Failure investigations are tough rigorous challenges form the best in engineering. This course will teach delegates the range of thinking and subjects, which need to be considered in driving to find the real root cause of a failure.
This course has been written for Operators, Drilling Contractors and Service personnel who require an in-depth detailed understanding of the causes of stuck pipe (which includes drill pipe, BHA’s, casing, liners and logging tools) and how sticking can be prevented.
ABOUT THE COURSE
The 3 day session on Stuck Pipe Prevention focuses upon the key mechanisms with which pipe becomes stuck and how the sticking mechanisms can be prevented through proper planning and operational procedures. It also covers the Driller’s First Actions, i.e. what the Driller should do as soon as he has become stuck in order to maximise the possibility of becoming free.
To maximise learning, delegates work through actual Stuck Pipe case histories, identifying the sticking mechanisms, prevention measures and what to do to get free. Presentation material is through the use of PowerPoint, case histories and video.
Typically, Fishing is the last chance for the Operator to recover the stuck BHA / fish from the hole. In many cases work pressure is considerable, since fishing is a high cost operation and because Governments often demand that nuclear sources for example are recovered. Thus, it is vital that Fishing is a success. And yet there is an estimated 85% failure rate.
The 2 day session on Fishing focuses upon how it can be a success first time. To maximise learning, delegates work through actual fishing case histories and follow proven procedures and methodologies. Presentation material is through the use of PowerPoint, case histories and videos
By the end of this course, delegates will be able to:
Understand how drill pipe become stuck & what they can do to prevent the situation from occurring.
What the driller should do regarding his “First Actions” upon becoming stuck.
Fully understand the contents of the Driller’s Stuck Pipe Prevention Handbook.
How to fish successfully the first time – i.e. what information, tools, techniques, practices and procedures are required.
Fully understand the contents of the Driller’s Fishing Handbook
PetroSync - Sand Control Completion PracticesPetroSync
One of the objectives of well completion is to maximize productivity with reliable equipment. These objectives are difficult to attain in unconsolidated sand formations due to sand production as a result of stress concentration
As compared with the standard Fishing Course, we spend more time studying the downhole “mechanics” of the fishing tools we use to catch the differing varieties of fish in oil wells and why fishing is not often successful first time.
This course examines the difficulties, challenges and problems facing today’s deepwater drilling programme designers and personnel where wells are being drilled in increasingly difficult downhole and environmental conditions with ever increasing cost and legislation further contributing to design and operational pressures.
PetroSync - Cost Engineering Risk Management-Earned Value ManagementPetroSync
Will cover the latest techniques and practical methodologies of project cost engineering and risk management to successfully manage project cost and risk, in order to maximize business ROI in the long run.
This course has been written for Operators, Drilling Contractors and Service personnel who require an in-depth detailed understanding of the causes of stuck pipe (which includes drill pipe, BHA’s, casing, liners and logging tools) and how sticking can be prevented.
ABOUT THE COURSE
The 3 day session on Stuck Pipe Prevention focuses upon the key mechanisms with which pipe becomes stuck and how the sticking mechanisms can be prevented through proper planning and operational procedures. It also covers the Driller’s First Actions, i.e. what the Driller should do as soon as he has become stuck in order to maximise the possibility of becoming free.
To maximise learning, delegates work through actual Stuck Pipe case histories, identifying the sticking mechanisms, prevention measures and what to do to get free. Presentation material is through the use of PowerPoint, case histories and video.
Typically, Fishing is the last chance for the Operator to recover the stuck BHA / fish from the hole. In many cases work pressure is considerable, since fishing is a high cost operation and because Governments often demand that nuclear sources for example are recovered. Thus, it is vital that Fishing is a success. And yet there is an estimated 85% failure rate.
The 2 day session on Fishing focuses upon how it can be a success first time. To maximise learning, delegates work through actual fishing case histories and follow proven procedures and methodologies. Presentation material is through the use of PowerPoint, case histories and videos
By the end of this course, delegates will be able to:
Understand how drill pipe become stuck & what they can do to prevent the situation from occurring.
What the driller should do regarding his “First Actions” upon becoming stuck.
Fully understand the contents of the Driller’s Stuck Pipe Prevention Handbook.
How to fish successfully the first time – i.e. what information, tools, techniques, practices and procedures are required.
Fully understand the contents of the Driller’s Fishing Handbook
PetroSync - Sand Control Completion PracticesPetroSync
One of the objectives of well completion is to maximize productivity with reliable equipment. These objectives are difficult to attain in unconsolidated sand formations due to sand production as a result of stress concentration
As compared with the standard Fishing Course, we spend more time studying the downhole “mechanics” of the fishing tools we use to catch the differing varieties of fish in oil wells and why fishing is not often successful first time.
This course examines the difficulties, challenges and problems facing today’s deepwater drilling programme designers and personnel where wells are being drilled in increasingly difficult downhole and environmental conditions with ever increasing cost and legislation further contributing to design and operational pressures.
PetroSync - Cost Engineering Risk Management-Earned Value ManagementPetroSync
Will cover the latest techniques and practical methodologies of project cost engineering and risk management to successfully manage project cost and risk, in order to maximize business ROI in the long run.
PetroSync - Budgeting and Forecasting in Oil & Gas IndustryPetroSync
Our Budgeting & Forecasting in Oil & Gas Industry shares insight of budgeting and forecasting process, enables fit-for-purpose budgets and business plans to be developed that robustly model complex, but realistic situations in a flexible and auditable manner.
PetroSync - IWCF Well Intervention Pressure Control Level 3 & 4PetroSync
This program is offered with either IWCF or IADC certification and follows new progressive, role specific curriculum. Each course concludes with up to 5 closed-book examinations leading to the required certificate of competence in well intervention.
PetroSync - Mastering Production Sharing ContractsPetroSync
course is specifically designed for professionals involved nationally and internationally in the oil and gas industry, it offers a unique opportunity to rapidly increase your understanding of the legal issues involved in production sharing contracts and to improve your negotiation techniques and skills in drafting a variety of related contracts.
PetroSync - Practical Accounting in Joint Ventures & Production Sharing Contr...PetroSync
Joint ventures allow companies to preserve autonomy, share investment risk and enhance competitiveness. The financial statements of many oil & gas companies can be different in future as a
result of the changes to the accounting for joint ventures, which raises the question of how such changes should be communicated to the investors and other stakeholders.
PetroSync Wellsite and Operations GeologyPetroSync
Wellsite Geologists are mainly involved in evaluating offset data before beginning any drilling operations. The focus of this course is aimed at improving the conduct of data acquisition of the subsurface region. Because the subsurface data acquisition entails big capital expenditure, it is important to obtain quality information for future use in field development designs and drilling operations.
PetroSync - Applied Petrophysics for Low Resistivity Thin-Bedded FormationsPetroSync
Thin bedded reservoirs are increasingly common exploration targets. However, evaluating such formations is difficult due to challenging and sometimes misleading data.
PetroSync - Exploration & Production AccountingPetroSync
This course provides an overview through the fundamentals of accounting in the O&G industry with focus on different methods for the expenditure capitalization, depreciation & depletion together with fundamentals for accounting for international operations represented by JVs and PSCs.
This course will concentrate on Offshore Marine Operations and will cover Operational and Managerial requirements for Loadout; Barge Transportation; Towing of Offshore Facilities; Lifting; Steel Jackets; Gravity-Based Structures; Lift-Off, Transportation and Inshore Mating of Topsides; Offshore Pipelines; Marine Operations Overview; Special Topics, and other essential topics related to Export/Import Oil & Gas.
PetroSync - Surface Geochemical Exploration for Oil and GasPetroSync
The great majority of oil and gas pools and mature source rocks have recognizable surface geochemical expression. The O&G industry devotes significant time and resources in finding and defining traps, but little or none in establishing the likely presence of hydrocarbon in those traps, especially for older onshore basins.
PetroSync - Acoustic and Flow Induced VibrationPetroSync
Failures of piping systems in the oil, gas and petrochemical industries can lead to damage of assets, personal injury and loss of life. Piping failure can be caused by excessive vibration, in the form of high levels of acoustic energy (AIV), or by flow turbulence (FIV) created by shear forces within the piping system.
PetroSync - LNG & Gas Sales Contracts-Negotiation and Pricing ReviewPetroSync
The course will start by going deep into the two main contracts, the SPA(GSPA) and the Capacity Agreement. By looking at their neuralgic clauses we will be able to understand the risk reward balance in contracts and how everything is dependent on everything.
A significant part of the course will discuss recent geochemical and isotopic methods of determining the origin of the gas, its thermal maturity (i.e. temperature of generation), the influence of mixing of gases from different sources and the origin of inorganic components such as nitrogen and carbon dioxide.
PetroSync - API Specification Q1 9th Edition Quality Management System Traini...PetroSync
This four-days course will provide an informative look at the requirements, interpretations, and practical applications of the quality management principles as based on the 9th Edition of API Specification Q1, Specification for Quality Management System Requirements for Manufacturing Organizations for the Petroleum and Natural Gas Industry.
PetroSync - Introduction to Oil and Gas AccountingPetroSync
The Oil & Gas Industry is one of the top industries in the world requiring intensive capital investment and involves significant risks. Accounting in the Oil & Gas industry is also very unique. Applying accounting rules and regulation are complex and different from any other industry.
The 2-day course focuses on these issues and provides an overall understanding of a series of major IFRS and US GAAP accounting principles and standards that are particularly applicable to the upstream oil and gas business; shows how to apply these accounting rules; discusses financial reporting requirements as applicable to upstream companies and all related Joint Ventures and Production Sharing Contracts.
PetroSync - Advanced Financial Modelling for Oil and GasPetroSync
This is an interactive and hands-on course aimed at developing participants’ skills in implementing a wide range of financial modelling applications that are found in the oil and gas and related sectors. The course is aimed at experienced Excel practitioners who wish to consolidate their knowledge and move to a more advanced level.
A very wide range of Excel functions is covered; the course is based around hands-on exercises to show the practical application of these functions. The course also covers issues relating to best practices, the design of models, issues that arise in frequent modelling applications. An overview of the links of these topics with other areas is also provided, such as the use of macros, and of risk and simulation modelling.
This drilling string design program is a unique course discussing all factors that influence the drill string during operations. The participants will learn about the drill pipe grade, the limitation for torque and tension, and the drill collars tensional stress. Delegates will be able to optimize the drilling operations by performing a proper drill string design and eliminating the corresponding problems.
Participants will be acquainted with the problems of string vibrations and the ways to solve them. Delegates will perform a string design for directional drilling and choose the best BHA to address the problems. This course will provide several examples to the participants and train them to estimate the torque and drag. This program will be discussing all the challenges of drill string design, and the best practices applied by the oil industry in addressing these problems.
Regarding to high stipulation of directional drilling and tendencies of maximizing oil and gas production by drilling horizontal and lateral or high deviated wells (ERW), a tremendous hazards were challenging in speed up of accomplishing directional drilling. This course will go through all problems and will help in optimizing the best directional plans moreover preventing directional problems and related hazards as well.
Effective measures for auditing project performance and controlling projects is the key to any project’s success. In this course, you will discover proven ways to work within your identified constraints, without letting predefined limits curtail creativity and innovation.
Our Auditing Project Performance & Project Control course is developed to help you learn the required skillsets to validate your project through auditing the limits of time, human resources, materials, budget, and specifications to ensure project success.
This course focuses on the hands-on training and experience, practicing art of auditing your project against the project requirements documents, risk management plans, and budget estimates.
You will also learn the best industry practices used to measure the triple constraints of project management and risk that ensure project success and techniques for estimating and forecasting future performance of your project.
Optimizing Gas Turbines and Life ManagementWalter Lee
A practical and comprehensive course on condition & life
assessments for gas turbines with the aim of improving gas
turbine operational & maintenance practices, minimizing
the likelihood of failures, prolonging asset life & reducing
maintenance costs.
PetroSync - Budgeting and Forecasting in Oil & Gas IndustryPetroSync
Our Budgeting & Forecasting in Oil & Gas Industry shares insight of budgeting and forecasting process, enables fit-for-purpose budgets and business plans to be developed that robustly model complex, but realistic situations in a flexible and auditable manner.
PetroSync - IWCF Well Intervention Pressure Control Level 3 & 4PetroSync
This program is offered with either IWCF or IADC certification and follows new progressive, role specific curriculum. Each course concludes with up to 5 closed-book examinations leading to the required certificate of competence in well intervention.
PetroSync - Mastering Production Sharing ContractsPetroSync
course is specifically designed for professionals involved nationally and internationally in the oil and gas industry, it offers a unique opportunity to rapidly increase your understanding of the legal issues involved in production sharing contracts and to improve your negotiation techniques and skills in drafting a variety of related contracts.
PetroSync - Practical Accounting in Joint Ventures & Production Sharing Contr...PetroSync
Joint ventures allow companies to preserve autonomy, share investment risk and enhance competitiveness. The financial statements of many oil & gas companies can be different in future as a
result of the changes to the accounting for joint ventures, which raises the question of how such changes should be communicated to the investors and other stakeholders.
PetroSync Wellsite and Operations GeologyPetroSync
Wellsite Geologists are mainly involved in evaluating offset data before beginning any drilling operations. The focus of this course is aimed at improving the conduct of data acquisition of the subsurface region. Because the subsurface data acquisition entails big capital expenditure, it is important to obtain quality information for future use in field development designs and drilling operations.
PetroSync - Applied Petrophysics for Low Resistivity Thin-Bedded FormationsPetroSync
Thin bedded reservoirs are increasingly common exploration targets. However, evaluating such formations is difficult due to challenging and sometimes misleading data.
PetroSync - Exploration & Production AccountingPetroSync
This course provides an overview through the fundamentals of accounting in the O&G industry with focus on different methods for the expenditure capitalization, depreciation & depletion together with fundamentals for accounting for international operations represented by JVs and PSCs.
This course will concentrate on Offshore Marine Operations and will cover Operational and Managerial requirements for Loadout; Barge Transportation; Towing of Offshore Facilities; Lifting; Steel Jackets; Gravity-Based Structures; Lift-Off, Transportation and Inshore Mating of Topsides; Offshore Pipelines; Marine Operations Overview; Special Topics, and other essential topics related to Export/Import Oil & Gas.
PetroSync - Surface Geochemical Exploration for Oil and GasPetroSync
The great majority of oil and gas pools and mature source rocks have recognizable surface geochemical expression. The O&G industry devotes significant time and resources in finding and defining traps, but little or none in establishing the likely presence of hydrocarbon in those traps, especially for older onshore basins.
PetroSync - Acoustic and Flow Induced VibrationPetroSync
Failures of piping systems in the oil, gas and petrochemical industries can lead to damage of assets, personal injury and loss of life. Piping failure can be caused by excessive vibration, in the form of high levels of acoustic energy (AIV), or by flow turbulence (FIV) created by shear forces within the piping system.
PetroSync - LNG & Gas Sales Contracts-Negotiation and Pricing ReviewPetroSync
The course will start by going deep into the two main contracts, the SPA(GSPA) and the Capacity Agreement. By looking at their neuralgic clauses we will be able to understand the risk reward balance in contracts and how everything is dependent on everything.
A significant part of the course will discuss recent geochemical and isotopic methods of determining the origin of the gas, its thermal maturity (i.e. temperature of generation), the influence of mixing of gases from different sources and the origin of inorganic components such as nitrogen and carbon dioxide.
PetroSync - API Specification Q1 9th Edition Quality Management System Traini...PetroSync
This four-days course will provide an informative look at the requirements, interpretations, and practical applications of the quality management principles as based on the 9th Edition of API Specification Q1, Specification for Quality Management System Requirements for Manufacturing Organizations for the Petroleum and Natural Gas Industry.
PetroSync - Introduction to Oil and Gas AccountingPetroSync
The Oil & Gas Industry is one of the top industries in the world requiring intensive capital investment and involves significant risks. Accounting in the Oil & Gas industry is also very unique. Applying accounting rules and regulation are complex and different from any other industry.
The 2-day course focuses on these issues and provides an overall understanding of a series of major IFRS and US GAAP accounting principles and standards that are particularly applicable to the upstream oil and gas business; shows how to apply these accounting rules; discusses financial reporting requirements as applicable to upstream companies and all related Joint Ventures and Production Sharing Contracts.
PetroSync - Advanced Financial Modelling for Oil and GasPetroSync
This is an interactive and hands-on course aimed at developing participants’ skills in implementing a wide range of financial modelling applications that are found in the oil and gas and related sectors. The course is aimed at experienced Excel practitioners who wish to consolidate their knowledge and move to a more advanced level.
A very wide range of Excel functions is covered; the course is based around hands-on exercises to show the practical application of these functions. The course also covers issues relating to best practices, the design of models, issues that arise in frequent modelling applications. An overview of the links of these topics with other areas is also provided, such as the use of macros, and of risk and simulation modelling.
This drilling string design program is a unique course discussing all factors that influence the drill string during operations. The participants will learn about the drill pipe grade, the limitation for torque and tension, and the drill collars tensional stress. Delegates will be able to optimize the drilling operations by performing a proper drill string design and eliminating the corresponding problems.
Participants will be acquainted with the problems of string vibrations and the ways to solve them. Delegates will perform a string design for directional drilling and choose the best BHA to address the problems. This course will provide several examples to the participants and train them to estimate the torque and drag. This program will be discussing all the challenges of drill string design, and the best practices applied by the oil industry in addressing these problems.
Regarding to high stipulation of directional drilling and tendencies of maximizing oil and gas production by drilling horizontal and lateral or high deviated wells (ERW), a tremendous hazards were challenging in speed up of accomplishing directional drilling. This course will go through all problems and will help in optimizing the best directional plans moreover preventing directional problems and related hazards as well.
Effective measures for auditing project performance and controlling projects is the key to any project’s success. In this course, you will discover proven ways to work within your identified constraints, without letting predefined limits curtail creativity and innovation.
Our Auditing Project Performance & Project Control course is developed to help you learn the required skillsets to validate your project through auditing the limits of time, human resources, materials, budget, and specifications to ensure project success.
This course focuses on the hands-on training and experience, practicing art of auditing your project against the project requirements documents, risk management plans, and budget estimates.
You will also learn the best industry practices used to measure the triple constraints of project management and risk that ensure project success and techniques for estimating and forecasting future performance of your project.
Optimizing Gas Turbines and Life ManagementWalter Lee
A practical and comprehensive course on condition & life
assessments for gas turbines with the aim of improving gas
turbine operational & maintenance practices, minimizing
the likelihood of failures, prolonging asset life & reducing
maintenance costs.
PUMPS, COMPRESSORS, & TURBINES; Selection, Operation and MaintenanceSyahrul Saharudin
Company benefits:
- Consolidation of Capital Investment
- Maximise Plant Availability and Reliability
- Minimize Operating and Maintenance Costs
- Maintain Original Machinery Design Performance
Who should attend:
- Chemical Process Engineers
- Mechanical Engineers
- Production Engineers
- Planners
- Operation, Technical service and Maintenance professionals
- Asset Managers
- Rotating Equipment Engineers
- Consultants
- Sales & Service Professional
Well intervention extends the life of producing wells by improving performance access to stranded or additional hydrocarbon reserves. Being challenged by the current oil price crisis, it is crucial to polish your intervention skills to avoid further asset loss and improve sustainability.
PetroSync - Drilling Engineering for Non-Drilling EngineerPetroSync
During the first day of this course, the entire drilling process will be discussed. The language of drillers - understanding their terminology. Understanding the abbreviations and acronyms associated with drilling.
PetroSync with Mr. Mandar Mulay organizing a 5 days training on ASME VIII Division 1 & 2 - Pressure Vessel Series. ASME VIII Div. 1 is the most commonly adopted code which is simple and used friendly, where as, ASME VIII Div 2 is an alternative code which provides a better engineered vessel with detailed stresses calculations and more rigorous testing, and allows for savings in material costs (thinner parts may be used).
Rigless Intervention: Slickline, Coiled Tubing, Hydraulic, Workover & New Tec...petroEDGE
Course Description
This three-day course is designed to provide participants with a thorough knowledge and understanding of the surface equipment, downhole tools, applications and operational contingencies for the most Rigless Interventions techniques used in Oil & Gas wells
worldwide.
This 3 day course will use real examples and exercises from around the world. Participants will be provided with first-hand knowledge of what can be achieved without a rig on site. Participants will further be provided with the advantages that a Rigless Intervention can offer in terms of cost effectiveness, minimal deferment, real time data and the ability to perform these operations on a live well.
Course Objective
To enable participants to understand the basic types of Rigless Interventions, the specific operations that can be performed and the risks and rewards associated with these opportunities.
Key areas focused-on during this 3 day training course:
Understand the common applications of Slickline, non-conductive braided cable and e-line (logging cable).
Learn the configuration of a basic wireline toolstring and how it is manipulated.
Understand the common applications of coil tubing and gain an understanding of basic coil tubing BHAs
Acquire an appreciation for the types of operations that can be carried out with coil tubing.
Understand the common applications of HWO and explore the types of operations that can be carried out with HWO.
Exploit new technologies in overcoming well integrity challenges
The course focuses on the practical applications of various techniques and methodologies in well completion --- from the selection of completion type, perforating strategies, fluid selection, and installation of production heads.
Conditionally accredited by IADC, this intensive four-day course is designed to provide participants with a thorough
knowledge of well integrity management and risk assessment in producing assets.
Based on the regulatory requirements and using real examples and exercises from around the world, this represents best practice integrity management within the
oil and gas industry.
The Subsea Production Engineering Course provides an overview of all of the functionalities and key interfaces of subsea equipment. The course will refer to relevant industry engineering standards for subsea equipment, and critical operational requirements. The sessions will cover challenges associated with equipment design and installability.
Improve Your Branding, Save Costs, and Engage Your Customers through Content ...LavaCon
By Berry Braster, Etteplan
Did you know that words like “set”, “run” and “go” each have over 368 definitions?
Content quality results in clear, concise, and consistent writing, which will drive cost down and quality up – providing your end users with information they can easily retrieve and understand, enhancing product safety, and improving your brand.
During this session, we will discuss how to implement content quality standards for authoring using various case studies, and how it helps you publish your content using technologies like augmented reality.
Similar to PetroSync - Gas Turbine Failure Analysis (20)
PetroSync - API 580 & API 581 Risk Based Inspection & Base Resource DocumentPetroSync
The course is based on API RP 580 Risk-Based Inspection and API Publication 581, Base Resource Document. The course first explains feasible means and alternatives for achieving a successful RBI program without undue complications. This course deals with RBI framework and methodology in a simple straight forward manner to establish and implement a risk-based inspection program best suited for the company objectives.
PetroSync - Geological Interpretation of Well LogsPetroSync
The richness and immediacy of wireline log data have advanced immensely in recent year — more data, more curves, more acronyms, and are available sooner. There is vital qualitative and quantitative data in the logs.
PetroSync - Chemically Enhanced Water Alternating GasPetroSync
It is know that two-third of the original oil in place are still in the ground. Petroleum companies are looking for techniques to improve sweep efficiency and increase recovery factors. As a result, Enhanced Oil Recovery (EOR) processes need to be carried out. Successful WAG floods can yield 5-20% additional oil recovery over waterflood because of improved microscopic displacement efficiency by the solvent coupled with improving areal and vertical sweep efficiency.
The course introduces the participants to modern carbonate environments and explain how the constituents of a carbonate sediment become lithified and changed after deposition to provide potential reservoir rocks.
This training course is a comprehensive course to the technology of shell and tube heat exchangers as these robust type of heat exchangers are the most commonly used in the process and refinery industries, where they provide flexibility and are easy to maintain.
Fitness-For-Service (FFS) assessments are quantitative engineering evaluations that are performed to demonstrate the structural integrity of an in-service component that may contain a flaw or damage.
This is an in-depth course that is designed to provide the participants with a solid understanding of reservoir engineering and associated modern theories in order to manage and maximize hydrocarbon recovery. Hands-on examples and exercises are used throughout the course to help participants with understanding key performance concepts. Participants are encouraged to bring their own laptop computer to class.
PetroSync - Fractured Reservoir Modeling with Application to Fractured BasementPetroSync
This course provides a unique opportunity to learn all the aspects related to the understanding and modeling of fractured reservoirs. Participants will gain knowledge of how fractured reservoirs differ from conventional reservoirs, and how to approach their fractured reservoir projects in a systematic manner.
PetroSync - Financial Assets Valuation for Oil & GasPetroSync
The Financial Assets Valuation For Oil & Gas course is structured specially for professionals in the oil & gas industry to equip participants with the financial understanding when valuing oil & gas assets.
This course is designed to provide basic knowledge about petroleum geology, exploration, drilling, production, and the overall business of the petroleum industry.
PetroSync - Play Fairways Analysis & Prospect EvaluationPetroSync
The proposed workshop will cover the key topics prospect appraisal and play fairway analysis. The aim of the course is to provide the exploration geology and play fairway context for prospect evaluation, and then concentrate on the geological understanding of the specific risks associated with hydrocarbon charge, seals, traps, reservoirs and timing, with special attention paid to the risks associated with geophysical evaluation.
The Course also covers both successful and unsuccessful Case Histories in HPHT drilling operations from around the globe as reported by Operators & Drilling Contractors. New technologies available to the Industry are also covered.
Democratizing Fuzzing at Scale by Abhishek Aryaabh.arya
Presented at NUS: Fuzzing and Software Security Summer School 2024
This keynote talks about the democratization of fuzzing at scale, highlighting the collaboration between open source communities, academia, and industry to advance the field of fuzzing. It delves into the history of fuzzing, the development of scalable fuzzing platforms, and the empowerment of community-driven research. The talk will further discuss recent advancements leveraging AI/ML and offer insights into the future evolution of the fuzzing landscape.
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)MdTanvirMahtab2
This presentation is about the working procedure of Shahjalal Fertilizer Company Limited (SFCL). A Govt. owned Company of Bangladesh Chemical Industries Corporation under Ministry of Industries.
Automobile Management System Project Report.pdfKamal Acharya
The proposed project is developed to manage the automobile in the automobile dealer company. The main module in this project is login, automobile management, customer management, sales, complaints and reports. The first module is the login. The automobile showroom owner should login to the project for usage. The username and password are verified and if it is correct, next form opens. If the username and password are not correct, it shows the error message.
When a customer search for a automobile, if the automobile is available, they will be taken to a page that shows the details of the automobile including automobile name, automobile ID, quantity, price etc. “Automobile Management System” is useful for maintaining automobiles, customers effectively and hence helps for establishing good relation between customer and automobile organization. It contains various customized modules for effectively maintaining automobiles and stock information accurately and safely.
When the automobile is sold to the customer, stock will be reduced automatically. When a new purchase is made, stock will be increased automatically. While selecting automobiles for sale, the proposed software will automatically check for total number of available stock of that particular item, if the total stock of that particular item is less than 5, software will notify the user to purchase the particular item.
Also when the user tries to sale items which are not in stock, the system will prompt the user that the stock is not enough. Customers of this system can search for a automobile; can purchase a automobile easily by selecting fast. On the other hand the stock of automobiles can be maintained perfectly by the automobile shop manager overcoming the drawbacks of existing system.
About
Indigenized remote control interface card suitable for MAFI system CCR equipment. Compatible for IDM8000 CCR. Backplane mounted serial and TCP/Ethernet communication module for CCR remote access. IDM 8000 CCR remote control on serial and TCP protocol.
• Remote control: Parallel or serial interface.
• Compatible with MAFI CCR system.
• Compatible with IDM8000 CCR.
• Compatible with Backplane mount serial communication.
• Compatible with commercial and Defence aviation CCR system.
• Remote control system for accessing CCR and allied system over serial or TCP.
• Indigenized local Support/presence in India.
• Easy in configuration using DIP switches.
Technical Specifications
Indigenized remote control interface card suitable for MAFI system CCR equipment. Compatible for IDM8000 CCR. Backplane mounted serial and TCP/Ethernet communication module for CCR remote access. IDM 8000 CCR remote control on serial and TCP protocol.
Key Features
Indigenized remote control interface card suitable for MAFI system CCR equipment. Compatible for IDM8000 CCR. Backplane mounted serial and TCP/Ethernet communication module for CCR remote access. IDM 8000 CCR remote control on serial and TCP protocol.
• Remote control: Parallel or serial interface
• Compatible with MAFI CCR system
• Copatiable with IDM8000 CCR
• Compatible with Backplane mount serial communication.
• Compatible with commercial and Defence aviation CCR system.
• Remote control system for accessing CCR and allied system over serial or TCP.
• Indigenized local Support/presence in India.
Application
• Remote control: Parallel or serial interface.
• Compatible with MAFI CCR system.
• Compatible with IDM8000 CCR.
• Compatible with Backplane mount serial communication.
• Compatible with commercial and Defence aviation CCR system.
• Remote control system for accessing CCR and allied system over serial or TCP.
• Indigenized local Support/presence in India.
• Easy in configuration using DIP switches.
Student information management system project report ii.pdfKamal Acharya
Our project explains about the student management. This project mainly explains the various actions related to student details. This project shows some ease in adding, editing and deleting the student details. It also provides a less time consuming process for viewing, adding, editing and deleting the marks of the students.
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdfKamal Acharya
The College Bus Management system is completely developed by Visual Basic .NET Version. The application is connect with most secured database language MS SQL Server. The application is develop by using best combination of front-end and back-end languages. The application is totally design like flat user interface. This flat user interface is more attractive user interface in 2017. The application is gives more important to the system functionality. The application is to manage the student’s details, driver’s details, bus details, bus route details, bus fees details and more. The application has only one unit for admin. The admin can manage the entire application. The admin can login into the application by using username and password of the admin. The application is develop for big and small colleges. It is more user friendly for non-computer person. Even they can easily learn how to manage the application within hours. The application is more secure by the admin. The system will give an effective output for the VB.Net and SQL Server given as input to the system. The compiled java program given as input to the system, after scanning the program will generate different reports. The application generates the report for users. The admin can view and download the report of the data. The application deliver the excel format reports. Because, excel formatted reports is very easy to understand the income and expense of the college bus. This application is mainly develop for windows operating system users. In 2017, 73% of people enterprises are using windows operating system. So the application will easily install for all the windows operating system users. The application-developed size is very low. The application consumes very low space in disk. Therefore, the user can allocate very minimum local disk space for this application.
Forklift Classes Overview by Intella PartsIntella Parts
Discover the different forklift classes and their specific applications. Learn how to choose the right forklift for your needs to ensure safety, efficiency, and compliance in your operations.
For more technical information, visit our website https://intellaparts.com
Immunizing Image Classifiers Against Localized Adversary Attacksgerogepatton
This paper addresses the vulnerability of deep learning models, particularly convolutional neural networks
(CNN)s, to adversarial attacks and presents a proactive training technique designed to counter them. We
introduce a novel volumization algorithm, which transforms 2D images into 3D volumetric representations.
When combined with 3D convolution and deep curriculum learning optimization (CLO), itsignificantly improves
the immunity of models against localized universal attacks by up to 40%. We evaluate our proposed approach
using contemporary CNN architectures and the modified Canadian Institute for Advanced Research (CIFAR-10
and CIFAR-100) and ImageNet Large Scale Visual Recognition Challenge (ILSVRC12) datasets, showcasing
accuracy improvements over previous techniques. The results indicate that the combination of the volumetric
input and curriculum learning holds significant promise for mitigating adversarial attacks without necessitating
adversary training.
Overview of the fundamental roles in Hydropower generation and the components involved in wider Electrical Engineering.
This paper presents the design and construction of hydroelectric dams from the hydrologist’s survey of the valley before construction, all aspects and involved disciplines, fluid dynamics, structural engineering, generation and mains frequency regulation to the very transmission of power through the network in the United Kingdom.
Author: Robbie Edward Sayers
Collaborators and co editors: Charlie Sims and Connor Healey.
(C) 2024 Robbie E. Sayers
Cosmetic shop management system project report.pdfKamal Acharya
Buying new cosmetic products is difficult. It can even be scary for those who have sensitive skin and are prone to skin trouble. The information needed to alleviate this problem is on the back of each product, but it's thought to interpret those ingredient lists unless you have a background in chemistry.
Instead of buying and hoping for the best, we can use data science to help us predict which products may be good fits for us. It includes various function programs to do the above mentioned tasks.
Data file handling has been effectively used in the program.
The automated cosmetic shop management system should deal with the automation of general workflow and administration process of the shop. The main processes of the system focus on customer's request where the system is able to search the most appropriate products and deliver it to the customers. It should help the employees to quickly identify the list of cosmetic product that have reached the minimum quantity and also keep a track of expired date for each cosmetic product. It should help the employees to find the rack number in which the product is placed.It is also Faster and more efficient way.
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...Amil Baba Dawood bangali
Contact with Dawood Bhai Just call on +92322-6382012 and we'll help you. We'll solve all your problems within 12 to 24 hours and with 101% guarantee and with astrology systematic. If you want to take any personal or professional advice then also you can call us on +92322-6382012 , ONLINE LOVE PROBLEM & Other all types of Daily Life Problem's.Then CALL or WHATSAPP us on +92322-6382012 and Get all these problems solutions here by Amil Baba DAWOOD BANGALI
#vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore#blackmagicformarriage #aamilbaba #kalajadu #kalailam #taweez #wazifaexpert #jadumantar #vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore #blackmagicforlove #blackmagicformarriage #aamilbaba #kalajadu #kalailam #taweez #wazifaexpert #jadumantar #vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore #Amilbabainuk #amilbabainspain #amilbabaindubai #Amilbabainnorway #amilbabainkrachi #amilbabainlahore #amilbabaingujranwalan #amilbabainislamabad
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
PetroSync - Gas Turbine Failure Analysis
1. Supported by
23rd-26thMay2016atKuala Lumpur, Malaysia
DiscoverTheLatestTechnologyandBestPracticalExperiencefromGasTurbineFailureExpert
Petrosync Lecturer
“I learned a lot of experiences which are not available in the literature!”
important for me after following this course!”
“This course has a really good point of view that I never met before to solve such a complicated
failure”
GasTurbineFailure
Analysis
Testimonials
ComplicatedMajor
FailureCaseStudies,
KnowledgesNotFrom
LiteratureandMany
PracticalExercises!
Jim Oswald, C.Eng, MIMechE
Leading Gas Turbine Failure Investigation Consultant
35 years experience designing & developing gas turbines
Chief Engineer Gas Turbines, Rolls-Royce
more than 20 years experience gas turbine failure investigations
Established and runs own consultancy specializing in GT failures
since 2003
Published international papers on gas turbine variable area
nozzle, gas turbine recuperators and wind turbine grid deploy-
ment
Major Gas Turbine Failures Investigations
OEM aero derivative turbine blade failures
Published paper on design of Variable Area Nozzle
WR-21 Turbine
Aero derivate oil and vibration investigation
CCGT combustor transitionduct major failures resolved
CCGT combustor major failures resolved
Director of Oswald Consultancy, a leading gas turbine failure
investigation consultant for many various turbine
2. Masterclass Overview
Failure investigations are tough rigorous challenges form the best in engineering.This course will teach delegates the
analytical and creative ability of the best students.
Jim Oswald has resolved many major gas turbine failures that can not be solved by many consultants before him.
These cases will be presented on the course and there will be a lot of exercises to let the delegates have a deep
understanding in solving major gas turbine failure.
Each attendee must bring a laptop computer with Microsoft operating system with Microsoft Excel and power point
installed.
Specially Designed for
The course is designed for professionals who want to know practical knowledge which will sharpen analytical
skill in resolving major gas turbine failures.
Reliability Engineer
Rotating Mechanical Engineer
Maintenance Engineer
Electrical Engineer
Instrument Engineer
Limited Attendees
The course has limited seats to ensure maximum learning and experience for all delegates.
your continuing professional development.
Interactive Training
You will be attending training designed to share both the latest knowledge and practical experience through interactive sessions. This will provide
you with a deeper and more long-term understanding of your current issues.
High Quality Course Materials
Printed course manual will provide you with working materials throughout the course and will be an invaluable source of reference for you and your
colleagues afterward. You can follow course progress on your laptop with soft copies provided.
Petrosync Quality
Masterclass Objectives
Learn from real experience on some of the most challenging gas turbine failure investigations
Learn how to avoid failureshappening again
Learn about the pressure of failure investigation and how to stay cool whilst work
What sort of methods OEMs use to avoid responsibility for failures.
Learn from an expert investigator with international reputation
3. 1
3
DAY 1
Gas Turbine Failure Analysis
23rd - 26th May 2016 at Kuala Lumpur, Malaysia
SAVE COST • IMPROVE PERFORMANCE • REDUCE RISK
PetroSync understands that in current economic climate, getting an excellent return on your training investment is critical for all our clients. This
at your preferred
location and time. We will meet you anywhere around the globe.
If you like to know more about this excellent program, please contact +65 6415 4500 or email general@petrosync.com
IN-HOUSE SOLUTIONS
Delegates will be reminded in how a gas turbine works, learn how to think through failure sequences and learn
how to avoid misleading failure information
• Group Task with Case Study – Delegates will identify gas turbine failure and chart sequence of events before
and after failure. Discussion on need for creativity in failure investigation based on Trainer’s experience.
• The importance of careful recording and how to record.
• Case Study
• Misinformation and how it occures
• Group Task - How to improve recording data
DAY 2
3
DAY 3
Delegates will learn about a common cause of failure (fatigue) and work through case study work using
methods taught and thus how to avoid a repeat failure
• Case Study
• Thermal Fatigue - What is it, how does it arrive and how leads to cracking and failure.
• Case Study
• Group task - calculate if thermal fatigue likely from data supplied
• Pattern of failures and why patterns matter
• Group task - identify patterns from data supplied. What does the pattern tell you?
• Group task - Delegates will be presented with failure evidence (based on real and serious failures) and
asked to explain the failure using methods learnt. They will work in teams of 3 or 4. Trainer will act as
engine operator and OEM. They need investigate and identify root cause followed by presenting the
results to senior management
DAY 4
Delegates will learn about formal failure methods, how and why metal fails when and how best to use specialist
expertise
• Fishbone, RCA, Ishikawa
• Group Task
• Using Specialist expertise in GT Failure investigations: mellurgy, noise, vibration, controls
• When and how to use them in validation and discovery of evidence
• How to break metal: fatigue, creep, fracture, vibration
• The differences, and why its vital to understanding failures
• Case Study
• Group Task - identify if fatigue or creep from reports / photos provided. Judge if high cycle or low cycle fatigue
&
4. Petrosync Lecturer
Mr. Jim Oswald, C.Eng, MIMechE
08:00–09:00 Registration (Day1)
09:00–11:00 Session I
11:00–11:15 Refreshment & Networking Session I
11:15–13:00 Session II
13:00–14:00
14:00–15:30 Session III
15:30–15:45 Refreshment & Networking Session II
15:45–17:00 Session IV
17:00 End of Day
PROGRAM SCHEDULE
Lunch
Leading Gas Turbine Failure Investigation Consultant
Jim Oswald, the director of Oswald Consultancy, has 35 years
experience designing & developing gas turbines and more than 20
years experience gas turbine failure investigations from various
turbines : Alstom, Siemens, RR, Mitsubishi, Westinghouse, etc.
Oswald Established an engineering consultancy in 2003 providing
technical support for design and development support for new and
operating gas turbine plant and other new product developments
in the energy industry.
Previous experiences gained in international energy company - new
product design & development and company strategy. Extensive
technical knowledge is combined with excellent presentation skills,
business acumen, international experience and a desire to assist
other
communicate, innovate and solve technically challenging issues.
CLIENT LIST
• GDF Suez
• Teesside Power Station
• Rolls-Royce
• Babcock International Group
• Energy Technology Institute
• E.on
• PX Ltd
• Stadtkraft
• Carbon Trust
• ITM Fuel Cells
EXPERIENCED IN
• Gas Turbine design
• Risk assessment
• Managing development programmes
• Stress analysis
• Creep analysis
• System design
• Innovation
• Turbine design
“On a number of occasions I observed Jim Oswald expertly lead his
complex combustor failures on large CCGTs. On each occasion his
were able to resolve the issues faced”, Darren Watson, Corelia
Solutions Ltd (formerly Technical & Development Manager for GDF
Suez Energy UK)
Testimonials
5. * For 5 or more delegates, please inquire for more attractive package.
* Important: Please note that registration without payment will incur a SGD 200 administration fee.
I agree to PetroSync’s terms & conditions,payment terms and cancellation policy.
Authorized Signature : ____________________________________________________________________________
PAYMENT TERMS : Payment is due in full at the time of registration. Full payment is mandatory for event attendance.
INVESTMENT PACKAGES
COURSEDETAILS
Title : Gas Turbine Failure Analysis
Date : 23rd - 26th May 2016
Location : Kuala Lumpur, Malaysia
* To enjoy the promotion & discount offer, payment must be made before deadline
* Prices include lunches, refreshments and materials. Promotion & discount cannot be combined with other promotional offers.
Name : Cay Aagen
Email : registration@petrosync.com
Phone : +65 6415 4500
Fax : +65 6826 4322
PROGRAMMECONSULTANT
DETAILS
Please accept our apologies for mail or email that is
incorrectly addressed.
Please email us at registration@petrosync.com and
inform us of any incorrect details. We will amend them
accordingly.
CHARGES&FEE(s)
- For Payment by Direct TelegraphicTransfer,
client has to bear both local and oversea bank
charges.
- For credit card payment, there is additional
4% credit card processsing fee.
TERMSANDCONDITIONS
DISCLAIMER
Please note that trainers and topics were confirmed at
the time of publishing; however, PetroSync may
necessitate substitutions, alterations or cancellations of
the trainers or topics. As such, PetroSync reserves the
right to change or cancel any part of its published
programme due to unforeseen circumstances. Any
substitutions or alterations will be updated on our web
page as soon as possible.
DATAPROTECTION
The information you provide will be safeguarded by
PetroSync that may be used to keep you informed of
relevant products and services. As an international
group we may transfer your data on a global basis for
the purpose indicated above. If you do not want us to
share your information with other reputable companies,
please tick this box
CANCELLATIONPOLICY
You may substitute delegates at any time as long as
reasonable advance notice is given to PetroSync. For
any cancellation received in writing not less than
fourteen (14) working days prior to the training course,
you will receive a credit voucher worth total transaction
with less a SGD 200 administration fee and any related
bank or credit card charges.
Delegates who cancel less than fourteen (14) working
days of the training course, or who do not attend the
course, are liable to pay the full course fee and no
refunds will be granted.
In the event that PetroSync cancels or postpones an
event for any reason and that the delegate is unable or
unwilling to attend in on the rescheduled date, you will
receive a credit voucher for 100% of the contract fee
paid. You may use this credit voucher for another
PetroSync to be mutually agreed with PetroSync, which
must occur within a year from the date of postponement.
PetroSync is not responsible for any loss or damage as
a result of the cancellation policy. PetroSync will assume
no liability whatsoever in the event this event is
cancelled, rescheduled or postponed due to any Act of
God, fire, act of government or state, war, civil
commotion, insurrection, embargo, industrial action, or
any other reason beyond management control.
CERTIFICATEOFATTENDANCE
80% attendance is required for PetroSync's
Certificate of Attendance.
* Early Bird Offer is one month before the event schedule
Group discount is based on standard price
Confirmation
DELEGATEDETAILS
1st Delegate Name
Direct Line Number: Email:
Job Title: Department:
Head of Department:
Company:____________________________________________ Industry : __________________________________
Address: _______________________________________________________Postcode: _________________________
Country: ________________________Email: __________________________________________________________
Attention Invoice to: ______________________________________________________________________________
Direct Line Number: ______________________________ Fax: _____________________________________________
PAYMENTMETHODS
Please note:
- Indicate if you have already registered by Phone Fax Email Web
By Credit Card :
Please debit my credit card: Visa MasterCard
Card Number:
Name printed on card: _____________________________________________________________________
Expiry Date:
Security Code:
INVOICEDETAILS
Mrs Ms Dr OthersMr
2nd Delegate Name
Direct Line Number: Email:
Job Title: Department:
Head of Department:
Mrs Ms Dr OthersMr
3rd Delegate Name
Direct Line Number: Email:
Job Title: Department:
Head of Department:
Mrs Ms Dr OthersMr
AMEX
- If you have not received an acknowledgement before the training, please call us to confirm your booking.
By Direct Transfer : Please quote invoice number(s) on remittance advice
PetroSync Global Pte Ltd Bank details:
All bank charges to be borne by payer. Please ensure that PetroSync Global Pte Ltd receives the full invoiced amount.
Account Name: PetroSync Global Pte Ltd
Bank Name : DBS Bank Ltd
Bank Code : 7171 • Bank Swift Code : DBSSSGSGXXX • Branch code : 288
Account No : • SGD : 288-901898-0 • USD : 0288-002682-01-6
Bank Address : 12 Marina Boulevard, Level 3. Marina Bay Financial Centre Tower 3. Singapore 018982
Please checklist the package that you are attending!
InvestmentPackage
Standard Price 20thMay2016
Group Discount
(3 or more Delegates)
Early Bird Offer
Deadline
20thMay2016
22ndApril2016
SGD4,495
CourseFee
SGD4,295
10% discounts for group of 3 registering from the
same organization at the same time