Multi Model Integration of Bus Services With
Sub-urban Trains of Mira-Bhayandar
Project by
Mr. Vilas Dhage, MBMC, Dist. Thane
Dr. Dipak Sawant, MBMC, Dist. Thane
Mr Sunil Kumar Garg, MRVC, Mumbai
Mentor
Ms. Manjiri Akalkotkar
Contents
 Background
 Project Scope
 Project Limitations
 Methodology – How you will do the project
 Existing Condition and Issues
 Proposed Solutions
 Way Forward
2
Location of Mira-Bhayandar
Municiapal Corporation
3
•Area: 79 Sq km
•Density : 10200 Persons / Sqkm
•Population: 10 Lakh
City Profile
• Location : Near and at northern threshold of Greater Mumbai (MS)
• Area : 79 Sq Kms.
• Population : 8,14,615 (2011)
• Decadal growth : 57 %
• Density :
• No of Motorized vehicles : 1,24,891
(a) Cars/ Jeeps 26,227 (21%)
(b) Two Wheelers 72,436 (58%)
(c) Auto Rickshaws/Taxis 6,244 (5%)
(d) Other Commercial Vehicles: 19,982(16%)
(e) No. of PTAS (and vehicles) 6 (220)
Population Growth Pattern
5
Registered Vehicles
6
Distribution According to Household Income
7
Distribution of Land Use
8
Land Use Plan for Mira Bhayandar
9Mostly residential area, commute to greater Mumbai area
Agencies
 Two important agencies
 MRVC - A PSU of Ministry of Railways with
participation of Ministry of Railway and Govt. of
Maharashtra with equity in the ratio of 51:49. MRVC
implementing Rail Component of Mumbai Urban
Transport Project (MUTP).
 MBMC - A local municipal body also running Bus
services in the area.
10
Overall Objective
• To develop specific actions in the form of short, medium and
long term transportation improvement proposals that will
achieve the transportation vision for the area.
• Long term and short term strategic planning to achieve desirable
mobility pattern for the city’s population in a sustainable and
cost effective manner.
• To make city to make the “engine of economic growth”
• To provide amenities and infrastructure for the convenience of
passengers and public transport vehicles.
• To take up measure of development for improvement of mobility
of people and make city livable.
Objective for the Project
 To assess the existing condition at Railway stations and
plan safe, efficient & environmentally sustainable
means for multimodal integration of bus Services with
sub-urban trains of Mira-Bhainder.
 To rationalize the bus services to sub-urban trains.
Background of city in context of project
• Existing Public Transport :-
• Sub-Urban Trains.
• MBMT, BEST, NMMT, TMT, MSRTC.
• Taxi & auto rickshaw.
• Road Network :- Well connected by road to National High Way.
(Thane, Mumbai & Gujrat)
• Rail Network :- Two railway stations
• Mira Road, Bhainder
• Suburban western local train service viz. Chuchgate to Virar. Two lakh
passengers board-alight everyday at above two stations (total 4 lakh)
Mira Bhayandar Road Network
14
Connected to MMR by two main
arterials
MMR Existing Rail Route
15
Location map of Mira Road Station
Location map of Bhayandar Station
Connected two main stations –
Chrchgate –Virar Line
Mira Bhayandar Stations
 Feeder service by multiple Public Transport
Authorities viz.
 MBMT, MSRTC, BEST, TMT, UMT, KDMT, NMMT,
VVMT
 Majority of people take bus to the stations
 2nd most preferred way is to walk to station
 3rd most preferred way is autorickshaw
 Station area need improvement for seamless journey
16
Railway Station Characteristics of Mira Road
Mode of Transportation By people :-
Bus 30%
Auto 20%
2 /4 Wheeler 14%
By Walking 34%
Cycle 2%
No of
Passenger
Entered
No of
Passenger
exited
No of
Bus
Routs
Trip Of Buses
Per Day
Frequency
of Buses
per Hours
Mira Road 99,370 96,228 12 698 38
Railway Station Characteristics Of Bhaindar
Mode of Transportation By people :-
Bus 49%
Auto 10%
2 /4 Wheeler 14%
By Walking 27%
Cycle 1%
No of
Passenger
Entered
No of
Passenger
exited
No of
Bus
Routs
Trip Of Buses
Per Day
Frequency
of Buses
per Hours
Bhaindar 1,01,042 1,14,050 24 1032 57
Scope of Work
 Delineate Station planning area for the Integration
of bus services with Sub-Urban Local trains
 Existing condition analysis and demand – supply
gap analysis of transportation needs
 Define Mobility Vision and Goals
 Identification of policy measures and individual
projects
 Preparation of a detailed plan involving
stakeholders consultation.
19
Methodology
• Define the scope & goals for the station area
integration
• Data collection & analysis (PTAs and Railways)
• Identification of issues, observations & conclusions
• Study on improvement / modification of existing
facilities
20
Methodology
• Identify Participation and involvement of all
Stakeholders, including that of NGOs & community
organizations.
• Assessment of impact on environment and social
aspect.
 Preparation of Plans and Estimates.
21
Existing Problems
• Traffic Congestion at stations
• Issues related to the bus service at stations
• Lack of coordination among the PTAs;
• Absence of Bus Terminus & Shelters;
• Uncertainty of Bus Schedules and Routes and lack of
public information systems;
• Direct connection from railway exit/entrance to the bus
stops lacking
22
Existing Problems
• Transfer of passengers from one mode that i.e. From
Local train to Bus services is inconvenient and time
consuming.
• Exposure of users to inclement climate (rains, humid
and hot weather)
• Various activities in the station vicinity
• Hawkers
• Drop off by other vehicles
23
Approach
 Travel pattern
 origin and destination
 Time of the day and mode choice
 Land use pattern & bus routes
 Mobility challenges
 Street connectivity within MBMC
 Institutional issues
 Coordination of bus schedules among PTA
24
Integration of Transport
 Infrastructure Integration
 Institutional Integration
 Operational Integration
 Information Integration
Information Integration
 Mobile enabled ITS facilities (M-Indicator) for
information regarding Rail & all STAs bus timings.
 Display boards at Bus stops with ETA for different Bus
operators
 Display boards at Terminals
Strategies
• Rationalization of bus service to stations
• Schedules, span of service and destination
• Integration Public information
• For railway and buses – time and route
• Station Area Traffic Improvement ,
• Seamless Accessibility with bus stops and
• Common fare collection mechanism
• Parking and drop off facilities
• Development of terminus, bus shelters
• Pedestrian pathways,
• Establishing Control/Management
• Funding by contribution of PTA and/or Government
Grants.
27
Strategy: Infrastructure Integration
 Modernization of Mira Road & Bhainder stations by
MRVC
 Beautification of Mira Road Station by MBMC
 Common Bus Shelters for different Bus operators
 Common Bus Terminals for different Bus operators
 Designated Auto Rickshaw stands at Rly Stations
 Designated parking spaces for two wheelers and four
wheelers
 Bus Stops integrated with Skywalk entry/exit for
pedestrians
Strategy: Institutional Integration
 UMMTA for MMR Region
 Seamless ticketing for all STAs and trains in MMR
region
 Planning coordination amogst different municipalities
and councils in MMR Region.
Data Collected – Other Agencies
1. Trespassing over Railway Track in Mumbai Suburban area
& remedial measures thereon By JJ School of Architecture,
Mumbai.
2. Mumbai Sub- urban Rail Passenger Surveys
and Analysis By Wilber Smith
3. Study on Station Area improvement of MIRA-Bhyandar
stations by Egis,
4. Comprehensive Mobility Plan (CMP) for Mira Bhayandar by
Urban Mass Transit Company Limited,
5. Short Term Traffic Improvement and Management Plan
for Mira Bhayandar by Urban Mass Transit Company Limited,
6. Field Visit
30
Data Collected
7. Data has been collected regarding future proposed
expenses road networking metro lines etc.
• Assessment of impact on environment and social aspect.
• Interaction with all Stakeholder, including that of NGOs &
community organization.
8. No of trains at both stations
9. Boarding and alighting data at both stations
10. Mode share at both stations
31
Details of Buses from Bhayandar Rly. Station
32
33
Details of Buses from Mira Road Rly. Station
New Bus Routes
 New Route Identification for Implementation
Route
No.
Bhaindar
(W)
Route
No.
Bhaindar
(E)
Route
No.
Mira Road
35 Boriwali,
Charkop
36 & 43 Ring Route
(via Indalok)
37 Ring Route
(via S.K. Stone)
42 Thane (W)
(Chendani
Koliwada)
40 Mulund (W) 39 Thakur Colledge
(via Magathane)
44 Mira Road
(E)
41 Ring Route
(Golden Nest via
Indralok)
46 Ring Route
(Sec. 7 to Sec. 10)
NOS OF TRAINS AT MIRA ROAD & BHAYANDAR RILWAY STATIONS
35
Passangers Entry-Exit Detail At Mira Road Rly Station
36
37
Passangers Entry-Exit Detailes At Bhayandar Rly Station
Peak hour mode shares for Mira Road & Bhayandar
Stations
38
Demand-Supply Analysis of Buses At Bhayandar & Mira Road Rly Station
39
Note : 1) Data Collection is Between 8.00 AM to 22.00 PM
2) Sitting Capacity of the Single Decker Bus is 49 to 51 with 20 to 21 standing
Railway map of the Bhayandar Station
40
Platforms : 6 Nos.
F.O.B. : 3 Nos.
Booking office : 16 nos.
Some Long distance Trains also halt at Bhayandar Station
Railway map of the Mira Road Station
41
Platforms : 4 Nos.
F.O.B. : 3 Nos.
Booking office : 13 nos.
Present Scenario at Bhyandar Road Rly Station
42
Issues at Bhayandar East Junction
43
Present Scenario at mira Road Station
44
•
Issues at Mira Road East Junction
45
General Findings
 Improper Scheduling of the Buses,
 Traffic Congestion due to high proportion of personal
mode, parking vehicle on road side, Lack of traffic
discipline etc.
 Absence of Information systems for Buses at Railway
Station & vice-versa,
 Noise & Air pollution
 Various activities in the station vicinity
• Hawkers
• Drop off by other vehicles
Findings -Institutional
 Multiplicity of agencies
 Difficulty in coordinating the roles of central, state and
Local Government agencies
 Individual objectives which are inconsistent with overall
development objectives
 Difficulties encountered within individual transport
agencies
 Functional responsibility unrelated to available
resources
47
Findings -Institutional
 Delays in implementation or non implementation of
essential schemes
 Lack of appropriate resources –
 Rarely the transport planning/ execution/ operational
organizations are staffed with the professionals required to
accomplish the given objectives
 Lack of shared goals & Objectives
48
Findings - Infrastructure
 Lack of proper bus terminal with
 basic facility like shelter,
 toilet & water
 Inadequate parking space, un-athorised parking,
 Encroachment of circulating area near railway
station by hawkers
 Lack of foot path leading to transit stops
 Mixing of buses and private vehicles;
49
Findings Operations
• Transfer of passengers from one mode that i.e. From
Local train to Bus services is inconvenient and time
consuming
• Mismatch of bus schedule, frequency and demand of
passengers
• Exposure of users to inclement climate (rains, humid
and hot weather)
Short Term Solution
1. Improvement to circulating area near station by
shifting hawkers, unauthorized parking,
2. Proper lane provision for buses, autorikshaw etc.
3. Rescheduling of buses according to demand,
4. Common fare system for various mode,
5. Dedicated footpath, skywalk up to bus pick-up
point including proper Informatory sign boards,
6. Enforcing of Traffic discipline,
7. Display of information of various mode,
8. Set-up of unilateral body to monitor various
mode of transport,
51
Long Term Solution
Considering the growing population &
potential of the further development of land use,
1. Development of Modern Bus Terminal with basic
amenities,
2. Station area improvement by segregating traffic
on various mode at different level to seamless
access to railway station,
3. Multi-level parking facility for Private vehicles
for convenient inter-chainging,
4. Identifying the new route to promote public
transport,
5. Promotion to NMT
52
Perception Plan For Mira Road Station Area
53
PLATFORM NO 2 & 3
PLATFORM NO 4
PLATFORM NO 1
ELEVATED WALKWAY
FOB3
FOB2
FOB1
RAILWAY
VACANT LAND
TF ROOM
SHANTI
OFFICE
RAILWA
Y
OFFICE
TOILET
BOOKIN
G
OFFICE
BOOKIN
G
OFFICE
PROPOSED
BASEMENT AREA FOR
PARKING
APPROX 10000 SQM
Perception Plan For Mira Road Station Area
54
11
22
33
44 55
55
22
66
66
77
88
99
11
22
33
44
55
66
77
88
99
10
11
12
CENTRAL PLAZA
STALLS
PROPOSED BUILDING
PLANTER
RAMP FOR CENTRAL PLAZA
RAMP FOR BASEMENT TWO WHEELER PARKING
PRIVATE VEHICLE LANE
AUTO VEHICLE LANE
TAXI VEHICLE LANE
PLATFORM FOR BUS
STAIRS TO SKYWALK
BUS LANE
12
10
11
Perception Plan For Mira Road Station Area
55
Planning at Bhayandar Station
56
• FOB 3 is congested Need Widening / Additional FOB
• Escalators for the Convenience of the Old People.
V/C=0.82
V/C=0.92
Perception Plan for Bhayandar Station Area Improvement
Vehicular Movement
drop-off
pick-up
Bus stop
Terminal
Perception Plan for Bhayandar Station Area Improvement
TO BE DEMOLISHED
LAND IDENTIFIED
FOR STATION
IMPROVEMENT
Perception Plan for Bhayandar Station Area Improvement
11
22
3344
55
6677
88
99
10
11
22
33
44
55
66
77
88
99
10
PROPOSED DROP OFF AND PICK UP
PROPOSED BOOKING OFFICE AT FOB LEVEL
PROPOSED STATION BUILDING ON WEST SIDE
EXISTING FOB-2 JOINED
WITH PROPOSED STATION BUILDING
PROPOSED DROP OFF AND PICK UP
PROPOSED STATION BUILDING ON EAST SIDE
PROPOSED BOOKING OFFICE AT BOTH LVL
PROPOSED STAIRS AND ESCALATORS
PROPOSED LIFTS
RAILWAY PROPOSED FOB
Way Forward / Future Steps
• Analyzing existing transport / situation.
• Traveled demand assessment .
• Development of vision and goal, planning of medium
and long range measure along with cost estimated and
prioitization of project.
60
Discussion
Any project or New Idea comes into reality only
with the Fund Availability & Institutional Support at
local, State & Central level.
61
62

More Related Content

What's hot

Ahmedabad,The Metropolitan city
Ahmedabad,The Metropolitan cityAhmedabad,The Metropolitan city
Ahmedabad,The Metropolitan city
Himanshu Pipaliya
 
REGIONAL PLAN: A CASE OF MUMBAI METROPOLITAN REGION
REGIONAL PLAN: A CASE OF MUMBAI METROPOLITAN REGIONREGIONAL PLAN: A CASE OF MUMBAI METROPOLITAN REGION
REGIONAL PLAN: A CASE OF MUMBAI METROPOLITAN REGION
Yash Shah
 
Surat BRTS - Abhijit Lokre
Surat BRTS - Abhijit LokreSurat BRTS - Abhijit Lokre
Surat BRTS - Abhijit Lokre
WRI Ross Center for Sustainable Cities
 
UJJAIN DEVELOPMENT PLAN (Transportation Proposals)
UJJAIN DEVELOPMENT PLAN (Transportation Proposals) UJJAIN DEVELOPMENT PLAN (Transportation Proposals)
UJJAIN DEVELOPMENT PLAN (Transportation Proposals)
shrikrishna kesharwani
 
Aim, objective and methodology of transit oriented development (TOD)
Aim, objective and methodology of transit oriented development (TOD)Aim, objective and methodology of transit oriented development (TOD)
Aim, objective and methodology of transit oriented development (TOD)
padamatikona swapnika
 
Area Appreciation Studio - 2021 - SPAD M.Plan
Area Appreciation Studio - 2021 - SPAD M.PlanArea Appreciation Studio - 2021 - SPAD M.Plan
Area Appreciation Studio - 2021 - SPAD M.Plan
Lakshman R
 
Transit Oriented Development.
Transit Oriented Development.Transit Oriented Development.
Transit Oriented Development.
shrikrishna kesharwani
 
Medium towns as future growth centers
Medium towns as future growth centersMedium towns as future growth centers
Medium towns as future growth centers
Omkar Parishwad
 
World Class Bus Rapid Transit System (BRTS) for Bangalore
World Class Bus Rapid Transit System (BRTS) for BangaloreWorld Class Bus Rapid Transit System (BRTS) for Bangalore
World Class Bus Rapid Transit System (BRTS) for Bangalore
Kiran Shaw
 
Transit Oriented Development
Transit Oriented DevelopmentTransit Oriented Development
Transit Oriented Development
glogan56
 
TOD in India
TOD in IndiaTOD in India
Mumbai metro project Phase I
Mumbai metro project Phase IMumbai metro project Phase I
Mumbai metro project Phase I
Karan Shah
 
Ahmedabad cmp
Ahmedabad cmpAhmedabad cmp
Ahmedabad cmp
Abhishek Kanwar
 
Varanasi -town planning pdf
Varanasi -town planning  pdfVaranasi -town planning  pdf
Varanasi -town planning pdf
AayushiMalviya4
 
Bhubaneswar- Urban Planning
Bhubaneswar- Urban PlanningBhubaneswar- Urban Planning
Bhubaneswar- Urban Planning
Kharunya Chitravelu
 
Transportation analysis at anand vihar
Transportation analysis at anand viharTransportation analysis at anand vihar
Transportation analysis at anand vihar
Sneha Lata
 
Draft Development Plan 2021 (Review) AUDA - D Thara, IAS
Draft Development Plan 2021 (Review) AUDA - D Thara, IASDraft Development Plan 2021 (Review) AUDA - D Thara, IAS
Draft Development Plan 2021 (Review) AUDA - D Thara, IAS
WRI Ross Center for Sustainable Cities
 
Methodology for Preparation of Master Plan
Methodology  for  Preparation of Master PlanMethodology  for  Preparation of Master Plan
Methodology for Preparation of Master Plan
JIT KUMAR GUPTA
 
1.6 Town planning India pre & post independence
1.6  Town planning India pre & post independence1.6  Town planning India pre & post independence
1.6 Town planning India pre & post independence
Sachin PatiL
 

What's hot (20)

Ahmedabad,The Metropolitan city
Ahmedabad,The Metropolitan cityAhmedabad,The Metropolitan city
Ahmedabad,The Metropolitan city
 
REGIONAL PLAN: A CASE OF MUMBAI METROPOLITAN REGION
REGIONAL PLAN: A CASE OF MUMBAI METROPOLITAN REGIONREGIONAL PLAN: A CASE OF MUMBAI METROPOLITAN REGION
REGIONAL PLAN: A CASE OF MUMBAI METROPOLITAN REGION
 
Surat BRTS - Abhijit Lokre
Surat BRTS - Abhijit LokreSurat BRTS - Abhijit Lokre
Surat BRTS - Abhijit Lokre
 
UJJAIN DEVELOPMENT PLAN (Transportation Proposals)
UJJAIN DEVELOPMENT PLAN (Transportation Proposals) UJJAIN DEVELOPMENT PLAN (Transportation Proposals)
UJJAIN DEVELOPMENT PLAN (Transportation Proposals)
 
Aim, objective and methodology of transit oriented development (TOD)
Aim, objective and methodology of transit oriented development (TOD)Aim, objective and methodology of transit oriented development (TOD)
Aim, objective and methodology of transit oriented development (TOD)
 
Area Appreciation Studio - 2021 - SPAD M.Plan
Area Appreciation Studio - 2021 - SPAD M.PlanArea Appreciation Studio - 2021 - SPAD M.Plan
Area Appreciation Studio - 2021 - SPAD M.Plan
 
Brts
BrtsBrts
Brts
 
Transit Oriented Development.
Transit Oriented Development.Transit Oriented Development.
Transit Oriented Development.
 
Medium towns as future growth centers
Medium towns as future growth centersMedium towns as future growth centers
Medium towns as future growth centers
 
World Class Bus Rapid Transit System (BRTS) for Bangalore
World Class Bus Rapid Transit System (BRTS) for BangaloreWorld Class Bus Rapid Transit System (BRTS) for Bangalore
World Class Bus Rapid Transit System (BRTS) for Bangalore
 
Transit Oriented Development
Transit Oriented DevelopmentTransit Oriented Development
Transit Oriented Development
 
TOD in India
TOD in IndiaTOD in India
TOD in India
 
Mumbai metro project Phase I
Mumbai metro project Phase IMumbai metro project Phase I
Mumbai metro project Phase I
 
Ahmedabad cmp
Ahmedabad cmpAhmedabad cmp
Ahmedabad cmp
 
Varanasi -town planning pdf
Varanasi -town planning  pdfVaranasi -town planning  pdf
Varanasi -town planning pdf
 
Bhubaneswar- Urban Planning
Bhubaneswar- Urban PlanningBhubaneswar- Urban Planning
Bhubaneswar- Urban Planning
 
Transportation analysis at anand vihar
Transportation analysis at anand viharTransportation analysis at anand vihar
Transportation analysis at anand vihar
 
Draft Development Plan 2021 (Review) AUDA - D Thara, IAS
Draft Development Plan 2021 (Review) AUDA - D Thara, IASDraft Development Plan 2021 (Review) AUDA - D Thara, IAS
Draft Development Plan 2021 (Review) AUDA - D Thara, IAS
 
Methodology for Preparation of Master Plan
Methodology  for  Preparation of Master PlanMethodology  for  Preparation of Master Plan
Methodology for Preparation of Master Plan
 
1.6 Town planning India pre & post independence
1.6  Town planning India pre & post independence1.6  Town planning India pre & post independence
1.6 Town planning India pre & post independence
 

Viewers also liked

Means of transport
Means of transport Means of transport
Means of transport
Graça Alexandre
 
Prepositions with Forms of Transport
Prepositions with Forms of TransportPrepositions with Forms of Transport
Prepositions with Forms of Transport
theLecturette
 
ESL: Means of Transport: Video
ESL: Means of Transport: VideoESL: Means of Transport: Video
ESL: Means of Transport: VideoA. Simoes
 
Crocodile App
Crocodile AppCrocodile App
Crocodile App
crocodileapp
 
World Usability Day
World Usability DayWorld Usability Day
World Usability Day
Alinta.Thornton
 
Tom's TEFL - Transport
Tom's TEFL - TransportTom's TEFL - Transport
Tom's TEFL - Transport
Hong Kong Primary School
 
Online flight booking srs document
Online flight booking srs documentOnline flight booking srs document
Online flight booking srs document
manthankdesai
 
Integrated Public Transport System - Bangalore
Integrated Public Transport System - BangaloreIntegrated Public Transport System - Bangalore
Integrated Public Transport System - BangaloreTehsin Kazi
 
Means Of Transport 1st Class
Means Of Transport   1st ClassMeans Of Transport   1st Class
Means Of Transport 1st Classmonodeth
 
Open Data als Chance für die IT-Branche
Open Data als Chance für die IT-BrancheOpen Data als Chance für die IT-Branche
Open Data als Chance für die IT-Branche
Robert Seyfriedsberger
 
Reise nach berlin
Reise nach berlinReise nach berlin
Reise nach berlinkrizser
 
Hardware
HardwareHardware
HardwareFLIEEP
 
C# Workshop - Networking
C# Workshop - NetworkingC# Workshop - Networking
C# Workshop - Networking
Qiong Wu
 
Pragmatic SOA - Beschränken auf das Wesentliche
Pragmatic SOA - Beschränken auf das WesentlichePragmatic SOA - Beschränken auf das Wesentliche
Pragmatic SOA - Beschränken auf das Wesentliche
1&1
 
Grobe einführung der fahrzeugelektronik und vernetzungssystem
Grobe einführung der fahrzeugelektronik und vernetzungssystemGrobe einführung der fahrzeugelektronik und vernetzungssystem
Grobe einführung der fahrzeugelektronik und vernetzungssystemTG-CDA
 
learn German with street signs
learn German with street signslearn German with street signs
learn German with street signs
RomyMatthies
 
Els carrils BUS-VAO del Maresme i de la C-58
Els carrils BUS-VAO del Maresme i de la C-58Els carrils BUS-VAO del Maresme i de la C-58
Els carrils BUS-VAO del Maresme i de la C-58
AMTU
 
Means of transportation
Means of transportationMeans of transportation
Means of transportation
Érico Damada
 

Viewers also liked (20)

Means of transport
Means of transport Means of transport
Means of transport
 
Prepositions with Forms of Transport
Prepositions with Forms of TransportPrepositions with Forms of Transport
Prepositions with Forms of Transport
 
ESL: Means of Transport: Video
ESL: Means of Transport: VideoESL: Means of Transport: Video
ESL: Means of Transport: Video
 
Crocodile App
Crocodile AppCrocodile App
Crocodile App
 
World Usability Day
World Usability DayWorld Usability Day
World Usability Day
 
Tom's TEFL - Transport
Tom's TEFL - TransportTom's TEFL - Transport
Tom's TEFL - Transport
 
Online flight booking srs document
Online flight booking srs documentOnline flight booking srs document
Online flight booking srs document
 
Integrated Public Transport System - Bangalore
Integrated Public Transport System - BangaloreIntegrated Public Transport System - Bangalore
Integrated Public Transport System - Bangalore
 
Means Of Transport 1st Class
Means Of Transport   1st ClassMeans Of Transport   1st Class
Means Of Transport 1st Class
 
Transports and travelling
Transports and travellingTransports and travelling
Transports and travelling
 
Open Data als Chance für die IT-Branche
Open Data als Chance für die IT-BrancheOpen Data als Chance für die IT-Branche
Open Data als Chance für die IT-Branche
 
Reise nach berlin
Reise nach berlinReise nach berlin
Reise nach berlin
 
Hardware
HardwareHardware
Hardware
 
C# Workshop - Networking
C# Workshop - NetworkingC# Workshop - Networking
C# Workshop - Networking
 
Pragmatic SOA - Beschränken auf das Wesentliche
Pragmatic SOA - Beschränken auf das WesentlichePragmatic SOA - Beschränken auf das Wesentliche
Pragmatic SOA - Beschränken auf das Wesentliche
 
Grobe einführung der fahrzeugelektronik und vernetzungssystem
Grobe einführung der fahrzeugelektronik und vernetzungssystemGrobe einführung der fahrzeugelektronik und vernetzungssystem
Grobe einführung der fahrzeugelektronik und vernetzungssystem
 
learn German with street signs
learn German with street signslearn German with street signs
learn German with street signs
 
Els carrils BUS-VAO del Maresme i de la C-58
Els carrils BUS-VAO del Maresme i de la C-58Els carrils BUS-VAO del Maresme i de la C-58
Els carrils BUS-VAO del Maresme i de la C-58
 
Ejercicio 8
Ejercicio 8Ejercicio 8
Ejercicio 8
 
Means of transportation
Means of transportationMeans of transportation
Means of transportation
 

Similar to Multi model integration of bus and train services mira bhayandar

Comprehensive mobility plan for thiruvananthapuram
Comprehensive mobility plan for thiruvananthapuramComprehensive mobility plan for thiruvananthapuram
Comprehensive mobility plan for thiruvananthapuram
Joel Manoj
 
City Bus Service Modernisation "BusKaroPlus" - Anjum Parwez, IAS
City Bus Service Modernisation "BusKaroPlus" - Anjum Parwez, IASCity Bus Service Modernisation "BusKaroPlus" - Anjum Parwez, IAS
City Bus Service Modernisation "BusKaroPlus" - Anjum Parwez, IAS
WRI Ross Center for Sustainable Cities
 
Market research on the Bandra Skywalk
Market research on the Bandra SkywalkMarket research on the Bandra Skywalk
Market research on the Bandra SkywalkHeemanish Midde
 
First – Last Mile_MBPJ_2015
First – Last Mile_MBPJ_2015First – Last Mile_MBPJ_2015
First – Last Mile_MBPJ_2015Norma Nun
 
Note on T&T Issues in GM and MCGM's Initiatives and Policies_13th Jan 2015_V3
Note on T&T Issues in GM and MCGM's Initiatives and Policies_13th Jan 2015_V3Note on T&T Issues in GM and MCGM's Initiatives and Policies_13th Jan 2015_V3
Note on T&T Issues in GM and MCGM's Initiatives and Policies_13th Jan 2015_V3Abhinav miryala
 
project ppt.pptx
project ppt.pptxproject ppt.pptx
project ppt.pptx
Aswin132028
 
94f86e45 9650-4b3c-8899-11ee30369769-converted
94f86e45 9650-4b3c-8899-11ee30369769-converted94f86e45 9650-4b3c-8899-11ee30369769-converted
94f86e45 9650-4b3c-8899-11ee30369769-converted
PARASMONGIA2
 
15-03 Relief Line Public Meeting Presentation
15-03 Relief Line Public Meeting Presentation15-03 Relief Line Public Meeting Presentation
15-03 Relief Line Public Meeting Presentation
Toronto Public Consultation Unit
 
The Development of Public Transportation Strategic Plan for Metro Cebu Volume...
The Development of Public Transportation Strategic Plan for Metro Cebu Volume...The Development of Public Transportation Strategic Plan for Metro Cebu Volume...
The Development of Public Transportation Strategic Plan for Metro Cebu Volume...
Emmanuel Mongaya
 
Project Mobility: Route 3 Express Toll Lanes Study
Project Mobility: Route 3 Express Toll Lanes StudyProject Mobility: Route 3 Express Toll Lanes Study
Project Mobility: Route 3 Express Toll Lanes Study
Metropolitan Area Planning Council
 
VTA North East County Open Houses Presentation, July 21
VTA North East County Open Houses Presentation, July 21VTA North East County Open Houses Presentation, July 21
VTA North East County Open Houses Presentation, July 21SCVTA
 
Presentation 07.10.2017
Presentation 07.10.2017Presentation 07.10.2017
Presentation 07.10.2017
Sanjeev Dyamannavar
 
15 03-24 rlpa sag1 presentation
15 03-24 rlpa sag1 presentation15 03-24 rlpa sag1 presentation
15 03-24 rlpa sag1 presentation
Toronto Public Consultation Unit
 
Necessity of integrated transport system to namma
Necessity of integrated transport system to nammaNecessity of integrated transport system to namma
Necessity of integrated transport system to namma
eSAT Publishing House
 
Necessity of integrated transport system to namma metro at byapanahalli – a s...
Necessity of integrated transport system to namma metro at byapanahalli – a s...Necessity of integrated transport system to namma metro at byapanahalli – a s...
Necessity of integrated transport system to namma metro at byapanahalli – a s...
eSAT Journals
 
VTA North County Open House Presentation April 2014
VTA North County Open House Presentation April 2014VTA North County Open House Presentation April 2014
VTA North County Open House Presentation April 2014
SCVTA
 
@ UDRI - Traffic & Transportation Plan - Final
@ UDRI - Traffic & Transportation Plan - Final@ UDRI - Traffic & Transportation Plan - Final
@ UDRI - Traffic & Transportation Plan - FinalAltamash Khan
 

Similar to Multi model integration of bus and train services mira bhayandar (20)

Comprehensive mobility plan for thiruvananthapuram
Comprehensive mobility plan for thiruvananthapuramComprehensive mobility plan for thiruvananthapuram
Comprehensive mobility plan for thiruvananthapuram
 
City Bus Service Modernisation "BusKaroPlus" - Anjum Parwez, IAS
City Bus Service Modernisation "BusKaroPlus" - Anjum Parwez, IASCity Bus Service Modernisation "BusKaroPlus" - Anjum Parwez, IAS
City Bus Service Modernisation "BusKaroPlus" - Anjum Parwez, IAS
 
5 route network rs final
5 route network rs final5 route network rs final
5 route network rs final
 
Market research on the Bandra Skywalk
Market research on the Bandra SkywalkMarket research on the Bandra Skywalk
Market research on the Bandra Skywalk
 
Makkah Metro Presentation
Makkah Metro Presentation Makkah Metro Presentation
Makkah Metro Presentation
 
First – Last Mile_MBPJ_2015
First – Last Mile_MBPJ_2015First – Last Mile_MBPJ_2015
First – Last Mile_MBPJ_2015
 
Note on T&T Issues in GM and MCGM's Initiatives and Policies_13th Jan 2015_V3
Note on T&T Issues in GM and MCGM's Initiatives and Policies_13th Jan 2015_V3Note on T&T Issues in GM and MCGM's Initiatives and Policies_13th Jan 2015_V3
Note on T&T Issues in GM and MCGM's Initiatives and Policies_13th Jan 2015_V3
 
project ppt.pptx
project ppt.pptxproject ppt.pptx
project ppt.pptx
 
94f86e45 9650-4b3c-8899-11ee30369769-converted
94f86e45 9650-4b3c-8899-11ee30369769-converted94f86e45 9650-4b3c-8899-11ee30369769-converted
94f86e45 9650-4b3c-8899-11ee30369769-converted
 
India Smart Cities and Urban Transport
India Smart Cities and Urban TransportIndia Smart Cities and Urban Transport
India Smart Cities and Urban Transport
 
15-03 Relief Line Public Meeting Presentation
15-03 Relief Line Public Meeting Presentation15-03 Relief Line Public Meeting Presentation
15-03 Relief Line Public Meeting Presentation
 
The Development of Public Transportation Strategic Plan for Metro Cebu Volume...
The Development of Public Transportation Strategic Plan for Metro Cebu Volume...The Development of Public Transportation Strategic Plan for Metro Cebu Volume...
The Development of Public Transportation Strategic Plan for Metro Cebu Volume...
 
Project Mobility: Route 3 Express Toll Lanes Study
Project Mobility: Route 3 Express Toll Lanes StudyProject Mobility: Route 3 Express Toll Lanes Study
Project Mobility: Route 3 Express Toll Lanes Study
 
VTA North East County Open Houses Presentation, July 21
VTA North East County Open Houses Presentation, July 21VTA North East County Open Houses Presentation, July 21
VTA North East County Open Houses Presentation, July 21
 
Presentation 07.10.2017
Presentation 07.10.2017Presentation 07.10.2017
Presentation 07.10.2017
 
15 03-24 rlpa sag1 presentation
15 03-24 rlpa sag1 presentation15 03-24 rlpa sag1 presentation
15 03-24 rlpa sag1 presentation
 
Necessity of integrated transport system to namma
Necessity of integrated transport system to nammaNecessity of integrated transport system to namma
Necessity of integrated transport system to namma
 
Necessity of integrated transport system to namma metro at byapanahalli – a s...
Necessity of integrated transport system to namma metro at byapanahalli – a s...Necessity of integrated transport system to namma metro at byapanahalli – a s...
Necessity of integrated transport system to namma metro at byapanahalli – a s...
 
VTA North County Open House Presentation April 2014
VTA North County Open House Presentation April 2014VTA North County Open House Presentation April 2014
VTA North County Open House Presentation April 2014
 
@ UDRI - Traffic & Transportation Plan - Final
@ UDRI - Traffic & Transportation Plan - Final@ UDRI - Traffic & Transportation Plan - Final
@ UDRI - Traffic & Transportation Plan - Final
 

Recently uploaded

Business update Q1 2024 Lar España Real Estate SOCIMI
Business update Q1 2024 Lar España Real Estate SOCIMIBusiness update Q1 2024 Lar España Real Estate SOCIMI
Business update Q1 2024 Lar España Real Estate SOCIMI
AlejandraGmez176757
 
Q1’2024 Update: MYCI’s Leap Year Rebound
Q1’2024 Update: MYCI’s Leap Year ReboundQ1’2024 Update: MYCI’s Leap Year Rebound
Q1’2024 Update: MYCI’s Leap Year Rebound
Oppotus
 
做(mqu毕业证书)麦考瑞大学毕业证硕士文凭证书学费发票原版一模一样
做(mqu毕业证书)麦考瑞大学毕业证硕士文凭证书学费发票原版一模一样做(mqu毕业证书)麦考瑞大学毕业证硕士文凭证书学费发票原版一模一样
做(mqu毕业证书)麦考瑞大学毕业证硕士文凭证书学费发票原版一模一样
axoqas
 
FP Growth Algorithm and its Applications
FP Growth Algorithm and its ApplicationsFP Growth Algorithm and its Applications
FP Growth Algorithm and its Applications
MaleehaSheikh2
 
一比一原版(YU毕业证)约克大学毕业证成绩单
一比一原版(YU毕业证)约克大学毕业证成绩单一比一原版(YU毕业证)约克大学毕业证成绩单
一比一原版(YU毕业证)约克大学毕业证成绩单
enxupq
 
Sample_Global Non-invasive Prenatal Testing (NIPT) Market, 2019-2030.pdf
Sample_Global Non-invasive Prenatal Testing (NIPT) Market, 2019-2030.pdfSample_Global Non-invasive Prenatal Testing (NIPT) Market, 2019-2030.pdf
Sample_Global Non-invasive Prenatal Testing (NIPT) Market, 2019-2030.pdf
Linda486226
 
standardisation of garbhpala offhgfffghh
standardisation of garbhpala offhgfffghhstandardisation of garbhpala offhgfffghh
standardisation of garbhpala offhgfffghh
ArpitMalhotra16
 
一比一原版(CU毕业证)卡尔顿大学毕业证成绩单
一比一原版(CU毕业证)卡尔顿大学毕业证成绩单一比一原版(CU毕业证)卡尔顿大学毕业证成绩单
一比一原版(CU毕业证)卡尔顿大学毕业证成绩单
yhkoc
 
社内勉強会資料_LLM Agents                              .
社内勉強会資料_LLM Agents                              .社内勉強会資料_LLM Agents                              .
社内勉強会資料_LLM Agents                              .
NABLAS株式会社
 
The affect of service quality and online reviews on customer loyalty in the E...
The affect of service quality and online reviews on customer loyalty in the E...The affect of service quality and online reviews on customer loyalty in the E...
The affect of service quality and online reviews on customer loyalty in the E...
jerlynmaetalle
 
SOCRadar Germany 2024 Threat Landscape Report
SOCRadar Germany 2024 Threat Landscape ReportSOCRadar Germany 2024 Threat Landscape Report
SOCRadar Germany 2024 Threat Landscape Report
SOCRadar
 
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单
ewymefz
 
Levelwise PageRank with Loop-Based Dead End Handling Strategy : SHORT REPORT ...
Levelwise PageRank with Loop-Based Dead End Handling Strategy : SHORT REPORT ...Levelwise PageRank with Loop-Based Dead End Handling Strategy : SHORT REPORT ...
Levelwise PageRank with Loop-Based Dead End Handling Strategy : SHORT REPORT ...
Subhajit Sahu
 
Algorithmic optimizations for Dynamic Levelwise PageRank (from STICD) : SHORT...
Algorithmic optimizations for Dynamic Levelwise PageRank (from STICD) : SHORT...Algorithmic optimizations for Dynamic Levelwise PageRank (from STICD) : SHORT...
Algorithmic optimizations for Dynamic Levelwise PageRank (from STICD) : SHORT...
Subhajit Sahu
 
Malana- Gimlet Market Analysis (Portfolio 2)
Malana- Gimlet Market Analysis (Portfolio 2)Malana- Gimlet Market Analysis (Portfolio 2)
Malana- Gimlet Market Analysis (Portfolio 2)
TravisMalana
 
一比一原版(UVic毕业证)维多利亚大学毕业证成绩单
一比一原版(UVic毕业证)维多利亚大学毕业证成绩单一比一原版(UVic毕业证)维多利亚大学毕业证成绩单
一比一原版(UVic毕业证)维多利亚大学毕业证成绩单
ukgaet
 
Opendatabay - Open Data Marketplace.pptx
Opendatabay - Open Data Marketplace.pptxOpendatabay - Open Data Marketplace.pptx
Opendatabay - Open Data Marketplace.pptx
Opendatabay
 
Empowering Data Analytics Ecosystem.pptx
Empowering Data Analytics Ecosystem.pptxEmpowering Data Analytics Ecosystem.pptx
Empowering Data Analytics Ecosystem.pptx
benishzehra469
 
Criminal IP - Threat Hunting Webinar.pdf
Criminal IP - Threat Hunting Webinar.pdfCriminal IP - Threat Hunting Webinar.pdf
Criminal IP - Threat Hunting Webinar.pdf
Criminal IP
 
一比一原版(CBU毕业证)卡普顿大学毕业证成绩单
一比一原版(CBU毕业证)卡普顿大学毕业证成绩单一比一原版(CBU毕业证)卡普顿大学毕业证成绩单
一比一原版(CBU毕业证)卡普顿大学毕业证成绩单
nscud
 

Recently uploaded (20)

Business update Q1 2024 Lar España Real Estate SOCIMI
Business update Q1 2024 Lar España Real Estate SOCIMIBusiness update Q1 2024 Lar España Real Estate SOCIMI
Business update Q1 2024 Lar España Real Estate SOCIMI
 
Q1’2024 Update: MYCI’s Leap Year Rebound
Q1’2024 Update: MYCI’s Leap Year ReboundQ1’2024 Update: MYCI’s Leap Year Rebound
Q1’2024 Update: MYCI’s Leap Year Rebound
 
做(mqu毕业证书)麦考瑞大学毕业证硕士文凭证书学费发票原版一模一样
做(mqu毕业证书)麦考瑞大学毕业证硕士文凭证书学费发票原版一模一样做(mqu毕业证书)麦考瑞大学毕业证硕士文凭证书学费发票原版一模一样
做(mqu毕业证书)麦考瑞大学毕业证硕士文凭证书学费发票原版一模一样
 
FP Growth Algorithm and its Applications
FP Growth Algorithm and its ApplicationsFP Growth Algorithm and its Applications
FP Growth Algorithm and its Applications
 
一比一原版(YU毕业证)约克大学毕业证成绩单
一比一原版(YU毕业证)约克大学毕业证成绩单一比一原版(YU毕业证)约克大学毕业证成绩单
一比一原版(YU毕业证)约克大学毕业证成绩单
 
Sample_Global Non-invasive Prenatal Testing (NIPT) Market, 2019-2030.pdf
Sample_Global Non-invasive Prenatal Testing (NIPT) Market, 2019-2030.pdfSample_Global Non-invasive Prenatal Testing (NIPT) Market, 2019-2030.pdf
Sample_Global Non-invasive Prenatal Testing (NIPT) Market, 2019-2030.pdf
 
standardisation of garbhpala offhgfffghh
standardisation of garbhpala offhgfffghhstandardisation of garbhpala offhgfffghh
standardisation of garbhpala offhgfffghh
 
一比一原版(CU毕业证)卡尔顿大学毕业证成绩单
一比一原版(CU毕业证)卡尔顿大学毕业证成绩单一比一原版(CU毕业证)卡尔顿大学毕业证成绩单
一比一原版(CU毕业证)卡尔顿大学毕业证成绩单
 
社内勉強会資料_LLM Agents                              .
社内勉強会資料_LLM Agents                              .社内勉強会資料_LLM Agents                              .
社内勉強会資料_LLM Agents                              .
 
The affect of service quality and online reviews on customer loyalty in the E...
The affect of service quality and online reviews on customer loyalty in the E...The affect of service quality and online reviews on customer loyalty in the E...
The affect of service quality and online reviews on customer loyalty in the E...
 
SOCRadar Germany 2024 Threat Landscape Report
SOCRadar Germany 2024 Threat Landscape ReportSOCRadar Germany 2024 Threat Landscape Report
SOCRadar Germany 2024 Threat Landscape Report
 
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单
 
Levelwise PageRank with Loop-Based Dead End Handling Strategy : SHORT REPORT ...
Levelwise PageRank with Loop-Based Dead End Handling Strategy : SHORT REPORT ...Levelwise PageRank with Loop-Based Dead End Handling Strategy : SHORT REPORT ...
Levelwise PageRank with Loop-Based Dead End Handling Strategy : SHORT REPORT ...
 
Algorithmic optimizations for Dynamic Levelwise PageRank (from STICD) : SHORT...
Algorithmic optimizations for Dynamic Levelwise PageRank (from STICD) : SHORT...Algorithmic optimizations for Dynamic Levelwise PageRank (from STICD) : SHORT...
Algorithmic optimizations for Dynamic Levelwise PageRank (from STICD) : SHORT...
 
Malana- Gimlet Market Analysis (Portfolio 2)
Malana- Gimlet Market Analysis (Portfolio 2)Malana- Gimlet Market Analysis (Portfolio 2)
Malana- Gimlet Market Analysis (Portfolio 2)
 
一比一原版(UVic毕业证)维多利亚大学毕业证成绩单
一比一原版(UVic毕业证)维多利亚大学毕业证成绩单一比一原版(UVic毕业证)维多利亚大学毕业证成绩单
一比一原版(UVic毕业证)维多利亚大学毕业证成绩单
 
Opendatabay - Open Data Marketplace.pptx
Opendatabay - Open Data Marketplace.pptxOpendatabay - Open Data Marketplace.pptx
Opendatabay - Open Data Marketplace.pptx
 
Empowering Data Analytics Ecosystem.pptx
Empowering Data Analytics Ecosystem.pptxEmpowering Data Analytics Ecosystem.pptx
Empowering Data Analytics Ecosystem.pptx
 
Criminal IP - Threat Hunting Webinar.pdf
Criminal IP - Threat Hunting Webinar.pdfCriminal IP - Threat Hunting Webinar.pdf
Criminal IP - Threat Hunting Webinar.pdf
 
一比一原版(CBU毕业证)卡普顿大学毕业证成绩单
一比一原版(CBU毕业证)卡普顿大学毕业证成绩单一比一原版(CBU毕业证)卡普顿大学毕业证成绩单
一比一原版(CBU毕业证)卡普顿大学毕业证成绩单
 

Multi model integration of bus and train services mira bhayandar

  • 1. Multi Model Integration of Bus Services With Sub-urban Trains of Mira-Bhayandar Project by Mr. Vilas Dhage, MBMC, Dist. Thane Dr. Dipak Sawant, MBMC, Dist. Thane Mr Sunil Kumar Garg, MRVC, Mumbai Mentor Ms. Manjiri Akalkotkar
  • 2. Contents  Background  Project Scope  Project Limitations  Methodology – How you will do the project  Existing Condition and Issues  Proposed Solutions  Way Forward 2
  • 3. Location of Mira-Bhayandar Municiapal Corporation 3 •Area: 79 Sq km •Density : 10200 Persons / Sqkm •Population: 10 Lakh
  • 4. City Profile • Location : Near and at northern threshold of Greater Mumbai (MS) • Area : 79 Sq Kms. • Population : 8,14,615 (2011) • Decadal growth : 57 % • Density : • No of Motorized vehicles : 1,24,891 (a) Cars/ Jeeps 26,227 (21%) (b) Two Wheelers 72,436 (58%) (c) Auto Rickshaws/Taxis 6,244 (5%) (d) Other Commercial Vehicles: 19,982(16%) (e) No. of PTAS (and vehicles) 6 (220)
  • 7. Distribution According to Household Income 7
  • 9. Land Use Plan for Mira Bhayandar 9Mostly residential area, commute to greater Mumbai area
  • 10. Agencies  Two important agencies  MRVC - A PSU of Ministry of Railways with participation of Ministry of Railway and Govt. of Maharashtra with equity in the ratio of 51:49. MRVC implementing Rail Component of Mumbai Urban Transport Project (MUTP).  MBMC - A local municipal body also running Bus services in the area. 10
  • 11. Overall Objective • To develop specific actions in the form of short, medium and long term transportation improvement proposals that will achieve the transportation vision for the area. • Long term and short term strategic planning to achieve desirable mobility pattern for the city’s population in a sustainable and cost effective manner. • To make city to make the “engine of economic growth” • To provide amenities and infrastructure for the convenience of passengers and public transport vehicles. • To take up measure of development for improvement of mobility of people and make city livable.
  • 12. Objective for the Project  To assess the existing condition at Railway stations and plan safe, efficient & environmentally sustainable means for multimodal integration of bus Services with sub-urban trains of Mira-Bhainder.  To rationalize the bus services to sub-urban trains.
  • 13. Background of city in context of project • Existing Public Transport :- • Sub-Urban Trains. • MBMT, BEST, NMMT, TMT, MSRTC. • Taxi & auto rickshaw. • Road Network :- Well connected by road to National High Way. (Thane, Mumbai & Gujrat) • Rail Network :- Two railway stations • Mira Road, Bhainder • Suburban western local train service viz. Chuchgate to Virar. Two lakh passengers board-alight everyday at above two stations (total 4 lakh)
  • 14. Mira Bhayandar Road Network 14 Connected to MMR by two main arterials
  • 15. MMR Existing Rail Route 15 Location map of Mira Road Station Location map of Bhayandar Station Connected two main stations – Chrchgate –Virar Line
  • 16. Mira Bhayandar Stations  Feeder service by multiple Public Transport Authorities viz.  MBMT, MSRTC, BEST, TMT, UMT, KDMT, NMMT, VVMT  Majority of people take bus to the stations  2nd most preferred way is to walk to station  3rd most preferred way is autorickshaw  Station area need improvement for seamless journey 16
  • 17. Railway Station Characteristics of Mira Road Mode of Transportation By people :- Bus 30% Auto 20% 2 /4 Wheeler 14% By Walking 34% Cycle 2% No of Passenger Entered No of Passenger exited No of Bus Routs Trip Of Buses Per Day Frequency of Buses per Hours Mira Road 99,370 96,228 12 698 38
  • 18. Railway Station Characteristics Of Bhaindar Mode of Transportation By people :- Bus 49% Auto 10% 2 /4 Wheeler 14% By Walking 27% Cycle 1% No of Passenger Entered No of Passenger exited No of Bus Routs Trip Of Buses Per Day Frequency of Buses per Hours Bhaindar 1,01,042 1,14,050 24 1032 57
  • 19. Scope of Work  Delineate Station planning area for the Integration of bus services with Sub-Urban Local trains  Existing condition analysis and demand – supply gap analysis of transportation needs  Define Mobility Vision and Goals  Identification of policy measures and individual projects  Preparation of a detailed plan involving stakeholders consultation. 19
  • 20. Methodology • Define the scope & goals for the station area integration • Data collection & analysis (PTAs and Railways) • Identification of issues, observations & conclusions • Study on improvement / modification of existing facilities 20
  • 21. Methodology • Identify Participation and involvement of all Stakeholders, including that of NGOs & community organizations. • Assessment of impact on environment and social aspect.  Preparation of Plans and Estimates. 21
  • 22. Existing Problems • Traffic Congestion at stations • Issues related to the bus service at stations • Lack of coordination among the PTAs; • Absence of Bus Terminus & Shelters; • Uncertainty of Bus Schedules and Routes and lack of public information systems; • Direct connection from railway exit/entrance to the bus stops lacking 22
  • 23. Existing Problems • Transfer of passengers from one mode that i.e. From Local train to Bus services is inconvenient and time consuming. • Exposure of users to inclement climate (rains, humid and hot weather) • Various activities in the station vicinity • Hawkers • Drop off by other vehicles 23
  • 24. Approach  Travel pattern  origin and destination  Time of the day and mode choice  Land use pattern & bus routes  Mobility challenges  Street connectivity within MBMC  Institutional issues  Coordination of bus schedules among PTA 24
  • 25. Integration of Transport  Infrastructure Integration  Institutional Integration  Operational Integration  Information Integration
  • 26. Information Integration  Mobile enabled ITS facilities (M-Indicator) for information regarding Rail & all STAs bus timings.  Display boards at Bus stops with ETA for different Bus operators  Display boards at Terminals
  • 27. Strategies • Rationalization of bus service to stations • Schedules, span of service and destination • Integration Public information • For railway and buses – time and route • Station Area Traffic Improvement , • Seamless Accessibility with bus stops and • Common fare collection mechanism • Parking and drop off facilities • Development of terminus, bus shelters • Pedestrian pathways, • Establishing Control/Management • Funding by contribution of PTA and/or Government Grants. 27
  • 28. Strategy: Infrastructure Integration  Modernization of Mira Road & Bhainder stations by MRVC  Beautification of Mira Road Station by MBMC  Common Bus Shelters for different Bus operators  Common Bus Terminals for different Bus operators  Designated Auto Rickshaw stands at Rly Stations  Designated parking spaces for two wheelers and four wheelers  Bus Stops integrated with Skywalk entry/exit for pedestrians
  • 29. Strategy: Institutional Integration  UMMTA for MMR Region  Seamless ticketing for all STAs and trains in MMR region  Planning coordination amogst different municipalities and councils in MMR Region.
  • 30. Data Collected – Other Agencies 1. Trespassing over Railway Track in Mumbai Suburban area & remedial measures thereon By JJ School of Architecture, Mumbai. 2. Mumbai Sub- urban Rail Passenger Surveys and Analysis By Wilber Smith 3. Study on Station Area improvement of MIRA-Bhyandar stations by Egis, 4. Comprehensive Mobility Plan (CMP) for Mira Bhayandar by Urban Mass Transit Company Limited, 5. Short Term Traffic Improvement and Management Plan for Mira Bhayandar by Urban Mass Transit Company Limited, 6. Field Visit 30
  • 31. Data Collected 7. Data has been collected regarding future proposed expenses road networking metro lines etc. • Assessment of impact on environment and social aspect. • Interaction with all Stakeholder, including that of NGOs & community organization. 8. No of trains at both stations 9. Boarding and alighting data at both stations 10. Mode share at both stations 31
  • 32. Details of Buses from Bhayandar Rly. Station 32
  • 33. 33 Details of Buses from Mira Road Rly. Station
  • 34. New Bus Routes  New Route Identification for Implementation Route No. Bhaindar (W) Route No. Bhaindar (E) Route No. Mira Road 35 Boriwali, Charkop 36 & 43 Ring Route (via Indalok) 37 Ring Route (via S.K. Stone) 42 Thane (W) (Chendani Koliwada) 40 Mulund (W) 39 Thakur Colledge (via Magathane) 44 Mira Road (E) 41 Ring Route (Golden Nest via Indralok) 46 Ring Route (Sec. 7 to Sec. 10)
  • 35. NOS OF TRAINS AT MIRA ROAD & BHAYANDAR RILWAY STATIONS 35
  • 36. Passangers Entry-Exit Detail At Mira Road Rly Station 36
  • 37. 37 Passangers Entry-Exit Detailes At Bhayandar Rly Station
  • 38. Peak hour mode shares for Mira Road & Bhayandar Stations 38
  • 39. Demand-Supply Analysis of Buses At Bhayandar & Mira Road Rly Station 39 Note : 1) Data Collection is Between 8.00 AM to 22.00 PM 2) Sitting Capacity of the Single Decker Bus is 49 to 51 with 20 to 21 standing
  • 40. Railway map of the Bhayandar Station 40 Platforms : 6 Nos. F.O.B. : 3 Nos. Booking office : 16 nos. Some Long distance Trains also halt at Bhayandar Station
  • 41. Railway map of the Mira Road Station 41 Platforms : 4 Nos. F.O.B. : 3 Nos. Booking office : 13 nos.
  • 42. Present Scenario at Bhyandar Road Rly Station 42
  • 43. Issues at Bhayandar East Junction 43
  • 44. Present Scenario at mira Road Station 44
  • 45. • Issues at Mira Road East Junction 45
  • 46. General Findings  Improper Scheduling of the Buses,  Traffic Congestion due to high proportion of personal mode, parking vehicle on road side, Lack of traffic discipline etc.  Absence of Information systems for Buses at Railway Station & vice-versa,  Noise & Air pollution  Various activities in the station vicinity • Hawkers • Drop off by other vehicles
  • 47. Findings -Institutional  Multiplicity of agencies  Difficulty in coordinating the roles of central, state and Local Government agencies  Individual objectives which are inconsistent with overall development objectives  Difficulties encountered within individual transport agencies  Functional responsibility unrelated to available resources 47
  • 48. Findings -Institutional  Delays in implementation or non implementation of essential schemes  Lack of appropriate resources –  Rarely the transport planning/ execution/ operational organizations are staffed with the professionals required to accomplish the given objectives  Lack of shared goals & Objectives 48
  • 49. Findings - Infrastructure  Lack of proper bus terminal with  basic facility like shelter,  toilet & water  Inadequate parking space, un-athorised parking,  Encroachment of circulating area near railway station by hawkers  Lack of foot path leading to transit stops  Mixing of buses and private vehicles; 49
  • 50. Findings Operations • Transfer of passengers from one mode that i.e. From Local train to Bus services is inconvenient and time consuming • Mismatch of bus schedule, frequency and demand of passengers • Exposure of users to inclement climate (rains, humid and hot weather)
  • 51. Short Term Solution 1. Improvement to circulating area near station by shifting hawkers, unauthorized parking, 2. Proper lane provision for buses, autorikshaw etc. 3. Rescheduling of buses according to demand, 4. Common fare system for various mode, 5. Dedicated footpath, skywalk up to bus pick-up point including proper Informatory sign boards, 6. Enforcing of Traffic discipline, 7. Display of information of various mode, 8. Set-up of unilateral body to monitor various mode of transport, 51
  • 52. Long Term Solution Considering the growing population & potential of the further development of land use, 1. Development of Modern Bus Terminal with basic amenities, 2. Station area improvement by segregating traffic on various mode at different level to seamless access to railway station, 3. Multi-level parking facility for Private vehicles for convenient inter-chainging, 4. Identifying the new route to promote public transport, 5. Promotion to NMT 52
  • 53. Perception Plan For Mira Road Station Area 53
  • 54. PLATFORM NO 2 & 3 PLATFORM NO 4 PLATFORM NO 1 ELEVATED WALKWAY FOB3 FOB2 FOB1 RAILWAY VACANT LAND TF ROOM SHANTI OFFICE RAILWA Y OFFICE TOILET BOOKIN G OFFICE BOOKIN G OFFICE PROPOSED BASEMENT AREA FOR PARKING APPROX 10000 SQM Perception Plan For Mira Road Station Area 54
  • 55. 11 22 33 44 55 55 22 66 66 77 88 99 11 22 33 44 55 66 77 88 99 10 11 12 CENTRAL PLAZA STALLS PROPOSED BUILDING PLANTER RAMP FOR CENTRAL PLAZA RAMP FOR BASEMENT TWO WHEELER PARKING PRIVATE VEHICLE LANE AUTO VEHICLE LANE TAXI VEHICLE LANE PLATFORM FOR BUS STAIRS TO SKYWALK BUS LANE 12 10 11 Perception Plan For Mira Road Station Area 55
  • 56. Planning at Bhayandar Station 56 • FOB 3 is congested Need Widening / Additional FOB • Escalators for the Convenience of the Old People. V/C=0.82 V/C=0.92
  • 57. Perception Plan for Bhayandar Station Area Improvement Vehicular Movement drop-off pick-up Bus stop Terminal
  • 58. Perception Plan for Bhayandar Station Area Improvement TO BE DEMOLISHED LAND IDENTIFIED FOR STATION IMPROVEMENT
  • 59. Perception Plan for Bhayandar Station Area Improvement 11 22 3344 55 6677 88 99 10 11 22 33 44 55 66 77 88 99 10 PROPOSED DROP OFF AND PICK UP PROPOSED BOOKING OFFICE AT FOB LEVEL PROPOSED STATION BUILDING ON WEST SIDE EXISTING FOB-2 JOINED WITH PROPOSED STATION BUILDING PROPOSED DROP OFF AND PICK UP PROPOSED STATION BUILDING ON EAST SIDE PROPOSED BOOKING OFFICE AT BOTH LVL PROPOSED STAIRS AND ESCALATORS PROPOSED LIFTS RAILWAY PROPOSED FOB
  • 60. Way Forward / Future Steps • Analyzing existing transport / situation. • Traveled demand assessment . • Development of vision and goal, planning of medium and long range measure along with cost estimated and prioitization of project. 60
  • 61. Discussion Any project or New Idea comes into reality only with the Fund Availability & Institutional Support at local, State & Central level. 61
  • 62. 62