Hesy Aquaculture is a specialist in the design and construction of intensive recirculation aquaculture systems (RAS) for fish farming. They have 30 years of experience and have delivered over 180 RAS systems worldwide for a variety of freshwater and saltwater fish species. Their turnkey systems include biological and technical start-up support, as well as management training. RAS is advantageous as it allows high density fish production using minimal water in a controlled environment, with benefits for water quality, disease control, and consistency of supply.