Overview of STI SP001 vs. API 653 Tank Inspections
Gary Diewald P.E., STI Inspector #AST-1755
Antea Group
September 10, 2019
2
Overview of STI versus API Tank Inspections
So you have Aboveground Storage Tanks
(ASTs) at your facility.
Which tank inspection protocol applies?
• Steel Tank Institute STI SP001
OR
• American Petroleum Institute API 653
?
3
Why Inspect ASTs?
Regulatory Drivers
EPA – SPCC (40 CFR 112. 8(c)(6)):
• Test or inspect each aboveground container for integrity
• Accordance with industry standards
State and Local Regulations
• Health and Environmental Protection Agencies
• Building Codes
• Fire Codes
Best Practices
• Reduce Risk/Costs (Spills, Clean up , Product loss)
4
STI SP001 Standard (6th Edition, January 2018)
Inspection and evaluation criteria required to determine suitability for continued service.
Inspect to identify the condition of and changes to AST.
• ASTs storing flammable and combustible liquids at atmospheric pressure
• Can be applied to AST storing other liquids following proper evaluation
Applicability
• Shop-Built/Fabricated AST – Horizontal or Vertical, Single or
Double Walled
• Steel Diked AST – Open or Closed
• Concrete Exterior AST
• Field-Erected AST – Limited Size
• Portable Containers – Drums, Totes (IBCs) – Plastic, Steel, Stainless
5
STI SPOO1 Inspection Components
Primary tank – thickness determination
Secondary tank (if present)
Tank foundation, supports and anchors
Tank gauges and alarms
Overfill valves and alarms
Insulation covering
Tank appurtenances
Normal vents
Emergency vents
Release prevention barriers
Spill control systems
Tank valves and connections (piping)
Example Periodic Inspection Checklist provided in Standard
6
Shop-Fabricated AST
Welded carbon or stainless steel AST fabricated in manufacturing facility
• Capacity of 75,000 gallons or less
• Constructed in accordance with UL 142, UL 2085, UL 2080, UL 2244,
UL 2245, SwRI 93-01, SwRI 97-04, or STI (AST F911, AST F921) standards
How to determine if you have a Shop-
Fabricated AST?
• Manufacturer Tank Plate
• Standard Certification Plate
• Capacity
• Lifting Lugs
• Tank Specifications
• Owner Purchase Records
7
Evidence of Shop Fabrication
8
Steel Diked ASTs
Integral steel secondary containment dike
• Open or Closed
9
Concrete Exterior ASTs
UL 2085
• Steel Tank
• Integral containment liner
• Concrete Shell
10
Smaller Field-Erected ASTs
Limited in size:
• Greater than 75,000 gallons
• 50 feet maximum height
• 30 feet maximum diameter
• Equates to ~264,000 gallons
• Shell thickness less than ½ inch
and bottom thickness equal to ¼ inch
AST
Type and Capacity
Category 1 Category 2 Category 3
Field-erected AST P, E(5), I (10) P, E&L (5), I (10) P, E&L (5), I (10)
11
STI SPOO1 Inspection Frequency
Risk Based Hierarchy
Inspection Matrix
AST Type and Size (Us
Gallons)
Category 1 Category 2 Category 3
Shop / Fabricated
ASTs
0 – 1100 gal. P P P, E & L (10)
1101 – 5000 gal. P P, E & L (10)
[P, E & L (5), I (10)]
OR
[P, L (2), E (5)]
5001 – 30,000
gal.
P, E (20)
[P, E (10), I (20)]
OR
[P, E (5), L (10)]
[P, E & L (5), I (10)]
OR
[P, L (1), E (5)]
30,001 – 75,000
gal.
P, E (20) P, E & L (5), I (15) [P, E & L (5), I (10)]
Portable Containers P P P**
R I S K
R
I
S
K
12
STI SPOO1 Definitions
Continuous Release Detection Method (CRDM)
• Inherent design - passive
• Liquid releases are detected visually
• Release prevention barrier (RPB)
• Secondary containment AST, including double-wall
AST or double-bottom AST
• Elevated AST, with or without release prevention
barrier
Release Prevention Barrier (RPB)
• Liquid containment barrier under the AST
• Steel (as in steel double bottom tanks)
• Concrete foundation pad or dike floor
• Elastomeric liners or other suitable materials
Spill Control = Secondary Containment
• Dike (concrete, earth, steel)
• Double-walled
• Remote Impoundment
Overfill Prevention
Procedures or devices used to prevent liquid in ASTs
from running over or spilling out of the AST during the
filling process
13
AST Category Chart (from STI SP001 Table A2.2):
Tank Configuration
Tank has Spill
Control?
Tank has
CRDM?
AST Category
Single wall vertical AST in contact with ground and no spill control No No 3
Single wall vertical AST in contact with ground in an earthen dike Yes No 2
Single wall vertical AST in concrete dike with concrete floor. Concrete
floor extends under tank completely
Yes Yes 1
Single wall vertical AST in dike with elastomeric liner. Liner extends
under tank completely
Yes Yes 1
Single wall vertical AST installed on gravel and no spill control No No 3
Single wall vertical AST installed on gravel in an earthen dike Yes No 2
Elevated AST with spill control Yes Yes 1
Elevated AST without spill control No Yes 3
AST with double-bottom and spill control Yes Yes 1
Double-wall AST with overfill prevention Yes Yes 1
Double-wall AST without overfill prevention No Yes 3
Concrete exterior AST with overfill prevention Yes Yes 1
Concrete exterior AST without overfill prevention No Yes 3
14
STI SPOO1 Inspection Types
P- Periodic AST Inspection – owner’s inspector knowledgeable in the tank operation –
Monthly and Annual frequency
E- Formal External Inspection (FEI) by certified STI inspector
I-Formal Internal Inspection (FII) by certified STI inspector
L-Leak test by owner or owner’s designee
(#) indicates maximum inspection interval in years. For example, E(20) indicates formal
external inspection every 20 years
15
STI SPOO1 Inspection Frequency
Risk Based Hierarchy
Inspection Matrix
AST Type and Size (Us
Gallons)
Category 1 Category 2 Category 3
Shop / Fabricated
ASTs
0 – 1100 gal. P P P, E & L (10)
1101 – 5000 gal. P P, E & L (10)
[P, E & L (5), I (10)]
OR
[P, L (2), E (5)]
5001 – 30,000
gal.
P, E (20)
[P, E (10), I (20)]
OR
[P, E (5), L (10)]
[P, E & L (5), I (10)]
OR
[P, L (1), E (5)]
30,001 – 75,000
gal.
P, E (20) P, E & L (5), I (15) [P, E & L (5), I (10)]
Portable Containers P P P**
R I S K
R
I
S
K
16
API 653 Standard (5th Edition, November 2014)
Steel storage tanks built to API 650 or older API
12C.
Minimum requirements for maintaining the
integrity of tanks after placed in service
Addresses inspection, repair, alteration,
relocation, and reconstruction of ASTs.
• Assess suitability for continued use
• Assess Brittle Fracture Risk
• Recognizes fitness-for-service assessment
concepts
17
API 653 Inspection Components
• Tank Foundation
• Bottom – flaw and thickness detection
• Shell – flaw and thickness detection
• Brittle Fracture/Failure Assessment
• Structure
• Roof
• Attached Appurtenances
• Nozzles to face of 1st flange, 1st threaded
joint, or 1st welding-end connection
Example Inspection Checklist provided in Standard
18
Field-Erected AST
Applicability
• Capacity greater than 75,000 gallons
• Size greater than 50 feet in height and 30 feet in
diameter
• Welded or Riveted
How to determine if you have a Field-Erected AST?
• Manufacturer Tank Plate
• Standard Certification Plate
• Capacity
• No Lifting Lugs
• Rounded Stairway
• Tank Specifications
• Owner Purchase Records
19
API 653 Inspection Frequency
Routine In-Service Inspections
• Owner personnel knowledgeable in tank system
and operation
• Monthly
External Inspections
• Authorized API 653 Inspector
• In service
• Ultrasonic thickness inspection
• Every 5 years
Internal Inspections
• Authorized API 653 Inspector
• Out of service
• Assessment of tank bottom condition
• Calculated according the API 653, Section 6.4.2
(corrosion rate determination)
20
API 653 Inspection Frequency
Initial Internal
Inspections
Intervals
• 10 years from
date of initial
service, or
• According to
Risk-Based
Inspection
(RBI)
Assessment
criteria
Tank Safeguard
Max. Initial
Interval
i) Original nominal bottom thickness 5/16 in. or greater 12 years
ii) Cathodic protection of the soil-side of the primary tank bottom per Note 1 12 years
iii) Thin-film lining of the product-side of the tank bottom per Note 2 12 years
iv) Fiberglass-reinforced lining of the product-side of the tank bottom per Note 2 13 years
v) Cathodic protection plus thin-film lining 14 years
vi) Cathodic protection plus fiberglass-reinforced lining 15 years
vii) Release prevention barrier per Note 3 (when similar service assessment performed) 20 years
viii) Release prevention barrier per Note 3 (when RBI assessment performed) 25 years
NOTE 1 For the purposes of 6.4.2.1, effective cathodic protection of the soil-side of the primary tank bottom means a system
installed and maintained in accordance with API 651.
NOTE 2 For purposes of 6.4.2.1, lining of the product-side of the tank bottom means a lining installed, maintained and inspected
in accordance with API 652.
NOTE 3 For purposes of 6.4.2.1, a release prevention barrier means an under-bottom leak detection and containment system
designed in accordance with API 650, Appendix I.
21
API 653 Inspection Frequency
Subsequent Internal
Inspection Intervals
• Determined in
accordance with
corrosion rate
procedure
calculations
• RBI procedures
• Not to exceed
maximum intervals
Procedure Used Max. Interval
i) Corrosion rate procedures in 6.4.2.3 20 years
ii) RBI assessment per 6.4.2.4 25 years
iii) RBI assessment per 6.4.2.4 and a release prevention barrier per Note 30 years
NOTE For purposes of 6.4.2.2, a release prevention barrier means an under-bottom leak detection and
containment system designed in accordance with API 650, Appendix I.
22
Comparison STI SP001 vs. API 653
Regulatory Compliance
• Both Standards provide compliance for tank integrity inspection for SPCC and local environmental
regulations
Risk Based Benefit
• Both Standards provide reduction in inspection frequency for use of release prevention barrier for reduced
spill risk
Applicability
• STI SP001 – All configurations of shop-built tanks and smaller field-erected tanks.
• API 653 - Field-erected tanks (welded or riveted). Also includes guidance for repair, alteration, relocation.
Cost
• STI SP001 - $700 to $2,000 depending upon tank configuration, insulation, economy of scale
• API 653 - $3,500 to $5,500 depending upon tank configuration and economy of scale
23
Overview of STI SP001 vs. API 653
Questions?
Gary Diewald, P.E.
Gary.Diewald@anteagroup.com

More Related Content

What's hot

Plumbness & Roundness of storage tanks
Plumbness & Roundness of storage tanksPlumbness & Roundness of storage tanks
Plumbness & Roundness of storage tanks
Weld Maniac
 
API 650 vs 620
API 650 vs 620API 650 vs 620
API 650 vs 620
Filipino Oil and Gas
 
Storage tanks _emissions_and_emission_reductions_201312
Storage tanks _emissions_and_emission_reductions_201312Storage tanks _emissions_and_emission_reductions_201312
Storage tanks _emissions_and_emission_reductions_201312
salah jallali
 
Presentation API 570 -510-653.pptx
Presentation API 570 -510-653.pptxPresentation API 570 -510-653.pptx
Presentation API 570 -510-653.pptx
hesham ismail
 
Asme sec viii div 2
Asme sec viii div 2Asme sec viii div 2
Asme sec viii div 2
Jithu John
 
Asme viii Div. 1 presentation rev.0
Asme viii Div. 1  presentation   rev.0Asme viii Div. 1  presentation   rev.0
Asme viii Div. 1 presentation rev.0
Mohammad Mahrous
 
Storage tank inspection presentation
Storage tank inspection presentationStorage tank inspection presentation
Storage tank inspection presentation
Ian Moore
 
ASME Section VIII Div 1. design training
ASME Section VIII Div 1.  design trainingASME Section VIII Div 1.  design training
ASME Section VIII Div 1. design training
Sam Jose
 
Api 653 study guide
Api 653 study guideApi 653 study guide
Api 653 study guide
JayJay Makinano
 
Storage Tank.pdf
Storage Tank.pdfStorage Tank.pdf
Piping sample report
Piping sample reportPiping sample report
Piping sample reportram111eg
 
( Itp ag pipe) rapid p006 a scs qac itp 3200 0007
( Itp ag pipe) rapid p006 a scs qac itp 3200 0007( Itp ag pipe) rapid p006 a scs qac itp 3200 0007
( Itp ag pipe) rapid p006 a scs qac itp 3200 0007
Tonni Bruce
 
ASME SEC IX PPT.pdf
ASME SEC IX PPT.pdfASME SEC IX PPT.pdf
ASME SEC IX PPT.pdf
PKNanavati
 
Asme sec ix overview
Asme sec ix overviewAsme sec ix overview
Asme sec ix overview
AshifuddinAli
 
Asme sec viii div 1 icb
Asme sec viii div 1 icbAsme sec viii div 1 icb
Asme sec viii div 1 icb
Praj Industries Ltd.
 
38785106 api-tank-design
38785106 api-tank-design38785106 api-tank-design
38785106 api-tank-design
141jdf
 
D-005 Iso Container Frame
D-005 Iso Container FrameD-005 Iso Container Frame
D-005 Iso Container FrameWafik Zakhary
 
143137557 storage-tanks
143137557 storage-tanks143137557 storage-tanks
143137557 storage-tanks
bernard347
 
Peaking & Banding
Peaking & BandingPeaking & Banding
Peaking & Banding
Weld Maniac
 
Flange management presentation
Flange management presentationFlange management presentation
Flange management presentation
Mohamed Gaafar
 

What's hot (20)

Plumbness & Roundness of storage tanks
Plumbness & Roundness of storage tanksPlumbness & Roundness of storage tanks
Plumbness & Roundness of storage tanks
 
API 650 vs 620
API 650 vs 620API 650 vs 620
API 650 vs 620
 
Storage tanks _emissions_and_emission_reductions_201312
Storage tanks _emissions_and_emission_reductions_201312Storage tanks _emissions_and_emission_reductions_201312
Storage tanks _emissions_and_emission_reductions_201312
 
Presentation API 570 -510-653.pptx
Presentation API 570 -510-653.pptxPresentation API 570 -510-653.pptx
Presentation API 570 -510-653.pptx
 
Asme sec viii div 2
Asme sec viii div 2Asme sec viii div 2
Asme sec viii div 2
 
Asme viii Div. 1 presentation rev.0
Asme viii Div. 1  presentation   rev.0Asme viii Div. 1  presentation   rev.0
Asme viii Div. 1 presentation rev.0
 
Storage tank inspection presentation
Storage tank inspection presentationStorage tank inspection presentation
Storage tank inspection presentation
 
ASME Section VIII Div 1. design training
ASME Section VIII Div 1.  design trainingASME Section VIII Div 1.  design training
ASME Section VIII Div 1. design training
 
Api 653 study guide
Api 653 study guideApi 653 study guide
Api 653 study guide
 
Storage Tank.pdf
Storage Tank.pdfStorage Tank.pdf
Storage Tank.pdf
 
Piping sample report
Piping sample reportPiping sample report
Piping sample report
 
( Itp ag pipe) rapid p006 a scs qac itp 3200 0007
( Itp ag pipe) rapid p006 a scs qac itp 3200 0007( Itp ag pipe) rapid p006 a scs qac itp 3200 0007
( Itp ag pipe) rapid p006 a scs qac itp 3200 0007
 
ASME SEC IX PPT.pdf
ASME SEC IX PPT.pdfASME SEC IX PPT.pdf
ASME SEC IX PPT.pdf
 
Asme sec ix overview
Asme sec ix overviewAsme sec ix overview
Asme sec ix overview
 
Asme sec viii div 1 icb
Asme sec viii div 1 icbAsme sec viii div 1 icb
Asme sec viii div 1 icb
 
38785106 api-tank-design
38785106 api-tank-design38785106 api-tank-design
38785106 api-tank-design
 
D-005 Iso Container Frame
D-005 Iso Container FrameD-005 Iso Container Frame
D-005 Iso Container Frame
 
143137557 storage-tanks
143137557 storage-tanks143137557 storage-tanks
143137557 storage-tanks
 
Peaking & Banding
Peaking & BandingPeaking & Banding
Peaking & Banding
 
Flange management presentation
Flange management presentationFlange management presentation
Flange management presentation
 

Similar to Overview of STI SP001 vs. API 653 Tank Inspections

TANK presentation-2.pptx
TANK presentation-2.pptxTANK presentation-2.pptx
TANK presentation-2.pptx
Murugan I
 
Rbi presentation inventure technologies
Rbi presentation inventure technologiesRbi presentation inventure technologies
Rbi presentation inventure technologies
Rindert Algra
 
mohamed daowod cv
mohamed daowod cvmohamed daowod cv
mohamed daowod cv
MOHAMED DAOWOD
 
A comprehensive approach to tank design and tank equipment selection
A comprehensive approach to tank design and tank equipment selectionA comprehensive approach to tank design and tank equipment selection
A comprehensive approach to tank design and tank equipment selection
Mohieddin Hadidi
 
003_TANK - Inspection & Maintenance.pptx
003_TANK - Inspection & Maintenance.pptx003_TANK - Inspection & Maintenance.pptx
003_TANK - Inspection & Maintenance.pptx
Neethu241454
 
Testing_of_transformers_adjusted.ppt
Testing_of_transformers_adjusted.pptTesting_of_transformers_adjusted.ppt
Testing_of_transformers_adjusted.ppt
Satish Pydimarla
 
Boiler condition survey
Boiler condition surveyBoiler condition survey
Boiler condition survey
Yasser B. A. Farag
 
Western Heat Forge pptx R23
Western Heat Forge pptx R23Western Heat Forge pptx R23
Western Heat Forge pptx R23SOHIL VOHRA
 
Mohammad Taher_QA-QC Piping-Welding
Mohammad Taher_QA-QC Piping-WeldingMohammad Taher_QA-QC Piping-Welding
Mohammad Taher_QA-QC Piping-WeldingMohammad Taher
 
Pipeline Operations & Maintenance Corrosion Field Testing - Where, When & How
Pipeline Operations & Maintenance Corrosion  Field Testing - Where, When & HowPipeline Operations & Maintenance Corrosion  Field Testing - Where, When & How
Pipeline Operations & Maintenance Corrosion Field Testing - Where, When & How
Audubon Engineering Company
 
CCS presentation_NADCAP_Groundsupport_etc_part_II
CCS presentation_NADCAP_Groundsupport_etc_part_IICCS presentation_NADCAP_Groundsupport_etc_part_II
CCS presentation_NADCAP_Groundsupport_etc_part_II
ketan.pole
 
API 622, API 624 and API 641 for Fugitive Emissions
API 622, API 624 and API 641 for Fugitive EmissionsAPI 622, API 624 and API 641 for Fugitive Emissions
API 622, API 624 and API 641 for Fugitive Emissions
PGE India - PILOT Gaskets
 
269831351-PIPING-Q-C-AG-UG.pdf
269831351-PIPING-Q-C-AG-UG.pdf269831351-PIPING-Q-C-AG-UG.pdf
269831351-PIPING-Q-C-AG-UG.pdf
moumo1
 
Siddharth Engineers, Pune, Valve & Engineering Components
Siddharth Engineers, Pune, Valve & Engineering ComponentsSiddharth Engineers, Pune, Valve & Engineering Components
Siddharth Engineers, Pune, Valve & Engineering Components
IndiaMART InterMESH Limited
 
2 appendix ii technical conditions, requirements and ma (1)
2 appendix ii   technical conditions, requirements and ma (1)2 appendix ii   technical conditions, requirements and ma (1)
2 appendix ii technical conditions, requirements and ma (1)
SERPETBOL.LTDA
 
Ivs2017 final presentation session12_strategies to api 624 qualification
Ivs2017 final presentation session12_strategies to api 624 qualificationIvs2017 final presentation session12_strategies to api 624 qualification
Ivs2017 final presentation session12_strategies to api 624 qualification
Kalsoft Solutions Private Limited
 
KDV WT Brochure 100510
KDV WT Brochure 100510KDV WT Brochure 100510
KDV WT Brochure 100510Ilan Almagor
 
CORE KNOWLEGDE for CIVIL INSPECTORS.pdf
CORE KNOWLEGDE for CIVIL INSPECTORS.pdfCORE KNOWLEGDE for CIVIL INSPECTORS.pdf
CORE KNOWLEGDE for CIVIL INSPECTORS.pdf
EngrAmin7
 

Similar to Overview of STI SP001 vs. API 653 Tank Inspections (20)

TANK presentation-2.pptx
TANK presentation-2.pptxTANK presentation-2.pptx
TANK presentation-2.pptx
 
Rbi presentation inventure technologies
Rbi presentation inventure technologiesRbi presentation inventure technologies
Rbi presentation inventure technologies
 
mohamed daowod cv
mohamed daowod cvmohamed daowod cv
mohamed daowod cv
 
A comprehensive approach to tank design and tank equipment selection
A comprehensive approach to tank design and tank equipment selectionA comprehensive approach to tank design and tank equipment selection
A comprehensive approach to tank design and tank equipment selection
 
003_TANK - Inspection & Maintenance.pptx
003_TANK - Inspection & Maintenance.pptx003_TANK - Inspection & Maintenance.pptx
003_TANK - Inspection & Maintenance.pptx
 
Testing_of_transformers_adjusted.ppt
Testing_of_transformers_adjusted.pptTesting_of_transformers_adjusted.ppt
Testing_of_transformers_adjusted.ppt
 
Presentation4
Presentation4Presentation4
Presentation4
 
Boiler condition survey
Boiler condition surveyBoiler condition survey
Boiler condition survey
 
Western Heat Forge pptx R23
Western Heat Forge pptx R23Western Heat Forge pptx R23
Western Heat Forge pptx R23
 
Mohammad Taher_QA-QC Piping-Welding
Mohammad Taher_QA-QC Piping-WeldingMohammad Taher_QA-QC Piping-Welding
Mohammad Taher_QA-QC Piping-Welding
 
Pipeline Operations & Maintenance Corrosion Field Testing - Where, When & How
Pipeline Operations & Maintenance Corrosion  Field Testing - Where, When & HowPipeline Operations & Maintenance Corrosion  Field Testing - Where, When & How
Pipeline Operations & Maintenance Corrosion Field Testing - Where, When & How
 
CCS presentation_NADCAP_Groundsupport_etc_part_II
CCS presentation_NADCAP_Groundsupport_etc_part_IICCS presentation_NADCAP_Groundsupport_etc_part_II
CCS presentation_NADCAP_Groundsupport_etc_part_II
 
API 622, API 624 and API 641 for Fugitive Emissions
API 622, API 624 and API 641 for Fugitive EmissionsAPI 622, API 624 and API 641 for Fugitive Emissions
API 622, API 624 and API 641 for Fugitive Emissions
 
269831351-PIPING-Q-C-AG-UG.pdf
269831351-PIPING-Q-C-AG-UG.pdf269831351-PIPING-Q-C-AG-UG.pdf
269831351-PIPING-Q-C-AG-UG.pdf
 
Siddharth Engineers, Pune, Valve & Engineering Components
Siddharth Engineers, Pune, Valve & Engineering ComponentsSiddharth Engineers, Pune, Valve & Engineering Components
Siddharth Engineers, Pune, Valve & Engineering Components
 
2 appendix ii technical conditions, requirements and ma (1)
2 appendix ii   technical conditions, requirements and ma (1)2 appendix ii   technical conditions, requirements and ma (1)
2 appendix ii technical conditions, requirements and ma (1)
 
Ivs2017 final presentation session12_strategies to api 624 qualification
Ivs2017 final presentation session12_strategies to api 624 qualificationIvs2017 final presentation session12_strategies to api 624 qualification
Ivs2017 final presentation session12_strategies to api 624 qualification
 
Mithun Banjan CV
Mithun Banjan CVMithun Banjan CV
Mithun Banjan CV
 
KDV WT Brochure 100510
KDV WT Brochure 100510KDV WT Brochure 100510
KDV WT Brochure 100510
 
CORE KNOWLEGDE for CIVIL INSPECTORS.pdf
CORE KNOWLEGDE for CIVIL INSPECTORS.pdfCORE KNOWLEGDE for CIVIL INSPECTORS.pdf
CORE KNOWLEGDE for CIVIL INSPECTORS.pdf
 

More from Antea Group

Preparation for Post-Incident - Claims Adjusting and Clean-up
Preparation for Post-Incident - Claims Adjusting and Clean-upPreparation for Post-Incident - Claims Adjusting and Clean-up
Preparation for Post-Incident - Claims Adjusting and Clean-up
Antea Group
 
Lessons Learned from PFAS in Groundwater
Lessons Learned from PFAS in GroundwaterLessons Learned from PFAS in Groundwater
Lessons Learned from PFAS in Groundwater
Antea Group
 
Unpacking the Business and Stakeholder Relationship Management Toolbox
Unpacking the Business and Stakeholder Relationship Management ToolboxUnpacking the Business and Stakeholder Relationship Management Toolbox
Unpacking the Business and Stakeholder Relationship Management Toolbox
Antea Group
 
Conceptual Site Model Development and Environmental Molecular Diagnostics
Conceptual Site Model Development and Environmental Molecular DiagnosticsConceptual Site Model Development and Environmental Molecular Diagnostics
Conceptual Site Model Development and Environmental Molecular Diagnostics
Antea Group
 
Tracking Full-Scale Performance of an Injectable Sorptive Biobarrier: One Yea...
Tracking Full-Scale Performance of an Injectable Sorptive Biobarrier: One Yea...Tracking Full-Scale Performance of an Injectable Sorptive Biobarrier: One Yea...
Tracking Full-Scale Performance of an Injectable Sorptive Biobarrier: One Yea...
Antea Group
 
2018 Railroad Environmental Conference: Local Stormwater Charges
2018 Railroad Environmental Conference: Local Stormwater Charges2018 Railroad Environmental Conference: Local Stormwater Charges
2018 Railroad Environmental Conference: Local Stormwater Charges
Antea Group
 
2018 Railroad Environmental Conference: Managing Health and Safety
2018 Railroad Environmental Conference: Managing Health and Safety2018 Railroad Environmental Conference: Managing Health and Safety
2018 Railroad Environmental Conference: Managing Health and Safety
Antea Group
 
2018 UST Regulations Update: What You Need to Know
2018 UST Regulations Update: What You Need to Know2018 UST Regulations Update: What You Need to Know
2018 UST Regulations Update: What You Need to Know
Antea Group
 
2018 National Tanks Conference & Exposition: HRSC Data Visualization
2018 National Tanks Conference & Exposition: HRSC Data Visualization2018 National Tanks Conference & Exposition: HRSC Data Visualization
2018 National Tanks Conference & Exposition: HRSC Data Visualization
Antea Group
 
Using Data Management and 3-Dimensional Data Visualization to Generate More C...
Using Data Management and 3-Dimensional Data Visualization to Generate More C...Using Data Management and 3-Dimensional Data Visualization to Generate More C...
Using Data Management and 3-Dimensional Data Visualization to Generate More C...
Antea Group
 
Using Environmental Molecular Diagnostics to support a Rhizodegradation Closu...
Using Environmental Molecular Diagnostics to support a Rhizodegradation Closu...Using Environmental Molecular Diagnostics to support a Rhizodegradation Closu...
Using Environmental Molecular Diagnostics to support a Rhizodegradation Closu...
Antea Group
 
Remediation of Volatile Organics in Groundwater Using In Situ Carbon (ISC) In...
Remediation of Volatile Organics in Groundwater Using In Situ Carbon (ISC) In...Remediation of Volatile Organics in Groundwater Using In Situ Carbon (ISC) In...
Remediation of Volatile Organics in Groundwater Using In Situ Carbon (ISC) In...
Antea Group
 
Optimizing a Sorptive Biomatrix MTBE Barrier
Optimizing a Sorptive Biomatrix MTBE BarrierOptimizing a Sorptive Biomatrix MTBE Barrier
Optimizing a Sorptive Biomatrix MTBE Barrier
Antea Group
 
Life Safety, Emergency Response, and Fire Safety: EU Regional EHS Regulatory ...
Life Safety, Emergency Response, and Fire Safety: EU Regional EHS Regulatory ...Life Safety, Emergency Response, and Fire Safety: EU Regional EHS Regulatory ...
Life Safety, Emergency Response, and Fire Safety: EU Regional EHS Regulatory ...
Antea Group
 
Critical H&S Obligations: EU Regional EHS Regulatory Highlights
Critical H&S Obligations: EU Regional EHS Regulatory HighlightsCritical H&S Obligations: EU Regional EHS Regulatory Highlights
Critical H&S Obligations: EU Regional EHS Regulatory Highlights
Antea Group
 
Industrial Hygiene and Occupational Health: EU Regional EHS Regulatory Highli...
Industrial Hygiene and Occupational Health: EU Regional EHS Regulatory Highli...Industrial Hygiene and Occupational Health: EU Regional EHS Regulatory Highli...
Industrial Hygiene and Occupational Health: EU Regional EHS Regulatory Highli...
Antea Group
 
Greater Europe EHS Regulatory Challenges
Greater Europe EHS Regulatory ChallengesGreater Europe EHS Regulatory Challenges
Greater Europe EHS Regulatory Challenges
Antea Group
 
Psychosocial Risks: European Expectations
Psychosocial Risks: European ExpectationsPsychosocial Risks: European Expectations
Psychosocial Risks: European Expectations
Antea Group
 
Injury Prevention for Seasonal Workers
Injury Prevention for Seasonal WorkersInjury Prevention for Seasonal Workers
Injury Prevention for Seasonal Workers
Antea Group
 
Reducing Costs using a Green Lens
Reducing Costs using a Green Lens Reducing Costs using a Green Lens
Reducing Costs using a Green Lens
Antea Group
 

More from Antea Group (20)

Preparation for Post-Incident - Claims Adjusting and Clean-up
Preparation for Post-Incident - Claims Adjusting and Clean-upPreparation for Post-Incident - Claims Adjusting and Clean-up
Preparation for Post-Incident - Claims Adjusting and Clean-up
 
Lessons Learned from PFAS in Groundwater
Lessons Learned from PFAS in GroundwaterLessons Learned from PFAS in Groundwater
Lessons Learned from PFAS in Groundwater
 
Unpacking the Business and Stakeholder Relationship Management Toolbox
Unpacking the Business and Stakeholder Relationship Management ToolboxUnpacking the Business and Stakeholder Relationship Management Toolbox
Unpacking the Business and Stakeholder Relationship Management Toolbox
 
Conceptual Site Model Development and Environmental Molecular Diagnostics
Conceptual Site Model Development and Environmental Molecular DiagnosticsConceptual Site Model Development and Environmental Molecular Diagnostics
Conceptual Site Model Development and Environmental Molecular Diagnostics
 
Tracking Full-Scale Performance of an Injectable Sorptive Biobarrier: One Yea...
Tracking Full-Scale Performance of an Injectable Sorptive Biobarrier: One Yea...Tracking Full-Scale Performance of an Injectable Sorptive Biobarrier: One Yea...
Tracking Full-Scale Performance of an Injectable Sorptive Biobarrier: One Yea...
 
2018 Railroad Environmental Conference: Local Stormwater Charges
2018 Railroad Environmental Conference: Local Stormwater Charges2018 Railroad Environmental Conference: Local Stormwater Charges
2018 Railroad Environmental Conference: Local Stormwater Charges
 
2018 Railroad Environmental Conference: Managing Health and Safety
2018 Railroad Environmental Conference: Managing Health and Safety2018 Railroad Environmental Conference: Managing Health and Safety
2018 Railroad Environmental Conference: Managing Health and Safety
 
2018 UST Regulations Update: What You Need to Know
2018 UST Regulations Update: What You Need to Know2018 UST Regulations Update: What You Need to Know
2018 UST Regulations Update: What You Need to Know
 
2018 National Tanks Conference & Exposition: HRSC Data Visualization
2018 National Tanks Conference & Exposition: HRSC Data Visualization2018 National Tanks Conference & Exposition: HRSC Data Visualization
2018 National Tanks Conference & Exposition: HRSC Data Visualization
 
Using Data Management and 3-Dimensional Data Visualization to Generate More C...
Using Data Management and 3-Dimensional Data Visualization to Generate More C...Using Data Management and 3-Dimensional Data Visualization to Generate More C...
Using Data Management and 3-Dimensional Data Visualization to Generate More C...
 
Using Environmental Molecular Diagnostics to support a Rhizodegradation Closu...
Using Environmental Molecular Diagnostics to support a Rhizodegradation Closu...Using Environmental Molecular Diagnostics to support a Rhizodegradation Closu...
Using Environmental Molecular Diagnostics to support a Rhizodegradation Closu...
 
Remediation of Volatile Organics in Groundwater Using In Situ Carbon (ISC) In...
Remediation of Volatile Organics in Groundwater Using In Situ Carbon (ISC) In...Remediation of Volatile Organics in Groundwater Using In Situ Carbon (ISC) In...
Remediation of Volatile Organics in Groundwater Using In Situ Carbon (ISC) In...
 
Optimizing a Sorptive Biomatrix MTBE Barrier
Optimizing a Sorptive Biomatrix MTBE BarrierOptimizing a Sorptive Biomatrix MTBE Barrier
Optimizing a Sorptive Biomatrix MTBE Barrier
 
Life Safety, Emergency Response, and Fire Safety: EU Regional EHS Regulatory ...
Life Safety, Emergency Response, and Fire Safety: EU Regional EHS Regulatory ...Life Safety, Emergency Response, and Fire Safety: EU Regional EHS Regulatory ...
Life Safety, Emergency Response, and Fire Safety: EU Regional EHS Regulatory ...
 
Critical H&S Obligations: EU Regional EHS Regulatory Highlights
Critical H&S Obligations: EU Regional EHS Regulatory HighlightsCritical H&S Obligations: EU Regional EHS Regulatory Highlights
Critical H&S Obligations: EU Regional EHS Regulatory Highlights
 
Industrial Hygiene and Occupational Health: EU Regional EHS Regulatory Highli...
Industrial Hygiene and Occupational Health: EU Regional EHS Regulatory Highli...Industrial Hygiene and Occupational Health: EU Regional EHS Regulatory Highli...
Industrial Hygiene and Occupational Health: EU Regional EHS Regulatory Highli...
 
Greater Europe EHS Regulatory Challenges
Greater Europe EHS Regulatory ChallengesGreater Europe EHS Regulatory Challenges
Greater Europe EHS Regulatory Challenges
 
Psychosocial Risks: European Expectations
Psychosocial Risks: European ExpectationsPsychosocial Risks: European Expectations
Psychosocial Risks: European Expectations
 
Injury Prevention for Seasonal Workers
Injury Prevention for Seasonal WorkersInjury Prevention for Seasonal Workers
Injury Prevention for Seasonal Workers
 
Reducing Costs using a Green Lens
Reducing Costs using a Green Lens Reducing Costs using a Green Lens
Reducing Costs using a Green Lens
 

Recently uploaded

Navigating the complex landscape of AI governance
Navigating the complex landscape of AI governanceNavigating the complex landscape of AI governance
Navigating the complex landscape of AI governance
Piermenotti Mauro
 
AGRICULTURE Hydrophonic FERTILISER PPT.pptx
AGRICULTURE Hydrophonic FERTILISER PPT.pptxAGRICULTURE Hydrophonic FERTILISER PPT.pptx
AGRICULTURE Hydrophonic FERTILISER PPT.pptx
BanitaDsouza
 
Summary of the Climate and Energy Policy of Australia
Summary of the Climate and Energy Policy of AustraliaSummary of the Climate and Energy Policy of Australia
Summary of the Climate and Energy Policy of Australia
yasmindemoraes1
 
Natural farming @ Dr. Siddhartha S. Jena.pptx
Natural farming @ Dr. Siddhartha S. Jena.pptxNatural farming @ Dr. Siddhartha S. Jena.pptx
Natural farming @ Dr. Siddhartha S. Jena.pptx
sidjena70
 
alhambra case study Islamic gardens part-2.pptx
alhambra case study Islamic gardens part-2.pptxalhambra case study Islamic gardens part-2.pptx
alhambra case study Islamic gardens part-2.pptx
CECOS University Peshawar, Pakistan
 
Daan Park Hydrangea flower season I like it
Daan Park Hydrangea flower season I like itDaan Park Hydrangea flower season I like it
Daan Park Hydrangea flower season I like it
a0966109726
 
ppt on beauty of the nature by Palak.pptx
ppt on  beauty of the nature by Palak.pptxppt on  beauty of the nature by Palak.pptx
ppt on beauty of the nature by Palak.pptx
RaniJaiswal16
 
NRW Board Paper - DRAFT NRW Recreation Strategy
NRW Board Paper - DRAFT NRW Recreation StrategyNRW Board Paper - DRAFT NRW Recreation Strategy
NRW Board Paper - DRAFT NRW Recreation Strategy
Robin Grant
 
Sustainable farming practices in India .pptx
Sustainable farming  practices in India .pptxSustainable farming  practices in India .pptx
Sustainable farming practices in India .pptx
chaitaliambole
 
Sustainable Rain water harvesting in india.ppt
Sustainable Rain water harvesting in india.pptSustainable Rain water harvesting in india.ppt
Sustainable Rain water harvesting in india.ppt
chaitaliambole
 
International+e-Commerce+Platform-www.cfye-commerce.shop
International+e-Commerce+Platform-www.cfye-commerce.shopInternational+e-Commerce+Platform-www.cfye-commerce.shop
International+e-Commerce+Platform-www.cfye-commerce.shop
laozhuseo02
 
"Understanding the Carbon Cycle: Processes, Human Impacts, and Strategies for...
"Understanding the Carbon Cycle: Processes, Human Impacts, and Strategies for..."Understanding the Carbon Cycle: Processes, Human Impacts, and Strategies for...
"Understanding the Carbon Cycle: Processes, Human Impacts, and Strategies for...
MMariSelvam4
 
Presentación Giulio Quaggiotto-Diálogo improbable .pptx.pdf
Presentación Giulio Quaggiotto-Diálogo improbable .pptx.pdfPresentación Giulio Quaggiotto-Diálogo improbable .pptx.pdf
Presentación Giulio Quaggiotto-Diálogo improbable .pptx.pdf
Innovation and Technology for Development Centre
 
How about Huawei mobile phone-www.cfye-commerce.shop
How about Huawei mobile phone-www.cfye-commerce.shopHow about Huawei mobile phone-www.cfye-commerce.shop
How about Huawei mobile phone-www.cfye-commerce.shop
laozhuseo02
 
Q&A with the Experts: The Food Service Playbook
Q&A with the Experts: The Food Service PlaybookQ&A with the Experts: The Food Service Playbook
Q&A with the Experts: The Food Service Playbook
World Resources Institute (WRI)
 
UNDERSTANDING WHAT GREEN WASHING IS!.pdf
UNDERSTANDING WHAT GREEN WASHING IS!.pdfUNDERSTANDING WHAT GREEN WASHING IS!.pdf
UNDERSTANDING WHAT GREEN WASHING IS!.pdf
JulietMogola
 
growbilliontrees.com-Trees for Granddaughter (1).pdf
growbilliontrees.com-Trees for Granddaughter (1).pdfgrowbilliontrees.com-Trees for Granddaughter (1).pdf
growbilliontrees.com-Trees for Granddaughter (1).pdf
yadavakashagra
 
Willie Nelson Net Worth: A Journey Through Music, Movies, and Business Ventures
Willie Nelson Net Worth: A Journey Through Music, Movies, and Business VenturesWillie Nelson Net Worth: A Journey Through Music, Movies, and Business Ventures
Willie Nelson Net Worth: A Journey Through Music, Movies, and Business Ventures
greendigital
 
Environmental Science Book By Dr. Y.K. Singh
Environmental Science Book By Dr. Y.K. SinghEnvironmental Science Book By Dr. Y.K. Singh
Environmental Science Book By Dr. Y.K. Singh
AhmadKhan917612
 
Celebrating World-environment-day-2024.pdf
Celebrating  World-environment-day-2024.pdfCelebrating  World-environment-day-2024.pdf
Celebrating World-environment-day-2024.pdf
rohankumarsinghrore1
 

Recently uploaded (20)

Navigating the complex landscape of AI governance
Navigating the complex landscape of AI governanceNavigating the complex landscape of AI governance
Navigating the complex landscape of AI governance
 
AGRICULTURE Hydrophonic FERTILISER PPT.pptx
AGRICULTURE Hydrophonic FERTILISER PPT.pptxAGRICULTURE Hydrophonic FERTILISER PPT.pptx
AGRICULTURE Hydrophonic FERTILISER PPT.pptx
 
Summary of the Climate and Energy Policy of Australia
Summary of the Climate and Energy Policy of AustraliaSummary of the Climate and Energy Policy of Australia
Summary of the Climate and Energy Policy of Australia
 
Natural farming @ Dr. Siddhartha S. Jena.pptx
Natural farming @ Dr. Siddhartha S. Jena.pptxNatural farming @ Dr. Siddhartha S. Jena.pptx
Natural farming @ Dr. Siddhartha S. Jena.pptx
 
alhambra case study Islamic gardens part-2.pptx
alhambra case study Islamic gardens part-2.pptxalhambra case study Islamic gardens part-2.pptx
alhambra case study Islamic gardens part-2.pptx
 
Daan Park Hydrangea flower season I like it
Daan Park Hydrangea flower season I like itDaan Park Hydrangea flower season I like it
Daan Park Hydrangea flower season I like it
 
ppt on beauty of the nature by Palak.pptx
ppt on  beauty of the nature by Palak.pptxppt on  beauty of the nature by Palak.pptx
ppt on beauty of the nature by Palak.pptx
 
NRW Board Paper - DRAFT NRW Recreation Strategy
NRW Board Paper - DRAFT NRW Recreation StrategyNRW Board Paper - DRAFT NRW Recreation Strategy
NRW Board Paper - DRAFT NRW Recreation Strategy
 
Sustainable farming practices in India .pptx
Sustainable farming  practices in India .pptxSustainable farming  practices in India .pptx
Sustainable farming practices in India .pptx
 
Sustainable Rain water harvesting in india.ppt
Sustainable Rain water harvesting in india.pptSustainable Rain water harvesting in india.ppt
Sustainable Rain water harvesting in india.ppt
 
International+e-Commerce+Platform-www.cfye-commerce.shop
International+e-Commerce+Platform-www.cfye-commerce.shopInternational+e-Commerce+Platform-www.cfye-commerce.shop
International+e-Commerce+Platform-www.cfye-commerce.shop
 
"Understanding the Carbon Cycle: Processes, Human Impacts, and Strategies for...
"Understanding the Carbon Cycle: Processes, Human Impacts, and Strategies for..."Understanding the Carbon Cycle: Processes, Human Impacts, and Strategies for...
"Understanding the Carbon Cycle: Processes, Human Impacts, and Strategies for...
 
Presentación Giulio Quaggiotto-Diálogo improbable .pptx.pdf
Presentación Giulio Quaggiotto-Diálogo improbable .pptx.pdfPresentación Giulio Quaggiotto-Diálogo improbable .pptx.pdf
Presentación Giulio Quaggiotto-Diálogo improbable .pptx.pdf
 
How about Huawei mobile phone-www.cfye-commerce.shop
How about Huawei mobile phone-www.cfye-commerce.shopHow about Huawei mobile phone-www.cfye-commerce.shop
How about Huawei mobile phone-www.cfye-commerce.shop
 
Q&A with the Experts: The Food Service Playbook
Q&A with the Experts: The Food Service PlaybookQ&A with the Experts: The Food Service Playbook
Q&A with the Experts: The Food Service Playbook
 
UNDERSTANDING WHAT GREEN WASHING IS!.pdf
UNDERSTANDING WHAT GREEN WASHING IS!.pdfUNDERSTANDING WHAT GREEN WASHING IS!.pdf
UNDERSTANDING WHAT GREEN WASHING IS!.pdf
 
growbilliontrees.com-Trees for Granddaughter (1).pdf
growbilliontrees.com-Trees for Granddaughter (1).pdfgrowbilliontrees.com-Trees for Granddaughter (1).pdf
growbilliontrees.com-Trees for Granddaughter (1).pdf
 
Willie Nelson Net Worth: A Journey Through Music, Movies, and Business Ventures
Willie Nelson Net Worth: A Journey Through Music, Movies, and Business VenturesWillie Nelson Net Worth: A Journey Through Music, Movies, and Business Ventures
Willie Nelson Net Worth: A Journey Through Music, Movies, and Business Ventures
 
Environmental Science Book By Dr. Y.K. Singh
Environmental Science Book By Dr. Y.K. SinghEnvironmental Science Book By Dr. Y.K. Singh
Environmental Science Book By Dr. Y.K. Singh
 
Celebrating World-environment-day-2024.pdf
Celebrating  World-environment-day-2024.pdfCelebrating  World-environment-day-2024.pdf
Celebrating World-environment-day-2024.pdf
 

Overview of STI SP001 vs. API 653 Tank Inspections

  • 1. 1 Overview of STI SP001 vs. API 653 Tank Inspections Gary Diewald P.E., STI Inspector #AST-1755 Antea Group September 10, 2019
  • 2. 2 Overview of STI versus API Tank Inspections So you have Aboveground Storage Tanks (ASTs) at your facility. Which tank inspection protocol applies? • Steel Tank Institute STI SP001 OR • American Petroleum Institute API 653 ?
  • 3. 3 Why Inspect ASTs? Regulatory Drivers EPA – SPCC (40 CFR 112. 8(c)(6)): • Test or inspect each aboveground container for integrity • Accordance with industry standards State and Local Regulations • Health and Environmental Protection Agencies • Building Codes • Fire Codes Best Practices • Reduce Risk/Costs (Spills, Clean up , Product loss)
  • 4. 4 STI SP001 Standard (6th Edition, January 2018) Inspection and evaluation criteria required to determine suitability for continued service. Inspect to identify the condition of and changes to AST. • ASTs storing flammable and combustible liquids at atmospheric pressure • Can be applied to AST storing other liquids following proper evaluation Applicability • Shop-Built/Fabricated AST – Horizontal or Vertical, Single or Double Walled • Steel Diked AST – Open or Closed • Concrete Exterior AST • Field-Erected AST – Limited Size • Portable Containers – Drums, Totes (IBCs) – Plastic, Steel, Stainless
  • 5. 5 STI SPOO1 Inspection Components Primary tank – thickness determination Secondary tank (if present) Tank foundation, supports and anchors Tank gauges and alarms Overfill valves and alarms Insulation covering Tank appurtenances Normal vents Emergency vents Release prevention barriers Spill control systems Tank valves and connections (piping) Example Periodic Inspection Checklist provided in Standard
  • 6. 6 Shop-Fabricated AST Welded carbon or stainless steel AST fabricated in manufacturing facility • Capacity of 75,000 gallons or less • Constructed in accordance with UL 142, UL 2085, UL 2080, UL 2244, UL 2245, SwRI 93-01, SwRI 97-04, or STI (AST F911, AST F921) standards How to determine if you have a Shop- Fabricated AST? • Manufacturer Tank Plate • Standard Certification Plate • Capacity • Lifting Lugs • Tank Specifications • Owner Purchase Records
  • 7. 7 Evidence of Shop Fabrication
  • 8. 8 Steel Diked ASTs Integral steel secondary containment dike • Open or Closed
  • 9. 9 Concrete Exterior ASTs UL 2085 • Steel Tank • Integral containment liner • Concrete Shell
  • 10. 10 Smaller Field-Erected ASTs Limited in size: • Greater than 75,000 gallons • 50 feet maximum height • 30 feet maximum diameter • Equates to ~264,000 gallons • Shell thickness less than ½ inch and bottom thickness equal to ¼ inch AST Type and Capacity Category 1 Category 2 Category 3 Field-erected AST P, E(5), I (10) P, E&L (5), I (10) P, E&L (5), I (10)
  • 11. 11 STI SPOO1 Inspection Frequency Risk Based Hierarchy Inspection Matrix AST Type and Size (Us Gallons) Category 1 Category 2 Category 3 Shop / Fabricated ASTs 0 – 1100 gal. P P P, E & L (10) 1101 – 5000 gal. P P, E & L (10) [P, E & L (5), I (10)] OR [P, L (2), E (5)] 5001 – 30,000 gal. P, E (20) [P, E (10), I (20)] OR [P, E (5), L (10)] [P, E & L (5), I (10)] OR [P, L (1), E (5)] 30,001 – 75,000 gal. P, E (20) P, E & L (5), I (15) [P, E & L (5), I (10)] Portable Containers P P P** R I S K R I S K
  • 12. 12 STI SPOO1 Definitions Continuous Release Detection Method (CRDM) • Inherent design - passive • Liquid releases are detected visually • Release prevention barrier (RPB) • Secondary containment AST, including double-wall AST or double-bottom AST • Elevated AST, with or without release prevention barrier Release Prevention Barrier (RPB) • Liquid containment barrier under the AST • Steel (as in steel double bottom tanks) • Concrete foundation pad or dike floor • Elastomeric liners or other suitable materials Spill Control = Secondary Containment • Dike (concrete, earth, steel) • Double-walled • Remote Impoundment Overfill Prevention Procedures or devices used to prevent liquid in ASTs from running over or spilling out of the AST during the filling process
  • 13. 13 AST Category Chart (from STI SP001 Table A2.2): Tank Configuration Tank has Spill Control? Tank has CRDM? AST Category Single wall vertical AST in contact with ground and no spill control No No 3 Single wall vertical AST in contact with ground in an earthen dike Yes No 2 Single wall vertical AST in concrete dike with concrete floor. Concrete floor extends under tank completely Yes Yes 1 Single wall vertical AST in dike with elastomeric liner. Liner extends under tank completely Yes Yes 1 Single wall vertical AST installed on gravel and no spill control No No 3 Single wall vertical AST installed on gravel in an earthen dike Yes No 2 Elevated AST with spill control Yes Yes 1 Elevated AST without spill control No Yes 3 AST with double-bottom and spill control Yes Yes 1 Double-wall AST with overfill prevention Yes Yes 1 Double-wall AST without overfill prevention No Yes 3 Concrete exterior AST with overfill prevention Yes Yes 1 Concrete exterior AST without overfill prevention No Yes 3
  • 14. 14 STI SPOO1 Inspection Types P- Periodic AST Inspection – owner’s inspector knowledgeable in the tank operation – Monthly and Annual frequency E- Formal External Inspection (FEI) by certified STI inspector I-Formal Internal Inspection (FII) by certified STI inspector L-Leak test by owner or owner’s designee (#) indicates maximum inspection interval in years. For example, E(20) indicates formal external inspection every 20 years
  • 15. 15 STI SPOO1 Inspection Frequency Risk Based Hierarchy Inspection Matrix AST Type and Size (Us Gallons) Category 1 Category 2 Category 3 Shop / Fabricated ASTs 0 – 1100 gal. P P P, E & L (10) 1101 – 5000 gal. P P, E & L (10) [P, E & L (5), I (10)] OR [P, L (2), E (5)] 5001 – 30,000 gal. P, E (20) [P, E (10), I (20)] OR [P, E (5), L (10)] [P, E & L (5), I (10)] OR [P, L (1), E (5)] 30,001 – 75,000 gal. P, E (20) P, E & L (5), I (15) [P, E & L (5), I (10)] Portable Containers P P P** R I S K R I S K
  • 16. 16 API 653 Standard (5th Edition, November 2014) Steel storage tanks built to API 650 or older API 12C. Minimum requirements for maintaining the integrity of tanks after placed in service Addresses inspection, repair, alteration, relocation, and reconstruction of ASTs. • Assess suitability for continued use • Assess Brittle Fracture Risk • Recognizes fitness-for-service assessment concepts
  • 17. 17 API 653 Inspection Components • Tank Foundation • Bottom – flaw and thickness detection • Shell – flaw and thickness detection • Brittle Fracture/Failure Assessment • Structure • Roof • Attached Appurtenances • Nozzles to face of 1st flange, 1st threaded joint, or 1st welding-end connection Example Inspection Checklist provided in Standard
  • 18. 18 Field-Erected AST Applicability • Capacity greater than 75,000 gallons • Size greater than 50 feet in height and 30 feet in diameter • Welded or Riveted How to determine if you have a Field-Erected AST? • Manufacturer Tank Plate • Standard Certification Plate • Capacity • No Lifting Lugs • Rounded Stairway • Tank Specifications • Owner Purchase Records
  • 19. 19 API 653 Inspection Frequency Routine In-Service Inspections • Owner personnel knowledgeable in tank system and operation • Monthly External Inspections • Authorized API 653 Inspector • In service • Ultrasonic thickness inspection • Every 5 years Internal Inspections • Authorized API 653 Inspector • Out of service • Assessment of tank bottom condition • Calculated according the API 653, Section 6.4.2 (corrosion rate determination)
  • 20. 20 API 653 Inspection Frequency Initial Internal Inspections Intervals • 10 years from date of initial service, or • According to Risk-Based Inspection (RBI) Assessment criteria Tank Safeguard Max. Initial Interval i) Original nominal bottom thickness 5/16 in. or greater 12 years ii) Cathodic protection of the soil-side of the primary tank bottom per Note 1 12 years iii) Thin-film lining of the product-side of the tank bottom per Note 2 12 years iv) Fiberglass-reinforced lining of the product-side of the tank bottom per Note 2 13 years v) Cathodic protection plus thin-film lining 14 years vi) Cathodic protection plus fiberglass-reinforced lining 15 years vii) Release prevention barrier per Note 3 (when similar service assessment performed) 20 years viii) Release prevention barrier per Note 3 (when RBI assessment performed) 25 years NOTE 1 For the purposes of 6.4.2.1, effective cathodic protection of the soil-side of the primary tank bottom means a system installed and maintained in accordance with API 651. NOTE 2 For purposes of 6.4.2.1, lining of the product-side of the tank bottom means a lining installed, maintained and inspected in accordance with API 652. NOTE 3 For purposes of 6.4.2.1, a release prevention barrier means an under-bottom leak detection and containment system designed in accordance with API 650, Appendix I.
  • 21. 21 API 653 Inspection Frequency Subsequent Internal Inspection Intervals • Determined in accordance with corrosion rate procedure calculations • RBI procedures • Not to exceed maximum intervals Procedure Used Max. Interval i) Corrosion rate procedures in 6.4.2.3 20 years ii) RBI assessment per 6.4.2.4 25 years iii) RBI assessment per 6.4.2.4 and a release prevention barrier per Note 30 years NOTE For purposes of 6.4.2.2, a release prevention barrier means an under-bottom leak detection and containment system designed in accordance with API 650, Appendix I.
  • 22. 22 Comparison STI SP001 vs. API 653 Regulatory Compliance • Both Standards provide compliance for tank integrity inspection for SPCC and local environmental regulations Risk Based Benefit • Both Standards provide reduction in inspection frequency for use of release prevention barrier for reduced spill risk Applicability • STI SP001 – All configurations of shop-built tanks and smaller field-erected tanks. • API 653 - Field-erected tanks (welded or riveted). Also includes guidance for repair, alteration, relocation. Cost • STI SP001 - $700 to $2,000 depending upon tank configuration, insulation, economy of scale • API 653 - $3,500 to $5,500 depending upon tank configuration and economy of scale
  • 23. 23 Overview of STI SP001 vs. API 653 Questions? Gary Diewald, P.E. Gary.Diewald@anteagroup.com