The course focuses on the practical applications of various techniques and methodologies in well completion --- from the selection of completion type, perforating strategies, fluid selection, and installation of production heads.
Scale-up and scale-down of chemical processesSeppo Karrila
Explains the path from for example synthesizing a useful appearing material in the lab to actual production of the same. Also explains what pilot machines are, how they are used, and why sometimes down-scaling of a unit operation is done to experiment in bench-scale.
Cellular layout helps us in increasing the productivity with minimizing the cost.
It is the latest technique to minimize the cost and increase the profits without affecting the organization. The concept of LEAN management.
It is the part of the pharmaceutical industry where a lab scale formula is transformed into a viable product by development of liable and practical procedure of manufacture.
Scale-up and scale-down of chemical processesSeppo Karrila
Explains the path from for example synthesizing a useful appearing material in the lab to actual production of the same. Also explains what pilot machines are, how they are used, and why sometimes down-scaling of a unit operation is done to experiment in bench-scale.
Cellular layout helps us in increasing the productivity with minimizing the cost.
It is the latest technique to minimize the cost and increase the profits without affecting the organization. The concept of LEAN management.
It is the part of the pharmaceutical industry where a lab scale formula is transformed into a viable product by development of liable and practical procedure of manufacture.
Koch Modular Process Systems shares our experience supporting companies successfully commercializing their novel technologies across the chemical processing industries including most recently the advanced plastics and rare earth metals recycling and biochemical markets.
Taking a new technology from concept to commercialization can be a daunting process for any company and especially formidable for emerging companies.
Whether you are an established company or a start-up, successfully navigating process development and scale-up challenges can directly impact your ability to achieve critical success factors such as: conceptualization, project funding, pilot testing, design development & optimization, and ultimately construction and start up. Success factors which can directly impact your ability to deliver a commercial-scale production unit on time and on budget while achieving time to market and meeting commitments to your stakeholders.
Chris Rentsch, Process Development Manager at Koch Modular, will walk through Koch Modular’s modularLAUNCH: Delivery Model. Furthermore, he will share real world examples and discuss critical success factors during each phase of process development and the pitfalls to be on the lookout for, which have the potential to sideline your project.
This presentation includes introduction of validation, types of validation,process validation of dosage forms[ solids(tablets),liquids(emulsions and suspensions),semisolids.
PROJECT MANAGEMENT PLAN OF WHITE PORTLAND CEMENT PLANT PROJECTSAJJAD KHUDHUR ABBAS
The Project management plan presented here will describe the project manager’s approach and the general responsibilities of the project team. In addition to the project management plan, several other documents will be developed and used to ensure compliance with project requirements as well regulations and industry specific standards. The specific plans will include processes, flow diagrams, responsibility matrices, organizational charts, and other pertinent information to guide the project staff.
Best Practices to Implement an Effective Change Control Program Company WideMimi V Syahputri
Understand the process/system.
Define how would you like to set your change control system based on process/system (one for all/grouping).
Categorize it (risk based approach).
Establish robust procedure with guidance.
Establish user friendly and informative form.
Establish robust data base.
Set up an effective training program.
Establish monitoring for continuous improvement.
Koch Modular Process Systems shares our experience supporting companies successfully commercializing their novel technologies across the chemical processing industries including most recently the advanced plastics and rare earth metals recycling and biochemical markets.
Taking a new technology from concept to commercialization can be a daunting process for any company and especially formidable for emerging companies.
Whether you are an established company or a start-up, successfully navigating process development and scale-up challenges can directly impact your ability to achieve critical success factors such as: conceptualization, project funding, pilot testing, design development & optimization, and ultimately construction and start up. Success factors which can directly impact your ability to deliver a commercial-scale production unit on time and on budget while achieving time to market and meeting commitments to your stakeholders.
Chris Rentsch, Process Development Manager at Koch Modular, will walk through Koch Modular’s modularLAUNCH: Delivery Model. Furthermore, he will share real world examples and discuss critical success factors during each phase of process development and the pitfalls to be on the lookout for, which have the potential to sideline your project.
This presentation includes introduction of validation, types of validation,process validation of dosage forms[ solids(tablets),liquids(emulsions and suspensions),semisolids.
PROJECT MANAGEMENT PLAN OF WHITE PORTLAND CEMENT PLANT PROJECTSAJJAD KHUDHUR ABBAS
The Project management plan presented here will describe the project manager’s approach and the general responsibilities of the project team. In addition to the project management plan, several other documents will be developed and used to ensure compliance with project requirements as well regulations and industry specific standards. The specific plans will include processes, flow diagrams, responsibility matrices, organizational charts, and other pertinent information to guide the project staff.
Best Practices to Implement an Effective Change Control Program Company WideMimi V Syahputri
Understand the process/system.
Define how would you like to set your change control system based on process/system (one for all/grouping).
Categorize it (risk based approach).
Establish robust procedure with guidance.
Establish user friendly and informative form.
Establish robust data base.
Set up an effective training program.
Establish monitoring for continuous improvement.
One factor that has bolstered China’s influence in the global energy market is its emergence as a major player in manufacturing and exporting low-cost, high quality drilling equipment.
Read this write up now to learn a few simple maintenance tips to ensure that your drilling rig is operating at its optimum efficiency. Visit http://prdrigs.com/ for more information.
The CEEM AHWUs (HWO), 460K, 235K, are designed to be rigged up as a stand-alone unit. It is to be used for the work over the existing wells Offshore and Land based. The rig is designed to complete all work-over functions completed by a conventional rig with the additional capability of working with pressure in snubbing and under-balanced situations.
Visit our website: www.ceemfze.ae for more information
International Oil & Gas Executive Development TrainingEaswaran Kanason
This practical, intensive five day course aims to provide participants with a solid grounding in the principles and practices of business management that are essential in oil & gas organizations, when moving from an operational to a more strategic role. Where operational management is about implementing plans with known parameters, strategic management is about exercising judgement in complex environments where there is no ‘one right way’. This course provides the tools and processes that ensure that these judgements are based on sound thinking. Specifically designed for the oil & gas sector, the program is directed and facilitated by two leading international consultants who have direct and extensive working experience as executives in the industry, assisted by guest speakers who will discuss additional key issues affecting the industry in Asia and beyond. This program’s uniqueness comes from it NOT being just another overview of the industry but focused on the essential business management skills for the sector.
This 5 day training course provides participants with knowledge of critical well completion processes, completion equipment and operations associated with deepwater completions and available intelligent well and completion architecture used for both platform and subsea completions.
PetroSync - Sand Control Completion PracticesPetroSync
One of the objectives of well completion is to maximize productivity with reliable equipment. These objectives are difficult to attain in unconsolidated sand formations due to sand production as a result of stress concentration
PetroSync - Drilling Engineering for Non-Drilling EngineerPetroSync
During the first day of this course, the entire drilling process will be discussed. The language of drillers - understanding their terminology. Understanding the abbreviations and acronyms associated with drilling.
This intensive five-day course is designed to provide participants with a thorough knowledge of downhole sand exclusion equipment and the operational procedures required for converting a drilled well into an efficient and safe producer. It follows a practical approach for the various types of sand control equipment, specific applications, the preparation and the final execution and installation of the equipment.
Asme section viii division 1 and 2 pressure vessel series ( CONFIRM RUN )Putri Kolopaking
ASME Section VIII Division 1 & 2 – Pressure Vessel Series
11th - 15th September 2017, Bandung - Indonesia
20th – 24th November 2017, Kuala Lumpur, Malaysia
PetroSync together with Mr. Mandar Mulay, organizing a 5 days training on ASME Section VIII Division 1 & 2 – Pressure Vessel Series. This Five-day program offers detailed insight and thorough understanding of the most common ASME codes, pertaining to design/ engineering and testing of the pressure vessels namely Section VIII Div. 1 and Section VIII Div. 2. This course emphasizes understanding of ‘stated’ and ‘implied’ requirements (i.e. content and intent) of the codes. The participants would be explained in detail the mechanics of adopting and applying the code rules and design formulas for different Design conditions and Services.
Objectives:
• Familiarize participants with the concepts and technical terms of the codes
• Design for external pressure and Jacketed vessels
• Discover the fabrication requirements, assembly and welding requirements.
• How to carry out pressure testing, certification and stamping of Pressure Vessels.
• Understand salient features and differences between Div 1 and Div 2
CLICK HERE TO SEE THE BROCHURE
Who should join:
The course is designed for, but not limited to, mechanical, maintenance, and inspection / QAQC professionals who are involved in pressure vessel equipment:
• Design Engineers / Managers
• Mechanical Engineers / Managers
• Maintenance Engineers / Managers
• QAQC Engineers / Managers
• Inspection Engineers / Managers
• Reliability Engineers / Managers
Our Expert Speaker:
Mandar Mulay has about 20 years hands on experience in design and integrity assessment of Piping Systems, Reactors & Storage Tanks, Pressure Vessels, Power Boiler, and Heat Exchanger. He is well conversant with the major industry codes & standards such as ASME Sec. I, ASME B 31.1, B31.3 , B31.4 and B31.8, ASME Sec VIII, BS-5500, TEMA, API -650, IS 803, API 579, ASME PCC-2 etc. He has also conducted several Training Courses ( ASME Sec. I, ASME Sec. VIII, ASME B 31.3 Piping Codes , API 579 FFS code, ASME PCC-2 Repair practices, and Heat Exchanger Design Operations & Maintenance ) in Saudi Arabia, Qatar, Bahrain and UAE for engineers from companies like Saudi Aramco, SABIC group of Companies, Qatar Petroleum, ADNOC, BAPCO, DEWA, Gulf Petrochemicals etc. He has already conducted many times the training courses in API 579, where the participants rated him “Excellent” for these courses.
PetroSync with Mr. Mandar Mulay organizing a 5 days training on ASME VIII Division 1 & 2 - Pressure Vessel Series. ASME VIII Div. 1 is the most commonly adopted code which is simple and used friendly, where as, ASME VIII Div 2 is an alternative code which provides a better engineered vessel with detailed stresses calculations and more rigorous testing, and allows for savings in material costs (thinner parts may be used).
This intensive 2 x 2 week program has been put together to cover Advanced Well Engineering topics. The program intends to uplift the knowledge and skills for engineers, who are or will be directly involved in well and completion design. It will also benefit staff that are or will be working as a member of a day-to-day operations team.
The courses present advanced concepts of drilling and completion operations, plus post-completion enhancement (workovers). Participants will learn to visualize and troubleshoot what is happening downhole, discover what can be accomplished and optimized, and learn how drilling and completions can alter reservoir performance.
Fitness-For-Service (FFS) assessments are quantitative engineering evaluations that are performed to demonstrate the structural integrity of an in-service component that may contain a flaw or damage.
PetroSync - Water Injection for Production SystemPetroSync
This course is designed to ensure effective understanding of thewater injection system as a reservoir primary recovery methodology in oil fields to maintain the reservoir pressure with special attention to the system components from the supply source to injection point in the reservoir, which permit the operator’s best insurance to achieve well safe and effective operations. The course is composed as modules,whichincludeexercises, group discussions and quizzes forfull comprehension of the course topics relevant to all functions of the water injection system and its operations.
PetroSync Wellsite and Operations GeologyPetroSync
Wellsite Geologists are mainly involved in evaluating offset data before beginning any drilling operations. The focus of this course is aimed at improving the conduct of data acquisition of the subsurface region. Because the subsurface data acquisition entails big capital expenditure, it is important to obtain quality information for future use in field development designs and drilling operations.
This 5 day training course reviews the fundamentals of Casing Design and builds on them to address well design challenges associated with deep, extended reach, HPHT and
deepwater wells.
Participants will review the theories of both uniaxial and triaxial pipe strength as per API Bulletin 5C3 and ISO/TR 10400, the implications of manufacturing standards and tolerances as per API Specification 5CT and the impact of downhole environmental conditions.
Brochure on Two Day Workshop on Plant Commissioning and Seamless Start Up By ...HIMADRI BANERJI
Overview of the wokshop:
To gain practical insights into:
Redefining the responsibilities of various departments to ensure a flawless start-up.
Ensuring that safety measures are put in place to
ensure zero LTIs during commissioning and startup.
Benchmarking your commissioning practices
against previous commissioning and start-up experiences.
Acquiring risk management techniques for better
prediction of what can go wrong during the commissioning and start-up process and identify
and plan effective mitigation measures.
Accelerating the ROI of your plant through proper
planning and management of resources during the
commissioning process.
Capturing the essence of commissioning and startup
in Greenfield and Brownfield Scenarios.
Conditionally accredited by IADC, this intensive four-day course is designed to provide participants with a thorough
knowledge of well integrity management and risk assessment in producing assets.
Based on the regulatory requirements and using real examples and exercises from around the world, this represents best practice integrity management within the
oil and gas industry.
The Subsea Production Engineering Course provides an overview of all of the functionalities and key interfaces of subsea equipment. The course will refer to relevant industry engineering standards for subsea equipment, and critical operational requirements. The sessions will cover challenges associated with equipment design and installability.
Rigless Intervention: Slickline, Coiled Tubing, Hydraulic, Workover & New Tec...petroEDGE
Course Description
This three-day course is designed to provide participants with a thorough knowledge and understanding of the surface equipment, downhole tools, applications and operational contingencies for the most Rigless Interventions techniques used in Oil & Gas wells
worldwide.
This 3 day course will use real examples and exercises from around the world. Participants will be provided with first-hand knowledge of what can be achieved without a rig on site. Participants will further be provided with the advantages that a Rigless Intervention can offer in terms of cost effectiveness, minimal deferment, real time data and the ability to perform these operations on a live well.
Course Objective
To enable participants to understand the basic types of Rigless Interventions, the specific operations that can be performed and the risks and rewards associated with these opportunities.
Key areas focused-on during this 3 day training course:
Understand the common applications of Slickline, non-conductive braided cable and e-line (logging cable).
Learn the configuration of a basic wireline toolstring and how it is manipulated.
Understand the common applications of coil tubing and gain an understanding of basic coil tubing BHAs
Acquire an appreciation for the types of operations that can be carried out with coil tubing.
Understand the common applications of HWO and explore the types of operations that can be carried out with HWO.
Exploit new technologies in overcoming well integrity challenges
This drilling string design program is a unique course discussing all factors that influence the drill string during operations. The participants will learn about the drill pipe grade, the limitation for torque and tension, and the drill collars tensional stress. Delegates will be able to optimize the drilling operations by performing a proper drill string design and eliminating the corresponding problems.
Participants will be acquainted with the problems of string vibrations and the ways to solve them. Delegates will perform a string design for directional drilling and choose the best BHA to address the problems. This course will provide several examples to the participants and train them to estimate the torque and drag. This program will be discussing all the challenges of drill string design, and the best practices applied by the oil industry in addressing these problems.
This course will concentrate on Offshore Marine Operations and will cover Operational and Managerial requirements for Loadout; Barge Transportation; Towing of Offshore Facilities; Lifting; Steel Jackets; Gravity-Based Structures; Lift-Off, Transportation and Inshore Mating of Topsides; Offshore Pipelines; Marine Operations Overview; Special Topics, and other essential topics related to Export/Import Oil & Gas.
Well intervention extends the life of producing wells by improving performance access to stranded or additional hydrocarbon reserves. Being challenged by the current oil price crisis, it is crucial to polish your intervention skills to avoid further asset loss and improve sustainability.
Similar to PetroSync - Well Completion and Workover (20)
PetroSync - API Specification Q1 9th Edition Quality Management System Traini...PetroSync
This four-days course will provide an informative look at the requirements, interpretations, and practical applications of the quality management principles as based on the 9th Edition of API Specification Q1, Specification for Quality Management System Requirements for Manufacturing Organizations for the Petroleum and Natural Gas Industry.
PetroSync - API 580 & API 581 Risk Based Inspection & Base Resource DocumentPetroSync
The course is based on API RP 580 Risk-Based Inspection and API Publication 581, Base Resource Document. The course first explains feasible means and alternatives for achieving a successful RBI program without undue complications. This course deals with RBI framework and methodology in a simple straight forward manner to establish and implement a risk-based inspection program best suited for the company objectives.
PetroSync - Surface Geochemical Exploration for Oil and GasPetroSync
The great majority of oil and gas pools and mature source rocks have recognizable surface geochemical expression. The O&G industry devotes significant time and resources in finding and defining traps, but little or none in establishing the likely presence of hydrocarbon in those traps, especially for older onshore basins.
PetroSync - Geological Interpretation of Well LogsPetroSync
The richness and immediacy of wireline log data have advanced immensely in recent year — more data, more curves, more acronyms, and are available sooner. There is vital qualitative and quantitative data in the logs.
PetroSync - Chemically Enhanced Water Alternating GasPetroSync
It is know that two-third of the original oil in place are still in the ground. Petroleum companies are looking for techniques to improve sweep efficiency and increase recovery factors. As a result, Enhanced Oil Recovery (EOR) processes need to be carried out. Successful WAG floods can yield 5-20% additional oil recovery over waterflood because of improved microscopic displacement efficiency by the solvent coupled with improving areal and vertical sweep efficiency.
PetroSync - Budgeting and Forecasting in Oil & Gas IndustryPetroSync
Our Budgeting & Forecasting in Oil & Gas Industry shares insight of budgeting and forecasting process, enables fit-for-purpose budgets and business plans to be developed that robustly model complex, but realistic situations in a flexible and auditable manner.
PetroSync - Practical Accounting in Joint Ventures & Production Sharing Contr...PetroSync
Joint ventures allow companies to preserve autonomy, share investment risk and enhance competitiveness. The financial statements of many oil & gas companies can be different in future as a
result of the changes to the accounting for joint ventures, which raises the question of how such changes should be communicated to the investors and other stakeholders.
PetroSync - Exploration & Production AccountingPetroSync
This course provides an overview through the fundamentals of accounting in the O&G industry with focus on different methods for the expenditure capitalization, depreciation & depletion together with fundamentals for accounting for international operations represented by JVs and PSCs.
Failure investigations are tough rigorous challenges form the best in engineering. This course will teach delegates the range of thinking and subjects, which need to be considered in driving to find the real root cause of a failure.
PetroSync - Acoustic and Flow Induced VibrationPetroSync
Failures of piping systems in the oil, gas and petrochemical industries can lead to damage of assets, personal injury and loss of life. Piping failure can be caused by excessive vibration, in the form of high levels of acoustic energy (AIV), or by flow turbulence (FIV) created by shear forces within the piping system.
The course introduces the participants to modern carbonate environments and explain how the constituents of a carbonate sediment become lithified and changed after deposition to provide potential reservoir rocks.
This course examines the difficulties, challenges and problems facing today’s deepwater drilling programme designers and personnel where wells are being drilled in increasingly difficult downhole and environmental conditions with ever increasing cost and legislation further contributing to design and operational pressures.
This training course is a comprehensive course to the technology of shell and tube heat exchangers as these robust type of heat exchangers are the most commonly used in the process and refinery industries, where they provide flexibility and are easy to maintain.
PetroSync - Applied Petrophysics for Low Resistivity Thin-Bedded FormationsPetroSync
Thin bedded reservoirs are increasingly common exploration targets. However, evaluating such formations is difficult due to challenging and sometimes misleading data.
This is an in-depth course that is designed to provide the participants with a solid understanding of reservoir engineering and associated modern theories in order to manage and maximize hydrocarbon recovery. Hands-on examples and exercises are used throughout the course to help participants with understanding key performance concepts. Participants are encouraged to bring their own laptop computer to class.
PetroSync - Fractured Reservoir Modeling with Application to Fractured BasementPetroSync
This course provides a unique opportunity to learn all the aspects related to the understanding and modeling of fractured reservoirs. Participants will gain knowledge of how fractured reservoirs differ from conventional reservoirs, and how to approach their fractured reservoir projects in a systematic manner.
PetroSync - Financial Assets Valuation for Oil & GasPetroSync
The Financial Assets Valuation For Oil & Gas course is structured specially for professionals in the oil & gas industry to equip participants with the financial understanding when valuing oil & gas assets.
PetroSync - Cost Engineering Risk Management-Earned Value ManagementPetroSync
Will cover the latest techniques and practical methodologies of project cost engineering and risk management to successfully manage project cost and risk, in order to maximize business ROI in the long run.
PetroSync - Mastering Production Sharing ContractsPetroSync
course is specifically designed for professionals involved nationally and internationally in the oil and gas industry, it offers a unique opportunity to rapidly increase your understanding of the legal issues involved in production sharing contracts and to improve your negotiation techniques and skills in drafting a variety of related contracts.
PetroSync - LNG & Gas Sales Contracts-Negotiation and Pricing ReviewPetroSync
The course will start by going deep into the two main contracts, the SPA(GSPA) and the Capacity Agreement. By looking at their neuralgic clauses we will be able to understand the risk reward balance in contracts and how everything is dependent on everything.
Courier management system project report.pdfKamal Acharya
It is now-a-days very important for the people to send or receive articles like imported furniture, electronic items, gifts, business goods and the like. People depend vastly on different transport systems which mostly use the manual way of receiving and delivering the articles. There is no way to track the articles till they are received and there is no way to let the customer know what happened in transit, once he booked some articles. In such a situation, we need a system which completely computerizes the cargo activities including time to time tracking of the articles sent. This need is fulfilled by Courier Management System software which is online software for the cargo management people that enables them to receive the goods from a source and send them to a required destination and track their status from time to time.
Final project report on grocery store management system..pdfKamal Acharya
In today’s fast-changing business environment, it’s extremely important to be able to respond to client needs in the most effective and timely manner. If your customers wish to see your business online and have instant access to your products or services.
Online Grocery Store is an e-commerce website, which retails various grocery products. This project allows viewing various products available enables registered users to purchase desired products instantly using Paytm, UPI payment processor (Instant Pay) and also can place order by using Cash on Delivery (Pay Later) option. This project provides an easy access to Administrators and Managers to view orders placed using Pay Later and Instant Pay options.
In order to develop an e-commerce website, a number of Technologies must be studied and understood. These include multi-tiered architecture, server and client-side scripting techniques, implementation technologies, programming language (such as PHP, HTML, CSS, JavaScript) and MySQL relational databases. This is a project with the objective to develop a basic website where a consumer is provided with a shopping cart website and also to know about the technologies used to develop such a website.
This document will discuss each of the underlying technologies to create and implement an e- commerce website.
About
Indigenized remote control interface card suitable for MAFI system CCR equipment. Compatible for IDM8000 CCR. Backplane mounted serial and TCP/Ethernet communication module for CCR remote access. IDM 8000 CCR remote control on serial and TCP protocol.
• Remote control: Parallel or serial interface.
• Compatible with MAFI CCR system.
• Compatible with IDM8000 CCR.
• Compatible with Backplane mount serial communication.
• Compatible with commercial and Defence aviation CCR system.
• Remote control system for accessing CCR and allied system over serial or TCP.
• Indigenized local Support/presence in India.
• Easy in configuration using DIP switches.
Technical Specifications
Indigenized remote control interface card suitable for MAFI system CCR equipment. Compatible for IDM8000 CCR. Backplane mounted serial and TCP/Ethernet communication module for CCR remote access. IDM 8000 CCR remote control on serial and TCP protocol.
Key Features
Indigenized remote control interface card suitable for MAFI system CCR equipment. Compatible for IDM8000 CCR. Backplane mounted serial and TCP/Ethernet communication module for CCR remote access. IDM 8000 CCR remote control on serial and TCP protocol.
• Remote control: Parallel or serial interface
• Compatible with MAFI CCR system
• Copatiable with IDM8000 CCR
• Compatible with Backplane mount serial communication.
• Compatible with commercial and Defence aviation CCR system.
• Remote control system for accessing CCR and allied system over serial or TCP.
• Indigenized local Support/presence in India.
Application
• Remote control: Parallel or serial interface.
• Compatible with MAFI CCR system.
• Compatible with IDM8000 CCR.
• Compatible with Backplane mount serial communication.
• Compatible with commercial and Defence aviation CCR system.
• Remote control system for accessing CCR and allied system over serial or TCP.
• Indigenized local Support/presence in India.
• Easy in configuration using DIP switches.
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSEDuvanRamosGarzon1
AIRCRAFT GENERAL
The Single Aisle is the most advanced family aircraft in service today, with fly-by-wire flight controls.
The A318, A319, A320 and A321 are twin-engine subsonic medium range aircraft.
The family offers a choice of engines
Welcome to WIPAC Monthly the magazine brought to you by the LinkedIn Group Water Industry Process Automation & Control.
In this month's edition, along with this month's industry news to celebrate the 13 years since the group was created we have articles including
A case study of the used of Advanced Process Control at the Wastewater Treatment works at Lleida in Spain
A look back on an article on smart wastewater networks in order to see how the industry has measured up in the interim around the adoption of Digital Transformation in the Water Industry.
Saudi Arabia stands as a titan in the global energy landscape, renowned for its abundant oil and gas resources. It's the largest exporter of petroleum and holds some of the world's most significant reserves. Let's delve into the top 10 oil and gas projects shaping Saudi Arabia's energy future in 2024.
Quality defects in TMT Bars, Possible causes and Potential Solutions.PrashantGoswami42
Maintaining high-quality standards in the production of TMT bars is crucial for ensuring structural integrity in construction. Addressing common defects through careful monitoring, standardized processes, and advanced technology can significantly improve the quality of TMT bars. Continuous training and adherence to quality control measures will also play a pivotal role in minimizing these defects.
Student information management system project report ii.pdfKamal Acharya
Our project explains about the student management. This project mainly explains the various actions related to student details. This project shows some ease in adding, editing and deleting the student details. It also provides a less time consuming process for viewing, adding, editing and deleting the marks of the students.
Automobile Management System Project Report.pdfKamal Acharya
The proposed project is developed to manage the automobile in the automobile dealer company. The main module in this project is login, automobile management, customer management, sales, complaints and reports. The first module is the login. The automobile showroom owner should login to the project for usage. The username and password are verified and if it is correct, next form opens. If the username and password are not correct, it shows the error message.
When a customer search for a automobile, if the automobile is available, they will be taken to a page that shows the details of the automobile including automobile name, automobile ID, quantity, price etc. “Automobile Management System” is useful for maintaining automobiles, customers effectively and hence helps for establishing good relation between customer and automobile organization. It contains various customized modules for effectively maintaining automobiles and stock information accurately and safely.
When the automobile is sold to the customer, stock will be reduced automatically. When a new purchase is made, stock will be increased automatically. While selecting automobiles for sale, the proposed software will automatically check for total number of available stock of that particular item, if the total stock of that particular item is less than 5, software will notify the user to purchase the particular item.
Also when the user tries to sale items which are not in stock, the system will prompt the user that the stock is not enough. Customers of this system can search for a automobile; can purchase a automobile easily by selecting fast. On the other hand the stock of automobiles can be maintained perfectly by the automobile shop manager overcoming the drawbacks of existing system.
1. Supported By
PETROSYNC’S WELL ENGINERRING SERIES
Learn the Modern Techniques in Completion Design and Installation
17 May 2016—20 May 2016
Bandung, Indonesia
WELLCOMPLETION
ANDWORKOVER
2. 2
Our Well Completion and Workover course is develop to provide detailed in-depth technical
and practical level knowledge of well completion and workover operation in order to improve
the productivity of the well.
WELL | WELL COMPLETION & WORKOVER
How Does This Course Benefits You?
Sand Control Solution
Expandable sand screen alternative to fracture-packing
sand control.
Able to Plan Effective Operation
Plan effective operation by gaining practical methods to design, plan and install safe and
efficient well completion and workover.
Improve the Well Productivity
Improve the productivity of the well by integrate the importance of completion process to
future production in order to maximize the success and minimize the failure
Improve Effectiveness and Efficiency Work Performance
Improve the effectiveness and efficiency of “frac packs” operation by learning the way how to
conduct the operation smoothly in a correct techniques.
Improve the Effectiveness of the Operation
Improve the effectiveness of sand control operation by learning the emerging techniques for
several critical situation.
Darcy Proves New Sand Control Technology with Second
Successful Installation
Hydraulic Screens enable more efficient completion of sand
plagued wells
Once a well has been drilled, the decision must be made: Will this well
become a producer or be plugged and abandoned as a dry hole? Should
the operator decide to move forward with developing the well,
completion operations must be undertaken.
general@petrosync.com | +65 6451 4500 | www.petrosync.com
Course Overview
Course Design Focuses on Practical Application
The course focuses on the practical applications of various techniques and methodologies in
well completion --- from the selection of completion type, perforating strategies, fluid
selection, and installation of production heads.
Includes Specific Completion Design Project and Case Studies
Both success/failure case histories of different situation of well completion installations in
different operating environment will be provided in order to maximize your learning benefits.
A Completion design project will be completed by you and present within the 4 days course.
You will also learn the well control and well workover techniques will also be covered to
complement the insurance of well longevity of the installation. This course provides a good
link to how the techniques in well completion would ensure better well performance and
production later in the life of the well.
3. 3
WELL | WELL COMPLETION & WORKOVER
PetroSync Distinguished Instructor
Who Needs This Program
Practical & Consulting
Over 25 years of engineering, operations, and management
experience in Completion, Workover & Well Services, and
Drilling
Leads major completion and workover projects with
companies such as Shell Canada, KNOC, KPO etc in North
America, Europe, Africa, Central Asia, & Far East Asia
Training
Provided intensive trainings in well completion and
workovers with different oil and gas companies. Some of
these training are “Well Completion & Intervention Training
(Level 1&2)” for KPO, “Sub-Sea Workover Operations
Training” for KNOC, and “Deep Water Sand Control” for Total
E&P International.
Awards
BG Chief Executive Innovation Award, London, UK - “Open
Hole Multistage Fracturing Completion with Swelling Packers
and Sliding Sleeves in Carbonate Reservoir” – (2012)
Michael Etuhoko
President & Founder of
Protekz Inc Canada
The course is designed for, but not limited to Completion Engineers, Workover Engineers,
Production Engineers, and those who are involved with well completions, workovers, well
interventions, and production.
Job Titles Include:
Completion Engineer
Workover Engineer
Well Services / Intervention Engineer
Production Engineer
Drilling Engineer
Well Site Engineer
PetroSync Inhouse Solutions
PetroSync can tailor our courses to meet your specific
needs at your preferred location and schedule. Contact us
for more information at +65 6415 4500 or email to
general @petrosync.com
PetroSync Quality Assurance
All PetroSync courses are developed with top quality to
address all your training needs and purposes. Our courses
are vetted strictly to ensure that we always deliver the best
courses with the best industry expert.
general@petrosync.com | +65 6451 4500 | www.petrosync.com
08:00—09:00 Registration (Day 1) 13:00—14:00 Lunch
09:00—11:00 Session I 14:00—15:30 Session III
11:00—11.15 Refreshment Session I 15:30—15:45 Refreshment Session II
11:15—13:00 Session II 15:45—17:00 Session Iv (Last Session)
Course Schedule
4. 4
WELL | WELL COMPLETION & WORKOVER
Course Agenda — 4 Days
general@petrosync.com | +65 6451 4500 | www.petrosync.com
DAY 1
Well Performance
Safety Alert
Introduction to Completion Design
Starter Quiz & Review
Introduction to Completion Design Project
Reservoir Completion: Inflow Performance
Reservoir Completion: Perforations
Reservoir Completion: Well Stimulation / Hydraulic
Fracturing
Reservoir Completion: Sand Control
Practical Exercise: Completion Design Project (work out
this in a group)
DAY 3
Modern Well Completion & Intro to Well Intervention
Completion Operation Base Preparation
Equipment Purchasing and Factory Acceptance
Service Contract
Equipment Preparation
Technical Program
Rig Preparation and Completion Installation Process
Operation Planning
Equipment Shipping
Equipment Reception
Pre-Job Meeting
Casing Cleaning Operation
Running in hole the completion equipment
Well Clean-Up
Reporting
After-Action Review
DAY 4
Well control & Well Workover
Well Control:
Well control Equipment
Blowout Preventer System Requirements
Choke Manifold
Circulating System
Kicks and its causes
Well Killing Operation
Forward circulation
Reverse circulation
Bull heading
Lubricate and Bleed
Class exercises on well control
Workover Operations:
Workover definition and description
Workover Types:
Safety Workover (SWO)
Long term suspension (LTS)
Plug and Abandonment (P&A)
Production enhancement (PE)
Workover Feasibility Studies
Group presentation /
General Review of the Well completion Design Project
Artificial Lift Methods
Tubing Stress Analysis
Purpose of Stress Analysis
Safety Factors and Design Factors
Load Cases
Completion Equipment and Connections
Completion Components (Features & Usage)
Completion Philosophy
Completion Components
Christmas Tree, Tubing Hangers, Tubing, Down Hole
Safety Valve, Packers, Tail Pipes, Expansion Devices,
Nipples, Mandrels, Gauges, Etc.
Practical Exercise: Completion design project (work out
this project in a group) (CONTINUE)
Emerging Techniques
Fiber Optics: Distributed Temperature System (DTS),
Pressure/ temperature (P/T), etc
Intervention less packers (Hydrostatic packers, swelling
packers, etc)
In-situ self-generating weak acid
Expandable tubulars
Expandable Sand Screens (ESS)
Sand Control in High angle and long interval: Alternate
path technology (SHUTS, CAPS, etc)
Formation Isolation Valves (FIV)
Intelligent & Smart Well Completion: Interval Control
Valves (ICV)
Underbalanced Drilling & Completion
Cased Hole Circulation Drilling & completion
Multistage Fracturing
Practical Exercise: Completion design project (CONTINUE)
Register For This Course Now!
Kindly fill up your particulars in the
registration form placed at the end of this
brochure, and send it to us or email to
registration@petrosync.com
You Might Also Be Interested In:
Sand Control Completion Practices
TBC | Bandung, Indonesia
Formation Damage Prevention & Treatment
11-14 July 2016 | Bandung, Indonesia
IWCF Well Intervention Pressure Control
TBC | Bandung, Indonesia
DAY 2
Well Completion Equipments, Components, & Installation
5. 5
By Credit Card:
Please debit my credit card: Visa MasterCard AMEX Security Code:
Card Number: Expiry Date:
Name Printed on Card:
By Direct Transfer: Please quote invoice number(s) on remittance advice
PetroSync Global Pte Ltd Bank Details:
Account Name: PetroSync Global Pte Ltd
Bank Name: DBS Bank Ltd
Bank Code: 7171—Bank Swift Code: DBSSSGSGXXX—Branch Code: 288
Account No: SGD: 288-901898-0 USD: 0288-002682-01-6
Bank Address: 12 Marina Boulevard, Level 3. Marina Bay Financial Centre Tower 3. Singapore 018982.
All bank charges to be borne by payer. Please ensure that PetroSync Global Pte Ltd receives the full invoiced
amount.
Title : Well Completion and Workover
Date : 17-20 May 2016
Location : Bandung, Indonesia
COURSE DETAILS
INVESTMENT PACKAGE DEADLINE FULL MASTERCLASS
Standard Price 16 May 2016 USD 3,595
Early Bird Offer 18 April 2016 USD 3,395
Group Discount
(3 or more Delegates)
16 May 2016 10% off
INVESTMENT PACKAGES (Please Circle)
Group Discount is based on Standard Price
*To enjoy the promotion & discount offer, payment must be made before dateline
* For 7 or more delegates, please inquire for more attractive package.
* Prices include lunches, refreshments and materials. Promotion & discount cannot be combined with other
promotional offers.
* Important: Please note that registration without payment will incur a SGD 200 administration fee.
COURSE CONSULTANT
Name : Cay Aagen
Email : registration@petrosync.com
Phone : +65 6415 4500
Fax : +65 6415 4322
TERMS AND CONDITIONS
DISCLAIMER
Please note that trainers and topics were confirmed at
the time of publishing; however, PetroSync may
necessitate substitutions, alterations or cancellations
of the trainers or topics. As such, PetroSync reserves
the right to change or cancel any part of its published
courseme due to unforeseen circumstances. Any
substitutions or alterations will be updated on our web
page as soon as possible.
DATA PROTECTION
The information you provide will be safeguarded by
PetroSync that may be used to keep you informed of
relevant products and services. As an international
group we may transfer your data on a global basis for
the purpose indicated above. If you do not want us to
share your information with other reputable
companies, please tick this box
CANCELLATION POLICY
You may substitute delegates at any time as long as
reasonable advance notice is given to PetroSync. For
any cancellation received in writing not less than
fourteen (14) working days prior to the training
course, you will receive credit voucher less a SGD $200
administration fee and any related bank or credit card
charges.
Delegates who cancel less than fourteen (14) working
days of the training course, or who do not attend the
course, are liable to pay the full course fee and no
refunds will be granted.
In the event that PetroSync cancels or postpones an
event for any reason and that the delegate is unable or
unwilling to attend in on the rescheduled date, you will
receive a credit voucher for 100% of the contract fee
paid. You may use this credit voucher for another
PetroSync to be mutually agreed with PetroSync,
which must occur within a year from the date of
postponement.
PetroSync is not responsible for any loss or damage as
a result of the cancellation policy. PetroSync will
assume no liability whatsoever in the event this event
is cancelled, rescheduled or postponed due to any Act
of God, fire, act of government or state, war, civil
commotion, insurrection, embargo, industrial action,
or any other reason beyond management control.
CERTIFICATE OF ATTENDANCE
70% attendance is required for PetroSync’s Certificate
of Attendance
DETAILS
Please accept our apologies for mail or email that is
incorrectly addressed.
Please email us at registration@petrosync.com and
inform us of any incorrect details. We will amend them
accordingly.
CHARGES & FEE(S)
- For Payment by Direct Telegraphic Transfer, client
has to bear both local and oversea bank charges.
- For credit card payment, there is additional 4%
credit card processing fee.
1st Delegate Name:
Direct Line Number: Email:
Job Title: Department:
Head of Department:
Mr Mrs Ms Dr Others
2nd Delegate Name:
Direct Line Number: Email:
Job Title: Department:
Head of Department:
Mr Mrs Ms Dr Others
3rd Delegate Name:
Direct Line Number: Email:
Job Title: Department:
Head of Department:
Mr Mrs Ms Dr Others
Attention Invoice to:
Direct Line Number: Fax:
Company: Industry:
Address: Postcode:
Country: Email:
Please note:
- Indicate if you have already registered by Phone Fax Email Web
- If you have not received an acknowledgement before the training, please call us to confirm your booking.
CONFIRMATION
I agree to PetroSync’s terms & conditions, payment terms and cancellation policy.
Authorized Signature:
PAYMENT TERMS : Payment is due in full at the time of registration. Full payment is mandatory for event attendance.
PAYMENT METHOD
INVOICE DETAILS
DELEGATES DETAILS