A PRACTICAL TRAINING 
SEMINAR 
ON 
SURATGARH SUPER THERMAL POWER 
PRESENTED BY: 
MUKESH KUMAR 
VII SEM. (ELECTRICAL ENGG.) 
11ESKEE066 
STATION 
SUBMITTED TO 
Mrs. RIDA QURESHI 
Mr. MANISH NAULAKHA
CONTENTS 
1. Introduction 
2. Land 
3. Water conducting system 
4. Block diagram of thermal power plant 
5. Boiler 
6. Economizer 
7. Super heater and Reheaters 
8. Air preheaters 
9. Turbines 
10. Condenser 
11. Coal and ash handling plants 
12. Generator
Introduction 
1. Suratgarh thermal power station is the first super 
thermal power Station of Rajasthan with total 
installed capacity of 1500 MW. 
2. Suratgarh super thermal power station is located 
27 km away from Suratgarh town in 
Ganganagar Dist. on the left bank of IGNP at Up 
Stream of Suratgarh Barrage. 
3.This station is operated and maintained by Rajasthan 
Vidhyut Utpadan Nigam Limited.
S.S.T.P.S. is designed in six stages 
•STAGE I - 1x250 MW 
•STAGE II - 1X250 MW 
•STAGE III - 1X250 MW 
•STAGE IV - 1X250 MW 
•STAGE V 1X250 MW 
•STAGE VI - 1X250 MW 
•STAGE VII- 1X660MW(Under construction) 
•STAGE VIII- 1X660MW(Under construction) 
Total Power Generation - 1500 MW
LAND : 
Total Land 5020 BIGHA 
Plant Area 3810 BIGHA 
Colony Area 431 BIGHA 
Railway Site 425 BIGHA 
Water conducting 354 BIGHA 
system
WATER CONDUCTING SYSTEM: 
a) Length of Intake Canal = 1.6 Km 
b) Capacity of each Decilting Pump = 
3.14 Kw*3(30M³/Hr.) 
c) Intake Pump House = 
90 Kw*6(1250M³/Hr.)Each Pump 
d) Raw Water Pump House = 
7 lacks M³
BLOCK DIAGRAM OF THERMAL POWER 
PLANT
BOILER
BOILER PARAMETERS:- 
•Height of boiler 60 meters 
•Height of chimeny 220 meters 
•Foundation depth 8.5 meters 
•Furnace Depth 11506 meters 
•Furnace Width 15.240 meters 
•Total Water Flow 780.5 T/Hr. 
•Steam Flow 740.8 T/Hr. 
•Steam Temperature 540ºC 
•Coal Requirement for 250MW 160 T/Hr. 
•Primary Air for pulverized fuel 268.4 T/Hr. 
•Secondary Air for ignition (Combination) 647.0 T/Hr. 
•Total Air 915.5 T/Hr. 
•Steam Pressure 156 Kg /cm²
• Flue gases coming 
out of the boiler 
carry lot of heat. 
An economizer 
extracts a part of 
this heat from flue 
gases and uses it 
for heating feed 
water. This use of 
economizer 
results in saving 
coal consumption 
and higher boiler 
efficiency 
Economizer
Super heater and Reheaters 
• Super heater : 
• Super heater is a component 
of a steam-generating unit in 
which steam, after it has left 
the boiler drum, is heated 
above its saturation 
temperature 
• Reheater : Some of the 
heat of superheated steam 
is used to rotate the 
turbine where it loses some 
of its energy
Air preheaters 
• After flue gases leave economizer, some further heat can 
be extracted from them and used to heat incoming heat. 
Cooling of flue gases by 20 degree centigrade increases the 
plant efficiency by 1%. 
• Air preheaters may be of three types 
 Plate type 
 Tubular type 
 Regenerative type
TURBINE 
In a Thermal Power Plant generally 3 turbines are used to increase the efficiency. 
. 
High Pressure Turbine(HPT): The superheated steam is directly fed to this 
turbine to rotate it. 
Intermediate Pressure Turbine(IPT): The out put from the HPT is reheated 
In a reheated(RH) and used to rotate IPT . 
Low Pressure Turbine(LPT): The Exhausted steam from the IPT is directly 
fed to rotate the shaft of LPT. 
HPT HPT IPT IPT LPT LPT 
Generator 
RH 
Steam 
Steam 
Shaft 
Super Heater 
Condenser
High pressure turbine: The HP turbine consists of 25 
reaction stages. The moving and stationary blades are 
inserted into appropriately shapes into inner casing and the 
shaft. 
Intermediate pressure turbine: The steam from HP 
turbine after reheating enters the inner casing from above 
and below through two inlet nozzles. 
The IP turbine consists of 20 reaction stages per flow. The 
moving and stationary blades are inserted in appropriately 
shaped grooves in shaft and inner casing. 
Low pressure turbine: Steam admitted to LP turbine 
from IP turbine flows into the inner casing from both sides 
through steam inlet nozzles.
TURBINE SPECIFICATION 
HP turbine having 25 Blades & 
Single flow. 
IP turbine having 17 Blades & 
Single flow. 
LP turbine having 8 Blades& 
Double flow. 
Inlet/Outlet Pressure And Temperature 
1. H P Turbine Steam Inlet/outlet pressure -150 Kg/Cm²/39.69 Kg/Cm² 
A inlet/outlet Temperature - 537*C/346*C 
2 . I P Turbine Steam Inlet pressure - 35.64 Kg/Cm² 
a. Outlet pressure - 6.83 Kg/Cm² 
b.Exhaust Temp. - 305*C 
3. LP Turbine Steam Inlet pressure - 6.83 Kg/Cm² 
a.Exhaust Temp. - 49*C
MOVING BLADES
FIXED BLADES
Rotor Layout
CONDENSER 
The condenser does the job of condensing the steam exhausted from 
turbine. 
Steam after rotating steam 
turbine comes to 
condenser. Condenser 
refers here to the shell and 
tube heat exchanger (or 
surface condenser) 
installed at the outlet of 
every steam turbine in 
Thermal power stations of 
utility companies 
generally.
Condenser Used In S.S.T.P.S. 
In S.S.T.P.S. surface condenser is used. A surface 
condenser consists of an airtight cylindrical shell having 
a chamber at each end. Water tube extends between the 
chambers. The shell is made of welded steel plate 
construction and the tubes are made of copper zinc alloy. 
Cooling water flow through the tubes. The steam is 
admitted from the top and gets condensed due to contact 
with the tube surface. The condensate leaves from the 
bottom. For efficient operation, the temperature rise in the 
cooling water passing through the condenser should be 
around 10degree C.
COAL & ASH HANDLIG PLANT 
1. COAL HANDLING PLANT (CHP) 
The function of CHP is automatic feeding of coal 
to the boiler furnace. The coal is transported to 
the power station by rail. One rail (rack) consists 
of 58 or 59 boxes with 60 – 70 tones coal loaded in 
each box. There are 6-7 racks of coal are 
used.About 18000 tonnes coal required per day for 
whole unit.
The main equipments of CHP are: 
1. Wagon trippler: - A tripler is a equipment that is used for unloading the 
coal from box by lifting and tilting the box. 
2. Side arm charger: - It is used for pushing or carrying the loaded or empty 
boxes. 
3. Conveyors: - Different sized and diff. Capacity conveyors are installed 
for feeding the coal from Tripler to bunkers. 
4. Crusher: - Crushers are provided for crushing the coal in desired sizes. 
5. Primary crusher : 2 
6. Secondary crusher : 8 
7. Stacker cum re-claimer : 2 
8. Stacker/Reclaimer: - The stored coal is stacked or reclaimed by the 
stacker/reclaimer. 
9. Bunkers: - Crushed coal is led to the mills via canonical shaped bunkers. 
10.Coal feeders: - Coal feeder delivers the coal from the bunkers to the mill. 
11.Pulverization of coal:- Pulverizing mills In modern TPS’s coal is 
pulverized i.e. ground to dust likesize. Pulverization is a means of 
exposing a large surface area to the action oxygen and consequently 
helping the combustion. mill used for one unit in which one standby. Mill 
is 4.7met in dia. &7.2 met in length.
Raw coal from bharat coal 
ltd. Dhanbad & 
bilaspur(MP) 
To SSTPS from gudla via a 
single railway track 
Wagon 
tippler 
bunkers Crusher house hoppers 
Raw coal 
feeders 
Coal mills 
(pulverization) 
Boiler furnace ( tangential firing of 
pulverized coal)
Useful Heat Value Of Different Grade Of Coal. 
GRADE U.H.V 
A >6200 Kcal/kg 
B 5600-6200 kcal/kg 
C 4940-5600 kcal/kg 
D 4200-4940 kcal/kg 
E 3360-4200 kcal/kg 
F 2400-3360 kcal/kg 
U.H.V = 8900-138[A+M] 
Where A=% of ash 
M =% Inherent moisture
2. ASH HANDLING PLANT (AHP) 
Coal contains a considerable amount of ash. The 
percentage of ash in the coal varies from about 5% in good 
quality coals to about 40% in poor quality coals. 
Generally poor quality coal is used in steam power plant, 
so the plant produces hundred tones of ash daily. 
For removal of ash from the boilers and its disposal to the 
suitable site is quite difficult. 
 Ash handling comprises the following operation: 
1. Removal of ash from the furnace ash hoppers. 
2. Transfer of ash to a fill or storage 
3. Disposal of stored ash.
In S.S.T.P.S. Hydraulic System Is Used For Ash 
Handling. 
Hydraulic system: 
In this system stream of water carries 
ash along with it in a Closed channel and disposes it of 
to the proper site. This is the healthy clean dustless and 
completely enclosed system. 
In this system the hoppers below the 
boilers are fitted with water nozzles both at the top and 
on sides. The top nozzles quench the ash while the side 
ones provides the driving force for the ash. The ash and 
water then flow along a trough to a receiving hopper or 
sump where the ash is separated from the water. The 
water is used again while the ash is sent out through 
the carriages.
GENERATOR: 
MECHANICAL 
ENERGY 
ELECTRICAL 
ENERGY 
 TWO POLE TYPE; WITH CYLINDRICAL ROTOR 
 BASIC PRINCIPLE :FARADAY’s LOW OF MAGNETIC 
INDUCTION 
 COOLING: 
 STATOR WINDING-DIRECT WATER COOLING 
 ROTOR WINDING – HYDROGEN COOLING
Generator 
The Synchronous Generator is used to Generate power by connecting the shaft of the 
Turbine to the shaft of the generator which cuts the magnetic flux producing Emf. 
• The Generated Voltage will generally 11KV to 20 KV max. 
• The Generated Voltage is stepped up by connecting Step up transformer and is 
transmitted and is also used for Auxiliary purposes. 
Bus Duct 
Generator Transformer 
20KV to 400KV 
SYNCHRONOUS 
GENERATOR 
UAT 
20Kv to 6.KV 
Unit Auxiliary Transformer: This transformer is used to step down the produced voltage and 
use for Auxiliary purpose.
suratgarh thermal power station by mk yadav

More Related Content

What's hot

A seminar report on stps by ashok khoja
A seminar report on stps by ashok khojaA seminar report on stps by ashok khoja
A seminar report on stps by ashok khojaASHOK KHOJA
 
Thermal power plant ppt
Thermal power plant pptThermal power plant ppt
Thermal power plant ppt
ayushi kesarvani
 
kstps training report
kstps training reportkstps training report
kstps training report
Omprakash Choudhary
 
Ntpc vocational training project report sipat
Ntpc vocational training project report sipatNtpc vocational training project report sipat
Ntpc vocational training project report sipat
pratikguptateddy
 
Suratgarh thermal power station
Suratgarh  thermal  power  stationSuratgarh  thermal  power  station
Suratgarh thermal power stationGaurav Gunjan
 
Thermal Power Generation
Thermal Power GenerationThermal Power Generation
Thermal Power Generation
Ravinder Jangid
 
Summer Training Report On Kalisindh Thermal Power Plant
Summer Training Report On Kalisindh Thermal Power PlantSummer Training Report On Kalisindh Thermal Power Plant
Summer Training Report On Kalisindh Thermal Power Plant
DS Group (Dharampal Satyapal Limited)
 
Chapter (5) gas turbine power plants
Chapter (5) gas turbine power plantsChapter (5) gas turbine power plants
Chapter (5) gas turbine power plants
Azam Ali
 
Kota Super Thermal Power Plant
Kota Super Thermal Power PlantKota Super Thermal Power Plant
Kota Super Thermal Power Plant
Himanshu Dixit
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
HARI GOVIND SINGH
 
Power plant ppt on kalisindh by vikas
Power plant ppt on kalisindh by vikasPower plant ppt on kalisindh by vikas
Power plant ppt on kalisindh by vikasVikas Gupta
 
report on thermal power plant
report on thermal power plantreport on thermal power plant
report on thermal power plant
sagar20jain
 
Thermal Plant report (Mechanical)
Thermal Plant report (Mechanical)Thermal Plant report (Mechanical)
Thermal Plant report (Mechanical)
sometech
 
Thermal power plant Khedr, Hisar, Haryana
Thermal power plant Khedr, Hisar, HaryanaThermal power plant Khedr, Hisar, Haryana
Thermal power plant Khedr, Hisar, HaryanaEesha Gupta
 
coal based thermal power plant
coal based thermal power plantcoal based thermal power plant
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
Rahul Jalan
 
Summer internship report of DCCPP
Summer internship report of DCCPPSummer internship report of DCCPP
Summer internship report of DCCPP
DurgSingh
 
Training report on thermal power plant
Training report on thermal power plantTraining report on thermal power plant
Training report on thermal power plant
lovely professional university
 
A Presentation on Kota Super Thermal Power Station
A Presentation on Kota Super Thermal Power StationA Presentation on Kota Super Thermal Power Station
A Presentation on Kota Super Thermal Power Station
LekhraJ Meena
 
Kalisindh thermal power project jhalawar (keshav)
Kalisindh thermal power project jhalawar (keshav)Kalisindh thermal power project jhalawar (keshav)
Kalisindh thermal power project jhalawar (keshav)
Keshav Meena
 

What's hot (20)

A seminar report on stps by ashok khoja
A seminar report on stps by ashok khojaA seminar report on stps by ashok khoja
A seminar report on stps by ashok khoja
 
Thermal power plant ppt
Thermal power plant pptThermal power plant ppt
Thermal power plant ppt
 
kstps training report
kstps training reportkstps training report
kstps training report
 
Ntpc vocational training project report sipat
Ntpc vocational training project report sipatNtpc vocational training project report sipat
Ntpc vocational training project report sipat
 
Suratgarh thermal power station
Suratgarh  thermal  power  stationSuratgarh  thermal  power  station
Suratgarh thermal power station
 
Thermal Power Generation
Thermal Power GenerationThermal Power Generation
Thermal Power Generation
 
Summer Training Report On Kalisindh Thermal Power Plant
Summer Training Report On Kalisindh Thermal Power PlantSummer Training Report On Kalisindh Thermal Power Plant
Summer Training Report On Kalisindh Thermal Power Plant
 
Chapter (5) gas turbine power plants
Chapter (5) gas turbine power plantsChapter (5) gas turbine power plants
Chapter (5) gas turbine power plants
 
Kota Super Thermal Power Plant
Kota Super Thermal Power PlantKota Super Thermal Power Plant
Kota Super Thermal Power Plant
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
 
Power plant ppt on kalisindh by vikas
Power plant ppt on kalisindh by vikasPower plant ppt on kalisindh by vikas
Power plant ppt on kalisindh by vikas
 
report on thermal power plant
report on thermal power plantreport on thermal power plant
report on thermal power plant
 
Thermal Plant report (Mechanical)
Thermal Plant report (Mechanical)Thermal Plant report (Mechanical)
Thermal Plant report (Mechanical)
 
Thermal power plant Khedr, Hisar, Haryana
Thermal power plant Khedr, Hisar, HaryanaThermal power plant Khedr, Hisar, Haryana
Thermal power plant Khedr, Hisar, Haryana
 
coal based thermal power plant
coal based thermal power plantcoal based thermal power plant
coal based thermal power plant
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
 
Summer internship report of DCCPP
Summer internship report of DCCPPSummer internship report of DCCPP
Summer internship report of DCCPP
 
Training report on thermal power plant
Training report on thermal power plantTraining report on thermal power plant
Training report on thermal power plant
 
A Presentation on Kota Super Thermal Power Station
A Presentation on Kota Super Thermal Power StationA Presentation on Kota Super Thermal Power Station
A Presentation on Kota Super Thermal Power Station
 
Kalisindh thermal power project jhalawar (keshav)
Kalisindh thermal power project jhalawar (keshav)Kalisindh thermal power project jhalawar (keshav)
Kalisindh thermal power project jhalawar (keshav)
 

Viewers also liked

Presentation suratgarh super thermal power station by rahul dabi
Presentation suratgarh super thermal power station  by rahul dabiPresentation suratgarh super thermal power station  by rahul dabi
Presentation suratgarh super thermal power station by rahul dabi
Rahul Dabi
 
Super thermal power plant,suratgarh
Super thermal power plant,suratgarhSuper thermal power plant,suratgarh
Super thermal power plant,suratgarh
Rajesh Nayak
 
SURATGARH SUPER THERMAL POWER STATION
SURATGARH  SUPER  THERMAL POWER    STATION SURATGARH  SUPER  THERMAL POWER    STATION
SURATGARH SUPER THERMAL POWER STATION Sagar Sharma
 
Industrial Training at Suratgarh Super Thermal Power Plant ppt
Industrial Training at Suratgarh Super Thermal Power Plant pptIndustrial Training at Suratgarh Super Thermal Power Plant ppt
Industrial Training at Suratgarh Super Thermal Power Plant ppt
MSHRISTISAHU
 
complete seminar report on simputer technology
complete seminar report on simputer technology complete seminar report on simputer technology
complete seminar report on simputer technology
Suchitra goudar
 
Shilpa ppt thermal plant copy
Shilpa ppt thermal plant   copyShilpa ppt thermal plant   copy
Shilpa ppt thermal plant copyShilpa Shukla
 

Viewers also liked (6)

Presentation suratgarh super thermal power station by rahul dabi
Presentation suratgarh super thermal power station  by rahul dabiPresentation suratgarh super thermal power station  by rahul dabi
Presentation suratgarh super thermal power station by rahul dabi
 
Super thermal power plant,suratgarh
Super thermal power plant,suratgarhSuper thermal power plant,suratgarh
Super thermal power plant,suratgarh
 
SURATGARH SUPER THERMAL POWER STATION
SURATGARH  SUPER  THERMAL POWER    STATION SURATGARH  SUPER  THERMAL POWER    STATION
SURATGARH SUPER THERMAL POWER STATION
 
Industrial Training at Suratgarh Super Thermal Power Plant ppt
Industrial Training at Suratgarh Super Thermal Power Plant pptIndustrial Training at Suratgarh Super Thermal Power Plant ppt
Industrial Training at Suratgarh Super Thermal Power Plant ppt
 
complete seminar report on simputer technology
complete seminar report on simputer technology complete seminar report on simputer technology
complete seminar report on simputer technology
 
Shilpa ppt thermal plant copy
Shilpa ppt thermal plant   copyShilpa ppt thermal plant   copy
Shilpa ppt thermal plant copy
 

Similar to suratgarh thermal power station by mk yadav

Kota thermal power plant ppt
Kota thermal power plant pptKota thermal power plant ppt
Kota thermal power plant ppt
Prakash Jarotia
 
Summer training at NTPC Badarpur ppt
Summer training at NTPC Badarpur ppt Summer training at NTPC Badarpur ppt
Summer training at NTPC Badarpur ppt
nilesh choubey
 
KSTPS PPT Astha.pptx
KSTPS PPT Astha.pptxKSTPS PPT Astha.pptx
KSTPS PPT Astha.pptx
ssuser4c2635
 
suratgarh super thermal power station
suratgarh super thermal power stationsuratgarh super thermal power station
suratgarh super thermal power station
JAIPUR ENGINEERING COLLEGE
 
thermal power plant at NTPC
thermal power plant at NTPCthermal power plant at NTPC
thermal power plant at NTPCricha khatri
 
CSTPS training REPORT
CSTPS training REPORTCSTPS training REPORT
CSTPS training REPORT
Uday Wankar
 
vocational training at DVC andal
 vocational training at DVC andal vocational training at DVC andal
vocational training at DVC andal
ANIL kumar
 
Ppt of internship at dccpp
Ppt of internship at dccppPpt of internship at dccpp
Ppt of internship at dccpp
DurgSingh
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
Nirbhaya Vikas
 
panki power plant training.ppt
panki power plant training.pptpanki power plant training.ppt
panki power plant training.ppt
Abhishek Awasthi
 
Presentation on THERMAL POWER PLANT
Presentation on THERMAL POWER PLANT Presentation on THERMAL POWER PLANT
Presentation on THERMAL POWER PLANT
Abhijeet Thakur
 
Cseb (chhattisgarh state electricity board) korba east vocational training pr...
Cseb (chhattisgarh state electricity board) korba east vocational training pr...Cseb (chhattisgarh state electricity board) korba east vocational training pr...
Cseb (chhattisgarh state electricity board) korba east vocational training pr...
haxxo24
 
Presentation sai,varun.
Presentation sai,varun.Presentation sai,varun.
Presentation sai,varun.
Sai Kumar
 
Summer Training Presentation Kota Super Thermal Power Station
Summer Training Presentation Kota Super Thermal Power StationSummer Training Presentation Kota Super Thermal Power Station
Summer Training Presentation Kota Super Thermal Power Station
FellowBuddy.com
 
Kota super thermal power plant
Kota super thermal power plantKota super thermal power plant
Kota super thermal power plantR G Sanjay Prakash
 
KSTPS presentation.pptx
KSTPS presentation.pptxKSTPS presentation.pptx
KSTPS presentation.pptx
ParulChandna6
 

Similar to suratgarh thermal power station by mk yadav (20)

Kota thermal power plant ppt
Kota thermal power plant pptKota thermal power plant ppt
Kota thermal power plant ppt
 
Summer training at NTPC Badarpur ppt
Summer training at NTPC Badarpur ppt Summer training at NTPC Badarpur ppt
Summer training at NTPC Badarpur ppt
 
KSTPS PPT Astha.pptx
KSTPS PPT Astha.pptxKSTPS PPT Astha.pptx
KSTPS PPT Astha.pptx
 
suratgarh super thermal power station
suratgarh super thermal power stationsuratgarh super thermal power station
suratgarh super thermal power station
 
KTPS
KTPSKTPS
KTPS
 
thermal power plant at NTPC
thermal power plant at NTPCthermal power plant at NTPC
thermal power plant at NTPC
 
Richappt
RichapptRichappt
Richappt
 
CSTPS training REPORT
CSTPS training REPORTCSTPS training REPORT
CSTPS training REPORT
 
vocational training at DVC andal
 vocational training at DVC andal vocational training at DVC andal
vocational training at DVC andal
 
Ppt of internship at dccpp
Ppt of internship at dccppPpt of internship at dccpp
Ppt of internship at dccpp
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
 
panki power plant training.ppt
panki power plant training.pptpanki power plant training.ppt
panki power plant training.ppt
 
Presentation on THERMAL POWER PLANT
Presentation on THERMAL POWER PLANT Presentation on THERMAL POWER PLANT
Presentation on THERMAL POWER PLANT
 
Cseb (chhattisgarh state electricity board) korba east vocational training pr...
Cseb (chhattisgarh state electricity board) korba east vocational training pr...Cseb (chhattisgarh state electricity board) korba east vocational training pr...
Cseb (chhattisgarh state electricity board) korba east vocational training pr...
 
Presentation sai,varun.
Presentation sai,varun.Presentation sai,varun.
Presentation sai,varun.
 
Summer Training Presentation Kota Super Thermal Power Station
Summer Training Presentation Kota Super Thermal Power StationSummer Training Presentation Kota Super Thermal Power Station
Summer Training Presentation Kota Super Thermal Power Station
 
Kota super thermal power plant
Kota super thermal power plantKota super thermal power plant
Kota super thermal power plant
 
Ntpc dadri ppt
Ntpc dadri pptNtpc dadri ppt
Ntpc dadri ppt
 
KSTPS presentation.pptx
KSTPS presentation.pptxKSTPS presentation.pptx
KSTPS presentation.pptx
 
Ntpc2 111125042448-phpapp02
Ntpc2 111125042448-phpapp02Ntpc2 111125042448-phpapp02
Ntpc2 111125042448-phpapp02
 

Recently uploaded

MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
Osamah Alsalih
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
Kamal Acharya
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
fxintegritypublishin
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Teleport Manpower Consultant
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
AJAYKUMARPUND1
 
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
zwunae
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Dr.Costas Sachpazis
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
thanhdowork
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
Kamal Acharya
 
Investor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptxInvestor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptx
AmarGB2
 
ML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptxML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptx
Vijay Dialani, PhD
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
TeeVichai
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
Pipe Restoration Solutions
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
AafreenAbuthahir2
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
seandesed
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
AhmedHussein950959
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
FluxPrime1
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
obonagu
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
VENKATESHvenky89705
 

Recently uploaded (20)

MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
 
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
 
Investor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptxInvestor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptx
 
ML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptxML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptx
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
 

suratgarh thermal power station by mk yadav

  • 1. A PRACTICAL TRAINING SEMINAR ON SURATGARH SUPER THERMAL POWER PRESENTED BY: MUKESH KUMAR VII SEM. (ELECTRICAL ENGG.) 11ESKEE066 STATION SUBMITTED TO Mrs. RIDA QURESHI Mr. MANISH NAULAKHA
  • 2. CONTENTS 1. Introduction 2. Land 3. Water conducting system 4. Block diagram of thermal power plant 5. Boiler 6. Economizer 7. Super heater and Reheaters 8. Air preheaters 9. Turbines 10. Condenser 11. Coal and ash handling plants 12. Generator
  • 3. Introduction 1. Suratgarh thermal power station is the first super thermal power Station of Rajasthan with total installed capacity of 1500 MW. 2. Suratgarh super thermal power station is located 27 km away from Suratgarh town in Ganganagar Dist. on the left bank of IGNP at Up Stream of Suratgarh Barrage. 3.This station is operated and maintained by Rajasthan Vidhyut Utpadan Nigam Limited.
  • 4. S.S.T.P.S. is designed in six stages •STAGE I - 1x250 MW •STAGE II - 1X250 MW •STAGE III - 1X250 MW •STAGE IV - 1X250 MW •STAGE V 1X250 MW •STAGE VI - 1X250 MW •STAGE VII- 1X660MW(Under construction) •STAGE VIII- 1X660MW(Under construction) Total Power Generation - 1500 MW
  • 5. LAND : Total Land 5020 BIGHA Plant Area 3810 BIGHA Colony Area 431 BIGHA Railway Site 425 BIGHA Water conducting 354 BIGHA system
  • 6. WATER CONDUCTING SYSTEM: a) Length of Intake Canal = 1.6 Km b) Capacity of each Decilting Pump = 3.14 Kw*3(30M³/Hr.) c) Intake Pump House = 90 Kw*6(1250M³/Hr.)Each Pump d) Raw Water Pump House = 7 lacks M³
  • 7. BLOCK DIAGRAM OF THERMAL POWER PLANT
  • 9. BOILER PARAMETERS:- •Height of boiler 60 meters •Height of chimeny 220 meters •Foundation depth 8.5 meters •Furnace Depth 11506 meters •Furnace Width 15.240 meters •Total Water Flow 780.5 T/Hr. •Steam Flow 740.8 T/Hr. •Steam Temperature 540ºC •Coal Requirement for 250MW 160 T/Hr. •Primary Air for pulverized fuel 268.4 T/Hr. •Secondary Air for ignition (Combination) 647.0 T/Hr. •Total Air 915.5 T/Hr. •Steam Pressure 156 Kg /cm²
  • 10. • Flue gases coming out of the boiler carry lot of heat. An economizer extracts a part of this heat from flue gases and uses it for heating feed water. This use of economizer results in saving coal consumption and higher boiler efficiency Economizer
  • 11. Super heater and Reheaters • Super heater : • Super heater is a component of a steam-generating unit in which steam, after it has left the boiler drum, is heated above its saturation temperature • Reheater : Some of the heat of superheated steam is used to rotate the turbine where it loses some of its energy
  • 12. Air preheaters • After flue gases leave economizer, some further heat can be extracted from them and used to heat incoming heat. Cooling of flue gases by 20 degree centigrade increases the plant efficiency by 1%. • Air preheaters may be of three types  Plate type  Tubular type  Regenerative type
  • 13. TURBINE In a Thermal Power Plant generally 3 turbines are used to increase the efficiency. . High Pressure Turbine(HPT): The superheated steam is directly fed to this turbine to rotate it. Intermediate Pressure Turbine(IPT): The out put from the HPT is reheated In a reheated(RH) and used to rotate IPT . Low Pressure Turbine(LPT): The Exhausted steam from the IPT is directly fed to rotate the shaft of LPT. HPT HPT IPT IPT LPT LPT Generator RH Steam Steam Shaft Super Heater Condenser
  • 14. High pressure turbine: The HP turbine consists of 25 reaction stages. The moving and stationary blades are inserted into appropriately shapes into inner casing and the shaft. Intermediate pressure turbine: The steam from HP turbine after reheating enters the inner casing from above and below through two inlet nozzles. The IP turbine consists of 20 reaction stages per flow. The moving and stationary blades are inserted in appropriately shaped grooves in shaft and inner casing. Low pressure turbine: Steam admitted to LP turbine from IP turbine flows into the inner casing from both sides through steam inlet nozzles.
  • 15. TURBINE SPECIFICATION HP turbine having 25 Blades & Single flow. IP turbine having 17 Blades & Single flow. LP turbine having 8 Blades& Double flow. Inlet/Outlet Pressure And Temperature 1. H P Turbine Steam Inlet/outlet pressure -150 Kg/Cm²/39.69 Kg/Cm² A inlet/outlet Temperature - 537*C/346*C 2 . I P Turbine Steam Inlet pressure - 35.64 Kg/Cm² a. Outlet pressure - 6.83 Kg/Cm² b.Exhaust Temp. - 305*C 3. LP Turbine Steam Inlet pressure - 6.83 Kg/Cm² a.Exhaust Temp. - 49*C
  • 17.
  • 20. CONDENSER The condenser does the job of condensing the steam exhausted from turbine. Steam after rotating steam turbine comes to condenser. Condenser refers here to the shell and tube heat exchanger (or surface condenser) installed at the outlet of every steam turbine in Thermal power stations of utility companies generally.
  • 21. Condenser Used In S.S.T.P.S. In S.S.T.P.S. surface condenser is used. A surface condenser consists of an airtight cylindrical shell having a chamber at each end. Water tube extends between the chambers. The shell is made of welded steel plate construction and the tubes are made of copper zinc alloy. Cooling water flow through the tubes. The steam is admitted from the top and gets condensed due to contact with the tube surface. The condensate leaves from the bottom. For efficient operation, the temperature rise in the cooling water passing through the condenser should be around 10degree C.
  • 22. COAL & ASH HANDLIG PLANT 1. COAL HANDLING PLANT (CHP) The function of CHP is automatic feeding of coal to the boiler furnace. The coal is transported to the power station by rail. One rail (rack) consists of 58 or 59 boxes with 60 – 70 tones coal loaded in each box. There are 6-7 racks of coal are used.About 18000 tonnes coal required per day for whole unit.
  • 23. The main equipments of CHP are: 1. Wagon trippler: - A tripler is a equipment that is used for unloading the coal from box by lifting and tilting the box. 2. Side arm charger: - It is used for pushing or carrying the loaded or empty boxes. 3. Conveyors: - Different sized and diff. Capacity conveyors are installed for feeding the coal from Tripler to bunkers. 4. Crusher: - Crushers are provided for crushing the coal in desired sizes. 5. Primary crusher : 2 6. Secondary crusher : 8 7. Stacker cum re-claimer : 2 8. Stacker/Reclaimer: - The stored coal is stacked or reclaimed by the stacker/reclaimer. 9. Bunkers: - Crushed coal is led to the mills via canonical shaped bunkers. 10.Coal feeders: - Coal feeder delivers the coal from the bunkers to the mill. 11.Pulverization of coal:- Pulverizing mills In modern TPS’s coal is pulverized i.e. ground to dust likesize. Pulverization is a means of exposing a large surface area to the action oxygen and consequently helping the combustion. mill used for one unit in which one standby. Mill is 4.7met in dia. &7.2 met in length.
  • 24. Raw coal from bharat coal ltd. Dhanbad & bilaspur(MP) To SSTPS from gudla via a single railway track Wagon tippler bunkers Crusher house hoppers Raw coal feeders Coal mills (pulverization) Boiler furnace ( tangential firing of pulverized coal)
  • 25. Useful Heat Value Of Different Grade Of Coal. GRADE U.H.V A >6200 Kcal/kg B 5600-6200 kcal/kg C 4940-5600 kcal/kg D 4200-4940 kcal/kg E 3360-4200 kcal/kg F 2400-3360 kcal/kg U.H.V = 8900-138[A+M] Where A=% of ash M =% Inherent moisture
  • 26. 2. ASH HANDLING PLANT (AHP) Coal contains a considerable amount of ash. The percentage of ash in the coal varies from about 5% in good quality coals to about 40% in poor quality coals. Generally poor quality coal is used in steam power plant, so the plant produces hundred tones of ash daily. For removal of ash from the boilers and its disposal to the suitable site is quite difficult.  Ash handling comprises the following operation: 1. Removal of ash from the furnace ash hoppers. 2. Transfer of ash to a fill or storage 3. Disposal of stored ash.
  • 27. In S.S.T.P.S. Hydraulic System Is Used For Ash Handling. Hydraulic system: In this system stream of water carries ash along with it in a Closed channel and disposes it of to the proper site. This is the healthy clean dustless and completely enclosed system. In this system the hoppers below the boilers are fitted with water nozzles both at the top and on sides. The top nozzles quench the ash while the side ones provides the driving force for the ash. The ash and water then flow along a trough to a receiving hopper or sump where the ash is separated from the water. The water is used again while the ash is sent out through the carriages.
  • 28. GENERATOR: MECHANICAL ENERGY ELECTRICAL ENERGY  TWO POLE TYPE; WITH CYLINDRICAL ROTOR  BASIC PRINCIPLE :FARADAY’s LOW OF MAGNETIC INDUCTION  COOLING:  STATOR WINDING-DIRECT WATER COOLING  ROTOR WINDING – HYDROGEN COOLING
  • 29. Generator The Synchronous Generator is used to Generate power by connecting the shaft of the Turbine to the shaft of the generator which cuts the magnetic flux producing Emf. • The Generated Voltage will generally 11KV to 20 KV max. • The Generated Voltage is stepped up by connecting Step up transformer and is transmitted and is also used for Auxiliary purposes. Bus Duct Generator Transformer 20KV to 400KV SYNCHRONOUS GENERATOR UAT 20Kv to 6.KV Unit Auxiliary Transformer: This transformer is used to step down the produced voltage and use for Auxiliary purpose.