Wellheads
1. Tubing (perforated)
2. Casing
3. Annular seal
4. Wellhead
5. Tubing suspension
6. Master valve
7. Master valve
8. Upper valve
9. Wing valve
10. Flow bean
11. To manifold
12. Operator
13. Hand wheel
14. Pressure gage
15. Annular space outlet
valve
16. Cellar
Sumur Produksi
Penyelesaian sumur meliputi pemasangan casing dan rangkaian pipa
produksi, serta mengupayakan agar cairan dapat mengalir ke
permukaan, dimana dipasang kepala sumur lengkap dengan
Christmas tree. Christmas tree merupakan sekumpulan valve, alat
ukur tekanan, penyangga tubing, dll.
3
What is a wellhead ?
– The wellhead is
• the surface foundation on which the well is built up during
the drilling operations and
• the base for the Xmas tree for production operations.
4
Wellheads - Drilling
During drilling process :
The well is controlled by
a BOP and choke
manifold
As the well is drilled :
Each annulus is sealed
off by the wellhead
5
Wellheads - Completed well
Xmas Tree The BOP's are removed
After the tubing is installed :
The Christmas tree is
installed to control the flow
from the well
Wellhead
6
Wellhead systems must be designed to :
Withstand tensile loads of suspended
tubulars
1
2 Provide a pressure sealing capability
ISOLATE the well from the external
environment
ISOLATE between casings and downhole
formations
MAINTAIN PRESSURE during well control
operations, well testing or shut in periods.
Life of Well
•Drilling
•Production
•Workover
•Suspension
•Abandonment
7
What does a wellhead do ?
HANG-OFF WEIGHT
1
2
3
4
CONTAINS PRESSURE
MONITOR THE WELL SAFETY
PROVIDE A BASE FOR THE XMAS
TREE
Surface Wellheads
9
Conventional spooled system
Casing Head Housing
Casing Head Spool
Tubing Head Spool
BOP Stack
10
What are the main
components ?
Casing Head Housing
Casing Head Spool
Tubing Head Spool
Xmas Tree
11
Surface Wellhead schematic
• Medium cost spool system
12
Casing Head Housing
First element of the
wellhead
13
Casing Head Housing - Functions
– It is normally connected to the surface casing
– Supports the next string of casing
– Provides connection to the BOP and together with it can:
• Seal the wellbore (from the atmosphere)
• Control access to the wellbore :
– for pressure control
– or fluid returns during drilling operations.
14
Casing Head Housing - Description
Slip-on weld or threaded
bottom connection
Test port
Side outlets
threaded or
studded
Top connection flanged (standard)
Ring groove
Landing area for
Casing Hanger
15
Starter Head
• Threaded onto surface
casing
• Can provide a landing plate
to sit on the conductor
• Internal profile for next
casing string
18
CHH - Base Plate
The casing head may be used in conjunction
with a base plate for more effective weight
distribution.
Conductor pipe
Surface casing
Cellar
19
What happens after installing the
Casing Head Housing ?
– Nipple up and test BOPs
– Install wear bushing.
– The next hole section is drilled.
– The intermediate casing is run in the hole and is cemented.
– P/U BOPs
– A rough cut is performed to allow retrieving remaining casing and
removing BOPs
20
Casing hung on Casing Hanger
Housing
21
Casing Hangers - Functions
• Suspends intermediate or production casing string
• Centres the casing string in the head (or spool)
• Seals off the casing annulus. ( It is the primary seal )
22
Starter Head summary
23
Casing Hangers
24
Casing Hangers
25
Casing Hangers
26
Casing Hangers
27
Casing Head Spools
Second element of the
wellhead
Normally not
threaded as
pressures higher
Eg >3000psi.
28
Next Section is Installed
Casing Spool
29
Casing Head Spools - Functions
– Seals off (packs off) surface casing string
– Provides support (landing bowl) for next casing string
– Provides support for well control equipment (BOP Stack)
• Sealing the wellbore (from the atmosphere)
• Controlling access to the wellbore :
– for pressure control
– or fluid returns during drilling operations.
30
Casing Head Spools - Description
Pack Off or Secondary Seal.
Designed to fit around OD of
current casing
Test port
Side outlets
threaded or
studded / flanged
(threaded not
common)
Top connection flanged (standard)
Ring groove
Landing area for
Casing Hanger
Bottom connection
compatible with the top
connection on the
previous casing head or
spool
32
What Seals Pressure Between Flanges
?
Achieved using API ring gaskets
33
What happens after installing the
Casing Spool Housing ?
– Nipple up and test BOPs
– Install wear bushing.
– The next hole section is drilled.
– The intermediate/Production casing is run in the hole and is cemented.
– P/U BOPs
– A rough cut is performed to allow retrieving remaining casing and
removing BOPs.
– Casing Hanger is installed
34
Casing Hangers
Intermediate
or
Production Casing
Landing area
35
Casing Pack-offs
• Fits inside the lower flange
of the casing spool
36
Casing Pack-offs
• Fits inside the lower flange
of the casing spool
37
Casing Pack-offs
• Fits inside the lower flange
of the casing spool
38
Casing Spools summary
39
Tubing Head Spools
Third element of the
wellhead
40
Tubing Head Spools - Functions
• Seals off (packs off) production casing string
• Provides support and lockdown for tubing hanger
• Provides support for the BOP Stack
41
Tubing Head Spools - Description
TUBING HANGER
LOCK DOWN BOLT
TOP BOWL FOR
TUBING HANGER
VALVE REMOVAL
PLUG THREADS
TEST PORT
Pack off designed to fit around OD
of production casing
42
Tubing Hangers
Tubing
Production casing
Tubing Head Spool
Tubing Hanger
Tubing Hanger
Tubing Head Spool
Tubing Bonnet
43
Tubing Hangers
Functions
• Suspends the tubing
• Seals off the annulus
• Provides a seat for a back pressure valve (BPV)
that can be temporally installed allowing the
BOP stack or X-mas tree to be removed
46
Dual Tubing Head
• Locator pins to orient the
dual hanger
47
Tubing Hanger
48
Tubing Heads summary
49
Tubing Bonnet
• Seats over the tubing hanger
neck
• Xmas tree on top of this
50
Tubing Bonnet
51
Tubing Bonnet
52
Dual Tubing Bonnet
• Dual completion
• Two tubing strings
– Long string
– Short string
• Spreader
53
Tubing Bonnet summary
67
Questions

More Related Content

What's hot

Wellhead equipment Introduction Based on API 6a & NACE
Wellhead equipment Introduction Based on API 6a & NACEWellhead equipment Introduction Based on API 6a & NACE
Wellhead equipment Introduction Based on API 6a & NACEAmir Rafati
 
Sequence of well completion part 1
Sequence of well completion part 1Sequence of well completion part 1
Sequence of well completion part 1Elsayed Amer
 
3. sequances of drilling operations
3. sequances of drilling operations3. sequances of drilling operations
3. sequances of drilling operationsElsayed Amer
 
7'' liner running and cementing
7'' liner running and cementing7'' liner running and cementing
7'' liner running and cementingKamel Elsayed
 
Production Packer setting and types
Production Packer setting and typesProduction Packer setting and types
Production Packer setting and typesElsayed Amer
 
Well completion techniques
Well completion techniquesWell completion techniques
Well completion techniquesvelMurugan260
 
Sequence of well drilling part 1
Sequence of well drilling part 1Sequence of well drilling part 1
Sequence of well drilling part 1Elsayed Amer
 
Installation procedures of wellhead
Installation procedures of wellheadInstallation procedures of wellhead
Installation procedures of wellheadElsayed Amer
 
Sequence of well completion part 1
Sequence of well completion part 1Sequence of well completion part 1
Sequence of well completion part 1Elsayed Amer
 
Basic Well Control
Basic Well ControlBasic Well Control
Basic Well ControlM.T.H Group
 
perforated joint, flow coupling and blast joint
perforated joint, flow coupling and blast jointperforated joint, flow coupling and blast joint
perforated joint, flow coupling and blast jointElsayed Amer
 
Completion equipment packer part #2
Completion equipment packer part #2Completion equipment packer part #2
Completion equipment packer part #2Elsayed Amer
 

What's hot (20)

Well intervention
Well  interventionWell  intervention
Well intervention
 
Wellhead equipment Introduction Based on API 6a & NACE
Wellhead equipment Introduction Based on API 6a & NACEWellhead equipment Introduction Based on API 6a & NACE
Wellhead equipment Introduction Based on API 6a & NACE
 
well control (1)
 well control (1) well control (1)
well control (1)
 
Sequence of well completion part 1
Sequence of well completion part 1Sequence of well completion part 1
Sequence of well completion part 1
 
3. sequances of drilling operations
3. sequances of drilling operations3. sequances of drilling operations
3. sequances of drilling operations
 
Well completion and testing
Well completion and testingWell completion and testing
Well completion and testing
 
7'' liner running and cementing
7'' liner running and cementing7'' liner running and cementing
7'' liner running and cementing
 
Production Packer setting and types
Production Packer setting and typesProduction Packer setting and types
Production Packer setting and types
 
Well completion techniques
Well completion techniquesWell completion techniques
Well completion techniques
 
Tubing string
Tubing stringTubing string
Tubing string
 
Sequence of well drilling part 1
Sequence of well drilling part 1Sequence of well drilling part 1
Sequence of well drilling part 1
 
Packers GFK
Packers GFKPackers GFK
Packers GFK
 
Installation procedures of wellhead
Installation procedures of wellheadInstallation procedures of wellhead
Installation procedures of wellhead
 
Sequence of well completion part 1
Sequence of well completion part 1Sequence of well completion part 1
Sequence of well completion part 1
 
Basic Well Control
Basic Well ControlBasic Well Control
Basic Well Control
 
perforated joint, flow coupling and blast joint
perforated joint, flow coupling and blast jointperforated joint, flow coupling and blast joint
perforated joint, flow coupling and blast joint
 
Completion equipment packer part #2
Completion equipment packer part #2Completion equipment packer part #2
Completion equipment packer part #2
 
Packers
PackersPackers
Packers
 
BHA.pdf
BHA.pdfBHA.pdf
BHA.pdf
 
Mudline Suspension (MLS)
Mudline Suspension (MLS)Mudline Suspension (MLS)
Mudline Suspension (MLS)
 

Similar to WELLHEAD FOR OIL AND GAS WELL.pptx

How a Well is Drilled.pdf
How a Well is Drilled.pdfHow a Well is Drilled.pdf
How a Well is Drilled.pdfAbdallahTayea99
 
wellheads-170105153648 (1).pdf
wellheads-170105153648 (1).pdfwellheads-170105153648 (1).pdf
wellheads-170105153648 (1).pdfAZLANAiyub
 
Well completion and stimulation
Well completion and stimulation Well completion and stimulation
Well completion and stimulation kaleem ullah
 
Best practices day one pm new
Best practices day one pm newBest practices day one pm new
Best practices day one pm newAhmed Radwan
 
Boiler mountings and accessories@snist
Boiler mountings and accessories@snistBoiler mountings and accessories@snist
Boiler mountings and accessories@snistshaukat5175
 
2d poster about coring procedure
2d poster about coring procedure2d poster about coring procedure
2d poster about coring procedureDr. Arzu Javadova
 
رضا مصطفوی طباطبایی, hydraulic workover and snubbing solutions
رضا مصطفوی طباطبایی, hydraulic workover and snubbing solutionsرضا مصطفوی طباطبایی, hydraulic workover and snubbing solutions
رضا مصطفوی طباطبایی, hydraulic workover and snubbing solutionsReza Mostafavi Tabatabaei
 
Hydraulic workover and snubbing solutions, رضا مصطفوی طباطبایی
Hydraulic workover and snubbing solutions, رضا مصطفوی طباطبایی Hydraulic workover and snubbing solutions, رضا مصطفوی طباطبایی
Hydraulic workover and snubbing solutions, رضا مصطفوی طباطبایی Reza Mostafavi Tabatabaei
 
Hydraulic workover and snubbing solutions, رضا مصطفوی طباطبایی
Hydraulic workover and snubbing solutions, رضا مصطفوی طباطبایی Hydraulic workover and snubbing solutions, رضا مصطفوی طباطبایی
Hydraulic workover and snubbing solutions, رضا مصطفوی طباطبایی Reza Mostafavi Tabatabaei
 
260416413-Well-Completion-ppt with examples
260416413-Well-Completion-ppt with examples260416413-Well-Completion-ppt with examples
260416413-Well-Completion-ppt with examplessreeharshavandavasi
 
TRAINNING OF PIPING.ppt
TRAINNING  OF  PIPING.pptTRAINNING  OF  PIPING.ppt
TRAINNING OF PIPING.pptmokhtar95
 
Instalação em terminais _ Milton Roy
Instalação em terminais _ Milton RoyInstalação em terminais _ Milton Roy
Instalação em terminais _ Milton RoyVibropac
 
Fluids & cementing 2022-2023 (1) (1).pdf
Fluids & cementing 2022-2023 (1) (1).pdfFluids & cementing 2022-2023 (1) (1).pdf
Fluids & cementing 2022-2023 (1) (1).pdfLokmanDridah
 
GAS TURBINE MAJOR INSPECTION
GAS TURBINE MAJOR INSPECTIONGAS TURBINE MAJOR INSPECTION
GAS TURBINE MAJOR INSPECTIONUzair Ahmad
 
Best practices day 4 am new
Best practices day 4 am newBest practices day 4 am new
Best practices day 4 am newAhmed Radwan
 

Similar to WELLHEAD FOR OIL AND GAS WELL.pptx (20)

How a Well is Drilled.pdf
How a Well is Drilled.pdfHow a Well is Drilled.pdf
How a Well is Drilled.pdf
 
wellheads-170105153648 (1).pdf
wellheads-170105153648 (1).pdfwellheads-170105153648 (1).pdf
wellheads-170105153648 (1).pdf
 
Well completion and stimulation
Well completion and stimulation Well completion and stimulation
Well completion and stimulation
 
Valves and Testing .pdf
Valves and Testing .pdfValves and Testing .pdf
Valves and Testing .pdf
 
Best practices day one pm new
Best practices day one pm newBest practices day one pm new
Best practices day one pm new
 
Boiler mountings and accessories@snist
Boiler mountings and accessories@snistBoiler mountings and accessories@snist
Boiler mountings and accessories@snist
 
2d poster about coring procedure
2d poster about coring procedure2d poster about coring procedure
2d poster about coring procedure
 
BOP
BOPBOP
BOP
 
رضا مصطفوی طباطبایی, hydraulic workover and snubbing solutions
رضا مصطفوی طباطبایی, hydraulic workover and snubbing solutionsرضا مصطفوی طباطبایی, hydraulic workover and snubbing solutions
رضا مصطفوی طباطبایی, hydraulic workover and snubbing solutions
 
Hydraulic workover and snubbing solutions, رضا مصطفوی طباطبایی
Hydraulic workover and snubbing solutions, رضا مصطفوی طباطبایی Hydraulic workover and snubbing solutions, رضا مصطفوی طباطبایی
Hydraulic workover and snubbing solutions, رضا مصطفوی طباطبایی
 
Hydraulic workover and snubbing solutions, رضا مصطفوی طباطبایی
Hydraulic workover and snubbing solutions, رضا مصطفوی طباطبایی Hydraulic workover and snubbing solutions, رضا مصطفوی طباطبایی
Hydraulic workover and snubbing solutions, رضا مصطفوی طباطبایی
 
260416413-Well-Completion-ppt with examples
260416413-Well-Completion-ppt with examples260416413-Well-Completion-ppt with examples
260416413-Well-Completion-ppt with examples
 
VALVE AND TESTING.pdf
VALVE AND TESTING.pdfVALVE AND TESTING.pdf
VALVE AND TESTING.pdf
 
TRAINNING OF PIPING.ppt
TRAINNING  OF  PIPING.pptTRAINNING  OF  PIPING.ppt
TRAINNING OF PIPING.ppt
 
2004 0930 Ca
2004 0930 Ca2004 0930 Ca
2004 0930 Ca
 
Instalação em terminais _ Milton Roy
Instalação em terminais _ Milton RoyInstalação em terminais _ Milton Roy
Instalação em terminais _ Milton Roy
 
Wen_Design.ppt
Wen_Design.pptWen_Design.ppt
Wen_Design.ppt
 
Fluids & cementing 2022-2023 (1) (1).pdf
Fluids & cementing 2022-2023 (1) (1).pdfFluids & cementing 2022-2023 (1) (1).pdf
Fluids & cementing 2022-2023 (1) (1).pdf
 
GAS TURBINE MAJOR INSPECTION
GAS TURBINE MAJOR INSPECTIONGAS TURBINE MAJOR INSPECTION
GAS TURBINE MAJOR INSPECTION
 
Best practices day 4 am new
Best practices day 4 am newBest practices day 4 am new
Best practices day 4 am new
 

Recently uploaded

GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSCAESB
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learningmisbanausheenparvam
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AIabhishek36461
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLDeelipZope
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girlsssuser7cb4ff
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerAnamika Sarkar
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionDr.Costas Sachpazis
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 

Recently uploaded (20)

GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learning
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AI
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCL
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girls
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 

WELLHEAD FOR OIL AND GAS WELL.pptx

  • 2. 1. Tubing (perforated) 2. Casing 3. Annular seal 4. Wellhead 5. Tubing suspension 6. Master valve 7. Master valve 8. Upper valve 9. Wing valve 10. Flow bean 11. To manifold 12. Operator 13. Hand wheel 14. Pressure gage 15. Annular space outlet valve 16. Cellar Sumur Produksi Penyelesaian sumur meliputi pemasangan casing dan rangkaian pipa produksi, serta mengupayakan agar cairan dapat mengalir ke permukaan, dimana dipasang kepala sumur lengkap dengan Christmas tree. Christmas tree merupakan sekumpulan valve, alat ukur tekanan, penyangga tubing, dll.
  • 3. 3 What is a wellhead ? – The wellhead is • the surface foundation on which the well is built up during the drilling operations and • the base for the Xmas tree for production operations.
  • 4. 4 Wellheads - Drilling During drilling process : The well is controlled by a BOP and choke manifold As the well is drilled : Each annulus is sealed off by the wellhead
  • 5. 5 Wellheads - Completed well Xmas Tree The BOP's are removed After the tubing is installed : The Christmas tree is installed to control the flow from the well Wellhead
  • 6. 6 Wellhead systems must be designed to : Withstand tensile loads of suspended tubulars 1 2 Provide a pressure sealing capability ISOLATE the well from the external environment ISOLATE between casings and downhole formations MAINTAIN PRESSURE during well control operations, well testing or shut in periods. Life of Well •Drilling •Production •Workover •Suspension •Abandonment
  • 7. 7 What does a wellhead do ? HANG-OFF WEIGHT 1 2 3 4 CONTAINS PRESSURE MONITOR THE WELL SAFETY PROVIDE A BASE FOR THE XMAS TREE
  • 9. 9 Conventional spooled system Casing Head Housing Casing Head Spool Tubing Head Spool BOP Stack
  • 10. 10 What are the main components ? Casing Head Housing Casing Head Spool Tubing Head Spool Xmas Tree
  • 11. 11 Surface Wellhead schematic • Medium cost spool system
  • 12. 12 Casing Head Housing First element of the wellhead
  • 13. 13 Casing Head Housing - Functions – It is normally connected to the surface casing – Supports the next string of casing – Provides connection to the BOP and together with it can: • Seal the wellbore (from the atmosphere) • Control access to the wellbore : – for pressure control – or fluid returns during drilling operations.
  • 14. 14 Casing Head Housing - Description Slip-on weld or threaded bottom connection Test port Side outlets threaded or studded Top connection flanged (standard) Ring groove Landing area for Casing Hanger
  • 15. 15 Starter Head • Threaded onto surface casing • Can provide a landing plate to sit on the conductor • Internal profile for next casing string
  • 16. 18 CHH - Base Plate The casing head may be used in conjunction with a base plate for more effective weight distribution. Conductor pipe Surface casing Cellar
  • 17. 19 What happens after installing the Casing Head Housing ? – Nipple up and test BOPs – Install wear bushing. – The next hole section is drilled. – The intermediate casing is run in the hole and is cemented. – P/U BOPs – A rough cut is performed to allow retrieving remaining casing and removing BOPs
  • 18. 20 Casing hung on Casing Hanger Housing
  • 19. 21 Casing Hangers - Functions • Suspends intermediate or production casing string • Centres the casing string in the head (or spool) • Seals off the casing annulus. ( It is the primary seal )
  • 25. 27 Casing Head Spools Second element of the wellhead Normally not threaded as pressures higher Eg >3000psi.
  • 26. 28 Next Section is Installed Casing Spool
  • 27. 29 Casing Head Spools - Functions – Seals off (packs off) surface casing string – Provides support (landing bowl) for next casing string – Provides support for well control equipment (BOP Stack) • Sealing the wellbore (from the atmosphere) • Controlling access to the wellbore : – for pressure control – or fluid returns during drilling operations.
  • 28. 30 Casing Head Spools - Description Pack Off or Secondary Seal. Designed to fit around OD of current casing Test port Side outlets threaded or studded / flanged (threaded not common) Top connection flanged (standard) Ring groove Landing area for Casing Hanger Bottom connection compatible with the top connection on the previous casing head or spool
  • 29. 32 What Seals Pressure Between Flanges ? Achieved using API ring gaskets
  • 30. 33 What happens after installing the Casing Spool Housing ? – Nipple up and test BOPs – Install wear bushing. – The next hole section is drilled. – The intermediate/Production casing is run in the hole and is cemented. – P/U BOPs – A rough cut is performed to allow retrieving remaining casing and removing BOPs. – Casing Hanger is installed
  • 32. 35 Casing Pack-offs • Fits inside the lower flange of the casing spool
  • 33. 36 Casing Pack-offs • Fits inside the lower flange of the casing spool
  • 34. 37 Casing Pack-offs • Fits inside the lower flange of the casing spool
  • 36. 39 Tubing Head Spools Third element of the wellhead
  • 37. 40 Tubing Head Spools - Functions • Seals off (packs off) production casing string • Provides support and lockdown for tubing hanger • Provides support for the BOP Stack
  • 38. 41 Tubing Head Spools - Description TUBING HANGER LOCK DOWN BOLT TOP BOWL FOR TUBING HANGER VALVE REMOVAL PLUG THREADS TEST PORT Pack off designed to fit around OD of production casing
  • 39. 42 Tubing Hangers Tubing Production casing Tubing Head Spool Tubing Hanger Tubing Hanger Tubing Head Spool Tubing Bonnet
  • 40. 43 Tubing Hangers Functions • Suspends the tubing • Seals off the annulus • Provides a seat for a back pressure valve (BPV) that can be temporally installed allowing the BOP stack or X-mas tree to be removed
  • 41. 46 Dual Tubing Head • Locator pins to orient the dual hanger
  • 44. 49 Tubing Bonnet • Seats over the tubing hanger neck • Xmas tree on top of this
  • 47. 52 Dual Tubing Bonnet • Dual completion • Two tubing strings – Long string – Short string • Spreader