BLOWOUT PREVENTER SYSTEM
Kreshna wisnu brata
12010133
TEKNIK PERMINYAKAN
*WHY THIS HAPPENS ?
* WHAT CAUSES IT?
*COULD IT IN PREVENT?
SHOULD BOP ?
*The Background
Blow Out
Pf >> Ph
Blow Out
Equipment
*Kick Indication
Drilling
Break
The
weight of
mud
down
Temperatur
mud and
pressure
abnormal
rise
Pressure
down
Volume of
mud thank
rise
Current
speed in
flow line rise
Rig Crew Less Training
Pressure Hidrostatik Down
Pressure Abnormal Formation
Tools not good function
Late Handled Kick
Rig Crew Less Training For Close and Kill Whel
Factor Kick
Factor Blow Out
*Bop Stuck 13 5/8’’- 5000 psi
Trayek Casing 7’’
BLOWOUT PREVENTER (BOP) EQP.
FUNCTION
BOP EQP.
Close well at situation there a pipe or not pipe
stripping in or stripping out
Withstand pressure well that arise and can be passed all the
equipment who were used to operating the drilling / rework
Control well pressure and can be used for work
circulation kill kick
Hang (hanging off) and cut the drill pipe in an emergency.
Having a system backup equipment if one breaks down, specifically
for high pressure wells
BOP
EQUIPMENT
BOP Stack
Type
1. Annular Type
BOP
2. Ram Type
BOP
3. Diverter
BOP In a pipe
1. Upper Kelly
Cock
2. Lower Kelly
Cock
3. Inside BOP
4. Drill Pipe
Float Valve
Control
System
1. Accumulator
Unit
2. Driller
Remote
Control
Panel
Line Control
Systeml
1. Drilling Spool
2. Killing Line
3. Choke Line
4. Choke
Manifold
5. Manual
Choke &
Super Choke
*Annular Preventer
HYDRIL Type GK
13- 5/8 ‘’
Flexible Closing Tools
Closing the Hole In Pipe Nor
There
Ways of working ?
Packing Element
Pressing piston powered
Rubber Nitrogen Fluid From
Accumulator Unit
*WORKING ANNULAR
CLOSE OPENNETRAL
Accumulator
Bank
*Ram Preventer
o The workings of Ram uses
hydraulic fluid from the
accumulator unit to open
and close the wild bursts
Pipe Ram
Blind Ram
Shear Ram
*KERJA RAM
13
Closing
Drillpipe
Opening
SICP
Leak while closed
*BOP inside pipe
*Upper Kelly Cock 3- ½ ‘’
Between the swivel and the kelly
joint to isolate the mud from the drill
string with a swivel, rotary house and
stand pipe in the event of a leak
Lower Kelly cock 3- ½ ‘’
under kelly
To prevent mud from falling apart as a
freelance kelly kelly, which
accommodated the pressure of 5000 psi
*INSIDE BOP
*close / withstand pressure
from the string during a
kick or bursts.
*Inside bop should be
available on the rig floor
position Standby
Drilling Spools
CONNECTION
Kill Line
Choke
Line
Kill line 2 1/8” x 10.000 psi Choke line 3-1/8’’ x 10.000 psi
* Kill line
serves as a conduit to the injection of fluid into the well if
necessary to shut down wells
Choke line
To stream high pressure fluid to the manifold in case of kick
*Back Pressure
Manifold
CHOKE MANIFOLD OR BACK PRESSURE MANIFOLD
serves as a flow divider in the event kick by dividing the flow
of appropriate safety procedures
Accumulator Unit
o Accumulator unit steel
which contains high-
pressure nitrogen
o Known for Closing Unit
has the main function to
close the BOP during a
kick
o Accumulator unit
produksi ABS 80
o 3000 Psi
o 3 unit Air Pump, 1 unit
Triplex
o 20 Botol
* BOP Remote Control Panel
Operation
Drilling
Rig FLoorDriller
*Prosedur Closed Well
1. Soft Closed
Open choke line valve
Closed BOP
Closed choke slowly
Read and record the
pressure cap drill pipe
and casing
2. Hard Closed
Closed BOP
Open choke line slowly
Read and record the
pressure cap drill pipe
and casing
* Metode Killing Well
Wait and
Weight
Driller Concurrent
*
*BOP (Blowout Preventer) is a tool used to
cover / hold kick or the flow of formation fluids
into the wellbore uncontrolled
*Source of power Acummulator is the water
pump and Electric pump
*Back Pressure Manifold serves to mud to mud
gas to separator, reserve pit, or flare
*BOP handling system on RIG PDSI
#15.3/N110-M wells relatively good, as long as
the drilling does not problem

More Related Content

What's hot

Basic Well Control
Basic Well ControlBasic Well Control
Basic Well ControlM.T.H Group
 
Sequence of well drilling part 1
Sequence of well drilling part 1Sequence of well drilling part 1
Sequence of well drilling part 1Elsayed Amer
 
Drilling Rig Components ( Illustrated Glossary )
Drilling Rig Components ( Illustrated Glossary )Drilling Rig Components ( Illustrated Glossary )
Drilling Rig Components ( Illustrated Glossary )guest521158
 
3. sequances of drilling operations
3. sequances of drilling operations3. sequances of drilling operations
3. sequances of drilling operationsElsayed Amer
 
Well control
Well controlWell control
Well controlSaba Saif
 
Well Control and Well Monitoring Systems
Well Control and Well Monitoring SystemsWell Control and Well Monitoring Systems
Well Control and Well Monitoring SystemsAFATous
 
Wellhead and christmas tree components, functions and more
Wellhead and christmas tree components, functions and moreWellhead and christmas tree components, functions and more
Wellhead and christmas tree components, functions and moreMohamed Abdelshafy Abozeima
 
Hydraulic workover and snubbing solutions, رضا مصطفوی طباطبایی
Hydraulic workover and snubbing solutions, رضا مصطفوی طباطبایی Hydraulic workover and snubbing solutions, رضا مصطفوی طباطبایی
Hydraulic workover and snubbing solutions, رضا مصطفوی طباطبایی Reza Mostafavi Tabatabaei
 
Completion equipment packer part #2
Completion equipment packer part #2Completion equipment packer part #2
Completion equipment packer part #2Elsayed Amer
 
Coiled Tubing Conveyed Perforations
Coiled Tubing Conveyed PerforationsCoiled Tubing Conveyed Perforations
Coiled Tubing Conveyed PerforationsKamel Elsayed
 
7'' liner running and cementing
7'' liner running and cementing7'' liner running and cementing
7'' liner running and cementingKamel Elsayed
 
Down hole problem and their prevention
Down hole problem and their preventionDown hole problem and their prevention
Down hole problem and their preventionSamiur Sany
 
Well completion equipment 2. landing nipples
Well completion equipment  2. landing nipplesWell completion equipment  2. landing nipples
Well completion equipment 2. landing nipplesElsayed Amer
 
Drilling Problems.pdf
Drilling Problems.pdfDrilling Problems.pdf
Drilling Problems.pdfTinaMarey
 
Horizontal drilling
Horizontal drillingHorizontal drilling
Horizontal drillingMubarik Rao
 

What's hot (20)

Basic Well Control
Basic Well ControlBasic Well Control
Basic Well Control
 
Sequence of well drilling part 1
Sequence of well drilling part 1Sequence of well drilling part 1
Sequence of well drilling part 1
 
Drilling Rig Components ( Illustrated Glossary )
Drilling Rig Components ( Illustrated Glossary )Drilling Rig Components ( Illustrated Glossary )
Drilling Rig Components ( Illustrated Glossary )
 
3. sequances of drilling operations
3. sequances of drilling operations3. sequances of drilling operations
3. sequances of drilling operations
 
Well control
Well controlWell control
Well control
 
Well Control and Well Monitoring Systems
Well Control and Well Monitoring SystemsWell Control and Well Monitoring Systems
Well Control and Well Monitoring Systems
 
well control (1)
 well control (1) well control (1)
well control (1)
 
Wellhead and christmas tree components, functions and more
Wellhead and christmas tree components, functions and moreWellhead and christmas tree components, functions and more
Wellhead and christmas tree components, functions and more
 
2.1 rig types
2.1 rig types2.1 rig types
2.1 rig types
 
Packers GFK
Packers GFKPackers GFK
Packers GFK
 
Hydraulic workover and snubbing solutions, رضا مصطفوی طباطبایی
Hydraulic workover and snubbing solutions, رضا مصطفوی طباطبایی Hydraulic workover and snubbing solutions, رضا مصطفوی طباطبایی
Hydraulic workover and snubbing solutions, رضا مصطفوی طباطبایی
 
Completion equipment packer part #2
Completion equipment packer part #2Completion equipment packer part #2
Completion equipment packer part #2
 
Wellhead
WellheadWellhead
Wellhead
 
Coiled Tubing Conveyed Perforations
Coiled Tubing Conveyed PerforationsCoiled Tubing Conveyed Perforations
Coiled Tubing Conveyed Perforations
 
Coiled tubing Equipments .pdf
Coiled tubing Equipments .pdfCoiled tubing Equipments .pdf
Coiled tubing Equipments .pdf
 
7'' liner running and cementing
7'' liner running and cementing7'' liner running and cementing
7'' liner running and cementing
 
Down hole problem and their prevention
Down hole problem and their preventionDown hole problem and their prevention
Down hole problem and their prevention
 
Well completion equipment 2. landing nipples
Well completion equipment  2. landing nipplesWell completion equipment  2. landing nipples
Well completion equipment 2. landing nipples
 
Drilling Problems.pdf
Drilling Problems.pdfDrilling Problems.pdf
Drilling Problems.pdf
 
Horizontal drilling
Horizontal drillingHorizontal drilling
Horizontal drilling
 

Viewers also liked

Bop cameron
Bop cameronBop cameron
Bop cameronjaoliver
 
Transocean well control
Transocean  well controlTransocean  well control
Transocean well controlSteffones K
 
PetroSync - IWCF Drilling Well Control 6.0
PetroSync - IWCF Drilling Well Control 6.0PetroSync - IWCF Drilling Well Control 6.0
PetroSync - IWCF Drilling Well Control 6.0Shanice Sua
 
Oil and Gas Solutions v2
Oil and Gas Solutions v2Oil and Gas Solutions v2
Oil and Gas Solutions v2Mel Chaar
 
Drilling Tools Technology - Threaded Connections
Drilling Tools Technology - Threaded ConnectionsDrilling Tools Technology - Threaded Connections
Drilling Tools Technology - Threaded ConnectionsRobert Smith
 
Advanced blowout and well control robert d. grace
Advanced blowout and well control   robert d. graceAdvanced blowout and well control   robert d. grace
Advanced blowout and well control robert d. graceThần Chết Nụ Hôn
 
Maersk Training Presentation
Maersk Training Presentation Maersk Training Presentation
Maersk Training Presentation Chittra Koman
 
IADC Aberdeen 2014 BOP presentation 0.1
IADC Aberdeen 2014 BOP presentation 0.1IADC Aberdeen 2014 BOP presentation 0.1
IADC Aberdeen 2014 BOP presentation 0.1Pieter van Asten
 
Offshore Drilling equipment Technical documentation
Offshore Drilling equipment Technical documentationOffshore Drilling equipment Technical documentation
Offshore Drilling equipment Technical documentationRAJESH KUMAR YESO
 
ISEN 459 real Final Poster
ISEN 459 real Final PosterISEN 459 real Final Poster
ISEN 459 real Final PosterIskander El Amri
 
Well control practices and procedures to control any uncontrolled situation
Well control practices and procedures to control any uncontrolled situationWell control practices and procedures to control any uncontrolled situation
Well control practices and procedures to control any uncontrolled situationShricharan Arrumugam
 

Viewers also liked (17)

Bop cameron
Bop cameronBop cameron
Bop cameron
 
Transocean well control
Transocean  well controlTransocean  well control
Transocean well control
 
Well control
Well control Well control
Well control
 
PetroSync - IWCF Drilling Well Control 6.0
PetroSync - IWCF Drilling Well Control 6.0PetroSync - IWCF Drilling Well Control 6.0
PetroSync - IWCF Drilling Well Control 6.0
 
BOP
BOPBOP
BOP
 
Oil and Gas Solutions v2
Oil and Gas Solutions v2Oil and Gas Solutions v2
Oil and Gas Solutions v2
 
T3 EUROPEAN PRESENTATION
T3 EUROPEAN PRESENTATIONT3 EUROPEAN PRESENTATION
T3 EUROPEAN PRESENTATION
 
Bop cameron type u parts
Bop cameron type u partsBop cameron type u parts
Bop cameron type u parts
 
Drilling Tools Technology - Threaded Connections
Drilling Tools Technology - Threaded ConnectionsDrilling Tools Technology - Threaded Connections
Drilling Tools Technology - Threaded Connections
 
Dk well control
Dk well controlDk well control
Dk well control
 
Advanced blowout and well control robert d. grace
Advanced blowout and well control   robert d. graceAdvanced blowout and well control   robert d. grace
Advanced blowout and well control robert d. grace
 
Maersk Training Presentation
Maersk Training Presentation Maersk Training Presentation
Maersk Training Presentation
 
IADC Aberdeen 2014 BOP presentation 0.1
IADC Aberdeen 2014 BOP presentation 0.1IADC Aberdeen 2014 BOP presentation 0.1
IADC Aberdeen 2014 BOP presentation 0.1
 
Offshore Drilling equipment Technical documentation
Offshore Drilling equipment Technical documentationOffshore Drilling equipment Technical documentation
Offshore Drilling equipment Technical documentation
 
ISEN 459 real Final Poster
ISEN 459 real Final PosterISEN 459 real Final Poster
ISEN 459 real Final Poster
 
Bomba koomey cgba-slide share
Bomba koomey cgba-slide shareBomba koomey cgba-slide share
Bomba koomey cgba-slide share
 
Well control practices and procedures to control any uncontrolled situation
Well control practices and procedures to control any uncontrolled situationWell control practices and procedures to control any uncontrolled situation
Well control practices and procedures to control any uncontrolled situation
 

Similar to blow out preventer system

unlocked-461fd952f4656fee70de599ef77bd2ba.pptx
unlocked-461fd952f4656fee70de599ef77bd2ba.pptxunlocked-461fd952f4656fee70de599ef77bd2ba.pptx
unlocked-461fd952f4656fee70de599ef77bd2ba.pptxWaledFekry1
 
Winding step-4.ppt
Winding step-4.pptWinding step-4.ppt
Winding step-4.pptABSHISHKUMAR
 
Tooling Equipment Terminology Training
Tooling Equipment Terminology TrainingTooling Equipment Terminology Training
Tooling Equipment Terminology TrainingWilliam Grohs
 
Installation and Drive Pipe Construction of the Bamford Hi-Ram Pump
Installation and Drive Pipe Construction of the Bamford Hi-Ram PumpInstallation and Drive Pipe Construction of the Bamford Hi-Ram Pump
Installation and Drive Pipe Construction of the Bamford Hi-Ram PumpFatin62c
 
2018 pumster english catalog
2018 pumster english catalog2018 pumster english catalog
2018 pumster english catalogpumster
 
12 drilling preventers
12 drilling preventers12 drilling preventers
12 drilling preventersAvinash B
 
20200116 tvn3- onesheet of piling works-rv5
20200116  tvn3- onesheet of piling works-rv520200116  tvn3- onesheet of piling works-rv5
20200116 tvn3- onesheet of piling works-rv5Thang234
 
Hydraulic Ram Pump: Plans, Assembly and Notes - Clemson University
Hydraulic Ram Pump: Plans, Assembly and Notes - Clemson UniversityHydraulic Ram Pump: Plans, Assembly and Notes - Clemson University
Hydraulic Ram Pump: Plans, Assembly and Notes - Clemson UniversityFatin62c
 
How a Hydraulic Ram Pump Works - Clemson University
How a Hydraulic Ram Pump Works - Clemson UniversityHow a Hydraulic Ram Pump Works - Clemson University
How a Hydraulic Ram Pump Works - Clemson UniversityFatin62c
 
Magnum Pump Saver - Worldwide Oilfield Machine
Magnum Pump Saver - Worldwide Oilfield MachineMagnum Pump Saver - Worldwide Oilfield Machine
Magnum Pump Saver - Worldwide Oilfield Machinewomgroup
 
Subsea Intervention System (SIS) - Worldwide Oilfield Machine
Subsea Intervention System (SIS) - Worldwide Oilfield MachineSubsea Intervention System (SIS) - Worldwide Oilfield Machine
Subsea Intervention System (SIS) - Worldwide Oilfield Machinewomgroup
 
Mini Pipe Sprayer
 Mini Pipe Sprayer Mini Pipe Sprayer
Mini Pipe Sprayer3M
 
Catálogo Williams _ Vdual seal plunger
Catálogo Williams _ Vdual seal plunger   Catálogo Williams _ Vdual seal plunger
Catálogo Williams _ Vdual seal plunger Vibropac
 
Catálogo Williams _ V series
Catálogo Williams _ V series Catálogo Williams _ V series
Catálogo Williams _ V series Vibropac
 
Extruder or Injection Molding Machine Startup and Shutdown Article
Extruder or Injection Molding Machine Startup and Shutdown ArticleExtruder or Injection Molding Machine Startup and Shutdown Article
Extruder or Injection Molding Machine Startup and Shutdown ArticleR&B Plastics Machinery
 
Tentec hydraulic tensioner data sheet
Tentec hydraulic tensioner data sheet Tentec hydraulic tensioner data sheet
Tentec hydraulic tensioner data sheet Peter Prins
 

Similar to blow out preventer system (20)

unlocked-461fd952f4656fee70de599ef77bd2ba.pptx
unlocked-461fd952f4656fee70de599ef77bd2ba.pptxunlocked-461fd952f4656fee70de599ef77bd2ba.pptx
unlocked-461fd952f4656fee70de599ef77bd2ba.pptx
 
Winding step-4.ppt
Winding step-4.pptWinding step-4.ppt
Winding step-4.ppt
 
Tooling Equipment Terminology Training
Tooling Equipment Terminology TrainingTooling Equipment Terminology Training
Tooling Equipment Terminology Training
 
Installation and Drive Pipe Construction of the Bamford Hi-Ram Pump
Installation and Drive Pipe Construction of the Bamford Hi-Ram PumpInstallation and Drive Pipe Construction of the Bamford Hi-Ram Pump
Installation and Drive Pipe Construction of the Bamford Hi-Ram Pump
 
The Bamford Hi-Ram Pump
The Bamford Hi-Ram PumpThe Bamford Hi-Ram Pump
The Bamford Hi-Ram Pump
 
2018 pumster english catalog
2018 pumster english catalog2018 pumster english catalog
2018 pumster english catalog
 
12 drilling preventers
12 drilling preventers12 drilling preventers
12 drilling preventers
 
20200116 tvn3- onesheet of piling works-rv5
20200116  tvn3- onesheet of piling works-rv520200116  tvn3- onesheet of piling works-rv5
20200116 tvn3- onesheet of piling works-rv5
 
Hydraulic Ram Pump: Plans, Assembly and Notes - Clemson University
Hydraulic Ram Pump: Plans, Assembly and Notes - Clemson UniversityHydraulic Ram Pump: Plans, Assembly and Notes - Clemson University
Hydraulic Ram Pump: Plans, Assembly and Notes - Clemson University
 
How a Hydraulic Ram Pump Works - Clemson University
How a Hydraulic Ram Pump Works - Clemson UniversityHow a Hydraulic Ram Pump Works - Clemson University
How a Hydraulic Ram Pump Works - Clemson University
 
Blowout preventer
Blowout preventerBlowout preventer
Blowout preventer
 
Magnum Pump Saver - Worldwide Oilfield Machine
Magnum Pump Saver - Worldwide Oilfield MachineMagnum Pump Saver - Worldwide Oilfield Machine
Magnum Pump Saver - Worldwide Oilfield Machine
 
[HIFLUX] Total catalog - Eng.
[HIFLUX] Total catalog - Eng.[HIFLUX] Total catalog - Eng.
[HIFLUX] Total catalog - Eng.
 
Hydraulic Ram Made from Standard Plumbing Parts
Hydraulic Ram Made from Standard Plumbing PartsHydraulic Ram Made from Standard Plumbing Parts
Hydraulic Ram Made from Standard Plumbing Parts
 
Subsea Intervention System (SIS) - Worldwide Oilfield Machine
Subsea Intervention System (SIS) - Worldwide Oilfield MachineSubsea Intervention System (SIS) - Worldwide Oilfield Machine
Subsea Intervention System (SIS) - Worldwide Oilfield Machine
 
Mini Pipe Sprayer
 Mini Pipe Sprayer Mini Pipe Sprayer
Mini Pipe Sprayer
 
Catálogo Williams _ Vdual seal plunger
Catálogo Williams _ Vdual seal plunger   Catálogo Williams _ Vdual seal plunger
Catálogo Williams _ Vdual seal plunger
 
Catálogo Williams _ V series
Catálogo Williams _ V series Catálogo Williams _ V series
Catálogo Williams _ V series
 
Extruder or Injection Molding Machine Startup and Shutdown Article
Extruder or Injection Molding Machine Startup and Shutdown ArticleExtruder or Injection Molding Machine Startup and Shutdown Article
Extruder or Injection Molding Machine Startup and Shutdown Article
 
Tentec hydraulic tensioner data sheet
Tentec hydraulic tensioner data sheet Tentec hydraulic tensioner data sheet
Tentec hydraulic tensioner data sheet
 

Recently uploaded

AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdfankushspencer015
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxfenichawla
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdfKamal Acharya
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGMANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGSIVASHANKAR N
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)simmis5
 

Recently uploaded (20)

AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGMANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 

blow out preventer system

  • 1. RIG PDSI #15.3/N110-M PT PERTAMINA DRILLING SERVICES INDONESIA AREA JAWA BLOWOUT PREVENTER SYSTEM Kreshna wisnu brata 12010133 TEKNIK PERMINYAKAN
  • 2. *WHY THIS HAPPENS ? * WHAT CAUSES IT? *COULD IT IN PREVENT?
  • 4. *The Background Blow Out Pf >> Ph Blow Out Equipment
  • 5. *Kick Indication Drilling Break The weight of mud down Temperatur mud and pressure abnormal rise Pressure down Volume of mud thank rise Current speed in flow line rise
  • 6. Rig Crew Less Training Pressure Hidrostatik Down Pressure Abnormal Formation Tools not good function Late Handled Kick Rig Crew Less Training For Close and Kill Whel Factor Kick Factor Blow Out
  • 7. *Bop Stuck 13 5/8’’- 5000 psi Trayek Casing 7’’
  • 8. BLOWOUT PREVENTER (BOP) EQP. FUNCTION BOP EQP. Close well at situation there a pipe or not pipe stripping in or stripping out Withstand pressure well that arise and can be passed all the equipment who were used to operating the drilling / rework Control well pressure and can be used for work circulation kill kick Hang (hanging off) and cut the drill pipe in an emergency. Having a system backup equipment if one breaks down, specifically for high pressure wells
  • 9. BOP EQUIPMENT BOP Stack Type 1. Annular Type BOP 2. Ram Type BOP 3. Diverter BOP In a pipe 1. Upper Kelly Cock 2. Lower Kelly Cock 3. Inside BOP 4. Drill Pipe Float Valve Control System 1. Accumulator Unit 2. Driller Remote Control Panel Line Control Systeml 1. Drilling Spool 2. Killing Line 3. Choke Line 4. Choke Manifold 5. Manual Choke & Super Choke
  • 10. *Annular Preventer HYDRIL Type GK 13- 5/8 ‘’ Flexible Closing Tools Closing the Hole In Pipe Nor There Ways of working ? Packing Element Pressing piston powered Rubber Nitrogen Fluid From Accumulator Unit
  • 12. *Ram Preventer o The workings of Ram uses hydraulic fluid from the accumulator unit to open and close the wild bursts Pipe Ram Blind Ram Shear Ram
  • 14. *BOP inside pipe *Upper Kelly Cock 3- ½ ‘’ Between the swivel and the kelly joint to isolate the mud from the drill string with a swivel, rotary house and stand pipe in the event of a leak Lower Kelly cock 3- ½ ‘’ under kelly To prevent mud from falling apart as a freelance kelly kelly, which accommodated the pressure of 5000 psi
  • 15. *INSIDE BOP *close / withstand pressure from the string during a kick or bursts. *Inside bop should be available on the rig floor position Standby
  • 17. Kill line 2 1/8” x 10.000 psi Choke line 3-1/8’’ x 10.000 psi * Kill line serves as a conduit to the injection of fluid into the well if necessary to shut down wells Choke line To stream high pressure fluid to the manifold in case of kick
  • 18. *Back Pressure Manifold CHOKE MANIFOLD OR BACK PRESSURE MANIFOLD serves as a flow divider in the event kick by dividing the flow of appropriate safety procedures
  • 19. Accumulator Unit o Accumulator unit steel which contains high- pressure nitrogen o Known for Closing Unit has the main function to close the BOP during a kick o Accumulator unit produksi ABS 80 o 3000 Psi o 3 unit Air Pump, 1 unit Triplex o 20 Botol
  • 20. * BOP Remote Control Panel Operation Drilling Rig FLoorDriller
  • 21. *Prosedur Closed Well 1. Soft Closed Open choke line valve Closed BOP Closed choke slowly Read and record the pressure cap drill pipe and casing 2. Hard Closed Closed BOP Open choke line slowly Read and record the pressure cap drill pipe and casing
  • 22. * Metode Killing Well Wait and Weight Driller Concurrent
  • 23. * *BOP (Blowout Preventer) is a tool used to cover / hold kick or the flow of formation fluids into the wellbore uncontrolled *Source of power Acummulator is the water pump and Electric pump *Back Pressure Manifold serves to mud to mud gas to separator, reserve pit, or flare *BOP handling system on RIG PDSI #15.3/N110-M wells relatively good, as long as the drilling does not problem