LINE 1 MUMBAI METRO OVERVIEW
Location- Mumbai, Maharashtra.
Terminal- Versova, Ghatkopar
Stations- 12
Operator- MOOPL
Rolling Stock- CSSR Puzhen
Daily Ridership- 4 lacs
PROJECT DESCRIPTION
• Government of Maharashtra (GOM) through the Mumbai
metropolitan region development authority (MMRDA) as
planned 146km long rail based Mass Rapid transit system
(MRTS)
• 1st corridor of the project is from the Versova Andheri
Ghatkopar line shall be elevated with root length of 11km with
12 stations in the car depot at D.N nagar
• Minimum curvature of line shall be 100mters and minimum
ground clearance 5.5 meters.
● The existing sub uran train connects north and south Bombay where as
this project provides connectivity between East - West rail to central
nad western suburbs
● Total time taken would be 21mins where as other modes of transport
takes 90mins
● Mumbai Metro runs On a elevator couridor which is full air
conditioner world class coaches, elevator and escalator at station,
automatic fare collection system and high level security system.
PPP STRUCTURE
• This project is a BOOT basis for a 35 years including construction
period of 5 years awarded by MMRDA. Under the construction
aggreement the concessionaire as to design , finance, construct,
operate, own and maintain the first corider and transfer the owner
ship and assets at the end of concession period.
• SVP named Mumbai Metro One Private Limited(MMOPL) formed
with reliance energy limited, veolia transport and and MMRDA.
FINANCING INFORMATION
• The total estimation of the project was 2356 crores
• The project was financed on the basis of viability grant by
GOI( 20%-470 crores) and GOM (7.5%- 180crores).
• The financing pattern was 70% debt and 30% equity. MMRDA
and private operator contributed 466 crores.
• The consortium banks are IDBI, Karur Vysya Bank, Canara
Bank, Indian Bank and Oriental bank of Commerce.
Viability Grant- a capital grant or subsidy or equity from
the Central or State Governments to render a Public
Private Partnership (PPP) project financially viable and
bankable.
Viability Gap Funding 650
Debt 1240
Equity 466
Total 256
The cost of borrowing for the rupee component, which constitutes
about 75 per cent of the total debt, the foreign currency loan will be at
3.5 per cent above LIBOR(London Inter-Bank Offered Rate).
Particulars With VGF Support
Project IRR 8%
Equity IRR 15%
Debt equity Ratio 70:30
IRR- Internal Rate of Return
•First
conceptuali
zed in 1997
INCEPTION
•Feasbility
study in
1997-2000
FEASIBILITY •Bids Invited in
August 2004
and successful
bidder chosen
in May 2006
PROCUREMENT
Development
commenced in
2008
DEVELOPMENT
• Ghatkopar-
Versova-
Andheri line
was delivered
in June 2014
DELIVERY
Concession
Period end.
EXIT
PROCESS ANALYSIS
Conceptualization and Feasibility
On exploring the viability of various mass transit that are efficient,
economical and environmentally friendly.
A feasibility report carried out under Indo-German Technical Co-
operation with consultancy work with TEWET in association with
DE-Consult and TCS during 1997-2000.
Study recommended Andheri-Ghatkopar was potentially
bankable and economically viable.
Procurement
The project was approved by the GoM in August 2004 global bids were Invited
through an Expression of Interest (EoI).
The bid process conducted a two stage bid-process, i.e. technical and financial
stage.
Technical bids were invited for the project in May 2005
• Hindustan Construction Company and RITES
• Reliance Energy Limited and Connex-France
• Shaktikumar Sacheti Limited and Lingkaran Metro
• Siemens, L&T, Gammon, BEML
• IL&FS and ITD Thailand and Unity Infraprojects
The consortia which qualified to submit financial proposals were:
a. Reliance Energy Limited and Connex-France
b. Siemens, L&T, Gammon, BEML
c. IL&FS and ITD Thailand and Unity Infraprojects
• Financial approvals were submitted in January 2006 only by Reliance
Energy and Connex France. Only the lowest of Financial bidder were
awarded consortium. The talks went from February to May 2006.
• REL-led consortium negotiated equity IRR of 26% to 15%. The VGF
was brought down to 650crores.
• VGF application submitted to GoM in June 2006 after successful
bidder is chosen
• The project was delayed obtaining Viability gap fund because it was
funded before model concession agreement(MCA).
MCA spells out the policy and regulatory framework
for implementation of a PPP project.
• The issue was finally resolved by grant of VGF in the form of a special
one time grant given to the state. The GoI agreed to give a special
grant of 20% of the project cost.
• The GoM approved a grant of 7.5% of project cost. The formal
approval for VGF of 650 crores was obtained much later by January
2009.
Development
The development phase of the project was initiated in parallel to the VGF
approval process.
Milestone achieved are,
 The SPV was incorporated in December 2006.
 The Engineering and Project Management Consultants,a consortium
of Parsons Brinkerhoff (USA) and Systra SA (France) joined the team
on February 14, 2007
 Signing of the Concession Agreement and Shareholders agreement
took place on March 7, 2007
 MMOPL and Government of Maharashtra entered the State Support
Agreement on April 20, 2007
 Construction commenced on February 8, 2008
 Financial Closure for the project completed on October 3, 2008
Pre-operative
risks
Risk
Period
Primary
Risk Bearer
Delay in Land
Acquisition
0-5
years
Government
Financing Risk 0-5
years
Private
sector
Planning 0-5
years
Private
sector
Regulatory,
Administrative and
approval delay.
0-5
years
Private
sector
RISK ALLOCATION FRAMEWORK
Sensitivity
Construction
phase Risk
Risk Period Primary Risk
Bearer
Design Risk 0-5 years Private Sector
Construction
Risk
0-5 years Private Sector
Change in scope
Risk
0-5 years Government
Financing Risk 0-5 years Private Sector
Sensitivity
Operational
Phase Risk
Risk
Period
Primary Risk Bearer
Technology
Risk
0-35 years Private
Sector/Government
Operational
and
Maintenance
Risk
0-35 years Private Sector
Market Risk 0-30 years Private Sector
Performance
Risk
0-30 years Private Sector
Sensitivity
Handover Risk Risk Period Risk Bearer
Handover Risk 35th year Private
Sector
Private Operator
event of default
0-35 years Private
Sector
MMRDA Event
of default
0-35 years Government
Sensitivity
Other Risk Risk Period Risk Bearer
Interface Risk
(with other
metro
corridors)
Through out Private Sector
Force Majeure Through out Shared(Depend
ing on the type
of Event)
Change in Law
Risk
Through out Private Sector
Sensitivity
POST FACTO VfM ANALYSIS
• A VfM analysis for the project has not been undertaken in the Feasibility
Study.
• The quantitative analysis to assess VfM will not be practical for this project.
• It has been achieved by the private operator based on publicly available
information and discussions with officials working on the project has been
attempted.
• Reduction in financial burden on the state budget, PPP project was structured
to ensure that it was viable by providing a viability gap funding for the
project.
• The financial bid parameter was the lowest viability gap quoted.
VfM- A measure of quality that assesses the monetary cost of the product or service against the quality and/or benefits of that product or service, taking
into account subjective factors such as fitness for purpose, along with whole-of-life costs such as installation, training, maintenance and disposal, and
wastage.
• The lowest financial bid quoted was viability gap funding of 1250 crores
which was reduced after negotiations to 650 crores.
• This is estimated to be around 50-60 crores. The total taxes estimated for the
project are around 300 crores.
• Thus, effectively the government would end up with a net spending of ` 400
crores and the city would get access to an asset worth 2300 crores.
• The construction and operations of a critical infrastructure facility for a
period of 30 years with a reduced requirement of upfront money.
• Substantial risk transfer,The private sector has undertaken substantial
project risks, such as financing, construction, operations and traffic/ revenue
risks.
DISCUSSIONAND CONCLUSION
• Mumbai’s metro network will span across 357 kilometres and 14 lines with
more than 220 stations, but it is not the silver bullet that will solve commuter
woes.
• Importance of MM, The metro will provide for the first time connectivity to
airport, Nariman Point, Cuffe Parade, Kalbadevi, Worli, BKC, Airport,
SEEPZ and MIDC. Besides, two important heritage stations of Mumbai i.e.
CSTM and Church gate will also get joined through MML-3 alignment
• Fadnavis announced on 8 April 2017 that the government was considering a
circular metro loop line along the Kalyan-Dombivli-Taloja route. The
proposed 15 km line would link Kalyan and Shil Phata with 13 stations, bring
metro connectivity to Kalyan East, Dombivli, Ambernath and Diva.
• The Mumbai Metro resumed services for general public on 19 October 2020,
after being shut down since March 2020 due to the COVID-19 pandamic
Summary
• The project brings number of benefits and opportunities to the city a safe,
efficient, comfortable and state of art modern Metro system direct
connectivity to important destinations
• Environmental benefits leading to better quality of lifeEconomy benefit
(EIRR 17.93%, FIRR 2.17%)Employment and Business opportunities as Rs
23,136 Crores investments will be made in the project within 5 years
KEY LEARNING
1. Expediting the bid process is critical to ensuring a good response to the
proposal
2. Delay in obtaining VGF approval
3. Delay in approvals can potentially derail the project
4. Land Acquisition process can lead to issues in the project
5. Clear Specifications on Asset Transfer on termination
6. Public Support for the project
7. Role of Good Project Preparation

More Related Content

What's hot

Mass transit system
Mass transit systemMass transit system
Mass transit system
Sagar Kaptan
 
Delhi Metro Project Case Study
Delhi Metro Project Case Study  Delhi Metro Project Case Study
Delhi Metro Project Case Study
Soumya Bhadani
 
Introductory presentation of Samruddhi Mahamarg : (Nagpur - Mumbai Expressway)
Introductory presentation of Samruddhi Mahamarg : (Nagpur - Mumbai Expressway)Introductory presentation of Samruddhi Mahamarg : (Nagpur - Mumbai Expressway)
Introductory presentation of Samruddhi Mahamarg : (Nagpur - Mumbai Expressway)
AshmiliJadhav
 
national Housing Policies- Kadambani singh
national Housing Policies- Kadambani singhnational Housing Policies- Kadambani singh
An introduction to transport planning rev 1
An introduction to transport planning rev 1An introduction to transport planning rev 1
An introduction to transport planning rev 1
Ronan Kearns
 
Case study of feasibility study of mrts
Case study of feasibility study of mrtsCase study of feasibility study of mrts
Case study of feasibility study of mrts
Divyarajsinh Chudasama
 
Cities Safer by Design - Guidelines For Safe Road Design for Cities
Cities Safer by Design - Guidelines For Safe Road Design for CitiesCities Safer by Design - Guidelines For Safe Road Design for Cities
Cities Safer by Design - Guidelines For Safe Road Design for Cities
WRI Ross Center for Sustainable Cities
 
Public Private Partnership in Urban Rail Transit
Public Private Partnership in Urban Rail TransitPublic Private Partnership in Urban Rail Transit
Public Private Partnership in Urban Rail Transit
Kapil Sinha
 
RISK ASSESSMENT OF METRO SITE
RISK ASSESSMENT OF METRO SITERISK ASSESSMENT OF METRO SITE
RISK ASSESSMENT OF METRO SITE
Pratham Sharma
 
Public private partnership
Public private partnershipPublic private partnership
Public private partnership
Ankit GAJJAR
 
Space standards and requirments for different land use activites, densities
Space standards and requirments for different land use activites, densitiesSpace standards and requirments for different land use activites, densities
Space standards and requirments for different land use activites, densities
Noshad Ahmed Wahocho
 
BRTS
BRTSBRTS
Ahmedabad cmp
Ahmedabad cmpAhmedabad cmp
Ahmedabad cmp
Abhishek Kanwar
 
Bandra worli sea link,Mumbai,Maharashtra,India
Bandra worli sea link,Mumbai,Maharashtra,IndiaBandra worli sea link,Mumbai,Maharashtra,India
Bandra worli sea link,Mumbai,Maharashtra,India
oyepuneeta
 
indian infrastructure and pune metro project (feasibility analysis)
indian infrastructure and pune metro project (feasibility analysis)indian infrastructure and pune metro project (feasibility analysis)
indian infrastructure and pune metro project (feasibility analysis)
Gurjit Kaur Kaler
 
Urban Governance of Surat City : S.M.C.
Urban Governance of Surat City : S.M.C.Urban Governance of Surat City : S.M.C.
Urban Governance of Surat City : S.M.C.
Siddhi Vakharia
 
Gujarat - Smart City Mission
Gujarat - Smart City MissionGujarat - Smart City Mission
Gujarat - Smart City Mission
WRI Ross Center for Sustainable Cities
 
Bhopal transport
Bhopal transportBhopal transport
Bhopal transport
sonika patel
 
MUMBAI METRO TRAIN
MUMBAI METRO TRAINMUMBAI METRO TRAIN
MUMBAI METRO TRAIN
Nithy Anand
 
Delhi metro and Economics
Delhi metro and EconomicsDelhi metro and Economics
Delhi metro and Economics
Kunal Bhadane
 

What's hot (20)

Mass transit system
Mass transit systemMass transit system
Mass transit system
 
Delhi Metro Project Case Study
Delhi Metro Project Case Study  Delhi Metro Project Case Study
Delhi Metro Project Case Study
 
Introductory presentation of Samruddhi Mahamarg : (Nagpur - Mumbai Expressway)
Introductory presentation of Samruddhi Mahamarg : (Nagpur - Mumbai Expressway)Introductory presentation of Samruddhi Mahamarg : (Nagpur - Mumbai Expressway)
Introductory presentation of Samruddhi Mahamarg : (Nagpur - Mumbai Expressway)
 
national Housing Policies- Kadambani singh
national Housing Policies- Kadambani singhnational Housing Policies- Kadambani singh
national Housing Policies- Kadambani singh
 
An introduction to transport planning rev 1
An introduction to transport planning rev 1An introduction to transport planning rev 1
An introduction to transport planning rev 1
 
Case study of feasibility study of mrts
Case study of feasibility study of mrtsCase study of feasibility study of mrts
Case study of feasibility study of mrts
 
Cities Safer by Design - Guidelines For Safe Road Design for Cities
Cities Safer by Design - Guidelines For Safe Road Design for CitiesCities Safer by Design - Guidelines For Safe Road Design for Cities
Cities Safer by Design - Guidelines For Safe Road Design for Cities
 
Public Private Partnership in Urban Rail Transit
Public Private Partnership in Urban Rail TransitPublic Private Partnership in Urban Rail Transit
Public Private Partnership in Urban Rail Transit
 
RISK ASSESSMENT OF METRO SITE
RISK ASSESSMENT OF METRO SITERISK ASSESSMENT OF METRO SITE
RISK ASSESSMENT OF METRO SITE
 
Public private partnership
Public private partnershipPublic private partnership
Public private partnership
 
Space standards and requirments for different land use activites, densities
Space standards and requirments for different land use activites, densitiesSpace standards and requirments for different land use activites, densities
Space standards and requirments for different land use activites, densities
 
BRTS
BRTSBRTS
BRTS
 
Ahmedabad cmp
Ahmedabad cmpAhmedabad cmp
Ahmedabad cmp
 
Bandra worli sea link,Mumbai,Maharashtra,India
Bandra worli sea link,Mumbai,Maharashtra,IndiaBandra worli sea link,Mumbai,Maharashtra,India
Bandra worli sea link,Mumbai,Maharashtra,India
 
indian infrastructure and pune metro project (feasibility analysis)
indian infrastructure and pune metro project (feasibility analysis)indian infrastructure and pune metro project (feasibility analysis)
indian infrastructure and pune metro project (feasibility analysis)
 
Urban Governance of Surat City : S.M.C.
Urban Governance of Surat City : S.M.C.Urban Governance of Surat City : S.M.C.
Urban Governance of Surat City : S.M.C.
 
Gujarat - Smart City Mission
Gujarat - Smart City MissionGujarat - Smart City Mission
Gujarat - Smart City Mission
 
Bhopal transport
Bhopal transportBhopal transport
Bhopal transport
 
MUMBAI METRO TRAIN
MUMBAI METRO TRAINMUMBAI METRO TRAIN
MUMBAI METRO TRAIN
 
Delhi metro and Economics
Delhi metro and EconomicsDelhi metro and Economics
Delhi metro and Economics
 

Similar to mumbai metro PPP model.pptx

Bot(build operate transfr)
Bot(build operate transfr)Bot(build operate transfr)
Bot(build operate transfr)
Kritika Garg
 
projectfinancingandpublicprivatepartnershipppp-191120191032.pdf
projectfinancingandpublicprivatepartnershipppp-191120191032.pdfprojectfinancingandpublicprivatepartnershipppp-191120191032.pdf
projectfinancingandpublicprivatepartnershipppp-191120191032.pdf
Seshukumar53
 
Project financing and public private partnership (ppp)
Project financing and public private partnership (ppp)Project financing and public private partnership (ppp)
Project financing and public private partnership (ppp)
M. Asim U Khan
 
Mumbai Metro Phase 1
Mumbai Metro Phase 1Mumbai Metro Phase 1
Mumbai Metro Phase 1
OmkarRasal
 
Public private partnership in development of road network
Public private partnership in development of road networkPublic private partnership in development of road network
Public private partnership in development of road network
Gokul K Prasad
 
BOOT 2
BOOT 2BOOT 2
Ppp
PppPpp
Project finance ppt final
Project finance ppt finalProject finance ppt final
Project finance ppt final
Sagar Srivastava
 
The PPP model- Delhi Gurgaon Expressway.
The PPP model- Delhi Gurgaon Expressway.The PPP model- Delhi Gurgaon Expressway.
The PPP model- Delhi Gurgaon Expressway.
TwinkleVincent2
 
Amritsar Inter City Bus Terminal PPP Structure and Risk mitigation matrix
Amritsar Inter City Bus Terminal PPP Structure and Risk mitigation matrixAmritsar Inter City Bus Terminal PPP Structure and Risk mitigation matrix
Amritsar Inter City Bus Terminal PPP Structure and Risk mitigation matrix
NISHCHAY SAXENA
 
Chapter19 financinginfrastructureprojects
Chapter19 financinginfrastructureprojectsChapter19 financinginfrastructureprojects
Chapter19 financinginfrastructureprojects
AKSHAYA0000
 
Aurecon_IndII IRF Presentation Nov 2014 Expressway Development - LinkedIn
Aurecon_IndII IRF Presentation Nov 2014 Expressway Development - LinkedInAurecon_IndII IRF Presentation Nov 2014 Expressway Development - LinkedIn
Aurecon_IndII IRF Presentation Nov 2014 Expressway Development - LinkedIn
Steve Richards
 
Public private partnership
Public private partnershipPublic private partnership
Public private partnership
Suryansh Kori
 
PPTs for presentation on 14.03.15
PPTs for presentation on 14.03.15PPTs for presentation on 14.03.15
PPTs for presentation on 14.03.15
Shyam Sundar Choudhary
 
Karnataka, India : Antecedentes de los proyectos PPP (marzo 2008)
Karnataka, India : Antecedentes de los proyectos PPP (marzo 2008)Karnataka, India : Antecedentes de los proyectos PPP (marzo 2008)
Karnataka, India : Antecedentes de los proyectos PPP (marzo 2008)
DBTGrupoIndia
 
Infra on Roads
Infra on RoadsInfra on Roads
Infra on Roads
Titiksha Chaturvedi
 
STUDY ON BOT PROJECT WITH A CASE STUDY OF DELHI GURGAON EXPRESSWAY
STUDY ON BOT PROJECT WITH A CASE STUDY OF DELHI GURGAON EXPRESSWAYSTUDY ON BOT PROJECT WITH A CASE STUDY OF DELHI GURGAON EXPRESSWAY
STUDY ON BOT PROJECT WITH A CASE STUDY OF DELHI GURGAON EXPRESSWAY
Shabaz Khan
 
Public Private Partnership
Public Private PartnershipPublic Private Partnership
Public Private Partnership
Deepti Mahajan
 
public private partnership
public private partnershippublic private partnership
public private partnership
DiyaGarg5
 
Aba forum division_4_aurora_light_rail_presentation_shresta_2012_11_27
Aba forum division_4_aurora_light_rail_presentation_shresta_2012_11_27Aba forum division_4_aurora_light_rail_presentation_shresta_2012_11_27
Aba forum division_4_aurora_light_rail_presentation_shresta_2012_11_27
Roland_Nikles
 

Similar to mumbai metro PPP model.pptx (20)

Bot(build operate transfr)
Bot(build operate transfr)Bot(build operate transfr)
Bot(build operate transfr)
 
projectfinancingandpublicprivatepartnershipppp-191120191032.pdf
projectfinancingandpublicprivatepartnershipppp-191120191032.pdfprojectfinancingandpublicprivatepartnershipppp-191120191032.pdf
projectfinancingandpublicprivatepartnershipppp-191120191032.pdf
 
Project financing and public private partnership (ppp)
Project financing and public private partnership (ppp)Project financing and public private partnership (ppp)
Project financing and public private partnership (ppp)
 
Mumbai Metro Phase 1
Mumbai Metro Phase 1Mumbai Metro Phase 1
Mumbai Metro Phase 1
 
Public private partnership in development of road network
Public private partnership in development of road networkPublic private partnership in development of road network
Public private partnership in development of road network
 
BOOT 2
BOOT 2BOOT 2
BOOT 2
 
Ppp
PppPpp
Ppp
 
Project finance ppt final
Project finance ppt finalProject finance ppt final
Project finance ppt final
 
The PPP model- Delhi Gurgaon Expressway.
The PPP model- Delhi Gurgaon Expressway.The PPP model- Delhi Gurgaon Expressway.
The PPP model- Delhi Gurgaon Expressway.
 
Amritsar Inter City Bus Terminal PPP Structure and Risk mitigation matrix
Amritsar Inter City Bus Terminal PPP Structure and Risk mitigation matrixAmritsar Inter City Bus Terminal PPP Structure and Risk mitigation matrix
Amritsar Inter City Bus Terminal PPP Structure and Risk mitigation matrix
 
Chapter19 financinginfrastructureprojects
Chapter19 financinginfrastructureprojectsChapter19 financinginfrastructureprojects
Chapter19 financinginfrastructureprojects
 
Aurecon_IndII IRF Presentation Nov 2014 Expressway Development - LinkedIn
Aurecon_IndII IRF Presentation Nov 2014 Expressway Development - LinkedInAurecon_IndII IRF Presentation Nov 2014 Expressway Development - LinkedIn
Aurecon_IndII IRF Presentation Nov 2014 Expressway Development - LinkedIn
 
Public private partnership
Public private partnershipPublic private partnership
Public private partnership
 
PPTs for presentation on 14.03.15
PPTs for presentation on 14.03.15PPTs for presentation on 14.03.15
PPTs for presentation on 14.03.15
 
Karnataka, India : Antecedentes de los proyectos PPP (marzo 2008)
Karnataka, India : Antecedentes de los proyectos PPP (marzo 2008)Karnataka, India : Antecedentes de los proyectos PPP (marzo 2008)
Karnataka, India : Antecedentes de los proyectos PPP (marzo 2008)
 
Infra on Roads
Infra on RoadsInfra on Roads
Infra on Roads
 
STUDY ON BOT PROJECT WITH A CASE STUDY OF DELHI GURGAON EXPRESSWAY
STUDY ON BOT PROJECT WITH A CASE STUDY OF DELHI GURGAON EXPRESSWAYSTUDY ON BOT PROJECT WITH A CASE STUDY OF DELHI GURGAON EXPRESSWAY
STUDY ON BOT PROJECT WITH A CASE STUDY OF DELHI GURGAON EXPRESSWAY
 
Public Private Partnership
Public Private PartnershipPublic Private Partnership
Public Private Partnership
 
public private partnership
public private partnershippublic private partnership
public private partnership
 
Aba forum division_4_aurora_light_rail_presentation_shresta_2012_11_27
Aba forum division_4_aurora_light_rail_presentation_shresta_2012_11_27Aba forum division_4_aurora_light_rail_presentation_shresta_2012_11_27
Aba forum division_4_aurora_light_rail_presentation_shresta_2012_11_27
 

Recently uploaded

Curve Fitting in Numerical Methods Regression
Curve Fitting in Numerical Methods RegressionCurve Fitting in Numerical Methods Regression
Curve Fitting in Numerical Methods Regression
Nada Hikmah
 
artificial intelligence and data science contents.pptx
artificial intelligence and data science contents.pptxartificial intelligence and data science contents.pptx
artificial intelligence and data science contents.pptx
GauravCar
 
22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt
KrishnaveniKrishnara1
 
AI assisted telemedicine KIOSK for Rural India.pptx
AI assisted telemedicine KIOSK for Rural India.pptxAI assisted telemedicine KIOSK for Rural India.pptx
AI assisted telemedicine KIOSK for Rural India.pptx
architagupta876
 
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student MemberIEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
VICTOR MAESTRE RAMIREZ
 
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
ydzowc
 
spirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptxspirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptx
Madan Karki
 
Software Engineering and Project Management - Introduction, Modeling Concepts...
Software Engineering and Project Management - Introduction, Modeling Concepts...Software Engineering and Project Management - Introduction, Modeling Concepts...
Software Engineering and Project Management - Introduction, Modeling Concepts...
Prakhyath Rai
 
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
IJECEIAES
 
Null Bangalore | Pentesters Approach to AWS IAM
Null Bangalore | Pentesters Approach to AWS IAMNull Bangalore | Pentesters Approach to AWS IAM
Null Bangalore | Pentesters Approach to AWS IAM
Divyanshu
 
Mechanical Engineering on AAI Summer Training Report-003.pdf
Mechanical Engineering on AAI Summer Training Report-003.pdfMechanical Engineering on AAI Summer Training Report-003.pdf
Mechanical Engineering on AAI Summer Training Report-003.pdf
21UME003TUSHARDEB
 
Software Quality Assurance-se412-v11.ppt
Software Quality Assurance-se412-v11.pptSoftware Quality Assurance-se412-v11.ppt
Software Quality Assurance-se412-v11.ppt
TaghreedAltamimi
 
Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...
bijceesjournal
 
Computational Engineering IITH Presentation
Computational Engineering IITH PresentationComputational Engineering IITH Presentation
Computational Engineering IITH Presentation
co23btech11018
 
People as resource Grade IX.pdf minimala
People as resource Grade IX.pdf minimalaPeople as resource Grade IX.pdf minimala
People as resource Grade IX.pdf minimala
riddhimaagrawal986
 
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
171ticu
 
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURSCompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
RamonNovais6
 
CEC 352 - SATELLITE COMMUNICATION UNIT 1
CEC 352 - SATELLITE COMMUNICATION UNIT 1CEC 352 - SATELLITE COMMUNICATION UNIT 1
CEC 352 - SATELLITE COMMUNICATION UNIT 1
PKavitha10
 
Material for memory and display system h
Material for memory and display system hMaterial for memory and display system h
Material for memory and display system h
gowrishankartb2005
 
An improved modulation technique suitable for a three level flying capacitor ...
An improved modulation technique suitable for a three level flying capacitor ...An improved modulation technique suitable for a three level flying capacitor ...
An improved modulation technique suitable for a three level flying capacitor ...
IJECEIAES
 

Recently uploaded (20)

Curve Fitting in Numerical Methods Regression
Curve Fitting in Numerical Methods RegressionCurve Fitting in Numerical Methods Regression
Curve Fitting in Numerical Methods Regression
 
artificial intelligence and data science contents.pptx
artificial intelligence and data science contents.pptxartificial intelligence and data science contents.pptx
artificial intelligence and data science contents.pptx
 
22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt
 
AI assisted telemedicine KIOSK for Rural India.pptx
AI assisted telemedicine KIOSK for Rural India.pptxAI assisted telemedicine KIOSK for Rural India.pptx
AI assisted telemedicine KIOSK for Rural India.pptx
 
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student MemberIEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
 
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
 
spirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptxspirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptx
 
Software Engineering and Project Management - Introduction, Modeling Concepts...
Software Engineering and Project Management - Introduction, Modeling Concepts...Software Engineering and Project Management - Introduction, Modeling Concepts...
Software Engineering and Project Management - Introduction, Modeling Concepts...
 
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
 
Null Bangalore | Pentesters Approach to AWS IAM
Null Bangalore | Pentesters Approach to AWS IAMNull Bangalore | Pentesters Approach to AWS IAM
Null Bangalore | Pentesters Approach to AWS IAM
 
Mechanical Engineering on AAI Summer Training Report-003.pdf
Mechanical Engineering on AAI Summer Training Report-003.pdfMechanical Engineering on AAI Summer Training Report-003.pdf
Mechanical Engineering on AAI Summer Training Report-003.pdf
 
Software Quality Assurance-se412-v11.ppt
Software Quality Assurance-se412-v11.pptSoftware Quality Assurance-se412-v11.ppt
Software Quality Assurance-se412-v11.ppt
 
Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...
 
Computational Engineering IITH Presentation
Computational Engineering IITH PresentationComputational Engineering IITH Presentation
Computational Engineering IITH Presentation
 
People as resource Grade IX.pdf minimala
People as resource Grade IX.pdf minimalaPeople as resource Grade IX.pdf minimala
People as resource Grade IX.pdf minimala
 
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
 
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURSCompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
 
CEC 352 - SATELLITE COMMUNICATION UNIT 1
CEC 352 - SATELLITE COMMUNICATION UNIT 1CEC 352 - SATELLITE COMMUNICATION UNIT 1
CEC 352 - SATELLITE COMMUNICATION UNIT 1
 
Material for memory and display system h
Material for memory and display system hMaterial for memory and display system h
Material for memory and display system h
 
An improved modulation technique suitable for a three level flying capacitor ...
An improved modulation technique suitable for a three level flying capacitor ...An improved modulation technique suitable for a three level flying capacitor ...
An improved modulation technique suitable for a three level flying capacitor ...
 

mumbai metro PPP model.pptx

  • 2.
  • 3. LINE 1 MUMBAI METRO OVERVIEW Location- Mumbai, Maharashtra. Terminal- Versova, Ghatkopar Stations- 12 Operator- MOOPL Rolling Stock- CSSR Puzhen Daily Ridership- 4 lacs
  • 4. PROJECT DESCRIPTION • Government of Maharashtra (GOM) through the Mumbai metropolitan region development authority (MMRDA) as planned 146km long rail based Mass Rapid transit system (MRTS) • 1st corridor of the project is from the Versova Andheri Ghatkopar line shall be elevated with root length of 11km with 12 stations in the car depot at D.N nagar • Minimum curvature of line shall be 100mters and minimum ground clearance 5.5 meters.
  • 5. ● The existing sub uran train connects north and south Bombay where as this project provides connectivity between East - West rail to central nad western suburbs ● Total time taken would be 21mins where as other modes of transport takes 90mins ● Mumbai Metro runs On a elevator couridor which is full air conditioner world class coaches, elevator and escalator at station, automatic fare collection system and high level security system.
  • 6. PPP STRUCTURE • This project is a BOOT basis for a 35 years including construction period of 5 years awarded by MMRDA. Under the construction aggreement the concessionaire as to design , finance, construct, operate, own and maintain the first corider and transfer the owner ship and assets at the end of concession period. • SVP named Mumbai Metro One Private Limited(MMOPL) formed with reliance energy limited, veolia transport and and MMRDA.
  • 7. FINANCING INFORMATION • The total estimation of the project was 2356 crores • The project was financed on the basis of viability grant by GOI( 20%-470 crores) and GOM (7.5%- 180crores). • The financing pattern was 70% debt and 30% equity. MMRDA and private operator contributed 466 crores. • The consortium banks are IDBI, Karur Vysya Bank, Canara Bank, Indian Bank and Oriental bank of Commerce. Viability Grant- a capital grant or subsidy or equity from the Central or State Governments to render a Public Private Partnership (PPP) project financially viable and bankable.
  • 8. Viability Gap Funding 650 Debt 1240 Equity 466 Total 256 The cost of borrowing for the rupee component, which constitutes about 75 per cent of the total debt, the foreign currency loan will be at 3.5 per cent above LIBOR(London Inter-Bank Offered Rate). Particulars With VGF Support Project IRR 8% Equity IRR 15% Debt equity Ratio 70:30 IRR- Internal Rate of Return
  • 9. •First conceptuali zed in 1997 INCEPTION •Feasbility study in 1997-2000 FEASIBILITY •Bids Invited in August 2004 and successful bidder chosen in May 2006 PROCUREMENT Development commenced in 2008 DEVELOPMENT • Ghatkopar- Versova- Andheri line was delivered in June 2014 DELIVERY Concession Period end. EXIT
  • 10. PROCESS ANALYSIS Conceptualization and Feasibility On exploring the viability of various mass transit that are efficient, economical and environmentally friendly. A feasibility report carried out under Indo-German Technical Co- operation with consultancy work with TEWET in association with DE-Consult and TCS during 1997-2000. Study recommended Andheri-Ghatkopar was potentially bankable and economically viable.
  • 11. Procurement The project was approved by the GoM in August 2004 global bids were Invited through an Expression of Interest (EoI). The bid process conducted a two stage bid-process, i.e. technical and financial stage. Technical bids were invited for the project in May 2005 • Hindustan Construction Company and RITES • Reliance Energy Limited and Connex-France • Shaktikumar Sacheti Limited and Lingkaran Metro • Siemens, L&T, Gammon, BEML • IL&FS and ITD Thailand and Unity Infraprojects
  • 12. The consortia which qualified to submit financial proposals were: a. Reliance Energy Limited and Connex-France b. Siemens, L&T, Gammon, BEML c. IL&FS and ITD Thailand and Unity Infraprojects • Financial approvals were submitted in January 2006 only by Reliance Energy and Connex France. Only the lowest of Financial bidder were awarded consortium. The talks went from February to May 2006. • REL-led consortium negotiated equity IRR of 26% to 15%. The VGF was brought down to 650crores. • VGF application submitted to GoM in June 2006 after successful bidder is chosen • The project was delayed obtaining Viability gap fund because it was funded before model concession agreement(MCA). MCA spells out the policy and regulatory framework for implementation of a PPP project.
  • 13. • The issue was finally resolved by grant of VGF in the form of a special one time grant given to the state. The GoI agreed to give a special grant of 20% of the project cost. • The GoM approved a grant of 7.5% of project cost. The formal approval for VGF of 650 crores was obtained much later by January 2009.
  • 14. Development The development phase of the project was initiated in parallel to the VGF approval process. Milestone achieved are,  The SPV was incorporated in December 2006.  The Engineering and Project Management Consultants,a consortium of Parsons Brinkerhoff (USA) and Systra SA (France) joined the team on February 14, 2007  Signing of the Concession Agreement and Shareholders agreement took place on March 7, 2007
  • 15.  MMOPL and Government of Maharashtra entered the State Support Agreement on April 20, 2007  Construction commenced on February 8, 2008  Financial Closure for the project completed on October 3, 2008
  • 16. Pre-operative risks Risk Period Primary Risk Bearer Delay in Land Acquisition 0-5 years Government Financing Risk 0-5 years Private sector Planning 0-5 years Private sector Regulatory, Administrative and approval delay. 0-5 years Private sector RISK ALLOCATION FRAMEWORK Sensitivity
  • 17. Construction phase Risk Risk Period Primary Risk Bearer Design Risk 0-5 years Private Sector Construction Risk 0-5 years Private Sector Change in scope Risk 0-5 years Government Financing Risk 0-5 years Private Sector Sensitivity
  • 18. Operational Phase Risk Risk Period Primary Risk Bearer Technology Risk 0-35 years Private Sector/Government Operational and Maintenance Risk 0-35 years Private Sector Market Risk 0-30 years Private Sector Performance Risk 0-30 years Private Sector Sensitivity
  • 19. Handover Risk Risk Period Risk Bearer Handover Risk 35th year Private Sector Private Operator event of default 0-35 years Private Sector MMRDA Event of default 0-35 years Government Sensitivity
  • 20. Other Risk Risk Period Risk Bearer Interface Risk (with other metro corridors) Through out Private Sector Force Majeure Through out Shared(Depend ing on the type of Event) Change in Law Risk Through out Private Sector Sensitivity
  • 21. POST FACTO VfM ANALYSIS • A VfM analysis for the project has not been undertaken in the Feasibility Study. • The quantitative analysis to assess VfM will not be practical for this project. • It has been achieved by the private operator based on publicly available information and discussions with officials working on the project has been attempted. • Reduction in financial burden on the state budget, PPP project was structured to ensure that it was viable by providing a viability gap funding for the project. • The financial bid parameter was the lowest viability gap quoted. VfM- A measure of quality that assesses the monetary cost of the product or service against the quality and/or benefits of that product or service, taking into account subjective factors such as fitness for purpose, along with whole-of-life costs such as installation, training, maintenance and disposal, and wastage.
  • 22. • The lowest financial bid quoted was viability gap funding of 1250 crores which was reduced after negotiations to 650 crores. • This is estimated to be around 50-60 crores. The total taxes estimated for the project are around 300 crores. • Thus, effectively the government would end up with a net spending of ` 400 crores and the city would get access to an asset worth 2300 crores. • The construction and operations of a critical infrastructure facility for a period of 30 years with a reduced requirement of upfront money. • Substantial risk transfer,The private sector has undertaken substantial project risks, such as financing, construction, operations and traffic/ revenue risks.
  • 23. DISCUSSIONAND CONCLUSION • Mumbai’s metro network will span across 357 kilometres and 14 lines with more than 220 stations, but it is not the silver bullet that will solve commuter woes. • Importance of MM, The metro will provide for the first time connectivity to airport, Nariman Point, Cuffe Parade, Kalbadevi, Worli, BKC, Airport, SEEPZ and MIDC. Besides, two important heritage stations of Mumbai i.e. CSTM and Church gate will also get joined through MML-3 alignment • Fadnavis announced on 8 April 2017 that the government was considering a circular metro loop line along the Kalyan-Dombivli-Taloja route. The proposed 15 km line would link Kalyan and Shil Phata with 13 stations, bring metro connectivity to Kalyan East, Dombivli, Ambernath and Diva.
  • 24. • The Mumbai Metro resumed services for general public on 19 October 2020, after being shut down since March 2020 due to the COVID-19 pandamic Summary • The project brings number of benefits and opportunities to the city a safe, efficient, comfortable and state of art modern Metro system direct connectivity to important destinations • Environmental benefits leading to better quality of lifeEconomy benefit (EIRR 17.93%, FIRR 2.17%)Employment and Business opportunities as Rs 23,136 Crores investments will be made in the project within 5 years
  • 25. KEY LEARNING 1. Expediting the bid process is critical to ensuring a good response to the proposal 2. Delay in obtaining VGF approval 3. Delay in approvals can potentially derail the project 4. Land Acquisition process can lead to issues in the project 5. Clear Specifications on Asset Transfer on termination 6. Public Support for the project 7. Role of Good Project Preparation