SlideShare a Scribd company logo
1 of 20
POINT ON WAVE
SWITCHING
Random switching of power system
equipment may lead to high-frequency
overvoltage transient and inrush
current.
This, in turn, may stress the equipment,
leading to rapid aging or dielectric
failure.
• What is ?
Point on Wave Controller/ Switch?
• Point on Wave Switch (PoW), often
called Point on Wave Controller is a
high speed microprocessor based relay
used for the controlled switching of
circuit breaker of HVAC system.
Controlled switching refers to open or
close a breaker at a pre-determined
point on the voltage waveform.
This controller is used for switching of
Shunt Reactors, Transmission Lines,
Power Transformers & Capacitor Bank.
• Point On Wave (POW) controllers, also
known as Synchronous Switching Controllers
(SSC), are high-speed microprocessor-based
relays used to open and close the contacts of
independent pole operation (IPO) circuit
breakers (CB) at the pre-determined point on
wave for minimizing the switching transients.
• This approach minimizes the disturbance to the
network, as well as the stresses to the
associated equipment.
• Very sophisticated algorithm implementations
are available in the market, allowing POW
controllers to perform optimum switching of
capacitor banks, shunt reactors, power
transformers, and compensated or
uncompensated transmission lines.
Why Controlled Switching is required?
Random switching of equipment may lead to
high frequency over-voltage transient and
inrush current.
This in turn may stress the equipment and
leads to rapid aging.
It is suggested to read Transformer Inrush
Current for better understanding of inrush
phenomenon.
How Controlled Switching by Point
on Wave Switch / PoW Controller
achieved?
• Point on Wave Switch basically synchronizes
the random closing / opening input order so
that individual poles of the breaker get close
/ open at pre-determined point on reference
voltage waveform.
Figure below shows the simplified
diagram of PoW controller operation
The above figure shows the use of PoW controller for switching Shunt Reactor. It can be
easily seen that, a Point on Wave controller takes the following inputs:
Source side PT supply
• Only one phase i.e. R-N of source side PT supply
is taken for reference. This PT supply acts as a
reference for system voltage and PoW controller
decides the target point on this system voltage.
In case of Shunt Reactor switching to minimize
the inrush current, it is desirable to close the
breaker at voltage peak. Since the load is reactive
in nature, therefore closing the breaker at
voltage peak will cause the shunt reactor to take
zero current (current through an inductor lags by
90°) and therefore the transients in current will
be minimized.
CB Parameter
• For PoW controller to decide the point of
switching on the system voltage
waveform, it is necessary for it to know
the breaker opening and closing time.
Therefore, breaker closing and tripping
parameter is fed.
• Breaker timing is obtained through the
timing test which is carried out along
with DCRM test.
CT Input
• CT input to PoW controller serves the purpose for
analysis of load current upon closing / opening of
breaker. It is also used for the estimation of breaker
opening / closing time. It shall be noted at this point
that breaker closing is the instant at which pre-
arcing at take place.
• Pre-arcing take place before the actual closing of
mechanical contacts. Normally pre-arcing time is
2ms. Similarly for opening operating, breaker
opening time is the instant between mechanical
contacts open and arc extinguishes. Therefore arcing
time must be considered for determination of target
point. Normally, arcing time is 6 ms.
Working Principle of Point on Wave Switch
• When a random closing / opening command is
given to the breaker through control switch, PoW
receives the command and process it before issuing
the closing / opening command to the breaker. It
introduces a time delay between the issue of
random command from control switch to the issue
of command by PoW Switch as shown in figure
below.
• In this time period, the controller does the
necessary calculation such that breaker may close at
defined point on reference voltage waveform. For
this calculation, breaker operating time is
considered and then PoW issues command in such a
time that breaker may close at the target point. In
the figure below, target point is at voltage zero.
Let us consider an example for better
understanding. Let us suppose that breaker
closing time is 104.78 ms and it is used for
switching shunt reactor. Therefore our target
point shall be voltage peak. Point on Wave
Switch has its own time delay and it adjusts its
delay in such a way that the sum of PoW delay
and Breaker closing time corresponds to
voltage peak. Suppose the controller delay be
37.80 ms, therefore expected target point
shall be (Breaker closure time + Controller
Delay = 104.78+37.80) 142.58 ms.
• But actual closure of breaker means the
instant of time where current start flowing
through the circuit.
• Thus pre-arcing time shall be taken into
consideration. Assuming pre-arcing time to
be 2 ms, the target point shall be 140.58 ms.
Figure below shows the graph of switching
instant for Shunt Reactor.
Following
points shall
be noted
from the
above
graph:
The target point for shunt reactor is at voltage peak to limit inrush current.
PoW Switch determines the target point for Y and B phase assuming balanced three phase
voltage as only one phase voltage input is given to it. Thus if R phase voltage is assumed
reference then VY = VmSin(ωt-120°), VB = VmSin(ωt+120°)
As voltage peak either positive or negative for Y phase is occurring first, therefore closing
command to Y pole of breaker will be issued first. Thereafter R and at last B pole will close.
Thus the difference in target point for two consecutive phases will be (30° = 10 ms / 6)
1.67 ms as evident from the graph above.
Carefully observe the current curve and see how smooth current transition is taking place.
It can be realized from the above graph that how inrush current is limited.
Adaptive Nature of Point on Wave Switch
• As we know that, Breaker opening and closing time
changes with time and aging. Further it is also
affected by the environmental condition. Therefore
it is necessary to compensate for these.
Compensation for environmental condition is
accounted by giving ambient temperature input to
Point on Wave Switch.
• For accounting change in breaker operating time
due aging, PoW is made adaptive. Adaptive means,
it can adapt its timing as per the previous switching
data so that required target point can be achieved.
Point on Wave Switch Bypass Feature
• A provision for bypassing PoW switch is generally
provided by the manufacturer. The controller gets
automatically bypassed in case of internal fault in
it.
• For manual bypass, two hand switches CLOSE and
TRIP with IN & OUT positions are provided to
bypass closing and tripping operation of breaker
manually when required.
• It shall be noted that, in case of protection
breaker always trips on PoW bypass mode. This is
done to avoid for any intentional introduction of
time delay for clearing fault.
Review of Switching Strategies
• One advantage of POW controllers is their capability to
perform more than one switching strategy to better adapt
when the network changes (e.g., changes in line
compensation levels or replacement of CBs with a different
operating mechanism). Our team can recommend new
operating strategies, improved settings, or potential
controller upgrades to fit the application.
Conlcusion: Point-on-Wave Switching
• It offers a cost-effective and compact electronic
solution to switching transients and can be installed at
initial build stage or as a retrofit to existing circuit
breakers.
Powertech Labs Point On Wave controller snapshot

More Related Content

What's hot

Presentation on 132/33KV BSPTCL(Bodhgaya Substation)
Presentation on 132/33KV BSPTCL(Bodhgaya Substation)Presentation on 132/33KV BSPTCL(Bodhgaya Substation)
Presentation on 132/33KV BSPTCL(Bodhgaya Substation)Rahul Prajapati
 
industrial training on 132 kv substation
industrial training on 132 kv substationindustrial training on 132 kv substation
industrial training on 132 kv substationpk130992
 
Stability test of transformer
Stability test of transformerStability test of transformer
Stability test of transformerSantu Mondal
 
Switchgear Equipment in a Substation
Switchgear Equipment in a SubstationSwitchgear Equipment in a Substation
Switchgear Equipment in a SubstationMd. Atiqur Rahman
 
Vacuum Circuit Breaker (VCB) Working and Applications | Uses Of VCB
Vacuum Circuit Breaker (VCB) Working and Applications | Uses Of VCB Vacuum Circuit Breaker (VCB) Working and Applications | Uses Of VCB
Vacuum Circuit Breaker (VCB) Working and Applications | Uses Of VCB System Protection
 
Substation protection devices
Substation protection devicesSubstation protection devices
Substation protection devicesRahul Aman
 
Electrical 132kv substation project .. shakir
Electrical 132kv substation project .. shakirElectrical 132kv substation project .. shakir
Electrical 132kv substation project .. shakirSheikh Shakir
 
132kv substation inplant training seminar
132kv substation inplant training seminar132kv substation inplant training seminar
132kv substation inplant training seminarShrikant Bhansali
 
BPMI TRANSFORMER PROTECTION.pptx.pdf
BPMI TRANSFORMER PROTECTION.pptx.pdfBPMI TRANSFORMER PROTECTION.pptx.pdf
BPMI TRANSFORMER PROTECTION.pptx.pdfssuser2e69dc
 
Design of substation
Design of substationDesign of substation
Design of substationSayanSarkar55
 
220 KV Switchyard general overview
220 KV Switchyard general overview220 KV Switchyard general overview
220 KV Switchyard general overviewThien Huynh
 
01a derivacao simples resolução
01a derivacao simples resolução01a derivacao simples resolução
01a derivacao simples resoluçãoRui Guimarães
 
LBB & BUSBAR PPT Rev 4.5.pdf
LBB & BUSBAR PPT Rev 4.5.pdfLBB & BUSBAR PPT Rev 4.5.pdf
LBB & BUSBAR PPT Rev 4.5.pdfKriteshKumar12
 
Voltage sag
Voltage sagVoltage sag
Voltage sagAJAL A J
 
substation 220 kv
substation 220 kv substation 220 kv
substation 220 kv student
 

What's hot (20)

132 kv seminar ppt
132 kv seminar ppt132 kv seminar ppt
132 kv seminar ppt
 
Presentation on 132/33KV BSPTCL(Bodhgaya Substation)
Presentation on 132/33KV BSPTCL(Bodhgaya Substation)Presentation on 132/33KV BSPTCL(Bodhgaya Substation)
Presentation on 132/33KV BSPTCL(Bodhgaya Substation)
 
industrial training on 132 kv substation
industrial training on 132 kv substationindustrial training on 132 kv substation
industrial training on 132 kv substation
 
Stability test of transformer
Stability test of transformerStability test of transformer
Stability test of transformer
 
Switchgear Equipment in a Substation
Switchgear Equipment in a SubstationSwitchgear Equipment in a Substation
Switchgear Equipment in a Substation
 
Vacuum Circuit Breaker (VCB) Working and Applications | Uses Of VCB
Vacuum Circuit Breaker (VCB) Working and Applications | Uses Of VCB Vacuum Circuit Breaker (VCB) Working and Applications | Uses Of VCB
Vacuum Circuit Breaker (VCB) Working and Applications | Uses Of VCB
 
Substation protection devices
Substation protection devicesSubstation protection devices
Substation protection devices
 
Electrical 132kv substation project .. shakir
Electrical 132kv substation project .. shakirElectrical 132kv substation project .. shakir
Electrical 132kv substation project .. shakir
 
132kv substation inplant training seminar
132kv substation inplant training seminar132kv substation inplant training seminar
132kv substation inplant training seminar
 
On load tap changer
On load tap changerOn load tap changer
On load tap changer
 
BPMI TRANSFORMER PROTECTION.pptx.pdf
BPMI TRANSFORMER PROTECTION.pptx.pdfBPMI TRANSFORMER PROTECTION.pptx.pdf
BPMI TRANSFORMER PROTECTION.pptx.pdf
 
Comutação de escada
Comutação de escadaComutação de escada
Comutação de escada
 
Design of substation
Design of substationDesign of substation
Design of substation
 
220 KV Switchyard general overview
220 KV Switchyard general overview220 KV Switchyard general overview
220 KV Switchyard general overview
 
Vf a7 manual
Vf a7 manualVf a7 manual
Vf a7 manual
 
01a derivacao simples resolução
01a derivacao simples resolução01a derivacao simples resolução
01a derivacao simples resolução
 
Switch yard & Protection
Switch yard & ProtectionSwitch yard & Protection
Switch yard & Protection
 
LBB & BUSBAR PPT Rev 4.5.pdf
LBB & BUSBAR PPT Rev 4.5.pdfLBB & BUSBAR PPT Rev 4.5.pdf
LBB & BUSBAR PPT Rev 4.5.pdf
 
Voltage sag
Voltage sagVoltage sag
Voltage sag
 
substation 220 kv
substation 220 kv substation 220 kv
substation 220 kv
 

Similar to POINT ON WAVE SWITCHING

Zero setting PSB protection_CBIP
Zero setting PSB protection_CBIPZero setting PSB protection_CBIP
Zero setting PSB protection_CBIPBadal Patnaik
 
Substation_equipment_ (1).pptx
Substation_equipment_ (1).pptxSubstation_equipment_ (1).pptx
Substation_equipment_ (1).pptxSatish Pydimarla
 
An Adaptive Zero Voltage Mechanism for Boost Converter
An Adaptive Zero Voltage Mechanism for Boost ConverterAn Adaptive Zero Voltage Mechanism for Boost Converter
An Adaptive Zero Voltage Mechanism for Boost ConverterIOSR Journals
 
ABB Controlled Switching with Switchsync
ABB Controlled Switching with SwitchsyncABB Controlled Switching with Switchsync
ABB Controlled Switching with SwitchsyncPower System Operation
 
Electric-Traction-Railways.ppt
Electric-Traction-Railways.pptElectric-Traction-Railways.ppt
Electric-Traction-Railways.pptssuserf805c8
 
microprocessor based automatic synchroniser (8085)
microprocessor based automatic synchroniser (8085)microprocessor based automatic synchroniser (8085)
microprocessor based automatic synchroniser (8085)BIJU GANESH
 
Fundamentals of Microprocessor Based Relays
Fundamentals of Microprocessor Based RelaysFundamentals of Microprocessor Based Relays
Fundamentals of Microprocessor Based Relaysmichaeljmack
 
Introduction_to_Mechatronics_Chapter3.pdf
Introduction_to_Mechatronics_Chapter3.pdfIntroduction_to_Mechatronics_Chapter3.pdf
Introduction_to_Mechatronics_Chapter3.pdfBereket Walle
 
Variable Frequency Drives.pptx
Variable Frequency Drives.pptxVariable Frequency Drives.pptx
Variable Frequency Drives.pptxYogesh Patel
 
2 twofold mode series echoing dc dc converter for ample load
2 twofold mode series echoing dc dc converter for ample load2 twofold mode series echoing dc dc converter for ample load
2 twofold mode series echoing dc dc converter for ample loadchelliah paramasivan
 
Current mode circuits & voltage mode circuits
Current mode circuits & voltage mode circuits Current mode circuits & voltage mode circuits
Current mode circuits & voltage mode circuits Kevin Gajera
 
Review of Step down Converter with Efficient ZVS Operation
Review of Step down Converter with Efficient ZVS OperationReview of Step down Converter with Efficient ZVS Operation
Review of Step down Converter with Efficient ZVS OperationIJRST Journal
 
Controlling of DC Motor using IC 555 Timer
Controlling of DC Motor using IC 555 TimerControlling of DC Motor using IC 555 Timer
Controlling of DC Motor using IC 555 TimerUpendra Chokka
 
455816491-ESP-Start-up-and-operation.pdf
455816491-ESP-Start-up-and-operation.pdf455816491-ESP-Start-up-and-operation.pdf
455816491-ESP-Start-up-and-operation.pdfZehronChemicals
 
Speed Control Of DC motor By Using PWM Technique
Speed Control Of DC motor By Using PWM TechniqueSpeed Control Of DC motor By Using PWM Technique
Speed Control Of DC motor By Using PWM TechniqueRITESH D. PATIL
 
Time Base Generators or Sweep Circuits.pptx
Time Base Generators or Sweep Circuits.pptxTime Base Generators or Sweep Circuits.pptx
Time Base Generators or Sweep Circuits.pptxSarmistaSengupta1
 

Similar to POINT ON WAVE SWITCHING (20)

Voltage Regulation
Voltage RegulationVoltage Regulation
Voltage Regulation
 
Zero setting PSB protection_CBIP
Zero setting PSB protection_CBIPZero setting PSB protection_CBIP
Zero setting PSB protection_CBIP
 
Substation_equipment_ (1).pptx
Substation_equipment_ (1).pptxSubstation_equipment_ (1).pptx
Substation_equipment_ (1).pptx
 
An Adaptive Zero Voltage Mechanism for Boost Converter
An Adaptive Zero Voltage Mechanism for Boost ConverterAn Adaptive Zero Voltage Mechanism for Boost Converter
An Adaptive Zero Voltage Mechanism for Boost Converter
 
Abb b.g. controlled switching ed4
Abb b.g. controlled switching ed4Abb b.g. controlled switching ed4
Abb b.g. controlled switching ed4
 
ABB Controlled Switching with Switchsync
ABB Controlled Switching with SwitchsyncABB Controlled Switching with Switchsync
ABB Controlled Switching with Switchsync
 
Electric-Traction-Railways.ppt
Electric-Traction-Railways.pptElectric-Traction-Railways.ppt
Electric-Traction-Railways.ppt
 
microprocessor based automatic synchroniser (8085)
microprocessor based automatic synchroniser (8085)microprocessor based automatic synchroniser (8085)
microprocessor based automatic synchroniser (8085)
 
Fundamentals of Microprocessor-based Relaying
Fundamentals of Microprocessor-based RelayingFundamentals of Microprocessor-based Relaying
Fundamentals of Microprocessor-based Relaying
 
Fundamentals of Microprocessor Based Relays
Fundamentals of Microprocessor Based RelaysFundamentals of Microprocessor Based Relays
Fundamentals of Microprocessor Based Relays
 
Introduction_to_Mechatronics_Chapter3.pdf
Introduction_to_Mechatronics_Chapter3.pdfIntroduction_to_Mechatronics_Chapter3.pdf
Introduction_to_Mechatronics_Chapter3.pdf
 
digital
digitaldigital
digital
 
Variable Frequency Drives.pptx
Variable Frequency Drives.pptxVariable Frequency Drives.pptx
Variable Frequency Drives.pptx
 
2 twofold mode series echoing dc dc converter for ample load
2 twofold mode series echoing dc dc converter for ample load2 twofold mode series echoing dc dc converter for ample load
2 twofold mode series echoing dc dc converter for ample load
 
Current mode circuits & voltage mode circuits
Current mode circuits & voltage mode circuits Current mode circuits & voltage mode circuits
Current mode circuits & voltage mode circuits
 
Review of Step down Converter with Efficient ZVS Operation
Review of Step down Converter with Efficient ZVS OperationReview of Step down Converter with Efficient ZVS Operation
Review of Step down Converter with Efficient ZVS Operation
 
Controlling of DC Motor using IC 555 Timer
Controlling of DC Motor using IC 555 TimerControlling of DC Motor using IC 555 Timer
Controlling of DC Motor using IC 555 Timer
 
455816491-ESP-Start-up-and-operation.pdf
455816491-ESP-Start-up-and-operation.pdf455816491-ESP-Start-up-and-operation.pdf
455816491-ESP-Start-up-and-operation.pdf
 
Speed Control Of DC motor By Using PWM Technique
Speed Control Of DC motor By Using PWM TechniqueSpeed Control Of DC motor By Using PWM Technique
Speed Control Of DC motor By Using PWM Technique
 
Time Base Generators or Sweep Circuits.pptx
Time Base Generators or Sweep Circuits.pptxTime Base Generators or Sweep Circuits.pptx
Time Base Generators or Sweep Circuits.pptx
 

More from Power System Operation

Thermography test of electrical panels
Thermography test of electrical panelsThermography test of electrical panels
Thermography test of electrical panelsPower System Operation
 
Big Data Analytics for Power Grid Operations
Big Data Analytics for Power Grid OperationsBig Data Analytics for Power Grid Operations
Big Data Analytics for Power Grid OperationsPower System Operation
 
SPS to RAS Special Protection Scheme Remedial Action Scheme
SPS to RAS Special Protection Scheme  Remedial Action SchemeSPS to RAS Special Protection Scheme  Remedial Action Scheme
SPS to RAS Special Protection Scheme Remedial Action SchemePower System Operation
 
SVC PLUS Frequency Stabilizer Frequency and voltage support for dynamic grid...
SVC PLUS Frequency Stabilizer Frequency and voltage support for  dynamic grid...SVC PLUS Frequency Stabilizer Frequency and voltage support for  dynamic grid...
SVC PLUS Frequency Stabilizer Frequency and voltage support for dynamic grid...Power System Operation
 
Principles & Testing Methods Of Earth Ground Resistance
Principles & Testing Methods Of Earth Ground ResistancePrinciples & Testing Methods Of Earth Ground Resistance
Principles & Testing Methods Of Earth Ground ResistancePower System Operation
 
Gas Insulated Switchgear? Gas-Insulated High-Voltage Switchgear (GIS)
Gas Insulated Switchgear?  Gas-Insulated High-Voltage Switchgear (GIS)Gas Insulated Switchgear?  Gas-Insulated High-Voltage Switchgear (GIS)
Gas Insulated Switchgear? Gas-Insulated High-Voltage Switchgear (GIS)Power System Operation
 
Electrical Transmission Tower Types - Design & Parts
Electrical Transmission Tower  Types - Design & PartsElectrical Transmission Tower  Types - Design & Parts
Electrical Transmission Tower Types - Design & PartsPower System Operation
 
The Need for Enhanced Power System Modelling Techniques & Simulation Tools
The Need for Enhanced  Power System  Modelling Techniques  &  Simulation Tools The Need for Enhanced  Power System  Modelling Techniques  &  Simulation Tools
The Need for Enhanced Power System Modelling Techniques & Simulation Tools Power System Operation
 
Power Quality Trends in the Transition to Carbon-Free Electrical Energy System
Power Quality  Trends in the Transition to  Carbon-Free Electrical Energy SystemPower Quality  Trends in the Transition to  Carbon-Free Electrical Energy System
Power Quality Trends in the Transition to Carbon-Free Electrical Energy SystemPower System Operation
 

More from Power System Operation (20)

ENERGY TRANSITION OUTLOOK 2021
ENERGY TRANSITION OUTLOOK  2021ENERGY TRANSITION OUTLOOK  2021
ENERGY TRANSITION OUTLOOK 2021
 
Thermography test of electrical panels
Thermography test of electrical panelsThermography test of electrical panels
Thermography test of electrical panels
 
What does peak shaving mean
What does peak shaving meanWhat does peak shaving mean
What does peak shaving mean
 
What's short circuit level
What's short circuit levelWhat's short circuit level
What's short circuit level
 
Power System Restoration Guide
Power System Restoration Guide  Power System Restoration Guide
Power System Restoration Guide
 
Big Data Analytics for Power Grid Operations
Big Data Analytics for Power Grid OperationsBig Data Analytics for Power Grid Operations
Big Data Analytics for Power Grid Operations
 
SPS to RAS Special Protection Scheme Remedial Action Scheme
SPS to RAS Special Protection Scheme  Remedial Action SchemeSPS to RAS Special Protection Scheme  Remedial Action Scheme
SPS to RAS Special Protection Scheme Remedial Action Scheme
 
Substation Neutral Earthing
Substation Neutral EarthingSubstation Neutral Earthing
Substation Neutral Earthing
 
SVC PLUS Frequency Stabilizer Frequency and voltage support for dynamic grid...
SVC PLUS Frequency Stabilizer Frequency and voltage support for  dynamic grid...SVC PLUS Frequency Stabilizer Frequency and voltage support for  dynamic grid...
SVC PLUS Frequency Stabilizer Frequency and voltage support for dynamic grid...
 
Principles & Testing Methods Of Earth Ground Resistance
Principles & Testing Methods Of Earth Ground ResistancePrinciples & Testing Methods Of Earth Ground Resistance
Principles & Testing Methods Of Earth Ground Resistance
 
Gas Insulated Switchgear? Gas-Insulated High-Voltage Switchgear (GIS)
Gas Insulated Switchgear?  Gas-Insulated High-Voltage Switchgear (GIS)Gas Insulated Switchgear?  Gas-Insulated High-Voltage Switchgear (GIS)
Gas Insulated Switchgear? Gas-Insulated High-Voltage Switchgear (GIS)
 
Electrical Transmission Tower Types - Design & Parts
Electrical Transmission Tower  Types - Design & PartsElectrical Transmission Tower  Types - Design & Parts
Electrical Transmission Tower Types - Design & Parts
 
What is load management
What is load managementWhat is load management
What is load management
 
What does merit order mean
What does merit order meanWhat does merit order mean
What does merit order mean
 
What are Balancing Services ?
What are  Balancing Services ?What are  Balancing Services ?
What are Balancing Services ?
 
The Need for Enhanced Power System Modelling Techniques & Simulation Tools
The Need for Enhanced  Power System  Modelling Techniques  &  Simulation Tools The Need for Enhanced  Power System  Modelling Techniques  &  Simulation Tools
The Need for Enhanced Power System Modelling Techniques & Simulation Tools
 
Power Quality Trends in the Transition to Carbon-Free Electrical Energy System
Power Quality  Trends in the Transition to  Carbon-Free Electrical Energy SystemPower Quality  Trends in the Transition to  Carbon-Free Electrical Energy System
Power Quality Trends in the Transition to Carbon-Free Electrical Energy System
 
Power Purchase Agreement PPA
Power Purchase Agreement PPA Power Purchase Agreement PPA
Power Purchase Agreement PPA
 
Harmonic study and analysis
Harmonic study and analysisHarmonic study and analysis
Harmonic study and analysis
 
What is leakage current testing
What is leakage current testingWhat is leakage current testing
What is leakage current testing
 

Recently uploaded

NO1 Best Powerful Vashikaran Specialist Baba Vashikaran Specialist For Love V...
NO1 Best Powerful Vashikaran Specialist Baba Vashikaran Specialist For Love V...NO1 Best Powerful Vashikaran Specialist Baba Vashikaran Specialist For Love V...
NO1 Best Powerful Vashikaran Specialist Baba Vashikaran Specialist For Love V...Amil baba
 
Databricks Generative AI FoundationCertified.pdf
Databricks Generative AI FoundationCertified.pdfDatabricks Generative AI FoundationCertified.pdf
Databricks Generative AI FoundationCertified.pdfVinayVadlagattu
 
Max. shear stress theory-Maximum Shear Stress Theory ​ Maximum Distortional ...
Max. shear stress theory-Maximum Shear Stress Theory ​  Maximum Distortional ...Max. shear stress theory-Maximum Shear Stress Theory ​  Maximum Distortional ...
Max. shear stress theory-Maximum Shear Stress Theory ​ Maximum Distortional ...ronahami
 
Geometric constructions Engineering Drawing.pdf
Geometric constructions Engineering Drawing.pdfGeometric constructions Engineering Drawing.pdf
Geometric constructions Engineering Drawing.pdfJNTUA
 
What is Coordinate Measuring Machine? CMM Types, Features, Functions
What is Coordinate Measuring Machine? CMM Types, Features, FunctionsWhat is Coordinate Measuring Machine? CMM Types, Features, Functions
What is Coordinate Measuring Machine? CMM Types, Features, FunctionsVIEW
 
Presentation on Slab, Beam, Column, and Foundation/Footing
Presentation on Slab,  Beam, Column, and Foundation/FootingPresentation on Slab,  Beam, Column, and Foundation/Footing
Presentation on Slab, Beam, Column, and Foundation/FootingEr. Suman Jyoti
 
litvinenko_Henry_Intrusion_Hong-Kong_2024.pdf
litvinenko_Henry_Intrusion_Hong-Kong_2024.pdflitvinenko_Henry_Intrusion_Hong-Kong_2024.pdf
litvinenko_Henry_Intrusion_Hong-Kong_2024.pdfAlexander Litvinenko
 
Seismic Hazard Assessment Software in Python by Prof. Dr. Costas Sachpazis
Seismic Hazard Assessment Software in Python by Prof. Dr. Costas SachpazisSeismic Hazard Assessment Software in Python by Prof. Dr. Costas Sachpazis
Seismic Hazard Assessment Software in Python by Prof. Dr. Costas SachpazisDr.Costas Sachpazis
 
01-vogelsanger-stanag-4178-ed-2-the-new-nato-standard-for-nitrocellulose-test...
01-vogelsanger-stanag-4178-ed-2-the-new-nato-standard-for-nitrocellulose-test...01-vogelsanger-stanag-4178-ed-2-the-new-nato-standard-for-nitrocellulose-test...
01-vogelsanger-stanag-4178-ed-2-the-new-nato-standard-for-nitrocellulose-test...AshwaniAnuragi1
 
Artificial intelligence presentation2-171219131633.pdf
Artificial intelligence presentation2-171219131633.pdfArtificial intelligence presentation2-171219131633.pdf
Artificial intelligence presentation2-171219131633.pdfKira Dess
 
Path loss model, OKUMURA Model, Hata Model
Path loss model, OKUMURA Model, Hata ModelPath loss model, OKUMURA Model, Hata Model
Path loss model, OKUMURA Model, Hata ModelDrAjayKumarYadav4
 
CLOUD COMPUTING SERVICES - Cloud Reference Modal
CLOUD COMPUTING SERVICES - Cloud Reference ModalCLOUD COMPUTING SERVICES - Cloud Reference Modal
CLOUD COMPUTING SERVICES - Cloud Reference ModalSwarnaSLcse
 
handbook on reinforce concrete and detailing
handbook on reinforce concrete and detailinghandbook on reinforce concrete and detailing
handbook on reinforce concrete and detailingAshishSingh1301
 
8th International Conference on Soft Computing, Mathematics and Control (SMC ...
8th International Conference on Soft Computing, Mathematics and Control (SMC ...8th International Conference on Soft Computing, Mathematics and Control (SMC ...
8th International Conference on Soft Computing, Mathematics and Control (SMC ...josephjonse
 
SLIDESHARE PPT-DECISION MAKING METHODS.pptx
SLIDESHARE PPT-DECISION MAKING METHODS.pptxSLIDESHARE PPT-DECISION MAKING METHODS.pptx
SLIDESHARE PPT-DECISION MAKING METHODS.pptxCHAIRMAN M
 
Involute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdf
Involute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdfInvolute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdf
Involute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdfJNTUA
 
Developing a smart system for infant incubators using the internet of things ...
Developing a smart system for infant incubators using the internet of things ...Developing a smart system for infant incubators using the internet of things ...
Developing a smart system for infant incubators using the internet of things ...IJECEIAES
 
Artificial Intelligence in due diligence
Artificial Intelligence in due diligenceArtificial Intelligence in due diligence
Artificial Intelligence in due diligencemahaffeycheryld
 
Worksharing and 3D Modeling with Revit.pptx
Worksharing and 3D Modeling with Revit.pptxWorksharing and 3D Modeling with Revit.pptx
Worksharing and 3D Modeling with Revit.pptxMustafa Ahmed
 

Recently uploaded (20)

NO1 Best Powerful Vashikaran Specialist Baba Vashikaran Specialist For Love V...
NO1 Best Powerful Vashikaran Specialist Baba Vashikaran Specialist For Love V...NO1 Best Powerful Vashikaran Specialist Baba Vashikaran Specialist For Love V...
NO1 Best Powerful Vashikaran Specialist Baba Vashikaran Specialist For Love V...
 
Databricks Generative AI FoundationCertified.pdf
Databricks Generative AI FoundationCertified.pdfDatabricks Generative AI FoundationCertified.pdf
Databricks Generative AI FoundationCertified.pdf
 
Max. shear stress theory-Maximum Shear Stress Theory ​ Maximum Distortional ...
Max. shear stress theory-Maximum Shear Stress Theory ​  Maximum Distortional ...Max. shear stress theory-Maximum Shear Stress Theory ​  Maximum Distortional ...
Max. shear stress theory-Maximum Shear Stress Theory ​ Maximum Distortional ...
 
Geometric constructions Engineering Drawing.pdf
Geometric constructions Engineering Drawing.pdfGeometric constructions Engineering Drawing.pdf
Geometric constructions Engineering Drawing.pdf
 
What is Coordinate Measuring Machine? CMM Types, Features, Functions
What is Coordinate Measuring Machine? CMM Types, Features, FunctionsWhat is Coordinate Measuring Machine? CMM Types, Features, Functions
What is Coordinate Measuring Machine? CMM Types, Features, Functions
 
Presentation on Slab, Beam, Column, and Foundation/Footing
Presentation on Slab,  Beam, Column, and Foundation/FootingPresentation on Slab,  Beam, Column, and Foundation/Footing
Presentation on Slab, Beam, Column, and Foundation/Footing
 
Signal Processing and Linear System Analysis
Signal Processing and Linear System AnalysisSignal Processing and Linear System Analysis
Signal Processing and Linear System Analysis
 
litvinenko_Henry_Intrusion_Hong-Kong_2024.pdf
litvinenko_Henry_Intrusion_Hong-Kong_2024.pdflitvinenko_Henry_Intrusion_Hong-Kong_2024.pdf
litvinenko_Henry_Intrusion_Hong-Kong_2024.pdf
 
Seismic Hazard Assessment Software in Python by Prof. Dr. Costas Sachpazis
Seismic Hazard Assessment Software in Python by Prof. Dr. Costas SachpazisSeismic Hazard Assessment Software in Python by Prof. Dr. Costas Sachpazis
Seismic Hazard Assessment Software in Python by Prof. Dr. Costas Sachpazis
 
01-vogelsanger-stanag-4178-ed-2-the-new-nato-standard-for-nitrocellulose-test...
01-vogelsanger-stanag-4178-ed-2-the-new-nato-standard-for-nitrocellulose-test...01-vogelsanger-stanag-4178-ed-2-the-new-nato-standard-for-nitrocellulose-test...
01-vogelsanger-stanag-4178-ed-2-the-new-nato-standard-for-nitrocellulose-test...
 
Artificial intelligence presentation2-171219131633.pdf
Artificial intelligence presentation2-171219131633.pdfArtificial intelligence presentation2-171219131633.pdf
Artificial intelligence presentation2-171219131633.pdf
 
Path loss model, OKUMURA Model, Hata Model
Path loss model, OKUMURA Model, Hata ModelPath loss model, OKUMURA Model, Hata Model
Path loss model, OKUMURA Model, Hata Model
 
CLOUD COMPUTING SERVICES - Cloud Reference Modal
CLOUD COMPUTING SERVICES - Cloud Reference ModalCLOUD COMPUTING SERVICES - Cloud Reference Modal
CLOUD COMPUTING SERVICES - Cloud Reference Modal
 
handbook on reinforce concrete and detailing
handbook on reinforce concrete and detailinghandbook on reinforce concrete and detailing
handbook on reinforce concrete and detailing
 
8th International Conference on Soft Computing, Mathematics and Control (SMC ...
8th International Conference on Soft Computing, Mathematics and Control (SMC ...8th International Conference on Soft Computing, Mathematics and Control (SMC ...
8th International Conference on Soft Computing, Mathematics and Control (SMC ...
 
SLIDESHARE PPT-DECISION MAKING METHODS.pptx
SLIDESHARE PPT-DECISION MAKING METHODS.pptxSLIDESHARE PPT-DECISION MAKING METHODS.pptx
SLIDESHARE PPT-DECISION MAKING METHODS.pptx
 
Involute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdf
Involute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdfInvolute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdf
Involute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdf
 
Developing a smart system for infant incubators using the internet of things ...
Developing a smart system for infant incubators using the internet of things ...Developing a smart system for infant incubators using the internet of things ...
Developing a smart system for infant incubators using the internet of things ...
 
Artificial Intelligence in due diligence
Artificial Intelligence in due diligenceArtificial Intelligence in due diligence
Artificial Intelligence in due diligence
 
Worksharing and 3D Modeling with Revit.pptx
Worksharing and 3D Modeling with Revit.pptxWorksharing and 3D Modeling with Revit.pptx
Worksharing and 3D Modeling with Revit.pptx
 

POINT ON WAVE SWITCHING

  • 2. Random switching of power system equipment may lead to high-frequency overvoltage transient and inrush current. This, in turn, may stress the equipment, leading to rapid aging or dielectric failure.
  • 3. • What is ? Point on Wave Controller/ Switch? • Point on Wave Switch (PoW), often called Point on Wave Controller is a high speed microprocessor based relay used for the controlled switching of circuit breaker of HVAC system. Controlled switching refers to open or close a breaker at a pre-determined point on the voltage waveform.
  • 4. This controller is used for switching of Shunt Reactors, Transmission Lines, Power Transformers & Capacitor Bank. • Point On Wave (POW) controllers, also known as Synchronous Switching Controllers (SSC), are high-speed microprocessor-based relays used to open and close the contacts of independent pole operation (IPO) circuit breakers (CB) at the pre-determined point on wave for minimizing the switching transients.
  • 5. • This approach minimizes the disturbance to the network, as well as the stresses to the associated equipment. • Very sophisticated algorithm implementations are available in the market, allowing POW controllers to perform optimum switching of capacitor banks, shunt reactors, power transformers, and compensated or uncompensated transmission lines.
  • 6. Why Controlled Switching is required? Random switching of equipment may lead to high frequency over-voltage transient and inrush current. This in turn may stress the equipment and leads to rapid aging. It is suggested to read Transformer Inrush Current for better understanding of inrush phenomenon.
  • 7. How Controlled Switching by Point on Wave Switch / PoW Controller achieved? • Point on Wave Switch basically synchronizes the random closing / opening input order so that individual poles of the breaker get close / open at pre-determined point on reference voltage waveform.
  • 8. Figure below shows the simplified diagram of PoW controller operation The above figure shows the use of PoW controller for switching Shunt Reactor. It can be easily seen that, a Point on Wave controller takes the following inputs:
  • 9. Source side PT supply • Only one phase i.e. R-N of source side PT supply is taken for reference. This PT supply acts as a reference for system voltage and PoW controller decides the target point on this system voltage. In case of Shunt Reactor switching to minimize the inrush current, it is desirable to close the breaker at voltage peak. Since the load is reactive in nature, therefore closing the breaker at voltage peak will cause the shunt reactor to take zero current (current through an inductor lags by 90°) and therefore the transients in current will be minimized.
  • 10. CB Parameter • For PoW controller to decide the point of switching on the system voltage waveform, it is necessary for it to know the breaker opening and closing time. Therefore, breaker closing and tripping parameter is fed. • Breaker timing is obtained through the timing test which is carried out along with DCRM test.
  • 11. CT Input • CT input to PoW controller serves the purpose for analysis of load current upon closing / opening of breaker. It is also used for the estimation of breaker opening / closing time. It shall be noted at this point that breaker closing is the instant at which pre- arcing at take place. • Pre-arcing take place before the actual closing of mechanical contacts. Normally pre-arcing time is 2ms. Similarly for opening operating, breaker opening time is the instant between mechanical contacts open and arc extinguishes. Therefore arcing time must be considered for determination of target point. Normally, arcing time is 6 ms.
  • 12. Working Principle of Point on Wave Switch • When a random closing / opening command is given to the breaker through control switch, PoW receives the command and process it before issuing the closing / opening command to the breaker. It introduces a time delay between the issue of random command from control switch to the issue of command by PoW Switch as shown in figure below. • In this time period, the controller does the necessary calculation such that breaker may close at defined point on reference voltage waveform. For this calculation, breaker operating time is considered and then PoW issues command in such a time that breaker may close at the target point. In the figure below, target point is at voltage zero.
  • 13.
  • 14. Let us consider an example for better understanding. Let us suppose that breaker closing time is 104.78 ms and it is used for switching shunt reactor. Therefore our target point shall be voltage peak. Point on Wave Switch has its own time delay and it adjusts its delay in such a way that the sum of PoW delay and Breaker closing time corresponds to voltage peak. Suppose the controller delay be 37.80 ms, therefore expected target point shall be (Breaker closure time + Controller Delay = 104.78+37.80) 142.58 ms.
  • 15. • But actual closure of breaker means the instant of time where current start flowing through the circuit. • Thus pre-arcing time shall be taken into consideration. Assuming pre-arcing time to be 2 ms, the target point shall be 140.58 ms. Figure below shows the graph of switching instant for Shunt Reactor.
  • 16. Following points shall be noted from the above graph: The target point for shunt reactor is at voltage peak to limit inrush current. PoW Switch determines the target point for Y and B phase assuming balanced three phase voltage as only one phase voltage input is given to it. Thus if R phase voltage is assumed reference then VY = VmSin(ωt-120°), VB = VmSin(ωt+120°) As voltage peak either positive or negative for Y phase is occurring first, therefore closing command to Y pole of breaker will be issued first. Thereafter R and at last B pole will close. Thus the difference in target point for two consecutive phases will be (30° = 10 ms / 6) 1.67 ms as evident from the graph above. Carefully observe the current curve and see how smooth current transition is taking place. It can be realized from the above graph that how inrush current is limited.
  • 17. Adaptive Nature of Point on Wave Switch • As we know that, Breaker opening and closing time changes with time and aging. Further it is also affected by the environmental condition. Therefore it is necessary to compensate for these. Compensation for environmental condition is accounted by giving ambient temperature input to Point on Wave Switch. • For accounting change in breaker operating time due aging, PoW is made adaptive. Adaptive means, it can adapt its timing as per the previous switching data so that required target point can be achieved.
  • 18. Point on Wave Switch Bypass Feature • A provision for bypassing PoW switch is generally provided by the manufacturer. The controller gets automatically bypassed in case of internal fault in it. • For manual bypass, two hand switches CLOSE and TRIP with IN & OUT positions are provided to bypass closing and tripping operation of breaker manually when required. • It shall be noted that, in case of protection breaker always trips on PoW bypass mode. This is done to avoid for any intentional introduction of time delay for clearing fault.
  • 19. Review of Switching Strategies • One advantage of POW controllers is their capability to perform more than one switching strategy to better adapt when the network changes (e.g., changes in line compensation levels or replacement of CBs with a different operating mechanism). Our team can recommend new operating strategies, improved settings, or potential controller upgrades to fit the application. Conlcusion: Point-on-Wave Switching • It offers a cost-effective and compact electronic solution to switching transients and can be installed at initial build stage or as a retrofit to existing circuit breakers.
  • 20. Powertech Labs Point On Wave controller snapshot