SlideShare a Scribd company logo
1 of 6
Download to read offline
INSTRUCTOR
Uday B. Kale(M. Eng. Mechanical)
Technical Director
KUB Quality Services
API 570 - Authorized Piping Inspector - Certificate #38157
API 510 – Authorized Pressure Vessel Inspector – Certificate #26785
API 653 – Authorized Above storage Tank Inspector-Certificate #27926
API SI- Source Inspector - Certificate #52837
API 580 – Risk Based Inspection - Certificate #50553
Certified Welding Inspector ( AWS) Certificate #00071941
CSWIP 3.1 Certificate #58489
ACCP Professional Level III (RT, UT, MT, VT) ASNT ID - 83835
RT 2 - Certified Site Incharge (BARC, India)
ASNT NDT Level III (RT, UT, MT, VT, PT, ET, LT ), ASNT ID- 83835
Level 3 as per EN 473 (UT, MT, PT, VT)
Limited Attendees
The course has limited seats to ensure maximum learning and experience for all delegates.
Certificate of Attendance
You will receive a Certificate of Attendance bearing the signatures of the Trainer upon successful
completion of the course. This certificate is proof of your continuing professional development.
Interactive Training
You will be attending training designed to share both the latest knowledge and practical
experience through interactive sessions. This will provide you with a deeper and more long-term
understanding of your current issues.
High Quality Course Materials
Printed course manual will provide you with working materials throughout the course and will be
an invaluable source of reference for you and your colleagues afterward. You can follow course
progress on your laptop with soft copies provided.
Reserve early to avoid disappointment!
SUMMARYOFPROFESSIONALACHIEVEMENT
ATTENDTHISINTENSIVECOURSETOMASTER:
Detailed explanations of all the information covered in the API 510
'Body of Knowledge' including ASME welding requirements for
pressure vessels section IX and VIII
ASME non-destructive testing principles and application of Section V
Pressure vessel design review ASME Section VIII, weld sizes, vessel
nozzle reinforcement, brittle fracture, weld efficiency factors, post
weld heat treatment
Pressure relieving devices, valves, bursting discs, setting, testing and
inspection; API 510 inspection, repair and rerating of vessels,
inspection intervals, inspection requirements, relationships to ASME
codes. Corrosion, minimum thickness determination and remaining
life calculations
Inspection and degradation mechanisms of pressure vessels,
corrosion and cracking mechanisms
Erosion, common corrodents, hydrogen and H2S damage, alloy
degradation.
The Middle East:
Qatar Petroleum, QAFAC, ADCO, ADGAS, ADMA, GASCO,
Banagas, Technip (Bahrain), Equate Petrochemicals Company,
Al Jubail Fertilizer Company, TUV Akadamie Middle East (UAE,
Saudi Arabia and Qatar)
Africa: BP - GUPCO (Egypt), Inspection and Test Nigeria Ltd
India & Asia: Oil India Limited, Tata, Dacon Inspection Ltd
Europe: Rosen Europe (The Netherlands)
PARTIALCLIENTLIST
Sculpt Your Skills for the Inspection, Repair, Alteration, and Rerating of Pressure Vessel Systems!
Be the qualified
API510 Inspector
in 2016!
29th February - 04th March 2016
04th - 08th April 2016
25th - 29th July 2016
14th - 18th November 2016
| Bandung, Indonesia
| Kuala Lumpur, Malaysia
| Bandung, Indonesia
| Kuala Lumpur, Malaysia
API 510
Pressure Vessel Inspector Course
API 510
Pressure Vessel Inspector Course
Reserve early to avoid disappointment!
SUPPORTEDBY
“To improve management control of process unit inspection, repair,
alteration and rerating; and to reduce the potential for inspection delays
resulting from regulatory requirements.”
-- API.org on API 570 Certification
American Petroleum Institute (API)
Code 510 Inspection, Repair, Alteration, and Rerating of Pressure
Vessel Systems is recognized and used with confidence worldwide.
The Piping Inspector Certification Program (PICP) is developed for the
continual high level of efficiency and safety through emphasizing
professional credibility and process integrity.
Pressure Vessel system is one of the critical production assets in
process industry. Organizations recognize the need to maintain
authorized inspection agency and technically assess qualified
pressure vessel engineers and inspectors to ensure facilities are at top
performance. Therefore, API 510 certification is one of the most
sought after professional competency that enables inspectors to be
actively involved in the improvement of industry & environmental
health and safety performance, reinforcement management control,
compliance of inspection capabilities.
With Mr. Uday Kale’s extensive involvements in the facilities
inspection, as well as his practical coaching and mentoring
approaches, this course not only prepare the candidates to pass API
510 examination with confident, it will also advance the appreciation
of pressure vessel facilities and thus to broaden the technical
knowledge base in order to avoid unplanned shutdown and reduce
expenses!
This course will specifically benefit Engineers, Supervisors, and
Managers from the following disciplines:
- Mechanical Engineering
- Inspection
- Maintenance & Operations
- Technical & Engineering
- QAQC
and technical personnel with 2-3 years of experience in the
management and planning of inspection and maintenance activities
of pressure vessel system at upstream oil & gas facilities, refineries,
process plants and petrochemical facilities.
PROGRAMOVERVIEW
AUDIENCE
WHYYOUSHOULDATTEND
Toensurethatallobjectivesofthecoursematchesyours,allPetroSync
programs are developed after intensive and extensive research
within the industry
PetroSyncprogramsfocusonyourimmediateworkingissuestoensure
that you are able to apply and deliver immediate results in real work
situations
Application and implementation of industry knowledge and
experience are the drivers for our course design, not theoretical
academiclectures
PetroSync training focuses on practical interactive learning tools and
techniques including case studies, group discussions, scenarios,
simulations,practicalexercisesandknowledgeassessmentsduringthe
course.Investasmallamountofyourtimetopreparebeforeattending
thecoursetoensuremaximumlearning
PetroSyncfollowsarigorousselectionprocesstoensurethatallexpert
trainers have first-hand, up-to-date and practical knowledge and are
leadersoftheirrespectiveindustrialdiscipline
SAVE COST • IMPROVE PERFORMANCE • REDUCE RISK
PetroSync understands that in current economic climate, getting an
excellent return on your training investment is critical for all our clients.
This excellent training can be conducted exclusively for your
organization.Thetrainingcanbetailoredtomeetyourspecificneedsat
yourpreferredlocationandtime.
Wewillmeetyouanywherearoundtheglobe. Ifyouliketoknowmore
aboutthisexcellentprogram,pleasecontacton+6564154500oremail
general@petrosync.com
IN-HOUSESOLUTIONS
PROGRAMSCHEDULE
08:00 Registration (Day1)
08:10 – 11:00 Session I
11:00 – 11:15 Refreshment & Networking
11:15 – 13:00 Session II
13:00 – 14:00 Networking Buffet Lunch
14:00 – 15:30 Session III
15:30 – 15:45 Refreshment & Networking
15:45 – 18:00 Session IV
18:00 End of Day
Each attendee must bring a Laptop computer with Microsoft operating
system and Scientific Calculator
MODULE–1
Welcome and Introduction
Overview of API 510 Course
MODULE–2
JOINT EFFICIENCIES
a. Weld Joint Categories from UW-3;
b. Type of radiography (full, spot, or none , RT-1, RT-2, etc.);
c. Joint efficiency by reading Table UW-12;
d. Joint efficiency for seamless heads and vessels Sections per
UW-12 (d); and
e. Joint efficiency for welded pipe and tubing per UW-12 (e).
MODULE-3
THICKNESS CALCULATIONS
a) The required thickness of a cylindrical shell (UG-27(c)(1));
b) The vessel part MAWP for a cylindrical shell
c) The required thickness of a head-Hemispherical, Ellipsoidal,
Torispherical
d) The vessel part MAWP for a head
MODULE-4
STATIC HEAD
a) Calculate static head pressure on any vessel part;
b) Calculate total pressure (MAWP + static head) on any vessel
part;
c) Calculate maximum vessel MAWP given vessel parts MAWP
and elevations
MODULE-5
EXTERNAL PRESSURE
a) Calculate the maximum allowable external pressure;
b) Calculate whether a cylindrical shell meets Code design for
external pressure.
IMPACT TESTING
a) Determine the minimum metal temperature of a material
which is exempt from impact testing (UG-20 (f),
UCS-66,UCS-68(c).)
MODULE–1
Welcome and Introduction
Overview of API 510 Course
DAY-1
MODULE-1
PRESSURE TESTING
a) Calculate a test pressure compensating for temperature. (UG-99 &
UG-100)
b) The precautions associated with hydrostatic and pneumatic testing,
c) Steps in a hydrotest Procedure (UG 99 and UG 100)
d) All steps in a pneumatic test procedure (UG 100 and UG 102)
MODULE-2
WELD SIZE FOR ATTACHMENT WELDS AT OPENINGS
a) Conversion of a fillet weld throat dimension to leg dimension ,
conversion factor(0.707)
b) Determine the required size of welds at openings (UW-16).
MODULE–3
NOZZLE REINFORCEMENT
Key concepts of reinforcement, such as replacement of strength and limits
of reinforcement.
Credit for extra metal in shell and nozzle
Calculate the required areas for reinforcement
MODULE-4
1 SCOPE OF API 510
1.1 General Application
1.2 Specific Applications
1.3 Recognized Technical Concepts
2 references
MODULE-5
3 definitions
4 owner/user inspection organization
4.1 General
4.2 Owner/user Organization Responsibilities
MODULE-1
5 inspection, examination and pressure testing practices
5.1 Inspection Plans
5.2 Risk-based Inspection
5.3 Preparation For Inspection
5.4 Inspection For Types Of Damage Modes Of Deterioration And Failure
MODULE–2
5.5 General Types Of Inspection And Surveillance
5.6 Condition Monitoring Locations
5.7 Condition Monitoring Methods
MODULE-3
5.8 Pressure Testing
5.9 Material Verification And Traceability
5.10 Inspection Of In-service Welds And Joints
5.11 Inspection Of Flanged Joints
MODULE-4
6 interval/frequency and extent of inspection
6.1 General
a) Determine the minimum me
which is exempt from i
UCS-66,UCS-68(c).)
MODULE-1
DAY-2
p g
4.1 General
4.2 Owner/user Organization Resp
MODULE-1
DAY-3
AGENDAOULTINE
DAY-4
MODULE-1
8 repairs, alterations, and rerating of pressure vessels .
8.1 Repairs And Alterations
Authorization
Approval
Materials Requirements
Welding Requirements
MODULE-2
Heat Treating Requirements
Preheating
Post weld Heat Treating
Local Postweld Heat treatment
Repairs to Stainless Steel Weld Overlay and Cladding
Rerating
MODULE-3
Introduction to ASME Sec. IX
Welding Procedure tests
Performance qualification tests
Acceptance criteria
Welding positions
P-No, F-No and A-No.
Review of:
a. Welding Procedure Specification (WPS); and
b. Procedure Qualification Record (PQR)
And determine:
a) Whether number and type of mechanical test listed on PQR are
appropriate
b) Whether the results of the tests are acceptable
c) Whether all required essential and non-essential variables have been
properly addressed.
DAY-56.2 Inspection During Installation And Service Changes
6.3 Risk-based Inspection
6.4 External Inspection
6.5 Internal And On-stream Inspection
6.6 Pressure-relieving Devices
MODULE-5
7 inspection data evaluation, analysis, and recording
7.1 Corrosion Rate Determination
7.2 Remaining Life Calculations
7.3 Maximum Allowable Working Pressure Determination
MODULE-6
7.4 Fitness For Service Analysis Of Corroded Regions
7.5 API RP 579 Fitness For Service Evaluations
7.6 Required Thickness Determination
7.7 Evaluation Of Existing Equipment With Minimal Documentation
7.8 Reports And Records
MODULE-1
API RP 576, Inspection of Pressure-Relieving Devices
1. Relief Devices
a) Description of Types -- (API RP-576, Section 2)
b) Causes of Improper Performance (API RP-576, Section 4)
c) Reasons for Inspection and Frequency Determination (API RP 576,
Sections 3 & 5)
d) Inspection and Test Service Procedures (API RP-576, Sections 6 and 7)
MODULE-2
A. Article 1, General Requirements:
B. Article 2, Radiographic Examination
MODULE-3
C. Article 6, Liquid Penetrant Examination,
D. Article 7, Magnetic Particle Examination (Yoke and Prod techniques
only):
E. Article 23, Ultrasonic Standards, Section SE–797
MODULE-4
API RP 576, Inspection of Pressure-Relieving Devices
1. Relief Devices
a) Description of Types -- (API RP-576, Section 2)
b) Causes of Improper Performance (API RP-576, Section 4)
c) Reasons for Inspection and Frequency Determination (API RP 576,
Sections 3 & 5)
d) Inspection and Test Service Procedures (API RP-576, Sections 6 and 7)
MODULE-5(1hour+1hourdiscussion)
Practice Examination-Open Book
Practice Examination-Closed Book
Feed Back and Closing
Uday B. Kale is a Post Graduate Mechanical Engineer with
experience in Inspection, Welding and NDE/NDT projects for last 18
years. Currently he is the technical director of M/s KUB Quality
Services. He has involved in inspection, welding and NDT projects in
the Middle East, Africa and India on offshore production platform
and petrochemical refineries. He has vast experience in Manufactur-
ing and In Service Inspection of Static Equipment used in Oil and
Gas.
Mr. Uday is very well-versed in international Codes and Standards.
He performed and led the shutdown teams in performing NDE,
internal and external inspection of equipments in central process-
ing plant, ammonia plant, FCCU, SRU, SWS and amine treating units
for Code stamp facilities of ADCO, Qatar Petroleum, Oil India,
QAFAC, Banagas, Al Jubail Fertilizer Company, and other various
units of Refineries, Petrochemicals, Gas Plant and Fertilizer Plant
and so on.
He was a lead API inspector for various shutdown and Turnaround.
He was also the appointed plant inspector for BP (GUPCO) in asset
integrity management, who took charge of 9 offshore production
complex, 75 Satellites and Onshore process units involving Close
Visual Inspection of piping, equipments, NDT co-ordination,
Baseline and Corrosion Monitoring. Furthermore, as an Inspector in
GASCO OAG pipeline project, he conducted and witnessed
Ultrasonic Examination of first 50 production weld joints of pipeline
done by PWT (Pipe Welding Technology, GMAW).
INSTRUCTOR
Uday B. Kale (M. Eng. Mechanical)
Technical Director
KUB Quality Services
SUMMARYOFPROFESSIONALACHIEVEMENT
Qatar Petroleum
BP - GUPCO (Egypt)
Oil India Limited
ADCO (Abu Dhabi)
ADGAS (Abu Dhabi)
ADMA (Abu Dhabi)
GASCO (Abu Dhabi)
QAFAC
Rosen Europe (The Netherlands)
Banagas (Bahrain)
TATA (India)
Al Jubail Fertilizer Company
Technip (Bahrain)
Equate Petrochemicals (Kuwait)
TUV Akadamie Middle East (UAE, Saudi Arabia and Qatar)
Inspection and Test Nigeria Ltd
Dacon Inspection Ltd
HBJ pipeline up-gradation projects
PARTIALCLIENT/PROJECTLIST
With his extensive involvement in various projects, Mr. Uday is also
an enthusiastic and knowledgeable mentor, who has been a faculty
in training, examination, qualification and certification of API 510 &
570, ASME B31.3, API653, welding and NDT in the Middle East, Africa
and Asia. He is a charted engineer with 25 + International certifica-
tion in Welding, NDE and In Service Inspection.
API 510 Pressure Vessel Inspector Course
29th February - 04th March 2016 at Bandung, Indonesia | 04th - 08th April 2016 at Kuala Lumpur, Malaysia
25th - 29th July 2016 at Bandung, Indonesia | 14th - 18th November 2016 at Kuala Lumpur, Malaysia
API 570 - Authorized Piping Inspector - Certificate #38157
API 510 – Authorized Pressure Vessel Inspector – Certificate #26785
API 653 – Authorized Above storage Tank Inspector-Certificate #27926
API SI- Source Inspector - Certificate #52837
API 580 – Risk Based Inspection - Certificate #50553
Certified Welding Inspector ( AWS) Certificate #00071941
CSWIP 3.1 Certificate #58489
ACCP Professional Level III (RT, UT, MT, VT) ASNT ID - 83835
RT 2 - Certified Site Incharge (BARC, India)
ASNT NDT Level III (RT, UT, MT, VT, PT, ET, LT ), ASNT ID- 83835
Level 3 as per EN 473 (UT, MT, PT, VT)
* To enjoy the offer, full payment must be made before the deadline.
* For 5 or more delegates, please inquire for more attractive package.
* Prices include lunches, refreshments and training materials. Discounts cannot be combined with other
promotional offers.
* Important: Please note that registration without payment will incur a SGD 200 administration fee.
PROGRAMMECONSULTANT
Contact : Cay Aagen
Email : registration@petrosync.com
Phone : +65 6415 4500
Fax : +65 6826 4322
INVESTMENT PACKAGES
Others
Others
Others
To Register
DELEGATEDETAILS
I agree to PetroSync’s payment terms and cancellation policy.
Signature : ____________________________________________________________________________
PAYMENT TERMS : Payment is due in full at the time of registration. Full payment is mandatory for event attendance.
Incorrect Details
Please accept our apologies for mail or email that is incorrectly addressed.
Please email us at registration@petrosync.com and inform us of any incorrect details. We will amend them accordingly.
1st Delegate Name
Direct Line Number: Email:
Job Title: Department:
Head of Department:
Company:____________________________________________ Industry : __________________________________
Address: _______________________________________________________Postcode: _________________________
Country: ________________________Email: __________________________________________________________
Attention Invoice to: ______________________________________________________________________________
Direct Line Number: ______________________________ Fax: _____________________________________________
PAYMENTMETHODS
Please note:
- Indicate if you have already registered by Phone Fax Email Web
By Credit Card :
Please debit my credit card: Visa MasterCard
Card Number:
Name printed on card: _____________________________________________________________________
Expiry Date:
Security Code:
INVOICEDETAILS
Mrs Ms DrMr
2nd Delegate Name
Direct Line Number: Email:
Job Title: Department:
Head of Department:
Mrs Ms DrMr
3rd Delegate Name
Direct Line Number: Email:
Job Title: Department:
Head of Department:
Mrs Ms DrMr
AMEX
- If you have not received an acknowledgement before the training, please call us to confirm your booking.
Confirma on
API510 - PressureVessel
InspectorCourse
Group Discount
SGD2,995SGD3,195
Please checklist the package that you are attending!
TERMSANDCONDITIONS
DISCLAIMER
Please note that trainers and topics were confirmed at the
time of publishing; however, PetroSync may necessitate
substitutions, alterations or cancellations of the trainers or
topics. As such, PetroSync reserves the right to change or
cancel any part of its published programme due to
unforeseen circumstances. Any substitutions or alterations
will be updated on our web page as soon as possible.
DATAPROTECTION
The information you provide will be safeguarded by
PetroSync that may be used to keep you informed of
relevant products and services. As an international group
we may transfer your data on a global basis for the purpose
indicated above. If you do not want us to share your
information with other reputable companies, please tick
this box
CANCELLATIONPOLICY
You may substitute delegates at any time as long as
reasonable advance notice is given to PetroSync. For any
cancellation received in writing not less than fourteen (14)
working days prior to the training course, you will receive a
credit voucher worth total transaction with less a SGD 200
administration fee and any related bank or credit card
charges.
Delegates who cancel less than fourteen (14) working days
of the training course, or who do not attend the course, are
liable to pay the full course fee and no refunds will be
granted.
In the event that PetroSync cancels or postpones an event
for any reason and that the delegate is unable or unwilling
to attend in on the rescheduled date, you will receive a
credit voucher for 100% of the contract fee paid. You may
use this credit voucher for another PetroSync to be mutually
agreed with PetroSync, which must occur within a year from
the date of postponement.
PetroSync is not responsible for any loss or damage as a
result of the cancellation policy. PetroSync will assume no
liability whatsoever in the event this event is cancelled,
rescheduled or postponed due to any Act of God, fire, act of
government or state, war, civil commotion, insurrection,
embargo, industrial action, or any other reason beyond
management control.
CERTIFICATEOFATTENDANCE
80% attendance is required for PetroSync's Certificate of
Attendance.
EarlyBirdOfferStandardPrice
29thFeb-04thMar2016
Bandung,Indonesia
25th-29thJuly2016
Bandung,Indonesia
04th-08thApril2016
KualaLumpur,Malaysia
By Direct Transfer : Please quote invoice number(s) on remittance advice
PetroSync Global Pte Ltd Bank details:
All bank charges to be borne by payer. Please ensure that PetroSync Global Pte Ltd receives the full invoiced amount.
Account Name: PetroSync Global Pte Ltd
Bank Name : DBS Bank Ltd
Bank Code : 7171 • Bank Swift Code : DBSSSGSGXXX • Branch code : 288
Account No : • SGD : 288-901898-0 • USD : 0288-002682-01-6
Bank Address : 12 Marina Boulevard, Level 3. Marina Bay Financial Centre Tower 3. Singapore 018982
SGD2,995SGD3,195
SGD2,995SGD3,195
Please accept our apologies for mail or email that is
incorrectly addressed.
Please email us at registration@petrosync.com and
inform us of any incorrect details. We will amend them
- For Payment by Direct TelegraphicTransfer,
client has to bear both local and oversea bank
- For credit card payment, there is additional
4% credit card processsing fee.
CHARGES&FEE(s)
DETAILS
Group discount is based on standard price
10% discounts for group of
3 registering from the
same organization
at the same time
14th-18thNovember2016
KualaLumpur,Malaysia
SGD2,995SGD3,195

More Related Content

What's hot

Qc (welding & ndt) course
Qc (welding & ndt) courseQc (welding & ndt) course
Qc (welding & ndt) courseramakrishna333
 
Api 570 closed book - 3 terms
Api 570   closed book - 3 termsApi 570   closed book - 3 terms
Api 570 closed book - 3 termsShahid Karim
 
Yeucau ve giamsat nhamay
Yeucau ve giamsat nhamayYeucau ve giamsat nhamay
Yeucau ve giamsat nhamayHai Nguyen
 
Cswip 11-01 - plant inspection- Week 1 cours
Cswip 11-01 - plant inspection- Week 1 coursCswip 11-01 - plant inspection- Week 1 cours
Cswip 11-01 - plant inspection- Week 1 coursRafik Guerbous
 
Api 570 Examination Preparatory Course
Api 570 Examination Preparatory CourseApi 570 Examination Preparatory Course
Api 570 Examination Preparatory Courseramakrishna333
 
Pressure vessels
Pressure vessels  Pressure vessels
Pressure vessels GPTraining
 
PetroSync - API 580 & API 581 Risk Based Inspection & Base Resource Document
PetroSync - API 580 & API 581 Risk Based Inspection & Base Resource DocumentPetroSync - API 580 & API 581 Risk Based Inspection & Base Resource Document
PetroSync - API 580 & API 581 Risk Based Inspection & Base Resource DocumentPetroSync
 
OCS Training API 510 pressure vessel preparation course 2019
OCS Training API 510 pressure vessel preparation course 2019OCS Training API 510 pressure vessel preparation course 2019
OCS Training API 510 pressure vessel preparation course 2019Muanisa Waras
 
Saif Ali_original
Saif Ali_originalSaif Ali_original
Saif Ali_originalSaif Ali
 
Tasha ramisetti new resume 2015
Tasha ramisetti new resume 2015Tasha ramisetti new resume 2015
Tasha ramisetti new resume 2015Tasha Ramisetti
 

What's hot (14)

Qc (welding & ndt) course
Qc (welding & ndt) courseQc (welding & ndt) course
Qc (welding & ndt) course
 
Api 570 closed book - 3 terms
Api 570   closed book - 3 termsApi 570   closed book - 3 terms
Api 570 closed book - 3 terms
 
Yeucau ve giamsat nhamay
Yeucau ve giamsat nhamayYeucau ve giamsat nhamay
Yeucau ve giamsat nhamay
 
Cswip 11-01 - plant inspection- Week 1 cours
Cswip 11-01 - plant inspection- Week 1 coursCswip 11-01 - plant inspection- Week 1 cours
Cswip 11-01 - plant inspection- Week 1 cours
 
Api 510 study plan
Api 510 study planApi 510 study plan
Api 510 study plan
 
Jayadevan_Pattali
Jayadevan_PattaliJayadevan_Pattali
Jayadevan_Pattali
 
Api 570 Examination Preparatory Course
Api 570 Examination Preparatory CourseApi 570 Examination Preparatory Course
Api 570 Examination Preparatory Course
 
Pressure vessels
Pressure vessels  Pressure vessels
Pressure vessels
 
PetroSync - API 580 & API 581 Risk Based Inspection & Base Resource Document
PetroSync - API 580 & API 581 Risk Based Inspection & Base Resource DocumentPetroSync - API 580 & API 581 Risk Based Inspection & Base Resource Document
PetroSync - API 580 & API 581 Risk Based Inspection & Base Resource Document
 
OCS Training API 510 pressure vessel preparation course 2019
OCS Training API 510 pressure vessel preparation course 2019OCS Training API 510 pressure vessel preparation course 2019
OCS Training API 510 pressure vessel preparation course 2019
 
Saif Ali_original
Saif Ali_originalSaif Ali_original
Saif Ali_original
 
Company Brochures
Company BrochuresCompany Brochures
Company Brochures
 
Tasha ramisetti new resume 2015
Tasha ramisetti new resume 2015Tasha ramisetti new resume 2015
Tasha ramisetti new resume 2015
 
Floating ball 2016_1
Floating ball 2016_1Floating ball 2016_1
Floating ball 2016_1
 

Viewers also liked

PetroSync - IWCF Certification Drilling Well Control Level 2
PetroSync - IWCF Certification Drilling Well Control Level 2PetroSync - IWCF Certification Drilling Well Control Level 2
PetroSync - IWCF Certification Drilling Well Control Level 2PetroSync
 
PetroSync - Incident Investigation for Upstream Drilling and Well Operation
PetroSync - Incident Investigation for Upstream Drilling and Well OperationPetroSync - Incident Investigation for Upstream Drilling and Well Operation
PetroSync - Incident Investigation for Upstream Drilling and Well OperationPetroSync
 
PetroSync - Crude Oil Trading and Price Risk Management
PetroSync - Crude Oil Trading and Price Risk ManagementPetroSync - Crude Oil Trading and Price Risk Management
PetroSync - Crude Oil Trading and Price Risk ManagementPetroSync
 
PetroSync - Advanced Fishing
PetroSync - Advanced FishingPetroSync - Advanced Fishing
PetroSync - Advanced FishingPetroSync
 
PetroSync - IWCF Well Intervention Pressure Control Level 2
PetroSync - IWCF Well Intervention Pressure Control Level 2PetroSync - IWCF Well Intervention Pressure Control Level 2
PetroSync - IWCF Well Intervention Pressure Control Level 2PetroSync
 
PetroSync - Advanced Practical Centrifugal Pumps
PetroSync - Advanced Practical Centrifugal PumpsPetroSync - Advanced Practical Centrifugal Pumps
PetroSync - Advanced Practical Centrifugal PumpsPetroSync
 
PetroSync - Basin Analysis - Level 3
PetroSync - Basin Analysis - Level 3PetroSync - Basin Analysis - Level 3
PetroSync - Basin Analysis - Level 3PetroSync
 
PetroSync - Pre-Commissioning, Commissioning and Start-Up
PetroSync - Pre-Commissioning, Commissioning and Start-UpPetroSync - Pre-Commissioning, Commissioning and Start-Up
PetroSync - Pre-Commissioning, Commissioning and Start-UpPetroSync
 
PetroSync - IWCF Certification Drilling Well Control Level 3 & 4
PetroSync - IWCF Certification Drilling Well Control Level 3 & 4PetroSync - IWCF Certification Drilling Well Control Level 3 & 4
PetroSync - IWCF Certification Drilling Well Control Level 3 & 4PetroSync
 
PetroSync - Process Safety Management
PetroSync - Process Safety ManagementPetroSync - Process Safety Management
PetroSync - Process Safety ManagementPetroSync
 
PetroSync - ASME VIII Division 1 & 2 Pressure vessel Series
PetroSync - ASME VIII Division 1 & 2 Pressure vessel SeriesPetroSync - ASME VIII Division 1 & 2 Pressure vessel Series
PetroSync - ASME VIII Division 1 & 2 Pressure vessel SeriesPetroSync
 
PetroSync - Applied Carbonate Sedimentology and Geomorphology
PetroSync - Applied Carbonate Sedimentology and GeomorphologyPetroSync - Applied Carbonate Sedimentology and Geomorphology
PetroSync - Applied Carbonate Sedimentology and GeomorphologyPetroSync
 
PetroSync - Project Risk Assessment & Management
PetroSync - Project Risk Assessment & ManagementPetroSync - Project Risk Assessment & Management
PetroSync - Project Risk Assessment & ManagementPetroSync
 
PetroSync - Advanced Stuck Pipe Prevention
PetroSync - Advanced Stuck Pipe PreventionPetroSync - Advanced Stuck Pipe Prevention
PetroSync - Advanced Stuck Pipe PreventionPetroSync
 
PetroSync - Sand Control Completion Practices
PetroSync - Sand Control Completion PracticesPetroSync - Sand Control Completion Practices
PetroSync - Sand Control Completion PracticesPetroSync
 
PetroSync - ASME B31.3 Process Piping Code Design Requirements
PetroSync - ASME B31.3 Process Piping Code Design RequirementsPetroSync - ASME B31.3 Process Piping Code Design Requirements
PetroSync - ASME B31.3 Process Piping Code Design RequirementsPetroSync
 
PetroSync - Seismic Interpretation
PetroSync - Seismic InterpretationPetroSync - Seismic Interpretation
PetroSync - Seismic InterpretationPetroSync
 
API 510 Pressure Vessel Inspector Certificate
API 510 Pressure Vessel Inspector CertificateAPI 510 Pressure Vessel Inspector Certificate
API 510 Pressure Vessel Inspector CertificateViet Tran Quoc
 
PetroSync - Technical Report Writing and Presentation Skills for Oil & Gas En...
PetroSync - Technical Report Writing and Presentation Skills for Oil & Gas En...PetroSync - Technical Report Writing and Presentation Skills for Oil & Gas En...
PetroSync - Technical Report Writing and Presentation Skills for Oil & Gas En...PetroSync
 
PetroSync - Emotional Intelligence for Effective Work Performance
PetroSync - Emotional Intelligence for Effective Work PerformancePetroSync - Emotional Intelligence for Effective Work Performance
PetroSync - Emotional Intelligence for Effective Work PerformancePetroSync
 

Viewers also liked (20)

PetroSync - IWCF Certification Drilling Well Control Level 2
PetroSync - IWCF Certification Drilling Well Control Level 2PetroSync - IWCF Certification Drilling Well Control Level 2
PetroSync - IWCF Certification Drilling Well Control Level 2
 
PetroSync - Incident Investigation for Upstream Drilling and Well Operation
PetroSync - Incident Investigation for Upstream Drilling and Well OperationPetroSync - Incident Investigation for Upstream Drilling and Well Operation
PetroSync - Incident Investigation for Upstream Drilling and Well Operation
 
PetroSync - Crude Oil Trading and Price Risk Management
PetroSync - Crude Oil Trading and Price Risk ManagementPetroSync - Crude Oil Trading and Price Risk Management
PetroSync - Crude Oil Trading and Price Risk Management
 
PetroSync - Advanced Fishing
PetroSync - Advanced FishingPetroSync - Advanced Fishing
PetroSync - Advanced Fishing
 
PetroSync - IWCF Well Intervention Pressure Control Level 2
PetroSync - IWCF Well Intervention Pressure Control Level 2PetroSync - IWCF Well Intervention Pressure Control Level 2
PetroSync - IWCF Well Intervention Pressure Control Level 2
 
PetroSync - Advanced Practical Centrifugal Pumps
PetroSync - Advanced Practical Centrifugal PumpsPetroSync - Advanced Practical Centrifugal Pumps
PetroSync - Advanced Practical Centrifugal Pumps
 
PetroSync - Basin Analysis - Level 3
PetroSync - Basin Analysis - Level 3PetroSync - Basin Analysis - Level 3
PetroSync - Basin Analysis - Level 3
 
PetroSync - Pre-Commissioning, Commissioning and Start-Up
PetroSync - Pre-Commissioning, Commissioning and Start-UpPetroSync - Pre-Commissioning, Commissioning and Start-Up
PetroSync - Pre-Commissioning, Commissioning and Start-Up
 
PetroSync - IWCF Certification Drilling Well Control Level 3 & 4
PetroSync - IWCF Certification Drilling Well Control Level 3 & 4PetroSync - IWCF Certification Drilling Well Control Level 3 & 4
PetroSync - IWCF Certification Drilling Well Control Level 3 & 4
 
PetroSync - Process Safety Management
PetroSync - Process Safety ManagementPetroSync - Process Safety Management
PetroSync - Process Safety Management
 
PetroSync - ASME VIII Division 1 & 2 Pressure vessel Series
PetroSync - ASME VIII Division 1 & 2 Pressure vessel SeriesPetroSync - ASME VIII Division 1 & 2 Pressure vessel Series
PetroSync - ASME VIII Division 1 & 2 Pressure vessel Series
 
PetroSync - Applied Carbonate Sedimentology and Geomorphology
PetroSync - Applied Carbonate Sedimentology and GeomorphologyPetroSync - Applied Carbonate Sedimentology and Geomorphology
PetroSync - Applied Carbonate Sedimentology and Geomorphology
 
PetroSync - Project Risk Assessment & Management
PetroSync - Project Risk Assessment & ManagementPetroSync - Project Risk Assessment & Management
PetroSync - Project Risk Assessment & Management
 
PetroSync - Advanced Stuck Pipe Prevention
PetroSync - Advanced Stuck Pipe PreventionPetroSync - Advanced Stuck Pipe Prevention
PetroSync - Advanced Stuck Pipe Prevention
 
PetroSync - Sand Control Completion Practices
PetroSync - Sand Control Completion PracticesPetroSync - Sand Control Completion Practices
PetroSync - Sand Control Completion Practices
 
PetroSync - ASME B31.3 Process Piping Code Design Requirements
PetroSync - ASME B31.3 Process Piping Code Design RequirementsPetroSync - ASME B31.3 Process Piping Code Design Requirements
PetroSync - ASME B31.3 Process Piping Code Design Requirements
 
PetroSync - Seismic Interpretation
PetroSync - Seismic InterpretationPetroSync - Seismic Interpretation
PetroSync - Seismic Interpretation
 
API 510 Pressure Vessel Inspector Certificate
API 510 Pressure Vessel Inspector CertificateAPI 510 Pressure Vessel Inspector Certificate
API 510 Pressure Vessel Inspector Certificate
 
PetroSync - Technical Report Writing and Presentation Skills for Oil & Gas En...
PetroSync - Technical Report Writing and Presentation Skills for Oil & Gas En...PetroSync - Technical Report Writing and Presentation Skills for Oil & Gas En...
PetroSync - Technical Report Writing and Presentation Skills for Oil & Gas En...
 
PetroSync - Emotional Intelligence for Effective Work Performance
PetroSync - Emotional Intelligence for Effective Work PerformancePetroSync - Emotional Intelligence for Effective Work Performance
PetroSync - Emotional Intelligence for Effective Work Performance
 

Similar to PetroSync - API 510 Pressure Vessel Inspector course

PetroSync_-_API_570_Piping_Inspector_Course_2023.pdf
PetroSync_-_API_570_Piping_Inspector_Course_2023.pdfPetroSync_-_API_570_Piping_Inspector_Course_2023.pdf
PetroSync_-_API_570_Piping_Inspector_Course_2023.pdfPetroSync Global
 
Asme section viii division 1 and 2 pressure vessel series ( CONFIRM RUN )
Asme section viii division 1 and 2   pressure vessel series ( CONFIRM RUN )Asme section viii division 1 and 2   pressure vessel series ( CONFIRM RUN )
Asme section viii division 1 and 2 pressure vessel series ( CONFIRM RUN )Putri Kolopaking
 
Oil & Gas technical training courses
Oil & Gas technical training coursesOil & Gas technical training courses
Oil & Gas technical training coursesDasline Sinta
 
PetroSync - API 579 Fitness for Service
PetroSync - API 579 Fitness for ServicePetroSync - API 579 Fitness for Service
PetroSync - API 579 Fitness for ServicePetroSync
 
Ncb training co presentation
Ncb training co  presentationNcb training co  presentation
Ncb training co presentationSangeethaPremraj
 
Ocs training calendar 2022
Ocs training calendar 2022Ocs training calendar 2022
Ocs training calendar 2022Muanisa Waras
 
WELL INTEGRITY MANAGEMENT
WELL INTEGRITY MANAGEMENTWELL INTEGRITY MANAGEMENT
WELL INTEGRITY MANAGEMENTpetroEDGE
 
Ocs training calendar catalog 2021
Ocs training calendar catalog 2021Ocs training calendar catalog 2021
Ocs training calendar catalog 2021Muanisa Waras
 
OCS Training Calendar 2023 - OCS Training Institute
OCS Training Calendar 2023 - OCS Training InstituteOCS Training Calendar 2023 - OCS Training Institute
OCS Training Calendar 2023 - OCS Training InstituteMuanisa Waras
 
PetroSync - Coiled Tubing Technology
PetroSync - Coiled Tubing TechnologyPetroSync - Coiled Tubing Technology
PetroSync - Coiled Tubing TechnologyPetroSync
 
vinu new cv p wp
vinu new cv p wpvinu new cv p wp
vinu new cv p wpVinu K S
 
Rashid konnakkal Resume
Rashid konnakkal Resume Rashid konnakkal Resume
Rashid konnakkal Resume Rashidkonnakkal
 
Advanced Casing Design
Advanced Casing Design Advanced Casing Design
Advanced Casing Design petroEDGE
 
Corrosion Management Summit_150813_LR
Corrosion Management Summit_150813_LRCorrosion Management Summit_150813_LR
Corrosion Management Summit_150813_LRAndrea Fernandes
 
Hussien Nasr, Resume
Hussien Nasr, ResumeHussien Nasr, Resume
Hussien Nasr, ResumeHussien Nasr
 

Similar to PetroSync - API 510 Pressure Vessel Inspector course (20)

PetroSync_-_API_570_Piping_Inspector_Course_2023.pdf
PetroSync_-_API_570_Piping_Inspector_Course_2023.pdfPetroSync_-_API_570_Piping_Inspector_Course_2023.pdf
PetroSync_-_API_570_Piping_Inspector_Course_2023.pdf
 
Asme section viii division 1 and 2 pressure vessel series ( CONFIRM RUN )
Asme section viii division 1 and 2   pressure vessel series ( CONFIRM RUN )Asme section viii division 1 and 2   pressure vessel series ( CONFIRM RUN )
Asme section viii division 1 and 2 pressure vessel series ( CONFIRM RUN )
 
Oil & Gas technical training courses
Oil & Gas technical training coursesOil & Gas technical training courses
Oil & Gas technical training courses
 
PetroSync - API 579 Fitness for Service
PetroSync - API 579 Fitness for ServicePetroSync - API 579 Fitness for Service
PetroSync - API 579 Fitness for Service
 
Ncb training co presentation
Ncb training co  presentationNcb training co  presentation
Ncb training co presentation
 
Ocs training calendar 2022
Ocs training calendar 2022Ocs training calendar 2022
Ocs training calendar 2022
 
WELL INTEGRITY MANAGEMENT
WELL INTEGRITY MANAGEMENTWELL INTEGRITY MANAGEMENT
WELL INTEGRITY MANAGEMENT
 
Ocs training calendar catalog 2021
Ocs training calendar catalog 2021Ocs training calendar catalog 2021
Ocs training calendar catalog 2021
 
OCS Training Calendar 2023 - OCS Training Institute
OCS Training Calendar 2023 - OCS Training InstituteOCS Training Calendar 2023 - OCS Training Institute
OCS Training Calendar 2023 - OCS Training Institute
 
PG Diploma Pressure vessel design
PG Diploma Pressure vessel designPG Diploma Pressure vessel design
PG Diploma Pressure vessel design
 
Certified pressure vessel
Certified pressure vesselCertified pressure vessel
Certified pressure vessel
 
PetroSync - Coiled Tubing Technology
PetroSync - Coiled Tubing TechnologyPetroSync - Coiled Tubing Technology
PetroSync - Coiled Tubing Technology
 
Thiru.CV_Latest
Thiru.CV_LatestThiru.CV_Latest
Thiru.CV_Latest
 
vinu new cv p wp
vinu new cv p wpvinu new cv p wp
vinu new cv p wp
 
Rashid konnakkal Resume
Rashid konnakkal Resume Rashid konnakkal Resume
Rashid konnakkal Resume
 
Advanced Casing Design
Advanced Casing Design Advanced Casing Design
Advanced Casing Design
 
Corrosion Management Summit_150813_LR
Corrosion Management Summit_150813_LRCorrosion Management Summit_150813_LR
Corrosion Management Summit_150813_LR
 
KASHIF MAQBOOL RESUME
KASHIF MAQBOOL RESUMEKASHIF MAQBOOL RESUME
KASHIF MAQBOOL RESUME
 
Ted Bouchier - CV
Ted Bouchier - CVTed Bouchier - CV
Ted Bouchier - CV
 
Hussien Nasr, Resume
Hussien Nasr, ResumeHussien Nasr, Resume
Hussien Nasr, Resume
 

More from PetroSync

PetroSync - API Specification Q1 9th Edition Quality Management System Traini...
PetroSync - API Specification Q1 9th Edition Quality Management System Traini...PetroSync - API Specification Q1 9th Edition Quality Management System Traini...
PetroSync - API Specification Q1 9th Edition Quality Management System Traini...PetroSync
 
PetroSync - Surface Geochemical Exploration for Oil and Gas
PetroSync - Surface Geochemical Exploration for Oil and GasPetroSync - Surface Geochemical Exploration for Oil and Gas
PetroSync - Surface Geochemical Exploration for Oil and GasPetroSync
 
PetroSync - Geological Interpretation of Well Logs
PetroSync - Geological Interpretation of Well LogsPetroSync - Geological Interpretation of Well Logs
PetroSync - Geological Interpretation of Well LogsPetroSync
 
PetroSync - Chemically Enhanced Water Alternating Gas
PetroSync - Chemically Enhanced Water Alternating GasPetroSync - Chemically Enhanced Water Alternating Gas
PetroSync - Chemically Enhanced Water Alternating GasPetroSync
 
PetroSync - Budgeting and Forecasting in Oil & Gas Industry
PetroSync - Budgeting and Forecasting in Oil & Gas IndustryPetroSync - Budgeting and Forecasting in Oil & Gas Industry
PetroSync - Budgeting and Forecasting in Oil & Gas IndustryPetroSync
 
PetroSync - Practical Accounting in Joint Ventures & Production Sharing Contr...
PetroSync - Practical Accounting in Joint Ventures & Production Sharing Contr...PetroSync - Practical Accounting in Joint Ventures & Production Sharing Contr...
PetroSync - Practical Accounting in Joint Ventures & Production Sharing Contr...PetroSync
 
PetroSync - Exploration & Production Accounting
PetroSync - Exploration & Production AccountingPetroSync - Exploration & Production Accounting
PetroSync - Exploration & Production AccountingPetroSync
 
PetroSync - Drilling Engineering for Non-Drilling Engineer
PetroSync - Drilling Engineering for Non-Drilling EngineerPetroSync - Drilling Engineering for Non-Drilling Engineer
PetroSync - Drilling Engineering for Non-Drilling EngineerPetroSync
 
PetroSync - Gas Turbine Failure Analysis
PetroSync - Gas Turbine Failure AnalysisPetroSync - Gas Turbine Failure Analysis
PetroSync - Gas Turbine Failure AnalysisPetroSync
 
PetroSync - Acoustic and Flow Induced Vibration
PetroSync - Acoustic and Flow Induced VibrationPetroSync - Acoustic and Flow Induced Vibration
PetroSync - Acoustic and Flow Induced VibrationPetroSync
 
PetroSync - Carbonate Reservoir Characterization
PetroSync - Carbonate Reservoir CharacterizationPetroSync - Carbonate Reservoir Characterization
PetroSync - Carbonate Reservoir CharacterizationPetroSync
 
PetroSync - Well Completion and Workover
PetroSync - Well Completion and WorkoverPetroSync - Well Completion and Workover
PetroSync - Well Completion and WorkoverPetroSync
 
PetroSync - Offshore Marine Operation
PetroSync - Offshore Marine OperationPetroSync - Offshore Marine Operation
PetroSync - Offshore Marine OperationPetroSync
 
PetroSync - Deepwater Drilling Optimisation
PetroSync - Deepwater Drilling OptimisationPetroSync - Deepwater Drilling Optimisation
PetroSync - Deepwater Drilling OptimisationPetroSync
 
PetroSync - TEMA & HTRI-Heat Exchanger Design & Cost Saving Management
PetroSync - TEMA & HTRI-Heat Exchanger Design & Cost Saving ManagementPetroSync - TEMA & HTRI-Heat Exchanger Design & Cost Saving Management
PetroSync - TEMA & HTRI-Heat Exchanger Design & Cost Saving ManagementPetroSync
 
PetroSync - Applied Petrophysics for Low Resistivity Thin-Bedded Formations
PetroSync - Applied Petrophysics for Low Resistivity Thin-Bedded FormationsPetroSync - Applied Petrophysics for Low Resistivity Thin-Bedded Formations
PetroSync - Applied Petrophysics for Low Resistivity Thin-Bedded FormationsPetroSync
 
PetroSync - Applied Reservoir Engineering
PetroSync - Applied Reservoir EngineeringPetroSync - Applied Reservoir Engineering
PetroSync - Applied Reservoir EngineeringPetroSync
 
PetroSync - Fractured Reservoir Modeling with Application to Fractured Basement
PetroSync - Fractured Reservoir Modeling with Application to Fractured BasementPetroSync - Fractured Reservoir Modeling with Application to Fractured Basement
PetroSync - Fractured Reservoir Modeling with Application to Fractured BasementPetroSync
 
PetroSync - Financial Assets Valuation for Oil & Gas
PetroSync - Financial Assets Valuation for Oil & GasPetroSync - Financial Assets Valuation for Oil & Gas
PetroSync - Financial Assets Valuation for Oil & GasPetroSync
 
PetroSync - Introduction to Oil and Gas For New Engineer and Non-Technical
PetroSync - Introduction to Oil and Gas For New Engineer and Non-TechnicalPetroSync - Introduction to Oil and Gas For New Engineer and Non-Technical
PetroSync - Introduction to Oil and Gas For New Engineer and Non-TechnicalPetroSync
 

More from PetroSync (20)

PetroSync - API Specification Q1 9th Edition Quality Management System Traini...
PetroSync - API Specification Q1 9th Edition Quality Management System Traini...PetroSync - API Specification Q1 9th Edition Quality Management System Traini...
PetroSync - API Specification Q1 9th Edition Quality Management System Traini...
 
PetroSync - Surface Geochemical Exploration for Oil and Gas
PetroSync - Surface Geochemical Exploration for Oil and GasPetroSync - Surface Geochemical Exploration for Oil and Gas
PetroSync - Surface Geochemical Exploration for Oil and Gas
 
PetroSync - Geological Interpretation of Well Logs
PetroSync - Geological Interpretation of Well LogsPetroSync - Geological Interpretation of Well Logs
PetroSync - Geological Interpretation of Well Logs
 
PetroSync - Chemically Enhanced Water Alternating Gas
PetroSync - Chemically Enhanced Water Alternating GasPetroSync - Chemically Enhanced Water Alternating Gas
PetroSync - Chemically Enhanced Water Alternating Gas
 
PetroSync - Budgeting and Forecasting in Oil & Gas Industry
PetroSync - Budgeting and Forecasting in Oil & Gas IndustryPetroSync - Budgeting and Forecasting in Oil & Gas Industry
PetroSync - Budgeting and Forecasting in Oil & Gas Industry
 
PetroSync - Practical Accounting in Joint Ventures & Production Sharing Contr...
PetroSync - Practical Accounting in Joint Ventures & Production Sharing Contr...PetroSync - Practical Accounting in Joint Ventures & Production Sharing Contr...
PetroSync - Practical Accounting in Joint Ventures & Production Sharing Contr...
 
PetroSync - Exploration & Production Accounting
PetroSync - Exploration & Production AccountingPetroSync - Exploration & Production Accounting
PetroSync - Exploration & Production Accounting
 
PetroSync - Drilling Engineering for Non-Drilling Engineer
PetroSync - Drilling Engineering for Non-Drilling EngineerPetroSync - Drilling Engineering for Non-Drilling Engineer
PetroSync - Drilling Engineering for Non-Drilling Engineer
 
PetroSync - Gas Turbine Failure Analysis
PetroSync - Gas Turbine Failure AnalysisPetroSync - Gas Turbine Failure Analysis
PetroSync - Gas Turbine Failure Analysis
 
PetroSync - Acoustic and Flow Induced Vibration
PetroSync - Acoustic and Flow Induced VibrationPetroSync - Acoustic and Flow Induced Vibration
PetroSync - Acoustic and Flow Induced Vibration
 
PetroSync - Carbonate Reservoir Characterization
PetroSync - Carbonate Reservoir CharacterizationPetroSync - Carbonate Reservoir Characterization
PetroSync - Carbonate Reservoir Characterization
 
PetroSync - Well Completion and Workover
PetroSync - Well Completion and WorkoverPetroSync - Well Completion and Workover
PetroSync - Well Completion and Workover
 
PetroSync - Offshore Marine Operation
PetroSync - Offshore Marine OperationPetroSync - Offshore Marine Operation
PetroSync - Offshore Marine Operation
 
PetroSync - Deepwater Drilling Optimisation
PetroSync - Deepwater Drilling OptimisationPetroSync - Deepwater Drilling Optimisation
PetroSync - Deepwater Drilling Optimisation
 
PetroSync - TEMA & HTRI-Heat Exchanger Design & Cost Saving Management
PetroSync - TEMA & HTRI-Heat Exchanger Design & Cost Saving ManagementPetroSync - TEMA & HTRI-Heat Exchanger Design & Cost Saving Management
PetroSync - TEMA & HTRI-Heat Exchanger Design & Cost Saving Management
 
PetroSync - Applied Petrophysics for Low Resistivity Thin-Bedded Formations
PetroSync - Applied Petrophysics for Low Resistivity Thin-Bedded FormationsPetroSync - Applied Petrophysics for Low Resistivity Thin-Bedded Formations
PetroSync - Applied Petrophysics for Low Resistivity Thin-Bedded Formations
 
PetroSync - Applied Reservoir Engineering
PetroSync - Applied Reservoir EngineeringPetroSync - Applied Reservoir Engineering
PetroSync - Applied Reservoir Engineering
 
PetroSync - Fractured Reservoir Modeling with Application to Fractured Basement
PetroSync - Fractured Reservoir Modeling with Application to Fractured BasementPetroSync - Fractured Reservoir Modeling with Application to Fractured Basement
PetroSync - Fractured Reservoir Modeling with Application to Fractured Basement
 
PetroSync - Financial Assets Valuation for Oil & Gas
PetroSync - Financial Assets Valuation for Oil & GasPetroSync - Financial Assets Valuation for Oil & Gas
PetroSync - Financial Assets Valuation for Oil & Gas
 
PetroSync - Introduction to Oil and Gas For New Engineer and Non-Technical
PetroSync - Introduction to Oil and Gas For New Engineer and Non-TechnicalPetroSync - Introduction to Oil and Gas For New Engineer and Non-Technical
PetroSync - Introduction to Oil and Gas For New Engineer and Non-Technical
 

Recently uploaded

Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerAnamika Sarkar
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineeringmalavadedarshan25
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...VICTOR MAESTRE RAMIREZ
 
power system scada applications and uses
power system scada applications and usespower system scada applications and uses
power system scada applications and usesDevarapalliHaritha
 
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)dollysharma2066
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxPoojaBan
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSCAESB
 
Churning of Butter, Factors affecting .
Churning of Butter, Factors affecting  .Churning of Butter, Factors affecting  .
Churning of Butter, Factors affecting .Satyam Kumar
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AIabhishek36461
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfme23b1001
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girlsssuser7cb4ff
 

Recently uploaded (20)

Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineering
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...
 
power system scada applications and uses
power system scada applications and usespower system scada applications and uses
power system scada applications and uses
 
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptx
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
 
Churning of Butter, Factors affecting .
Churning of Butter, Factors affecting  .Churning of Butter, Factors affecting  .
Churning of Butter, Factors affecting .
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AI
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdf
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girls
 
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
 

PetroSync - API 510 Pressure Vessel Inspector course

  • 1. INSTRUCTOR Uday B. Kale(M. Eng. Mechanical) Technical Director KUB Quality Services API 570 - Authorized Piping Inspector - Certificate #38157 API 510 – Authorized Pressure Vessel Inspector – Certificate #26785 API 653 – Authorized Above storage Tank Inspector-Certificate #27926 API SI- Source Inspector - Certificate #52837 API 580 – Risk Based Inspection - Certificate #50553 Certified Welding Inspector ( AWS) Certificate #00071941 CSWIP 3.1 Certificate #58489 ACCP Professional Level III (RT, UT, MT, VT) ASNT ID - 83835 RT 2 - Certified Site Incharge (BARC, India) ASNT NDT Level III (RT, UT, MT, VT, PT, ET, LT ), ASNT ID- 83835 Level 3 as per EN 473 (UT, MT, PT, VT) Limited Attendees The course has limited seats to ensure maximum learning and experience for all delegates. Certificate of Attendance You will receive a Certificate of Attendance bearing the signatures of the Trainer upon successful completion of the course. This certificate is proof of your continuing professional development. Interactive Training You will be attending training designed to share both the latest knowledge and practical experience through interactive sessions. This will provide you with a deeper and more long-term understanding of your current issues. High Quality Course Materials Printed course manual will provide you with working materials throughout the course and will be an invaluable source of reference for you and your colleagues afterward. You can follow course progress on your laptop with soft copies provided. Reserve early to avoid disappointment! SUMMARYOFPROFESSIONALACHIEVEMENT ATTENDTHISINTENSIVECOURSETOMASTER: Detailed explanations of all the information covered in the API 510 'Body of Knowledge' including ASME welding requirements for pressure vessels section IX and VIII ASME non-destructive testing principles and application of Section V Pressure vessel design review ASME Section VIII, weld sizes, vessel nozzle reinforcement, brittle fracture, weld efficiency factors, post weld heat treatment Pressure relieving devices, valves, bursting discs, setting, testing and inspection; API 510 inspection, repair and rerating of vessels, inspection intervals, inspection requirements, relationships to ASME codes. Corrosion, minimum thickness determination and remaining life calculations Inspection and degradation mechanisms of pressure vessels, corrosion and cracking mechanisms Erosion, common corrodents, hydrogen and H2S damage, alloy degradation. The Middle East: Qatar Petroleum, QAFAC, ADCO, ADGAS, ADMA, GASCO, Banagas, Technip (Bahrain), Equate Petrochemicals Company, Al Jubail Fertilizer Company, TUV Akadamie Middle East (UAE, Saudi Arabia and Qatar) Africa: BP - GUPCO (Egypt), Inspection and Test Nigeria Ltd India & Asia: Oil India Limited, Tata, Dacon Inspection Ltd Europe: Rosen Europe (The Netherlands) PARTIALCLIENTLIST Sculpt Your Skills for the Inspection, Repair, Alteration, and Rerating of Pressure Vessel Systems! Be the qualified API510 Inspector in 2016! 29th February - 04th March 2016 04th - 08th April 2016 25th - 29th July 2016 14th - 18th November 2016 | Bandung, Indonesia | Kuala Lumpur, Malaysia | Bandung, Indonesia | Kuala Lumpur, Malaysia API 510 Pressure Vessel Inspector Course API 510 Pressure Vessel Inspector Course Reserve early to avoid disappointment! SUPPORTEDBY
  • 2. “To improve management control of process unit inspection, repair, alteration and rerating; and to reduce the potential for inspection delays resulting from regulatory requirements.” -- API.org on API 570 Certification American Petroleum Institute (API) Code 510 Inspection, Repair, Alteration, and Rerating of Pressure Vessel Systems is recognized and used with confidence worldwide. The Piping Inspector Certification Program (PICP) is developed for the continual high level of efficiency and safety through emphasizing professional credibility and process integrity. Pressure Vessel system is one of the critical production assets in process industry. Organizations recognize the need to maintain authorized inspection agency and technically assess qualified pressure vessel engineers and inspectors to ensure facilities are at top performance. Therefore, API 510 certification is one of the most sought after professional competency that enables inspectors to be actively involved in the improvement of industry & environmental health and safety performance, reinforcement management control, compliance of inspection capabilities. With Mr. Uday Kale’s extensive involvements in the facilities inspection, as well as his practical coaching and mentoring approaches, this course not only prepare the candidates to pass API 510 examination with confident, it will also advance the appreciation of pressure vessel facilities and thus to broaden the technical knowledge base in order to avoid unplanned shutdown and reduce expenses! This course will specifically benefit Engineers, Supervisors, and Managers from the following disciplines: - Mechanical Engineering - Inspection - Maintenance & Operations - Technical & Engineering - QAQC and technical personnel with 2-3 years of experience in the management and planning of inspection and maintenance activities of pressure vessel system at upstream oil & gas facilities, refineries, process plants and petrochemical facilities. PROGRAMOVERVIEW AUDIENCE WHYYOUSHOULDATTEND Toensurethatallobjectivesofthecoursematchesyours,allPetroSync programs are developed after intensive and extensive research within the industry PetroSyncprogramsfocusonyourimmediateworkingissuestoensure that you are able to apply and deliver immediate results in real work situations Application and implementation of industry knowledge and experience are the drivers for our course design, not theoretical academiclectures PetroSync training focuses on practical interactive learning tools and techniques including case studies, group discussions, scenarios, simulations,practicalexercisesandknowledgeassessmentsduringthe course.Investasmallamountofyourtimetopreparebeforeattending thecoursetoensuremaximumlearning PetroSyncfollowsarigorousselectionprocesstoensurethatallexpert trainers have first-hand, up-to-date and practical knowledge and are leadersoftheirrespectiveindustrialdiscipline SAVE COST • IMPROVE PERFORMANCE • REDUCE RISK PetroSync understands that in current economic climate, getting an excellent return on your training investment is critical for all our clients. This excellent training can be conducted exclusively for your organization.Thetrainingcanbetailoredtomeetyourspecificneedsat yourpreferredlocationandtime. Wewillmeetyouanywherearoundtheglobe. Ifyouliketoknowmore aboutthisexcellentprogram,pleasecontacton+6564154500oremail general@petrosync.com IN-HOUSESOLUTIONS PROGRAMSCHEDULE 08:00 Registration (Day1) 08:10 – 11:00 Session I 11:00 – 11:15 Refreshment & Networking 11:15 – 13:00 Session II 13:00 – 14:00 Networking Buffet Lunch 14:00 – 15:30 Session III 15:30 – 15:45 Refreshment & Networking 15:45 – 18:00 Session IV 18:00 End of Day Each attendee must bring a Laptop computer with Microsoft operating system and Scientific Calculator
  • 3. MODULE–1 Welcome and Introduction Overview of API 510 Course MODULE–2 JOINT EFFICIENCIES a. Weld Joint Categories from UW-3; b. Type of radiography (full, spot, or none , RT-1, RT-2, etc.); c. Joint efficiency by reading Table UW-12; d. Joint efficiency for seamless heads and vessels Sections per UW-12 (d); and e. Joint efficiency for welded pipe and tubing per UW-12 (e). MODULE-3 THICKNESS CALCULATIONS a) The required thickness of a cylindrical shell (UG-27(c)(1)); b) The vessel part MAWP for a cylindrical shell c) The required thickness of a head-Hemispherical, Ellipsoidal, Torispherical d) The vessel part MAWP for a head MODULE-4 STATIC HEAD a) Calculate static head pressure on any vessel part; b) Calculate total pressure (MAWP + static head) on any vessel part; c) Calculate maximum vessel MAWP given vessel parts MAWP and elevations MODULE-5 EXTERNAL PRESSURE a) Calculate the maximum allowable external pressure; b) Calculate whether a cylindrical shell meets Code design for external pressure. IMPACT TESTING a) Determine the minimum metal temperature of a material which is exempt from impact testing (UG-20 (f), UCS-66,UCS-68(c).) MODULE–1 Welcome and Introduction Overview of API 510 Course DAY-1 MODULE-1 PRESSURE TESTING a) Calculate a test pressure compensating for temperature. (UG-99 & UG-100) b) The precautions associated with hydrostatic and pneumatic testing, c) Steps in a hydrotest Procedure (UG 99 and UG 100) d) All steps in a pneumatic test procedure (UG 100 and UG 102) MODULE-2 WELD SIZE FOR ATTACHMENT WELDS AT OPENINGS a) Conversion of a fillet weld throat dimension to leg dimension , conversion factor(0.707) b) Determine the required size of welds at openings (UW-16). MODULE–3 NOZZLE REINFORCEMENT Key concepts of reinforcement, such as replacement of strength and limits of reinforcement. Credit for extra metal in shell and nozzle Calculate the required areas for reinforcement MODULE-4 1 SCOPE OF API 510 1.1 General Application 1.2 Specific Applications 1.3 Recognized Technical Concepts 2 references MODULE-5 3 definitions 4 owner/user inspection organization 4.1 General 4.2 Owner/user Organization Responsibilities MODULE-1 5 inspection, examination and pressure testing practices 5.1 Inspection Plans 5.2 Risk-based Inspection 5.3 Preparation For Inspection 5.4 Inspection For Types Of Damage Modes Of Deterioration And Failure MODULE–2 5.5 General Types Of Inspection And Surveillance 5.6 Condition Monitoring Locations 5.7 Condition Monitoring Methods MODULE-3 5.8 Pressure Testing 5.9 Material Verification And Traceability 5.10 Inspection Of In-service Welds And Joints 5.11 Inspection Of Flanged Joints MODULE-4 6 interval/frequency and extent of inspection 6.1 General a) Determine the minimum me which is exempt from i UCS-66,UCS-68(c).) MODULE-1 DAY-2 p g 4.1 General 4.2 Owner/user Organization Resp MODULE-1 DAY-3 AGENDAOULTINE
  • 4. DAY-4 MODULE-1 8 repairs, alterations, and rerating of pressure vessels . 8.1 Repairs And Alterations Authorization Approval Materials Requirements Welding Requirements MODULE-2 Heat Treating Requirements Preheating Post weld Heat Treating Local Postweld Heat treatment Repairs to Stainless Steel Weld Overlay and Cladding Rerating MODULE-3 Introduction to ASME Sec. IX Welding Procedure tests Performance qualification tests Acceptance criteria Welding positions P-No, F-No and A-No. Review of: a. Welding Procedure Specification (WPS); and b. Procedure Qualification Record (PQR) And determine: a) Whether number and type of mechanical test listed on PQR are appropriate b) Whether the results of the tests are acceptable c) Whether all required essential and non-essential variables have been properly addressed. DAY-56.2 Inspection During Installation And Service Changes 6.3 Risk-based Inspection 6.4 External Inspection 6.5 Internal And On-stream Inspection 6.6 Pressure-relieving Devices MODULE-5 7 inspection data evaluation, analysis, and recording 7.1 Corrosion Rate Determination 7.2 Remaining Life Calculations 7.3 Maximum Allowable Working Pressure Determination MODULE-6 7.4 Fitness For Service Analysis Of Corroded Regions 7.5 API RP 579 Fitness For Service Evaluations 7.6 Required Thickness Determination 7.7 Evaluation Of Existing Equipment With Minimal Documentation 7.8 Reports And Records MODULE-1 API RP 576, Inspection of Pressure-Relieving Devices 1. Relief Devices a) Description of Types -- (API RP-576, Section 2) b) Causes of Improper Performance (API RP-576, Section 4) c) Reasons for Inspection and Frequency Determination (API RP 576, Sections 3 & 5) d) Inspection and Test Service Procedures (API RP-576, Sections 6 and 7) MODULE-2 A. Article 1, General Requirements: B. Article 2, Radiographic Examination MODULE-3 C. Article 6, Liquid Penetrant Examination, D. Article 7, Magnetic Particle Examination (Yoke and Prod techniques only): E. Article 23, Ultrasonic Standards, Section SE–797 MODULE-4 API RP 576, Inspection of Pressure-Relieving Devices 1. Relief Devices a) Description of Types -- (API RP-576, Section 2) b) Causes of Improper Performance (API RP-576, Section 4) c) Reasons for Inspection and Frequency Determination (API RP 576, Sections 3 & 5) d) Inspection and Test Service Procedures (API RP-576, Sections 6 and 7) MODULE-5(1hour+1hourdiscussion) Practice Examination-Open Book Practice Examination-Closed Book Feed Back and Closing
  • 5. Uday B. Kale is a Post Graduate Mechanical Engineer with experience in Inspection, Welding and NDE/NDT projects for last 18 years. Currently he is the technical director of M/s KUB Quality Services. He has involved in inspection, welding and NDT projects in the Middle East, Africa and India on offshore production platform and petrochemical refineries. He has vast experience in Manufactur- ing and In Service Inspection of Static Equipment used in Oil and Gas. Mr. Uday is very well-versed in international Codes and Standards. He performed and led the shutdown teams in performing NDE, internal and external inspection of equipments in central process- ing plant, ammonia plant, FCCU, SRU, SWS and amine treating units for Code stamp facilities of ADCO, Qatar Petroleum, Oil India, QAFAC, Banagas, Al Jubail Fertilizer Company, and other various units of Refineries, Petrochemicals, Gas Plant and Fertilizer Plant and so on. He was a lead API inspector for various shutdown and Turnaround. He was also the appointed plant inspector for BP (GUPCO) in asset integrity management, who took charge of 9 offshore production complex, 75 Satellites and Onshore process units involving Close Visual Inspection of piping, equipments, NDT co-ordination, Baseline and Corrosion Monitoring. Furthermore, as an Inspector in GASCO OAG pipeline project, he conducted and witnessed Ultrasonic Examination of first 50 production weld joints of pipeline done by PWT (Pipe Welding Technology, GMAW). INSTRUCTOR Uday B. Kale (M. Eng. Mechanical) Technical Director KUB Quality Services SUMMARYOFPROFESSIONALACHIEVEMENT Qatar Petroleum BP - GUPCO (Egypt) Oil India Limited ADCO (Abu Dhabi) ADGAS (Abu Dhabi) ADMA (Abu Dhabi) GASCO (Abu Dhabi) QAFAC Rosen Europe (The Netherlands) Banagas (Bahrain) TATA (India) Al Jubail Fertilizer Company Technip (Bahrain) Equate Petrochemicals (Kuwait) TUV Akadamie Middle East (UAE, Saudi Arabia and Qatar) Inspection and Test Nigeria Ltd Dacon Inspection Ltd HBJ pipeline up-gradation projects PARTIALCLIENT/PROJECTLIST With his extensive involvement in various projects, Mr. Uday is also an enthusiastic and knowledgeable mentor, who has been a faculty in training, examination, qualification and certification of API 510 & 570, ASME B31.3, API653, welding and NDT in the Middle East, Africa and Asia. He is a charted engineer with 25 + International certifica- tion in Welding, NDE and In Service Inspection. API 510 Pressure Vessel Inspector Course 29th February - 04th March 2016 at Bandung, Indonesia | 04th - 08th April 2016 at Kuala Lumpur, Malaysia 25th - 29th July 2016 at Bandung, Indonesia | 14th - 18th November 2016 at Kuala Lumpur, Malaysia API 570 - Authorized Piping Inspector - Certificate #38157 API 510 – Authorized Pressure Vessel Inspector – Certificate #26785 API 653 – Authorized Above storage Tank Inspector-Certificate #27926 API SI- Source Inspector - Certificate #52837 API 580 – Risk Based Inspection - Certificate #50553 Certified Welding Inspector ( AWS) Certificate #00071941 CSWIP 3.1 Certificate #58489 ACCP Professional Level III (RT, UT, MT, VT) ASNT ID - 83835 RT 2 - Certified Site Incharge (BARC, India) ASNT NDT Level III (RT, UT, MT, VT, PT, ET, LT ), ASNT ID- 83835 Level 3 as per EN 473 (UT, MT, PT, VT)
  • 6. * To enjoy the offer, full payment must be made before the deadline. * For 5 or more delegates, please inquire for more attractive package. * Prices include lunches, refreshments and training materials. Discounts cannot be combined with other promotional offers. * Important: Please note that registration without payment will incur a SGD 200 administration fee. PROGRAMMECONSULTANT Contact : Cay Aagen Email : registration@petrosync.com Phone : +65 6415 4500 Fax : +65 6826 4322 INVESTMENT PACKAGES Others Others Others To Register DELEGATEDETAILS I agree to PetroSync’s payment terms and cancellation policy. Signature : ____________________________________________________________________________ PAYMENT TERMS : Payment is due in full at the time of registration. Full payment is mandatory for event attendance. Incorrect Details Please accept our apologies for mail or email that is incorrectly addressed. Please email us at registration@petrosync.com and inform us of any incorrect details. We will amend them accordingly. 1st Delegate Name Direct Line Number: Email: Job Title: Department: Head of Department: Company:____________________________________________ Industry : __________________________________ Address: _______________________________________________________Postcode: _________________________ Country: ________________________Email: __________________________________________________________ Attention Invoice to: ______________________________________________________________________________ Direct Line Number: ______________________________ Fax: _____________________________________________ PAYMENTMETHODS Please note: - Indicate if you have already registered by Phone Fax Email Web By Credit Card : Please debit my credit card: Visa MasterCard Card Number: Name printed on card: _____________________________________________________________________ Expiry Date: Security Code: INVOICEDETAILS Mrs Ms DrMr 2nd Delegate Name Direct Line Number: Email: Job Title: Department: Head of Department: Mrs Ms DrMr 3rd Delegate Name Direct Line Number: Email: Job Title: Department: Head of Department: Mrs Ms DrMr AMEX - If you have not received an acknowledgement before the training, please call us to confirm your booking. Confirma on API510 - PressureVessel InspectorCourse Group Discount SGD2,995SGD3,195 Please checklist the package that you are attending! TERMSANDCONDITIONS DISCLAIMER Please note that trainers and topics were confirmed at the time of publishing; however, PetroSync may necessitate substitutions, alterations or cancellations of the trainers or topics. As such, PetroSync reserves the right to change or cancel any part of its published programme due to unforeseen circumstances. Any substitutions or alterations will be updated on our web page as soon as possible. DATAPROTECTION The information you provide will be safeguarded by PetroSync that may be used to keep you informed of relevant products and services. As an international group we may transfer your data on a global basis for the purpose indicated above. If you do not want us to share your information with other reputable companies, please tick this box CANCELLATIONPOLICY You may substitute delegates at any time as long as reasonable advance notice is given to PetroSync. For any cancellation received in writing not less than fourteen (14) working days prior to the training course, you will receive a credit voucher worth total transaction with less a SGD 200 administration fee and any related bank or credit card charges. Delegates who cancel less than fourteen (14) working days of the training course, or who do not attend the course, are liable to pay the full course fee and no refunds will be granted. In the event that PetroSync cancels or postpones an event for any reason and that the delegate is unable or unwilling to attend in on the rescheduled date, you will receive a credit voucher for 100% of the contract fee paid. You may use this credit voucher for another PetroSync to be mutually agreed with PetroSync, which must occur within a year from the date of postponement. PetroSync is not responsible for any loss or damage as a result of the cancellation policy. PetroSync will assume no liability whatsoever in the event this event is cancelled, rescheduled or postponed due to any Act of God, fire, act of government or state, war, civil commotion, insurrection, embargo, industrial action, or any other reason beyond management control. CERTIFICATEOFATTENDANCE 80% attendance is required for PetroSync's Certificate of Attendance. EarlyBirdOfferStandardPrice 29thFeb-04thMar2016 Bandung,Indonesia 25th-29thJuly2016 Bandung,Indonesia 04th-08thApril2016 KualaLumpur,Malaysia By Direct Transfer : Please quote invoice number(s) on remittance advice PetroSync Global Pte Ltd Bank details: All bank charges to be borne by payer. Please ensure that PetroSync Global Pte Ltd receives the full invoiced amount. Account Name: PetroSync Global Pte Ltd Bank Name : DBS Bank Ltd Bank Code : 7171 • Bank Swift Code : DBSSSGSGXXX • Branch code : 288 Account No : • SGD : 288-901898-0 • USD : 0288-002682-01-6 Bank Address : 12 Marina Boulevard, Level 3. Marina Bay Financial Centre Tower 3. Singapore 018982 SGD2,995SGD3,195 SGD2,995SGD3,195 Please accept our apologies for mail or email that is incorrectly addressed. Please email us at registration@petrosync.com and inform us of any incorrect details. We will amend them - For Payment by Direct TelegraphicTransfer, client has to bear both local and oversea bank - For credit card payment, there is additional 4% credit card processsing fee. CHARGES&FEE(s) DETAILS Group discount is based on standard price 10% discounts for group of 3 registering from the same organization at the same time 14th-18thNovember2016 KualaLumpur,Malaysia SGD2,995SGD3,195