                           National Guard
                         Black Belt Training
                              Module 01

                             Introduction


                                               UNCLASSIFIED / FOUO

                                                   UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO




Learning Objectives

        Class introductions
        Review training materials and software
        Establish code of conduct, expectations, and logistics
        Understand the adult learning environment
        Review CPI methodology and topics to be covered in class
        Use data to establish a Continuous Process Improvement
         (CPI) baseline for the class
        Establish project presentation expectations


                                                                              2


                                                             UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO




Class Introductions

         Name
         Organization/division/unit/location
         Years experience
         Hobby/interest/fun fact
         Project problem statement
         Expectations for class



                                                                 3


                                                UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO




Ground Rules
         Cell phones, blackberries, pagers etc. turned off
         One conversation at a time
         Treat everyone with respect
         Interaction is essential – Ask questions / participate
         Share experiences that relate to the topic
         Be on time
         Take frequent breaks to stay fresh
         Have fun!
         Others: ____________________________
                                                                           4


                                                          UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO




Classroom Logistics
         Class hours
         Safety
               Fire exits and where to congregate
               Trips and other hazards
         Restroom facilities
         Breaks
         Lunch accommodations
         Others?

                                                                      5


                                                     UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO




Module Format
           Learning Objectives / Agenda
           Lecture
           Exercises
           Takeaways
           Q&A
           Parking lot
           Plusses (+) and deltas (   )
           Knowledge assessments and course evaluations
                                                                        6


                                                       UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO




How Do We Learn?
                       Teaching                Retention
                                                           Characteristics
                      Techniques                 Rate
                                                           Time Pressured
                      Presentation                5%       Content Focused
                                                            Spray and Pray
                      Reading                    10%

                      Audio-Visual               20%

                      Demonstration              30%

                      Discussion Group           50%

                      Practice with Feedback     75%
                                                           Learner Focused
                      Teach Others/Immediate Use 80%          Interactive
                                                           Time-Consuming
                                                                                      7


                                                                     UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO




Our Learning Environment
         Pre-work (Project Charter)
         Classroom concept lecture/discussion
         Classroom application – Instructor-led
         Classroom application – Team-led
         Classroom team teach back
         Homework assignments and debrief
         Knowledge assessments – Individual
         Application to your project – BB-led
                                                                    8


                                                   UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO




Our Learning Focus - CPI Methods and Tools
         CPI methodologies
         complement each                                               DMAIC Methods
               other                                                   Product or Service Outputs




                                                                       Six Sigma Tools Increase
                                                                        Effectiveness
                              Lean Tools Increase Efficiency                 Reduce Variation
                               Simplify Work Flows
                                                                             Eliminate Defects
                               Focus On High-value Steps

                               Eliminate Waste




                                                                                        The customer is the
                                                                                       driving force behind all
                      “As-Is Flow”                      “To-Be Flow”
                                                                                        improvement efforts

                                                                                                                             9


                                                                                                            UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO




CPI Methods

           DMAIC
                One of several Lean Six Sigma methodologies
                 providing a structured approach to problem-solving
                 within the following 5 phases: Define, Measure,
                 Analyze, Improve and Control
           8-Step Process
                AFSO21 structured approach to Lean problem-solving
                 using an 8-step process

                                                                                6. See
    1.Validate         2. Identify      3. Set     4. Determine   5. Develop              7. Confirm      8. Standardize
                                                                               Counter-
       the            Performance    Improvement       Root        Counter-                Results          Successful
                                                                               Measures
     Problem              Gaps         Targets         Cause      Measures                & Process          Processes
                                                                               Through

                                                                                                                       10


                                                                                                       UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO




CPI Tools
      “Six     Sigma”
           Term originally comes from statistics
           Statistics help us measure and understand both individual data points,
            averages, and variation in a process or service
             Primary focus is achieving improvements in service quality and cost

      “Lean”
           Focus is eliminating non-customer value added waste in a process or
            service
           Result is reducing service lead times, improving on-time delivery
            performance, and reducing cost

      “Lean          Six Sigma”
           Combines the speed and power of both Lean and Six Sigma tools
           “Only a fast and responsive process is capable of achieving high quality,
            and only a high quality process can sustain high velocity”
                                                                                               11


                                                                               UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO




CPI Process Road Map - Overview
                                                                   8-STEP PROCESS
                                                                                                             6. See
     1.Validate              2. Identify           3. Set          4. Determine           5. Develop                       7. Confirm        8. Standardize
                                                                                                            Counter-
        the                 Performance         Improvement            Root                Counter-                         Results            Successful
                                                                                                            Measures
      Problem                   Gaps              Targets              Cause              Measures                         & Process            Processes
                                                                                                            Through

           Define                    Measure                         Analyze                           Improve                      Control

 • Identify Problem          • Map Current Process           • Identify Potential Root     • Develop Potential Solutions    • Implement Mistake Proofing
 • Validate Problem          • Go & See Process                Causes (Fishbone, 5         • Develop Evaluation Criteria    • Develop SOPs, Training Plan
 • Establish Strategic       • Identify Bottlenecks            Whys, etc)                  • Select Best Solutions           and Process Controls
   Alignment                 • Create Value Stream Map       • Reduce List of Potential    • Apply Lean Concepts            • Implement Solution
 • Gather Voice of the       • Identify Key Input, Process     Root Causes (Affinity,      • Develop Future State           • Establish Ongoing Process
   Customer & Business         and Output Metrics              Pareto, etc)                  Process Map(s)                   Measurements
 • Create Goal Statement     • Develop Operational           • Confirm Root Cause to       • Develop Pilot Plan             • Identify Project Replication
 • Validate Business Case      Definitions                     Output Relationship         • Pilot Solution                   Opportunities
 • Determine Scope           • Develop Data Collection       • Estimate Impact of Root     • Develop Full Scale Action /    • Estimate Final Financial /
 • Select Team                 Plan                            Causes on Key Outputs         Implementation Plan              Operational Benefits
 • Develop Timeline          • Validate Measurement            (Hypothesis Tests,          • Complete Improve Gate          • Transition Project to Process
 • Communicate Plan            System                          Regression, etc)                                               Owner
 • High-Level Process Map    • Collect Baseline Data         • Prioritize Root Causes                                       • Develop Audit / Response
 • Complete Define Gate      • Identify Performance Gaps       (XY Matrix, etc)                                               Plan
                             • Complete SWOT Analysis        • Complete Analyze Gate                                        • Create Final Storyboard
                             • Estimate Financial /                                                                         • Complete Control Gate
                               Operational Benefits
                             • Determine Process Stability
                             • Determine Process                            Integrated CPI Methods & Tools                                                    12
                               Capability
                             • Complete Measure Gate
                                                                                                                                        UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO




Six Sigma Baseline
    Where are we as a class? Our personal knowledge:
          1 – I have never used statistical methods
          2 – I use some data occasionally
          3 – I use data frequently
          4 – I almost always use data and know what to do with it
          5 – I should be teaching this stuff




                                                                            13


                                                            UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO




Lean Baseline
       Where are we as a class? Our personal knowledge:
             1 – I have never used lean tools/techniques
             2 – I use lean tools sometimes
             3 – I use lean tools a lot
             4 – I always use lean, in any process/environment
             5 – I should be teaching this stuff




                                                                              14


                                                              UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO

   UNCLASSIFIED / FOUO




                           National Guard
                         Black Belt Training
                         Project Presentations




                                                 UNCLASSIFIED / FOUO

                                                     UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO




Project Presentations – Overview
     All   students - be prepared to give a short visual and
         oral presentation of your project
             At the beginning of the week, post your visual project presentation
              on a prominent section of the classroom wall
             Throughout the week, 10 students will be selected at random to
              provide an oral presentation of their project to the class
             Presentations should be concise and well practiced (< 5 minutes)
             Presentations will be followed by a short Q&A (< 3 minutes)

      Why?
             Receive feedback on use of CPI problem solving methodology/tools
             Develop public speaking skills and practice presentation style
             Learn about other student projects
                                                                                         16


                                                                         UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO




Project Presentations – Week 2
      For   Week 2, each student should post their Project
         Charter presentation on a prominent section of the
         classroom wall
      Each           Project Charter presentation should include:
              Project name and description
              Project goal, scope, objectives
              Current and expected impact on customers
              Connection to organization / unit strategy
              Anticipated budget impact
              Sponsoring organization and team members
              Timeline for completion
                                                                                     17


                                                                     UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO




Project Presentations – After Week 2
      At   the beginning of each week, students should post
         their Project Storyboard presentation on a prominent
         section of the classroom wall
      Each           Storyboard presentation should:
             Show current project status
             Support “tell a story”
             Follow the 8-Step/DMAIC process to structure and organize the
              tools used
             Be readable (summarize and condense exhibits, as needed)
             Use arrows, call out boxes, and balloons to highlight questions,
              key leanings, risks & issues, etc.
             Display data supporting findings and conclusions
                                                                                          18


                                                                          UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO




DMAIC Project “Storyboard” – Example
  Define                                          1.2 Day
                Project Charter                   CCR Gap                                                           Sigma
                                                                                                                 Performanc
   BUS CASE: Be #2 Fin Service Provider                                                                           e Level of
                                                                                                                     1.3
   GOAL: Reduce Loan/Lease CT from
   9.2 to 8.0 days by July 1
                                                                                             Measure
   FIN IMPACT: $2.7M per year                    Analyze
           Potential Root Causes




                                                                                             Control




                                                                      Improve
                                                            Loan or
                                                                                Pilot Plan
                                                            Lease
                                                            Screen                                      “Officer performs
                                                            Entry                                       both” & “Officers
                                                                                                            changed”,
                                                            Color
                                                                                                          eliminated as
                                                            Printouts
                                                                                                       contributors to high
                                                            Rewards                                         lead time.
                                                            & Recog
Officer Work & Turnover, Waiting, & Automation                                                                                 19
    Affect CT; Job Aids affect Variation in CT              Flex
                                                            Time
                                                                                                        UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO




8-Step A3 Project Summary Report
               Company:                 Department:        Date:              Prepared by:
              1. Define the problem situation              3. Action plans to correct problems




             2. Problem Analysis                           4. Results of Activity




                                                           5. Future Steps




                                                 Source: Toyota Way Fieldbook by Liker and Meier, McGraw Hill, c 2006
                                                                                                                     20


                                                                                                     UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO




Takeaways
      Introduction          to class instructors and participants
      Code           of conduct, expectations, and class logistics
      An   understanding of the learning process, learning
         environment, and CPI learning focus
      Appreciation  of our baseline familiarity and comfort level
         working with Six Sigma and Lean
      Project         presentation format and expectations




                                                                                      21


                                                                      UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO




        What other comments or questions
                  do you have?




                                                     22


                                     UNCLASSIFIED / FOUO

NG BB 01 Introduction

  • 1.
    UNCLASSIFIED / FOUO UNCLASSIFIED / FOUO National Guard Black Belt Training Module 01 Introduction UNCLASSIFIED / FOUO UNCLASSIFIED / FOUO
  • 2.
    UNCLASSIFIED / FOUO LearningObjectives  Class introductions  Review training materials and software  Establish code of conduct, expectations, and logistics  Understand the adult learning environment  Review CPI methodology and topics to be covered in class  Use data to establish a Continuous Process Improvement (CPI) baseline for the class  Establish project presentation expectations 2 UNCLASSIFIED / FOUO
  • 3.
    UNCLASSIFIED / FOUO ClassIntroductions  Name  Organization/division/unit/location  Years experience  Hobby/interest/fun fact  Project problem statement  Expectations for class 3 UNCLASSIFIED / FOUO
  • 4.
    UNCLASSIFIED / FOUO GroundRules  Cell phones, blackberries, pagers etc. turned off  One conversation at a time  Treat everyone with respect  Interaction is essential – Ask questions / participate  Share experiences that relate to the topic  Be on time  Take frequent breaks to stay fresh  Have fun!  Others: ____________________________ 4 UNCLASSIFIED / FOUO
  • 5.
    UNCLASSIFIED / FOUO ClassroomLogistics  Class hours  Safety  Fire exits and where to congregate  Trips and other hazards  Restroom facilities  Breaks  Lunch accommodations  Others? 5 UNCLASSIFIED / FOUO
  • 6.
    UNCLASSIFIED / FOUO ModuleFormat  Learning Objectives / Agenda  Lecture  Exercises  Takeaways  Q&A  Parking lot  Plusses (+) and deltas ( )  Knowledge assessments and course evaluations 6 UNCLASSIFIED / FOUO
  • 7.
    UNCLASSIFIED / FOUO HowDo We Learn? Teaching Retention Characteristics Techniques Rate Time Pressured Presentation 5% Content Focused Spray and Pray Reading 10% Audio-Visual 20% Demonstration 30% Discussion Group 50% Practice with Feedback 75% Learner Focused Teach Others/Immediate Use 80% Interactive Time-Consuming 7 UNCLASSIFIED / FOUO
  • 8.
    UNCLASSIFIED / FOUO OurLearning Environment  Pre-work (Project Charter)  Classroom concept lecture/discussion  Classroom application – Instructor-led  Classroom application – Team-led  Classroom team teach back  Homework assignments and debrief  Knowledge assessments – Individual  Application to your project – BB-led 8 UNCLASSIFIED / FOUO
  • 9.
    UNCLASSIFIED / FOUO OurLearning Focus - CPI Methods and Tools CPI methodologies complement each DMAIC Methods other Product or Service Outputs Six Sigma Tools Increase Effectiveness Lean Tools Increase Efficiency  Reduce Variation  Simplify Work Flows  Eliminate Defects  Focus On High-value Steps  Eliminate Waste The customer is the driving force behind all “As-Is Flow” “To-Be Flow” improvement efforts 9 UNCLASSIFIED / FOUO
  • 10.
    UNCLASSIFIED / FOUO CPIMethods  DMAIC  One of several Lean Six Sigma methodologies providing a structured approach to problem-solving within the following 5 phases: Define, Measure, Analyze, Improve and Control  8-Step Process  AFSO21 structured approach to Lean problem-solving using an 8-step process 6. See 1.Validate 2. Identify 3. Set 4. Determine 5. Develop 7. Confirm 8. Standardize Counter- the Performance Improvement Root Counter- Results Successful Measures Problem Gaps Targets Cause Measures & Process Processes Through 10 UNCLASSIFIED / FOUO
  • 11.
    UNCLASSIFIED / FOUO CPITools  “Six Sigma”  Term originally comes from statistics  Statistics help us measure and understand both individual data points, averages, and variation in a process or service  Primary focus is achieving improvements in service quality and cost  “Lean”  Focus is eliminating non-customer value added waste in a process or service  Result is reducing service lead times, improving on-time delivery performance, and reducing cost  “Lean Six Sigma”  Combines the speed and power of both Lean and Six Sigma tools  “Only a fast and responsive process is capable of achieving high quality, and only a high quality process can sustain high velocity” 11 UNCLASSIFIED / FOUO
  • 12.
    UNCLASSIFIED / FOUO CPIProcess Road Map - Overview 8-STEP PROCESS 6. See 1.Validate 2. Identify 3. Set 4. Determine 5. Develop 7. Confirm 8. Standardize Counter- the Performance Improvement Root Counter- Results Successful Measures Problem Gaps Targets Cause Measures & Process Processes Through Define Measure Analyze Improve Control • Identify Problem • Map Current Process • Identify Potential Root • Develop Potential Solutions • Implement Mistake Proofing • Validate Problem • Go & See Process Causes (Fishbone, 5 • Develop Evaluation Criteria • Develop SOPs, Training Plan • Establish Strategic • Identify Bottlenecks Whys, etc) • Select Best Solutions and Process Controls Alignment • Create Value Stream Map • Reduce List of Potential • Apply Lean Concepts • Implement Solution • Gather Voice of the • Identify Key Input, Process Root Causes (Affinity, • Develop Future State • Establish Ongoing Process Customer & Business and Output Metrics Pareto, etc) Process Map(s) Measurements • Create Goal Statement • Develop Operational • Confirm Root Cause to • Develop Pilot Plan • Identify Project Replication • Validate Business Case Definitions Output Relationship • Pilot Solution Opportunities • Determine Scope • Develop Data Collection • Estimate Impact of Root • Develop Full Scale Action / • Estimate Final Financial / • Select Team Plan Causes on Key Outputs Implementation Plan Operational Benefits • Develop Timeline • Validate Measurement (Hypothesis Tests, • Complete Improve Gate • Transition Project to Process • Communicate Plan System Regression, etc) Owner • High-Level Process Map • Collect Baseline Data • Prioritize Root Causes • Develop Audit / Response • Complete Define Gate • Identify Performance Gaps (XY Matrix, etc) Plan • Complete SWOT Analysis • Complete Analyze Gate • Create Final Storyboard • Estimate Financial / • Complete Control Gate Operational Benefits • Determine Process Stability • Determine Process Integrated CPI Methods & Tools 12 Capability • Complete Measure Gate UNCLASSIFIED / FOUO
  • 13.
    UNCLASSIFIED / FOUO SixSigma Baseline  Where are we as a class? Our personal knowledge:  1 – I have never used statistical methods  2 – I use some data occasionally  3 – I use data frequently  4 – I almost always use data and know what to do with it  5 – I should be teaching this stuff 13 UNCLASSIFIED / FOUO
  • 14.
    UNCLASSIFIED / FOUO LeanBaseline  Where are we as a class? Our personal knowledge:  1 – I have never used lean tools/techniques  2 – I use lean tools sometimes  3 – I use lean tools a lot  4 – I always use lean, in any process/environment  5 – I should be teaching this stuff 14 UNCLASSIFIED / FOUO
  • 15.
    UNCLASSIFIED / FOUO UNCLASSIFIED / FOUO National Guard Black Belt Training Project Presentations UNCLASSIFIED / FOUO UNCLASSIFIED / FOUO
  • 16.
    UNCLASSIFIED / FOUO ProjectPresentations – Overview All students - be prepared to give a short visual and oral presentation of your project  At the beginning of the week, post your visual project presentation on a prominent section of the classroom wall  Throughout the week, 10 students will be selected at random to provide an oral presentation of their project to the class  Presentations should be concise and well practiced (< 5 minutes)  Presentations will be followed by a short Q&A (< 3 minutes)  Why?  Receive feedback on use of CPI problem solving methodology/tools  Develop public speaking skills and practice presentation style  Learn about other student projects 16 UNCLASSIFIED / FOUO
  • 17.
    UNCLASSIFIED / FOUO ProjectPresentations – Week 2  For Week 2, each student should post their Project Charter presentation on a prominent section of the classroom wall  Each Project Charter presentation should include:  Project name and description  Project goal, scope, objectives  Current and expected impact on customers  Connection to organization / unit strategy  Anticipated budget impact  Sponsoring organization and team members  Timeline for completion 17 UNCLASSIFIED / FOUO
  • 18.
    UNCLASSIFIED / FOUO ProjectPresentations – After Week 2  At the beginning of each week, students should post their Project Storyboard presentation on a prominent section of the classroom wall  Each Storyboard presentation should:  Show current project status  Support “tell a story”  Follow the 8-Step/DMAIC process to structure and organize the tools used  Be readable (summarize and condense exhibits, as needed)  Use arrows, call out boxes, and balloons to highlight questions, key leanings, risks & issues, etc.  Display data supporting findings and conclusions 18 UNCLASSIFIED / FOUO
  • 19.
    UNCLASSIFIED / FOUO DMAICProject “Storyboard” – Example Define 1.2 Day Project Charter CCR Gap Sigma Performanc BUS CASE: Be #2 Fin Service Provider e Level of 1.3 GOAL: Reduce Loan/Lease CT from 9.2 to 8.0 days by July 1 Measure FIN IMPACT: $2.7M per year Analyze Potential Root Causes Control Improve Loan or Pilot Plan Lease Screen “Officer performs Entry both” & “Officers changed”, Color eliminated as Printouts contributors to high Rewards lead time. & Recog Officer Work & Turnover, Waiting, & Automation 19 Affect CT; Job Aids affect Variation in CT Flex Time UNCLASSIFIED / FOUO
  • 20.
    UNCLASSIFIED / FOUO 8-StepA3 Project Summary Report Company: Department: Date: Prepared by: 1. Define the problem situation 3. Action plans to correct problems 2. Problem Analysis 4. Results of Activity 5. Future Steps Source: Toyota Way Fieldbook by Liker and Meier, McGraw Hill, c 2006 20 UNCLASSIFIED / FOUO
  • 21.
    UNCLASSIFIED / FOUO Takeaways  Introduction to class instructors and participants  Code of conduct, expectations, and class logistics  An understanding of the learning process, learning environment, and CPI learning focus  Appreciation of our baseline familiarity and comfort level working with Six Sigma and Lean  Project presentation format and expectations 21 UNCLASSIFIED / FOUO
  • 22.
    UNCLASSIFIED / FOUO What other comments or questions do you have? 22 UNCLASSIFIED / FOUO