Bandra Worli Sea Link(BWSL) is the civil engineering
marvel spanning across the arc of Mumbai coastline .
•Started in 2000
•Opened in 2009
Reduces time
Regulation of traffic
Stress free driving
Reduces accidents and noise pollution
Use of M60 grade concrete
Largest span for cable stayed bridge
Dimensions
Material used
India’s first bridge in open sea conditions
An intelligent bridge management system (IBS)
provides traffic information, surveillance, monitoring
and control systems.
Partners involved were ultratech, TATA steel, VSL
Singapore, SPCC etc.
 The entire project was originally conceived as one large
project comprising, different components, but in order to
accelerate the overall construction schedule, the project
has been divided into five construction packages.
 Package I: Construction of flyover over Love Grove
junction at Worli.
 Package II: Construction of cloverleaf interchange at
Mahim intersection.
 Package III: Construction of solid approach road from the
Mahim intersection up to the start of the Toll Plaza on the
Bandra side.
 Package IV: Construction of Cable-Stayed Bridges
together with viaduct approaches extending from
Worli up to the Toll Plaza at Bandra end, Intelligent
Bridge System (IBS).
 Package V: Improvement to Khan Abdul Gaffar Khan
Road.
 Package IV is the largest and main phase of Bandra-
Worli Sea Link Project. Main features of this
technically challenging package are :
 Cable-Stayed Bridge including viaduct approaches
extending from Worli up to Toll Plaza at Bandra end.
 Modern Toll Plaza.
 The work order for work of construction of BWSL
bridge was issued to HCC for Rs.400.23 crore. The
completion time was stated as 30 months from the
date of notice to proceed with the work.
 The bridge layout is categorized into three different
parts:
 Part 1 - North-end approach structure.
 Part 2 - Cable-Stayed Bridge.
 Part 3 - South end approach structure.
 A modern toll plaza with 16 lanes is provided at the
Bandra end. The toll plaza is equipped with a state-
of-the-art toll collection system. A structure is
provided at this location to house the control system
for the ITS.
 Engineering Challenges
1) Laying of foundation
2) Heavy spans
3) Design of concrete tower
4) ground stabilization
Working during monsoon
Logistics
Psychological conditioning
 Change in design of the bridge
 Change in the contractors and the delay caused by
them.
 Estimated savings in Vehicle Operating Costs (VOC):
Rs. 100 Crores per annum.
 Considerable savings in travel time (20 to 30
minutes) due to increased speed and reduced delays
(23 signals avoided).
 Stress free driving.
 Reduced accidents.
 Reduction in traffic on existing roads because of
traffic diversion to the Sea Link.
 Reduction in Carbon Monoxide and Nitrogen Oxide
Levels in Mahim, Dadar, Prabhadevi and Worli along
existing roads.
 Reduced noise pollution in Mahim, Dadar,
Prabhadevi and Worli along existing roads.
 No adverse effect on fisheries, marine life and
livelihood of fisherman.
 Landscaping along the approaches and waterfront
promenade enhance the environment and add green
spots to the city.
 The cost of the Bandra-Worli Sea Link Project
originally (July 1999) estimated at Rs.665.81 crore
was revised (August 2004) to Rs.1,306.25 crore.
 Though the project was originally expected to be
completed by March 2003, the expected date of
completion is now stated to be April 2008.Delay were
mainly due technical changes brought up by new
consultants .
 The Company changed the design of the Worli bridge
to “Cable stay” from “Arch bridge” to align with the
bridge at Bandra, a decision, which could have been
taken at the initial stages itself.
 Against a commitment of Rs.580 crore by way of
grants, the State Government had provided only
Rs.100 crore till June 2007.
 The selection process of Consultant for the design
and project management work was defective, as the
Company did not verify the technical parameters as
projected by the Consultant.
 The Company did not levy Liquidated Damages
amounting to Rs.12.80 crore on the Contractor
(HCC) as per conditions of the contract despite
wrongful stoppage of work by them for 18 months
and non-achievement of milestones due to poor
progress of work.
Bandra worli sea link,Mumbai,Maharashtra,India

More Related Content

What's hot

Critical Analysis of the Planning scenario in Hyderabad City
Critical Analysis of the Planning scenario in Hyderabad CityCritical Analysis of the Planning scenario in Hyderabad City
Critical Analysis of the Planning scenario in Hyderabad City
Maitreyi Yellapragada
 

What's hot (20)

Bhopal city planning
Bhopal city planningBhopal city planning
Bhopal city planning
 
Isbt, kashmiri gate, delhi_a case study
Isbt, kashmiri gate, delhi_a case studyIsbt, kashmiri gate, delhi_a case study
Isbt, kashmiri gate, delhi_a case study
 
case study of netaji metro station
case study of netaji metro station case study of netaji metro station
case study of netaji metro station
 
Navi mumbai development
Navi mumbai developmentNavi mumbai development
Navi mumbai development
 
Critical Analysis of the Planning scenario in Hyderabad City
Critical Analysis of the Planning scenario in Hyderabad CityCritical Analysis of the Planning scenario in Hyderabad City
Critical Analysis of the Planning scenario in Hyderabad City
 
A study report on Kutch-Bhuj
A study report on Kutch-BhujA study report on Kutch-Bhuj
A study report on Kutch-Bhuj
 
Pandit Nehru Bus Terminal
Pandit Nehru Bus Terminal Pandit Nehru Bus Terminal
Pandit Nehru Bus Terminal
 
Pol of Ahmedabad , pol housing, traditional housing, vernacular architecture ...
Pol of Ahmedabad , pol housing, traditional housing, vernacular architecture ...Pol of Ahmedabad , pol housing, traditional housing, vernacular architecture ...
Pol of Ahmedabad , pol housing, traditional housing, vernacular architecture ...
 
TEMPLE TOWN - Madurai and Omkareswar, India
TEMPLE TOWN - Madurai and Omkareswar, IndiaTEMPLE TOWN - Madurai and Omkareswar, India
TEMPLE TOWN - Madurai and Omkareswar, India
 
Railway Station Design 251115
Railway Station Design 251115Railway Station Design 251115
Railway Station Design 251115
 
Inter state bus terminal - Library Study & Case Study
Inter state bus terminal - Library Study & Case StudyInter state bus terminal - Library Study & Case Study
Inter state bus terminal - Library Study & Case Study
 
Noida Master Plan 2021
Noida Master Plan 2021Noida Master Plan 2021
Noida Master Plan 2021
 
The Design of Central Vista Delhi
The Design of Central Vista DelhiThe Design of Central Vista Delhi
The Design of Central Vista Delhi
 
Planning for a Multi-Modal Transportation Hub at Rourkela
Planning for a Multi-Modal Transportation Hub at RourkelaPlanning for a Multi-Modal Transportation Hub at Rourkela
Planning for a Multi-Modal Transportation Hub at Rourkela
 
Bhopal transport
Bhopal transportBhopal transport
Bhopal transport
 
CLIMATIC STUDY OF GUWAHATI
CLIMATIC STUDY OF GUWAHATICLIMATIC STUDY OF GUWAHATI
CLIMATIC STUDY OF GUWAHATI
 
UTTIPEC STREET DESIGN GUIDELINES
UTTIPEC STREET DESIGN GUIDELINESUTTIPEC STREET DESIGN GUIDELINES
UTTIPEC STREET DESIGN GUIDELINES
 
URBAN DESIGN (Mehdipatnam HYD)
URBAN DESIGN (Mehdipatnam HYD)URBAN DESIGN (Mehdipatnam HYD)
URBAN DESIGN (Mehdipatnam HYD)
 
MultiModal Transportation in New DElhi
MultiModal Transportation in New DElhiMultiModal Transportation in New DElhi
MultiModal Transportation in New DElhi
 
Master Plan by SPA Bhopal
Master Plan by SPA BhopalMaster Plan by SPA Bhopal
Master Plan by SPA Bhopal
 

Viewers also liked

incentives given by Maharastra govt to Enterpeneurs
incentives given by Maharastra govt to Enterpeneursincentives given by Maharastra govt to Enterpeneurs
incentives given by Maharastra govt to Enterpeneurs
Jayendra Krishna
 
Bandra Worli Sealink
Bandra Worli SealinkBandra Worli Sealink
Bandra Worli Sealink
DesignTeja
 
Blaise Diagne Airport
Blaise Diagne AirportBlaise Diagne Airport
Blaise Diagne Airport
cgla
 
Solar Energy Presentation - OPEX / RESCO / BOOT with 100% Funding
Solar Energy Presentation -  OPEX / RESCO / BOOT with 100% FundingSolar Energy Presentation -  OPEX / RESCO / BOOT with 100% Funding
Solar Energy Presentation - OPEX / RESCO / BOOT with 100% Funding
Enerco Energy Solutions LLP
 
Build,Operate,Own,Transfer (BOOT)
Build,Operate,Own,Transfer (BOOT)Build,Operate,Own,Transfer (BOOT)
Build,Operate,Own,Transfer (BOOT)
Mohd. Ikhwan
 
Worldhighestrailwaybridge
Worldhighestrailwaybridge Worldhighestrailwaybridge
Worldhighestrailwaybridge
Hakkim Shajahan
 

Viewers also liked (20)

Bandra Worli Sea Link
Bandra Worli Sea LinkBandra Worli Sea Link
Bandra Worli Sea Link
 
Bandra Worli Sealink
Bandra Worli SealinkBandra Worli Sealink
Bandra Worli Sealink
 
Bandra Worli sea link
Bandra Worli sea linkBandra Worli sea link
Bandra Worli sea link
 
Bandra worli sea link
Bandra worli sea linkBandra worli sea link
Bandra worli sea link
 
Bandra worli sealink pdf
Bandra worli sealink pdfBandra worli sealink pdf
Bandra worli sealink pdf
 
Bandra worli sealink
Bandra worli sealinkBandra worli sealink
Bandra worli sealink
 
Bandra Worli Bridge
Bandra Worli BridgeBandra Worli Bridge
Bandra Worli Bridge
 
Bandra Worli Sea Link #BWSL
Bandra Worli Sea Link #BWSLBandra Worli Sea Link #BWSL
Bandra Worli Sea Link #BWSL
 
Mumbai
MumbaiMumbai
Mumbai
 
Mmmodified copy
Mmmodified   copyMmmodified   copy
Mmmodified copy
 
B w sealink
B w sealinkB w sealink
B w sealink
 
incentives given by Maharastra govt to Enterpeneurs
incentives given by Maharastra govt to Enterpeneursincentives given by Maharastra govt to Enterpeneurs
incentives given by Maharastra govt to Enterpeneurs
 
Mirage - Rohan Lifescapes
Mirage - Rohan LifescapesMirage - Rohan Lifescapes
Mirage - Rohan Lifescapes
 
Vidhi seminar
Vidhi seminar Vidhi seminar
Vidhi seminar
 
Bandra Worli Sealink
Bandra Worli SealinkBandra Worli Sealink
Bandra Worli Sealink
 
Blaise Diagne Airport
Blaise Diagne AirportBlaise Diagne Airport
Blaise Diagne Airport
 
Solar Energy Presentation - OPEX / RESCO / BOOT with 100% Funding
Solar Energy Presentation -  OPEX / RESCO / BOOT with 100% FundingSolar Energy Presentation -  OPEX / RESCO / BOOT with 100% Funding
Solar Energy Presentation - OPEX / RESCO / BOOT with 100% Funding
 
Route Survey
Route SurveyRoute Survey
Route Survey
 
Build,Operate,Own,Transfer (BOOT)
Build,Operate,Own,Transfer (BOOT)Build,Operate,Own,Transfer (BOOT)
Build,Operate,Own,Transfer (BOOT)
 
Worldhighestrailwaybridge
Worldhighestrailwaybridge Worldhighestrailwaybridge
Worldhighestrailwaybridge
 

Similar to Bandra worli sea link,Mumbai,Maharashtra,India

Status of roads in nairobi by ps mo r 2nd august 2012
Status of roads in nairobi  by ps mo r 2nd august 2012Status of roads in nairobi  by ps mo r 2nd august 2012
Status of roads in nairobi by ps mo r 2nd august 2012
Functional Eco
 
AjayasankarK M _ Engineer
AjayasankarK M _ EngineerAjayasankarK M _ Engineer
AjayasankarK M _ Engineer
Ajay Sankar
 

Similar to Bandra worli sea link,Mumbai,Maharashtra,India (20)

Bandra worli sea link case study
Bandra worli sea link  case studyBandra worli sea link  case study
Bandra worli sea link case study
 
Analysis and Review of EIA of Padma Multipurpose Bridge Project in Bangladesh
Analysis and Review of EIA of Padma Multipurpose Bridge Project in BangladeshAnalysis and Review of EIA of Padma Multipurpose Bridge Project in Bangladesh
Analysis and Review of EIA of Padma Multipurpose Bridge Project in Bangladesh
 
Case Study on Mumbai Trans Harbor link
Case Study on Mumbai Trans Harbor linkCase Study on Mumbai Trans Harbor link
Case Study on Mumbai Trans Harbor link
 
Paper
PaperPaper
Paper
 
Training report done on Bridge Construction
Training report done on Bridge ConstructionTraining report done on Bridge Construction
Training report done on Bridge Construction
 
Padma Brige Project 2017
Padma Brige Project 2017Padma Brige Project 2017
Padma Brige Project 2017
 
CV Sriinivas 1i doc
CV Sriinivas 1i docCV Sriinivas 1i doc
CV Sriinivas 1i doc
 
Padma bridge
Padma bridgePadma bridge
Padma bridge
 
VCS Resume_May 2015
VCS Resume_May 2015VCS Resume_May 2015
VCS Resume_May 2015
 
electronic city elevated highway project.
electronic city elevated highway project. electronic city elevated highway project.
electronic city elevated highway project.
 
EASTERN PERIPHERAL EXPRESSWAY REPORT
EASTERN PERIPHERAL EXPRESSWAY REPORTEASTERN PERIPHERAL EXPRESSWAY REPORT
EASTERN PERIPHERAL EXPRESSWAY REPORT
 
CAREER LAND MARKS
CAREER LAND MARKSCAREER LAND MARKS
CAREER LAND MARKS
 
Status of roads in nairobi by ps mo r 2nd august 2012
Status of roads in nairobi  by ps mo r 2nd august 2012Status of roads in nairobi  by ps mo r 2nd august 2012
Status of roads in nairobi by ps mo r 2nd august 2012
 
BMRCL In-Plant Training Report
BMRCL In-Plant Training ReportBMRCL In-Plant Training Report
BMRCL In-Plant Training Report
 
General Project report standing abrevation stock fy mou rt if olc hgf hhb h ...
General Project report standing abrevation stock fy mou rt if olc hgf  hhb h ...General Project report standing abrevation stock fy mou rt if olc hgf  hhb h ...
General Project report standing abrevation stock fy mou rt if olc hgf hhb h ...
 
AjayasankarK M _ Engineer
AjayasankarK M _ EngineerAjayasankarK M _ Engineer
AjayasankarK M _ Engineer
 
Nl infrastructure oct 3 - oct 9, 2015
Nl infrastructure oct 3 - oct 9, 2015Nl infrastructure oct 3 - oct 9, 2015
Nl infrastructure oct 3 - oct 9, 2015
 
gammon report by priyanshu kumar, 9608684800
gammon report by priyanshu kumar, 9608684800gammon report by priyanshu kumar, 9608684800
gammon report by priyanshu kumar, 9608684800
 
PM Project group 4.pptx
PM Project group 4.pptxPM Project group 4.pptx
PM Project group 4.pptx
 
IRJET- Analysis of Construction in Terms of Sustainability in Sagar City Ring...
IRJET- Analysis of Construction in Terms of Sustainability in Sagar City Ring...IRJET- Analysis of Construction in Terms of Sustainability in Sagar City Ring...
IRJET- Analysis of Construction in Terms of Sustainability in Sagar City Ring...
 

Recently uploaded

Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdf
Kamal Acharya
 
Digital Signal Processing Lecture notes n.pdf
Digital Signal Processing Lecture notes n.pdfDigital Signal Processing Lecture notes n.pdf
Digital Signal Processing Lecture notes n.pdf
AbrahamGadissa
 
RS Khurmi Machine Design Clutch and Brake Exercise Numerical Solutions
RS Khurmi Machine Design Clutch and Brake Exercise Numerical SolutionsRS Khurmi Machine Design Clutch and Brake Exercise Numerical Solutions
RS Khurmi Machine Design Clutch and Brake Exercise Numerical Solutions
Atif Razi
 

Recently uploaded (20)

A case study of cinema management system project report..pdf
A case study of cinema management system project report..pdfA case study of cinema management system project report..pdf
A case study of cinema management system project report..pdf
 
Event Management System Vb Net Project Report.pdf
Event Management System Vb Net  Project Report.pdfEvent Management System Vb Net  Project Report.pdf
Event Management System Vb Net Project Report.pdf
 
Cloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptx
Cloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptxCloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptx
Cloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptx
 
retail automation billing system ppt.pptx
retail automation billing system ppt.pptxretail automation billing system ppt.pptx
retail automation billing system ppt.pptx
 
shape functions of 1D and 2 D rectangular elements.pptx
shape functions of 1D and 2 D rectangular elements.pptxshape functions of 1D and 2 D rectangular elements.pptx
shape functions of 1D and 2 D rectangular elements.pptx
 
NO1 Pandit Amil Baba In Bahawalpur, Sargodha, Sialkot, Sheikhupura, Rahim Yar...
NO1 Pandit Amil Baba In Bahawalpur, Sargodha, Sialkot, Sheikhupura, Rahim Yar...NO1 Pandit Amil Baba In Bahawalpur, Sargodha, Sialkot, Sheikhupura, Rahim Yar...
NO1 Pandit Amil Baba In Bahawalpur, Sargodha, Sialkot, Sheikhupura, Rahim Yar...
 
Halogenation process of chemical process industries
Halogenation process of chemical process industriesHalogenation process of chemical process industries
Halogenation process of chemical process industries
 
Introduction to Machine Learning Unit-5 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-5 Notes for II-II Mechanical EngineeringIntroduction to Machine Learning Unit-5 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-5 Notes for II-II Mechanical Engineering
 
KIT-601 Lecture Notes-UNIT-5.pdf Frame Works and Visualization
KIT-601 Lecture Notes-UNIT-5.pdf Frame Works and VisualizationKIT-601 Lecture Notes-UNIT-5.pdf Frame Works and Visualization
KIT-601 Lecture Notes-UNIT-5.pdf Frame Works and Visualization
 
Top 13 Famous Civil Engineering Scientist
Top 13 Famous Civil Engineering ScientistTop 13 Famous Civil Engineering Scientist
Top 13 Famous Civil Engineering Scientist
 
Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdf
 
Digital Signal Processing Lecture notes n.pdf
Digital Signal Processing Lecture notes n.pdfDigital Signal Processing Lecture notes n.pdf
Digital Signal Processing Lecture notes n.pdf
 
RESORT MANAGEMENT AND RESERVATION SYSTEM PROJECT REPORT.pdf
RESORT MANAGEMENT AND RESERVATION SYSTEM PROJECT REPORT.pdfRESORT MANAGEMENT AND RESERVATION SYSTEM PROJECT REPORT.pdf
RESORT MANAGEMENT AND RESERVATION SYSTEM PROJECT REPORT.pdf
 
Courier management system project report.pdf
Courier management system project report.pdfCourier management system project report.pdf
Courier management system project report.pdf
 
ENERGY STORAGE DEVICES INTRODUCTION UNIT-I
ENERGY STORAGE DEVICES  INTRODUCTION UNIT-IENERGY STORAGE DEVICES  INTRODUCTION UNIT-I
ENERGY STORAGE DEVICES INTRODUCTION UNIT-I
 
AI for workflow automation Use cases applications benefits and development.pdf
AI for workflow automation Use cases applications benefits and development.pdfAI for workflow automation Use cases applications benefits and development.pdf
AI for workflow automation Use cases applications benefits and development.pdf
 
RS Khurmi Machine Design Clutch and Brake Exercise Numerical Solutions
RS Khurmi Machine Design Clutch and Brake Exercise Numerical SolutionsRS Khurmi Machine Design Clutch and Brake Exercise Numerical Solutions
RS Khurmi Machine Design Clutch and Brake Exercise Numerical Solutions
 
Explosives Industry manufacturing process.pdf
Explosives Industry manufacturing process.pdfExplosives Industry manufacturing process.pdf
Explosives Industry manufacturing process.pdf
 
Furniture showroom management system project.pdf
Furniture showroom management system project.pdfFurniture showroom management system project.pdf
Furniture showroom management system project.pdf
 
Pharmacy management system project report..pdf
Pharmacy management system project report..pdfPharmacy management system project report..pdf
Pharmacy management system project report..pdf
 

Bandra worli sea link,Mumbai,Maharashtra,India

  • 1. Submitted By: Sulakshya Gaur(121684) Aayush Mittal(121685) Harshit Thakur(121689) Rajat Bhardwaj(121696) Puneet Goyal(121699)
  • 2. Bandra Worli Sea Link(BWSL) is the civil engineering marvel spanning across the arc of Mumbai coastline . •Started in 2000 •Opened in 2009
  • 3. Reduces time Regulation of traffic Stress free driving Reduces accidents and noise pollution
  • 4. Use of M60 grade concrete Largest span for cable stayed bridge Dimensions Material used India’s first bridge in open sea conditions An intelligent bridge management system (IBS) provides traffic information, surveillance, monitoring and control systems. Partners involved were ultratech, TATA steel, VSL Singapore, SPCC etc.
  • 5.
  • 6.  The entire project was originally conceived as one large project comprising, different components, but in order to accelerate the overall construction schedule, the project has been divided into five construction packages.  Package I: Construction of flyover over Love Grove junction at Worli.  Package II: Construction of cloverleaf interchange at Mahim intersection.  Package III: Construction of solid approach road from the Mahim intersection up to the start of the Toll Plaza on the Bandra side.
  • 7.  Package IV: Construction of Cable-Stayed Bridges together with viaduct approaches extending from Worli up to the Toll Plaza at Bandra end, Intelligent Bridge System (IBS).  Package V: Improvement to Khan Abdul Gaffar Khan Road.
  • 8.  Package IV is the largest and main phase of Bandra- Worli Sea Link Project. Main features of this technically challenging package are :  Cable-Stayed Bridge including viaduct approaches extending from Worli up to Toll Plaza at Bandra end.  Modern Toll Plaza.
  • 9.  The work order for work of construction of BWSL bridge was issued to HCC for Rs.400.23 crore. The completion time was stated as 30 months from the date of notice to proceed with the work.  The bridge layout is categorized into three different parts:  Part 1 - North-end approach structure.  Part 2 - Cable-Stayed Bridge.  Part 3 - South end approach structure.
  • 10.  A modern toll plaza with 16 lanes is provided at the Bandra end. The toll plaza is equipped with a state- of-the-art toll collection system. A structure is provided at this location to house the control system for the ITS.
  • 11.  Engineering Challenges 1) Laying of foundation 2) Heavy spans 3) Design of concrete tower 4) ground stabilization
  • 13.  Change in design of the bridge  Change in the contractors and the delay caused by them.
  • 14.
  • 15.  Estimated savings in Vehicle Operating Costs (VOC): Rs. 100 Crores per annum.  Considerable savings in travel time (20 to 30 minutes) due to increased speed and reduced delays (23 signals avoided).  Stress free driving.  Reduced accidents.  Reduction in traffic on existing roads because of traffic diversion to the Sea Link.
  • 16.  Reduction in Carbon Monoxide and Nitrogen Oxide Levels in Mahim, Dadar, Prabhadevi and Worli along existing roads.  Reduced noise pollution in Mahim, Dadar, Prabhadevi and Worli along existing roads.  No adverse effect on fisheries, marine life and livelihood of fisherman.  Landscaping along the approaches and waterfront promenade enhance the environment and add green spots to the city.
  • 17.
  • 18.  The cost of the Bandra-Worli Sea Link Project originally (July 1999) estimated at Rs.665.81 crore was revised (August 2004) to Rs.1,306.25 crore.  Though the project was originally expected to be completed by March 2003, the expected date of completion is now stated to be April 2008.Delay were mainly due technical changes brought up by new consultants .
  • 19.  The Company changed the design of the Worli bridge to “Cable stay” from “Arch bridge” to align with the bridge at Bandra, a decision, which could have been taken at the initial stages itself.  Against a commitment of Rs.580 crore by way of grants, the State Government had provided only Rs.100 crore till June 2007.
  • 20.  The selection process of Consultant for the design and project management work was defective, as the Company did not verify the technical parameters as projected by the Consultant.  The Company did not levy Liquidated Damages amounting to Rs.12.80 crore on the Contractor (HCC) as per conditions of the contract despite wrongful stoppage of work by them for 18 months and non-achievement of milestones due to poor progress of work.

Editor's Notes

  1. Though Packages-I, II and III i.e. flyover at Worli, Mahim Intersection, Solid approach road up to the start of toll plaza and a public promenade were completed (February 2003), the crucial Package-IV i.e. the main cable stayed bridge across the sea was delayed. The increase in project cost was mainly due to payments of escalation (Rs.213 crore) to Contractors on account of inordinate delay in completion (61 months), introduction of new technical changes in the bridge at the behest of the new Consultant (Rs.70 crore), provision for additional claims made by the Contractor for delay in award of work etc. (Rs.125 crore) and increase in interest liability due to delayed completion (Rs.230 crore).
  2. . This not only increased the cost by Rs.70 crore but also delayed completion of the works of Package-IV. Further, the Consultant was wrongly paid Rs.2.50 crore on account of deleted work.