El Camino Bus Rapid Transit Project
El Camino Real Bus Rapid Transit Project
Would upgrade the current 522 Rapid Bus to BRT status by
making changes to El Camino Real and The Alameda that
make transit FAST, FREQUENT AND RELIABLE and make
WALKING and BICYCLING along the corridor SAFER.
El Camino Real Bus Rapid Transit Project
Making Stops Faster
BRT stations would function like light rail stations, allowing passengers
to purchase fares or tap Clipper Cards at stations and board through all
three doors.
Increasing Transit Travel Speeds
In some parts of the corridor, a general use lane could be converted into a
bus-only lane, allowing the BRT to bypass traffic.
Transit signal priority would allow an approaching BRT bus to hold a
green light.
El Camino Real Bus Rapid Transit Project
Making Bicycling and Walking Safer
El Camino Real is designed for cars and can be a scary and dangerous place
to bicycle or walk. Many bicycle and pedestrian collisions occur each year
and some are fatal.
In parts of the corridor with bus-only lanes, bicycle lanes could be
installed (if the city approves).
Crossing distances would be shortened and new intersections, signals and
crosswalks can be added to make El Camino Real less of a barrier between
neighborhoods.
Median BRT stations would act as pedestrian refuges.
Mixed Flow Configuration
Two Possible Ways to Implement BRT
Dedicated Lane Configuration
Two Possible Ways to Implement BRT
How Bus-Only Lanes Work – Dedicated Lanes
In some parts of the corridor, the bus-only lane would be in the center of the
street, adjacent to the median. BRT stations would be in the middle of the
street. The eastbound and westbound stations would be on opposite sides of
the intersection.
Bus-Only Lanes
WB BRT Station
El Camino Real Bus Rapid Transit Project
How Bulbout Stations Work - Mixed Flow
In parts of the corridor with bulbout stations, the curb would be
extended out to the travel lane. The BRT would stop in the
travel lane while passengers board—approximately a 20-second
duration.
BRT stops in lane
Bulbout BRT Station
El Camino Real Bus Rapid Transit Project
Project Alternatives and Environmental Analysis
Seven project alternatives—ranging from doing nothing to
building 14 miles of bus-only lanes—are currently being
studied by VTA.
A Draft Environmental Impact Report (DEIR), which
analyzes the impact that the project will have across 17
categories will be released in late Summer, 2014.
VTA’s Board of Directors will choose a locally preferred
alternative after the public comment period for the DEIR.
El Camino Real Bus Rapid Transit Project
Public Outreach and City Coordination
2010 to present Monthly meetings with city staff
Summer, 2011 City Council, committee presentations
Fall, 2011 Open House community meetings
Spring , 2012 City Council, committee presentations
Fall, 2012 VTA Board of Directors workshop, mtg.
February, 2013 Environmental Scoping meetings
El Camino Real Bus Rapid Transit Project
Silicon Valley Express Lanes
What are Express Lanes?
• Express Lanes are converted carpool lanes that
offer solo drivers the opportunity to use carpool
lanes for a fee.
13
Why are Express Lanes being developed?
• To provide congestion relief through more
effective use of HOV lane capacity
• To provide commuters with a new mobility
option
• To better manage lanes to keep traffic moving
and provide more reliable travel times
14
Who can use Express Lanes?
• SOLO DRIVERS: Can use Express Lanes for a
fee when there is available capacity.
• CARPOOL USERS: Eligible vehicles with two
or more people per car, exempt clean air vehicles,
transit buses, and motorcycles travel in Express
Lanes FREE of charge.
15
Why drivers use Express Lanes
• Drivers choose to use Express Lanes for a variety
of reasons at different times, but the most reported
reasons are:
• Time Savings
• Ease of Commute
• Convenience
16
FasTrak ®
17
NO TOLL BOOTHS
FEES
AUTOMATICALLY
DEDUCTED FROM
ACCOUNT
FASTRAK
TRANSPONDER
ATTACHES TO
WINDSHIELD
How Much Do Solo Drivers Pay?
• Range of cost on SR 237 has been
between $0.30 and $4.75, with an
average toll less than $2.00
• Pricing changes as the number of
cars increases or decreases to
ensure a free flow of traffic
• When more cars are on the
roadway, the price to enter the
Express Lanes is higher. When
there are fewer cars on the road,
the price is lower
18
Digital Signage and Pricing
19
How Do I Pay?
• Step 1: Visit bayareafastrak.org to learn about
FasTrak®
• Step 2: Purchase a toll tag through FasTrak® or at
retail locations
• Step 3: Register your new toll tag immediately to
a new or existing FasTrak® account online
or by phone at (877) 229-8655.
• Step 4: After you have completed the registration
process, mount toll tag in your vehicle and
begin enjoying the benefits of FasTrak®.
20
How Are Toll Revenues Used?
• Expenses for operations,
maintenance, and enforcement of
Express Lanes are the first use of
toll revenues.
• Any remaining revenues are to be
used within the corridor for
transportation improvements
including transit
21
Where /When Can I Use Express Lanes?
Express Lanes are proposed on the following
routes:
• SR 237 Express Lanes
• Phase 1 (in operation March 2012)
• Phase 2 (2016 pending funding)
• SR 85 Express Lanes - 2017 pending funding
• US 101 Express Lanes - 2017 pending funding
• Express Lanes will operate at the same times as
existing HOV lanes.
22
23
SR 237 Express Lanes Data
• Up to 10,000 solo drivers use the SR 237 Express
Lanes each week
• Solo drivers have saved up to 20 minutes
• Drivers in the general purpose lanes are saving up to
seven (7) minutes
24
SR 237 Express Lanes – Phase 2
• Project Description
• Single-lane Express Lane (convert HOV lane from
existing Phase 1 terminus to approximately Mathilda
Ave.)
• Project length: 4 miles
• Environmental Clearance
• Fall 2014
• Project Opening
• Targeting 2016, funding dependent
25
26
SR 85 Express Lanes
• Project Description
• Single-lane Express Lane (convert HOV lane from
US 101 interchange in San Jose to US 101
interchange in Mountain View)
• Double-lane Express Lanes (add another lane in each
direction between the SR 87 and I-280 interchanges)
• Project length: 27 miles
• Environmental Clearance
• Circulation December 2013
• Approval Early 2015
• Project Opening
• Targeting 2017, funding dependent
27
28
US 101 Express Lanes
• Project Description
• Single-lane Express Lane (convert HOV lane from
Cochrane Rd. in Morgan Hill to SR 85 interchange in
Mountain View)
• Double-lane Express Lanes (add a new lane between
Dunne Ave. and SR 85 interchange in San Jose, between
Blossom Hill Road and Mathilda Dr. in Sunnyvale; and
convert double-lane HOV lanes from SR85 interchange
in Mtn View to the county line in Palo Alto)
• Project length: 36 miles
• Environmental Clearance
• Early 2015
• Project Opening
• Targeting 2017, funding dependent
29
30
North Central County Bus Improvement Plan
NORTH CENTRAL COUNTY BUS IMPROVEMENT PLAN
PURPOSE
The planned Bus Rapid Transit (BRT) services on El Camino Real and Stevens Creek
may change travel demand on local bus routes that cross these corridors.
Additionally, the cities in this area (Mountain View, Sunnyvale, Santa Clara and
Cupertino) are intensifying land uses in areas that are not easily accessible by BRT so
it may be necessary to make changes to local bus service to meet a changing rider
demand. The Plan will make recommendations that will flow into VTA’s scheduled
service adjustment process.
GOALS
Improve connectivity of local routes with the BRT routes
Explore whether new service types or new routes are needed
Improve overall transit service in the study area while being cost effective
Collect input from the communities in the study area
NORTH CENTRAL COUNTY BUS IMPROVEMENT PLAN
STUDY AREA
NORTH CENTRAL COUNTY BUS IMPROVEMENT PLAN
SCHEDULE
2014
April Existing Conditions Analysis
May Development of Draft Recommendations
June Review Draft Recommendations with City Staff
July Community and City Council Meetings
August Final Recommendations released
2015
VTA’s Biennial Service Changes
2018
Service Changes relating to opening of BRT routes
Rider Surveys
New Bus Stop
Designs
Easy To Work With
TRANSIT
PASSENGER
ENVIRONMENT
PLAN
Prioritizing
Improvements
Stop Percentiles
RidershipPercentages
Most of VTA’s bus riders come from a small
percentage of stops. 21% of bus riders come
from the top 1% of bus stops. 50% of bus riders
come from 5% of bus stops.
That tells us we need to prioritize improvements
to high-ridership stops to ensure the maximum
rider benefit per dollar spent.
Prioritizing
Improvements
New Bus Stop
Designs
Easy To Work With
TRANSIT
PASSENGER
ENVIRONMENT
PLAN
Rider Surveys
In the past, decisions about how to improve bus
stops were made with good intentions, but not
with data regarding which bus stop amenities
riders value most.
VTA surveyed riders in the summer of 2013 and
found that transit information is the most desired
amenity, followed by shelter and seating. This
information will inform which types of
improvements are installed.
Prioritizing
Improvements
Easy To Work With
TRANSIT
PASSENGER
ENVIRONMENT
PLAN
Rider Surveys
New Bus Stop
Designs
Many of VTA’s boxy, blue shelters are
approaching the end of their 20-year lifetime.
They will need to be replaced in the coming
decade so we’re looking at new, more functional,
more aesthetically pleasing shelter designs.
Prioritizing
Improvements
TRANSIT
PASSENGER
ENVIRONMENT
PLAN
Rider Surveys
New Bus Stop
Designs
Easy To Work With
In the past, VTA’s thinking about bus stop design
has been somewhat rigid and it hasn’t been easy
for cities, developers and the public to know how
to work with VTA. The Transit Passenger
Environment Plan explains all of VTA’s policies
about bus stops and makes it easy to work with
us.
Light Rail Efficiency Project
Tasman Drive Pocket Track
Project Description
• Constructs approximately 1,000 foot long storage track
on Tasman Drive between Old Ironsides Drive and
Patrick Henry Drive.
• Capable of storing three 3-car trains.
• Enables flexibility for VTA service to support Levi’s
Stadium events in 2014 and BART connection in 2017.
• Construction Budget: Approximately $14M.
• Construction Start: February 2014.
• Construction End: December 2014.
Santa Clara Stadium Site
42Source: 49ers Stadium EIR, 2009/ AECOM, 2012
Light Rail Efficiency Project
Tasman Drive Pocket Track
CONSTRUCTION PHOTOS
DOUBLE CROSSOVER
TURNOUT INSTALLATION
BART Transit Integration Plan
BART Transit Integration Plan (BTIP)
• About connections to BART – but also chance to
take fresh look at service network
• Primarily focused on service and related capital
improvements (e.g., stops)
• Will address relationship of Great Mall/Main Transit
Center to Milpitas BART Station
• Fremont Express services to be addressed in advance
of others due to Warm Springs opening earlier
• Completion by mid-2015 (Warm Springs
recommendation earlier)
48
VTA Planning for BART
• BART Transit Integration Plan (BTIP) – service planning for all
BART connections and related service
• Fares and transfer policies – separate analyses
49
• Warm Springs/South Fremont
station opening 2015,
Milpitas & Berryessa 2017
• Berryessa Connector Study
(completed 2013)
recommended new trunk
services between Berryessa
and Downtown San Jose
Berryessa Connectors:
• 323 Stevens Creek every 10 min
• Downtown Limited Stop every 15 min
Service Included in Study
• Light rail service
• Santa Clara/Alum Rock
Rapid & Berryessa
Connector corridor (not
incl. 22)
• Milpitas/Berryessa
Local
• Milpitas/Berryessa
Express & Limited
Stop
• Fremont Express
50
Fremont Express Services: Initial
Findings
• Key question: Move to
new stations, eliminate,
or keep some?
• Consider ~500
boardings per day at
non-BART
stops in Fremont, higher
ridership on 181
51
BTIP Timeline
52
• Summer
• Fremont data collection
• First round of public participation
• Fall
• Alternatives development (Fremont first,
followed by rest of study area)
• Winter/Early Spring
• Alternatives Assessment – return for your input

More Related Content

What's hot

Size does matter - but when is big too big?
Size does matter - but when is big too big?Size does matter - but when is big too big?
Size does matter - but when is big too big?JumpingJaq
 
Kennedy Mobility Hub Presentation
Kennedy Mobility Hub PresentationKennedy Mobility Hub Presentation
Kennedy Mobility Hub PresentationCrosstown TO
 
MTC San Mateo County 101 corridor strategies 062515
MTC San Mateo County 101 corridor strategies 062515 MTC San Mateo County 101 corridor strategies 062515
MTC San Mateo County 101 corridor strategies 062515 Adina Levin
 
Metra Presentation - A Vision for the Fulton Market Area
Metra Presentation - A Vision for the Fulton Market AreaMetra Presentation - A Vision for the Fulton Market Area
Metra Presentation - A Vision for the Fulton Market AreaWest Central Association
 
The Future of VTA Light Rail, Presentation to SPUR San Jose Nov. 12, 2014
The Future of VTA Light Rail, Presentation to SPUR San Jose Nov. 12, 2014The Future of VTA Light Rail, Presentation to SPUR San Jose Nov. 12, 2014
The Future of VTA Light Rail, Presentation to SPUR San Jose Nov. 12, 2014SCVTA
 
Colorado APA Conference Future High Speed Rail Stations and Land Use Presenta...
Colorado APA Conference Future High Speed Rail Stations and Land Use Presenta...Colorado APA Conference Future High Speed Rail Stations and Land Use Presenta...
Colorado APA Conference Future High Speed Rail Stations and Land Use Presenta...OV Consulting
 
Update trans supporting_documents.pdf 3
Update trans supporting_documents.pdf 3Update trans supporting_documents.pdf 3
Update trans supporting_documents.pdf 3Kenneth Hogge Sr
 
Unseen heroes - SMART CITY MEASURES
Unseen heroes - SMART CITY MEASURESUnseen heroes - SMART CITY MEASURES
Unseen heroes - SMART CITY MEASURESASHWIN KUMAR
 
Mountain View Double-Track Project May 22 Presentation
Mountain View Double-Track Project May 22 PresentationMountain View Double-Track Project May 22 Presentation
Mountain View Double-Track Project May 22 PresentationSCVTA
 
CMAX July 2016 Open House - Poster Boards
CMAX July 2016 Open House - Poster BoardsCMAX July 2016 Open House - Poster Boards
CMAX July 2016 Open House - Poster BoardsDoug Arseneault
 
COTA NE AA Public Meeting Presentation
COTA NE AA Public Meeting PresentationCOTA NE AA Public Meeting Presentation
COTA NE AA Public Meeting PresentationCOTA BUS
 
East Open House - East At-Grade (Pharmacy - Ionview Stops) to Kennedy Station...
East Open House - East At-Grade (Pharmacy - Ionview Stops) to Kennedy Station...East Open House - East At-Grade (Pharmacy - Ionview Stops) to Kennedy Station...
East Open House - East At-Grade (Pharmacy - Ionview Stops) to Kennedy Station...Crosstown TO
 

What's hot (20)

Size does matter - but when is big too big?
Size does matter - but when is big too big?Size does matter - but when is big too big?
Size does matter - but when is big too big?
 
SmartTrack Public Meeting Presentation
SmartTrack Public Meeting PresentationSmartTrack Public Meeting Presentation
SmartTrack Public Meeting Presentation
 
Coordinated Transit Planning in Toronto
Coordinated Transit Planning in TorontoCoordinated Transit Planning in Toronto
Coordinated Transit Planning in Toronto
 
Kennedy Mobility Hub Presentation
Kennedy Mobility Hub PresentationKennedy Mobility Hub Presentation
Kennedy Mobility Hub Presentation
 
MTC San Mateo County 101 corridor strategies 062515
MTC San Mateo County 101 corridor strategies 062515 MTC San Mateo County 101 corridor strategies 062515
MTC San Mateo County 101 corridor strategies 062515
 
Metra Station - Fulton Market/Kinzie
Metra Station - Fulton Market/KinzieMetra Station - Fulton Market/Kinzie
Metra Station - Fulton Market/Kinzie
 
Metra Presentation - A Vision for the Fulton Market Area
Metra Presentation - A Vision for the Fulton Market AreaMetra Presentation - A Vision for the Fulton Market Area
Metra Presentation - A Vision for the Fulton Market Area
 
Task 3.b: EN TRIPS Priority Corridors - Preliminary Street Redesign Alternat...
Task 3.b:  EN TRIPS Priority Corridors - Preliminary Street Redesign Alternat...Task 3.b:  EN TRIPS Priority Corridors - Preliminary Street Redesign Alternat...
Task 3.b: EN TRIPS Priority Corridors - Preliminary Street Redesign Alternat...
 
AICPA GPAC presentation
AICPA GPAC presentationAICPA GPAC presentation
AICPA GPAC presentation
 
Project Mobility: Route 3 Express Toll Lanes Study
Project Mobility: Route 3 Express Toll Lanes StudyProject Mobility: Route 3 Express Toll Lanes Study
Project Mobility: Route 3 Express Toll Lanes Study
 
The Future of VTA Light Rail, Presentation to SPUR San Jose Nov. 12, 2014
The Future of VTA Light Rail, Presentation to SPUR San Jose Nov. 12, 2014The Future of VTA Light Rail, Presentation to SPUR San Jose Nov. 12, 2014
The Future of VTA Light Rail, Presentation to SPUR San Jose Nov. 12, 2014
 
Colorado APA Conference Future High Speed Rail Stations and Land Use Presenta...
Colorado APA Conference Future High Speed Rail Stations and Land Use Presenta...Colorado APA Conference Future High Speed Rail Stations and Land Use Presenta...
Colorado APA Conference Future High Speed Rail Stations and Land Use Presenta...
 
Level of Service F for Grade A Streets--Cesar Chavez Street
Level of Service F for Grade A Streets--Cesar Chavez Street  Level of Service F for Grade A Streets--Cesar Chavez Street
Level of Service F for Grade A Streets--Cesar Chavez Street
 
Update trans supporting_documents.pdf 3
Update trans supporting_documents.pdf 3Update trans supporting_documents.pdf 3
Update trans supporting_documents.pdf 3
 
port miami tunnel impact on downtown miami traffic
port miami tunnel impact on downtown miami trafficport miami tunnel impact on downtown miami traffic
port miami tunnel impact on downtown miami traffic
 
Unseen heroes - SMART CITY MEASURES
Unseen heroes - SMART CITY MEASURESUnseen heroes - SMART CITY MEASURES
Unseen heroes - SMART CITY MEASURES
 
Mountain View Double-Track Project May 22 Presentation
Mountain View Double-Track Project May 22 PresentationMountain View Double-Track Project May 22 Presentation
Mountain View Double-Track Project May 22 Presentation
 
CMAX July 2016 Open House - Poster Boards
CMAX July 2016 Open House - Poster BoardsCMAX July 2016 Open House - Poster Boards
CMAX July 2016 Open House - Poster Boards
 
COTA NE AA Public Meeting Presentation
COTA NE AA Public Meeting PresentationCOTA NE AA Public Meeting Presentation
COTA NE AA Public Meeting Presentation
 
East Open House - East At-Grade (Pharmacy - Ionview Stops) to Kennedy Station...
East Open House - East At-Grade (Pharmacy - Ionview Stops) to Kennedy Station...East Open House - East At-Grade (Pharmacy - Ionview Stops) to Kennedy Station...
East Open House - East At-Grade (Pharmacy - Ionview Stops) to Kennedy Station...
 

Viewers also liked

VTA's Development Review Annual Report 2015
VTA's Development Review Annual Report 2015VTA's Development Review Annual Report 2015
VTA's Development Review Annual Report 2015SCVTA
 
Annual report 2014
Annual report 2014Annual report 2014
Annual report 2014SCVTA
 
VTA North Central County Bus Improvement Plan
VTA North Central County Bus Improvement PlanVTA North Central County Bus Improvement Plan
VTA North Central County Bus Improvement PlanSCVTA
 
Current Condition of Santa Clara County's Transportation System
Current Condition of Santa Clara County's Transportation SystemCurrent Condition of Santa Clara County's Transportation System
Current Condition of Santa Clara County's Transportation SystemSCVTA
 
Hack My Ride 2.0 Kickoff Hackathon Presentation
Hack My Ride 2.0 Kickoff Hackathon PresentationHack My Ride 2.0 Kickoff Hackathon Presentation
Hack My Ride 2.0 Kickoff Hackathon PresentationSCVTA
 
VTA Envision Silicon Valley Program Presentation
VTA Envision Silicon Valley Program PresentationVTA Envision Silicon Valley Program Presentation
VTA Envision Silicon Valley Program PresentationSCVTA
 
Final 12 01 community mtg phase ii presentation
Final 12 01 community mtg  phase ii presentationFinal 12 01 community mtg  phase ii presentation
Final 12 01 community mtg phase ii presentationSCVTA
 
VTA's Next Network: Your Transit Choices
VTA's Next Network: Your Transit ChoicesVTA's Next Network: Your Transit Choices
VTA's Next Network: Your Transit ChoicesSCVTA
 

Viewers also liked (8)

VTA's Development Review Annual Report 2015
VTA's Development Review Annual Report 2015VTA's Development Review Annual Report 2015
VTA's Development Review Annual Report 2015
 
Annual report 2014
Annual report 2014Annual report 2014
Annual report 2014
 
VTA North Central County Bus Improvement Plan
VTA North Central County Bus Improvement PlanVTA North Central County Bus Improvement Plan
VTA North Central County Bus Improvement Plan
 
Current Condition of Santa Clara County's Transportation System
Current Condition of Santa Clara County's Transportation SystemCurrent Condition of Santa Clara County's Transportation System
Current Condition of Santa Clara County's Transportation System
 
Hack My Ride 2.0 Kickoff Hackathon Presentation
Hack My Ride 2.0 Kickoff Hackathon PresentationHack My Ride 2.0 Kickoff Hackathon Presentation
Hack My Ride 2.0 Kickoff Hackathon Presentation
 
VTA Envision Silicon Valley Program Presentation
VTA Envision Silicon Valley Program PresentationVTA Envision Silicon Valley Program Presentation
VTA Envision Silicon Valley Program Presentation
 
Final 12 01 community mtg phase ii presentation
Final 12 01 community mtg  phase ii presentationFinal 12 01 community mtg  phase ii presentation
Final 12 01 community mtg phase ii presentation
 
VTA's Next Network: Your Transit Choices
VTA's Next Network: Your Transit ChoicesVTA's Next Network: Your Transit Choices
VTA's Next Network: Your Transit Choices
 

Similar to VTA North East County Open Houses Presentation, July 21

MAPC sPARKing New Ideas Parking Symposium: Presentation by Scott Hamwey
MAPC sPARKing New Ideas Parking Symposium: Presentation by Scott HamweyMAPC sPARKing New Ideas Parking Symposium: Presentation by Scott Hamwey
MAPC sPARKing New Ideas Parking Symposium: Presentation by Scott HamweyMetropolitan Area Planning Council
 
Mt view tcmp community_meeting_2-02-17
Mt view tcmp community_meeting_2-02-17Mt view tcmp community_meeting_2-02-17
Mt view tcmp community_meeting_2-02-17Adina Levin
 
January Service Change Public Comment Meeting
January Service Change Public Comment MeetingJanuary Service Change Public Comment Meeting
January Service Change Public Comment MeetingCOTA BUS
 
Possibilities For Bus Lane System
Possibilities For Bus Lane SystemPossibilities For Bus Lane System
Possibilities For Bus Lane SystemNaveen Chandra
 
Presentation2
Presentation2Presentation2
Presentation2Aman Haz
 
First – Last Mile_MBPJ_2015
First – Last Mile_MBPJ_2015First – Last Mile_MBPJ_2015
First – Last Mile_MBPJ_2015Norma Nun
 
Integrated Public Transport System - Bangalore
Integrated Public Transport System - BangaloreIntegrated Public Transport System - Bangalore
Integrated Public Transport System - BangaloreTehsin Kazi
 
Moving-About-Paradise
Moving-About-ParadiseMoving-About-Paradise
Moving-About-ParadiseAlan Hoffman
 
RBRC Presentation oct 18_11_langley chamber final
RBRC Presentation  oct 18_11_langley chamber finalRBRC Presentation  oct 18_11_langley chamber final
RBRC Presentation oct 18_11_langley chamber finalRobertsBankRailCorridor
 
Possibilities for Bus Lane System
Possibilities for Bus Lane SystemPossibilities for Bus Lane System
Possibilities for Bus Lane Systemguestf2886b
 
Caltrans San Mateo county managed lanes
Caltrans San Mateo county managed lanesCaltrans San Mateo county managed lanes
Caltrans San Mateo county managed lanesAdina Levin
 
Bus Rapid Transit System (BRTS) - Case Studies in Indian Scenario
Bus Rapid Transit System (BRTS) - Case Studies in Indian Scenario Bus Rapid Transit System (BRTS) - Case Studies in Indian Scenario
Bus Rapid Transit System (BRTS) - Case Studies in Indian Scenario Apparao Gandi
 
THE GREEN TRANSPORT final
THE GREEN TRANSPORT finalTHE GREEN TRANSPORT final
THE GREEN TRANSPORT finalDeepanshu Garg
 
BUS Rapid Transist System
BUS Rapid Transist SystemBUS Rapid Transist System
BUS Rapid Transist Systemnitheshkumarj1
 

Similar to VTA North East County Open Houses Presentation, July 21 (20)

MAPC sPARKing New Ideas Parking Symposium: Presentation by Scott Hamwey
MAPC sPARKing New Ideas Parking Symposium: Presentation by Scott HamweyMAPC sPARKing New Ideas Parking Symposium: Presentation by Scott Hamwey
MAPC sPARKing New Ideas Parking Symposium: Presentation by Scott Hamwey
 
Mt view tcmp community_meeting_2-02-17
Mt view tcmp community_meeting_2-02-17Mt view tcmp community_meeting_2-02-17
Mt view tcmp community_meeting_2-02-17
 
January Service Change Public Comment Meeting
January Service Change Public Comment MeetingJanuary Service Change Public Comment Meeting
January Service Change Public Comment Meeting
 
2016-06-06 Scarborough Subway Extension SAG
2016-06-06 Scarborough Subway Extension SAG2016-06-06 Scarborough Subway Extension SAG
2016-06-06 Scarborough Subway Extension SAG
 
Possibilities For Bus Lane System
Possibilities For Bus Lane SystemPossibilities For Bus Lane System
Possibilities For Bus Lane System
 
Presentation2
Presentation2Presentation2
Presentation2
 
First – Last Mile_MBPJ_2015
First – Last Mile_MBPJ_2015First – Last Mile_MBPJ_2015
First – Last Mile_MBPJ_2015
 
Integrated Public Transport System - Bangalore
Integrated Public Transport System - BangaloreIntegrated Public Transport System - Bangalore
Integrated Public Transport System - Bangalore
 
Transportation Studies in the 21st Century: Incorporating all Modes
Transportation Studies in the 21st Century: Incorporating all ModesTransportation Studies in the 21st Century: Incorporating all Modes
Transportation Studies in the 21st Century: Incorporating all Modes
 
SEM 1 PRESENTATION
SEM 1 PRESENTATIONSEM 1 PRESENTATION
SEM 1 PRESENTATION
 
Moving-About-Paradise
Moving-About-ParadiseMoving-About-Paradise
Moving-About-Paradise
 
RBRC Presentation oct 18_11_langley chamber final
RBRC Presentation  oct 18_11_langley chamber finalRBRC Presentation  oct 18_11_langley chamber final
RBRC Presentation oct 18_11_langley chamber final
 
Possibilities for Bus Lane System
Possibilities for Bus Lane SystemPossibilities for Bus Lane System
Possibilities for Bus Lane System
 
Caltrans San Mateo county managed lanes
Caltrans San Mateo county managed lanesCaltrans San Mateo county managed lanes
Caltrans San Mateo county managed lanes
 
February Transit Update Presentation
February Transit Update PresentationFebruary Transit Update Presentation
February Transit Update Presentation
 
Rapid transit system
Rapid transit systemRapid transit system
Rapid transit system
 
5 route network rs final
5 route network rs final5 route network rs final
5 route network rs final
 
Bus Rapid Transit System (BRTS) - Case Studies in Indian Scenario
Bus Rapid Transit System (BRTS) - Case Studies in Indian Scenario Bus Rapid Transit System (BRTS) - Case Studies in Indian Scenario
Bus Rapid Transit System (BRTS) - Case Studies in Indian Scenario
 
THE GREEN TRANSPORT final
THE GREEN TRANSPORT finalTHE GREEN TRANSPORT final
THE GREEN TRANSPORT final
 
BUS Rapid Transist System
BUS Rapid Transist SystemBUS Rapid Transist System
BUS Rapid Transist System
 

More from SCVTA

VTA Strategic Plan 2016
VTA Strategic Plan 2016VTA Strategic Plan 2016
VTA Strategic Plan 2016SCVTA
 
2016 Measure B Update to Committees Feb 2018
2016 Measure B Update to Committees Feb 20182016 Measure B Update to Committees Feb 2018
2016 Measure B Update to Committees Feb 2018SCVTA
 
VTA 2016 Measure B Program Areas
VTA 2016 Measure B Program AreasVTA 2016 Measure B Program Areas
VTA 2016 Measure B Program AreasSCVTA
 
2016 Measure B Presentation, Dec 2016
2016 Measure B Presentation, Dec 20162016 Measure B Presentation, Dec 2016
2016 Measure B Presentation, Dec 2016SCVTA
 
VTA Draft Strategic Plan Outline
VTA Draft Strategic Plan OutlineVTA Draft Strategic Plan Outline
VTA Draft Strategic Plan OutlineSCVTA
 
VTA Development Review Annual Report
VTA Development Review Annual ReportVTA Development Review Annual Report
VTA Development Review Annual ReportSCVTA
 
VTA's Envision Silicon Valley May 2016 community meetings presentation
VTA's Envision Silicon Valley May 2016 community meetings presentationVTA's Envision Silicon Valley May 2016 community meetings presentation
VTA's Envision Silicon Valley May 2016 community meetings presentationSCVTA
 
VTA Transit Passenger Improvement Plan
VTA Transit Passenger Improvement PlanVTA Transit Passenger Improvement Plan
VTA Transit Passenger Improvement PlanSCVTA
 
Envision Outreach Report February 2016
Envision Outreach Report February 2016Envision Outreach Report February 2016
Envision Outreach Report February 2016SCVTA
 
VTA's Preliminary Envision Silicon Valley Project Evaluation
VTA's Preliminary Envision Silicon Valley Project EvaluationVTA's Preliminary Envision Silicon Valley Project Evaluation
VTA's Preliminary Envision Silicon Valley Project EvaluationSCVTA
 
Funding Transportation Improvements in Santa Clara County
Funding Transportation Improvements in Santa Clara CountyFunding Transportation Improvements in Santa Clara County
Funding Transportation Improvements in Santa Clara CountySCVTA
 
Santa Clara County Past Sales Tax Measures
Santa Clara County Past Sales Tax MeasuresSanta Clara County Past Sales Tax Measures
Santa Clara County Past Sales Tax MeasuresSCVTA
 
VTA Hack My Ride Lightning Talks
VTA Hack My Ride Lightning TalksVTA Hack My Ride Lightning Talks
VTA Hack My Ride Lightning TalksSCVTA
 
VTA and the new Bay Area Commuter Benefits Program
VTA and the new Bay Area Commuter Benefits ProgramVTA and the new Bay Area Commuter Benefits Program
VTA and the new Bay Area Commuter Benefits ProgramSCVTA
 
Proposed Sales Tax Ballot Measure
Proposed Sales Tax Ballot MeasureProposed Sales Tax Ballot Measure
Proposed Sales Tax Ballot MeasureSCVTA
 
VTA On-Board Passenger Survey Presentation
VTA On-Board Passenger Survey PresentationVTA On-Board Passenger Survey Presentation
VTA On-Board Passenger Survey PresentationSCVTA
 
VTA 2013 Sustainability Report
VTA 2013 Sustainability ReportVTA 2013 Sustainability Report
VTA 2013 Sustainability ReportSCVTA
 
VTA Light Rail Efficiency Project Mountain View newsletter Spring 2014
VTA Light Rail Efficiency Project Mountain View newsletter Spring 2014VTA Light Rail Efficiency Project Mountain View newsletter Spring 2014
VTA Light Rail Efficiency Project Mountain View newsletter Spring 2014SCVTA
 

More from SCVTA (18)

VTA Strategic Plan 2016
VTA Strategic Plan 2016VTA Strategic Plan 2016
VTA Strategic Plan 2016
 
2016 Measure B Update to Committees Feb 2018
2016 Measure B Update to Committees Feb 20182016 Measure B Update to Committees Feb 2018
2016 Measure B Update to Committees Feb 2018
 
VTA 2016 Measure B Program Areas
VTA 2016 Measure B Program AreasVTA 2016 Measure B Program Areas
VTA 2016 Measure B Program Areas
 
2016 Measure B Presentation, Dec 2016
2016 Measure B Presentation, Dec 20162016 Measure B Presentation, Dec 2016
2016 Measure B Presentation, Dec 2016
 
VTA Draft Strategic Plan Outline
VTA Draft Strategic Plan OutlineVTA Draft Strategic Plan Outline
VTA Draft Strategic Plan Outline
 
VTA Development Review Annual Report
VTA Development Review Annual ReportVTA Development Review Annual Report
VTA Development Review Annual Report
 
VTA's Envision Silicon Valley May 2016 community meetings presentation
VTA's Envision Silicon Valley May 2016 community meetings presentationVTA's Envision Silicon Valley May 2016 community meetings presentation
VTA's Envision Silicon Valley May 2016 community meetings presentation
 
VTA Transit Passenger Improvement Plan
VTA Transit Passenger Improvement PlanVTA Transit Passenger Improvement Plan
VTA Transit Passenger Improvement Plan
 
Envision Outreach Report February 2016
Envision Outreach Report February 2016Envision Outreach Report February 2016
Envision Outreach Report February 2016
 
VTA's Preliminary Envision Silicon Valley Project Evaluation
VTA's Preliminary Envision Silicon Valley Project EvaluationVTA's Preliminary Envision Silicon Valley Project Evaluation
VTA's Preliminary Envision Silicon Valley Project Evaluation
 
Funding Transportation Improvements in Santa Clara County
Funding Transportation Improvements in Santa Clara CountyFunding Transportation Improvements in Santa Clara County
Funding Transportation Improvements in Santa Clara County
 
Santa Clara County Past Sales Tax Measures
Santa Clara County Past Sales Tax MeasuresSanta Clara County Past Sales Tax Measures
Santa Clara County Past Sales Tax Measures
 
VTA Hack My Ride Lightning Talks
VTA Hack My Ride Lightning TalksVTA Hack My Ride Lightning Talks
VTA Hack My Ride Lightning Talks
 
VTA and the new Bay Area Commuter Benefits Program
VTA and the new Bay Area Commuter Benefits ProgramVTA and the new Bay Area Commuter Benefits Program
VTA and the new Bay Area Commuter Benefits Program
 
Proposed Sales Tax Ballot Measure
Proposed Sales Tax Ballot MeasureProposed Sales Tax Ballot Measure
Proposed Sales Tax Ballot Measure
 
VTA On-Board Passenger Survey Presentation
VTA On-Board Passenger Survey PresentationVTA On-Board Passenger Survey Presentation
VTA On-Board Passenger Survey Presentation
 
VTA 2013 Sustainability Report
VTA 2013 Sustainability ReportVTA 2013 Sustainability Report
VTA 2013 Sustainability Report
 
VTA Light Rail Efficiency Project Mountain View newsletter Spring 2014
VTA Light Rail Efficiency Project Mountain View newsletter Spring 2014VTA Light Rail Efficiency Project Mountain View newsletter Spring 2014
VTA Light Rail Efficiency Project Mountain View newsletter Spring 2014
 

Recently uploaded

SBFT Tool Competition 2024 -- Python Test Case Generation Track
SBFT Tool Competition 2024 -- Python Test Case Generation TrackSBFT Tool Competition 2024 -- Python Test Case Generation Track
SBFT Tool Competition 2024 -- Python Test Case Generation TrackSebastiano Panichella
 
Open Source Camp Kubernetes 2024 | Monitoring Kubernetes With Icinga by Eric ...
Open Source Camp Kubernetes 2024 | Monitoring Kubernetes With Icinga by Eric ...Open Source Camp Kubernetes 2024 | Monitoring Kubernetes With Icinga by Eric ...
Open Source Camp Kubernetes 2024 | Monitoring Kubernetes With Icinga by Eric ...NETWAYS
 
OSCamp Kubernetes 2024 | Zero-Touch OS-Infrastruktur für Container und Kubern...
OSCamp Kubernetes 2024 | Zero-Touch OS-Infrastruktur für Container und Kubern...OSCamp Kubernetes 2024 | Zero-Touch OS-Infrastruktur für Container und Kubern...
OSCamp Kubernetes 2024 | Zero-Touch OS-Infrastruktur für Container und Kubern...NETWAYS
 
The Ten Facts About People With Autism Presentation
The Ten Facts About People With Autism PresentationThe Ten Facts About People With Autism Presentation
The Ten Facts About People With Autism PresentationNathan Young
 
James Joyce, Dubliners and Ulysses.ppt !
James Joyce, Dubliners and Ulysses.ppt !James Joyce, Dubliners and Ulysses.ppt !
James Joyce, Dubliners and Ulysses.ppt !risocarla2016
 
Simulation-based Testing of Unmanned Aerial Vehicles with Aerialist
Simulation-based Testing of Unmanned Aerial Vehicles with AerialistSimulation-based Testing of Unmanned Aerial Vehicles with Aerialist
Simulation-based Testing of Unmanned Aerial Vehicles with AerialistSebastiano Panichella
 
OSCamp Kubernetes 2024 | A Tester's Guide to CI_CD as an Automated Quality Co...
OSCamp Kubernetes 2024 | A Tester's Guide to CI_CD as an Automated Quality Co...OSCamp Kubernetes 2024 | A Tester's Guide to CI_CD as an Automated Quality Co...
OSCamp Kubernetes 2024 | A Tester's Guide to CI_CD as an Automated Quality Co...NETWAYS
 
Event 4 Introduction to Open Source.pptx
Event 4 Introduction to Open Source.pptxEvent 4 Introduction to Open Source.pptx
Event 4 Introduction to Open Source.pptxaryanv1753
 
PHYSICS PROJECT BY MSC - NANOTECHNOLOGY
PHYSICS PROJECT BY MSC  - NANOTECHNOLOGYPHYSICS PROJECT BY MSC  - NANOTECHNOLOGY
PHYSICS PROJECT BY MSC - NANOTECHNOLOGYpruthirajnayak525
 
Work Remotely with Confluence ACE 2.pptx
Work Remotely with Confluence ACE 2.pptxWork Remotely with Confluence ACE 2.pptx
Work Remotely with Confluence ACE 2.pptxmavinoikein
 
Anne Frank A Beacon of Hope amidst darkness ppt.pptx
Anne Frank A Beacon of Hope amidst darkness ppt.pptxAnne Frank A Beacon of Hope amidst darkness ppt.pptx
Anne Frank A Beacon of Hope amidst darkness ppt.pptxnoorehahmad
 
Mathan flower ppt.pptx slide orchids ✨🌸
Mathan flower ppt.pptx slide orchids ✨🌸Mathan flower ppt.pptx slide orchids ✨🌸
Mathan flower ppt.pptx slide orchids ✨🌸mathanramanathan2005
 
call girls in delhi malviya nagar @9811711561@
call girls in delhi malviya nagar @9811711561@call girls in delhi malviya nagar @9811711561@
call girls in delhi malviya nagar @9811711561@vikas rana
 
Presentation for the Strategic Dialogue on the Future of Agriculture, Brussel...
Presentation for the Strategic Dialogue on the Future of Agriculture, Brussel...Presentation for the Strategic Dialogue on the Future of Agriculture, Brussel...
Presentation for the Strategic Dialogue on the Future of Agriculture, Brussel...Krijn Poppe
 
Gaps, Issues and Challenges in the Implementation of Mother Tongue Based-Mult...
Gaps, Issues and Challenges in the Implementation of Mother Tongue Based-Mult...Gaps, Issues and Challenges in the Implementation of Mother Tongue Based-Mult...
Gaps, Issues and Challenges in the Implementation of Mother Tongue Based-Mult...marjmae69
 
Open Source Camp Kubernetes 2024 | Running WebAssembly on Kubernetes by Alex ...
Open Source Camp Kubernetes 2024 | Running WebAssembly on Kubernetes by Alex ...Open Source Camp Kubernetes 2024 | Running WebAssembly on Kubernetes by Alex ...
Open Source Camp Kubernetes 2024 | Running WebAssembly on Kubernetes by Alex ...NETWAYS
 
Open Source Strategy in Logistics 2015_Henrik Hankedvz-d-nl-log-conference.pdf
Open Source Strategy in Logistics 2015_Henrik Hankedvz-d-nl-log-conference.pdfOpen Source Strategy in Logistics 2015_Henrik Hankedvz-d-nl-log-conference.pdf
Open Source Strategy in Logistics 2015_Henrik Hankedvz-d-nl-log-conference.pdfhenrik385807
 
Genesis part 2 Isaiah Scudder 04-24-2024.pptx
Genesis part 2 Isaiah Scudder 04-24-2024.pptxGenesis part 2 Isaiah Scudder 04-24-2024.pptx
Genesis part 2 Isaiah Scudder 04-24-2024.pptxFamilyWorshipCenterD
 
OSCamp Kubernetes 2024 | SRE Challenges in Monolith to Microservices Shift at...
OSCamp Kubernetes 2024 | SRE Challenges in Monolith to Microservices Shift at...OSCamp Kubernetes 2024 | SRE Challenges in Monolith to Microservices Shift at...
OSCamp Kubernetes 2024 | SRE Challenges in Monolith to Microservices Shift at...NETWAYS
 
The 3rd Intl. Workshop on NL-based Software Engineering
The 3rd Intl. Workshop on NL-based Software EngineeringThe 3rd Intl. Workshop on NL-based Software Engineering
The 3rd Intl. Workshop on NL-based Software EngineeringSebastiano Panichella
 

Recently uploaded (20)

SBFT Tool Competition 2024 -- Python Test Case Generation Track
SBFT Tool Competition 2024 -- Python Test Case Generation TrackSBFT Tool Competition 2024 -- Python Test Case Generation Track
SBFT Tool Competition 2024 -- Python Test Case Generation Track
 
Open Source Camp Kubernetes 2024 | Monitoring Kubernetes With Icinga by Eric ...
Open Source Camp Kubernetes 2024 | Monitoring Kubernetes With Icinga by Eric ...Open Source Camp Kubernetes 2024 | Monitoring Kubernetes With Icinga by Eric ...
Open Source Camp Kubernetes 2024 | Monitoring Kubernetes With Icinga by Eric ...
 
OSCamp Kubernetes 2024 | Zero-Touch OS-Infrastruktur für Container und Kubern...
OSCamp Kubernetes 2024 | Zero-Touch OS-Infrastruktur für Container und Kubern...OSCamp Kubernetes 2024 | Zero-Touch OS-Infrastruktur für Container und Kubern...
OSCamp Kubernetes 2024 | Zero-Touch OS-Infrastruktur für Container und Kubern...
 
The Ten Facts About People With Autism Presentation
The Ten Facts About People With Autism PresentationThe Ten Facts About People With Autism Presentation
The Ten Facts About People With Autism Presentation
 
James Joyce, Dubliners and Ulysses.ppt !
James Joyce, Dubliners and Ulysses.ppt !James Joyce, Dubliners and Ulysses.ppt !
James Joyce, Dubliners and Ulysses.ppt !
 
Simulation-based Testing of Unmanned Aerial Vehicles with Aerialist
Simulation-based Testing of Unmanned Aerial Vehicles with AerialistSimulation-based Testing of Unmanned Aerial Vehicles with Aerialist
Simulation-based Testing of Unmanned Aerial Vehicles with Aerialist
 
OSCamp Kubernetes 2024 | A Tester's Guide to CI_CD as an Automated Quality Co...
OSCamp Kubernetes 2024 | A Tester's Guide to CI_CD as an Automated Quality Co...OSCamp Kubernetes 2024 | A Tester's Guide to CI_CD as an Automated Quality Co...
OSCamp Kubernetes 2024 | A Tester's Guide to CI_CD as an Automated Quality Co...
 
Event 4 Introduction to Open Source.pptx
Event 4 Introduction to Open Source.pptxEvent 4 Introduction to Open Source.pptx
Event 4 Introduction to Open Source.pptx
 
PHYSICS PROJECT BY MSC - NANOTECHNOLOGY
PHYSICS PROJECT BY MSC  - NANOTECHNOLOGYPHYSICS PROJECT BY MSC  - NANOTECHNOLOGY
PHYSICS PROJECT BY MSC - NANOTECHNOLOGY
 
Work Remotely with Confluence ACE 2.pptx
Work Remotely with Confluence ACE 2.pptxWork Remotely with Confluence ACE 2.pptx
Work Remotely with Confluence ACE 2.pptx
 
Anne Frank A Beacon of Hope amidst darkness ppt.pptx
Anne Frank A Beacon of Hope amidst darkness ppt.pptxAnne Frank A Beacon of Hope amidst darkness ppt.pptx
Anne Frank A Beacon of Hope amidst darkness ppt.pptx
 
Mathan flower ppt.pptx slide orchids ✨🌸
Mathan flower ppt.pptx slide orchids ✨🌸Mathan flower ppt.pptx slide orchids ✨🌸
Mathan flower ppt.pptx slide orchids ✨🌸
 
call girls in delhi malviya nagar @9811711561@
call girls in delhi malviya nagar @9811711561@call girls in delhi malviya nagar @9811711561@
call girls in delhi malviya nagar @9811711561@
 
Presentation for the Strategic Dialogue on the Future of Agriculture, Brussel...
Presentation for the Strategic Dialogue on the Future of Agriculture, Brussel...Presentation for the Strategic Dialogue on the Future of Agriculture, Brussel...
Presentation for the Strategic Dialogue on the Future of Agriculture, Brussel...
 
Gaps, Issues and Challenges in the Implementation of Mother Tongue Based-Mult...
Gaps, Issues and Challenges in the Implementation of Mother Tongue Based-Mult...Gaps, Issues and Challenges in the Implementation of Mother Tongue Based-Mult...
Gaps, Issues and Challenges in the Implementation of Mother Tongue Based-Mult...
 
Open Source Camp Kubernetes 2024 | Running WebAssembly on Kubernetes by Alex ...
Open Source Camp Kubernetes 2024 | Running WebAssembly on Kubernetes by Alex ...Open Source Camp Kubernetes 2024 | Running WebAssembly on Kubernetes by Alex ...
Open Source Camp Kubernetes 2024 | Running WebAssembly on Kubernetes by Alex ...
 
Open Source Strategy in Logistics 2015_Henrik Hankedvz-d-nl-log-conference.pdf
Open Source Strategy in Logistics 2015_Henrik Hankedvz-d-nl-log-conference.pdfOpen Source Strategy in Logistics 2015_Henrik Hankedvz-d-nl-log-conference.pdf
Open Source Strategy in Logistics 2015_Henrik Hankedvz-d-nl-log-conference.pdf
 
Genesis part 2 Isaiah Scudder 04-24-2024.pptx
Genesis part 2 Isaiah Scudder 04-24-2024.pptxGenesis part 2 Isaiah Scudder 04-24-2024.pptx
Genesis part 2 Isaiah Scudder 04-24-2024.pptx
 
OSCamp Kubernetes 2024 | SRE Challenges in Monolith to Microservices Shift at...
OSCamp Kubernetes 2024 | SRE Challenges in Monolith to Microservices Shift at...OSCamp Kubernetes 2024 | SRE Challenges in Monolith to Microservices Shift at...
OSCamp Kubernetes 2024 | SRE Challenges in Monolith to Microservices Shift at...
 
The 3rd Intl. Workshop on NL-based Software Engineering
The 3rd Intl. Workshop on NL-based Software EngineeringThe 3rd Intl. Workshop on NL-based Software Engineering
The 3rd Intl. Workshop on NL-based Software Engineering
 

VTA North East County Open Houses Presentation, July 21

  • 1. Santa Clara Valley Transportation Authority North East County Open House Santa Clara City Hall Council Chambers July 21, 2014
  • 2. El Camino Bus Rapid Transit Project
  • 3. El Camino Real Bus Rapid Transit Project Would upgrade the current 522 Rapid Bus to BRT status by making changes to El Camino Real and The Alameda that make transit FAST, FREQUENT AND RELIABLE and make WALKING and BICYCLING along the corridor SAFER.
  • 4. El Camino Real Bus Rapid Transit Project Making Stops Faster BRT stations would function like light rail stations, allowing passengers to purchase fares or tap Clipper Cards at stations and board through all three doors. Increasing Transit Travel Speeds In some parts of the corridor, a general use lane could be converted into a bus-only lane, allowing the BRT to bypass traffic. Transit signal priority would allow an approaching BRT bus to hold a green light.
  • 5. El Camino Real Bus Rapid Transit Project Making Bicycling and Walking Safer El Camino Real is designed for cars and can be a scary and dangerous place to bicycle or walk. Many bicycle and pedestrian collisions occur each year and some are fatal. In parts of the corridor with bus-only lanes, bicycle lanes could be installed (if the city approves). Crossing distances would be shortened and new intersections, signals and crosswalks can be added to make El Camino Real less of a barrier between neighborhoods. Median BRT stations would act as pedestrian refuges.
  • 6. Mixed Flow Configuration Two Possible Ways to Implement BRT
  • 7. Dedicated Lane Configuration Two Possible Ways to Implement BRT
  • 8. How Bus-Only Lanes Work – Dedicated Lanes In some parts of the corridor, the bus-only lane would be in the center of the street, adjacent to the median. BRT stations would be in the middle of the street. The eastbound and westbound stations would be on opposite sides of the intersection. Bus-Only Lanes WB BRT Station El Camino Real Bus Rapid Transit Project
  • 9. How Bulbout Stations Work - Mixed Flow In parts of the corridor with bulbout stations, the curb would be extended out to the travel lane. The BRT would stop in the travel lane while passengers board—approximately a 20-second duration. BRT stops in lane Bulbout BRT Station El Camino Real Bus Rapid Transit Project
  • 10. Project Alternatives and Environmental Analysis Seven project alternatives—ranging from doing nothing to building 14 miles of bus-only lanes—are currently being studied by VTA. A Draft Environmental Impact Report (DEIR), which analyzes the impact that the project will have across 17 categories will be released in late Summer, 2014. VTA’s Board of Directors will choose a locally preferred alternative after the public comment period for the DEIR. El Camino Real Bus Rapid Transit Project
  • 11. Public Outreach and City Coordination 2010 to present Monthly meetings with city staff Summer, 2011 City Council, committee presentations Fall, 2011 Open House community meetings Spring , 2012 City Council, committee presentations Fall, 2012 VTA Board of Directors workshop, mtg. February, 2013 Environmental Scoping meetings El Camino Real Bus Rapid Transit Project
  • 13. What are Express Lanes? • Express Lanes are converted carpool lanes that offer solo drivers the opportunity to use carpool lanes for a fee. 13
  • 14. Why are Express Lanes being developed? • To provide congestion relief through more effective use of HOV lane capacity • To provide commuters with a new mobility option • To better manage lanes to keep traffic moving and provide more reliable travel times 14
  • 15. Who can use Express Lanes? • SOLO DRIVERS: Can use Express Lanes for a fee when there is available capacity. • CARPOOL USERS: Eligible vehicles with two or more people per car, exempt clean air vehicles, transit buses, and motorcycles travel in Express Lanes FREE of charge. 15
  • 16. Why drivers use Express Lanes • Drivers choose to use Express Lanes for a variety of reasons at different times, but the most reported reasons are: • Time Savings • Ease of Commute • Convenience 16
  • 17. FasTrak ® 17 NO TOLL BOOTHS FEES AUTOMATICALLY DEDUCTED FROM ACCOUNT FASTRAK TRANSPONDER ATTACHES TO WINDSHIELD
  • 18. How Much Do Solo Drivers Pay? • Range of cost on SR 237 has been between $0.30 and $4.75, with an average toll less than $2.00 • Pricing changes as the number of cars increases or decreases to ensure a free flow of traffic • When more cars are on the roadway, the price to enter the Express Lanes is higher. When there are fewer cars on the road, the price is lower 18
  • 19. Digital Signage and Pricing 19
  • 20. How Do I Pay? • Step 1: Visit bayareafastrak.org to learn about FasTrak® • Step 2: Purchase a toll tag through FasTrak® or at retail locations • Step 3: Register your new toll tag immediately to a new or existing FasTrak® account online or by phone at (877) 229-8655. • Step 4: After you have completed the registration process, mount toll tag in your vehicle and begin enjoying the benefits of FasTrak®. 20
  • 21. How Are Toll Revenues Used? • Expenses for operations, maintenance, and enforcement of Express Lanes are the first use of toll revenues. • Any remaining revenues are to be used within the corridor for transportation improvements including transit 21
  • 22. Where /When Can I Use Express Lanes? Express Lanes are proposed on the following routes: • SR 237 Express Lanes • Phase 1 (in operation March 2012) • Phase 2 (2016 pending funding) • SR 85 Express Lanes - 2017 pending funding • US 101 Express Lanes - 2017 pending funding • Express Lanes will operate at the same times as existing HOV lanes. 22
  • 23. 23
  • 24. SR 237 Express Lanes Data • Up to 10,000 solo drivers use the SR 237 Express Lanes each week • Solo drivers have saved up to 20 minutes • Drivers in the general purpose lanes are saving up to seven (7) minutes 24
  • 25. SR 237 Express Lanes – Phase 2 • Project Description • Single-lane Express Lane (convert HOV lane from existing Phase 1 terminus to approximately Mathilda Ave.) • Project length: 4 miles • Environmental Clearance • Fall 2014 • Project Opening • Targeting 2016, funding dependent 25
  • 26. 26
  • 27. SR 85 Express Lanes • Project Description • Single-lane Express Lane (convert HOV lane from US 101 interchange in San Jose to US 101 interchange in Mountain View) • Double-lane Express Lanes (add another lane in each direction between the SR 87 and I-280 interchanges) • Project length: 27 miles • Environmental Clearance • Circulation December 2013 • Approval Early 2015 • Project Opening • Targeting 2017, funding dependent 27
  • 28. 28
  • 29. US 101 Express Lanes • Project Description • Single-lane Express Lane (convert HOV lane from Cochrane Rd. in Morgan Hill to SR 85 interchange in Mountain View) • Double-lane Express Lanes (add a new lane between Dunne Ave. and SR 85 interchange in San Jose, between Blossom Hill Road and Mathilda Dr. in Sunnyvale; and convert double-lane HOV lanes from SR85 interchange in Mtn View to the county line in Palo Alto) • Project length: 36 miles • Environmental Clearance • Early 2015 • Project Opening • Targeting 2017, funding dependent 29
  • 30. 30
  • 31. North Central County Bus Improvement Plan
  • 32. NORTH CENTRAL COUNTY BUS IMPROVEMENT PLAN PURPOSE The planned Bus Rapid Transit (BRT) services on El Camino Real and Stevens Creek may change travel demand on local bus routes that cross these corridors. Additionally, the cities in this area (Mountain View, Sunnyvale, Santa Clara and Cupertino) are intensifying land uses in areas that are not easily accessible by BRT so it may be necessary to make changes to local bus service to meet a changing rider demand. The Plan will make recommendations that will flow into VTA’s scheduled service adjustment process. GOALS Improve connectivity of local routes with the BRT routes Explore whether new service types or new routes are needed Improve overall transit service in the study area while being cost effective Collect input from the communities in the study area
  • 33. NORTH CENTRAL COUNTY BUS IMPROVEMENT PLAN STUDY AREA
  • 34. NORTH CENTRAL COUNTY BUS IMPROVEMENT PLAN SCHEDULE 2014 April Existing Conditions Analysis May Development of Draft Recommendations June Review Draft Recommendations with City Staff July Community and City Council Meetings August Final Recommendations released 2015 VTA’s Biennial Service Changes 2018 Service Changes relating to opening of BRT routes
  • 35. Rider Surveys New Bus Stop Designs Easy To Work With TRANSIT PASSENGER ENVIRONMENT PLAN Prioritizing Improvements Stop Percentiles RidershipPercentages Most of VTA’s bus riders come from a small percentage of stops. 21% of bus riders come from the top 1% of bus stops. 50% of bus riders come from 5% of bus stops. That tells us we need to prioritize improvements to high-ridership stops to ensure the maximum rider benefit per dollar spent.
  • 36. Prioritizing Improvements New Bus Stop Designs Easy To Work With TRANSIT PASSENGER ENVIRONMENT PLAN Rider Surveys In the past, decisions about how to improve bus stops were made with good intentions, but not with data regarding which bus stop amenities riders value most. VTA surveyed riders in the summer of 2013 and found that transit information is the most desired amenity, followed by shelter and seating. This information will inform which types of improvements are installed.
  • 37. Prioritizing Improvements Easy To Work With TRANSIT PASSENGER ENVIRONMENT PLAN Rider Surveys New Bus Stop Designs Many of VTA’s boxy, blue shelters are approaching the end of their 20-year lifetime. They will need to be replaced in the coming decade so we’re looking at new, more functional, more aesthetically pleasing shelter designs.
  • 38. Prioritizing Improvements TRANSIT PASSENGER ENVIRONMENT PLAN Rider Surveys New Bus Stop Designs Easy To Work With In the past, VTA’s thinking about bus stop design has been somewhat rigid and it hasn’t been easy for cities, developers and the public to know how to work with VTA. The Transit Passenger Environment Plan explains all of VTA’s policies about bus stops and makes it easy to work with us.
  • 39. Light Rail Efficiency Project Tasman Drive Pocket Track
  • 40. Project Description • Constructs approximately 1,000 foot long storage track on Tasman Drive between Old Ironsides Drive and Patrick Henry Drive. • Capable of storing three 3-car trains. • Enables flexibility for VTA service to support Levi’s Stadium events in 2014 and BART connection in 2017. • Construction Budget: Approximately $14M. • Construction Start: February 2014. • Construction End: December 2014.
  • 41.
  • 42. Santa Clara Stadium Site 42Source: 49ers Stadium EIR, 2009/ AECOM, 2012
  • 43.
  • 44. Light Rail Efficiency Project Tasman Drive Pocket Track CONSTRUCTION PHOTOS
  • 48. BART Transit Integration Plan (BTIP) • About connections to BART – but also chance to take fresh look at service network • Primarily focused on service and related capital improvements (e.g., stops) • Will address relationship of Great Mall/Main Transit Center to Milpitas BART Station • Fremont Express services to be addressed in advance of others due to Warm Springs opening earlier • Completion by mid-2015 (Warm Springs recommendation earlier) 48
  • 49. VTA Planning for BART • BART Transit Integration Plan (BTIP) – service planning for all BART connections and related service • Fares and transfer policies – separate analyses 49 • Warm Springs/South Fremont station opening 2015, Milpitas & Berryessa 2017 • Berryessa Connector Study (completed 2013) recommended new trunk services between Berryessa and Downtown San Jose Berryessa Connectors: • 323 Stevens Creek every 10 min • Downtown Limited Stop every 15 min
  • 50. Service Included in Study • Light rail service • Santa Clara/Alum Rock Rapid & Berryessa Connector corridor (not incl. 22) • Milpitas/Berryessa Local • Milpitas/Berryessa Express & Limited Stop • Fremont Express 50
  • 51. Fremont Express Services: Initial Findings • Key question: Move to new stations, eliminate, or keep some? • Consider ~500 boardings per day at non-BART stops in Fremont, higher ridership on 181 51
  • 52. BTIP Timeline 52 • Summer • Fremont data collection • First round of public participation • Fall • Alternatives development (Fremont first, followed by rest of study area) • Winter/Early Spring • Alternatives Assessment – return for your input