This course will educate participants on how to avoid plugging and how to restore wells with plugging problems in the perforations or formation face.Beyond taking steps to eliminate severe permeability reduction in the near wellbore area, the next step is to obtain the best communication of the wellbore with the virgin formation.
All petroleum companies aims to reach maximum production naturally by saving the pay zone characteristics to avoid using different enhanced oil recovery techniques.
Now it is possible by Special Core analysis techniques. Simple analysis on the surface; great time saving while drilling the subsurface.
Trying in this presentation to explain the main topics of (FDT).
For any further information, please contact me on : abdalrahmanibrahim209@gamil.com
The acidizing is pumping of the acids into the wellbore to remove near well formation damage and other damaging substances, matrix acidizing is applied primarily to remove skin damage that caused by drilling, completion, work over, well killing or injection fluids.
This project is concerned with carbonate reservoirs that exceeded in Kurdistan subsurface formations.
Conduct a case study using real industrial data of Arab-D formation (Ghawar oil field – Saudi Arabia) which has five water wells were treated with 50 gallon of HCl acid The treatment acid was placed with coiled tubing and foam was used as diverter. The foam was made from nitrogen, water and surfactants.
Water injection pressure, injection rate and injection flow meter profiles prior to and after the treatment for the five wells show optimistic results to an acceptable extent
In coiled tubing acid placement, the coiled tubing/borehole annulus is usually filled with acid which allow the acid to be in contact with the entire zone at bottom hole temperature condition. This reduces the degree of diversion effectiveness.
Recommend people who work in carbonate reservoirs they should done their work on petrophysical analysis and the porosity should not have exceeded by the acids
Evaluation of a systematic approach to matrix acidizing on an oil producing welleSAT Journals
Abstract All wells are susceptible to formation damage to some degree, ranging from relatively minor loss of productivity to plugging of specific zones. Formation damage could simply be referred to as a term used to emphasize reduced current production. Acidizing is a well stimulate technique where acids are primarily used to remove or cure damage around wellbore caused by drilling, completion, production and work over operations in order to improve production. In matrix acidizing, acid is used to remove the damage near the wellbore. This removal of severe plugging in sandstone, limestone or dolomite by matrix acidizing process can lead to large increase in well productivity. It is expected that matrix acid treatment should remove flow restrictions near the wellbore and allow the well to produce at an undamaged rate. However, the production rate after treatment is sometimes lower than predicted or in extreme cases without any improvement at all. This study evaluates matrix acidizing operations in oil producing wells with a view to identifying causes of acidizing failures and developed a systematic approach to matrix acidizing that will eliminate failures and greatly enhance the performance of acidized oil wells. Discussions have been centered on the fundamentals of formation damage and acidizing, review of existing literature on the subject and matrix models. In treated wells studied, stimulation ratios from productivity indices were almost equal to or greater than 2 (≥ 2) and always greater than stimulations ratios from production rates, showing that the treatments were positive in reducing or curing damage around the wellbore but the stimulation ratios from the two parameters (productivity index and production rate) were not the same as a result of flow restrictions. Since all treated intervals in the different wells studied showed positive response to damage reduction, it could be concluded that acidizing if properly executed will reduce or cure damage around the wellbore and improve productivity. Key Words: formation damage, matrix acidizing, stimulation, and productivity, stimulation ratio, etc…
All petroleum companies aims to reach maximum production naturally by saving the pay zone characteristics to avoid using different enhanced oil recovery techniques.
Now it is possible by Special Core analysis techniques. Simple analysis on the surface; great time saving while drilling the subsurface.
Trying in this presentation to explain the main topics of (FDT).
For any further information, please contact me on : abdalrahmanibrahim209@gamil.com
The acidizing is pumping of the acids into the wellbore to remove near well formation damage and other damaging substances, matrix acidizing is applied primarily to remove skin damage that caused by drilling, completion, work over, well killing or injection fluids.
This project is concerned with carbonate reservoirs that exceeded in Kurdistan subsurface formations.
Conduct a case study using real industrial data of Arab-D formation (Ghawar oil field – Saudi Arabia) which has five water wells were treated with 50 gallon of HCl acid The treatment acid was placed with coiled tubing and foam was used as diverter. The foam was made from nitrogen, water and surfactants.
Water injection pressure, injection rate and injection flow meter profiles prior to and after the treatment for the five wells show optimistic results to an acceptable extent
In coiled tubing acid placement, the coiled tubing/borehole annulus is usually filled with acid which allow the acid to be in contact with the entire zone at bottom hole temperature condition. This reduces the degree of diversion effectiveness.
Recommend people who work in carbonate reservoirs they should done their work on petrophysical analysis and the porosity should not have exceeded by the acids
Evaluation of a systematic approach to matrix acidizing on an oil producing welleSAT Journals
Abstract All wells are susceptible to formation damage to some degree, ranging from relatively minor loss of productivity to plugging of specific zones. Formation damage could simply be referred to as a term used to emphasize reduced current production. Acidizing is a well stimulate technique where acids are primarily used to remove or cure damage around wellbore caused by drilling, completion, production and work over operations in order to improve production. In matrix acidizing, acid is used to remove the damage near the wellbore. This removal of severe plugging in sandstone, limestone or dolomite by matrix acidizing process can lead to large increase in well productivity. It is expected that matrix acid treatment should remove flow restrictions near the wellbore and allow the well to produce at an undamaged rate. However, the production rate after treatment is sometimes lower than predicted or in extreme cases without any improvement at all. This study evaluates matrix acidizing operations in oil producing wells with a view to identifying causes of acidizing failures and developed a systematic approach to matrix acidizing that will eliminate failures and greatly enhance the performance of acidized oil wells. Discussions have been centered on the fundamentals of formation damage and acidizing, review of existing literature on the subject and matrix models. In treated wells studied, stimulation ratios from productivity indices were almost equal to or greater than 2 (≥ 2) and always greater than stimulations ratios from production rates, showing that the treatments were positive in reducing or curing damage around the wellbore but the stimulation ratios from the two parameters (productivity index and production rate) were not the same as a result of flow restrictions. Since all treated intervals in the different wells studied showed positive response to damage reduction, it could be concluded that acidizing if properly executed will reduce or cure damage around the wellbore and improve productivity. Key Words: formation damage, matrix acidizing, stimulation, and productivity, stimulation ratio, etc…
I hope this presentation helps you to understand why we use acidizing process and calculations needed to perform the optimum acidizing .
Any questions contact me at karim.elfarash@std.suezuniv.edu.eg
The flow of fluids through these pores is often restricted because of permeability damage in the near-wellbore (NWB) formation. During matrix acidizing, the acid treatment is injected at matrix pressure and staying below formation fracture pressure.
Matrix acidizing of carbonates and silicates are worlds apart.
hello everybody,
My name is Ashish Kumar pursuing the diploma in civil engineering(2016-19) from GLA UNIVERSITY, MATHURA
This is a powerpoint presentation on Concrete Admixtures(Department of Civil Engineering)
share and like this ppt if you learn something new from this.
Thank You.
Mechanism of chemical admixture, Plasticizers and super Plasticizers and their effect on concrete property in fresh and hardened state, Marsh cone test for optimum dosage of superplasticizer, retarder, accelerator, Air-entraining admixtures, new generation superplasticiser.
Fly ash, Silica fume, GCBS, and their effect on concrete property in fresh state and hardened state
Use of chemical admixtures and mineral additives in various kinds of high performance and high strength concrete is essential. I have explained how it works.
PetroSync - Technical Report Writing and Presentation Skills for Oil & Gas En...PetroSync
This Technical Report Writing & Presentation Skills three-day course will teach Oil and Gas professionals how to write professional technical reports in a way that will be clearly understood by technical and non-technical readers alike, to ensure the maximum impact for them and their businesses.
The course starts off by building up from the ‘foundations’ of language, in terms of how to improve ‘readability’ and understanding by the readers for the best results. It teaches how to write good sentences and paragraphs.
I hope this presentation helps you to understand why we use acidizing process and calculations needed to perform the optimum acidizing .
Any questions contact me at karim.elfarash@std.suezuniv.edu.eg
The flow of fluids through these pores is often restricted because of permeability damage in the near-wellbore (NWB) formation. During matrix acidizing, the acid treatment is injected at matrix pressure and staying below formation fracture pressure.
Matrix acidizing of carbonates and silicates are worlds apart.
hello everybody,
My name is Ashish Kumar pursuing the diploma in civil engineering(2016-19) from GLA UNIVERSITY, MATHURA
This is a powerpoint presentation on Concrete Admixtures(Department of Civil Engineering)
share and like this ppt if you learn something new from this.
Thank You.
Mechanism of chemical admixture, Plasticizers and super Plasticizers and their effect on concrete property in fresh and hardened state, Marsh cone test for optimum dosage of superplasticizer, retarder, accelerator, Air-entraining admixtures, new generation superplasticiser.
Fly ash, Silica fume, GCBS, and their effect on concrete property in fresh state and hardened state
Use of chemical admixtures and mineral additives in various kinds of high performance and high strength concrete is essential. I have explained how it works.
PetroSync - Technical Report Writing and Presentation Skills for Oil & Gas En...PetroSync
This Technical Report Writing & Presentation Skills three-day course will teach Oil and Gas professionals how to write professional technical reports in a way that will be clearly understood by technical and non-technical readers alike, to ensure the maximum impact for them and their businesses.
The course starts off by building up from the ‘foundations’ of language, in terms of how to improve ‘readability’ and understanding by the readers for the best results. It teaches how to write good sentences and paragraphs.
PetroSync - Emotional Intelligence for Effective Work PerformancePetroSync
In order for your organization to tap the potential of its human resources, developing the employees’ capability to think effectively and creatively will be the ultimate goal. They will be able to plan, generate new ideas, make decisions, solve problems etc. with clarity and confidence if given the right fundamental thinking tools. Mind Mapping is a revolutionary method of assessing intelligence developed during 40 years of research by TONY BUZAN. His startlingly innovative MIND MAPS along with his concepts of MENTAL LITERACY have altered the way millions of people approach thinking today. Employees who are able to innovate corporate improvements are those who have learned how to harness the awesome capacity of the human brains.
PetroSync - Water Injection for Production SystemPetroSync
This course is designed to ensure effective understanding of thewater injection system as a reservoir primary recovery methodology in oil fields to maintain the reservoir pressure with special attention to the system components from the supply source to injection point in the reservoir, which permit the operator’s best insurance to achieve well safe and effective operations. The course is composed as modules,whichincludeexercises, group discussions and quizzes forfull comprehension of the course topics relevant to all functions of the water injection system and its operations.
PetroSync - Advanced Contract Negotiation and Post-Contract ManagementPetroSync
While many negotiation courses address the topic in a general light, this workshop is specifically focused upon the Oil and Gas commercial relationship negotiation interface. You will learn how to become an effective negotiator in the context of a commercial contracting – you will realize that negotiations is not merely an event, but rather an inter-related phase in a larger process. When should you negotiate? How can you best prepare for negotiations with commercial partners in the Oil and Gas sector? Why are internal negotiations with stakeholders sometimes tougher than negotiating with external commercial partners? These are just some of the easier questions we will address in this interactive session.
Post-contract appraisal is fundamental to contract and supplier relationship management – it allows the buyer and supplier to monitor compliance, identify non-compliance and trigger corrective actions including contractual penalties and assess supplier performance and compare it with its peers.
This course is designed in with leading contract industry knowledge and practical contract negotiation case studies discussion and analysis to provide an interactive learning environment.
This course is designed to introduce an overview of the coiled tubing operations concept and its applications in oil fields. It introduces variety of coiled tubing technologies with special attention on the unit as surface equipment and downhole tools. Moreover, the course covers the main components, application envelope and the coiled tubing special applications and contingency plan for all possible situations, which could be encountered throughout various operations.
PetroSync - Advanced Seismic Data Acquisition and ProcessingPetroSync
Advanced Seismic Data Acquisition and Processing course will cover both seismic acquisition procedures as well as data processing methodologies in application to various complex environments and case studies. They will learn the tools available in the industry to ensure quality control on the conduct of the survey and the type of data acquired. Theories will be presented along with practical exercises on situational cases in application of the core skills of data acquisition. Delegates will also learn about the best practices and the new technologies available for seismic data acquisition and how this can be applied to their own operations.
Tool Physcis cover the operating principles of modern logging tools, their applicability to varied environmental (borehole, formation and drilling fluid) condition and their use for defining petrophysical properties. It is important to properly select logging tool suites that are fit-for-purpose calls to know their limitations in specific well conditions.
Our Advanced Logging Tools Physics focuses on Basic Logging Operations and Quality HSE, Basic Nuclear Logging, Resistivity Logging, Acoustic (Sonic Logging), Nuclear Magnetic Resonance, Borehole Imaging & Dipmeters and Modern Nuclear Tools.
PetroSync - Oil and Gas Contract ManagementPetroSync
This highly interactive 5 days course will cover all the aspects and form the basis of binding obligations within the oil and gas industry.
Delegates will get an unprecedented insight on how the world’s leading oil and gas companies are handling their contracting challenges, the approach that best practice corporations are implementing and the way this affects the contract professionals.
Using a combination of lectures, visuals, class discussions and real-life case studies, this course will present a logical and systematic approach to effective contract risk management.
As compared with the standard Fishing Course, we spend more time studying the downhole “mechanics” of the fishing tools we use to catch the differing varieties of fish in oil wells and why fishing is not often successful first time.
The preparation of a SCAL measurement program is ideally a multi-disciplinary effort. This SCAL course will prepare reservoir engineers, petrophysicists, geologists and other E&P professionals to design a SCAL program, select a service provider, coach the execution of the program if and when required, manage data quality and do state-of-the-art data interpretation. Particularly for design and data interpretation use can be made of a dedicated, license free, SCAL flow simulator.
The course is highly interactive with an abundance of exercises, both with dedicated Excel spread sheets and with the SCAL simulator. No simulation experience is required to use the simulator.
This course has been written for Operators, Drilling Contractors and Service personnel who require an in-depth detailed understanding of the causes of stuck pipe (which includes drill pipe, BHA’s, casing, liners and logging tools) and how sticking can be prevented.
PetroSync - Sand Control Completion PracticesPetroSync
One of the objectives of well completion is to maximize productivity with reliable equipment. These objectives are difficult to attain in unconsolidated sand formations due to sand production as a result of stress concentration
Seismic interpretation is a critical step in evaluating the subsurface, as it turns the large investments in seismic data to tangible value to base all E&P decisions. It is essential for explorationists to learn to execute this key skill in their career.
SPE 165151 The Long-Term Production Performance of Deep HPHT Gas Condensate ...jdowns
Maps and analyses the long-term production of eight HPHT gas and condensate fields in which formate brines were the last well construction fluids to contact the producing reservoirs
The purpose of this 2-day training is for legal personnel to improve on their key skills in writing legal reports to ensure high quality caliber of corporate report writing for internal and external communications adherent to both corporate and legal standards. Provisional O&G business transactions will be covered in the program to provide specific industry examples.
This program is designed for those involved in drilling and service contracts from both the operator and contractor perspective. Attendees will actively participate in discussions pertaining to contracting philosophy and terms as well as industry custom and practice.
The program will cover all aspects of contracts including the tender process, letters of intent, contract negotiation, contract administration, ethics considerations and dispute resolution. Special emphasis will be placed on the most controversial and highly negotiated provisions of drilling and service contracts, the impact of decisions in the pending Macondo litigation and contract administration in the event of a crisis.
While the program will focus on offshore and land daywork drilling contracts, incentive contracts (footage, turnkey and performance bonus) and variable day rate drilling contracts will also be reviewed and analyzed along with oil service contracts.
PetroSync - Crude Oil Trading and Price Risk ManagementPetroSync
Crude Oil Trading & Price Risk Management provides the knowledge and understanding of the workings of the world of crude oil trading and introduce the complicated concept of hedging, to identify price risk and learn how to manage that risk through the different financial instruments available.
Course Description
The business of fuelling the world through hydrocarbon production must be carried out with optimum profitability. Participants will learn how sand production and inadvertent formation damage can erode these profits. Methods and procedures will be presented to guide the participants in decision making with regard to completing a well with optimum control of formation sand while incurring minimal damage to the well or production zone. Extensive theory will be presented illustrating why certain practices should either be employed or strictly avoided. The very latest in the use of forecasting methods, tools, techniques, and personal experiences will be presented.
By attending the 5 day training course, you will be able to:
Assess how rock will fail and how this analysis is used to determine the appropriate sand control method.
Interpret particle size distribution data.
Determine the appropriate sand control method when provided with appropriate reservoir and production data.
Select completion equipment and associated tooling for sand control (screens, gravels, work strings, barrier valves etc.)
Produce an outline installation procedure for the main types of sand control.
Troubleshoot sand control problems.
The course focuses on the practical applications of various techniques and methodologies in well completion --- from the selection of completion type, perforating strategies, fluid selection, and installation of production heads.
PetroSync - Fractured Reservoir Modeling with Application to Fractured BasementPetroSync
This course provides a unique opportunity to learn all the aspects related to the understanding and modeling of fractured reservoirs. Participants will gain knowledge of how fractured reservoirs differ from conventional reservoirs, and how to approach their fractured reservoir projects in a systematic manner.
This course examines the difficulties, challenges and problems facing today’s deepwater drilling programme designers and personnel where wells are being drilled in increasingly difficult downhole and environmental conditions with ever increasing cost and legislation further contributing to design and operational pressures.
This intensive 2 x 2 week program has been put together to cover Advanced Well Engineering topics. The program intends to uplift the knowledge and skills for engineers, who are or will be directly involved in well and completion design. It will also benefit staff that are or will be working as a member of a day-to-day operations team.
The courses present advanced concepts of drilling and completion operations, plus post-completion enhancement (workovers). Participants will learn to visualize and troubleshoot what is happening downhole, discover what can be accomplished and optimized, and learn how drilling and completions can alter reservoir performance.
PE979 HIGH PRESSURE HIGH TEMPERATURE COMPLETIONSpetroEDGE
This course is aimed primarily at completions and drilling engineers. It is also aimed at those that are influenced by HPHT issues (e.g. reservoir engineers, project
managers, subsea and facility engineers). The course will benefit vendors, service companies and other specialists. The course assumes basic knowledge of completions.
This 5 day training course provides participants with knowledge of critical well completion processes, completion equipment and operations associated with deepwater completions and available intelligent well and completion architecture used for both platform and subsea completions.
This 5 day training course reviews the fundamentals of Casing Design and builds on them to address well design challenges associated with deep, extended reach, HPHT and
deepwater wells.
Participants will review the theories of both uniaxial and triaxial pipe strength as per API Bulletin 5C3 and ISO/TR 10400, the implications of manufacturing standards and tolerances as per API Specification 5CT and the impact of downhole environmental conditions.
This intensive five-day course is designed to provide participants with a thorough knowledge of downhole sand exclusion equipment and the operational procedures required for converting a drilled well into an efficient and safe producer. It follows a practical approach for the various types of sand control equipment, specific applications, the preparation and the final execution and installation of the equipment.
INTRODUCTION TO OFFSHORE DRILLING AND PRODUCTION FACILITIESpetroEDGE
This 4 day (separately bookable) intensive training course will cover the details of drilling rigs and how they operate, especially for deepwater activities. Current drilling rigs are highly automated and efficient. These advances will be illustrated with animations and videos. The relationship between drilling and production will be explored with examples of current field developments
In attending this course, you will acquire specialist skills related to HPHT Well Control. The course focuses on key characteristics and challenges of HPHT Well Control. Key modules include:
- Well barriers – the impact of temperature and pressure on primary and secondary well barriers
- Operational Planning - Rig selection, BOP equipment issues
- Well Design – Kick tolerance, Pore pressure prediction
- Well Delivery - fingerprinting, well bore breathing, high-reliability drilling practices
- Well Control – practical well control for on bottom, off bottom and out of hole well control, kicks and losses
Similar to PetroSync - Formation Damage Prevention and Treatments (20)
PetroSync - API Specification Q1 9th Edition Quality Management System Traini...PetroSync
This four-days course will provide an informative look at the requirements, interpretations, and practical applications of the quality management principles as based on the 9th Edition of API Specification Q1, Specification for Quality Management System Requirements for Manufacturing Organizations for the Petroleum and Natural Gas Industry.
PetroSync - API 580 & API 581 Risk Based Inspection & Base Resource DocumentPetroSync
The course is based on API RP 580 Risk-Based Inspection and API Publication 581, Base Resource Document. The course first explains feasible means and alternatives for achieving a successful RBI program without undue complications. This course deals with RBI framework and methodology in a simple straight forward manner to establish and implement a risk-based inspection program best suited for the company objectives.
PetroSync - Surface Geochemical Exploration for Oil and GasPetroSync
The great majority of oil and gas pools and mature source rocks have recognizable surface geochemical expression. The O&G industry devotes significant time and resources in finding and defining traps, but little or none in establishing the likely presence of hydrocarbon in those traps, especially for older onshore basins.
PetroSync - Geological Interpretation of Well LogsPetroSync
The richness and immediacy of wireline log data have advanced immensely in recent year — more data, more curves, more acronyms, and are available sooner. There is vital qualitative and quantitative data in the logs.
PetroSync - Chemically Enhanced Water Alternating GasPetroSync
It is know that two-third of the original oil in place are still in the ground. Petroleum companies are looking for techniques to improve sweep efficiency and increase recovery factors. As a result, Enhanced Oil Recovery (EOR) processes need to be carried out. Successful WAG floods can yield 5-20% additional oil recovery over waterflood because of improved microscopic displacement efficiency by the solvent coupled with improving areal and vertical sweep efficiency.
PetroSync - Budgeting and Forecasting in Oil & Gas IndustryPetroSync
Our Budgeting & Forecasting in Oil & Gas Industry shares insight of budgeting and forecasting process, enables fit-for-purpose budgets and business plans to be developed that robustly model complex, but realistic situations in a flexible and auditable manner.
PetroSync - Practical Accounting in Joint Ventures & Production Sharing Contr...PetroSync
Joint ventures allow companies to preserve autonomy, share investment risk and enhance competitiveness. The financial statements of many oil & gas companies can be different in future as a
result of the changes to the accounting for joint ventures, which raises the question of how such changes should be communicated to the investors and other stakeholders.
PetroSync - Exploration & Production AccountingPetroSync
This course provides an overview through the fundamentals of accounting in the O&G industry with focus on different methods for the expenditure capitalization, depreciation & depletion together with fundamentals for accounting for international operations represented by JVs and PSCs.
PetroSync - Drilling Engineering for Non-Drilling EngineerPetroSync
During the first day of this course, the entire drilling process will be discussed. The language of drillers - understanding their terminology. Understanding the abbreviations and acronyms associated with drilling.
Failure investigations are tough rigorous challenges form the best in engineering. This course will teach delegates the range of thinking and subjects, which need to be considered in driving to find the real root cause of a failure.
PetroSync - Acoustic and Flow Induced VibrationPetroSync
Failures of piping systems in the oil, gas and petrochemical industries can lead to damage of assets, personal injury and loss of life. Piping failure can be caused by excessive vibration, in the form of high levels of acoustic energy (AIV), or by flow turbulence (FIV) created by shear forces within the piping system.
The course introduces the participants to modern carbonate environments and explain how the constituents of a carbonate sediment become lithified and changed after deposition to provide potential reservoir rocks.
This course will concentrate on Offshore Marine Operations and will cover Operational and Managerial requirements for Loadout; Barge Transportation; Towing of Offshore Facilities; Lifting; Steel Jackets; Gravity-Based Structures; Lift-Off, Transportation and Inshore Mating of Topsides; Offshore Pipelines; Marine Operations Overview; Special Topics, and other essential topics related to Export/Import Oil & Gas.
This training course is a comprehensive course to the technology of shell and tube heat exchangers as these robust type of heat exchangers are the most commonly used in the process and refinery industries, where they provide flexibility and are easy to maintain.
Fitness-For-Service (FFS) assessments are quantitative engineering evaluations that are performed to demonstrate the structural integrity of an in-service component that may contain a flaw or damage.
PetroSync - Applied Petrophysics for Low Resistivity Thin-Bedded FormationsPetroSync
Thin bedded reservoirs are increasingly common exploration targets. However, evaluating such formations is difficult due to challenging and sometimes misleading data.
This is an in-depth course that is designed to provide the participants with a solid understanding of reservoir engineering and associated modern theories in order to manage and maximize hydrocarbon recovery. Hands-on examples and exercises are used throughout the course to help participants with understanding key performance concepts. Participants are encouraged to bring their own laptop computer to class.
PetroSync - Financial Assets Valuation for Oil & GasPetroSync
The Financial Assets Valuation For Oil & Gas course is structured specially for professionals in the oil & gas industry to equip participants with the financial understanding when valuing oil & gas assets.
PetroSync - Cost Engineering Risk Management-Earned Value ManagementPetroSync
Will cover the latest techniques and practical methodologies of project cost engineering and risk management to successfully manage project cost and risk, in order to maximize business ROI in the long run.
Event Management System Vb Net Project Report.pdfKamal Acharya
In present era, the scopes of information technology growing with a very fast .We do not see any are untouched from this industry. The scope of information technology has become wider includes: Business and industry. Household Business, Communication, Education, Entertainment, Science, Medicine, Engineering, Distance Learning, Weather Forecasting. Carrier Searching and so on.
My project named “Event Management System” is software that store and maintained all events coordinated in college. It also helpful to print related reports. My project will help to record the events coordinated by faculties with their Name, Event subject, date & details in an efficient & effective ways.
In my system we have to make a system by which a user can record all events coordinated by a particular faculty. In our proposed system some more featured are added which differs it from the existing system such as security.
Courier management system project report.pdfKamal Acharya
It is now-a-days very important for the people to send or receive articles like imported furniture, electronic items, gifts, business goods and the like. People depend vastly on different transport systems which mostly use the manual way of receiving and delivering the articles. There is no way to track the articles till they are received and there is no way to let the customer know what happened in transit, once he booked some articles. In such a situation, we need a system which completely computerizes the cargo activities including time to time tracking of the articles sent. This need is fulfilled by Courier Management System software which is online software for the cargo management people that enables them to receive the goods from a source and send them to a required destination and track their status from time to time.
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...Amil Baba Dawood bangali
Contact with Dawood Bhai Just call on +92322-6382012 and we'll help you. We'll solve all your problems within 12 to 24 hours and with 101% guarantee and with astrology systematic. If you want to take any personal or professional advice then also you can call us on +92322-6382012 , ONLINE LOVE PROBLEM & Other all types of Daily Life Problem's.Then CALL or WHATSAPP us on +92322-6382012 and Get all these problems solutions here by Amil Baba DAWOOD BANGALI
#vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore#blackmagicformarriage #aamilbaba #kalajadu #kalailam #taweez #wazifaexpert #jadumantar #vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore #blackmagicforlove #blackmagicformarriage #aamilbaba #kalajadu #kalailam #taweez #wazifaexpert #jadumantar #vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore #Amilbabainuk #amilbabainspain #amilbabaindubai #Amilbabainnorway #amilbabainkrachi #amilbabainlahore #amilbabaingujranwalan #amilbabainislamabad
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdfKamal Acharya
The College Bus Management system is completely developed by Visual Basic .NET Version. The application is connect with most secured database language MS SQL Server. The application is develop by using best combination of front-end and back-end languages. The application is totally design like flat user interface. This flat user interface is more attractive user interface in 2017. The application is gives more important to the system functionality. The application is to manage the student’s details, driver’s details, bus details, bus route details, bus fees details and more. The application has only one unit for admin. The admin can manage the entire application. The admin can login into the application by using username and password of the admin. The application is develop for big and small colleges. It is more user friendly for non-computer person. Even they can easily learn how to manage the application within hours. The application is more secure by the admin. The system will give an effective output for the VB.Net and SQL Server given as input to the system. The compiled java program given as input to the system, after scanning the program will generate different reports. The application generates the report for users. The admin can view and download the report of the data. The application deliver the excel format reports. Because, excel formatted reports is very easy to understand the income and expense of the college bus. This application is mainly develop for windows operating system users. In 2017, 73% of people enterprises are using windows operating system. So the application will easily install for all the windows operating system users. The application-developed size is very low. The application consumes very low space in disk. Therefore, the user can allocate very minimum local disk space for this application.
Explore the innovative world of trenchless pipe repair with our comprehensive guide, "The Benefits and Techniques of Trenchless Pipe Repair." This document delves into the modern methods of repairing underground pipes without the need for extensive excavation, highlighting the numerous advantages and the latest techniques used in the industry.
Learn about the cost savings, reduced environmental impact, and minimal disruption associated with trenchless technology. Discover detailed explanations of popular techniques such as pipe bursting, cured-in-place pipe (CIPP) lining, and directional drilling. Understand how these methods can be applied to various types of infrastructure, from residential plumbing to large-scale municipal systems.
Ideal for homeowners, contractors, engineers, and anyone interested in modern plumbing solutions, this guide provides valuable insights into why trenchless pipe repair is becoming the preferred choice for pipe rehabilitation. Stay informed about the latest advancements and best practices in the field.
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)MdTanvirMahtab2
This presentation is about the working procedure of Shahjalal Fertilizer Company Limited (SFCL). A Govt. owned Company of Bangladesh Chemical Industries Corporation under Ministry of Industries.
About
Indigenized remote control interface card suitable for MAFI system CCR equipment. Compatible for IDM8000 CCR. Backplane mounted serial and TCP/Ethernet communication module for CCR remote access. IDM 8000 CCR remote control on serial and TCP protocol.
• Remote control: Parallel or serial interface.
• Compatible with MAFI CCR system.
• Compatible with IDM8000 CCR.
• Compatible with Backplane mount serial communication.
• Compatible with commercial and Defence aviation CCR system.
• Remote control system for accessing CCR and allied system over serial or TCP.
• Indigenized local Support/presence in India.
• Easy in configuration using DIP switches.
Technical Specifications
Indigenized remote control interface card suitable for MAFI system CCR equipment. Compatible for IDM8000 CCR. Backplane mounted serial and TCP/Ethernet communication module for CCR remote access. IDM 8000 CCR remote control on serial and TCP protocol.
Key Features
Indigenized remote control interface card suitable for MAFI system CCR equipment. Compatible for IDM8000 CCR. Backplane mounted serial and TCP/Ethernet communication module for CCR remote access. IDM 8000 CCR remote control on serial and TCP protocol.
• Remote control: Parallel or serial interface
• Compatible with MAFI CCR system
• Copatiable with IDM8000 CCR
• Compatible with Backplane mount serial communication.
• Compatible with commercial and Defence aviation CCR system.
• Remote control system for accessing CCR and allied system over serial or TCP.
• Indigenized local Support/presence in India.
Application
• Remote control: Parallel or serial interface.
• Compatible with MAFI CCR system.
• Compatible with IDM8000 CCR.
• Compatible with Backplane mount serial communication.
• Compatible with commercial and Defence aviation CCR system.
• Remote control system for accessing CCR and allied system over serial or TCP.
• Indigenized local Support/presence in India.
• Easy in configuration using DIP switches.
Water scarcity is the lack of fresh water resources to meet the standard water demand. There are two type of water scarcity. One is physical. The other is economic water scarcity.
Final project report on grocery store management system..pdfKamal Acharya
In today’s fast-changing business environment, it’s extremely important to be able to respond to client needs in the most effective and timely manner. If your customers wish to see your business online and have instant access to your products or services.
Online Grocery Store is an e-commerce website, which retails various grocery products. This project allows viewing various products available enables registered users to purchase desired products instantly using Paytm, UPI payment processor (Instant Pay) and also can place order by using Cash on Delivery (Pay Later) option. This project provides an easy access to Administrators and Managers to view orders placed using Pay Later and Instant Pay options.
In order to develop an e-commerce website, a number of Technologies must be studied and understood. These include multi-tiered architecture, server and client-side scripting techniques, implementation technologies, programming language (such as PHP, HTML, CSS, JavaScript) and MySQL relational databases. This is a project with the objective to develop a basic website where a consumer is provided with a shopping cart website and also to know about the technologies used to develop such a website.
This document will discuss each of the underlying technologies to create and implement an e- commerce website.
Vaccine management system project report documentation..pdfKamal Acharya
The Division of Vaccine and Immunization is facing increasing difficulty monitoring vaccines and other commodities distribution once they have been distributed from the national stores. With the introduction of new vaccines, more challenges have been anticipated with this additions posing serious threat to the already over strained vaccine supply chain system in Kenya.
Forklift Classes Overview by Intella PartsIntella Parts
Discover the different forklift classes and their specific applications. Learn how to choose the right forklift for your needs to ensure safety, efficiency, and compliance in your operations.
For more technical information, visit our website https://intellaparts.com
PetroSync - Formation Damage Prevention and Treatments
1. 24August2015-28August2015atBandung,Indonesia
PetroSync Distinguished Instructor:
FormationDamageFormationDamage
PreventionandTreatmentsPreventionandTreatments
MICHAEL ETUHOKO, P.Eng., PMP
President & Founder, Protekz Inc Canada
UNDERSTAND the effect of formation damage on revenue to the operator
UNDERSTAND the mechanism of formation damage
LEARN how to select the best fluid at every phase of the well development
LEARN the ways and steps how to diagnose formation damage problems
GAIN the praticals of best treatment to a sandstone and carbonate reservoir
LEARN how to stimulate tight reservoir with low porosity, low permeability and high
permeability reservoir
Over 22 years of engineering, operations, and management experience in Completion,
Workover & Well Services, and Drilling
Highly sought after Consultant, President & Founder of Protekz Inc Canada, an independent
well and production engineering consultancy
Leads major completion and workover projects with companies such as Shell Canada, KNOC,
KPO etc in North America, Europe, Africa, Central Asia, & Far East Asia
Authored and presented SPE Papers at the SPE Asia Pacific Oil & Gas Conference (Australia,
2004) & SPE Annual Technical Conference & Exhibition (Texas USA,2004)
The course is designed for, but not limited to Completion Engineers, Workover Engineers,
Production Engineers, and those who are involved with well completions, workovers, well
interventions, and production.
Learnthelatesttechniquesofpreventionand
treatmentsforformationdamage
Course Objectives
Completion Engineer
Workover Engineer
Well Services / Intervention Engineer
Production Engineer
Drilling Engineer
Well Site Engineer
Specially designed for
Recommended Prerequisites
O 22
Supported by
Drilling, completion and production engineering and operation background at any level and no
prior training in formation damage.
2. The purpose of this 5-day course is to provide attendees with adequate knowledge in formation
damage prevention and treatments. The course will take participants through the types and
mechanics of formation damage, and their preventions and treatments. This course will educate
participants on how to avoid plugging and how to restore wells with plugging problems in the
perforations or formation face.Beyond taking steps to eliminate severe permeability reduction in
the near wellbore area, the next step is to obtain the best communication of the wellbore with the
virgin formation. Therefore, fluids selection is critical as damage to the reservoir can result in
impaired production and substantial loss of revenue to the Operator.This course has been designed
to cover the laboratory techniques involved in formation damage testing and different well
stimulation techniques to achieve the best reservoir-wellbore communications.
In this course, the causes and consequences of sand production will be discussed, followed by the
prediction measures to decide or delay sand control in oil and gas project development. All the
types of sandface completions and emerging technologies available in the industry today to
prevent sand production and to boost well productivity results will be discussed.
FORMATION DAMAGE PREVENTION AND TREATMENTS
24 August 2015 - 28 August 2015 at Bandung, Indonesia
Course Overview
Course Content
Course Introduction & Overview
Formation Damage:
-Types of formation damage
-Classification of Formation damage by process
-Sources of formation damage
-Skin and impact on well productivity
-Formation damage laboratory tests (return
permeability test, formation initiation pressure
test, cake lift off test, etc
-Formation damage from drilling mud
/processes
-Formation damage from perforations
-Formation damage from Completion and
workover fluid
-Formation damage from oil and gas
production activities
-Formation damage from scales
-Formation damage from organic deposits
-Formation damage from Wettability changes
-Formation damage from Acid stimulation
-Formation damage from Injection (water
injection, CO2 injection, polymer flooding,
steam flooding
Day One: Formation Damage
SAVE COST • IMPROVE PERFORMANCE • REDUCE RISK
PetroSync understands that in current economic climate, getting an excellent return on your training investment is critical. This training can be
conductedexclusivelyforyourorganization.Thetrainingcanbetailoredtomeetyourspecificneedsatyourpreferredlocationandtime. Wewillmeet
you anywhere around the globe.
If you like to know more about this program, please contact Jerry Tay (Conference Director) on +65 6415 4502 or email jerry.t@petrosync.com
IN-HOUSE SOLUTIONS
Class exercise:
-Classexercise:Theobjectivesoftheclassexerciseon
formationdamageareasfollows:
-Skincalculations
-Productivityratiocalculations
-Diagnosesofformationdamagesandproposinga
treatmentsolutiontoremedytheproblemetc
Laboratory techniques:
-Core flood test
-Formation damage test
-Screen plugging test
-Sand retention test
-Particle size distribution (PSD)
-Rheological measurements
-Compatibility tests / Emulsion stability
-Solubility Tests
3. FORMATION DAMAGE PREVENTION AND TREATMENTS
24 August 2015 - 28 August 2015 at Bandung, Indonesia
Stimulation of Sandstone reservoir:
-Why stimulating a Sandstone reservoir
-Sandstone reservoir description – mineralogy
-Acid formulation and lab tests e.g. acid response curve, compatibility test, return permeability
test, etc
-How much overflush is required
-How to avoid fluoride precipitation in sandstone stimulation
Stimulation of Carbonate reservoir
-Why stimulating a carbonate reservoir
-Carbonate reservoir description - mineralogy
-Acid formulation and lab tests e.g. acid response curve, compatibility test, return permeability
test, etc
-What is the big deal about wormholes?
-How to ensure the best acid coverage? Open hole? Cased hole?
-Acid placement in heterogeneous reservoir? Use of diverting agents
-How to ensure the best zonal coverage?
-Practical guidelines on how to select and evaluate acid treatment
Day Two: Stimulation of Sandstone Reservoir
Introduction to Hydraulic Fracturing
-Basic principles in fracturing
-Frac height prediction
-Frac height design
-Frac pressure prediction
-Completion design for Frac well candidates
-Perforation strategy
-Fluid selection,
-Proppant selection
Class exercise:The objectives of the class exercise on
hydraulic fracturing are as follows:
-CalculationsonFoldofIncrease(FOI)asascreeningtool
toselectwellsforhydraulicfracturingcandidate.
-Calculationstocompareacidfracversusproppedfracina
carbonatereservoir
Day Three: Fracturing Technology
Class exercise:The objectives of the class exercise onWell stimulation are as follows:
-Calculationsontheeffectofformationdamageonwellproduction
-Calculationsonflowefficiency
-Useofproductionhistorytoassessformationdamage
-Stimulationwellcandidateselection
Class group exercises on Matrix treatment design methodology
Multistage Fracturing technology
-Application in open hole horizontal well using
swelling packer and stimulation sleeves
-Application in cased hole vertical to deviated
wells using composite plug technology
-Real life field case history from planning,
design, completion installation, stimulation to
clean-up
-Example from a world class carbonate
reservoir
4. FORMATION DAMAGE PREVENTION AND TREATMENTS
24 August 2015 - 28 August 2015 at Bandung, Indonesia
Sand Control completion overview:
-How much of a problem is sand production?
-What are the consequences of sand
production?
Sand detection:
-Sand monitoring
-Measuring Sand production
Sand prediction and monitoring
-What causes sand production?
-Types of sand failure
-How to predict sand production in new wells
-How to predict sand failure during well
production
Day Four: Modern Well Completion & Intro to Well Intervention
Production problems
Scales
-Introduction to scale
-Sources of scale deposition
-Types of scales
-Why scale forms?
-Impact of scale on well productivity
-Scale control and prevention
-Scale treatments
Paraffin /Wax
-Consequences on flow assurance
-Root cause of paraffin /wax problems
-Preventive solutions
-Wax removal
Asphaltene
-Where and why are they formed?
-Asphatene removal?
Hydrates
-Impact on productivity
-Hydrate formation envelope
-Hydrate prevention
Day Five: Well Control & Well Workover
Water and gas shut off
Problem types
-Near wellbore flow
-Fissures to injectors
-Poor areal sweep
-High permeability layer with or without cross
flow
-Gravity segregation layer
-Coning etc
Diagnostics
-Data collection techniques
-Water / gas shut off techniques
Fieldcasehistories
FOCUS TRAINING • REDUCE COST • ENHANCED RESULTS
Over the years, there has been a growing demand for hybrid training programs. It is an excellent option to maximize your training dollar for your
specific needs. We make it possible to run a program that is customized to your training requirements at a fraction of an in-house budget!
If you would like to know more about this program, please contact us on +65 6415 4500 or email general@petrosync.com
HYBRID TRAINING SOLUTIONS
Sand Control completion:
-Selective perforation method
-Cased hole gravel pack
-Frack pack
-Perforating for sand control
-Frac pack completion: success of a frac pack,
frac pack limitations,
-Frac pack fluids, frac pack installation and
treatment procedure
-Gravel pack / Frac pack evaluation
-Sand Control field operations step
-Case histories
SandControldesignexercise
5. MIKE’SPARTIALCLIENTLIST
FORMATION DAMAGE PREVENTION AND TREATMENTS
24 August 2015 - 28 August 2015 at Bandung, Indonesia
Mike operates his own consultancy firm, which provides well and production engineering services to various
international oil & gas companies. in Europe, North America, Africa, Central Asia, and Far East Asia. He
specializes and consults for Well Completion, Workover and Well Services, Sand Control, and Formation
Damage Prevention and Treatments. Before becoming a consultant, he trained and worked in Shell and Total
E&P.
His Current and Recent Assignments Include the Following:
Lead Completions & Intervention for Karachaganak Field, Kazakhstan
Completion & Intervention for Field with Characteristics: Deep wells (± 6200m TVD on the average), light
oil/condensate and gas, High GOR, H2S > 7%, CO2 > 6%, low porosity, low permeability and HPHT reservoir
environment
Subsea Intervention/Workover/Completion for Korean National Oil Company
Diagnose and restore Donghae 1-4P Sub-sea well back to production
Completions, Sand Control, & Well Testing (Deepwater Exploration Asset) for BG Nigeria
Responsible for “Well Completion and Testing”operations in deepwater exploration campaign
Well Productivity for Total E&P
Scales Squeeze treatment for Dunbar, Alwyn, Otter and Elgin/Franklin fields; Fracturing design and operations in
HPHT wells; Sand Control in HPHT wells, Water shut-off in HPHT wells
Mike has presented for several international conferences including Offshore Technology Conference, SPE Asia
Pacific Oil & Gas Conference, and SPE AnnualTechnical Conference Exhibition. He has also authored SPE papers
on “Monobore Completion Using Interventionless Technology” and “Open Hole Multistage Fracturing
Completion in Carbonate Reservoir.”
In the recent years, Mike has provided intensive trainings in well completion and workovers with different oil
and gas companies. Some of these training are“Well Completion & Intervention Training (Level 1&2)”for KPO,
“Sub-Sea Workover Operations Training”for KNOC, and“Deep Water Sand Control”for Total E&P International.
Shell
Total E&P International
Chevron
BG Nigeria
Karachaganak Petroleum Operation (KPO) (Kazakhstan)
Korean National Oil Company
ENI-AGIP
Luke Oil (Indiana, US)
JVGas (Algeria)
& Many Others
PetroSync Distinguished Instructor:
MICHAEL ETUHOKO, P.Eng., PMP
President & Founder, Protekz Inc Canada
6. Group Discount is based on Standard Price
* For 7 or more delegates, please inquire for more attractive package.
* Important: Please note that registration without payment will incur a SGD 200 administration fee.
1st Delegate Name
Direct Line Number: Email:
Job Title: Department:
Head of Department:
Company:____________________________________________ Industry : __________________________________
Address: _______________________________________________________Postcode: _________________________
Country: ________________________Email: __________________________________________________________
Attention Invoice to: ______________________________________________________________________________
Direct Line Number: ______________________________ Fax: _____________________________________________
PAYMENTMETHODS
DELEGATESDETAILS
Please note:
- Indicate if you have already registered by Phone Fax Email Web
I agree to PetroSync’s terms & conditions,payment terms and cancellation policy.
By Direct Transfer : Please quote invoice number(s) on remittance advice
By Credit Card :
Please debit my credit card: Visa MasterCard
Card Number:
Name printed on card: _____________________________________________________________________
Expiry Date:
Security Code:
INVOICEDETAILS
Authorized Signature : ____________________________________________________________________________
Mrs Ms Dr OthersMr
DETAILS
PAYMENT TERMS : Payment is due in full at the time of registration. Full payment is mandatory for event attendance.
2nd Delegate Name
Direct Line Number: Email:
Job Title: Department:
Head of Department:
Mrs Ms Dr OthersMr
3rd Delegate Name
Direct Line Number: Email:
Job Title: Department:
Head of Department:
Mrs Ms Dr OthersMr
AMEX
TERMSANDCONDITIONS
CHARGES&FEE(s)
- For Payment by Direct TelegraphicTransfer,
client has to bear both local and oversea
bank charges.
- For credit card payment, there is additional
4% credit card processsing fee.
DISCLAIMER
Please note that trainers and topics were confirmed at
the time of publishing; however, PetroSync may
necessitate substitutions, alterations or cancellations of
the trainers or topics. As such, PetroSync reserves the
right to change or cancel any part of its published
programme due to unforeseen circumstances. Any
substitutions or alterations will be updated on our web
page as soon as possible.
DATAPROTECTION
The information you provide will be safeguarded by
PetroSync that may be used to keep you informed of
relevant products and services. As an international
group we may transfer your data on a global basis for
the purpose indicated above. If you do not want us to
share your information with other reputable companies,
please tick this box
CANCELLATIONPOLICY
You may substitute delegates at any time as long as
reasonable advance notice is given to PetroSync. For
any cancellation received in writing not less than
fourteen (14) working days prior to the training course,
you will receive credit voucher less a SGD $200
administration fee and any related bank or credit card
charges.
Delegates who cancel less than fourteen (14) working
days of the training course, or who do not attend the
course, are liable to pay the full course fee and no
refunds will be granted.
In the event that PetroSync cancels or postpones an
event for any reason and that the delegate is unable or
unwilling to attend in on the rescheduled date, you will
receive a credit voucher for 100% of the contract fee
paid. You may use this credit voucher for another
PetroSync to be mutually agreed with PetroSync, which
must occur within a year from the date of postponement.
PetroSync is not responsible for any loss or damage as
a result of the cancellation policy. PetroSync will assume
no liability whatsoever in the event this event is
cancelled, rescheduled or postponed due to any Act of
God, fire, act of government or state, war, civil
commotion, insurrection, embargo, industrial action, or
any other reason beyond management control.
* To enjoy the promotion & discount offer, payment must be made before deadline
* Prices include lunches, refreshments and materials. Promotion & discount cannot be combined with other promotional offers.
Please accept our apologies for mail or email that is
incorrectly addressed.
Please email us at registration@petrosync.com and
inform us of any incorrect details. We will amend them
accordingly.
- If you have not received an acknowledgement before the training, please call us to confirm your booking.
CourseConfirmation
INVESTMENT PACKAGES
CourseDetails
Title : Formation Damage Prevention and Treaments
Date : 24 August - 28 August 2015
Location : Bandung, Indonesia
InvestmentPackage FULLMASTERCLASS
Standard Price 21AUG2015 SGD$ 5,995
Group Discount
(3 or more Delegates)
10% discount for groups of 3 registering from the
same organization at the same time
Early Bird Offer
Deadline
21AUG2015
17JUL2015 SGD$ 5,795
PROGRAMMECONSULTANT
Name : Cay Aagen
Email : registration@petrosync.com
Phone : +65 6415 4500
Fax : +65 6826 4322
CERTIFICATEOFATTENDANCE
70% attendance is required for PetroSync's Certificate
PetroSync Global Pte Ltd Bank details:
Account Name: PetroSync Global Pte Ltd
Bank Name : DBS Bank Ltd
Bank Code : 7171 • Bank Swift Code : DBSSSGSGXXX • Branch code : 288
Account No : • SGD : 2889018980 • USD : 0288002682016
Bank Address : 12 Marina Boulevard, Level 3. Marina Bay Financial Centre Tower 3. Singapore 018982
All bank charges to be borne by payer. Please ensure that PetroSync Global Pte Ltd eceives the full invoiced amount.