Measuring and reporting project metrics
2
Visualize and navigate by geographical location
3
Access P6 Analytics on the go
4
Challenge #3 – Make better use of scarce resources
and deliver to expectations
• Improving the accuracy of schedules and forecasts
• No common method for communicating risk, likelihood and possible impact
clearly to prompt mitigating action and justify proposed spends
Challenge
• Develop & deploy an enterprise risk solution to manage risk and contingency
planning
Solution
5
Project risk management and mitigation strategies
9
Challenge #4 – Poor coordination and tracking of
communication between internal & external parties
• Inefficient work processes, document coordination, and collaboration for
internal and external resources increasing the impact on cost, schedule,
scope and quality of projects and programs
• Thousands of documents, formats, sources…so, insufficient or missing
documentation for claims
Challenge
• Develop standards and repeatable processes for managing programs/projects
• Store documents in a centralized repository with real-time access by all parties
Solution
10
Easily
maintain a
clear,
complete
and search-
able record
for claims
protection
Efficiently manage and control documents
11
Hold internal
and external
team members
accountable
Efficiently manage and control documents
12
Quickly identify
holdups and…
Efficiently manage and control documents
13
impact on
schedule
Quickly identify
holdups and…
Efficiently manage and control documents
14
Challenge #5 - Managing change orders and RFIs
• Governance & rigor for change process
• Slow RFI response times lead to increased cost and possibly project delays
Challenge
• End-to-end change management solution
Solution
15
Managing RFIs electronically
Operate
17
Challenge #1 – Inefficient processes for managing
work orders
• Utilize manual, homegrown systems to schedule work orders and assign
resources …so they don’t optimize resources
Challenge
• Integrate best of breed systems to provide accurate and timely forecasting of
cost, schedule and resources to completion
• Provide one access point for all project and resource information
Solution
18
Optimization through integrated work management
with EAM (Enterprise Asset Mgmt)
19
Import work orders from EAM → sequence them
according to priority and resource availability → send
dates back to EAM
20
One access point for all project information
Sample integration with SAP via Inspire
21
Challenge #2 – Inefficient use of craft labor
• Low craft productivity (Avg is 35%) due to poor planning and utilization
• Difficulty managing emergent (unplanned) work due to lack of enterprise-wide
resource visibility
Challenge
• Visualize leveling resources to optimize utilization
• Optimize resource utilization on the critical path during shutdowns/outages
Solution
22
Visualize resources across all types of work
Capital, Routine/Daily, Shutdown/Turnaround/Outage
23
Optimize resource utilization
Consolidated repository; Powerful, flexible resource analysis
24
Resource leveling to optimize craft productivity
25
Visualize sequence of activities
26
Challenge #3 – Aging workforce
• Knowledge “walking out the door”
• Inability to capture best practices
Challenge
• Deploy a knowledge retention strategy
Solution
27
Use templates to capture best practices of retiring
workforce
• Quickly “ramp up”
new hires
• Drive operational
savings through
standardized project
management
approaches
Oracle eppm for asset intensive industries ppt part 2

Oracle eppm for asset intensive industries ppt part 2

  • 1.
  • 2.
    2 Visualize and navigateby geographical location
  • 3.
  • 4.
    4 Challenge #3 –Make better use of scarce resources and deliver to expectations • Improving the accuracy of schedules and forecasts • No common method for communicating risk, likelihood and possible impact clearly to prompt mitigating action and justify proposed spends Challenge • Develop & deploy an enterprise risk solution to manage risk and contingency planning Solution
  • 5.
    5 Project risk managementand mitigation strategies
  • 6.
    9 Challenge #4 –Poor coordination and tracking of communication between internal & external parties • Inefficient work processes, document coordination, and collaboration for internal and external resources increasing the impact on cost, schedule, scope and quality of projects and programs • Thousands of documents, formats, sources…so, insufficient or missing documentation for claims Challenge • Develop standards and repeatable processes for managing programs/projects • Store documents in a centralized repository with real-time access by all parties Solution
  • 7.
    10 Easily maintain a clear, complete and search- ablerecord for claims protection Efficiently manage and control documents
  • 8.
    11 Hold internal and external teammembers accountable Efficiently manage and control documents
  • 9.
  • 10.
    13 impact on schedule Quickly identify holdupsand… Efficiently manage and control documents
  • 11.
    14 Challenge #5 -Managing change orders and RFIs • Governance & rigor for change process • Slow RFI response times lead to increased cost and possibly project delays Challenge • End-to-end change management solution Solution
  • 12.
  • 13.
  • 14.
    17 Challenge #1 –Inefficient processes for managing work orders • Utilize manual, homegrown systems to schedule work orders and assign resources …so they don’t optimize resources Challenge • Integrate best of breed systems to provide accurate and timely forecasting of cost, schedule and resources to completion • Provide one access point for all project and resource information Solution
  • 15.
    18 Optimization through integratedwork management with EAM (Enterprise Asset Mgmt)
  • 16.
    19 Import work ordersfrom EAM → sequence them according to priority and resource availability → send dates back to EAM
  • 17.
    20 One access pointfor all project information Sample integration with SAP via Inspire
  • 18.
    21 Challenge #2 –Inefficient use of craft labor • Low craft productivity (Avg is 35%) due to poor planning and utilization • Difficulty managing emergent (unplanned) work due to lack of enterprise-wide resource visibility Challenge • Visualize leveling resources to optimize utilization • Optimize resource utilization on the critical path during shutdowns/outages Solution
  • 19.
    22 Visualize resources acrossall types of work Capital, Routine/Daily, Shutdown/Turnaround/Outage
  • 20.
    23 Optimize resource utilization Consolidatedrepository; Powerful, flexible resource analysis
  • 21.
    24 Resource leveling tooptimize craft productivity
  • 22.
  • 23.
    26 Challenge #3 –Aging workforce • Knowledge “walking out the door” • Inability to capture best practices Challenge • Deploy a knowledge retention strategy Solution
  • 24.
    27 Use templates tocapture best practices of retiring workforce • Quickly “ramp up” new hires • Drive operational savings through standardized project management approaches