-:ACKNOWLEDGEMENT:- 
We had a great pleasure in expressing our sincere gratitude to 
the TPO of our college and Mr. D.Bose, GM(HR & 
A),W.B.S.E.T.C.L for allowing summer training at Liluah 
132/33/25 KV substation. 
We are greatly thankful to Mr. Rakesh Kundu, assistant engineer 
of Liluah transmission(O & M) substation for his immense help 
and suitable guidance during training period. 
We are also thankful to all other staffs of substation for their day 
to day help and assistance.
SINGLE LINE DIAGRAM OF LILUAH 
132/33/25 KV
ELECTRICAL BUSBAR 
ELECTRICAL BUSBAR 
 It is the collector of electrical energy at one location at 
constant voltage 
 Types:- 1. Rigid type: - made up of aluminium alloy tubes of 50 
to 250 mm diameter and supported on post insulator with 
clamps and connector. 
2. Flexible type:- made up of A.C.S.R. conductor and 
supported at both ends by strain insulators clamps and 
conductors. 
 Acts as common point when a number of generator or feeder 
operating at same voltage is to be connected together. 
TYPES OF ARRANGEMENT 
1. Single busbar system 
2. Duplicate busbar system 
3. Triple busbar system
PROTECTIVE SCHEME IN 
POWER SYSTEM 
 The capital investment involved in a power system for the 
generation, transmission & distribution of electrical power is 
so great that proper precaution must be taken to ensure 
that the equipment not only operate as nearly as possible 
to peak efficient but also that it is protected from accident 
. 
 There are two main components of protection scheme: 
1. Protective relay. 
2. Circuit breakers. 
1. Protective relay:- A relay is an automatic device which 
senses an abnormal condition in an electrical circuit 
and closes its contacts. 
There are two operating principle of relay: 
I. Electromagnetic induction. 
II. Electromagnetic attraction.
Relays used for line protection : 
(a) Earth fault relay (b) over current relay (c) distant protection relay 
(d)Zone protection relay 
Relays used for transformer protection: 
(a)Earth fault relay. b) Over current relay. (c) buchholz relay 
(d)differential relay (e)back up earth fault relay (f)restricted earth 
fault relay (g)high temp relay (g)high temp relay (h)supervision relay. 
2.CIRCUIT BREAKER- 
• Isolate the faulty part of the power system in case of abnormal 
condition. 
•A protective relay detects the abnormal condition & sends a tripping 
signal to circuit breaker. After receiving that relay trips the circuit and 
circuit breaker isolates the faulty part 
•In normal condition, the two contacts(fixed and moving) remain in 
closed position 
CLASSIFICATION- 
1. Oil circuit breaker 
2. Air blast CBs 
3. Sulphur hexafluoride CBs 
4. Vacuum CBs
PROTECTION AGAINST LIGHTNING 
The most commonly used devices for protection 
against lightning surges are: 
1. Earthing screen. 
2. Overhead ground wires. 
3. Lightning arrester or surge diverters.
ISOLATOR 
 An Isolator is a disconnecting switch being operated under the condition 
of no load negligible current. 
 Used for disconnecting the circuit breaker from the circuit and to isolate 
the electrical circuit at the time of maintenance work and repair. 
 Interlocking arrangement are generally provided in the isolators. 
TYPES:- 
1. Vertical break type single, double and triple pole insulator 
2. Horizontal two rotating post, centre break insulator 
3. Horizontal break ,centre rotating double break insulator 
4. Extra high voltage column insulator
CAPACITOR BANK 
These capacitors have an important role to investigate the 
behavior of the breaker towards the restricting voltage. 
1. Controls and improves the voltages. 
2. Removes the reactive components of VARS component of the 
power which is not desirable. 
3. Improves power factor. 
Capacitor 
s
POWERLINE CARRIER COMMUNICATION 
(PLCC) 
 Protection signaling, speech and data transmission for 
system operation and control, management information 
system etc. are predominantly met by PLCC . 
 It is the most economical and reliable method of 
communication because of higher mechanical strength 
and insulation of high voltage power-lines which 
contribute to the increased reliability of communication 
and lower attenuation over the longer distances 
involved. 
PLCC Equipments-a) 
Wave trap 
b) Coupling capacitor 
c) Line Matching Unit(LMU) 
d) Protective equipments.
BATTERY 
 Provide unit charge to the entire system & behaves as back-up 
charging system 
 In Liluah 132 KV substation these units provide control voltage of 220 
VOLT DC back-up of entire system. 
 Makers- Amra Raja Make 
 Charging & discharging is needed to keep it healthy. 
Battery Charger: 
SL. No. : 4/2008/2 
AC Input: 415± 10% 
Ph: 50 Hz 
DC Output to charge: 250 V 
AH:110 A 
Cells at quick/boost: 2/2.7 
A.P.L.: 60 A 
Trickle/float: 2.15/2.3 
V.P.C.: 1602 /480 M
EARTH TRANSFORMER 
An Earth Transformer is 
connected in those areas 
where earth point is not 
available like a system 
connected to delta side of 
electrical power 
transformer, an artificial 
neutral point is created 
using earth transformer.
Sl.no Specifications Earthing Transformer 1 Earthing Transformer 2 
1. Makers name GEC GEC 
2. Std IS3151-1982 IS2026-1977 
3. KVA Rating 100 100 
4. Volts at no load HV:33KV,LV:415V HV:33KV,LV:415V 
5. Amperes rating HV:1.75A,LV:139A HV:1.75A,LV:139.3A 
6. Phases 3 3 
7. Types of Cooling ON AN ON AN 
8. Frequency 50 Hz 50 Hz 
9. Vector group ZNyn-11 ZNyn-11 
10. Impedance volt 4.5077% 3.796% 
11. Earth fault current 550 A for 30 sec 287 amp for 30 sec 
12. Year of mfg. 1990 1986
TRACTION TRANSFORMER(132KV/25KV) 
 It is used to supply the Indian Railways. The Railways use 25 KV Single 
phase line, so the Traction Transformer takes 2 phase 132 V Input supply 
and gives 2 phase 25 KV Output out of which one phase is grounded and 
made neutral and other phase is used by the Indian Railways. 
Serial 
no. 
Specifications Traction Transformer 1 & Traction 
Transformer2 
1. Maker’s Name Crompton Greaves Ltd. 
2. MVA Rating 12.5/18.75 
3. MVA (As per I.S) 13.5/20 
4. KV Rating (at no load) H.V=132 KV;L.V=15KV 
5. Line Current(Amps) H.V=102/151.5amp;L.V=500/750amp 
6. Output Phase Single 
7. Frequency(Hz) 50Hz
8. Type of cooling ON AN/ON AF 
9. Total Oil(ltrs/kg) 15300/12900 
10. Total Mass(Kg) 47600 
11. Untanking Mass Core & winding=18900 kg 
Bell tank=4200 kg 
12. Heaviest Package With oil=33500 kg 
Without oil=24800 kg 
13. Hot Spot temperature Ref<1150C 
14. Ambient temperature 45OC 
15. Insulation level (H.V./L.V.) LI650AC275/LI250AC95 
16. Guaranteed temperature rise of oil(0C) 50 
17. Guaranteed temperature rise of winding(0C): 50 
18. Maker’s w.o no.: T8174 
19. Maker’s sl no.: 24749 
20. Customer reference No.: LOI REF PLN/TRACTION/TRANS/491 
21. Year of mfg: 06-04-1987
STATION SERVICE TRANSFORMER 
Station Service Transformer converts HV 33 KV TO 
LV 400KV which is used by the Substation for its own 
needs like to run the air conditioner, fans and to run 
the control panel and relay panel. 
Specifications- 
 Maker’s Name: - Transmake Electrical Pvt. Ltd. 
 STD:- IS2026 & 1180 
 KVA Rating:-100 
 Volts at no load:-HV-33KV & LV-400V 
 Current at no load(A):-HV-1.75 & LV-144.34 
 Phase:-3 
 Diagram:- TW/100/33 
 Sl. No.-94311 
 Type of cooling:- ON AN
Frequency:- 50 Hz 
Impedance:- 4.1% 
Vector Group:- DYn11 
Core & Winding weight:- 430 Kg 
Weight of oil:- 260 Kg 
Total weight:- 930 Kg 
Oil quantity:- 300 Ltrs 
Year Of Mfg:- 12/2002 
Guaranteed Max temp. rise in oil:450C
POWER TRANSFORMER-3 
NAMEPLATE PARTICULARS: 
 Maker’s Name: - Bharat Heavy Electricals Ltd. 
 MVA Rating: - 30/40/50 
 Vector Symbol: - YnD1 
 Phase: - 3 
 Frequency: - 50 Hz 
 Type of cooling: - ON AN/ON AF/OF AF 
 Diagram Drg. no:-14561950473 
 Sl. No.:- 2013511 
 Year of mfg:- 2001 
 OLTC With oil, transport with oil heaviest package:- 50 
Tonnes 
 Complete transformer including oil:- 97 Tonnes 
 Bil: HV:- 550 kvp & LV:-170 kvp 
 Impedance volts(at 750C):- 12.5 ± 13% 
 KV(No load):- HV-132 KV & LV-33 KV 
 Amps:- HV-218.95 & LV-875.81 
 At taps: normal tap(9b)
POWER TRANSFORMER-4 
SPECIFICATION: 
 Maker’s Name:- ABB 
 Ref. Std: IS2026 
 Sl. No.: AAA-003 
 Year of mfg:- 2008 
 Frequency:- 50 Hz 
 Type of cooling:-ON AN/ON AF/OF AF 
 % Impedance Voltage HV/LV: 
 Nominal Power(ON AN/ON AF/OF AF):-30/40/50 MVA 
 Nominal voltage:- HV-132 KV & LV-33 KV 
 OLTC Type:- EASUNMR 
 Rated current:- 350 A 
 Insulation Ground:- 725 KV 
 Step Voltage:- 953 V 
 Control Voltage:- 110 V 
 Variation:- +10% to -10% of HV 
 No. of steps:- 16 
 Temp. rise of oil/winding:- 500C/550C 
 Vector Group:- YDn1 
 Short circuit current(max duration 3 sec):- HV=1.749 KA & 
LV=6.99 KA
•% Impedance Voltage HV/LV: 
Tap No. Guaranteed at N tap Actual (after test) 
Tap 1 
12.5% (± 10%) 
12.14% 
Tap 9b 11.64% 
Tap 17 11.33% 
•Insulation Level:- 
Testing Voltage HV HVN LV 
Um(Highest sys V) 145 36 
AC(Power frequency) 230 38 70 
Lightning Impulse 550 95 170 
•Core & Winding Mass:- 45670 Kg 
•Tank & Fitting Mass:- 12520 Kg 
•Oil Mass:- 17830 kg 
•Total Transformer mass:- 76020 Kg 
•Transformer mass(oil filled):- 68420 kg 
•Total oil quantity:- 20030 litres
Cooling Fans 
MOG 
POWER TRANSFORMER 4 
POWER TRANSFORMER 3 
HV 
Bushings 
Conservator 
Radiator Bank 
Buchholz 
relay 
Oil pump 
Earthing Transformer 
Oil level indicator
industrial training on 132 kv substation

More Related Content

What's hot

Presentation on 132/33 KVSubstation Training
Presentation on 132/33 KVSubstation Training Presentation on 132/33 KVSubstation Training
Presentation on 132/33 KVSubstation Training
Sakshi Rastogi
 
PPT ON SUMMER TRAINING FROM UPPCL 132/33 KV SUB STATION
PPT ON SUMMER TRAINING FROM UPPCL 132/33 KV SUB STATIONPPT ON SUMMER TRAINING FROM UPPCL 132/33 KV SUB STATION
PPT ON SUMMER TRAINING FROM UPPCL 132/33 KV SUB STATION
Swatantra SwAt
 
400kv sub-station-final-ppt-by-mohit
400kv sub-station-final-ppt-by-mohit400kv sub-station-final-ppt-by-mohit
400kv sub-station-final-ppt-by-mohitMohit Awasthi
 
220 KV Substation Operation & Maintenance
220 KV Substation Operation & Maintenance220 KV Substation Operation & Maintenance
220 KV Substation Operation & Maintenance
Himansu Pradhan
 
Electrical 132kv substation project .. shakir
Electrical 132kv substation project .. shakirElectrical 132kv substation project .. shakir
Electrical 132kv substation project .. shakir
Sheikh Shakir
 
Relays and its types - complete guide
Relays and its types - complete guideRelays and its types - complete guide
Relays and its types - complete guide
Slides Hub
 
Electric substation
Electric substation Electric substation
Electric substation
ANNU KUMAR
 
Electrical substations: 132 KV
Electrical substations: 132 KV Electrical substations: 132 KV
Electrical substations: 132 KV
Girish Gupta
 
Training at 132 kv substation
Training at 132 kv substation Training at 132 kv substation
Training at 132 kv substation
Tejveer Choudhary
 
Switchgear Equipment in a Substation
Switchgear Equipment in a SubstationSwitchgear Equipment in a Substation
Switchgear Equipment in a Substation
Md. Atiqur Rahman
 
Ppt on 132 kv gss by ashok khoja
Ppt on  132 kv gss  by ashok khojaPpt on  132 kv gss  by ashok khoja
Ppt on 132 kv gss by ashok khojaASHOK KHOJA
 
Report on 220kv substation at Jassure
Report on 220kv substation at JassureReport on 220kv substation at Jassure
Report on 220kv substation at Jassure
Shuvam Pathania
 
Ppt of 132kv gss sitapura jaipur
Ppt of 132kv gss sitapura jaipurPpt of 132kv gss sitapura jaipur
Ppt of 132kv gss sitapura jaipur
kishankky
 
POWER DISTRIBUTION 2.docx
POWER DISTRIBUTION 2.docxPOWER DISTRIBUTION 2.docx
POWER DISTRIBUTION 2.docxJeffrey Dorsey
 
substation 220 kv
substation 220 kv substation 220 kv
substation 220 kv
student
 
Substation protection devices
Substation protection devicesSubstation protection devices
Substation protection devices
Rahul Aman
 
220 kv gss dausa
220 kv gss dausa220 kv gss dausa
220 kv gss dausa
hemraj meena
 
sub-station training report
sub-station training reportsub-station training report
sub-station training report
sitesh95074
 
Substations
SubstationsSubstations
Substations
itfakash
 

What's hot (20)

Presentation on 132/33 KVSubstation Training
Presentation on 132/33 KVSubstation Training Presentation on 132/33 KVSubstation Training
Presentation on 132/33 KVSubstation Training
 
PPT ON SUMMER TRAINING FROM UPPCL 132/33 KV SUB STATION
PPT ON SUMMER TRAINING FROM UPPCL 132/33 KV SUB STATIONPPT ON SUMMER TRAINING FROM UPPCL 132/33 KV SUB STATION
PPT ON SUMMER TRAINING FROM UPPCL 132/33 KV SUB STATION
 
400kv sub-station-final-ppt-by-mohit
400kv sub-station-final-ppt-by-mohit400kv sub-station-final-ppt-by-mohit
400kv sub-station-final-ppt-by-mohit
 
220 KV Substation Operation & Maintenance
220 KV Substation Operation & Maintenance220 KV Substation Operation & Maintenance
220 KV Substation Operation & Maintenance
 
Electrical 132kv substation project .. shakir
Electrical 132kv substation project .. shakirElectrical 132kv substation project .. shakir
Electrical 132kv substation project .. shakir
 
132 kv
132 kv132 kv
132 kv
 
Relays and its types - complete guide
Relays and its types - complete guideRelays and its types - complete guide
Relays and its types - complete guide
 
Electric substation
Electric substation Electric substation
Electric substation
 
Electrical substations: 132 KV
Electrical substations: 132 KV Electrical substations: 132 KV
Electrical substations: 132 KV
 
Training at 132 kv substation
Training at 132 kv substation Training at 132 kv substation
Training at 132 kv substation
 
Switchgear Equipment in a Substation
Switchgear Equipment in a SubstationSwitchgear Equipment in a Substation
Switchgear Equipment in a Substation
 
Ppt on 132 kv gss by ashok khoja
Ppt on  132 kv gss  by ashok khojaPpt on  132 kv gss  by ashok khoja
Ppt on 132 kv gss by ashok khoja
 
Report on 220kv substation at Jassure
Report on 220kv substation at JassureReport on 220kv substation at Jassure
Report on 220kv substation at Jassure
 
Ppt of 132kv gss sitapura jaipur
Ppt of 132kv gss sitapura jaipurPpt of 132kv gss sitapura jaipur
Ppt of 132kv gss sitapura jaipur
 
POWER DISTRIBUTION 2.docx
POWER DISTRIBUTION 2.docxPOWER DISTRIBUTION 2.docx
POWER DISTRIBUTION 2.docx
 
substation 220 kv
substation 220 kv substation 220 kv
substation 220 kv
 
Substation protection devices
Substation protection devicesSubstation protection devices
Substation protection devices
 
220 kv gss dausa
220 kv gss dausa220 kv gss dausa
220 kv gss dausa
 
sub-station training report
sub-station training reportsub-station training report
sub-station training report
 
Substations
SubstationsSubstations
Substations
 

Similar to industrial training on 132 kv substation

industrial training ppt from 33 kv substation UPCL
industrial training ppt from 33 kv substation UPCLindustrial training ppt from 33 kv substation UPCL
industrial training ppt from 33 kv substation UPCL
surendra rawat
 
C.S.P.D.C.L.AMBIKAPUR (TOWN)
C.S.P.D.C.L.AMBIKAPUR (TOWN)C.S.P.D.C.L.AMBIKAPUR (TOWN)
C.S.P.D.C.L.AMBIKAPUR (TOWN)saurabhVEC
 
ppt on summer training on uppcl
ppt on summer training on uppclppt on summer training on uppcl
ppt on summer training on uppcl
Sunny Daksh
 
Heavy maintenance
Heavy maintenanceHeavy maintenance
Heavy maintenance
Dilan Atapattu
 
220 kv gss renwal ppt
220 kv gss renwal ppt220 kv gss renwal ppt
220 kv gss renwal ppt
अनिल कुमावत
 
Gss ppt by kanhaiya
Gss ppt  by kanhaiyaGss ppt  by kanhaiya
Gss ppt by kanhaiya
imkanhaiyalal
 
220kv substation
220kv substation220kv substation
220kv substation
Anbarasu Balakrishnan
 
132 KV GSS NPH jodhpur treaning report
132 KV GSS NPH jodhpur treaning report 132 KV GSS NPH jodhpur treaning report
132 KV GSS NPH jodhpur treaning report
imkanhaiyalal
 
Vocational Training Report ( Sealdah Power House)
Vocational Training Report ( Sealdah Power House)Vocational Training Report ( Sealdah Power House)
Vocational Training Report ( Sealdah Power House)
shovandey07
 
fdocuments.in_presentation-on-substation-220-kv.pptx
fdocuments.in_presentation-on-substation-220-kv.pptxfdocuments.in_presentation-on-substation-220-kv.pptx
fdocuments.in_presentation-on-substation-220-kv.pptx
AkshaiSai2
 
Original Transistor NPN MJE13003 KSE13003 E13003 13003 1.5A 400V TO-126 New
Original Transistor NPN MJE13003 KSE13003 E13003 13003 1.5A 400V TO-126 NewOriginal Transistor NPN MJE13003 KSE13003 E13003 13003 1.5A 400V TO-126 New
Original Transistor NPN MJE13003 KSE13003 E13003 13003 1.5A 400V TO-126 New
AUTHELECTRONIC
 
Report on minor project
Report on minor projectReport on minor project
Report on minor projectAnil Maurya
 
Switch yard & Protection
Switch yard & ProtectionSwitch yard & Protection
Switch yard & Protection
MANOJ KUMAR MAHARANA
 
400 kv nelmangala
400 kv nelmangala400 kv nelmangala
400 kv nelmangala
Mayur Dhanaji Rane
 
Power Transformer Differential protection
Power Transformer Differential protectionPower Transformer Differential protection
Power Transformer Differential protection
Rishi Tandon
 
Differential protection
Differential protectionDifferential protection
Differential protection
Rishi Tandon
 
Indusrtrial training ppt (1).pptx
Indusrtrial training ppt (1).pptxIndusrtrial training ppt (1).pptx
Indusrtrial training ppt (1).pptx
SNEHAKANWAR1
 
Installation testing and_commissioning_o (1)
Installation testing and_commissioning_o (1)Installation testing and_commissioning_o (1)
Installation testing and_commissioning_o (1)
FunExplode
 

Similar to industrial training on 132 kv substation (20)

industrial training ppt from 33 kv substation UPCL
industrial training ppt from 33 kv substation UPCLindustrial training ppt from 33 kv substation UPCL
industrial training ppt from 33 kv substation UPCL
 
C.S.P.D.C.L.AMBIKAPUR (TOWN)
C.S.P.D.C.L.AMBIKAPUR (TOWN)C.S.P.D.C.L.AMBIKAPUR (TOWN)
C.S.P.D.C.L.AMBIKAPUR (TOWN)
 
ppt on summer training on uppcl
ppt on summer training on uppclppt on summer training on uppcl
ppt on summer training on uppcl
 
Heavy maintenance
Heavy maintenanceHeavy maintenance
Heavy maintenance
 
220 kv gss renwal ppt
220 kv gss renwal ppt220 kv gss renwal ppt
220 kv gss renwal ppt
 
Thermoelectricity
ThermoelectricityThermoelectricity
Thermoelectricity
 
Gss ppt by kanhaiya
Gss ppt  by kanhaiyaGss ppt  by kanhaiya
Gss ppt by kanhaiya
 
220kv substation
220kv substation220kv substation
220kv substation
 
132 KV GSS NPH jodhpur treaning report
132 KV GSS NPH jodhpur treaning report 132 KV GSS NPH jodhpur treaning report
132 KV GSS NPH jodhpur treaning report
 
Vocational Training Report ( Sealdah Power House)
Vocational Training Report ( Sealdah Power House)Vocational Training Report ( Sealdah Power House)
Vocational Training Report ( Sealdah Power House)
 
fdocuments.in_presentation-on-substation-220-kv.pptx
fdocuments.in_presentation-on-substation-220-kv.pptxfdocuments.in_presentation-on-substation-220-kv.pptx
fdocuments.in_presentation-on-substation-220-kv.pptx
 
Wapda Engineering Acadmy Report
Wapda Engineering Acadmy ReportWapda Engineering Acadmy Report
Wapda Engineering Acadmy Report
 
Original Transistor NPN MJE13003 KSE13003 E13003 13003 1.5A 400V TO-126 New
Original Transistor NPN MJE13003 KSE13003 E13003 13003 1.5A 400V TO-126 NewOriginal Transistor NPN MJE13003 KSE13003 E13003 13003 1.5A 400V TO-126 New
Original Transistor NPN MJE13003 KSE13003 E13003 13003 1.5A 400V TO-126 New
 
Report on minor project
Report on minor projectReport on minor project
Report on minor project
 
Switch yard & Protection
Switch yard & ProtectionSwitch yard & Protection
Switch yard & Protection
 
400 kv nelmangala
400 kv nelmangala400 kv nelmangala
400 kv nelmangala
 
Power Transformer Differential protection
Power Transformer Differential protectionPower Transformer Differential protection
Power Transformer Differential protection
 
Differential protection
Differential protectionDifferential protection
Differential protection
 
Indusrtrial training ppt (1).pptx
Indusrtrial training ppt (1).pptxIndusrtrial training ppt (1).pptx
Indusrtrial training ppt (1).pptx
 
Installation testing and_commissioning_o (1)
Installation testing and_commissioning_o (1)Installation testing and_commissioning_o (1)
Installation testing and_commissioning_o (1)
 

Recently uploaded

CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
karthi keyan
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
gerogepatton
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
seandesed
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
ViniHema
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
Jayaprasanna4
 
Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdf
Kamal Acharya
 
Vaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdfVaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdf
Kamal Acharya
 
Forklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella PartsForklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella Parts
Intella Parts
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
Kamal Acharya
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation & Control
 
Halogenation process of chemical process industries
Halogenation process of chemical process industriesHalogenation process of chemical process industries
Halogenation process of chemical process industries
MuhammadTufail242431
 
LIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.pptLIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.ppt
ssuser9bd3ba
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
Robbie Edward Sayers
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
bakpo1
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
Pratik Pawar
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
FluxPrime1
 
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdfCOLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
Kamal Acharya
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
MdTanvirMahtab2
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
fxintegritypublishin
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
Kamal Acharya
 

Recently uploaded (20)

CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
 
Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdf
 
Vaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdfVaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdf
 
Forklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella PartsForklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella Parts
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
 
Halogenation process of chemical process industries
Halogenation process of chemical process industriesHalogenation process of chemical process industries
Halogenation process of chemical process industries
 
LIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.pptLIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.ppt
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
 
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdfCOLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
 

industrial training on 132 kv substation

  • 1. A GOVERNMENT OF WEST BENGAL ENTERPRISE A PROJECT ON LILUAH 132/33/25 KV SUBSTATION PRESENTED BY:- PRABHAT KUMAR (EE/11/012) ARIJIT DAS (EE/11/015) DIPTESH KOLEY (EE/11/033)
  • 2. -:ACKNOWLEDGEMENT:- We had a great pleasure in expressing our sincere gratitude to the TPO of our college and Mr. D.Bose, GM(HR & A),W.B.S.E.T.C.L for allowing summer training at Liluah 132/33/25 KV substation. We are greatly thankful to Mr. Rakesh Kundu, assistant engineer of Liluah transmission(O & M) substation for his immense help and suitable guidance during training period. We are also thankful to all other staffs of substation for their day to day help and assistance.
  • 3. SINGLE LINE DIAGRAM OF LILUAH 132/33/25 KV
  • 4. ELECTRICAL BUSBAR ELECTRICAL BUSBAR  It is the collector of electrical energy at one location at constant voltage  Types:- 1. Rigid type: - made up of aluminium alloy tubes of 50 to 250 mm diameter and supported on post insulator with clamps and connector. 2. Flexible type:- made up of A.C.S.R. conductor and supported at both ends by strain insulators clamps and conductors.  Acts as common point when a number of generator or feeder operating at same voltage is to be connected together. TYPES OF ARRANGEMENT 1. Single busbar system 2. Duplicate busbar system 3. Triple busbar system
  • 5. PROTECTIVE SCHEME IN POWER SYSTEM  The capital investment involved in a power system for the generation, transmission & distribution of electrical power is so great that proper precaution must be taken to ensure that the equipment not only operate as nearly as possible to peak efficient but also that it is protected from accident .  There are two main components of protection scheme: 1. Protective relay. 2. Circuit breakers. 1. Protective relay:- A relay is an automatic device which senses an abnormal condition in an electrical circuit and closes its contacts. There are two operating principle of relay: I. Electromagnetic induction. II. Electromagnetic attraction.
  • 6. Relays used for line protection : (a) Earth fault relay (b) over current relay (c) distant protection relay (d)Zone protection relay Relays used for transformer protection: (a)Earth fault relay. b) Over current relay. (c) buchholz relay (d)differential relay (e)back up earth fault relay (f)restricted earth fault relay (g)high temp relay (g)high temp relay (h)supervision relay. 2.CIRCUIT BREAKER- • Isolate the faulty part of the power system in case of abnormal condition. •A protective relay detects the abnormal condition & sends a tripping signal to circuit breaker. After receiving that relay trips the circuit and circuit breaker isolates the faulty part •In normal condition, the two contacts(fixed and moving) remain in closed position CLASSIFICATION- 1. Oil circuit breaker 2. Air blast CBs 3. Sulphur hexafluoride CBs 4. Vacuum CBs
  • 7. PROTECTION AGAINST LIGHTNING The most commonly used devices for protection against lightning surges are: 1. Earthing screen. 2. Overhead ground wires. 3. Lightning arrester or surge diverters.
  • 8. ISOLATOR  An Isolator is a disconnecting switch being operated under the condition of no load negligible current.  Used for disconnecting the circuit breaker from the circuit and to isolate the electrical circuit at the time of maintenance work and repair.  Interlocking arrangement are generally provided in the isolators. TYPES:- 1. Vertical break type single, double and triple pole insulator 2. Horizontal two rotating post, centre break insulator 3. Horizontal break ,centre rotating double break insulator 4. Extra high voltage column insulator
  • 9. CAPACITOR BANK These capacitors have an important role to investigate the behavior of the breaker towards the restricting voltage. 1. Controls and improves the voltages. 2. Removes the reactive components of VARS component of the power which is not desirable. 3. Improves power factor. Capacitor s
  • 10. POWERLINE CARRIER COMMUNICATION (PLCC)  Protection signaling, speech and data transmission for system operation and control, management information system etc. are predominantly met by PLCC .  It is the most economical and reliable method of communication because of higher mechanical strength and insulation of high voltage power-lines which contribute to the increased reliability of communication and lower attenuation over the longer distances involved. PLCC Equipments-a) Wave trap b) Coupling capacitor c) Line Matching Unit(LMU) d) Protective equipments.
  • 11. BATTERY  Provide unit charge to the entire system & behaves as back-up charging system  In Liluah 132 KV substation these units provide control voltage of 220 VOLT DC back-up of entire system.  Makers- Amra Raja Make  Charging & discharging is needed to keep it healthy. Battery Charger: SL. No. : 4/2008/2 AC Input: 415± 10% Ph: 50 Hz DC Output to charge: 250 V AH:110 A Cells at quick/boost: 2/2.7 A.P.L.: 60 A Trickle/float: 2.15/2.3 V.P.C.: 1602 /480 M
  • 12. EARTH TRANSFORMER An Earth Transformer is connected in those areas where earth point is not available like a system connected to delta side of electrical power transformer, an artificial neutral point is created using earth transformer.
  • 13. Sl.no Specifications Earthing Transformer 1 Earthing Transformer 2 1. Makers name GEC GEC 2. Std IS3151-1982 IS2026-1977 3. KVA Rating 100 100 4. Volts at no load HV:33KV,LV:415V HV:33KV,LV:415V 5. Amperes rating HV:1.75A,LV:139A HV:1.75A,LV:139.3A 6. Phases 3 3 7. Types of Cooling ON AN ON AN 8. Frequency 50 Hz 50 Hz 9. Vector group ZNyn-11 ZNyn-11 10. Impedance volt 4.5077% 3.796% 11. Earth fault current 550 A for 30 sec 287 amp for 30 sec 12. Year of mfg. 1990 1986
  • 14. TRACTION TRANSFORMER(132KV/25KV)  It is used to supply the Indian Railways. The Railways use 25 KV Single phase line, so the Traction Transformer takes 2 phase 132 V Input supply and gives 2 phase 25 KV Output out of which one phase is grounded and made neutral and other phase is used by the Indian Railways. Serial no. Specifications Traction Transformer 1 & Traction Transformer2 1. Maker’s Name Crompton Greaves Ltd. 2. MVA Rating 12.5/18.75 3. MVA (As per I.S) 13.5/20 4. KV Rating (at no load) H.V=132 KV;L.V=15KV 5. Line Current(Amps) H.V=102/151.5amp;L.V=500/750amp 6. Output Phase Single 7. Frequency(Hz) 50Hz
  • 15. 8. Type of cooling ON AN/ON AF 9. Total Oil(ltrs/kg) 15300/12900 10. Total Mass(Kg) 47600 11. Untanking Mass Core & winding=18900 kg Bell tank=4200 kg 12. Heaviest Package With oil=33500 kg Without oil=24800 kg 13. Hot Spot temperature Ref<1150C 14. Ambient temperature 45OC 15. Insulation level (H.V./L.V.) LI650AC275/LI250AC95 16. Guaranteed temperature rise of oil(0C) 50 17. Guaranteed temperature rise of winding(0C): 50 18. Maker’s w.o no.: T8174 19. Maker’s sl no.: 24749 20. Customer reference No.: LOI REF PLN/TRACTION/TRANS/491 21. Year of mfg: 06-04-1987
  • 16. STATION SERVICE TRANSFORMER Station Service Transformer converts HV 33 KV TO LV 400KV which is used by the Substation for its own needs like to run the air conditioner, fans and to run the control panel and relay panel. Specifications-  Maker’s Name: - Transmake Electrical Pvt. Ltd.  STD:- IS2026 & 1180  KVA Rating:-100  Volts at no load:-HV-33KV & LV-400V  Current at no load(A):-HV-1.75 & LV-144.34  Phase:-3  Diagram:- TW/100/33  Sl. No.-94311  Type of cooling:- ON AN
  • 17. Frequency:- 50 Hz Impedance:- 4.1% Vector Group:- DYn11 Core & Winding weight:- 430 Kg Weight of oil:- 260 Kg Total weight:- 930 Kg Oil quantity:- 300 Ltrs Year Of Mfg:- 12/2002 Guaranteed Max temp. rise in oil:450C
  • 18. POWER TRANSFORMER-3 NAMEPLATE PARTICULARS:  Maker’s Name: - Bharat Heavy Electricals Ltd.  MVA Rating: - 30/40/50  Vector Symbol: - YnD1  Phase: - 3  Frequency: - 50 Hz  Type of cooling: - ON AN/ON AF/OF AF  Diagram Drg. no:-14561950473  Sl. No.:- 2013511  Year of mfg:- 2001  OLTC With oil, transport with oil heaviest package:- 50 Tonnes  Complete transformer including oil:- 97 Tonnes  Bil: HV:- 550 kvp & LV:-170 kvp  Impedance volts(at 750C):- 12.5 ± 13%  KV(No load):- HV-132 KV & LV-33 KV  Amps:- HV-218.95 & LV-875.81  At taps: normal tap(9b)
  • 19. POWER TRANSFORMER-4 SPECIFICATION:  Maker’s Name:- ABB  Ref. Std: IS2026  Sl. No.: AAA-003  Year of mfg:- 2008  Frequency:- 50 Hz  Type of cooling:-ON AN/ON AF/OF AF  % Impedance Voltage HV/LV:  Nominal Power(ON AN/ON AF/OF AF):-30/40/50 MVA  Nominal voltage:- HV-132 KV & LV-33 KV  OLTC Type:- EASUNMR  Rated current:- 350 A  Insulation Ground:- 725 KV  Step Voltage:- 953 V  Control Voltage:- 110 V  Variation:- +10% to -10% of HV  No. of steps:- 16  Temp. rise of oil/winding:- 500C/550C  Vector Group:- YDn1  Short circuit current(max duration 3 sec):- HV=1.749 KA & LV=6.99 KA
  • 20. •% Impedance Voltage HV/LV: Tap No. Guaranteed at N tap Actual (after test) Tap 1 12.5% (± 10%) 12.14% Tap 9b 11.64% Tap 17 11.33% •Insulation Level:- Testing Voltage HV HVN LV Um(Highest sys V) 145 36 AC(Power frequency) 230 38 70 Lightning Impulse 550 95 170 •Core & Winding Mass:- 45670 Kg •Tank & Fitting Mass:- 12520 Kg •Oil Mass:- 17830 kg •Total Transformer mass:- 76020 Kg •Transformer mass(oil filled):- 68420 kg •Total oil quantity:- 20030 litres
  • 21. Cooling Fans MOG POWER TRANSFORMER 4 POWER TRANSFORMER 3 HV Bushings Conservator Radiator Bank Buchholz relay Oil pump Earthing Transformer Oil level indicator