SlideShare a Scribd company logo
1 of 5
Download to read offline
Supported By
PETROSYNC’S WELL EGINEERING SERIES
Protect Your Assets with Better Understanding of Well Intervention
4 April 2016—7 April 2016
Kuala Lumpur, Malaysia
AdvancedWireline
InterventionOperation
2
Our Advance Wireline Intervention course is developed to provide detailed in-depth technical
and practical level knowledge of wireline operation in order to apply to the oil and gas
industry.
WELL | ADVANCE D WIRELINE INTERVENTION OPERATION
How Does This Course Benefits You?
Increase Well Efficiency
Do you know what is the latest technology for completion
& production?
Effective Operation
Plan effective operation by understanding the techniques of the equipment and the use of
equipment before the operation works
Improve Work Efficiency
Improve the effectiveness of slickline operations via accurate identification of the problems
causing a fishing job
Improve the Effectiveness of Braided Line Fishing
Improve the effectiveness and efficiency of braided line fishing during the operation by
learning how to use braided line equipment in a correct techniques
Learn the Latest Technology
Improve the effectiveness of slickline and braided line fishing operations by learning the new
technology for surface units for fishing and new technology for downhole tools
Production Issues and how can define it quickly?
Do you know that intervention able to speed up in finding
the production problem?
Well intervention extends the life of producing wells by improving
performance access to stranded or additional hydrocarbon reserves. Being
challenged by the current oil price crisis, it is crucial to polish your
intervention skills to avoid further asset loss and improve sustainability.
general@petrosync.com | +65 6451 4500 | www.petrosync.com
Course Overview
Course Design Focuses on Wireline Intervention
This course focuses on the wireline conveyance and intervention methods with a balanced
approach on actual operation aspect for both engineer and operator positioning.
Includes Specific and Practical Case Studies
Past case examples on wireline intervention are enhanced with understanding the use of
circulating devices, plugs, hydrostatics and gas lift operation.
You will also have a better understanding the use of circulating devices, plugs, hydrostatics
and gas lift operation. In addition to that, you will also be able to sharpen your intervention
skills by using braided line and as well as fishing with both braided line and slickline.
3
WELL | ADVANCE D WIRELINE INTERVENTION OPERATION
PetroSync Distinguished Instructor
Who Needs This Program
Practical
Over 40 years of experiences. In charge in day to day
operations ( worked as district manager over 7 years in
Schlumberger, worked as wireline supervisor 7 years in Otis
Engineering)
Consulting
Also worked with Wild Well Control specialist in the
extinguishing of the wells in Kuwait after the Gulf war.
Designing and using new tools in a downhole memory capacity.
(Wood Group Technology)
Teaching
Developed and presented several training courses covering
electronic explosive triggers for slickline. (EXPRO)
Steve Arnold Ph.D
Independent Consultant
from Arnoco LLC
 People involved in Well Intervention and Workover operation.
 People who are moving up to an advanced level of slickline or whom are presently in an
advanced capacity.
Job Titles Include:
Wireline Assistants
Wireline Operators
Field Support
Subsurface Engineer
XXX
Production Technologist
Petroleum Engineers
Geo-scientist
PetroSync Inhouse Solutions
PetroSync can tailor our courses to meet your specific
needs at your preferred location and schedule. Contact us
for more information at +65 6415 4500 or email to
general @petrosync.com
PetroSync Quality Assurance
All PetroSync courses are developed with top quality to
address all your training needs and purposes. Our courses
are vetted strictly to ensure that we always deliver the best
courses with the best industry expert.
general@petrosync.com | +65 6451 4500 | www.petrosync.com
08:00—09:00 Registration (Day 1) 13:00—14:00 Lunch
09:00—11:00 Session I 14:00—15:30 Session III
11:00—11.15 Refreshment Session I 15:30—15:45 Refreshment Session II
11:15—13:00 Session II 15:45—17:00 Session Iv (Last Session)
Course Schedule
4
WELL | ADVANCE D WIRELINE INTERVENTION OPERATION
Course Agenda — 4 Days
general@petrosync.com | +65 6451 4500 | www.petrosync.com
DAY 1
Review Basic Procedures & Equipment
Review of basic wireline procedures
Downhole equipment
 Circulating devices: sliding side door, side pocket mandrel
principles
 Downhole assembly functions, running/pulling/testing
procedures
 Flow control devices, identification, uses, running &
pulling procedures
 Sub surface safety valve equipment, variations, running &
pulling procedures
 Setting and retrieving of mandrels within SPM
 Opening and closing of sliding sleeves
“X” and “R” equipment
 Difference between the two types of equipment
 Proper setting and pulling of “X” and “R” locks
DAY 2
Slickline and Braided Line Application
Jarring with downhole tools
 Different types of jars and how the function of each helps
in different circumstances
Types of services performed on slickline and their
problems causing a fishing job
 Running callipers
 Running Memory Production Logging Tools
 Slickline perforating
 Setting bridge plugs and umbrella plugs on slickline
 Cutting tubing on slickline
Braided line equipment
 Surface equipment
 Downhole equipment as opposed to slickline
 Swabbing operations
 Grease pump equipment and use
DAY 3
Slickline & Braided Line Fishing
Slickline and braided line fishing
 Wire broken at the surface
 Wire remains visible
 Wire broken downhole
 Blown up the hole
 Wire finder
 Wire grabs
 Fishing clamps
 Retrieval of fish
 Fishing for tools
 Fishing procedure
Workshop: Scenario based Drop Discussion
Slickline and Braided Line Fishing
 Prevention
 Hay Pulleys
 Safety areas to consider that may present added
problems
DAY 4
New Technology and Case Studies
Slickline and braided line fishing (continued)
 New technology for surface units for fishing
 New technology for downhole tools
Case studies:
 Wire stuck in hole at stuffing box due to well conditions
and improper surface rig up
 Unexplained wire break downhole and how to recover
 Bird nest of braided line coming out of hole with fish
attached
5
By Credit Card:
Please debit my credit card: Visa MasterCard AMEX Security Code:
Card Number: Expiry Date:
Name Printed on Card:
By Direct Transfer: Please quote invoice number(s) on remittance advice
PetroSync Global Pte Ltd Bank Details:
Account Name: PetroSync Global Pte Ltd
Bank Name: DBS Bank Ltd
Bank Code: 7171—Bank Swift Code: DBSSSGSGXXX—Branch Code: 288
Account No: SGD: 288-901898-0 USD: 0288-002682-01-6
Bank Address: 12 Marina Boulevard, Level 3. Marina Bay Financial Centre Tower 3. Singapore 018982.
All bank charges to be borne by payer. Please ensure that PetroSync Global Pte Ltd receives the full invoiced
amount.
Title : Advanced Wireline Intervention Operation
Date : 4—7 April 2016
Location : Kuala Lumpur, Malaysia
COURSE DETAILS
INVESTMENT PACKAGE DEADLINE FULL MASTERCLASS
Standard Price 1 April 2016 USD 3,595
Early Bird Offer 4 March 2016 USD 3,395
Group Discount
(3 or more Delegates)
1 April 2016 10 % Off
INVESTMENT PACKAGES (Please Circle)
Group Discount is based on Standard Price
*To enjoy the promotion & discount offer, payment must be made before dateline
* For 7 or more delegates, please inquire for more attractive package.
* Prices include lunches, refreshments and materials. Promotion & discount cannot be combined with other
promotional offers.
* Important: Please note that registration without payment will incur a SGD 200 administration fee.
COURSE CONSULTANT
Name : Cay Aagen
Email : registration@petrosync.com
Phone : +65 6415 4500
Fax : +65 6415 4322
TERMS AND CONDITIONS
DISCLAIMER
Please note that trainers and topics were confirmed at
the time of publishing; however, PetroSync may
necessitate substitutions, alterations or cancellations
of the trainers or topics. As such, PetroSync reserves
the right to change or cancel any part of its published
courseme due to unforeseen circumstances. Any
substitutions or alterations will be updated on our web
page as soon as possible.
DATA PROTECTION
The information you provide will be safeguarded by
PetroSync that may be used to keep you informed of
relevant products and services. As an international
group we may transfer your data on a global basis for
the purpose indicated above. If you do not want us to
share your information with other reputable
companies, please tick this box
CANCELLATION POLICY
You may substitute delegates at any time as long as
reasonable advance notice is given to PetroSync. For
any cancellation received in writing not less than
fourteen (14) working days prior to the training
course, you will receive credit voucher less a SGD $200
administration fee and any related bank or credit card
charges.
Delegates who cancel less than fourteen (14) working
days of the training course, or who do not attend the
course, are liable to pay the full course fee and no
refunds will be granted.
In the event that PetroSync cancels or postpones an
event for any reason and that the delegate is unable or
unwilling to attend in on the rescheduled date, you will
receive a credit voucher for 100% of the contract fee
paid. You may use this credit voucher for another
PetroSync to be mutually agreed with PetroSync,
which must occur within a year from the date of
postponement.
PetroSync is not responsible for any loss or damage as
a result of the cancellation policy. PetroSync will
assume no liability whatsoever in the event this event
is cancelled, rescheduled or postponed due to any Act
of God, fire, act of government or state, war, civil
commotion, insurrection, embargo, industrial action,
or any other reason beyond management control.
CERTIFICATE OF ATTENDANCE
70% attendance is required for PetroSync’s Certificate
of Attendance
DETAILS
Please accept our apologies for mail or email that is
incorrectly addressed.
Please email us at registration@petrosync.com and
inform us of any incorrect details. We will amend them
accordingly.
CHARGES & FEE(S)
- For Payment by Direct Telegraphic Transfer, client
has to bear both local and oversea bank charges.
- For credit card payment, there is additional 4%
credit card processing fee.
1st Delegate Name:
Direct Line Number: Email:
Job Title: Department:
Head of Department:
Mr Mrs Ms Dr Others
2nd Delegate Name:
Direct Line Number: Email:
Job Title: Department:
Head of Department:
Mr Mrs Ms Dr Others
3rd Delegate Name:
Direct Line Number: Email:
Job Title: Department:
Head of Department:
Mr Mrs Ms Dr Others
Attention Invoice to:
Direct Line Number: Fax:
Company: Industry:
Address: Postcode:
Country: Email:
Please note:
- Indicate if you have already registered by Phone Fax Email Web
- If you have not received an acknowledgement before the training, please call us to confirm your booking.
CONFIRMATION
I agree to PetroSync’s terms & conditions, payment terms and cancellation policy.
Authorized Signature:
PAYMENT TERMS : Payment is due in full at the time of registration. Full payment is mandatory for event attendance.
PAYMENT METHOD
INVOICE DETAILS
DELEGATES DETAILS

More Related Content

Viewers also liked

PetroSync - Mastering Production Sharing Contracts
PetroSync - Mastering Production Sharing ContractsPetroSync - Mastering Production Sharing Contracts
PetroSync - Mastering Production Sharing ContractsPetroSync
 
PetroSync - Introduction to Oil and Gas For New Engineer and Non-Technical
PetroSync - Introduction to Oil and Gas For New Engineer and Non-TechnicalPetroSync - Introduction to Oil and Gas For New Engineer and Non-Technical
PetroSync - Introduction to Oil and Gas For New Engineer and Non-TechnicalPetroSync
 
PetroSync - Cost Engineering Risk Management-Earned Value Management
PetroSync - Cost Engineering Risk Management-Earned Value ManagementPetroSync - Cost Engineering Risk Management-Earned Value Management
PetroSync - Cost Engineering Risk Management-Earned Value ManagementPetroSync
 
PetroSync Wellsite and Operations Geology
PetroSync Wellsite and Operations GeologyPetroSync Wellsite and Operations Geology
PetroSync Wellsite and Operations GeologyPetroSync
 
PetroSync - Applied Petrophysics for Low Resistivity Thin-Bedded Formations
PetroSync - Applied Petrophysics for Low Resistivity Thin-Bedded FormationsPetroSync - Applied Petrophysics for Low Resistivity Thin-Bedded Formations
PetroSync - Applied Petrophysics for Low Resistivity Thin-Bedded FormationsPetroSync
 
PetroSync - LNG & Gas Sales Contracts-Negotiation and Pricing Review
PetroSync - LNG & Gas Sales Contracts-Negotiation and Pricing ReviewPetroSync - LNG & Gas Sales Contracts-Negotiation and Pricing Review
PetroSync - LNG & Gas Sales Contracts-Negotiation and Pricing ReviewPetroSync
 
PetroSync - Natural Gas Geochemistry
PetroSync - Natural Gas GeochemistryPetroSync - Natural Gas Geochemistry
PetroSync - Natural Gas GeochemistryPetroSync
 
PetroSync - Fractured Reservoir Modeling with Application to Fractured Basement
PetroSync - Fractured Reservoir Modeling with Application to Fractured BasementPetroSync - Fractured Reservoir Modeling with Application to Fractured Basement
PetroSync - Fractured Reservoir Modeling with Application to Fractured BasementPetroSync
 
PetroSync - Play Fairways Analysis & Prospect Evaluation
PetroSync - Play Fairways Analysis & Prospect EvaluationPetroSync - Play Fairways Analysis & Prospect Evaluation
PetroSync - Play Fairways Analysis & Prospect EvaluationPetroSync
 
PetroSync - HPHT Drilling Operation
PetroSync - HPHT Drilling OperationPetroSync - HPHT Drilling Operation
PetroSync - HPHT Drilling OperationPetroSync
 
PetroSync - Geology for Non-Geologist
PetroSync - Geology for Non-GeologistPetroSync - Geology for Non-Geologist
PetroSync - Geology for Non-GeologistPetroSync
 
PetroSync - Advanced Practical Centrifugal Pumps
PetroSync - Advanced Practical Centrifugal PumpsPetroSync - Advanced Practical Centrifugal Pumps
PetroSync - Advanced Practical Centrifugal PumpsPetroSync
 
PetroSync - Pre-Commissioning, Commissioning and Start-Up
PetroSync - Pre-Commissioning, Commissioning and Start-UpPetroSync - Pre-Commissioning, Commissioning and Start-Up
PetroSync - Pre-Commissioning, Commissioning and Start-UpPetroSync
 
PetroSync - IWCF Certification Drilling Well Control Level 3 & 4
PetroSync - IWCF Certification Drilling Well Control Level 3 & 4PetroSync - IWCF Certification Drilling Well Control Level 3 & 4
PetroSync - IWCF Certification Drilling Well Control Level 3 & 4PetroSync
 
PetroSync - Upstream Petroleum Economics, Risk and Fiscal Analysis
PetroSync - Upstream Petroleum Economics, Risk and Fiscal AnalysisPetroSync - Upstream Petroleum Economics, Risk and Fiscal Analysis
PetroSync - Upstream Petroleum Economics, Risk and Fiscal AnalysisPetroSync
 
PetroSync - Applied Reservoir Engineering
PetroSync - Applied Reservoir EngineeringPetroSync - Applied Reservoir Engineering
PetroSync - Applied Reservoir EngineeringPetroSync
 
PetroSync - Well Test Analysis
PetroSync - Well Test AnalysisPetroSync - Well Test Analysis
PetroSync - Well Test AnalysisPetroSync
 
PetroSync - Financial Assets Valuation for Oil & Gas
PetroSync - Financial Assets Valuation for Oil & GasPetroSync - Financial Assets Valuation for Oil & Gas
PetroSync - Financial Assets Valuation for Oil & GasPetroSync
 
Nine Project (8-19-15)
Nine Project (8-19-15)Nine Project (8-19-15)
Nine Project (8-19-15)Mario Castillo
 

Viewers also liked (20)

PetroSync - Mastering Production Sharing Contracts
PetroSync - Mastering Production Sharing ContractsPetroSync - Mastering Production Sharing Contracts
PetroSync - Mastering Production Sharing Contracts
 
PetroSync - Introduction to Oil and Gas For New Engineer and Non-Technical
PetroSync - Introduction to Oil and Gas For New Engineer and Non-TechnicalPetroSync - Introduction to Oil and Gas For New Engineer and Non-Technical
PetroSync - Introduction to Oil and Gas For New Engineer and Non-Technical
 
PetroSync - Cost Engineering Risk Management-Earned Value Management
PetroSync - Cost Engineering Risk Management-Earned Value ManagementPetroSync - Cost Engineering Risk Management-Earned Value Management
PetroSync - Cost Engineering Risk Management-Earned Value Management
 
PetroSync Wellsite and Operations Geology
PetroSync Wellsite and Operations GeologyPetroSync Wellsite and Operations Geology
PetroSync Wellsite and Operations Geology
 
PetroSync - Applied Petrophysics for Low Resistivity Thin-Bedded Formations
PetroSync - Applied Petrophysics for Low Resistivity Thin-Bedded FormationsPetroSync - Applied Petrophysics for Low Resistivity Thin-Bedded Formations
PetroSync - Applied Petrophysics for Low Resistivity Thin-Bedded Formations
 
PetroSync - LNG & Gas Sales Contracts-Negotiation and Pricing Review
PetroSync - LNG & Gas Sales Contracts-Negotiation and Pricing ReviewPetroSync - LNG & Gas Sales Contracts-Negotiation and Pricing Review
PetroSync - LNG & Gas Sales Contracts-Negotiation and Pricing Review
 
PetroSync - Natural Gas Geochemistry
PetroSync - Natural Gas GeochemistryPetroSync - Natural Gas Geochemistry
PetroSync - Natural Gas Geochemistry
 
PetroSync - Fractured Reservoir Modeling with Application to Fractured Basement
PetroSync - Fractured Reservoir Modeling with Application to Fractured BasementPetroSync - Fractured Reservoir Modeling with Application to Fractured Basement
PetroSync - Fractured Reservoir Modeling with Application to Fractured Basement
 
PetroSync - Play Fairways Analysis & Prospect Evaluation
PetroSync - Play Fairways Analysis & Prospect EvaluationPetroSync - Play Fairways Analysis & Prospect Evaluation
PetroSync - Play Fairways Analysis & Prospect Evaluation
 
PetroSync - HPHT Drilling Operation
PetroSync - HPHT Drilling OperationPetroSync - HPHT Drilling Operation
PetroSync - HPHT Drilling Operation
 
PetroSync - Geology for Non-Geologist
PetroSync - Geology for Non-GeologistPetroSync - Geology for Non-Geologist
PetroSync - Geology for Non-Geologist
 
PetroSync - Advanced Practical Centrifugal Pumps
PetroSync - Advanced Practical Centrifugal PumpsPetroSync - Advanced Practical Centrifugal Pumps
PetroSync - Advanced Practical Centrifugal Pumps
 
PetroSync - Pre-Commissioning, Commissioning and Start-Up
PetroSync - Pre-Commissioning, Commissioning and Start-UpPetroSync - Pre-Commissioning, Commissioning and Start-Up
PetroSync - Pre-Commissioning, Commissioning and Start-Up
 
PetroSync - IWCF Certification Drilling Well Control Level 3 & 4
PetroSync - IWCF Certification Drilling Well Control Level 3 & 4PetroSync - IWCF Certification Drilling Well Control Level 3 & 4
PetroSync - IWCF Certification Drilling Well Control Level 3 & 4
 
PetroSync - Upstream Petroleum Economics, Risk and Fiscal Analysis
PetroSync - Upstream Petroleum Economics, Risk and Fiscal AnalysisPetroSync - Upstream Petroleum Economics, Risk and Fiscal Analysis
PetroSync - Upstream Petroleum Economics, Risk and Fiscal Analysis
 
PetroSync - Applied Reservoir Engineering
PetroSync - Applied Reservoir EngineeringPetroSync - Applied Reservoir Engineering
PetroSync - Applied Reservoir Engineering
 
PetroSync - Well Test Analysis
PetroSync - Well Test AnalysisPetroSync - Well Test Analysis
PetroSync - Well Test Analysis
 
PetroSync - Financial Assets Valuation for Oil & Gas
PetroSync - Financial Assets Valuation for Oil & GasPetroSync - Financial Assets Valuation for Oil & Gas
PetroSync - Financial Assets Valuation for Oil & Gas
 
ỐNG THÉP LUỒN DÂY ĐIỆN ( STEEL CONDUIT )/ ỐNG RUỘT GÀ LÕI THÉP ( FLEXIBLE MET...
ỐNG THÉP LUỒN DÂY ĐIỆN ( STEEL CONDUIT )/ ỐNG RUỘT GÀ LÕI THÉP ( FLEXIBLE MET...ỐNG THÉP LUỒN DÂY ĐIỆN ( STEEL CONDUIT )/ ỐNG RUỘT GÀ LÕI THÉP ( FLEXIBLE MET...
ỐNG THÉP LUỒN DÂY ĐIỆN ( STEEL CONDUIT )/ ỐNG RUỘT GÀ LÕI THÉP ( FLEXIBLE MET...
 
Nine Project (8-19-15)
Nine Project (8-19-15)Nine Project (8-19-15)
Nine Project (8-19-15)
 

Similar to Advanced Wireline Intervention

PetroSync - Drilling Engineering for Non-Drilling Engineer
PetroSync - Drilling Engineering for Non-Drilling EngineerPetroSync - Drilling Engineering for Non-Drilling Engineer
PetroSync - Drilling Engineering for Non-Drilling EngineerPetroSync
 
PetroSync - Geological Interpretation of Well Logs
PetroSync - Geological Interpretation of Well LogsPetroSync - Geological Interpretation of Well Logs
PetroSync - Geological Interpretation of Well LogsPetroSync
 
PetroSync - Well Completion and Workover
PetroSync - Well Completion and WorkoverPetroSync - Well Completion and Workover
PetroSync - Well Completion and WorkoverPetroSync
 
PetroSync - Sand Control Completion Practices
PetroSync - Sand Control Completion PracticesPetroSync - Sand Control Completion Practices
PetroSync - Sand Control Completion PracticesPetroSync
 
Subsea Production Engineering
Subsea Production EngineeringSubsea Production Engineering
Subsea Production EngineeringpetroEDGE
 
PetroSync - Offshore Marine Operation
PetroSync - Offshore Marine OperationPetroSync - Offshore Marine Operation
PetroSync - Offshore Marine OperationPetroSync
 
PetroSync - Incident Investigation for Upstream Drilling and Well Operation
PetroSync - Incident Investigation for Upstream Drilling and Well OperationPetroSync - Incident Investigation for Upstream Drilling and Well Operation
PetroSync - Incident Investigation for Upstream Drilling and Well OperationPetroSync
 
Aviation fuel handling and safety,may, lagos
Aviation fuel handling and safety,may, lagosAviation fuel handling and safety,may, lagos
Aviation fuel handling and safety,may, lagosPetro Nomics
 
PetroSync - IWCF Drilling Well Control 6.0
PetroSync - IWCF Drilling Well Control 6.0PetroSync - IWCF Drilling Well Control 6.0
PetroSync - IWCF Drilling Well Control 6.0Shanice Sua
 
Aviation Fuel Handling and Safety, Lagos
Aviation Fuel Handling and Safety, LagosAviation Fuel Handling and Safety, Lagos
Aviation Fuel Handling and Safety, LagosIfeoma Onyemachi
 
Stuck Pipe Prevention and Fishing
Stuck Pipe Prevention and FishingStuck Pipe Prevention and Fishing
Stuck Pipe Prevention and FishingpetroEDGE
 
PetroSync - Seismic Interpretation
PetroSync - Seismic InterpretationPetroSync - Seismic Interpretation
PetroSync - Seismic InterpretationPetroSync
 
PetroSync - IWCF Well Intervention Pressure Control Level 2
PetroSync - IWCF Well Intervention Pressure Control Level 2PetroSync - IWCF Well Intervention Pressure Control Level 2
PetroSync - IWCF Well Intervention Pressure Control Level 2PetroSync
 
Oil&gas tendering skills packaging - development techniques-2017
Oil&gas tendering skills packaging - development techniques-2017Oil&gas tendering skills packaging - development techniques-2017
Oil&gas tendering skills packaging - development techniques-2017AF Dowell Mirin
 
PetroSync - Basin Analysis - Level 3
PetroSync - Basin Analysis - Level 3PetroSync - Basin Analysis - Level 3
PetroSync - Basin Analysis - Level 3PetroSync
 
Pipeline Risk Management and Assessment
Pipeline Risk Management and AssessmentPipeline Risk Management and Assessment
Pipeline Risk Management and AssessmentpetroEDGE
 
Nationally Recognised Courses Offered By Gold Training
Nationally Recognised Courses Offered By Gold TrainingNationally Recognised Courses Offered By Gold Training
Nationally Recognised Courses Offered By Gold Traininggoldrto
 
SPP 25-29 May 2015, Jakarta, Indonesia
SPP  25-29 May 2015, Jakarta, IndonesiaSPP  25-29 May 2015, Jakarta, Indonesia
SPP 25-29 May 2015, Jakarta, IndonesiaCarla Karenina
 
Sand Control Operations
Sand Control OperationsSand Control Operations
Sand Control OperationspetroEDGE
 
SKILLZUP ACADEMY - LIST OF TRAINING COURSES
SKILLZUP ACADEMY - LIST OF TRAINING COURSESSKILLZUP ACADEMY - LIST OF TRAINING COURSES
SKILLZUP ACADEMY - LIST OF TRAINING COURSESNordinRamli
 

Similar to Advanced Wireline Intervention (20)

PetroSync - Drilling Engineering for Non-Drilling Engineer
PetroSync - Drilling Engineering for Non-Drilling EngineerPetroSync - Drilling Engineering for Non-Drilling Engineer
PetroSync - Drilling Engineering for Non-Drilling Engineer
 
PetroSync - Geological Interpretation of Well Logs
PetroSync - Geological Interpretation of Well LogsPetroSync - Geological Interpretation of Well Logs
PetroSync - Geological Interpretation of Well Logs
 
PetroSync - Well Completion and Workover
PetroSync - Well Completion and WorkoverPetroSync - Well Completion and Workover
PetroSync - Well Completion and Workover
 
PetroSync - Sand Control Completion Practices
PetroSync - Sand Control Completion PracticesPetroSync - Sand Control Completion Practices
PetroSync - Sand Control Completion Practices
 
Subsea Production Engineering
Subsea Production EngineeringSubsea Production Engineering
Subsea Production Engineering
 
PetroSync - Offshore Marine Operation
PetroSync - Offshore Marine OperationPetroSync - Offshore Marine Operation
PetroSync - Offshore Marine Operation
 
PetroSync - Incident Investigation for Upstream Drilling and Well Operation
PetroSync - Incident Investigation for Upstream Drilling and Well OperationPetroSync - Incident Investigation for Upstream Drilling and Well Operation
PetroSync - Incident Investigation for Upstream Drilling and Well Operation
 
Aviation fuel handling and safety,may, lagos
Aviation fuel handling and safety,may, lagosAviation fuel handling and safety,may, lagos
Aviation fuel handling and safety,may, lagos
 
PetroSync - IWCF Drilling Well Control 6.0
PetroSync - IWCF Drilling Well Control 6.0PetroSync - IWCF Drilling Well Control 6.0
PetroSync - IWCF Drilling Well Control 6.0
 
Aviation Fuel Handling and Safety, Lagos
Aviation Fuel Handling and Safety, LagosAviation Fuel Handling and Safety, Lagos
Aviation Fuel Handling and Safety, Lagos
 
Stuck Pipe Prevention and Fishing
Stuck Pipe Prevention and FishingStuck Pipe Prevention and Fishing
Stuck Pipe Prevention and Fishing
 
PetroSync - Seismic Interpretation
PetroSync - Seismic InterpretationPetroSync - Seismic Interpretation
PetroSync - Seismic Interpretation
 
PetroSync - IWCF Well Intervention Pressure Control Level 2
PetroSync - IWCF Well Intervention Pressure Control Level 2PetroSync - IWCF Well Intervention Pressure Control Level 2
PetroSync - IWCF Well Intervention Pressure Control Level 2
 
Oil&gas tendering skills packaging - development techniques-2017
Oil&gas tendering skills packaging - development techniques-2017Oil&gas tendering skills packaging - development techniques-2017
Oil&gas tendering skills packaging - development techniques-2017
 
PetroSync - Basin Analysis - Level 3
PetroSync - Basin Analysis - Level 3PetroSync - Basin Analysis - Level 3
PetroSync - Basin Analysis - Level 3
 
Pipeline Risk Management and Assessment
Pipeline Risk Management and AssessmentPipeline Risk Management and Assessment
Pipeline Risk Management and Assessment
 
Nationally Recognised Courses Offered By Gold Training
Nationally Recognised Courses Offered By Gold TrainingNationally Recognised Courses Offered By Gold Training
Nationally Recognised Courses Offered By Gold Training
 
SPP 25-29 May 2015, Jakarta, Indonesia
SPP  25-29 May 2015, Jakarta, IndonesiaSPP  25-29 May 2015, Jakarta, Indonesia
SPP 25-29 May 2015, Jakarta, Indonesia
 
Sand Control Operations
Sand Control OperationsSand Control Operations
Sand Control Operations
 
SKILLZUP ACADEMY - LIST OF TRAINING COURSES
SKILLZUP ACADEMY - LIST OF TRAINING COURSESSKILLZUP ACADEMY - LIST OF TRAINING COURSES
SKILLZUP ACADEMY - LIST OF TRAINING COURSES
 

More from PetroSync

PetroSync - API Specification Q1 9th Edition Quality Management System Traini...
PetroSync - API Specification Q1 9th Edition Quality Management System Traini...PetroSync - API Specification Q1 9th Edition Quality Management System Traini...
PetroSync - API Specification Q1 9th Edition Quality Management System Traini...PetroSync
 
PetroSync - API 580 & API 581 Risk Based Inspection & Base Resource Document
PetroSync - API 580 & API 581 Risk Based Inspection & Base Resource DocumentPetroSync - API 580 & API 581 Risk Based Inspection & Base Resource Document
PetroSync - API 580 & API 581 Risk Based Inspection & Base Resource DocumentPetroSync
 
PetroSync - Surface Geochemical Exploration for Oil and Gas
PetroSync - Surface Geochemical Exploration for Oil and GasPetroSync - Surface Geochemical Exploration for Oil and Gas
PetroSync - Surface Geochemical Exploration for Oil and GasPetroSync
 
PetroSync - Chemically Enhanced Water Alternating Gas
PetroSync - Chemically Enhanced Water Alternating GasPetroSync - Chemically Enhanced Water Alternating Gas
PetroSync - Chemically Enhanced Water Alternating GasPetroSync
 
PetroSync - Budgeting and Forecasting in Oil & Gas Industry
PetroSync - Budgeting and Forecasting in Oil & Gas IndustryPetroSync - Budgeting and Forecasting in Oil & Gas Industry
PetroSync - Budgeting and Forecasting in Oil & Gas IndustryPetroSync
 
PetroSync - Practical Accounting in Joint Ventures & Production Sharing Contr...
PetroSync - Practical Accounting in Joint Ventures & Production Sharing Contr...PetroSync - Practical Accounting in Joint Ventures & Production Sharing Contr...
PetroSync - Practical Accounting in Joint Ventures & Production Sharing Contr...PetroSync
 
PetroSync - Exploration & Production Accounting
PetroSync - Exploration & Production AccountingPetroSync - Exploration & Production Accounting
PetroSync - Exploration & Production AccountingPetroSync
 
PetroSync - Acoustic and Flow Induced Vibration
PetroSync - Acoustic and Flow Induced VibrationPetroSync - Acoustic and Flow Induced Vibration
PetroSync - Acoustic and Flow Induced VibrationPetroSync
 
PetroSync - Carbonate Reservoir Characterization
PetroSync - Carbonate Reservoir CharacterizationPetroSync - Carbonate Reservoir Characterization
PetroSync - Carbonate Reservoir CharacterizationPetroSync
 
PetroSync - Deepwater Drilling Optimisation
PetroSync - Deepwater Drilling OptimisationPetroSync - Deepwater Drilling Optimisation
PetroSync - Deepwater Drilling OptimisationPetroSync
 
PetroSync - TEMA & HTRI-Heat Exchanger Design & Cost Saving Management
PetroSync - TEMA & HTRI-Heat Exchanger Design & Cost Saving ManagementPetroSync - TEMA & HTRI-Heat Exchanger Design & Cost Saving Management
PetroSync - TEMA & HTRI-Heat Exchanger Design & Cost Saving ManagementPetroSync
 
PetroSync - API 579 Fitness for Service
PetroSync - API 579 Fitness for ServicePetroSync - API 579 Fitness for Service
PetroSync - API 579 Fitness for ServicePetroSync
 

More from PetroSync (12)

PetroSync - API Specification Q1 9th Edition Quality Management System Traini...
PetroSync - API Specification Q1 9th Edition Quality Management System Traini...PetroSync - API Specification Q1 9th Edition Quality Management System Traini...
PetroSync - API Specification Q1 9th Edition Quality Management System Traini...
 
PetroSync - API 580 & API 581 Risk Based Inspection & Base Resource Document
PetroSync - API 580 & API 581 Risk Based Inspection & Base Resource DocumentPetroSync - API 580 & API 581 Risk Based Inspection & Base Resource Document
PetroSync - API 580 & API 581 Risk Based Inspection & Base Resource Document
 
PetroSync - Surface Geochemical Exploration for Oil and Gas
PetroSync - Surface Geochemical Exploration for Oil and GasPetroSync - Surface Geochemical Exploration for Oil and Gas
PetroSync - Surface Geochemical Exploration for Oil and Gas
 
PetroSync - Chemically Enhanced Water Alternating Gas
PetroSync - Chemically Enhanced Water Alternating GasPetroSync - Chemically Enhanced Water Alternating Gas
PetroSync - Chemically Enhanced Water Alternating Gas
 
PetroSync - Budgeting and Forecasting in Oil & Gas Industry
PetroSync - Budgeting and Forecasting in Oil & Gas IndustryPetroSync - Budgeting and Forecasting in Oil & Gas Industry
PetroSync - Budgeting and Forecasting in Oil & Gas Industry
 
PetroSync - Practical Accounting in Joint Ventures & Production Sharing Contr...
PetroSync - Practical Accounting in Joint Ventures & Production Sharing Contr...PetroSync - Practical Accounting in Joint Ventures & Production Sharing Contr...
PetroSync - Practical Accounting in Joint Ventures & Production Sharing Contr...
 
PetroSync - Exploration & Production Accounting
PetroSync - Exploration & Production AccountingPetroSync - Exploration & Production Accounting
PetroSync - Exploration & Production Accounting
 
PetroSync - Acoustic and Flow Induced Vibration
PetroSync - Acoustic and Flow Induced VibrationPetroSync - Acoustic and Flow Induced Vibration
PetroSync - Acoustic and Flow Induced Vibration
 
PetroSync - Carbonate Reservoir Characterization
PetroSync - Carbonate Reservoir CharacterizationPetroSync - Carbonate Reservoir Characterization
PetroSync - Carbonate Reservoir Characterization
 
PetroSync - Deepwater Drilling Optimisation
PetroSync - Deepwater Drilling OptimisationPetroSync - Deepwater Drilling Optimisation
PetroSync - Deepwater Drilling Optimisation
 
PetroSync - TEMA & HTRI-Heat Exchanger Design & Cost Saving Management
PetroSync - TEMA & HTRI-Heat Exchanger Design & Cost Saving ManagementPetroSync - TEMA & HTRI-Heat Exchanger Design & Cost Saving Management
PetroSync - TEMA & HTRI-Heat Exchanger Design & Cost Saving Management
 
PetroSync - API 579 Fitness for Service
PetroSync - API 579 Fitness for ServicePetroSync - API 579 Fitness for Service
PetroSync - API 579 Fitness for Service
 

Recently uploaded

Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx959SahilShah
 
Churning of Butter, Factors affecting .
Churning of Butter, Factors affecting  .Churning of Butter, Factors affecting  .
Churning of Butter, Factors affecting .Satyam Kumar
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptSAURABHKUMAR892774
 
Risk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfRisk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfROCENODodongVILLACER
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...srsj9000
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionDr.Costas Sachpazis
 
Introduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHIntroduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHC Sai Kiran
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSCAESB
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.eptoze12
 
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEINFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEroselinkalist12
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girlsssuser7cb4ff
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfme23b1001
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)Dr SOUNDIRARAJ N
 

Recently uploaded (20)

Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx
 
Churning of Butter, Factors affecting .
Churning of Butter, Factors affecting  .Churning of Butter, Factors affecting  .
Churning of Butter, Factors affecting .
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.ppt
 
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
 
Risk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfRisk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdf
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
POWER SYSTEMS-1 Complete notes examples
POWER SYSTEMS-1 Complete notes  examplesPOWER SYSTEMS-1 Complete notes  examples
POWER SYSTEMS-1 Complete notes examples
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
 
Introduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHIntroduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECH
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEINFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girls
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdf
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 

Advanced Wireline Intervention

  • 1. Supported By PETROSYNC’S WELL EGINEERING SERIES Protect Your Assets with Better Understanding of Well Intervention 4 April 2016—7 April 2016 Kuala Lumpur, Malaysia AdvancedWireline InterventionOperation
  • 2. 2 Our Advance Wireline Intervention course is developed to provide detailed in-depth technical and practical level knowledge of wireline operation in order to apply to the oil and gas industry. WELL | ADVANCE D WIRELINE INTERVENTION OPERATION How Does This Course Benefits You? Increase Well Efficiency Do you know what is the latest technology for completion & production? Effective Operation Plan effective operation by understanding the techniques of the equipment and the use of equipment before the operation works Improve Work Efficiency Improve the effectiveness of slickline operations via accurate identification of the problems causing a fishing job Improve the Effectiveness of Braided Line Fishing Improve the effectiveness and efficiency of braided line fishing during the operation by learning how to use braided line equipment in a correct techniques Learn the Latest Technology Improve the effectiveness of slickline and braided line fishing operations by learning the new technology for surface units for fishing and new technology for downhole tools Production Issues and how can define it quickly? Do you know that intervention able to speed up in finding the production problem? Well intervention extends the life of producing wells by improving performance access to stranded or additional hydrocarbon reserves. Being challenged by the current oil price crisis, it is crucial to polish your intervention skills to avoid further asset loss and improve sustainability. general@petrosync.com | +65 6451 4500 | www.petrosync.com Course Overview Course Design Focuses on Wireline Intervention This course focuses on the wireline conveyance and intervention methods with a balanced approach on actual operation aspect for both engineer and operator positioning. Includes Specific and Practical Case Studies Past case examples on wireline intervention are enhanced with understanding the use of circulating devices, plugs, hydrostatics and gas lift operation. You will also have a better understanding the use of circulating devices, plugs, hydrostatics and gas lift operation. In addition to that, you will also be able to sharpen your intervention skills by using braided line and as well as fishing with both braided line and slickline.
  • 3. 3 WELL | ADVANCE D WIRELINE INTERVENTION OPERATION PetroSync Distinguished Instructor Who Needs This Program Practical Over 40 years of experiences. In charge in day to day operations ( worked as district manager over 7 years in Schlumberger, worked as wireline supervisor 7 years in Otis Engineering) Consulting Also worked with Wild Well Control specialist in the extinguishing of the wells in Kuwait after the Gulf war. Designing and using new tools in a downhole memory capacity. (Wood Group Technology) Teaching Developed and presented several training courses covering electronic explosive triggers for slickline. (EXPRO) Steve Arnold Ph.D Independent Consultant from Arnoco LLC  People involved in Well Intervention and Workover operation.  People who are moving up to an advanced level of slickline or whom are presently in an advanced capacity. Job Titles Include: Wireline Assistants Wireline Operators Field Support Subsurface Engineer XXX Production Technologist Petroleum Engineers Geo-scientist PetroSync Inhouse Solutions PetroSync can tailor our courses to meet your specific needs at your preferred location and schedule. Contact us for more information at +65 6415 4500 or email to general @petrosync.com PetroSync Quality Assurance All PetroSync courses are developed with top quality to address all your training needs and purposes. Our courses are vetted strictly to ensure that we always deliver the best courses with the best industry expert. general@petrosync.com | +65 6451 4500 | www.petrosync.com 08:00—09:00 Registration (Day 1) 13:00—14:00 Lunch 09:00—11:00 Session I 14:00—15:30 Session III 11:00—11.15 Refreshment Session I 15:30—15:45 Refreshment Session II 11:15—13:00 Session II 15:45—17:00 Session Iv (Last Session) Course Schedule
  • 4. 4 WELL | ADVANCE D WIRELINE INTERVENTION OPERATION Course Agenda — 4 Days general@petrosync.com | +65 6451 4500 | www.petrosync.com DAY 1 Review Basic Procedures & Equipment Review of basic wireline procedures Downhole equipment  Circulating devices: sliding side door, side pocket mandrel principles  Downhole assembly functions, running/pulling/testing procedures  Flow control devices, identification, uses, running & pulling procedures  Sub surface safety valve equipment, variations, running & pulling procedures  Setting and retrieving of mandrels within SPM  Opening and closing of sliding sleeves “X” and “R” equipment  Difference between the two types of equipment  Proper setting and pulling of “X” and “R” locks DAY 2 Slickline and Braided Line Application Jarring with downhole tools  Different types of jars and how the function of each helps in different circumstances Types of services performed on slickline and their problems causing a fishing job  Running callipers  Running Memory Production Logging Tools  Slickline perforating  Setting bridge plugs and umbrella plugs on slickline  Cutting tubing on slickline Braided line equipment  Surface equipment  Downhole equipment as opposed to slickline  Swabbing operations  Grease pump equipment and use DAY 3 Slickline & Braided Line Fishing Slickline and braided line fishing  Wire broken at the surface  Wire remains visible  Wire broken downhole  Blown up the hole  Wire finder  Wire grabs  Fishing clamps  Retrieval of fish  Fishing for tools  Fishing procedure Workshop: Scenario based Drop Discussion Slickline and Braided Line Fishing  Prevention  Hay Pulleys  Safety areas to consider that may present added problems DAY 4 New Technology and Case Studies Slickline and braided line fishing (continued)  New technology for surface units for fishing  New technology for downhole tools Case studies:  Wire stuck in hole at stuffing box due to well conditions and improper surface rig up  Unexplained wire break downhole and how to recover  Bird nest of braided line coming out of hole with fish attached
  • 5. 5 By Credit Card: Please debit my credit card: Visa MasterCard AMEX Security Code: Card Number: Expiry Date: Name Printed on Card: By Direct Transfer: Please quote invoice number(s) on remittance advice PetroSync Global Pte Ltd Bank Details: Account Name: PetroSync Global Pte Ltd Bank Name: DBS Bank Ltd Bank Code: 7171—Bank Swift Code: DBSSSGSGXXX—Branch Code: 288 Account No: SGD: 288-901898-0 USD: 0288-002682-01-6 Bank Address: 12 Marina Boulevard, Level 3. Marina Bay Financial Centre Tower 3. Singapore 018982. All bank charges to be borne by payer. Please ensure that PetroSync Global Pte Ltd receives the full invoiced amount. Title : Advanced Wireline Intervention Operation Date : 4—7 April 2016 Location : Kuala Lumpur, Malaysia COURSE DETAILS INVESTMENT PACKAGE DEADLINE FULL MASTERCLASS Standard Price 1 April 2016 USD 3,595 Early Bird Offer 4 March 2016 USD 3,395 Group Discount (3 or more Delegates) 1 April 2016 10 % Off INVESTMENT PACKAGES (Please Circle) Group Discount is based on Standard Price *To enjoy the promotion & discount offer, payment must be made before dateline * For 7 or more delegates, please inquire for more attractive package. * Prices include lunches, refreshments and materials. Promotion & discount cannot be combined with other promotional offers. * Important: Please note that registration without payment will incur a SGD 200 administration fee. COURSE CONSULTANT Name : Cay Aagen Email : registration@petrosync.com Phone : +65 6415 4500 Fax : +65 6415 4322 TERMS AND CONDITIONS DISCLAIMER Please note that trainers and topics were confirmed at the time of publishing; however, PetroSync may necessitate substitutions, alterations or cancellations of the trainers or topics. As such, PetroSync reserves the right to change or cancel any part of its published courseme due to unforeseen circumstances. Any substitutions or alterations will be updated on our web page as soon as possible. DATA PROTECTION The information you provide will be safeguarded by PetroSync that may be used to keep you informed of relevant products and services. As an international group we may transfer your data on a global basis for the purpose indicated above. If you do not want us to share your information with other reputable companies, please tick this box CANCELLATION POLICY You may substitute delegates at any time as long as reasonable advance notice is given to PetroSync. For any cancellation received in writing not less than fourteen (14) working days prior to the training course, you will receive credit voucher less a SGD $200 administration fee and any related bank or credit card charges. Delegates who cancel less than fourteen (14) working days of the training course, or who do not attend the course, are liable to pay the full course fee and no refunds will be granted. In the event that PetroSync cancels or postpones an event for any reason and that the delegate is unable or unwilling to attend in on the rescheduled date, you will receive a credit voucher for 100% of the contract fee paid. You may use this credit voucher for another PetroSync to be mutually agreed with PetroSync, which must occur within a year from the date of postponement. PetroSync is not responsible for any loss or damage as a result of the cancellation policy. PetroSync will assume no liability whatsoever in the event this event is cancelled, rescheduled or postponed due to any Act of God, fire, act of government or state, war, civil commotion, insurrection, embargo, industrial action, or any other reason beyond management control. CERTIFICATE OF ATTENDANCE 70% attendance is required for PetroSync’s Certificate of Attendance DETAILS Please accept our apologies for mail or email that is incorrectly addressed. Please email us at registration@petrosync.com and inform us of any incorrect details. We will amend them accordingly. CHARGES & FEE(S) - For Payment by Direct Telegraphic Transfer, client has to bear both local and oversea bank charges. - For credit card payment, there is additional 4% credit card processing fee. 1st Delegate Name: Direct Line Number: Email: Job Title: Department: Head of Department: Mr Mrs Ms Dr Others 2nd Delegate Name: Direct Line Number: Email: Job Title: Department: Head of Department: Mr Mrs Ms Dr Others 3rd Delegate Name: Direct Line Number: Email: Job Title: Department: Head of Department: Mr Mrs Ms Dr Others Attention Invoice to: Direct Line Number: Fax: Company: Industry: Address: Postcode: Country: Email: Please note: - Indicate if you have already registered by Phone Fax Email Web - If you have not received an acknowledgement before the training, please call us to confirm your booking. CONFIRMATION I agree to PetroSync’s terms & conditions, payment terms and cancellation policy. Authorized Signature: PAYMENT TERMS : Payment is due in full at the time of registration. Full payment is mandatory for event attendance. PAYMENT METHOD INVOICE DETAILS DELEGATES DETAILS