The compulsory examinations are : Principles & Producers, Completion Operations, and additional minimum of 1 examination is required from Coil Tubing Operation, Wireline Operations or Hydraulic Workover Snubbing) Operations.
Wellhead equipment Introduction Based on API 6a & NACEAmir Rafati
1. Typical Onshore Wellhead and Casing Head Types
• CSG HEAD NO.1
• CSG HEAD NO.3
• CSG HEAD NO.6
• CSG HEAD NO.8
• CSG HEAD NO.9
• CSG HEAD DESIGN DUE TO FIELD EXPERIENCES
• AG(H)-10K
• B(H)-10K
• C(H)-5K
• V(H)-5K
• T(H)-3K,5K
• WELLHEAD DESIGN DUE TO FIELD EXPERIENCES
2. Brief Description of Wellhead Equipment and their Types
• Sealings and Ring Gaskets
• Safety valves
• Gate valves
• Double Studded Adaptors
• Spools
• Hangers
• Flanges
3. Install and Testing Wellhead and Casing Head Equipment
• Safety valves
• Gate valves
• Double Studded Adaptors
• Spools
• Hangers
• Flanges
4. Introduction to API 6A applications
• PSL: PRODUCT SPECIFICATION LEVELS
• PR: PERFORMANCE REQUIREMENT
• T/C: TEMPERATURE CLASS
• M/C: MATERIAL CLASS
This is an academic lecture for Diploma in Engineering 7th Semester Mining and Mine Survey Technology. The Course related to this presentation is Well completion and testing
Wellhead equipment Introduction Based on API 6a & NACEAmir Rafati
1. Typical Onshore Wellhead and Casing Head Types
• CSG HEAD NO.1
• CSG HEAD NO.3
• CSG HEAD NO.6
• CSG HEAD NO.8
• CSG HEAD NO.9
• CSG HEAD DESIGN DUE TO FIELD EXPERIENCES
• AG(H)-10K
• B(H)-10K
• C(H)-5K
• V(H)-5K
• T(H)-3K,5K
• WELLHEAD DESIGN DUE TO FIELD EXPERIENCES
2. Brief Description of Wellhead Equipment and their Types
• Sealings and Ring Gaskets
• Safety valves
• Gate valves
• Double Studded Adaptors
• Spools
• Hangers
• Flanges
3. Install and Testing Wellhead and Casing Head Equipment
• Safety valves
• Gate valves
• Double Studded Adaptors
• Spools
• Hangers
• Flanges
4. Introduction to API 6A applications
• PSL: PRODUCT SPECIFICATION LEVELS
• PR: PERFORMANCE REQUIREMENT
• T/C: TEMPERATURE CLASS
• M/C: MATERIAL CLASS
This is an academic lecture for Diploma in Engineering 7th Semester Mining and Mine Survey Technology. The Course related to this presentation is Well completion and testing
Slot recovery operation for well J58-87, as a preparation of J58 platform to drill a new Extended-Reach Well SB293-4
Drilled by GULF OF SUEZ PETROLEUM CO. GUPCO
Joint Venture with BP, EGYPT. 2013
@ Gulf of Suez, EGYPT.
Well Control is very important in Petroleum Engineering and necessary for being able to avoid hazards and controlling them as much as possible. This presentation provides valuable notes, instructions, and information about Well Control.
PetroSync - Crude Oil Trading and Price Risk ManagementPetroSync
Crude Oil Trading & Price Risk Management provides the knowledge and understanding of the workings of the world of crude oil trading and introduce the complicated concept of hedging, to identify price risk and learn how to manage that risk through the different financial instruments available.
PetroSync - Incident Investigation for Upstream Drilling and Well OperationPetroSync
Incident management starts when the initial emergency response activities are over. Then we must secure the site, secure perishable information, inform stakeholders, and consider quarantine of the site and equipment, maybe issue Stop Work-order and a Safety Alerts.
Slot recovery operation for well J58-87, as a preparation of J58 platform to drill a new Extended-Reach Well SB293-4
Drilled by GULF OF SUEZ PETROLEUM CO. GUPCO
Joint Venture with BP, EGYPT. 2013
@ Gulf of Suez, EGYPT.
Well Control is very important in Petroleum Engineering and necessary for being able to avoid hazards and controlling them as much as possible. This presentation provides valuable notes, instructions, and information about Well Control.
PetroSync - Crude Oil Trading and Price Risk ManagementPetroSync
Crude Oil Trading & Price Risk Management provides the knowledge and understanding of the workings of the world of crude oil trading and introduce the complicated concept of hedging, to identify price risk and learn how to manage that risk through the different financial instruments available.
PetroSync - Incident Investigation for Upstream Drilling and Well OperationPetroSync
Incident management starts when the initial emergency response activities are over. Then we must secure the site, secure perishable information, inform stakeholders, and consider quarantine of the site and equipment, maybe issue Stop Work-order and a Safety Alerts.
The over-riding aim of the pump and system training course is to reduce the costs associate with owning and running pumps. Organizations spend millions running and repairing pumps. Nine out of ten pumps fails early.
PetroSync - IWCF Certification Drilling Well Control Level 2PetroSync
This course is designed for people in critical well control positions on drilling installation as well as onshore roles. The candidates will complete an IWCF accredited training course, taught according to IWCF syllabus, in order to prepare them for assessment.
Advanced Basin Analysis is key to understanding and identification major basin settings for petroleum prospectivity. It evaluates the potential successful basins in exploration for hydrocarbons.
As compared with the standard Fishing Course, we spend more time studying the downhole “mechanics” of the fishing tools we use to catch the differing varieties of fish in oil wells and why fishing is not often successful first time.
PetroSync - Pre-Commissioning, Commissioning and Start-UpPetroSync
Successful commissioning new or starting-up revised equipment and systems requires meticulous planning, organizing and controlling. Careful methodical, detailed planning – early – is the key to the success of any commissioning.
PetroSync with Mr. Mandar Mulay organizing a 5 days training on ASME VIII Division 1 & 2 - Pressure Vessel Series. ASME VIII Div. 1 is the most commonly adopted code which is simple and used friendly, where as, ASME VIII Div 2 is an alternative code which provides a better engineered vessel with detailed stresses calculations and more rigorous testing, and allows for savings in material costs (thinner parts may be used).
PetroSync - API 510 Pressure Vessel Inspector coursePetroSync
The API 510 Certification Preparation is designed to equip the professional with such information and understand the exam format. The course will prepare the professional with both parts of the exam, the closed and open book portion.
PetroSync - IWCF Certification Drilling Well Control Level 3 & 4PetroSync
This course is designed for people in critical well control positions on drilling installation as well as onshore roles. The candidates will complete an IWCF accredited training course, taught according to IWCF syllabus, in order to prepare them for assessment.
Oil and gas companies handle the most dangerous chemicals and processes across all industries. Catastrophic incidents and casualties are products of the failure to manage process safety. The danger present in everyday operations is evolving thus it is essential to always improve in handling risk and hazard.
PetroSync - Applied Carbonate Sedimentology and GeomorphologyPetroSync
In many carbonate reservoirs, the depositional and facies patterns strongly influence reservoir geometry and continuity. This program will enable you understand the key competencies in carbonate sedimentology which will be key to enhanced interpretation of reservoir systems.
Protecting project interests from possible risks of major financial liabilities has always been a major business concern. Projects must properly been managed by qualitative risk assessment to minimize or to avoid risk occur in a project planning.
PetroSync - API 570 Piping Inspector coursePetroSync
Piping Inspection Code 570 Inspection, Repair, Alteration, and Rerating of In-Service Piping Systems is recognized and used with confidence worldwide. The Piping Inspector Certification Program (PICP) is developed for the continual high level of efficiency and safety through emphasizing professional credibility and process integrity.
This course has been written for Operators, Drilling Contractors and Service personnel who require an in-depth detailed understanding of the causes of stuck pipe (which includes drill pipe, BHA’s, casing, liners and logging tools) and how sticking can be prevented.
PetroSync - Sand Control Completion PracticesPetroSync
One of the objectives of well completion is to maximize productivity with reliable equipment. These objectives are difficult to attain in unconsolidated sand formations due to sand production as a result of stress concentration
PetroSync - ASME B31.3 Process Piping Code Design RequirementsPetroSync
Important code requirements will be explained in a simple, straight forward manner, including the short-cut methods in designing of Pipes, Pipe fitting and Flanges. The participants would be explained in detail the mechanics of adopting and applying the code rules for day-to-day use in their professional work.
Seismic interpretation is a critical step in evaluating the subsurface, as it turns the large investments in seismic data to tangible value to base all E&P decisions. It is essential for explorationists to learn to execute this key skill in their career.
PetroSync - Emotional Intelligence for Effective Work PerformancePetroSync
In order for your organization to tap the potential of its human resources, developing the employees’ capability to think effectively and creatively will be the ultimate goal. They will be able to plan, generate new ideas, make decisions, solve problems etc. with clarity and confidence if given the right fundamental thinking tools. Mind Mapping is a revolutionary method of assessing intelligence developed during 40 years of research by TONY BUZAN. His startlingly innovative MIND MAPS along with his concepts of MENTAL LITERACY have altered the way millions of people approach thinking today. Employees who are able to innovate corporate improvements are those who have learned how to harness the awesome capacity of the human brains.
PetroSync - Technical Report Writing and Presentation Skills for Oil & Gas En...PetroSync
This Technical Report Writing & Presentation Skills three-day course will teach Oil and Gas professionals how to write professional technical reports in a way that will be clearly understood by technical and non-technical readers alike, to ensure the maximum impact for them and their businesses.
The course starts off by building up from the ‘foundations’ of language, in terms of how to improve ‘readability’ and understanding by the readers for the best results. It teaches how to write good sentences and paragraphs.
PetroSync - API Specification Q1 9th Edition Quality Management System Traini...PetroSync
This four-days course will provide an informative look at the requirements, interpretations, and practical applications of the quality management principles as based on the 9th Edition of API Specification Q1, Specification for Quality Management System Requirements for Manufacturing Organizations for the Petroleum and Natural Gas Industry.
Well intervention extends the life of producing wells by improving performance access to stranded or additional hydrocarbon reserves. Being challenged by the current oil price crisis, it is crucial to polish your intervention skills to avoid further asset loss and improve sustainability.
PACCC? So Easy Even a Caveman Can Do It? Not quite. An InsightArthur A Rimbold
These 17 pages ONLY outline the coursework and guidelines to gain and maintain any providers certification. Holding it will require retesting, continued learning, and the lack of failing their public.
PetroSync - API 580 & API 581 Risk Based Inspection & Base Resource DocumentPetroSync
The course is based on API RP 580 Risk-Based Inspection and API Publication 581, Base Resource Document. The course first explains feasible means and alternatives for achieving a successful RBI program without undue complications. This course deals with RBI framework and methodology in a simple straight forward manner to establish and implement a risk-based inspection program best suited for the company objectives.
PetroSync - Surface Geochemical Exploration for Oil and GasPetroSync
The great majority of oil and gas pools and mature source rocks have recognizable surface geochemical expression. The O&G industry devotes significant time and resources in finding and defining traps, but little or none in establishing the likely presence of hydrocarbon in those traps, especially for older onshore basins.
PetroSync - Geological Interpretation of Well LogsPetroSync
The richness and immediacy of wireline log data have advanced immensely in recent year — more data, more curves, more acronyms, and are available sooner. There is vital qualitative and quantitative data in the logs.
PetroSync - Chemically Enhanced Water Alternating GasPetroSync
It is know that two-third of the original oil in place are still in the ground. Petroleum companies are looking for techniques to improve sweep efficiency and increase recovery factors. As a result, Enhanced Oil Recovery (EOR) processes need to be carried out. Successful WAG floods can yield 5-20% additional oil recovery over waterflood because of improved microscopic displacement efficiency by the solvent coupled with improving areal and vertical sweep efficiency.
PetroSync - Budgeting and Forecasting in Oil & Gas IndustryPetroSync
Our Budgeting & Forecasting in Oil & Gas Industry shares insight of budgeting and forecasting process, enables fit-for-purpose budgets and business plans to be developed that robustly model complex, but realistic situations in a flexible and auditable manner.
PetroSync - Practical Accounting in Joint Ventures & Production Sharing Contr...PetroSync
Joint ventures allow companies to preserve autonomy, share investment risk and enhance competitiveness. The financial statements of many oil & gas companies can be different in future as a
result of the changes to the accounting for joint ventures, which raises the question of how such changes should be communicated to the investors and other stakeholders.
PetroSync - Exploration & Production AccountingPetroSync
This course provides an overview through the fundamentals of accounting in the O&G industry with focus on different methods for the expenditure capitalization, depreciation & depletion together with fundamentals for accounting for international operations represented by JVs and PSCs.
PetroSync - Drilling Engineering for Non-Drilling EngineerPetroSync
During the first day of this course, the entire drilling process will be discussed. The language of drillers - understanding their terminology. Understanding the abbreviations and acronyms associated with drilling.
Failure investigations are tough rigorous challenges form the best in engineering. This course will teach delegates the range of thinking and subjects, which need to be considered in driving to find the real root cause of a failure.
PetroSync - Acoustic and Flow Induced VibrationPetroSync
Failures of piping systems in the oil, gas and petrochemical industries can lead to damage of assets, personal injury and loss of life. Piping failure can be caused by excessive vibration, in the form of high levels of acoustic energy (AIV), or by flow turbulence (FIV) created by shear forces within the piping system.
The course introduces the participants to modern carbonate environments and explain how the constituents of a carbonate sediment become lithified and changed after deposition to provide potential reservoir rocks.
The course focuses on the practical applications of various techniques and methodologies in well completion --- from the selection of completion type, perforating strategies, fluid selection, and installation of production heads.
This course will concentrate on Offshore Marine Operations and will cover Operational and Managerial requirements for Loadout; Barge Transportation; Towing of Offshore Facilities; Lifting; Steel Jackets; Gravity-Based Structures; Lift-Off, Transportation and Inshore Mating of Topsides; Offshore Pipelines; Marine Operations Overview; Special Topics, and other essential topics related to Export/Import Oil & Gas.
This course examines the difficulties, challenges and problems facing today’s deepwater drilling programme designers and personnel where wells are being drilled in increasingly difficult downhole and environmental conditions with ever increasing cost and legislation further contributing to design and operational pressures.
This training course is a comprehensive course to the technology of shell and tube heat exchangers as these robust type of heat exchangers are the most commonly used in the process and refinery industries, where they provide flexibility and are easy to maintain.
Fitness-For-Service (FFS) assessments are quantitative engineering evaluations that are performed to demonstrate the structural integrity of an in-service component that may contain a flaw or damage.
PetroSync - Applied Petrophysics for Low Resistivity Thin-Bedded FormationsPetroSync
Thin bedded reservoirs are increasingly common exploration targets. However, evaluating such formations is difficult due to challenging and sometimes misleading data.
This is an in-depth course that is designed to provide the participants with a solid understanding of reservoir engineering and associated modern theories in order to manage and maximize hydrocarbon recovery. Hands-on examples and exercises are used throughout the course to help participants with understanding key performance concepts. Participants are encouraged to bring their own laptop computer to class.
PetroSync - Fractured Reservoir Modeling with Application to Fractured BasementPetroSync
This course provides a unique opportunity to learn all the aspects related to the understanding and modeling of fractured reservoirs. Participants will gain knowledge of how fractured reservoirs differ from conventional reservoirs, and how to approach their fractured reservoir projects in a systematic manner.
PetroSync - Financial Assets Valuation for Oil & GasPetroSync
The Financial Assets Valuation For Oil & Gas course is structured specially for professionals in the oil & gas industry to equip participants with the financial understanding when valuing oil & gas assets.
About
Indigenized remote control interface card suitable for MAFI system CCR equipment. Compatible for IDM8000 CCR. Backplane mounted serial and TCP/Ethernet communication module for CCR remote access. IDM 8000 CCR remote control on serial and TCP protocol.
• Remote control: Parallel or serial interface.
• Compatible with MAFI CCR system.
• Compatible with IDM8000 CCR.
• Compatible with Backplane mount serial communication.
• Compatible with commercial and Defence aviation CCR system.
• Remote control system for accessing CCR and allied system over serial or TCP.
• Indigenized local Support/presence in India.
• Easy in configuration using DIP switches.
Technical Specifications
Indigenized remote control interface card suitable for MAFI system CCR equipment. Compatible for IDM8000 CCR. Backplane mounted serial and TCP/Ethernet communication module for CCR remote access. IDM 8000 CCR remote control on serial and TCP protocol.
Key Features
Indigenized remote control interface card suitable for MAFI system CCR equipment. Compatible for IDM8000 CCR. Backplane mounted serial and TCP/Ethernet communication module for CCR remote access. IDM 8000 CCR remote control on serial and TCP protocol.
• Remote control: Parallel or serial interface
• Compatible with MAFI CCR system
• Copatiable with IDM8000 CCR
• Compatible with Backplane mount serial communication.
• Compatible with commercial and Defence aviation CCR system.
• Remote control system for accessing CCR and allied system over serial or TCP.
• Indigenized local Support/presence in India.
Application
• Remote control: Parallel or serial interface.
• Compatible with MAFI CCR system.
• Compatible with IDM8000 CCR.
• Compatible with Backplane mount serial communication.
• Compatible with commercial and Defence aviation CCR system.
• Remote control system for accessing CCR and allied system over serial or TCP.
• Indigenized local Support/presence in India.
• Easy in configuration using DIP switches.
Explore the innovative world of trenchless pipe repair with our comprehensive guide, "The Benefits and Techniques of Trenchless Pipe Repair." This document delves into the modern methods of repairing underground pipes without the need for extensive excavation, highlighting the numerous advantages and the latest techniques used in the industry.
Learn about the cost savings, reduced environmental impact, and minimal disruption associated with trenchless technology. Discover detailed explanations of popular techniques such as pipe bursting, cured-in-place pipe (CIPP) lining, and directional drilling. Understand how these methods can be applied to various types of infrastructure, from residential plumbing to large-scale municipal systems.
Ideal for homeowners, contractors, engineers, and anyone interested in modern plumbing solutions, this guide provides valuable insights into why trenchless pipe repair is becoming the preferred choice for pipe rehabilitation. Stay informed about the latest advancements and best practices in the field.
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdffxintegritypublishin
Advancements in technology unveil a myriad of electrical and electronic breakthroughs geared towards efficiently harnessing limited resources to meet human energy demands. The optimization of hybrid solar PV panels and pumped hydro energy supply systems plays a pivotal role in utilizing natural resources effectively. This initiative not only benefits humanity but also fosters environmental sustainability. The study investigated the design optimization of these hybrid systems, focusing on understanding solar radiation patterns, identifying geographical influences on solar radiation, formulating a mathematical model for system optimization, and determining the optimal configuration of PV panels and pumped hydro storage. Through a comparative analysis approach and eight weeks of data collection, the study addressed key research questions related to solar radiation patterns and optimal system design. The findings highlighted regions with heightened solar radiation levels, showcasing substantial potential for power generation and emphasizing the system's efficiency. Optimizing system design significantly boosted power generation, promoted renewable energy utilization, and enhanced energy storage capacity. The study underscored the benefits of optimizing hybrid solar PV panels and pumped hydro energy supply systems for sustainable energy usage. Optimizing the design of solar PV panels and pumped hydro energy supply systems as examined across diverse climatic conditions in a developing country, not only enhances power generation but also improves the integration of renewable energy sources and boosts energy storage capacities, particularly beneficial for less economically prosperous regions. Additionally, the study provides valuable insights for advancing energy research in economically viable areas. Recommendations included conducting site-specific assessments, utilizing advanced modeling tools, implementing regular maintenance protocols, and enhancing communication among system components.
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Dr.Costas Sachpazis
Terzaghi's soil bearing capacity theory, developed by Karl Terzaghi, is a fundamental principle in geotechnical engineering used to determine the bearing capacity of shallow foundations. This theory provides a method to calculate the ultimate bearing capacity of soil, which is the maximum load per unit area that the soil can support without undergoing shear failure. The Calculation HTML Code included.
Welcome to WIPAC Monthly the magazine brought to you by the LinkedIn Group Water Industry Process Automation & Control.
In this month's edition, along with this month's industry news to celebrate the 13 years since the group was created we have articles including
A case study of the used of Advanced Process Control at the Wastewater Treatment works at Lleida in Spain
A look back on an article on smart wastewater networks in order to see how the industry has measured up in the interim around the adoption of Digital Transformation in the Water Industry.
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxR&R Consult
CFD analysis is incredibly effective at solving mysteries and improving the performance of complex systems!
Here's a great example: At a large natural gas-fired power plant, where they use waste heat to generate steam and energy, they were puzzled that their boiler wasn't producing as much steam as expected.
R&R and Tetra Engineering Group Inc. were asked to solve the issue with reduced steam production.
An inspection had shown that a significant amount of hot flue gas was bypassing the boiler tubes, where the heat was supposed to be transferred.
R&R Consult conducted a CFD analysis, which revealed that 6.3% of the flue gas was bypassing the boiler tubes without transferring heat. The analysis also showed that the flue gas was instead being directed along the sides of the boiler and between the modules that were supposed to capture the heat. This was the cause of the reduced performance.
Based on our results, Tetra Engineering installed covering plates to reduce the bypass flow. This improved the boiler's performance and increased electricity production.
It is always satisfying when we can help solve complex challenges like this. Do your systems also need a check-up or optimization? Give us a call!
Work done in cooperation with James Malloy and David Moelling from Tetra Engineering.
More examples of our work https://www.r-r-consult.dk/en/cases-en/
Hierarchical Digital Twin of a Naval Power SystemKerry Sado
A hierarchical digital twin of a Naval DC power system has been developed and experimentally verified. Similar to other state-of-the-art digital twins, this technology creates a digital replica of the physical system executed in real-time or faster, which can modify hardware controls. However, its advantage stems from distributing computational efforts by utilizing a hierarchical structure composed of lower-level digital twin blocks and a higher-level system digital twin. Each digital twin block is associated with a physical subsystem of the hardware and communicates with a singular system digital twin, which creates a system-level response. By extracting information from each level of the hierarchy, power system controls of the hardware were reconfigured autonomously. This hierarchical digital twin development offers several advantages over other digital twins, particularly in the field of naval power systems. The hierarchical structure allows for greater computational efficiency and scalability while the ability to autonomously reconfigure hardware controls offers increased flexibility and responsiveness. The hierarchical decomposition and models utilized were well aligned with the physical twin, as indicated by the maximum deviations between the developed digital twin hierarchy and the hardware.
Final project report on grocery store management system..pdfKamal Acharya
In today’s fast-changing business environment, it’s extremely important to be able to respond to client needs in the most effective and timely manner. If your customers wish to see your business online and have instant access to your products or services.
Online Grocery Store is an e-commerce website, which retails various grocery products. This project allows viewing various products available enables registered users to purchase desired products instantly using Paytm, UPI payment processor (Instant Pay) and also can place order by using Cash on Delivery (Pay Later) option. This project provides an easy access to Administrators and Managers to view orders placed using Pay Later and Instant Pay options.
In order to develop an e-commerce website, a number of Technologies must be studied and understood. These include multi-tiered architecture, server and client-side scripting techniques, implementation technologies, programming language (such as PHP, HTML, CSS, JavaScript) and MySQL relational databases. This is a project with the objective to develop a basic website where a consumer is provided with a shopping cart website and also to know about the technologies used to develop such a website.
This document will discuss each of the underlying technologies to create and implement an e- commerce website.
Cosmetic shop management system project report.pdfKamal Acharya
Buying new cosmetic products is difficult. It can even be scary for those who have sensitive skin and are prone to skin trouble. The information needed to alleviate this problem is on the back of each product, but it's thought to interpret those ingredient lists unless you have a background in chemistry.
Instead of buying and hoping for the best, we can use data science to help us predict which products may be good fits for us. It includes various function programs to do the above mentioned tasks.
Data file handling has been effectively used in the program.
The automated cosmetic shop management system should deal with the automation of general workflow and administration process of the shop. The main processes of the system focus on customer's request where the system is able to search the most appropriate products and deliver it to the customers. It should help the employees to quickly identify the list of cosmetic product that have reached the minimum quantity and also keep a track of expired date for each cosmetic product. It should help the employees to find the rack number in which the product is placed.It is also Faster and more efficient way.
2. 2
WELL ENGINEERING| IWCF WELL INTERVENTION PRESSURE CONTROL
Interesting Facts Related to Subject Matter
Do you know that xxx xxx xxx xx xx ?
This 4-day (Level 2) & 5-day (Level 3 & Level 4) program is offered with either IWCF or IADC
certification and follows new progressive, role specific curriculum. Each course concludes with
up to 5 closed-book examinations leading to the required certificate of competence in well
intervention.
general@petrosync.com | +65 6451 4500 | www.petrosync.com
Course Overview
Level 2 training – If passed, the certificate is valid for 5 years.
Level 3 and 4 training – If passed, the certificate is valid for 2 years
Who Needs This Program
This program is aimed at persons in critical positions involving well control during well
intervention operations. Well Intervention Pressure Control courses are offered at various role
-specific levels for well services personnel with a requirement to hold an IWCF or IADC Well
Control certificate.
Level 2 is designed for first-time candidates.
Level 3 is designed for operators.
Level 4 is designed for supervisors.
PetroSync Quality Assurance
All PetroSync courses are developed with top quality to
address all your training needs and purposes. Our courses
are vetted strictly to ensure that we always deliver the
best courses with the best industry expert.
PetroSync Inhouse Solutions
PetroSync can tailor our courses to meet your specific
needs at your preferred location and schedule. Contact us
for more information at +65 6415 4500 or email to
general @petrosync.com
Course Schedule
07:30—08:00 Registration (Day 1) 12:30—13:30 Lunch
08:00—10:30 Session I 13:30—15:30 Session III
10:30—10:45 Refreshment Session I 15:30—15:45 Refreshment Session II
10:45—12:30 Session II 15:45—17:00 Session Iv (Last Session)
Certification Overview
The compulsory examinations are : Principles & Producers, Completion Operations, and
additional minimum of 1 examination is required from Coil Tubing Operation, Wireline
Operations or Hydraulic Workover Snubbing) Operations.
Different levels of training are available
3. 3
Structure
Equipment
Completion
Wireline
Coiled tubing
Snubbing
Barrier principles
Well information
Shut-in procedures
Pressure control methods
Problems
Pressure control management
Independent Invigilators who are registered and ap-
proved by the IWCF conduct the written tests at center
which have been approved and accredited for the pur-
pose of the certification program. Register For This Course Now!
You Might Also Be Interested In:
IWCF Well Intervention Pressure Control
Level 3 & 4
16-20 May 2016 | Indonesia
IWCF Certification Drilling Well Control
Level 3 & 4
9-13 May 2016 | Indonesia
Kindly fill up your particulars in the
registration form placed at the end of this
brochure, and send it to us or email to
registration@petrosync.com
general@petrosync.com | +65 6451 4500 | www.petrosync.com
WELL ENGINEERING | IWCF WELL INTERVENTION PRESSURE CONTROL
Content
The certification standards in our program are based on the
pressure control knowledge required by service equipment
operators and supervisory personnel in their jobs. These
standards have been devised so that the measurement of
candidate’s knowledge can be assessed systematically.
The following certification options are provided and are
made up of compulsory and optional components:
Compulsory
Completion Operations
Completion Equipment
Optional (at least choose 1)
Coiled Tubing Operations
Wireline Operations
Snubbing Operations
Candidates must attempt both compulsory components
and one or more optional component in a combined certifi-
cation program. However, to obtain a combined certificate,
candidates must pass each component they have been
nominated for.
COURSE DETAILS
Re-sit Policy
If candidate fails in 1 component, and achieves 66—
69%, he is eligible for instant re-sit (USD 100).
If he achieves 65% or below, he can take first re-sit
within 90 days after initial exam (USD 200). Re-sit
registration should be done at least 12 working days
before re-sit date. Candidates must receive further
training in the areas of weakness must be confirmed
by PetroSync and will be charged USD 1000 per
training day and USD 75 per re-sit test paper.
If the candidate fails on 2 or more components, he is
not be eligible for re-sit, and must re-attend a new
course.
Remark: Instant re-sit will be prepared by the IWCF
invigilator on the actual exam day, he will prepare the
instant re-sit paper as per the percentage participants on the
class. For example 3 delegates, he will ready 1 extra re-sit
paper for the one who qualified to sit for the instant re-sit
which is only fails 1 component and achieved between 66-
69%.
Examination Structure
4. 4
By Credit Card:
Please debit my credit card: Visa MasterCard AMEX Security Code:
Card Number: Expiry Date:
Name Printed on Card:
By Direct Transfer: Please quote invoice number(s) on remittance advice
PetroSync Global Pte Ltd Bank Details:
Account Name: PetroSync Global Pte Ltd
Bank Name: DBS Bank Ltd
Bank Code: 7171—Bank Swift Code: DBSSSGSGXXX—Branch Code: 288
Account No: SGD: 288-901898-0 USD: 0288-002682-01-6
Bank Address: 12 Marina Boulevard, Level 3. Marina Bay Financial Centre Tower 3. Singapore 018982.
All bank charges to be borne by payer. Please ensure that PetroSync Global Pte Ltd receives the full invoiced
amount.
Title : IWCF Well Intervention Pressure Control
Date : Subject to Course Level
Location : Bandung, Indonesia
COURSE DETAILS
COURSE DATE 14-17 March 2016 4-8 April 2016 4-8 April 2016
COURSE PRICE USD 1,850 USD 1,950 USD 1,950
DATELINE 15 February 2016 7 March 2016 7 March 2016
COURSE LEVEL Level 2 Level 3 Level 4
INVESTMENT PACKAGES (Please Circle)
COURSE CONSULTANT
Name : Cay Aagen
Email : registration@petrosync.com
Phone : +65 6415 4500
Fax : +65 6415 4322
TERMS AND CONDITIONS
DISCLAIMER
Please note that trainers and topics were confirmed at
the time of publishing; however, PetroSync may
necessitate substitutions, alterations or cancellations
of the trainers or topics. As such, PetroSync reserves
the right to change or cancel any part of its published
course due to unforeseen circumstances. Any
substitutions or alterations will be updated on our web
page as soon as possible.
DATA PROTECTION
The information you provide will be safeguarded by
PetroSync that may be used to keep you informed of
relevant products and services. As an international
group we may transfer your data on a global basis for
the purpose indicated above. If you do not want us to
share your information with other reputable
companies, please tick this box
CANCELLATION POLICY
You may substitute delegates at any time as long as
reasonable advance notice is given to PetroSync. For
any cancellation received in writing not less than
fourteen (14) working days prior to the training
course, you will receive credit voucher less a USD $200
administration fee and any related bank or credit card
charges. Delegates who cancel less than fourteen (14)
working days of the training course, or who do not
attend the course, are liable to pay the full course fee
and no refunds will be granted. In the event that
PetroSync cancels or postpones an event for any
reason and that the delegate is unable or unwilling to
attend in on the rescheduled date, you will receive a
credit voucher for 100% of the contract fee paid. You
may use this credit voucher for another PetroSync to
be mutually agreed with PetroSync, which must occur
within a year from the date of postponement.
PetroSync is not responsible for any loss or damage as
a result of the cancellation policy. PetroSync will
assume no liability whatsoever in the event this event
is cancelled, rescheduled or postponed due to any Act
of God, fire, act of government or state, war, civil
commotion, insurrection, embargo, industrial action,
or any other reason beyond management control.
CERTIFICATE OF ATTENDANCE
As per IWCF information Notice No 2012-02, candi-
dates must not miss more than total 4 hours training
to be eligible to take the exam
DETAILS
Please accept our apologies for mail or email that is
incorrectly addressed.
Please email us at registration@petrosync.com and
inform us of any incorrect details. We will amend them
accordingly.
CHARGES & FEE(S)
- For Payment by Direct Telegraphic Transfer, client
has to bear both local and oversea bank charges.
- For credit card payment, there is additional 4%
credit card processing fee.
1st Delegate Name:
Direct Line Number: Email:
Job Title: Department:
Head of Department:
Mr Mrs Ms Dr Others
2nd Delegate Name:
Direct Line Number: Email:
Job Title: Department:
Head of Department:
Mr Mrs Ms Dr Others
3rd Delegate Name:
Direct Line Number: Email:
Job Title: Department:
Head of Department:
Mr Mrs Ms Dr Others
Attention Invoice to:
Direct Line Number: Fax:
Company: Industry:
Address: Postcode:
Country: Email:
Please note:
- Indicate if you have already registered by Phone Fax Email Web
- If you have not received an acknowledgement before the training, please call us to confirm your booking.
CONFIRMATION
I agree to PetroSync’s terms & conditions, payment terms and cancellation policy.
Authorized Signature:
PAYMENT TERMS : Payment is due in full at the time of registration. Full payment is mandatory for event attendance.
PAYMENT METHOD
INVOICE DETAILS
DELEGATES DETAILS
** Price will not be included for re‐sit exam