The Bandara Worli Sea Link is a cable-stayed bridge that connects the suburbs of Bandra in western Mumbai to Worli in south Mumbai. At 5.6 km long, it is one of India's most complex infrastructure projects. Construction began in 2000 but faced numerous delays and cost overruns due to technical challenges and monsoon restrictions, finally opening in 2009 at a cost of Rs. 1653.25 crore, over double the initial estimated budget. The sea link provides significant travel time savings and reduces pollution between the western and southern parts of Mumbai.
Detailed presentation of Arch and cable stayed bridge connecting bandra to worli in Mumbai.One of the traffic decongestion efforts by Municipal corporation of Bombay.
The new Bandra-Worli Sea Link is a symbol of the great advances of the economy and engineering capabilities
of the India which is reflection of modern infrastructure
The new Bandra-Worli Sea Link is a symbol of the great advances of the economy and engineering capabilities
of the India which is reflection of modern infrastructure.
Detailed presentation of Arch and cable stayed bridge connecting bandra to worli in Mumbai.One of the traffic decongestion efforts by Municipal corporation of Bombay.
The new Bandra-Worli Sea Link is a symbol of the great advances of the economy and engineering capabilities
of the India which is reflection of modern infrastructure
The new Bandra-Worli Sea Link is a symbol of the great advances of the economy and engineering capabilities
of the India which is reflection of modern infrastructure.
Chenab Bridge, Jammu and Kashmir - Railway TechnologyPradeep Kumar
The Chenab Bridge is an arch bridge under construction in India. It spans the Chenab River between Bakkal and Kauri, in Reasi district of Jammu and Kashmir
Presentation on Chenab Bidge.
Indian Railways has undertaken the mega- project of construction of a new railway line in the State of Jammu and Kashmir. The Chenab Bridge is a railway steel and concrete arch bridge under construction between Bakkal and Kauri in the Reasi from Udhampur to Baramulla.
Chenab Bridge, Jammu and Kashmir - Railway TechnologyPradeep Kumar
The Chenab Bridge is an arch bridge under construction in India. It spans the Chenab River between Bakkal and Kauri, in Reasi district of Jammu and Kashmir
Presentation on Chenab Bidge.
Indian Railways has undertaken the mega- project of construction of a new railway line in the State of Jammu and Kashmir. The Chenab Bridge is a railway steel and concrete arch bridge under construction between Bakkal and Kauri in the Reasi from Udhampur to Baramulla.
How to Make Awesome SlideShares: Tips & TricksSlideShare
Turbocharge your online presence with SlideShare. We provide the best tips and tricks for succeeding on SlideShare. Get ideas for what to upload, tips for designing your deck and more.
Lifescapes Mirage is a rarity in every sense, its location gives it a towering presence. By virtue of being strategically & conveniently located in Matunga, you are close to Prabhadevi, Lower Parel, Bandra Worli Sea Link, BKC, the Western and Central Suburbs.
For more details visit us at:
http://rohanlifescapes.com/
work done by : Monik Hirpara
take some sort help from Wikipedia.
all important information about bruj khalifa.
all the records of bruj khalifa.
planning and management of floor.
important factor of building construction.
development time and it's photos.
important links, floors number and it's uses.
thank you.....
Innovative solution for crossing larger spaces like railway yardRajesh Prasad
This paper titled Innovative solution for crossing larger spaces like railway yard has been presented in a seminar organised by CEAI at Kolkata on 03.06.2016
Future fast track model for new road over bridge spanning over railway yard- ...Rajesh Prasad
Implementation of 4 lane cable stayed road over bridge is nearing completion. It is felt that it could be a future fast track model for construction of ROB over busy railway yard in India
The Padma Bridge is a multipurpose road-rail bridge across the Padma River to be constructed in Bangladesh. Padma Bridge is the most challenging construction project in the history of Bangladesh. The two-level steel truss bridge will carry a four-lane highway on the upper level and a single track railway on a lower level. With 150 m span, 6150 m total length and 18.10 m width it is going to be the largest bridge in the Ganges-Brahmaputra-Meghna river basins of country in terms of both span and the total length.
The presentation about Padma Multipurpose Bridge Project was presented 4th April 2019. At Uttara University. Department of Civil Engineering, Batch- 16 (A).
THE EFFECT OF LATERAL CONFIGURATION ON STATIC AND DYNAMIC BEHAVIOUR OF LONG S...IAEME Publication
Long span bridge is the demand of every nation and it could be achieved with use of enhanced materials. With the development of the high strength materials and techniques for analysis of bridge, long span cable supported bridge are introduced. Generally, cable supported bridges comprise both suspension and cable-stayed bridge. Cable supported bridges are flexible in behavior. These flexible systems are susceptible to the dynamic effects of wind and earthquake loads. With increasing span of the bridge the flexibility of the bridge is increasing. Here, attempt is made to improve the rigidity of long span bridge and presented in this research paper. For enhancing the rigidity of the bridge in lateral and vertical directions, different configuration of the cables of long span cable supported bridges is considered in this study.
Explore the innovative world of trenchless pipe repair with our comprehensive guide, "The Benefits and Techniques of Trenchless Pipe Repair." This document delves into the modern methods of repairing underground pipes without the need for extensive excavation, highlighting the numerous advantages and the latest techniques used in the industry.
Learn about the cost savings, reduced environmental impact, and minimal disruption associated with trenchless technology. Discover detailed explanations of popular techniques such as pipe bursting, cured-in-place pipe (CIPP) lining, and directional drilling. Understand how these methods can be applied to various types of infrastructure, from residential plumbing to large-scale municipal systems.
Ideal for homeowners, contractors, engineers, and anyone interested in modern plumbing solutions, this guide provides valuable insights into why trenchless pipe repair is becoming the preferred choice for pipe rehabilitation. Stay informed about the latest advancements and best practices in the field.
Hierarchical Digital Twin of a Naval Power SystemKerry Sado
A hierarchical digital twin of a Naval DC power system has been developed and experimentally verified. Similar to other state-of-the-art digital twins, this technology creates a digital replica of the physical system executed in real-time or faster, which can modify hardware controls. However, its advantage stems from distributing computational efforts by utilizing a hierarchical structure composed of lower-level digital twin blocks and a higher-level system digital twin. Each digital twin block is associated with a physical subsystem of the hardware and communicates with a singular system digital twin, which creates a system-level response. By extracting information from each level of the hierarchy, power system controls of the hardware were reconfigured autonomously. This hierarchical digital twin development offers several advantages over other digital twins, particularly in the field of naval power systems. The hierarchical structure allows for greater computational efficiency and scalability while the ability to autonomously reconfigure hardware controls offers increased flexibility and responsiveness. The hierarchical decomposition and models utilized were well aligned with the physical twin, as indicated by the maximum deviations between the developed digital twin hierarchy and the hardware.
Saudi Arabia stands as a titan in the global energy landscape, renowned for its abundant oil and gas resources. It's the largest exporter of petroleum and holds some of the world's most significant reserves. Let's delve into the top 10 oil and gas projects shaping Saudi Arabia's energy future in 2024.
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdffxintegritypublishin
Advancements in technology unveil a myriad of electrical and electronic breakthroughs geared towards efficiently harnessing limited resources to meet human energy demands. The optimization of hybrid solar PV panels and pumped hydro energy supply systems plays a pivotal role in utilizing natural resources effectively. This initiative not only benefits humanity but also fosters environmental sustainability. The study investigated the design optimization of these hybrid systems, focusing on understanding solar radiation patterns, identifying geographical influences on solar radiation, formulating a mathematical model for system optimization, and determining the optimal configuration of PV panels and pumped hydro storage. Through a comparative analysis approach and eight weeks of data collection, the study addressed key research questions related to solar radiation patterns and optimal system design. The findings highlighted regions with heightened solar radiation levels, showcasing substantial potential for power generation and emphasizing the system's efficiency. Optimizing system design significantly boosted power generation, promoted renewable energy utilization, and enhanced energy storage capacity. The study underscored the benefits of optimizing hybrid solar PV panels and pumped hydro energy supply systems for sustainable energy usage. Optimizing the design of solar PV panels and pumped hydro energy supply systems as examined across diverse climatic conditions in a developing country, not only enhances power generation but also improves the integration of renewable energy sources and boosts energy storage capacities, particularly beneficial for less economically prosperous regions. Additionally, the study provides valuable insights for advancing energy research in economically viable areas. Recommendations included conducting site-specific assessments, utilizing advanced modeling tools, implementing regular maintenance protocols, and enhancing communication among system components.
Water scarcity is the lack of fresh water resources to meet the standard water demand. There are two type of water scarcity. One is physical. The other is economic water scarcity.
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxR&R Consult
CFD analysis is incredibly effective at solving mysteries and improving the performance of complex systems!
Here's a great example: At a large natural gas-fired power plant, where they use waste heat to generate steam and energy, they were puzzled that their boiler wasn't producing as much steam as expected.
R&R and Tetra Engineering Group Inc. were asked to solve the issue with reduced steam production.
An inspection had shown that a significant amount of hot flue gas was bypassing the boiler tubes, where the heat was supposed to be transferred.
R&R Consult conducted a CFD analysis, which revealed that 6.3% of the flue gas was bypassing the boiler tubes without transferring heat. The analysis also showed that the flue gas was instead being directed along the sides of the boiler and between the modules that were supposed to capture the heat. This was the cause of the reduced performance.
Based on our results, Tetra Engineering installed covering plates to reduce the bypass flow. This improved the boiler's performance and increased electricity production.
It is always satisfying when we can help solve complex challenges like this. Do your systems also need a check-up or optimization? Give us a call!
Work done in cooperation with James Malloy and David Moelling from Tetra Engineering.
More examples of our work https://www.r-r-consult.dk/en/cases-en/
About
Indigenized remote control interface card suitable for MAFI system CCR equipment. Compatible for IDM8000 CCR. Backplane mounted serial and TCP/Ethernet communication module for CCR remote access. IDM 8000 CCR remote control on serial and TCP protocol.
• Remote control: Parallel or serial interface.
• Compatible with MAFI CCR system.
• Compatible with IDM8000 CCR.
• Compatible with Backplane mount serial communication.
• Compatible with commercial and Defence aviation CCR system.
• Remote control system for accessing CCR and allied system over serial or TCP.
• Indigenized local Support/presence in India.
• Easy in configuration using DIP switches.
Technical Specifications
Indigenized remote control interface card suitable for MAFI system CCR equipment. Compatible for IDM8000 CCR. Backplane mounted serial and TCP/Ethernet communication module for CCR remote access. IDM 8000 CCR remote control on serial and TCP protocol.
Key Features
Indigenized remote control interface card suitable for MAFI system CCR equipment. Compatible for IDM8000 CCR. Backplane mounted serial and TCP/Ethernet communication module for CCR remote access. IDM 8000 CCR remote control on serial and TCP protocol.
• Remote control: Parallel or serial interface
• Compatible with MAFI CCR system
• Copatiable with IDM8000 CCR
• Compatible with Backplane mount serial communication.
• Compatible with commercial and Defence aviation CCR system.
• Remote control system for accessing CCR and allied system over serial or TCP.
• Indigenized local Support/presence in India.
Application
• Remote control: Parallel or serial interface.
• Compatible with MAFI CCR system.
• Compatible with IDM8000 CCR.
• Compatible with Backplane mount serial communication.
• Compatible with commercial and Defence aviation CCR system.
• Remote control system for accessing CCR and allied system over serial or TCP.
• Indigenized local Support/presence in India.
• Easy in configuration using DIP switches.
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...Amil Baba Dawood bangali
Contact with Dawood Bhai Just call on +92322-6382012 and we'll help you. We'll solve all your problems within 12 to 24 hours and with 101% guarantee and with astrology systematic. If you want to take any personal or professional advice then also you can call us on +92322-6382012 , ONLINE LOVE PROBLEM & Other all types of Daily Life Problem's.Then CALL or WHATSAPP us on +92322-6382012 and Get all these problems solutions here by Amil Baba DAWOOD BANGALI
#vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore#blackmagicformarriage #aamilbaba #kalajadu #kalailam #taweez #wazifaexpert #jadumantar #vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore #blackmagicforlove #blackmagicformarriage #aamilbaba #kalajadu #kalailam #taweez #wazifaexpert #jadumantar #vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore #Amilbabainuk #amilbabainspain #amilbabaindubai #Amilbabainnorway #amilbabainkrachi #amilbabainlahore #amilbabaingujranwalan #amilbabainislamabad
Immunizing Image Classifiers Against Localized Adversary Attacksgerogepatton
This paper addresses the vulnerability of deep learning models, particularly convolutional neural networks
(CNN)s, to adversarial attacks and presents a proactive training technique designed to counter them. We
introduce a novel volumization algorithm, which transforms 2D images into 3D volumetric representations.
When combined with 3D convolution and deep curriculum learning optimization (CLO), itsignificantly improves
the immunity of models against localized universal attacks by up to 40%. We evaluate our proposed approach
using contemporary CNN architectures and the modified Canadian Institute for Advanced Research (CIFAR-10
and CIFAR-100) and ImageNet Large Scale Visual Recognition Challenge (ILSVRC12) datasets, showcasing
accuracy improvements over previous techniques. The results indicate that the combination of the volumetric
input and curriculum learning holds significant promise for mitigating adversarial attacks without necessitating
adversary training.
3. INTRODUCTION
Officially known as Rajiv Gandhi Sea Link.
Cable-stayed bridge with pre-stressed concrete-steel viaducts.
Links the Bandra (Western suburb) and Worli ( South Mumbai).
Inaugurated on June 30 , 2009.
Among the most complex & advanced construction projects
ever in India.
4. Designed By : Sheshadri Srinivasan
(Structural engineer ,
Working in Lebanese Engineering Firm
Dar-Al-Handshah )
Commissioned By : Maharashtra State Road Development Corporation
Constructed By : Hindustan Construction company , India ( HCC)
5. HISTORY
Mahim Causeway was the only link connecting westernsuburbs to island
city of Mumbai, making it highlycongested during the peak hours .
Vehicular traffic admeasuring about 120,000 PCUtravels on the Mahim
causeway everyday and during peak hours and it takes about forty minutes to
travelfrom Mahim causeway to Worli, a distance of about 8km.
7. BASIC INFO
Official Name “ Rajiv Gandhi Setu ”
Carries 8 Lanes of Traffic
Owner MSRDC
Design Cable-stayed, Concrete-Steel precast viaducts
Total length 5.6 Km ( 3.5 miles )
Width 2 × 20 m ( 66 ft )
Highest Point 126 m ( 413 ft )
Longest Span 2 × 250 m ( 820 ft )
Vertical Clearance 20 m ( below bridge for transportation )
Foundation Type Pile Foundation
Toll System Automated 16-Lane Toll Plaza
8. Time Frame
Estimated Time Frame : 5 years
Construction begin : June 1995
Construction end : March 2003
Actual Time Frame : 11 years
Construction begin : October 2000
Construction End : 24 March 2010
Opened : 30 June 2009
9. BUDGET
Estimated Cost : ₹ 665.81 Cr
Actual Cost : ₹ 1653.25 Cr
The Increament in project cost was due to payments of escalation ₹ 213
Cr on account of inordinate delay in completion (61 months ) .
New technical changes in the bridge at the behest of new consultant₹70 Cr
.
Contractor for delay in award of work ₹ 125 Cr .
Interest liability due to delayed completion ₹ 230 Cr .
10. PIERS :
The span between the piers is 50 maters .
This distance arrived by considering optimization between foundation cost
Vs. superstructure cost .
If the piers are wide apart then foundation cost comes down , but the
superstructure becomes heavier and its cost goes up .
Moreover, more number of piers provide better wind resistance .
11.
12. CABLE WIRE
Are also known as ‘ Parallel Wire Stay Cables ’.
Manufactured by “Shanghai Pujiang Cable Co. Ltd” China .
Each cable consists a group of steel wires ( 6 wires ) .
Each steel wire has a diameter 7mm with a breaking limit of 6.28
Tones.
Group of these wires was packed in two layers of HDPE (High
Density Poly Ethylene) material .
13.
14. Highly uneven and variable foundation bed
even for plane area of one pile .
The maritime Board does not allow marine
traffic in monsoon season . Thus work was
halted Mid-May only to re-commence in
October . Effectively reducing the work
schedule to only seven month in a year .
Needed for extra steel trusses , further
experts .
Delay due to change in design of stray Cable
.
15. BENEFITS
Considerable savings in travel time from 40
min to 8 min
Estimated savings in fuel and vehicle
operating cost is around $ 16.2 million .
Stress free driving .
Reduced accidents and noise pollution .
Reduction in air pollution .