesh rajay viduat utpadan nigam ...
Summer training report at uttpar pradesh rajay viduat utpadan          nigam ...Summer training report at uttpar pradesh rajay viduat utpadan          nigam ...
Summer training report at uttpar pradesh rajay viduat utpadan nigam ...
 
VOCATIONAL TRAINING REPORT ON NTPC KORBA
VOCATIONAL TRAINING REPORT ON NTPC KORBAVOCATIONAL TRAINING REPORT ON NTPC KORBA
VOCATIONAL TRAINING REPORT ON NTPC KORBA
 
rajwest thermal power plant
rajwest thermal power plantrajwest thermal power plant
rajwest thermal power plant
 
Vocational Training Report in DVC DSTPS Andal
Vocational Training Report in DVC DSTPS AndalVocational Training Report in DVC DSTPS Andal
Vocational Training Report in DVC DSTPS Andal
 
Kstps ppt
Kstps pptKstps ppt
Kstps ppt
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
 
Operational description of 400kv switchyard NTPC Ramagundam RSTPS
Operational description of 400kv switchyard NTPC Ramagundam RSTPSOperational description of 400kv switchyard NTPC Ramagundam RSTPS
Operational description of 400kv switchyard NTPC Ramagundam RSTPS
 
Presentation on thermal power plant
Presentation on thermal power plantPresentation on thermal power plant
Presentation on thermal power plant
 
C ktps training-report
C ktps training-reportC ktps training-report
C ktps training-report
 
Thermal power Plant presentation
Thermal power Plant presentationThermal power Plant presentation
Thermal power Plant presentation
 

Similar to Introduction to the 1240MW Kota Super Thermal Power Station

KSTPS presentation.pptx
KSTPS presentation.pptxKSTPS presentation.pptx
KSTPS presentation.pptxParulChandna6
 
KSTPS PPT Astha.pptx
KSTPS PPT Astha.pptxKSTPS PPT Astha.pptx
KSTPS PPT Astha.pptxssuser4c2635
 
Thermal power plant
 Thermal power plant  Thermal power plant
Thermal power plant sagar20jain
 
Coal based power plant
Coal based power plantCoal based power plant
Coal based power plantGaurav Kaushik
 
Ppt on btps bokaro industrial training
Ppt on btps bokaro industrial trainingPpt on btps bokaro industrial training
Ppt on btps bokaro industrial trainingRadhe Shyam
 
Kota thermal power plant ppt
Kota thermal power plant pptKota thermal power plant ppt
Kota thermal power plant pptPrakash Jarotia
 
Presentation sai,varun.
Presentation sai,varun.Presentation sai,varun.
Presentation sai,varun.Sai Kumar
 
Summer training at NTPC Badarpur ppt
Summer training at NTPC Badarpur ppt Summer training at NTPC Badarpur ppt
Summer training at NTPC Badarpur ppt nilesh choubey
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plantaman Singh
 
thermal power plant at NTPC
thermal power plant at NTPCthermal power plant at NTPC
thermal power plant at NTPCricha khatri
 
Summer Training Presentation Kota Super Thermal Power Station
Summer Training Presentation Kota Super Thermal Power StationSummer Training Presentation Kota Super Thermal Power Station
Summer Training Presentation Kota Super Thermal Power StationFellowBuddy.com
 

Similar to Introduction to the 1240MW Kota Super Thermal Power Station (20)

kota super thermal poer plant
kota super thermal poer plantkota super thermal poer plant
kota super thermal poer plant
 
KSTPS presentation.pptx
KSTPS presentation.pptxKSTPS presentation.pptx
KSTPS presentation.pptx
 
KSTPS PPT Astha.pptx
KSTPS PPT Astha.pptxKSTPS PPT Astha.pptx
KSTPS PPT Astha.pptx
 
Ntpc dadri
Ntpc dadriNtpc dadri
Ntpc dadri
 
power plant ppt
power plant pptpower plant ppt
power plant ppt
 
Ntpc dadri ppt
Ntpc dadri pptNtpc dadri ppt
Ntpc dadri ppt
 
Thermal power plant
 Thermal power plant  Thermal power plant
Thermal power plant
 
Coal based power plant
Coal based power plantCoal based power plant
Coal based power plant
 
Ppt on btps bokaro industrial training
Ppt on btps bokaro industrial trainingPpt on btps bokaro industrial training
Ppt on btps bokaro industrial training
 
Kota thermal power plant ppt
Kota thermal power plant pptKota thermal power plant ppt
Kota thermal power plant ppt
 
Steam plan
Steam planSteam plan
Steam plan
 
adi ntpc.pptx
adi ntpc.pptxadi ntpc.pptx
adi ntpc.pptx
 
Industrial training
Industrial trainingIndustrial training
Industrial training
 
Presentation sai,varun.
Presentation sai,varun.Presentation sai,varun.
Presentation sai,varun.
 
Summer training at NTPC Badarpur ppt
Summer training at NTPC Badarpur ppt Summer training at NTPC Badarpur ppt
Summer training at NTPC Badarpur ppt
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
 
Richappt
RichapptRichappt
Richappt
 
thermal power plant at NTPC
thermal power plant at NTPCthermal power plant at NTPC
thermal power plant at NTPC
 
Summer Training Presentation Kota Super Thermal Power Station
Summer Training Presentation Kota Super Thermal Power StationSummer Training Presentation Kota Super Thermal Power Station
Summer Training Presentation Kota Super Thermal Power Station
 
ntpc dadri
ntpc dadri ntpc dadri
ntpc dadri
 

Recently uploaded

Artificial intelligence in the post-deep learning era
Artificial intelligence in the post-deep learning eraArtificial intelligence in the post-deep learning era
Artificial intelligence in the post-deep learning eraDeakin University
 
AI as an Interface for Commercial Buildings
AI as an Interface for Commercial BuildingsAI as an Interface for Commercial Buildings
AI as an Interface for Commercial BuildingsMemoori
 
Unleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubUnleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubKalema Edgar
 
Making_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptx
Making_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptxMaking_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptx
Making_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptxnull - The Open Security Community
 
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)Bun (KitWorks Team Study 노별마루 발표 2024.4.22)
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)Wonjun Hwang
 
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Patryk Bandurski
 
Connect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationConnect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationSlibray Presentation
 
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
"Federated learning: out of reach no matter how close",Oleksandr LapshynFwdays
 
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024BookNet Canada
 
Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024Enterprise Knowledge
 
CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):comworks
 
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...shyamraj55
 
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024BookNet Canada
 
Key Features Of Token Development (1).pptx
Key  Features Of Token  Development (1).pptxKey  Features Of Token  Development (1).pptx
Key Features Of Token Development (1).pptxLBM Solutions
 
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 3652toLead Limited
 
Unblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesUnblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesSinan KOZAK
 
Install Stable Diffusion in windows machine
Install Stable Diffusion in windows machineInstall Stable Diffusion in windows machine
Install Stable Diffusion in windows machinePadma Pradeep
 

Recently uploaded (20)

Artificial intelligence in the post-deep learning era
Artificial intelligence in the post-deep learning eraArtificial intelligence in the post-deep learning era
Artificial intelligence in the post-deep learning era
 
AI as an Interface for Commercial Buildings
AI as an Interface for Commercial BuildingsAI as an Interface for Commercial Buildings
AI as an Interface for Commercial Buildings
 
Unleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubUnleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding Club
 
Making_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptx
Making_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptxMaking_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptx
Making_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptx
 
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)Bun (KitWorks Team Study 노별마루 발표 2024.4.22)
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)
 
Hot Sexy call girls in Panjabi Bagh 🔝 9953056974 🔝 Delhi escort Service
Hot Sexy call girls in Panjabi Bagh 🔝 9953056974 🔝 Delhi escort ServiceHot Sexy call girls in Panjabi Bagh 🔝 9953056974 🔝 Delhi escort Service
Hot Sexy call girls in Panjabi Bagh 🔝 9953056974 🔝 Delhi escort Service
 
E-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptx
E-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptxE-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptx
E-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptx
 
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
 
Vulnerability_Management_GRC_by Sohang Sengupta.pptx
Vulnerability_Management_GRC_by Sohang Sengupta.pptxVulnerability_Management_GRC_by Sohang Sengupta.pptx
Vulnerability_Management_GRC_by Sohang Sengupta.pptx
 
Connect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationConnect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck Presentation
 
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
 
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
 
Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024
 
CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):
 
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
 
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
 
Key Features Of Token Development (1).pptx
Key  Features Of Token  Development (1).pptxKey  Features Of Token  Development (1).pptx
Key Features Of Token Development (1).pptx
 
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
 
Unblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesUnblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen Frames
 
Install Stable Diffusion in windows machine
Install Stable Diffusion in windows machineInstall Stable Diffusion in windows machine
Install Stable Diffusion in windows machine
 

Introduction to the 1240MW Kota Super Thermal Power Station

  • 1. Arpit Budania 11ESEEE015 B.Tech Electrical Engineering S.E.C,Dundlod By :
  • 2.
  • 4. Introduction Of The Thermal Power Plant • It was established in 1983 • It was located on the left bank of the Chambal river at the upstream of Kota Barrage • 1st & 2nd unit are of 110 MW each • 3rd,4th&5th units are of 210 MW each • 6th & 7th unit are of 195 MW each • Total generation capacity is (110+110+210+210+210+195+195)=1240MW • Favorable condition  Abundant Quantity of clean cooling water  Good transport facility  Concentration of load in kota region due to large number of industries
  • 5. Installed Capacity Stage Unit Number Installed Capacity (MW) Cost (Rs. Crore) Date Of Comisioning Status Stage I 1 110 143 January,1983 Running 2 110 July,1983 Running Stage II 3 210 480 September,1988 Running 4 210 May,1989 Running Stage III 5 210 480 March,1994 Running Stage IV 6 195 635 July,2003 Running Stage V 7 195 880 May,2009 Running
  • 6. Main Parts of Kota Super Thermal Power Station • Principle • Layout • Coal Handling Plant • Boiler • Super Heater • Steam Turbine • Economizer • Generator • Water Treatment Plant • Ash Handling Plant • Control Room
  • 7. The Principle of a Classical Power Plant
  • 10. Wagon Uploading System • Unload the coal from wagon to hopper with the help of wagon Tripler • Hopper allows to pass coal pieces =< 200mm • From hopper coal fall on vibrator which is supported by roller
  • 11. Conveying System • Belt are used to convey coal from coal handling plant to furnace • Specification • Belt width : 1400mm • Speed : 2.2m/sec • Total install power : 360kw • Capacity : 1350/750 ton/hr • Number of conveyor : 38
  • 12. Crushing System • CRUSHER HOUSE :- It consists of crusher which are used to crush the coal to 20mm size • Two types  Primary crusher o Rail crusher o Rotary breaker  Secondary crusher
  • 13. Boiler • It is a closed vessel in which water under pressure is converted into steam. • Hot water used to transfer heat to a process. • A boiler is always designed to absorb maximum amount of heat released in process of combustion. • Furnace:- It is primary part of boiler where the fuel is burnt to liberate heat energy.
  • 15. Super Heater • Super heater consists group of tubes. • The tubes are heated b the heat of combustion gases during their passage from furnace to chimney, so temperature increased. • Super heater remove the moisture from the steam leaving from boiler tubes.
  • 16. Steam Turbine • It is a machine in which a shaft is rotated by reaction of a wheel. • When steam is used to ratate turbine then it is called steam turbine • It will convert kinetic energy to mechanical energy
  • 17. Economizer • Economizer is a device which recover the heat from the flue gases on their way to chimney. • It increases the 10-12% efficiency of the plant.
  • 18. Generator • An electrical generator is a device which is used to convert the mechanical energy into electrical energy through electro mechanical energy conversion. • The generator is driven by directly coupled steam turbine at a speed of 3000 r.p.m .
  • 19. Water Treatment Plant • Pressure filter removes the undisclosed impurities from raw water. • Carbon filter removes excess chlorine from clarified water. • D.M. plant removes dissolved impurities from clarified water. • Conductivity, pH & silica content of this water must be checked time to time • D.M. water must be in the ratio 1:8.
  • 20. Ash Handling Plant • In thermal plant 25% is furnace bottom ash and 75% is pulverized fuel ash. • Electrostatic precipitator is used in ash handling plant to remove fly ash.
  • 22.